Curso Especializado Acciones MSCA Modulo 4: Cómo escribir la sección Implementación
Transcript
Page 1: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  Especializado  Acciones  MSCA  

Modulo  4:  Cómo  escribir  la  sección  Implementación    

Page 2: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.  IMPLEMENTATION    3.1    Overall  coherence  and  effec1veness  of  the  work  plan,  including  appropriateness  of  the  alloca2on  of  tasks  and  resources    ¿Qué  paquetes  de  trabajo  2ene  tu  MSCA?    3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    ¿Cómo  se  organiza  tu  MSCA?  ¿Cómo  se  ges2onan  los  riesgos  en  tu  MSCA?      

Page 3: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.  IMPLEMENTATION    3.3    Appropriateness  of  the  ins.tu.onal  environment    ¿Qué  compromisos  adquiere  tu  host?  ¿Qué  infraestructuras  2ene  tu  host?    3.4  Competences,  experience  and  complementarity  of  the  par1cipa1ng  organisa1ons  and  ins.tu.onal  commitment    ¿Cómo  va  a  contribuir  tu  host  en  tu  training  y  tu  inves2gación?      

Page 4: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Recordatorio  

Page 5: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Specific  :  Específicos  Measurable:  Medibles  ADainable:  Alcanzables  RealisEc:  Realistas  Time-­‐Based:  Tiempo  limitado  

Seccion  B1.1.2:  ObjeEvos  SMART  

Nota  final:  puedes  usar  obje2vos  o  paquetes  de  trabajo  Work-­‐packages  (WP,  preferible)  

Page 6: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1    Overall  coherence  and  effec1veness  of  the  work  plan,  including  appropriateness  of  the  alloca2on  of  tasks  and  resources    

B1.1.2   B3.1  

Estrechamente  relacionados  

Page 7: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Dos  situaciones:      1)  Que  No  hayas  descrito  en  profundidad  los  WP  en  la  seccion  

B1.1.2:    Entonces  debes  describirlo  en  la  seccion  3.1    2)  Que  SI  hayas  descrito  en  profundidad  los  WP  en  la  seccion  B1.1.2    Entonces  debes  nombrarlos  nuevamente  (2tulo)  en  la  seccion  3.1  y  detallar  todos  los  deliverables  y  milestones  del  proyecto    

Page 8: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

DEFINICIONES  BASICAS  

Page 9: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

MILESTONES:  metas  a  alcanzar,  obje2vos  que  de  cumplirse  2enen  un  impacto  significa2vo  en  tu  MSCA  (checkpoints)    DELIVERABLES:  Todo  aquello  que  se  entrega  como  prueba  que  has  cumplido  unas  metas  parciales  o  el  proyecto  MSCA  total.  Normalmente  son  informes  técnicos  (informes  a  mitad  y  final  de  MSCA,  Status  Reports,  task  reports,  etc.)      SECONDMENTS:  Estancias  breves  en  otros  centros  

Page 10: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Work-­‐packages:  Todas  las  acciones  necesarias  para  llegar  al  obje2vo  (descrito  en  la  seccion  B1.1.2)      Work-­‐packages  necesarios  de  incluir:      WP-­‐1-­‐4:  Rela2vos  a  los  obje2vos  de  tu  proyecto  MSCA  WP:  Management  WP:  Dissemina2on  of  results  and  Outreach    

Page 11: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Como  escribir  la  sección  3.1:      1)  Introduce  la  estructura  de  tu  work  plan  2)  Desarrolla  las  tareas,  los  milestones  y  deliverables  del  proyecto  3)  Integralo  todo  en  un  diagrama  de  GanD  

Page 12: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Como  escribir  la  sección  3.1      

1)  Introduce  la  estructura  de  tu  work  plan  2)  Desarrolla  las  tareas,  los  milestones  y  deliverables  del  proyecto  3)  Integralo  todo  en  un  diagrama  de  GanD  

Page 13: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

1)  Introduce  la  estructura  de  tu  work  plan    PROJECT  embraces  a  forma2ve  research  approach  organised  in  four  synergis.c  work  packages  that  focus  on  coordina2ng  and  managing  the  project  (WP1),  science  development  (WP2  and  WP3)  and  science  communica2on  (WP4)  tasks  (Fig.  X).  Work  packages  2  and  3  are  2ghtly  coupled  and  cross-­‐feed  each  other:  WP2  includes  the  core  modelling  and  theore2cal  development  tasks  of  PROJECT  ,  while  WP3  focuses  on  the  implementa2on  of  manipula2ve  field  experiments  and  on  model  parameteriza2on,  calibra2on  and  valida2on.  WP4  addresses  the  communica2on  and  public  engagement  strategy  of  the  Ac2on,  connec2ng  scien2fic  advances  from  previous  WPs  with  the  various  key  target  audiences.  To  op2mize  the  use  of  exper2se  and  available  resources,  leverage  ongoing  research,  and  increase  the  impact  of  the  Ac2on,  two  PROJECT  Tasks  (3.1;  4.1)  will  be  developed  during  Secondment.  

