20000
5000
20000
14000
20000
5000
20000
61000
20000
5000
20000
15000
20000
5000
20000
270000
20000
16000
20000
5000
20000
81000
LOT M
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 2000
SOLAR HAI PLAN
AR-001J.ROTH
V.PHAM
1 : 2000
Solar Hai1
A
B
C
D
E
F
G
H
I
J
K
L
N
O
P
Q
R
S
T
U
V
NORTH2 30/01/18
VISUAL SCALE 1:2000 @ A3200m40m 160m120m80m0m
3 Updated Annotations and Template Title 01/02/18
01 OF 01
Updated Plans and Detailing VP
VP
JR
JR
20 February, 2018
1 Updated Plans and Detailing 19/01/18 VP JR
4 Updated to As-Built 14/09/18 VP JR
DASHED LINE OF 10m x 10m SOLAR ENVELOPE ABOVE
SOLAR HAI STREET
SOLAR HAI STREET
PROPOSED DESERT ROSEHOUSE
240
ENTRANCE
EX
IT
CAR SPACE
0
5291
720
680320
3589
3537
2627
1536
01:14 1:14
1:1
6
1:16
CONTINUOUS LINE OF 20m x 20mSOLAR ENVELOPE SURFACE LEVEL
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
SITE PLAN
AR-002L. FAIDUTTI
C.EIO
1 : 100
Site Plan1
NORTH
1
2
30/01/18
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
3
Updated annotations and Template Title 01/02/18
01 OF 014
Centered Model, hid elements, created regions 03/02/18
Updated Plans and Detailing VP
VP
VP
JR
JT
JR
20 February, 2018
5
Added spot elevation at the exit/ entrance 14/02/18 JR JT
GREEN WALL & TIMBER SLATS
PROPOSED ELECTRIC VEHICLE PARKING AREA 7800MM X 3200MM
NOTES
FOR ALL RAMP SLOPES AND RAMP DIMENSIONS, PLEASE REFER TO AR-401 - RAMP AND RAILING DIMENSIONS
CURVEDGREENWALL
Updated to As-Built 14/09/18 JR VP
AR-103
N
AR-104EAR-102 W
AR-101
S
2
RU-003
2
RU-003
1
AR-201
1
AR-201
1
AR-212
1
AR-212
-
1
AR-211
1
AR-211
1
AR-202
1
AR-202
2
RU-004
2
RU-004
1
RU-003
1
RU-003 1
RU-004
1
RU-004
AR-403
2
AR-402
2
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
GROUND FLOORVIEWS
AR-003J.ROTH
V.PHAM
1 : 100
Section and Elevation Views1
NORTH
Updated annotations and template title 01/02/18
2 03/02/18
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
VP
01 OF 01
Updated Plans and Detailing VP
20 February, 2018
1
JR
JR
3 09/09/18Updated Layout VP JR
4 Updated to As-Built 14/09/18 VP JR
DOTTED LINE OF ROOF ABOVE
CAR SPACE
2010
BACKDECK
FRONTDECK
BACK RAMP
7910 6722
11020
3840
1600
EN
TR
AN
CE
EX
IT
240
0
1600
1600
FRONT RAMP
720
320 680
720
0
1600
2911
1600
1600
840
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
GROUND FLOORPLAN
AR-011J.ROTH
C.EIO
1 : 100
AR - Exterior Features1
NORTH
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
20 February, 2018
1
2
30/01/18
3
Updated Plans, Detailing and Template Adjustments 01/02/18
4
Centered Model, hid elements, created regions 03/02/18
Updated Plans and Detailing JR
VP
VP
VP
JT
JR
01 OF 01
GREEN WALL & TIMBER SCREEN
EXTENDING AROUND DECK
AREA
NOTES
FOR ALL RAMP SLOPES AND RAMP DIMENSIONS, PLEASE REFER TO AR-401 - RAMP AND RAILING DIMENSIONS.
5
09/09/18Updated Layout VP JR
GREEN WALL
Updated to As-Built 14/09/18 JR VP
PLANTROOM
GUESTBEDROOM
MASTER BEDROOM
BATHROOM
273 4900 116 3694 273 3498 273
13049 OA
10886 O
A
13049 OA
273
2946
468
3597
116
2094
116
1894
273
11796 O
A
1233 1090 1650 1090 1523 1090 1580 3771
273 4298 273 2728 273 3238 273 1400 273
4843 614 1500 614 1392 1660 459 1945
273
3194
116
3600
116
3294
273
LIVINGROOMDINING ROOM
KITCHEN
ENTRANCE W.C.
1038
1450
823
2010
603
1090
100
1015
411
8557
ROOF DASHED LINE
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
GROUND FLOORPLAN
AR-012J.ROTH
V.PHAM
1 : 100
AR - Walls and Openings1
NORTH
1
2
30/01/18
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
3
Updated Plans, Detailing and Template Adjustments 01/02/18
4
Centered model, added dimensions, hid elements 03/02/18
Updated Plans and Detailing VP
VP
VP
JR
JT
JR
18 January, 201801 OF 01
5
Edited dimensions 06/09/18 VP JR
Updated to As-Built 14/09/18 JR VP
4900 116 3694 273 3498
3294
116
3600
116
3194
320
910
1080
1290
12481
10320
4298 3273 3510 1400
668 1080 910 780 1350 112 1161297 1090 1580 49 2950 500
3173 1015 3418 1015 2350 1510
2697 116 9668
12481
116
49
1990
55
116
1894
3597
116
2094
116
1894
7817
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
GROUND FLOORPLAN
AR-013J.ROTH
V.PHAM
1 : 100
AR - Interior Openings1
GUEST BEDROOM
DINING ROOM
MASTER BEDROOM
ENTRANCE
PLANT ROOM
W.C
BATHROOMLIVING ROOM
KITCHEN
NORTH
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
20 February, 2018
1 Updated Plans and Detailing 19/01/18
2 30/01/18
3 Updated Plans, Detailing and Template Adjustments 01/02/18
VP
4 Centered model, added dimensions, hid elements 03/02/18
Updated Plans and Detailing VP
VP
VP
JR
JR
JR
JR01 OF 01
NOTES
FOR RULES COMPLIANCE INFORMATION REGARDING THE FLOOR PLAN, PLEASE SEE RU-301 - RULES COMPLIANCE FLOOR PLAN.
