Saudi Mega Projects 2015 Conference & Exhibition
“Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities“
09 December 2015
Contents
Jubail 2
Jalmudah District
Mutrafiah District
City Center
Ras Al-Khair Industrial City (RIC)
World's Largest Project: Jubail 2
Industrial Port
Commercial Port
Airport Area
Jubail 2 85 Km2
Jubail 1 65 Km2
Residential Area
Jubail 2 – Industrial Area 52 contracts with more than 27 million man-hours.
31 industries with current investment of SR 153 billion
and production capacity of 41 MTPA.
By 2030, three additional districts will be
developed to provide over 27,000 residential units as part of the expansion program.
Jubail 2 – Residential Area
Mutrafiah Mardumah
Al-Reggah
Jubail 2 – Industrial Port (KFIP) Existing Petrochemical Quays PQ1 and PQ2 with 1.1 Km2
of tank farm area and 15 Petrochemical Berths.
PQ2: 7 Berths (2002 – 2008)
Materials Handling Pipelines
Industrial Port
Commercial Port
Airport Area
Jubail 1
Residential Area
Jubail 2
Completed Planned
LEGEND
Length of pipelines 2,230 km Width of pipeline corridors 15 to 52 km Number of current pipeline 300
Seawater Cooling
Jubail 2
Piping: 109 km in length. Capacity of 4.8 Million Cubic Meter / Day
Completed Proposed
Rail Network
To Ras Al-Khair
Industrial Port
Commercial Port
Airport Area
Residential Area
Jubail 2
Jubail 1
To Dammam
Under Construction Rail by SAR
Proposed Rail
8 Km2 total area of the Logistic Area
Jalmudah Housing & Amenities
Completed
Future
Under Development
Housing Education Health Social/Civic RC Private
1,685 1,835
2,158 2,642
- 2,742
11,062
5 Schools/KG
20 Schools/KG
5 Schools/KG
1 Clinic
-
2 Clinic
1 Hospital
4 Mosques
2 Sport Center
1 Police Station
17 Mosques
12 Mosques
1 Fire Station
1 Sport Center
Mutrafiah Housing & Amenities
Completed
Future
Under Development
Housing Education Health Social/Civic RC Private
- -
- 6,050
216 3,162
9,428
-
6 Schools/KG
27 Schools/KG
-
-
3 Clinic
1 Hospital
17 Mosques
5 Sport Center
1 Fire Station
12 Mosques
-
Jubail’s New City Centre
Centre of Attention Land Use 2030
Office (GFA) 380,000m2
Residential (GFA) 7,500 (apartments)
1,170,000m2
Retail & Services (GFA) 390,000m2
Hospitality (GFA) 900 (Rooms)
70,000m2
Population Working Population: 19,000
Residential Population: 25,000
Mardumah Bay
Aquarium
Priority Area
Petropolis
TS-4
Total area of New City Center 2.75 Km2
Integrated Industrial Cities
RIC & Jubail together will constitute one of the most
significant integrated industrial regions in the world
98 Km2
150 Km2
LAND USE: Long Term & Comprehensive
Planning
Total Area = 98 Km2
Future RIC
Expansion
Ras Al-Khair Industrial City Phase 1
Al
Al
Cu, Zn
Ph
Ph
Ph
Ph
Minerals & Metals
AN IM
E Logistic Hub
IM
IM
E
E
Al
PORT
SWCC
Primary Industries
Downstream Industries
Support Industries
Future Downstream
Admin/Support Services
Labor Camp
Utilities
18
Reliable Infrastructure Planning
Internal Road, Rail, Conveyor Network
Gas Network
Waste Water Treatment
Water Supply
Power Supply
SWCC
S/S 2 S/S 3 Ma’aden S/S
S/S 1
Bulk Storage & RO Plant SWCC
Intake
Intake/
Outfall
Outfall
Sanitary Wastewater
Treatment Plant (SWTP)
Industrial Wastewater
Treatment Plant (IWTP)
Logistics
Hub
Sea Water Cooling
7 Existing Berths
44 under Expansion
Rail Link & Conveyers
500,000 m2 Storage
Existing
Planned
Existing and Planned Sea Port