Ej.  1  

Page 14: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

1)  Introduce  la  estructura  de  tu  work  plan    The  main  goal  of  the  proposed  work  is  the  development  of  innova2ve  methodologies  by  the  design  of  miniaturized  systems  integrated  with  synthe2c  micro  and  nanomotors  for  the  sensing  of  food  contaminants  such  as  mycotoxins  (aflatoxin)  and  heavy  metals  in  foods.  To  this  end,  several  objeEves  have  been  described  in  secEon  B1.1.  Based  on  the  objec2ves  from  the  sec2on  and  the  clearly  exposed  research  methodology  from  sec2on  B1.1,  the  following  ac2vi2es  and  work  plan  are  purposed:    

Ej.  2  

Page 15: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

1)  Introduce  la  estructura  de  tu  work  plan    List  of  deliverables,  milestones  and  secondments  have  been  defined  to  maximize  the  effecEveness  and  impact  of  our  project  (see  below).  A  detailed  schedule,  in  terms  of  number  of  months  elapsed  from  the  start  of  the  project,  has  been  elaborated  for  the  efficient  achievement  of  the  main  goal  and  specific  objecEves  of  the  proposal  (see  sec2on  B1.1).  Es2mated  2me  for  the  performance  of  work  packages    (described  in  sec2on  B1.1  )    and  secondments,  comple2on  of  deliverables  and  comply  with  key  milestones,  communicaEon  and  disseminaEon  ac2ons,  are  indicated  in  the  Gand  Chart  below.  

Ej.  3  

Page 16: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

1)  Introduce  la  estructura  de  tu  work  plan:  usa  figuras  Ejemplo  de  Diagrama  de  flujo  

Page 17: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Como  escribir  la  sección  3.1      1)  Introduce  la  estructura  de  tu  work  plan  

2)  Desarrolla  los  milestones  y  deliverables  del  proyecto  3)  Integralo  todo  en  un  diagrama  de  GanD  

Recomendable:  1  Milestone  +  1  Deliverable  por  WP  

Page 18: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

2)  Desarrolla  las  tareas,  los  milestones  y  deliverables  del  proyecto  

List  of  major  Deliverables:  D1  -­‐  Report  on  the  development  of  XXX  Nanostructures  (TNs)  -­‐  month  4  D2.1  -­‐  Report  on  the  in  vitro  evalua2on  and  selec2on  of  biocompa2ble  TNs  –  month  7  D2.2  -­‐  Report  on  the  in  vitro  evalua2on  and  selec2on  of  func2onal  TNs  –  month  11  D2.3  -­‐  Report  on  the  specificity  of  the  best  targe2ng  approaches  based  on  the  analysis  of  ligand  receptor-­‐interac2ons  –  month  14  D3  -­‐  Report  on  the  op2miza2on  of  the  Best  TNs  –  month  16  D4.1  -­‐  Report  on  the  in  vivo  evalua2on  and  selec2on  of  biocompa2ble  TNs  –  month  20  D4.2  -­‐  Report  on  the  in  vivo  evalua2on  and  selec2on  of  the  Lead  TNs  –  month  23  D5  -­‐  Publica2on  of  the  results  –  month  24    

Ej.  1  

Page 19: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

2)  Desarrolla  las  tareas,  los  milestones  y  deliverables  del  proyecto  

WP1  aims  to  ensure  effec2ve  coordina2on  and  implementa2on  of  the  work-­‐plan  and  efficient  resource  u2liza2on.  Task  1.1.  Management.  Administra2on  and  financial  management  of  the  Ac2on;  prepara2on  of  reports;  communica2on  with  EC;  and  visibility  ac2vi2es  (including  PROJECT  webpage)  Task  1.2.  Coordina2on  and  evalua2on  (C&E).  Three  major  C&E  mee2ngs  are  scheduled  (months  1,  10,  20),  involving  researchers  from  various  disciplines  from  the  host  and  partner  ins2tu2ons.  The  kick-­‐off  will  coordinate  foreseen  tasks.  Second  and  third  mee2ng  will  address  Ac2on  progress  regarding  task  development,  training,  coordina2on,  communica2on,  2mely  repor2ng,  promo2on  of  gender  equality,  and  iden2fying  required  correc2ve  ac2ons,  if  any.  Evalua2on  reports  will  be  produced  from  mee2ng  outcomes  (Deliverables  1.1  and  1.2).  

Ej.  2  

Page 20: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

2)  Desarrolla  las  tareas,  los  milestones  y  deliverables  del  proyecto  

NO  TE  OLVIDES  DE  LAS  TASK,  MILESTONES  Y  DELIVERABLES  DE  LOS  SECONDMENTS  (SI  HAY)  

Ej.  2  

Page 21: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Como  escribir  la  sección  3.1        1)  Introduce  la  estructura  de  tu  work  plan  2)  Desarrolla  los  milestones  y  deliverables  del  proyecto  

3)  Integralo  todo  en  un  diagrama  de  GanD  

Page 22: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

3)  Integralo  todo  en  un  diagrama  de  GanD  

¿Qué  es  un  diagrama  de  GanD?    Es  una  herramienta  gráfica  cuyo  obje2vo  es  exponer  el  2empo  de  dedicación  previsto  para  diferentes  tareas  o  ac2vidades  a  lo  largo  de  un  2empo  total  determinado  

NOTA:  Todos  sabemos  que  el  2empo  reflejado  en  el  Gand  es  flexible,  no  hace  falta  indicarlo  

Page 23: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Ejemplo  de  Diagrama  de  Gand  

EF  

Page 24: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Ejemplo  de  Diagrama  de  Gand  

GF  

Page 25: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Ejemplo  de  Diagrama  de  Gand  

Page 26: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Ejemplo  de  Diagrama  de  Gand  

Page 27: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.1     Overall   coherence   and   effec.veness   of   the   work   plan,   including  appropriateness  of  the  allocaEon  of  tasks  and  resources    