Updated to As-Built 14/09/18 JR JT5
FALL 3°
FALL 10°
FALL 10°
FALL 10°
BIPV-T ROOF
COLORBOND METALROOF SHEETING 3
150
8623
4406
3310
10865
11772
13026
4843 2728 1684 3771
13026
9255 3771
4217
4406
7716
3150
FALL 3°
4649
3973
DASHED LINE OF 10m x 10m SOLAR ENVELOPE ABOVE
CONTINUOUS LINE OF 20m x 20mSOLAR ENVELOPE SURFACE LEVEL
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
ROOF PLAN
AR-021L.FAIDUTTI
C.EIO
1 : 100
Roof Plan1
1
2
30/01/18
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
3
Updated Plans, Detailing and Template Adjustments 01/02/18
01 OF 014
Centered model, added dimensions, hid elements 03/02/18
Updated Plans and Detailing VP
VP
VP
JR
JR
JR
NORTH
NOTES
ROOF CONSISTING OF 10° PITCH IS A SINGLE BIPV-T SYSTEM. NO INDIVIDUAL PV PANELS DEPECTED AS WHOLE 10° PITCHED ROOF IS ONE LARGE PV SYSTEM.
LADDER RESTAINT BRACKET IS FOR ATTACHING LADDER TO ALLOW FOR ACCESS TO ROOF.
= HARNESS ANCHOR POINT
BIPV-T = BUILDING INTEGRATED PHOTOVOLTAIC -THERMAL
LOCATION OF LADDER RESTRAINT BRACKET
LOCATION OF WEATHER STATION
18 January, 2018
5
Edited dimensions 06/09/18 VP JR
GUTTER FALL
FALL FALL
FALL
FALL
Updated to As-Built 14/09/18 JR JT5
Surface Level
0
Ground Floor Level
720
Solar Envelope
7000
ACCESSIBLE RAMP
BIPV-T ROOF
Roof Level
5231
OUTDOOR WALL MOUNTED SCONCE LAMP
PIVOT ENTRANCE DOOR (D5)
LIGHT WEIGHT CONCRETE SECOND SKIN WALL
WATERTANK
WASTE WATERTANK
DINING ROOM DOOR (D5)
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
BUILDINGELEVATIONSOUTH
AR-101V.PHAM
C.EIO
1 : 50
SouthS
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
BUILDINGELEVATIONSOUTH
AR-101V.PHAM
C.EIO
1
2
01/02/18
3
Inserted the Piers 14/02/18
Updated Plans, Detailing and Template Adjustments VP
JAP
JR
JT
20 February, 20184
Updated Annotations and Dimensions for Deliverable #5 19/02/18 CE JR
01 OF 015
09/09/18Added annotation VP JR
Updated to As-Built 14/09/18 JR VP
Surface Level
0
Ground Floor Level
720
Solar Envelope
7000
Roof Level
5231
LIGHT WEIGHT CONCRETE SECOND SKIN WALL
BIPV-T ROOFCOLORBOND METAL ROOF SHEETING
10° ROOF PITCH
3° ROOF PITCHTIMBER PICKET FENCE &GREEN WALL
ACCESSIBLE RAMP
WATER TANK
ACCESSIBLE RAMP
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
BUILDINGELEVATIONWEST
AR-102V. PHAM
C. EIO
1 : 50
WestW
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
BUILDINGELEVATIONWEST
AR-102V. PHAM
C. EIO
1
2
01/02/18
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
3
Inserted the Piers 14/02/18
Updated Plans, Detailing and Template Adjustments VP
JAP
JT
JT
20 February, 2018
Updated Annotations and Dimensions for Deliverable #5 19/02/18 CE VP
401 OF 01
Edited layout 06/09/18 VP JR
Updated to As-Built 14/09/18 JR VP5
Surface Level
0
Ground Floor Level
720
Solar Envelope
7000
Roof Level
5231
VENTILATED FACADE WALL
BIPV-T ROOF COLORBOND METAL ROOF SHEETINGWALL RECESSED SLIDING DOOR (D3) BIPV-T ROOF
ACCESSIBLE RAMP
CLERESTORY WINDOWS (W4)
MASTER BEDROOM WINDOWS, NORTH KITCHEN WINDOW(W2)
FRESH AIR GRILL
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
BUILDINGELEVATIONNORTH
AR-103V.PHAM
C.EIO
1 : 50
NorthN
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
1 Hid Section/Reference Lines 30/01/18
2 01/02/18
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
3 Inserted the Piers 14/02/18
JR
Updated Plans, Detailing and Template Adjustments VP
JAP
VP
JT
JT
20 February, 2018Updated Annotations and Dimensions for Deliverable #5 19/02/18 CE VP401 OF 01
Updated to As-Built 14/09/18 JR VP5
Surface Level
0
Ground Floor Level
720
Solar Envelope
7000
Roof Level
5231
BIPV-T ROOF
10° ROOF PITCH
LIGHT WEIGHT CONCRETE SECOND SKIN WALL
3° ROOF PITCH
COLORBOND METAL ROOF SHEETINGEASTERN
KITCHEN WINDOW (W3)EASTERN
KITCHEN DOOR (D2)
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
BUILDINGELEVATION EAST
