9
CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY AUTHORITY Address: 120 Le Duan str. Hoan Kiem dist. Hanoi Viet Nam Tel: (+84-24) 9427545; Fax: (+84-24) 9427551; E-mail: [email protected] High-Level Expert Group Meeting on Harmonization of Rules and Regulations for Facilitation of International Railway Transport Ankara, Turkey 3 and 4 May 2018
Transcript
Page 1: CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM … Nam_HLEGM.pdfCURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY

CURRENT STATUS AND PLAN FOR CONNECTING

VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES

Ankara, 03rd May 2018

VIET NAM RAILWAY AUTHORITY

Address: 120 Le Duan str. – Hoan Kiem dist. – Hanoi – Viet Nam

Tel: (+84-24) 9427545; Fax: (+84-24) 9427551; E-mail: [email protected]

High-Level Expert Group Meeting on Harmonization of Rules and

Regulations for Facilitation of International Railway Transport

Ankara, Turkey

3 and 4 May 2018

Page 2: CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM … Nam_HLEGM.pdfCURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY

1. Current status of Viet Nam railway network

No. Main linesGauge

(mm)

Length

(km)

Ratio

(%)

1Ha Noi – Ho Chi Minh

city1.000 1.727

2 Gia Lam – Hai Phong 1.000 102

3 Yen Vien – Lao Cai 1.000 296

Sub – Total 2.125 84%

4 Ha Noi – Dong DangDual Gauge

1.000&1.435 167

5Dong Anh – Quan

Trieu

Dual Gauge

1.000&1.43555

Sub – Total 222 9%

6Kep – Ha Long – Cai

Lan1.435 128

7 Kep – Luu Xa 1.435 56

Sub – Total 184 7%

Total 2.531 100%

Page 3: CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM … Nam_HLEGM.pdfCURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY

2. National railway network - By 2020

No. Investment projects listLength

(km)

Investment

scale

Expected

capital

I Renovate and upgrade existing railways

1 Hanoi – Ho Chi Minh city 1,726

Meet the

National

railway

technology

standard

State,

private

2 Hanoi - Lao Cai 285

3 Hanoi - Hai Phong 96

4 Hanoi - Thai Nguyen 54

5 Hanoi - Lang Son 156

6 Kep - Chi Linh 38

7 Kep - Luu Xa 56

IITo study the plan for the construction of new railways with great transport

demands, trans-Asia railway

1 High-speed rail on the north-south axis 1,570

Double track,

1435mm,

electrification

State,

private

2 Lao Cai - Hanoi - Hai Phòng 380

Electrification3 Hanoi - Dong Dang 156

4 Ho Chi Minh city - Can Tho 320

5 Vung Ang - Cha Lo (Mu Gia) 119 Single track

6 Bien Hoa - Vung Tau 84 Single track

and double

track7 Di An - Loc Ninh 128

8 Hai Phong - Lach Huyen 40

III

To put into operation the entire route

of Yen Vien - Pha Lai - Ha Long - Cai

Lan

129 Single trackState,

private

Page 4: CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM … Nam_HLEGM.pdfCURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY

2. National railway network - 2020 ÷ 2030

No. Investment projects listLength

(km)

Investment

scale

Expected

capital

I Continue to renovate and upgrade existing railways

1 Hanoi – Ho Chi Minh city 1,726Meet the

National

railway

technology

standard

State,

private

2 Hanoi - Lao Cai 285

3 Hanoi - Hai Phong 96

4 Hanoi - Thai Nguyen 54

5 Hanoi - Lang Son 156

IIConstruction of new railways with great transport demands, trans-

Asia railway

1High-speed rail on the north-south

axis1,570

Double track,

1435mm,

electrification

State,

private

2 Lao Cai - Hanoi - Hai Phòng 380

Electrification3 Hanoi - Dong Dang 156

4 Ho Chi Minh city - Can Tho 320

5 Vung Ang - Cha Lo (Mu Gia) 119 Single track

6 Bien Hoa - Vung Tau 84 Single track

and double

track7 Hai Phong - Lach Huyen 40

MỤ GIẠ

VŨNG ÁNG

Page 5: CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM … Nam_HLEGM.pdfCURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY

2. National railway network - 2020 ÷ 2030

No. Investment projects listLength

(km)

Investment

scale

Expected

capital

IIITo study the plan on building new routes connecting seaports,

industrial parks and tourism

1 Thap Cham - Da Lat 84

Single trackState,

private

2Dong Ha - Lao Bao - My Thuy

seaport114

3 Tuy Hoa - Buon Ma Thuat 169

4 Dac Nong - Binh Thuan 121

5 Dac Nong - Chon Thanh 67

6 High land railway network 550

7Thai Nguyen - Tuyen Quang - Yen

Bai73

8Nam Dinh - Thai Binh - Hai Phong -

Quang Ninh120

9 Lạng Son - Quang Ninh (Mui Chua) 95

10 Ha Long - Mong Cai 150

MỤ GIẠ

VŨNG ÁNG

Page 6: CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM … Nam_HLEGM.pdfCURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY

Strive to complete the 1435mm high speed

double rail line on the North - South axis; After

2050 deployment of high speed operation

350km/h;

Modernization of the existing rail network meets

primarily with demand for local passenger and

cargo transport;

To complete the construction of the Central

Highlands railway, trans-Asia railway, railway

linking industrial parks and large seaports.

2. National railway network – Vision to 2050

Page 7: CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM … Nam_HLEGM.pdfCURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY

3. International treaties Viet Nam has participated

related to railway transportation border crossings

Bilateral:

✓ Viet Nam - China border railway Agreement (Signed on 1992). Currently being amended.

✓ Agreement to connect railways in Viet Nam - Cambodia (Signed on 2010).

✓ Agreement on construction and operation of railway lines Vung Ang - Vientiane between

Viet Nam – Laos (Currently under construction).

Multilateral:

▪ Organization for Cooperation of Railways (OSJD): Convention on international through

railway traffic. Currently under negotiation (04 meetings have been organized).

▪ ASEAN: The ASEAN Framework Agreement on the Facilitation of Goods in Transit

(Signed on 16th December 1998); Protocol 6 on railways border and interchange stations

(Signed on 16th December 2011).

▪ Greater Mekong Railway Association (GMRA): Framework Agreement for Cross-Border

Railway Transport Connectivity in the GMS (Currently under construction).

▪ United Nations Economic and Social Commission for Asia and the Pancific (UNESCAP):

Intergovernmental Agreement on the Trans-Asian railway network (Signed on 2006);

Framework for enhancing efficiency of railway border crossings along the Trans-Asian

railway network and beyond (Now we are discussing here).

Page 8: CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM … Nam_HLEGM.pdfCURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY

4. Conclusions and recommendations

At present, many bilateral and multilateral agreements exist between countries in

Asia and the Pacific along the trans-Asia railway. However, these agreements are

largely focused on issues related to rail technical solutions, which have not yet

focused on customs, border guard and quarantine solutions. As a result, cross-

border rail transportation between these countries has not been smooth and

smooth.

Therefore, UNECAP's support to build "FRAMEWORK FOR ENHANCING

EFFICIENCY OF RAILWAY BORDER CROSSINGS ALONG THE TRANS-

ASIAN RAILWAY NETWORK AND BEYOND" is very necessary and

appropriate to create maximum favorable conditions and to promote more

vigorously cross-border freight and passenger transport, for rail transport to

become the backbone of transportation in general and a driving force for the

economic development of each country.

We hope that UNESCAP continues to assist in finding solutions for countries

(including Viet Nam) to soon be able to invest in connecting rail infrastructure

together, as well as early completion of the framework above to put into practice.

Page 9: CURRENT STATUS AND PLAN FOR CONNECTING VIET NAM … Nam_HLEGM.pdfCURRENT STATUS AND PLAN FOR CONNECTING VIET NAM RAILWAY WITH NEIGHBORING COUNTRIES Ankara, 03rd May 2018 VIET NAM RAILWAY

Thank you for your attention!