Ejemplo  de  Diagrama  de  Gand  

Page 28: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

Page 29: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

Aquí  se  trata  de  dejar  claro:      1)  La  estructura  de  organización  y  management  del  proyecto  2)  Los  principales  riesgos  de  la  MSCA  y  el  plan  de  con2ngencia  para  

estos  riesgos  

InvesEgador   Grupo  aceptor  

Proyecto  

Trinomio  MSCA  

Hospedaje  y  Apoyo  al  proyecto:  Ges2ón  (financiera,legal,IPR,  Transferencia,  comunicación,  

Page 30: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

1)  La  estructura  de  organización  y  management  del  proyecto    FPS  will  act  as  host  insEtuEon  and  will  support  the  candidate  through  Communica2on,  Legal,  Intellectual  Property  and  Transfer  Technology  Departments  and  Interna2onal  Research  Projects  Office  belonging  to  the  Network  of  Research  Management  Founda2ons  of  the  Andalusian  Public  Health  System.  The  host  ins2tu2on  will  support  the  candidate  in  the  management  of  the  project,  in  the  integra2on  of  knowledge  and  results  arising  from  research.  According  to  this,  the  procedure  to  manage  this  grant  will  be  the  same  followed  with  other  research  grants  hold  by  Bionand  scien2sts.  While  Bionand  develops  the  research  project  and  training,  FPS  ensures  the  fulfillment  of  the  financial  and  scien2fic  commitments,  and  the  implementa2on  of  the  project  following  the  Marie  Curie  Grant  Agreement  clauses  and  specific  provisions.  

Magne2c-­‐PCR  

Page 31: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

1)  La  estructura  de  organización  y  management  del  proyecto  The  ac2vi2es  and  mechanisms  that  will  ensure  the  efficient  and  effec2ve  running  of  the  grants  are:  a)  Administra2on  and  Financial  Control;  b)  Control  of  work  progress  (verifica2on  of  deliverables)  and  monitor  of  expenditure;  c)  Refinement  and  upda2ng  of  work-­‐plan  if  necessary;  d)  Produc2on  of  progress  and  final  reports  for  the  European  Commission.  These  administra2ve  and  financial  tasks  will  be  carried  out  by  qualified  personnel  of  the  Project  Management  and  the  Financial  Departments  of  FPS  in  close  collabora2on  with  the  fellow  and  Dr.  Garcia-­‐MarEn  who  will  monitor  and  review  the  overall  work  plan  of  the  project.  To  do  so  they  will  maintain:  A)  Weekly  Lab  Mee2ngs;  B)  Weekly  Project  Mee2ngs;  C)  Quarterly  administra2on  mee2ngs:  Researcher-­‐Bionand  administra2on  unit  and  FPS  Project  Management  Department;    

Magne2c-­‐PCR  

Page 32: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

1)  La  estructura  de  organización  y  management  del  proyecto    D)  Semester  assessments  on  the  researcher’s  ac2vi2es:  elaborated  by  the  Scien2st  in  charge  based  on  the  day  to  day  monitoring  and  the  weekly  mee2ngs  (Internal  document).  The  financial  management  of  this  project  will  be  handled  by  qualified  and  experienced  personnel  of  the  Project  Management  and  the  Financial  Departments  of  FPS.  The  project  management  department  will  designate  a  project  manager  who  will:  1)  Be  the  main  interface  between  the  incoming  fellowship  and  the  Interna2onal  Project  Office  (FPS);  2)  Monitor  expenditure  and  ensure  that  only  eligible  costs  are  claimed  for;  3)  Ensure  2mely  the  prepara2on  and  submission  of  reports  

Magne2c-­‐PCR  

Page 33: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

1)  La  estructura  de  organización  y  management  del  proyecto    The  financial  department  in  collabora2on  with  his  project  manager  will:  1)  Ensure  2mely  payments  of  funding  of  the  fellowship  and  the  host  ins2tu2ons  of  implementa2on  of  the  project  set  out  in  the  EC  schedule  of  payments;  2)  Keep  records  and  financial  accounts.  Moreover,  the  management  department  will  be  supported  by  the  Interna2onal  Project  Office  (www.juntadeandalucia.es/proyectosinternacionales-­‐salud/)  during  the  life  of  the  project.  This  office  will  support  the  project  management  pointed  out  in  communica2ng  with  EC,  prepara2on  and  submission  of  report,  informing  the  EC  about  any  changes  of  the  project,  ect.  Besides,  FPS  will  draw  up  an  agreement  between  the  host  ins2tu2on  and  the  Fellow  as  per  the  requirements  specified  in  Annex  III  to  the  Marie  Curie  Grant  Agreement.  

Magne2c-­‐PCR  

Page 34: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    1)  La  estructura  de  organización  y  management  del  proyecto    To  achieve  the  ambi2ous  objec2ves  of  this  project,  PROJECT  requires  stringent  project  organisa2on  and  efficient  management  strategy.  The  project  will  be  managed  by  Dr.  XXX,  under  the  supervision  of  Dr.  ZZZ.  The  ISEM  administraEon  unit  and  the  CNRS  internaEonal  project  management  office  will  support  the  fellow  through  (a)  provision  of  office  space  (computer  support,  email  account,  telephone,  vehicles),  (b)  access  to  CNRS  specialist  libraries  and  collec1ons,  assistance  with  comple1ng  the  Marie  Curie  grant  agreement  and  repor1ng  requirements,  (c)  assistance  with  intellectual  property  and  human  resources  issues.  Progress  monitoring  is  assured  through  a  Personal  Career  Development  Plan  with  clear  assurance  and  mechanisms  for  correc2ve  ac2on  when  necessary  (see  sec2on  2.3.2),  Coordina2on  and  Evalua2on  mee2ngs,  including  a  forma2ve  evalua2on  process  addressing  PROJECT  progress  (see  Task  1.2  in  sec2on  4.1.1),  and  forma2ve  tes2ng  of  “key  messages”  (see  WP4  in  sec2on  4.1.1).  