AR-104V.PHAM
C.EIO
1 : 50
EastE
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
1 Hid Section/Reference Lines 30/01/18
2 01/02/18
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
3 Inserted the Piers 14/02/18
JR
Updated Plans, Detailing and Template Adjustments VP
JAP
JR
JT
JT
20 February, 2018Updated Annotations and Dimensions for Deliverable #5 19/02/18 CE VP401 OF 01
Updated to As-Built 14/09/18 JR VP5
Surface Level
0
Ceiling Level
3330
Ground Floor Level
720
1AR-331
1AR-321
2AR-341
Solar Envelope
7000
LIVING ROOMKITCHEN ENTRANCE
1AR-333
Roof Level
5231
2AR-308
10° ROOF PITCH
3° ROOF PITCH
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
LONGITUDINALSECTION 1
AR-201L.FAIDUTTI
C.EIO
1 : 50
Section 1 - Longitudinal1
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
CEILING CAVITY CEILING CAVITY
1 Hid Section/Reference Lines 30/01/18
2 01/02/18
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
3 Inserted the Piers and Heights 14/02/18
JR
Updated Plans, Detailing and Template Adjustments VP
JAP
VP
JT
JT
20 February, 201801 OF 01
NOTES
FOR ALL DIMENSIONS RELATING TO RAMPS OR RAILINGS, PLEASE REFER TO AR-401 - RAMP AND RAILING DIMENSIONS.
4 Updated to As-Built 14/09/18 VP JR
Surface Level
0
Ceiling Level
3330
Ground Floor Level
720
Solar Envelope
7000
MASTER BEDROOMBATHROOMGUEST BEDROOM
Roof Level
5231
AAR-305
1AR-332
2616
2616
1AR-322
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
LONGITUDINALSECTION 2
AR-202L.FAIDUTTI
C.EIO
1 : 50
Section 2 - Longitudinal1
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
CEILING CAVITYCEILING CAVITY
1 Hid Section/Reference Lines 30/01/18
2 01/02/18
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
3 Inserted the Piers 14/02/18
Updated Plans, Detailing and Template Adjustments VP
JAP
JR
JT
JT
20 February, 2018
VP
01 OF 014 Updated to As-Built 14/09/18 VP JR
Surface Level
0
Ceiling Level
3330
Ground Floor Level
720
Solar Envelope
7000
BATHROOM KITCHEN LIVING ROOM
Roof Level
5231
2AR-317
2616
2616
1AR-334
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
TRANSVERSALSECTION 1
AR-211J.THIM
J.ROTH
1 : 50
Section 1 - Transversal1
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
CEILING CAVITY
CEILING CAVITY
1 Hid Section/Reference Lines 30/01/18
2 01/02/18
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
3 Inserted the Piers 14/02/18
VP
Updated Plans, Detailing and Template Adjustments VP
JAP
JR
JT
JT
20 February, 201801 OF 01
4 Updated to As-Built 14/09/18 VP JR
Surface Level
0
Ceiling Level
3330
Ground Floor Level
720
Solar Envelope
7000
Roof Level
5231
2616
2616
2597
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
TRANSVERSALSECTION 2
AR-212V.PHAM
C.EIO
1 : 50
Section 2 - Transversal1
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
ENTRANCEW.C. FRONT DECK GUEST BEDROOM
CEILING CAVITYCEILING CAVITY
1 Hid Section/Reference Lines 30/01/18
2 01/02/18
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
3 Inserted the Piers 14/02/18
VP
Updated Plans, Detailing and Template Adjustments VP
JAP
JR
JT
JT
20 February, 201801 OF 01
4 Updated to As-Built 14/09/18 VP JR
KITCHEN
LIVING ROOM
ENTRANCE W.C.
DINING ROOM
PLANTROOM
GUESTBEDROOM
MASTER BEDROOM
BATHROOM
W2.2
D6.2 D7.1
W2.1W3.1
D7.2
W1.1
D1.1
W2.3
D3.1D7.3
D2.1
D6.1
D8.1
D5.1
D9.1
D4.1
D7.4
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
DOOR ANDWINDOWLOCATIONS - GF
AR-301L.FAIDUTTI
V.PHAM
1 : 100
Door and Window Tags1
Window Tags
Mark Location REF Drawing No.
W1.1 Guest Bedroom AR - 304
W2.1 Master Bedroom, Kitchen AR - 305
W2.2 Master Bedroom, Kitchen AR - 305
W2.3 Master Bedroom, Kitchen AR - 306
W3.1 Kitchen AR - 307
W4.1 Dining Area AR - 308
W4.2 Dining Area AR - 308
W4.3 Dining Area AR - 308
Door Tags
Mark Location REF Drawing No.
