C O U N T Y O F S A N D I E G O
ovember 2014
Las Colinas Detention and Reentry Facility
Schedule : Sitework began summer 2012 forPhase 1 occupancy August 2014; Phase 2began fall 2014 for completion January 2016Scope: Construct 1,216 bed multi-custodywomen's detention campus on 45 acres,replacing the existing facility.Delivery: Design-Build: Balfour BeattyEst. Cost: $289.2 million project cost
Capital Improvement Projects2014/15 - 2018/19
Cedar and Kettner Development Parking Structure
Schedule : Groundbreaking December 2013or completion summer 2015.
Scope: Construct 10-level parking structureroviding approximately 650 spaces for County
Administration Center staff.Delivery: Design-Build: McCarthy Building Co.Est. Cost: $36.1 million project cost
County of San DiegoDepartment of General Services
5560 Overland Avenue, Suite 410San Diego, CA 92123
858.694.3610www.sdcounty.ca.gov/general_services
Register for notication of solicitations athttp://buynet.sdcounty.ca.gov
Alpine Branch Library
Schedule : Contract award October 2014 forcompletion spring 2016Scope: Construct approx. 12,700 sq ft Zero NetEnergy Library to replace the 3,000 sq ft leasedfacility.Delivery: Design-Build: C.W. DriverEst. Cost: $9.2 million project cost
County Administration Center Waterfront Park2014 Orchid Award-Urban Planning
Boulevard Fire Station
Schedule : Groundbreaking January 2014 forompletion spring 2015
Scope: Construct 7,866 sq ft new re station withiving quarters and bays for 6 emergency vehicleso replace the existing shared facility.
Delivery: Design-Build: Hunter Steel Constr. Co.Est. Cost: $3.5 million project cost
Imperial Beach Branch Library
Schedule : In procurement for contract awardwinter 2014/15 with completion spring 2016Scope: Demo existing facility and construct 12,000 SF building integrating with existing2,000 SF City community room.Delivery: Design-Build: In procurementEst. Cost: $9.1 million project cost
2014 AIASD Merit Award-Interiors
http://buynet.sdcounty.ca.gov/http://www.sdcounty.ca.gov/general_serviceshttp://buynet.sdcounty.ca.gov/http://www.sdcounty.ca.gov/general_services8/9/2019 Current Capital Project
2/2
C O U N T Y O F S A N D I E G O
Department of General Services
Planned and ProposedCapital Construction Opportunities
FY2014/15 - 2018/19
Additional information can be found at:City, County, Port Rotation - http://www.sandiego.gov/publicworks/about/contracting/consultant/rotationlist.shtmlCounty Operational Plan & Budget Information http://www.sdcounty.ca.gov/auditor/budinfo.html
!"#$%& ()*+,%-"$. !*$%*+ / /01 (2*+3,$4 52*$#*6 7#-%* 891 7,$ : -*;"6 !5
Project RFB/RFPForecast
Scope Delivery Est ProjectCost
County Operations Center -Crime Lab and Fleet Facility
DDA; Fleet bldg/parking in design;select Crime LabGC, Architect
Proposed 150,000 SF for CrimeLaboratory, Property and Evidence, andCentral Investigations staff; relocation ofFleet service facility, new parking structure
DDA/Design-Build
$104.8 million
East County Regional CenterTIs and Window Replacement
November 2014 7th floor tenant improvements, replacewindows 6th, 7th and 8th floors.
CM at Risk $7.7 million
North County CrisisResidential Health Facility
Winter 2014/15 Design and construct new 6,500 SF shortterm residential building
Design-Build Est. $4 million
Pine Valley Fire Station Winter 2014/15 Design and construct new 4-bay building
with sleeping quarters
Design-Build Est. $4 million
Assessor/Recorder/CountyClerk El Cajon Branch Office
TBD; Currentlyin site acquisition
Design and construct new 14-15,000 SFbuilding
Design-Build TBD
North Coastal Mental HealthCenter (Oceanside)
TBD; Currentlyconfirmingprogram
Design and construction of a peer-centered facility for recovery,rehabilitation, job screening/placement
Design-Build TBD
Borrego Springs Library TBD; Currentlyin site acquisition
Acquire site, design and construct new14-15,000 SF building
Design-Build Est. $9.9 million
Cedar & Kettner DevelopmentProject
RFP/RFB TBD Phase 2 private mixed use development ofthe Cedar & Kettner development site
PrivateDevelopment
N/A
Regional CommunicationsSystem Replacement
Varies by site Design, procure and install P25 NationalInteroperability Platform at various sites
May vary by site TBD
4S Ranch Library Expansion TBD; Currentlyin site acquisition
Design and construct approx. 7,000 SFexpansion of existing facility
CM at Risk TBD
Job Order Contracting(JOC) & Consultants
RFB/RFPForecast
Scope Delivery Est Cost
General, Mechanical/HVAC,various other specialty JOCs
Periodicallythrough the year
Provide general, engineering or specialtyconstruction services for County projects
JOC Contract Up to$4,200,000
Consulting Opportunities
Board Policy F-40 allows use of the City, County and Port District Consultant Rotation List for qualified consultant services up to$1,000,000.These lists include architectural, construction and project management, various engineering and specialty professionalconsulting services.Also register on and monitor the Countys BuyNet - http://buynet.sdcounty.ca.gov - for new procurements. Such procurementsmay include architectural, engineering, construction and project management, commissioning, and other professional services.
November 2014