Ej.  2  

Page 35: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

2)  Ges2ón  de  riesgos  de  la  MSCA  y  el  plan  de  con2ngencia  para  estos  riesgos    

Para  cada  obje2vo/WP  definido  en  el  apartado  B1.1.2  hay  que  definir  los  riesgos  posibles  (qué  puede  salir  mal,  vislumbrar  el  peor  escenario  posible  en  tu  MSCA)  y  las  acciones  correctoras  (con2ngency  plan)  

Page 36: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

2)  Ges2ón  de  riesgos  de  la  MSCA  y  el  plan  de  con2ngencia  para  estos  riesgos    

SIEMPRE  HAY  RIESGOS!    No  caigas  en  el  error  de  decir  que  tu  proyecto  no  2ene  riesgos  (no  

lo  has  pensado  bien)  

Page 37: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

2)  Ges2ón  de  riesgos  de  la  MSCA  y  el  plan  de  con2ngencia  para  estos  riesgos    

OBJETIVO   PROBLEMA  Que  puede  

surgir  

ALTERNATIVA  

Flujo  del  apartado:  

IMP:  PARA  TODOS  LOS  OBJETIVOS  DESCRITOS  EN  B.1.1.2  

Page 38: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

2)  Ges2ón  de  riesgos  de  la  MSCA  y  el  plan  de  con2ngencia  para  estos  riesgos    Next,  we  discuss  some  techniques,  methodologies  or  tasks  that  presumably  may  imply  some  risks.  Following  alternaEve  soluEons  are  proposed  to  overcome  these  issues:  Aim  1:  Developing  magne1c  nanopar1cle  with  specific  DNA  sequences  and  detec1on  by  PCR  requires  a  very  heat-­‐stable  nanopar1cle  plaOorm.  The  use  of  a  clinically  approved  NP  (Feraheme)  coated  with  carboxymethyl-­‐dextran  have  proven  this  thermal  stability  requirement  and  will  be  used  in  the  design  of  the  next  genera2on  NPs.  NPs  will  be  used  in  isothermal  PCR  with  the  proper  adjustments  and  in  collabora2on  with  Biohelix  company.  Although  sensibility  of  PCR  is  amongst  the  highest  in  molecular  biology  field,  sensibility  of  the  MRSw  can  be  further  increased  with  higher  size  NPs  (above  50nm).  Synthesis  and  thermal  analysis  of  big  NPs  will  be  executed  and  tested  in  both,  regular  and  isothermal  PCR  enviroments  

Magne1c-­‐PCR  

Page 39: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

2)  Ges2ón  de  riesgos  de  la  MSCA  y  el  plan  de  con2ngencia  para  estos  riesgos    

Ej.  2  

The  proposed  project  is  based  on  the  experience  of  the  applicant  and  supervisor  who  work  in  these  topics  and  believes,  awer  bibliography  revision  and  a  deep  discussion,  that  the  project  will  be  a  success.  However,  there  are  risks  that  can  make  endanger  reaching  project  objecEves.  Regarding  the  previous  experience,  bibliography  and  study  of  the  project,  these  risks  that  can  appear  during  the  research  are  presented  here  :    •  Polymer  employed  for  the  nanotube  surface  are  not  working  or  are  not  in  stock:  The  micro/nanomotors  that  will  be  synthesized  for  the  AFB  assay  contain  a  surface  layer  made  of  a  carboxi  polymer  (carboxi-­‐EDOT)  which  is  commercial.  It  is  relevant  for  the  following  modifica2on  steps.  If  this  polymer  is  not  available,  the  applicant  have  the  knowledge  for  development  this  superficial  layer  of  motors  with  other  similar  polymers  as  carboxi-­‐pyrrol  and  changing  the  electropolymeriza2on  condi2ons  (Voltages  and  saline  solu2ons).  These  new  motors  will  have  a  surface  with  carboxi-­‐groups  which  is  required  for  modifica2on  steps.    

Page 40: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.2  Appropriateness  of  the  management  structure  and  procedures,  including  quality  management  and  risk  management    