D1.1 Dining Room AR - 312
D2.1 Kitchen AR - 313
D3.1 Back Patio AR - 314
D4.1 Plant Room AR - 315
D5.1 Entrance AR - 316
D6.1 Dining Room AR - 317
D6.2 Guest Bedroom AR - 317
D7.1 Guest W.C. AR - 318
D7.2 Bathroom AR - 318
D7.3 Bathroom AR - 318
D7.4 Living Room AR - 317
D8.1 Master Bedroom AR - 319
D9.1 Living Room AR - 320
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
1 Updated Plans and Detailing 17/01/18
2 01/02/18
VP
Updating door tag numbers CE
JR
JR
07 September, 2018
NORTH
01 OF 01
3 07/09/18Updating door tag numbers VP JR
WINDOW TAGS
DOOR TAGS
TAGS LEGEND
4 Updated to As-Built 14/09/18 VP JR
W4.1 W4.2 W4.3
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
DOOR ANDWINDOWLOCATIONS - CL
AR-302J. ROTH
V.PHAM
1 : 100
Window Tags - Celestory1
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
Window Tags
Mark Location REF Drawing No.
W1.1 Guest Bedroom AR - 304
W2.1 Master Bedroom, Kitchen AR - 305
W2.2 Master Bedroom, Kitchen AR - 305
W2.3 Master Bedroom, Kitchen AR - 306
W3.1 Kitchen AR - 307
W4.1 Dining Area AR - 308
W4.2 Dining Area AR - 308
W4.3 Dining Area AR - 308
NORTH
20 February, 201820 February, 201801 OF 01
WINDOW TAGS
DOOR TAGS
TAGS LEGEND
1 Updated to As-Built 14/09/18 VP JR
W2MASTER BEDROOM, KITCHEN
NORTH
W1GUEST BEDROOM
W3KITCHEN EAST
W4DINING AREA
1090
1440
1450
1440
1090
1440
1810
600
ELEVATIONELEVATION ELEVATION ELEVATION
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
WINDOWSCHEDULE
AR-303J.ROTH
V.PHAM
AR-301 Window Schedule
Type Mark Count Window Style Operation Location Width Height
W1 1 Awning Window Automated Guest Bedroom 1450 1440
W2 3 Awning Window Automated Master Bedroom,Kitchen
1090 1440
W3 1 Casement Window Manual Kitchen 1090 1440
W4 3 Transom Awning Window Automated Dining Area 1810 600
1 : 25
Window Legend VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
1
2
18/01/18
3
29/01/18
4
Updated Plans, Detailing and Template Adjustments 01/02/18
Minor grammar/sizing update
VP
Schedule/Placement/Scale VP
VP JR
JR
JR
01 OF 0106 September, 2018Edited Tags 06/09/18 VP JR4
5 Updated to As-Built 14/09/18 VP JR
NOTES
WINDOWS FIXED DIRECTLY TO STEEL FRAME USING MINIMUM OF 2 BUGAL SCREWS ON BOTH LEFT AND RIGHT SIDES OF WINDOW FRAME
40 65 1240 65 40
1450
40
65
1205
90
40
1440
ELEVATION VIEW
325
26
273
26
1450
65
60
200
1440
960
325
2400
EXTERIOR
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
WINDOWDETAILING (W1)
AR-304J.ROTH
V.PHAM
1 : 25
Window Detailing (W1)
1 Updated Plans and Detailing 19/01/18
2 Placement and Annotations 29/01/18
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
3 Updated Plans, Detailing and Template Adjustments 01/02/18 VP
VP
VP
F.F.L.
SECTION VIEW
PLAN VIEW
20 February, 2018
JR
JR
JR
01 OF 01
NOTES
WINDOW FRAME MADE OF RECYCLED HARDWOOD.WINDOW AUTOMATED.
FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:
4mm CLEAR TOUGHENED + MICROSHADE10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED
CSR VIRIDIAN MICROSHADE MESH TO BE INSTALLED ON GLAZING SURFACE. MICROSHADE TYPE: MS-A.
HARDWARE NOT SHOWN IN DRAWING.
GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS
WINDOW GLAZING COMPLIANT WITH IRC SECTION R308
THERMAL RESISTANCE (R) VALUE FOR WINDOW DETAIL (W1): 1.047Km2/W
4 Updated to As-Built 14/09/18 VP JR
40 65 880 65 40
1090
40
65
1205
90
40
1440
ELEVATION VIEW
1440
960
325
2400
26
273
26
200
60
65
1090
325
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
WINDOWDETAILING (W2)
AR-305J. ROTH
V.PHAM
1 : 25
Window Detailing (W2)
1 Updated Plans and Detailing 19/01/18
2 Placement and Annotations 29/01/18
PLAN VIEW
SECTION VIEW
F.F.L.
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
3 Updated Plans, Detailing and Template Adjustments 01/02/18 VP
VP
VP
20 February, 2018
JR
JR
JR
EXTERIOR
01 OF 01
NOTES
WINDOW FRAME MADE OF RECYCLED HARDWOOD.WINDOW AUTOMATED.
FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:
4mm CLEAR TOUGHENED + MICROSHADE10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED
HARDWARE NOT SHOWN IN DRAWING.
GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS
WINDOW GLAZING COMPLIANT WITH IRC SECTION R308
THERMAL RESISTANCE (R) VALUE FOR WINDOW DETAIL (W2): 1.079Km2/W
4 Updated to As-Built 14/09/18 VP JR
40 65 880 65 40
1090
40
65
1230
65
40
1440
ELEVATION VIEW
26
273
26
325
1090
65
60
200
1440
325
EXTERIOR
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
WINDOWDETAILING (W3)
AR-307J. ROTH
V.PHAM
1 : 25
Window Detailing (W3)
PLAN VIEW
SECTION VIEW
F.F.L.