Ej.  3  

We  do  not  foresee  technical  problems  in  the  basic  prepara2on  of  therapeu2c  nanostructures  (TNs),  in  vitro  or  in  vivo  experiments,  due  to  the  background  of  the  applicant  and  the  excellent  exper2se  of  the  host  and  partner  organiza2ons  in  their  respec2ve  areas.  The  criEcal  issue  of  this  project  is  the  efficiency  of  nanomedicines  to  reach  macrophages  in  vivo  and  exert  a  significant  funcEonal  acEvity.  For  this  reason  we  have  designed  at  least  two  different  “targeEng”  strategies  and  two  “therapeuEc”  strategies  that  have  been  thoughxully  chosen  on  the  basis  of  the  available  literature  and  our  own  experience.  The  re-­‐educa2on  of  TAM  loading  the  nanomedicines  with  ac2vators  of  TLR7  receptors  will  be  priori2zed.  However,  an  alternaEve  approach  (WP1.2.  ),  by  means  of  TNs  loaded  with  chemotherapeuEc  drugs,  has  been  considered  and  incorporated  in  the  proposal.    This  alterna2ve  strategy  will  be  pursued  if  the  TLR7-­‐TNs  are  not  effec2ve  in  vivo,  or  if  their  ac2vity  is  not  sufficiently  long-­‐las2ng.  This  alterna2ve  approach  is  based  on  a  dis2nct  ra2onale,  as  TNs  loaded  with  chemotherapeu2c  drugs  are  expected  to  kill,  and  not  to  re-­‐educate  macrophages.  Key  milestones,  intended  for  the  exclusion  and  selec2on/iden2fica2on  of  TNs,  will  be  strictly  obeyed  at  each  step  of  the  project,  thus  guaranteeing  the  appropriate  progress  and  success  of  the  proposal.  

Page 41: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.3    Appropriateness  of  the  ins.tu.onal  environment    

Page 42: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.3    Appropriateness  of  the  ins.tu.onal  environment    

Se  trata  de  “vender”  la  ins2tucion  donde  vas  como  la  mejor  para  desarrollar  tu  MSCA:    •  Mejor  equipamiento  •  Mejores  infraestructuras  de  inves2gación  •  Mejores  servicios  de  apoyo  a  los  inves2gadores  •  Mejor  network  y  colaboraciones  establecidas  previamente  •  Mejor  ins2tucion  para  transferencia  tecnologica  empresarial  (patentes,  spin-­‐offs,  etc)  

•  Mejor  ins2tucion  para  translación  (I+D  básica-­‐-­‐-­‐-­‐Clínica)  •  Mejores  posibilidades  de  desarrollo  profesional  en  EU  

Page 43: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.3    Appropriateness  of  the  ins.tu.onal  environment    

Destaca  aquí  (B3.3)  las  infraestructuras,  servicios  y  equipamientos  más  importantes.      Completa  la  lista  en  el  apartado  5  (Capacity  of  the  Par2cipa2ng  Organisa2ons  )    

Equilibrio  B3.3  y  B5  

Page 44: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.3    Appropriateness  of  the  ins.tu.onal  environment    

The  project  will  be  developed  at  BIONAND  (www.bionand.es),  which  is  the  Andalusian  Centre  for  Nanomedicine  and  Biotechnology.  This  is  a  mixed  centre  with  stakes  held  by  the  Regional  Ministry  of  Innova2on,  Science  and  Enterprise,  the  Regional  Ministry  of  Health  and  the  University  of  Malaga  with  the  purpose  to  promote  and  encourage  the  development  of  an  andalusian  center  for  excellence  research  in  Nanomedicine.  Bionand  was  created  in  2011  with  the  help  of  European  Regional  Development  Fund  (ERDF,  11.6Millions  €)  and  Spanish  Ministry  of  Economy  and  Compe22vity  (grants  IMBS10-­‐1C-­‐247,  PCT-­‐420000-­‐2010-­‐003  and  INP-­‐2011-­‐23-­‐420000-­‐ACT2,  11.7Millions  €),  as  a  mulEdisciplinary  research  space,  where  different  professionals  from  the  healthcare,  university  and  business  areas  interact.  Focused  in  the  development  of  new  nanomaterials  and  its  biomedical  applicaEons,  the  center  facilitates  the  genera2on  of  new  diagnosis  systems  for  preven2on  and  treatment  of  diseases.  

Magne1c-­‐PCR  

Page 45: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.3    Appropriateness  of  the  ins.tu.onal  environment    

Well-­‐equipped  with  a  unique  combinaEon  of  firstclass  laboratories  for  chemistry,  biochemistry,  molecular  biology,  cell  culture  and  animal  faciliEes,  together  with  a  wide  range  of  dedicated,  state  of  the  art  imaging  equipment,  Bionand  is  certainly  leading  the  way  in  the  most  influen2al  evolu2on  of  Nanomedicine  and  molecular  imaging.  The  following  facili2es  are  available  for  the  researcher  at  Bionand:  •  Cell  Culture  Unit:  unit  provided  with  the  equipment  (12  h…………..  •  Nanoimaging  Unit:  composed  of  different  equipment  for  imaging,  both  in  

vitro  and  in  vivo.  •  Spectroscopy  and  Nanomaterials  analysis  Unit:  equipped  with  different  

spectroscopic  instruments,  such  as………..  

Magne1c-­‐PCR  

Page 46: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.3    Appropriateness  of  the  ins.tu.onal  environment    

The  XXXX  is  one  of  the  6  research  unit  laboratories  of  the  European  Ins2tute  for  Marine  Studies,  which  is  one  of  the  most  important  marine  science  research  centres  in  France.  As  will  be  explained  in  part  B5,  the  XXXX  is  strongly  pluridisciplinary  and  units  scien2sts  from  several  ins2tu2ons.  This  will  ensure  that  the  fellow  gets  mul2ple  opportuni2es  for  presen2ng  her  work  and  interac2ng  with  researcher  at  these  neighbouring  ins2tu2ons.  In  addi2on,  the  mulEdisciplinary  approach  of  the  XXXX  is  essen2al  for  research  on  the  highly  complex  interac2ons  between  components  of  the  marine  environment.  The  unit’s  interdisciplinary  policy  is  built  on  a  sound  basis  of  skills  in  the  relevant  scien2fic  disciplines  and  an  integra2on  of  this  approach  in  daily  ac2vi2es.    

Ej.  1  

Page 47: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.3    Appropriateness  of  the  ins.tu.onal  environment    

With  direct  relevance  to  this  proposal,  the  main  infrastructures  needed  consist  in  computers,  specialized  sowware  and  diverse  kind  of  data  (e.g.  acous2c,  oceanographic  and  biological)  available  at  the  host  ins2tu2ons.  New  data  will  be  included  in  the  LEMAR  databases  awer  the  planned  cruises.  The  host  ins2tu2on  will  also  provide  the  postdoc  with  an  office  space,  full  access  to  the  network  of  the  ins2tute,  as  well  as  to  library  facili2es  such  as  Internet  subscrip2ons  to  top  scien2fic  journals.  Within  the  project  there  are  no  needs  from  research  in  laboratory.  Therefore,  the  infrastructures  of  the  ins2tute,  and  in  par2cular  the  host  group,  comprise  the  equipment  and  the  competence  that  perfectly  respond  to  the  needs  of  the  project.  During  secondements,  the  fellow  will  be  hosted  at  IRD  and  SPC  of  Nouméa,  and  at  the  XXX  of  Toulouse  and  she  will  benefit  from  the  respec2ve  center  facili2es  (see  sec2on  6),  including  office  space,  compu2ng  and  technical  resources.    

Ej.  1  

Page 48: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.3    Appropriateness  of  the  ins.tu.onal  environment    

The  Max  Planck  Society  has  a  world-­‐leading  reputa2on  as  a  science  &  technology  research  organisa2on.  In  2006,  the  Times  Higher  Educa2on  Supplement  rankings  of  non-­‐university  research  ins2tu2ons  placed  the  Max  Planck  Society  as  number  1  in  the  world  for  science  research,  and  number  3  in  technology  research.  The  MPI  for  Intelligent  Systems  belongs  to  the  Max  Planck  Society,  a  German  research  ins2tu2on  strong  in  basic  research.  The  Max  Planck  Ins2tute  for  Intelligent  Systems  approaches  intelligent  systems  from  the  viewpoint  of  learning  in  systems  with  percep2on-­‐ac2on  loops  while  these  systems  interact  with  natural,  complex  environments.  The  ins1tute  focuses  on  establishing  the  scien1fic  founda1ons  of  percep1on,  ac1on  and  learning  through  interdisciplinary  and  collabora1ve  research  across  scales  and  systems.    

Ej.  2  

Page 49: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.3    Appropriateness  of  the  ins.tu.onal  environment    

The  MPI  for  Intelligent  Systems  and  the  ETH  Zurich  have  launched  a  research  network  in  the  research  field  of  learning  systems.  Thus,  the  scien2sts  are  conduc2ng  joint  research  projects  and  will  hold  joint  conferences  and  workshops.  They  will  also  have  easier  access  to  each  other’s  research  faciliEes.  In  addi2on,  the  applicant  will  join  a  large,  well  resourced,  mul2disciplinary  team  led  by  Dr.  XXXX  (see  hdp://www.com.com).  The  group  comprises  some  people  (PhD  student  and  post-­‐docs)  from  different  part  of  whole  world,  and  includes  materials  chemists,  analy2cal  scien2sts,  physics  scien2sts  and  mechatronic  engineers,  as  well  as  admin  support,  and  is  well  equipped  in  terms  of  general  lab  instrumenta2on,  materials,  and  rapid  prototyping  facili2es.  The  team  is  located  in  the  MPI  for  Intelligence  systems  and  has  full  access  to  specialist  facili2es  for  microfabrica2on,  clean  rooms,  lithographic  techniques,  surface  analysis  and  visualisa2on.  These  facili2es  offers  by  MPI  and  the  research  mul2disciplinary  team  which  is  exper2se  in  the  topic  presented  here,  make  them  the  most  properly  place  for  the  development  of  the  proposed  project.    

Ej.  2  

Page 50: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.4  Competences,  experience  and  complementarity  of  the  par1cipa1ng  

organisa1ons  and  ins.tu.onal  commitment    

Page 51: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.4  Competences,  experience  and  complementarity  of  the  par1cipa1ng  organisa1ons  and  ins.tu.onal  commitment    

Debes  describir  la  par2cipación  ac2va  del  beneficiario  (host  ins2tu2on)  en  tu  inves2gación  y  training.  En  las  GF  debes  también  incluir  el  host  del  tercer  pais  (partner).      Puntos  esenciales  a  cubrir  en  este  apartado:    1)  Complementaridad  entre  TU  y  tu  supervisor  (su  línea  

inves2gación)  2)  Complementaridad  entre  la(s)  ins2tución(es),  las  lineas  de  

inves2gación  y  el  proyecto  MSCA  presentado  

Page 52: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.4  Competences,  experience  and  complementarity  of  the  par1cipa1ng  organisa1ons  and  ins.tu.onal  commitment    

Outgoing:  The  Massachuseds  General  Hospital,  where  CMIR  is  located,  maintains  an  Office  for  Interna2onal  Scholars  and  Students  to  assist  and  advise  scien2sts  like  Dr.  Alcántara  in  immigra2on,  visa,  health  insurance  and  related  maders.  Upon  establishment  of  the  start  date,  Dr.  Alcántara  will  be  given  a  list  of  contacts  and/or  possible  accommoda2ons,  and  will  be  helped  to  understand  and  sign  the  rela2ve  contract.  As  a  rule,  the  foreign  fellow  is  always  supported  by  a  na2ve  speaker  in  all  the  ini2al  interac2on  with  the  USA  ins2tu2ons.  CMIR  has  an  induc2on  week  for  all  new  researchers  where  they  are  introduced  to  and  receive  important  and  appropriate  training  in  safety  (COSHH,  GLP,  fire,  handling  skills,  disposal  prac2ces)  and  core  skills  (eg.  Record  keeping,  data  handling,  experimental/factorial  design,  IT,  databases,  analy2cal  facili2es  eg  NMR,  Mass  Spectroscopy  etc).    