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
1 Updated Plans and Detailing 19/01/18
2 Placement and Annotations 29/01/18
3 Updated Plans, Detailing and Template Adjustments 01/02/18 VP
VP
VP
20 February, 2018
JR
JR
JR
01 OF 01
NOTES
WINDOW FRAME MADE OF RECYCLED HARDWOOD.
FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:
4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED
LOCK / LEVER SET TO BE MANUFACTURED.
HARDWARE NOT SHOWN IN DRAWING.
GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS
WINDOW GLAZING COMPLIANT WITH IRC SECTION R308
THERMAL RESISTANCE (R) VALUE FOR WINDOW DETAIL (W3): 1.047Km2/W
4 Updated to As-Built 14/09/18 VP JR
40 65 1600 65 40
1810
40
65
365
90
40
600
ELEVATION VIEW
26
273
26
325
1810
65
60
200
600
325
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
WINDOWDETAILING (W4)
AR-308J. ROTH
V. PHAM
1 : 25
Window Detailing (W4)
1 Updated Plans and Detailing 19/01/18
2 Placement and Annotations 29/01/18
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
3 Updated Plans, Detailing and Template Adjustments 01/02/18 VP
VP
VP
PLAN VIEW
SECTION VIEW
20 February, 2018
JR
JR
JR
EXTERIOR
01 OF 01
NOTES
WINDOW FRAME MADE OF RECYCLED HARDWOOD.WINDOW AUTOMATED.
FRAME REBATE SET TO 44mm- ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:
4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED
HARDWARE NOT SHOWN IN DRAWING.
WINDOW OPENING MECHANISM TO BE ELECTONIC AND CONNECTED TO THE HOME BUILDING AUTOMATION SYSTEM
GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS
WINDOW GLAZING COMPLIANT WITH IRC SECTION R308
THERMAL RESISTANCE (R) VALUE FOR WINDOW DETAIL (W1): 0.930Km2/W
4 Updated to As-Built 14/09/18 VP JR
DOOR D4PLANT ROOM
DOOR D1DINING ROOM
DOOR D5EXTERNAL ENTRANCE
DOOR D2KITCHEN
DOOR D3EXTERNAL BACK PATIO
15001015
2440
2440
1660
F.F.L.
880
21402680
2950
2440 RECESSED
WALL
DOOR D8MASTER BEDROOM
DOOR D7INTERNAL SLIDING
GUEST W.C, LIVING ROOM, BATHROOM
DOOR D6INTERNAL HINGED
GUEST BEDROOM, DINING ROOM
13501015 10603600
DOOR D9LIVING ROOM
F.F.L.
2160
2140
2440
2140
CAVITY
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
DOOR SCHEDULE
AR-311J.ROTH
V.PHAM
AR-311 Door Locations
Mark Location Description
D1.1 Dining Room D1
D2.1 Kitchen D2
D3.1 Back Patio D3
D4.1 Plant Room D4
D5.1 Entrance D5
D6.1 Dining Room D6
D6.2 Guest Bedroom D6
D7.1 Guest W.C. D7
D7.2 Bathroom D7
D7.3 Bathroom D7
D7.4 Living Room D7
D8.1 Master Bedroom D8
D9.1 Living Room D9
AR-311 Door Quantities
Description Count Height Width Thermal Resistance (R)
D1 1 2680 1500 N/A
D2 1 2440 1015 1.053
D3 1 2440 2950 N/A
D4 1 2140 914 0.9823
D5 1 2440 1660 N/A
D6 2 2180 1015 1.045
D7 4 2160 1940 N/A
D8 1 2140 1350 N/A
D9 1 2440 3600 N/A
1 : 50
Door Legend External
1 : 50
Door Legend Internal VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
1 Minor grammar/sizing update 17/01/18
2 29/01/18
VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m
3 Schedule & Legend rearrangement on sheet 02/02/18
JR
4 Replaced Plant Room Door 07/02/18
Schedule/Placement/Scale JR
CE
JR
VP
VP
VP
VP 20 February, 201801 OF 01
NOTE
ALL INTERNAL DOORS DESIGNED TO HAVE (AT MINIMUM) A CLEAR WIDTH OF 800mm, AND EXTERNAL DOORS DESIGNED TO HAVE (AT MINIMUM) A CLEAR WIDTH OF 900mm.
5 Updated to As-Built 14/09/18 VP JR
40 68 1284 68 40
323 139 773
40
460
40
2100
40
2680
40
68
324
68
40
93
1857
140
10
40
1500
1500
40 485 935 40
25
273
23
320
2
AR-312
320
214 40 3 54 9
58
350
40
40
20
390
140
10
40
257
54
9
320
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3As indicated
DOOR DETAILING(D1)
AR-312C.MCDOWELL
L.FAIDUTTI
1 : 25
Door Detailing (D1)ELEVATION VIEW
PLAN VIEW
1 Updated Plans and Detailing 19/01/18
2 29/01/18
3 Updated Plans, Detailing and Template Adjustments 01/02/18
VP
Plan Views and Annotations VP
VP
JR
JR
JR
20 February, 201801 OF 01
NOTES
DOOR FRAME MADE OF RECYCLED HARDWOOD.DRAINAGE GUTTER IN SILL TO BE MANUFACTURED.
FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:
4mm CLEAR TOUGHENED + MICROSHADE10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED
VIRIDIAN MICROSHADE MESH TO BE INSTALLED ON GLAZING SURFACE OF DOOR & WINDOW. MICROSHADE TYPE:
MS-D ON WINDOWMS-A ON DOOR
HARDWARE NOT SHOWN IN DRAWING.
DOOR & WINDOW OPEN OUT.
GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS
WINDOW GLAZING COMPLIANT WITH IRC SECTION R308
44mm REBATE MAX.30mm IGU DETAILS IN NOTES
3mm WINDOW SEAL TYP.
INTERIOROF HOUSE
3mm DOOR SEAL TYP.
44mm REBATE MAX.30mm IGU DETAILS IN NOTES
3mm WINDOW SEAL TYP.
44mm REBATE MAX.30mm IGU DETAILS IN NOTES
ELECTRONIC ACTUATOR.
1 : 5
Frame Details (D1)2
1 : 5
Rebated Door Section (D1)3
DOOR GLASS
4 Updated Detailing 26/02/18 LF CM
WALL LAYERING
BRASS STRIP TYP.
DOOR BRUSH SEALS TBC.
F.F.L.
1
5 Updated to As-Built 14/09/18 VP JR
1015
40
2360
40
2440
40 935 40
24
273
24
2
AR-313
40 935 40
1015
320
454340219
320
390
130
10
40
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3As indicated
DOOR DETAILING(D2)
AR-313C.MCDOWELL
L.FAIDUTTI
1 : 25
Door Detailing (D2) VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
ELEVATION VIEW
PLAN VIEW
1 Updated Plans and Detailing 19/01/18
2 07/02/18
VP
Updated Plans and Detailing JR
JR
VP
20 February, 201801 OF 01
1 : 5
Frame Details (D2)3
BRASS STRIP TYP.
DOOR BRUSH SEALS TBC.
NOTES
DOOR FRAME MADE OF RECYCLED HARDWOOD.DRAINAGE HOLES TO BE MANUFACTURED ON SITE.
FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:
4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED
HARDWARE NOT SHOWN IN DRAWING.
DOOR OPENS OUT.
GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS
WINDOW GLAZING COMPLIANT WITH IRC SECTION R308
44mm REBATE MAX30mm IGU DETAILS IN NOTES
3mm DOOR SEAL TYP.
INTERIOROF HOUSE
3 Updated Detailing 26/02/18 LF CM
F.F.L.
1 2
4 Updated to As-Built 14/09/18 VP JR
2950
10101940
2
AR-314
4092090840908409040
4097040186040
333
182
515
RECESSEDWALL
2440
1020
40
2360
40 1
40
2115
90
24 181 54 10 54 168 24
515
65
80
18
22
130
10
205 54 10 54 10 182
515
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3As indicated
DOOR DETAILING(D3)
AR-314C.MCDOWELL
L.FAIDUTTI
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
ELEVATION VIEW
PLAN VIEW
1 Updated Plans and Detailing 19/01/18
2 07/02/18
VP
Updated Plans and Detailing JR
JR
VP
20 February, 201801 OF 01
1 : 25
Door Detailing (D3) 1 : 5
Frame Details (D3)3
NOTES
DOOR FRAME MADE OF RECYCLED HARDWOOD.DRAINAGE HOLES TO BE MANUFACTURED ON SITE.
FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:
4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED
HARDWARE NOT SHOWN IN DRAWING.
GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS
WINDOW GLAZING COMPLIANT WITH IRC SECTION R308
44mm REBATE MAX.30mm IGU DETAILS IN NOTES
17mm X 22mm DEEP TRACK.
DOOR SEAL
DOOR BRUSH SEALS TYP. TBC.
3 Updated Detailing 26/02/18 LF CM
DECKING BOARDS
44mm REBATE MAX.30mm IGU DETAILS IN NOTES
WALL LAYERING
F.F.L.
1 2
4 Updated to As-Built 14/09/18 VP JR
2140
40
2100
320880
40 400 400 40
880
2140
40
2100
4040040040
880
24
273
24
320
140
40
140
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
DOOR DETAILING(D4)
AR-315J. ROTH
V. PHAM
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
PLAN VIEW
DETAILED VIEW
F.F.L.
1 : 25
Door Detailing (D4)
ELEVATION VIEW
1 Updated Plans and Detailing 19/01/18
2 29/01/18
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
3 Updated Plans, Detailing and Template Adjustments 01/02/18
VP
Plan Views and Annotations VP
VP
JR
JR
JR
20 February, 201801 OF 01
1
4 Updated to As-Built 14/09/18 VP JR
NOTES
DOOR MANUFACTURED BY AUSFLAM FIRE SYSTEMS PTY LTD. TO A 2HR FIRE RATING AS SPECIFIED IN SDME RULES AND BUILDING CODE V4.
PRODUCT INFORMATION:
2 x 400Wmm x 2097Hmm 2HR DOUBLE DOOR AND RETRO FIT FRAME AFS FR270
40
2360
40
65
2230
65
2440
40 470 40 1070 40
65 340 65
1660
24
273
24
320
40 1580 40
2
AR-316
5
AR-316
65
40
233 54 37
24 273 24
320
40
10
40
72 47 77168
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3As indicated
DOOR DETAILING(D5)
AR-316C.MCDOWELL
L.FAIDUTTI
1 : 25
Door Detailing (D5)
ELEVATION VIEW
PLAN VIEW
1 Updated Plans and Detailing 19/01/18
2 01/02/18
3 Updated Plans, Detailing and Template Adjustments 01/02/18
VP
Rearrange views on sheet CE
VP
JR
JR
JR
20 February, 201801 OF 01
NOTES
DOOR FRAME MADE OF RECYCLED HARDWOOD.