MRI-­‐Nanobiosensor  

Page 53: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.4  Competences,  experience  and  complementarity  of  the  par1cipa1ng  organisa1ons  and  ins.tu.onal  commitment    

CMIR  encourages  researchers  to  take,  at  appropriate  2mes  during  their  tui2on,  a  comprehensive  range  of  courses  to  develop  general  skills  &  awareness  e.g.,  Scien2fic  &  Report  Wri2ng,  IT  Skills,  Ethics  &  Science,  Science  &  the  Media,  Library  skills,  Time  management,  Teaching  Prac2ce,  Careers,  Research  Management,  Good  supervisory  prac2ce.  At  the  beginning  of  the  project,  in  addi2on  to  standard  departmental  induc2on,  the  researcher  will  be  orientated  with  respect  to  the  teamworking  of  the  research  group,  ini2ated  in  background  reading  and  all  laboratory  procedures  clearly  explained.  Prac2cal  work  will  start  as  soon  as  possible  to  promote  his  interac2on  with  other  department  and  group  members.  Dr.  Alcántara  does  not  have  children  at  the  moment;  however,  CMIR  has  an  internal  childcare  programme  in  which  the  applicant  could  be  enrolled,  if  required.  

MRI-­‐Nanobiosensor  

Page 54: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.4  Competences,  experience  and  complementarity  of  the  par1cipa1ng  organisa1ons  and  ins.tu.onal  commitment    

Return:  Dr.  Alcántara  will  be  integrated  in  the  Biofunc2onal  Nanopar2cles  Group  (Dr.  Jesus  Mar{nez).  He  will  be  provided  with  lab  space,  students  (Ph.D  and  undergraduate)  and  infrastructure  to  achieve  with  success  his  project.  In  parallel  to  this  stage  Dr.  Alcántara  will  be  encourage  and  supported  to  create  a  spin-­‐off  enterprise  to  apply  his  managing  and  scien2fic  knowledge  into  the  market  place.  He  will  be  provided  with  lab  space  and  money  enough  to  start  the  ac2vity  and  will  be  monitored  by  INA.  INA  have  a  specific  administra2on  helpdesk  to  facilitate  Dr.  Alcántara  asking  for  European  funding  programs  (scien2fic  or  enterprise  form).  Depending  on  his  results  and  orienta2on,  at  the  end  of  this  fellowship,  INA  or  University  of  Zaragoza  will  accept  Dr.  Alcantara´s  candidature  to  be  part  of  INA  scien2fic  staff.  

MRI-­‐Nanobiosensor  

Page 55: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.4  Competences,  experience  and  complementarity  of  the  par1cipa1ng  organisa1ons  and  ins.tu.onal  commitment    

Managing  dryland  ecosystems  addressing  their  poten2al  state  transi2ons  requires  a  predic2ve  understanding  of  the  interdependent  ecological  and  hydrological  factors  and  mechanisms  that  govern  how  these  systems  func2on,  par2cularly  under  changing  condi2ons  and  pressures.  Addressing  this  need  requires  a  unique  mix  of  competences  and  experience  that  PROJECT  has  integrated.  The  fellow,  Dr.  XXX,  brings  a  decade  of  research  experience  in  experimental  ecology.  The  Supervisor,  Dr.  YYY,  is  an  interna2onally  recognized  and  regarded  scien2st  and  modeller  with  highly  complementary  research  interests  and  skills  who  has  made  available  the  excep2onal  facili2es  and  pooled  exper2se  represented  by  the  host  ins2tu2on,  XX-­‐CNRS.  Her  highly  produc2ve  track  record  achieved  in  part  through  innova2on  and  highly  effec2ve  mentoring  and  project  management  underscore  the  appropriateness  of  the  proposed  collabora2on.    

Ej.  2  

Page 56: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.4  Competences,  experience  and  complementarity  of  the  par1cipa1ng  organisa1ons  and  ins.tu.onal  commitment    

Moreover,  it  is  clear  that  Dr.  XXX  brings  to  ZZZ-­‐CNRS  the  capacity  to  conduct  forma2ve  modelling  research  2ghtly  coupled  to  empirical  field  research  and  the  network  necessary  through  UA  (Secondment)  to  ensure  both  2mely  research  results  and  successful  knowledge  transfer.  This  is  the  right  combina2on  to  take  on  such  an  important  and  yet  challenging  ini2a2ve  such  as  PROJECT.  The  host  ins2tu2on  will  recruit  Dr.  XXX    conform  to  the  principles  of  the  “Code  of  conduct  for  recruitment  of  researchers”,  appoint  Dr.  YYY  as  her  Supervisor  during  the  whole  dura2on  of  the  ac2on,  and  take  complete  responsibility  for  execu2ng  the  proposed  ac2on.  Both,  the  Beneficiary  and  the  Partner  Organisa2on  have  a  strong  track  record  in  suppor2ng  Marie  Curie  Ac2ons,  and  commit  themselves  to  support  the  career  development  and  training  of  the  fellow  and  provide  her  with  the  assistance,  infrastructure,  equipment  and  products  needed  for  implemen2ng  PROJECT  as  detailed  in  the  proposal.  