WINDOW FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:
4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED
HARDWARE NOT SHOWN IN DRAWING.
PIVOTING DOOR OPENS IN.
WINDOW IS FIXED.
GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS
WINDOW GLAZING COMPLIANT WITH IRC SECTION R308
1 : 5
Window Frame Details (D5)2
1 : 5
Door Frame Details (D5)3
75mm X 35mm FULL LENGTH HANDLE
DOOR BRUSH SEALS TBC.
44mm REBATE MAX.30mm IGU DETAILS IN NOTES
4 Updated Detailing 26/02/18 LF CM
F.F.L.
1
5 Updated to As-Built 14/09/18 VP JR
40
2100
40
2180
1015
40 935 40
110
1015
40 935 40
35
110
40
2180
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
DOOR DETAILING(D6)
AR-317J. ROTH
V. PHAM
1 : 25
Door Detailing (D6)
DETAILED VIEWELEVATION VIEW
PLAN VIEW
F.F.L.
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
1 Updated Plans and Detailing 07/02/18 JR VP
20 February, 201801 OF 01
1
2 Updated to As-Built 14/09/18 VP JR
2160
2100
60
SLIDING DOORCAVITY
CAVITY FOR DOOR STOP
50 860 40 1000 40
1990
116
110
60
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
DOOR DETAILING(D7)
AR-318J. ROTH
V. PHAM
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
1 : 25
Door Detailing (D7)
ELEVATION VIEW
PLAN VIEW
DETAILED VIEW
F.F.L.
1 Updated Plans and Detailing 19/01/18
2 29/01/18
3 Updated Plans, Detailing and Template Adjustments 01/02/18
VP
Plan Views and Annotations VP
VP
JR
JR
JR
20 February, 201801 OF 01
1
4 Updated to As-Built 14/09/18 VP JR
2140
1350
2100
40
40 335 935 40
110
40 338 932 40
1350
36
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
DOOR DETAILING(D8)
AR-319J. ROTH
V. PHAM
1 : 25
Door Detailing (D8) VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
PLAN VIEW
DETAILED VIEW
F.F.L.
ELEVATION VIEW
1 Updated Plans and Detailing 19/01/18
2 29/01/18
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
3 Updated Plans, Detailing and Template Adjustments 01/02/18
VP
Plan Views and Annotations VP
VP
JR
JR
JR
20 February, 201801 OF 01
1
4 Updated to As-Built 14/09/18 VP JR
3600
40 3520 40
2440
40
2360
40
90
2115
140
13 54 10 54 10 54 10 54 13
273
32 17 47 17 47 17 96
273
18
22
40 90 768 90 768 90 768 90 768 90 40
3600
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3As indicated
DOOR DETAILING(D9)
AR-320C.MCDOWELL
L.FAIDUTTI
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
ELEVATION VIEW
PLAN VIEW
1 Updated Plans and Detailing 19/01/18
2 07/02/18
VP
Updated Plans and Detailing JR
JR
VP
20 February, 2018
1 : 25
Door Detailing (D9)
01 OF 01
1 : 5
Frame Details (D9)2
NOTES
DOOR FRAME MADE OF RECYCLED HARDWOOD.
FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:
4mm CLEAR TOUGHENED
REBATED PULL TO BE MANUFACTURED. NOT SHOWN IN THE DRAWING.
DOOR WILL REQUIRE LOCKING / DROP BOLTS. LOCKING / DROP BOLTS ARE NOT SHOWN IN THE DRAWING.
GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS
WINDOW GLAZING COMPLIANT WITH IRC SECTION R308
17mm X 22mm DEEP TRACKS
3 Updated Detailing 26/02/18 LF CM
F.F.L.
1
4 Updated to As-Built 14/09/18 VP JR
15mm FROSTED OAK ENGINEERED TIMBER FLOORING
21mm STRUCTURAL PLYWOOD TIMBER SHEETING
9mm STRUCTURAL PLYWOOD
152mm STEEL STUD & 2X75mm BRADFORD BLACK INSULATION BATTS
1mm VAPOUR RETARDER MEMBRANE
40mm RIGID INSULATION
4mm RUBBER UNDERLAY
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 10
FLOORCONSTRUCTIONDETAILS
AR-321J.ROTH
C.EIO
1 : 10
Interior Floor Detail1
VISUAL SCALE 1:10 @ A31m0.2m 0.8m0.6m0.4m0m
1 Updated Plans, Detailing and Template Adjustments 01/02/18 JR
FLOOR CONSTRUCTION DETAILS
THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK) FIRE RATING CLASS*
19 FROSTED OAK ENGINEERERD TIMBER FLOORING 0.13 -4 RUBBER UNDERLAY 0.83 -21 STRUCTURAL PLYWOOD TIMBER SHEETING 0.13 C152 STEEL STUD & SOFT INSULATION 0.035 A9 STRUCTURAL PLYWOOD 0.13 C1 VAPOUR RETARDER MEMBRANE 2.3 B40 RIGID INSULATION 0.028 A