Ej.  2  

Page 57: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

3.4  Competences,  experience  and  complementarity  of  the  par1cipa1ng  organisa1ons  and  ins.tu.onal  commitment    

En  las  GF  debes  también  incluir  cartas  de  commitment  del  host  del  tercer  pais  (partner).  Se  anexan  en  el  apartado  B7,  aunque  es  bueno  mencionarlas  aquí  (B3.4)    

“Full  commitment  of  the  organiza2ons  involved  in  this  project  are  backed  by  the  corresponding  Leders  adached  in  part  B7”  

¿Quien  lo  ges2ona?    Interna2onal  project  Officers  

Tu  IP  

Page 58: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Herramientas  para  el  GanD        

Page 59: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Herramientas  para  el  GanD  

     

Microsow  Excel  o  Google  Spreadsheet  hdps://www.google.com/sheets    Smart  Sheet    hdps://www.smartsheet.com/    Gand  Project  hdp://www.gandproject.biz/      

Page 60: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Principales  criEcas  de  los  revisores        

Page 61: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Principales  criEcas  de  los  revisores  

     

•  Minor  risks  associated  with  the  6  month  experimental  plan  have  not  been  sufficiently  addressed.  

•  Risk  management  is  described  but  the  con2ngency  plans  are  too  generic  and  not  properly  addressing  the  projects  risks  

•  Quality  management  structures  and  procedures  are  not  sufficiently  detailed.    

•  The  financial  management  aspects  are  not  presented.  •  The  role  of  secondment  hosts  is  not  sufficiently  clear.  

Page 62: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Principales  criEcas  de  los  revisores  

     

•  The  new  career  perspec2ve  that  is  provided  is  limited  to  the  specific  topic  of  this  research.  A  broader  perspec2ve  is  not  shown.  

•  The  impact  of  secondments  in  industry  is  not  sufficiently  explicit.  •  The  risk  strategy  is  not  fully  considered  in  the  light  of  the  heavy  

workload  involved  in  the  project.  •  The  proposal  does  not  convincingly  establish  that  the  host  in  the  

outward  phase  has  the  exper2se  to  fully  support  the  planned  work  involving  either  molecular  biology  or  bio2c  agents.    

•  The  2me  allocated  to  learn  La}ce  QCD  and  obtain  results  is  too  short  to  be  realis2c.  

•  The  three  deliverables  men2oned  in  the  proposal  are  not  sufficiently  described.  

Page 63: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Principales  criEcas  de  los  revisores  

     

•  There  is  no  sufficient  informa2on  on  the  structure  of  the  scien2fic  management.  

•  The  management  structure  and  the  progress  monitoring  mechanisms  put  in  place  have  not  been  described  in  sufficient  detail.  

•  The  con2ngency  plan  has  not  fully  considered  all  the  possible  risks.  

•  The  overall  2ming  of  the  work  plan  seems  overly  2ght.  •  The  con2ngency  planning  is  not  clearly  demonstrated.  •  The  host  infrastructure  is  not  sufficiently  described.  

Page 64: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Principales  criEcas  de  los  revisores  

     

•  It  is  not  fully  described  how  the  fellowship  will  be  beneficial  for  the  host  organisa2ons.    

•  The  work  plan  is  quite  imprecise  on  experimental  condi2ons  and  introgression  line  characterisa2on.  

•  The  final  goal  of  the  research  is  not  clearly  emphasized  .  The  major  milestones  only  refer  to  pec2c-­‐enriched  cell  wall  popula2ons,  which  is  not  consistent  with  the  project’s  more  general  outline.  

•  Although  in  the  List  of  Par2cipants  there  is  no  partner  organisa2on  (known  already  or  to  be  determined  later),  in  the  implementa2on  sec2on  a  secondment  is  clearly  men2oned.  

Page 65: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Principales  criEcas  de  los  revisores  

     

•  Risk  assessment  comes  too  late  during  the  project.  The  risk  assessment  plan  takes  into  account  the  risks  of  not  achieving  the  planned  milestones,  but  the  con2ngency  measures  are  not  convincingly  described  

•  There  are  several  aspects  in  the  descrip2on  of  the  research  ac2vi2es  that  are  not  adequately  specified  

•  The  deliverables  and  the  dura2on  of  some  par2cular  tasks  are  not  clearly  presented.  

•  The  appropriateness  of  the  secondment  host  is  not  adequately  jus2fied.  

•  A  list  of  deliverables  and  milestones  is  missing  

Page 66: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

Principales  criEcas  de  los  revisores  

     

•  There  is  limited  informa2on  of  Intellectual  Property  Rights.  •  The  con2ngency  plan  provided  has  significant  weaknesses,  since  

it  does  not  propose  a  convincing  strategy  to  overcome  the  risk  iden2fied  (as  outlined  in  the  work  plan)  with  alterna2ve  strategies  that  allow  the  project  to  reach  its  objec2ves.  

 

Page 67: Curso&Especializado&Acciones&MSCAMSCA-M-4 … · Curso&especializado&MSCA 3.1 ! ! Overall! coherence! and! effec.veness of! the! work plan,! including& appropriateness&of&the&allocaEon&of&tasks&and&resources&&

Curso  especializado  MSCA  

¿Más  preguntas?    •  Grupo  privado  Google+  •  Webinario  