TOTAL THICKNESS 242 mmR-VALUE 6.12 m2K/W
20 February, 2018
VP
01 OF 01
2 Updated to As-Built 14/09/18 VP JR
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 10
BATHROOM ANDW/C FLOORDETAILS
AR-322V. PHAM
J. ROTH
1 : 10
Bathroom and W/C Floor1
FLOOR CONSTRUCTION DETAILS
THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK) FIRE RATING CLASS*
8 PORCELAIN TILE 1.5 -3 TILE GLUE MCB A50 ADHESIVEVARYING SCREED 0.13 C2 WATERPROOF MEMBRANE19 CEMENT SHEETING 0.5100 STEEL STUD & SOFT INSULATION 0.035 A9 STRUCTURAL PLYWOOD 0.13 C1 VAPOUR RETARDER MEMBRANE 2.3 B40 RIGID INSULATION 0.028 A
TOTAL THICKNESS 232 mmR-VALUE 5.10 m2K/W
8mm PORCELAIN TILE
3mm TILE GLUE MCB A50 ADHESIVEVARYING DEPTH SCREED2mm WATERPROOF MEMBRANE
19mm CEMENT SHEETING100mm STEEL STUD AND SOFT INSULATION
9mm STRUCTURAL PLYWOOD
1mm VAPOUR RETARDER MEMBRANE
40mm RIGID INSULATION
20 February, 2018
1 Updated to As-Built 14/09/18 VP JR
152mm STEEL STUD & 2X75mm BRADFORD BLACK INSULATION BATTS
1mm WATER TIGHT MEMBRANE
10mm AIR GAP WITH TIMBER BATTERNS
80mm RIGID INSULATION
87mm 'TRACTILE' SOLAR TILE ROOFING
21mm TOP HATS
12mm STRUCTURAL PLYWOOD
13mm PLASTERBOARD CEILING
1mm ENVIROSEAL PROCTORWRAP HTR
1 : 10
10Deg Roof (Raked Ceiling)1
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 10
ROOF DETAILS -10DEG ROOF
AR-331L.FAIDUTTI
C.EIO
1 Updated Plans,Template Adjustments, Removed Tractile Info. 01/02/18 JR
RAKED ROOF CONSTRUCTION DETAILS
THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK)
87 'TRACTILE' SOLAR TILE ROOFING -21 TOP HATS -10 AIR GAP 0.0281 ENVIROSEAL PROCTORWRAP HTR -80 RIGID INSULATION 0.131 WATER TIGHT MEMBRANE 2.412 STRUCTURAL PLYWOOD 0.13152 STEEL STUD & SOFT INSULATION 0.03513 PLASTERBOARD CEILING 0.16
TOTAL THICKNESS 372 mmR-VALUE 4.99 m2K/W
VP
01 OF 01
VISUAL SCALE 1:10 @ A31m0.2m 0.8m0.6m0.4m0m
20 February, 2018
2 Updated to As-Built 14/09/18 VP JR
87mm 'TRACTILE' SOLAR TILE ROOFING21mm TOP HATS ROOFING10mm AIR GAP1mm ENVIROSEAL PROCTORWRAP HTR80mm RIGID INSULATION1mm WATER TIGHT MEMBRANE
12mm STRUCTURAL PLYWOOD BOARD
75mm STEEL BOTTOM CHORD & BRADFORD BLACK INSULATION BATTS
75mm STEEL STUD & BRADFORD BLACK INSULATION BATTS
TRUSS ROOF CAVITY
22mm CEILING TOP HATS
13mm PLASTERBOARD CEILING
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 10
ROOF DETAILS -10DEG ROOF
AR-332V.PHAM
J.ROTH
1 : 10
10Deg Roof (Flat Ceiling)1
TRUSS ROOF (TRACTILE) CONSTRUCTION DETAILS
THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK)
87 'TRACTILE' SOLAR TILE ROOFING -21 TOP HATS -30 AIR GAP 0.0281 SARKING -80 RIGID INSULATION 0.131 WATER TIGHT MEMBRANE 2.412 STRUCTURAL PLYWOOD BOARD 0.1375 STEEL STUD & SOFT INSULATION 0.035VARYING TRUSS ROOF CAVITY 0.02875 STEEL STUD & SOFT INSULATION 0.03522 CEILING TOP HATS -13 PLASTERBOARD CEILING 0.16
TOTAL THICKNESS: 397 mm (MINIMUM)R-VALUE: 5.08 m2K/W
20 February, 2018
VISUAL SCALE 1:10 @ A31m0.2m 0.8m0.6m0.4m0m
01 OF 01
1 Updated to As-Built 14/09/18 VP JR
13mm PLASTERBOARD CEILING
TRUSS ROOF CAVITY
75mm STEEL BOTTOM CHORD & BRADFORD BLACK INSULATION BATTS
22mm CEILING TOP HATS
1mm WATER TIGHT MEMBRANE12mm STRUCTURAL PLYWOOD BOARD
80mm RIGID INSULATION
30mm AIR GAP 1mm ENVIROSEAL PROCTORWRAP HTR
40mm ROOF BATTENS
29mm 'LYSAGHT TRIMDEK' ROOF
75mm STEEL STUD & BRADFORD BLACK INSULATION BATTS
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 10
ROOF DETAILS -3DEG ROOF
AR-333V.PHAM
J .ROTH
1 : 10
3Deg Roof (Flat Ceiling)1
01 OF 0120 February, 2018
1 Updated to As-Built 14/09/18 VP JR
TRUSS ROOF (TRACTILE) CONSTRUCTION DETAILS
THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK)
29 'LYSAGHT TRIMDEK' ROOF -40 ROOF BATTENS -30 AIR GAP 0.0281 ENVIROSEAL PROCTORWRAP HTR -80 RIGID INSULATION 0.131 WATER TIGHT MEMBRANE 2.412 STRUCTURAL PLYWOOD BOARD 0.1375 STEEL STUD & SOFT INSULATION 0.035VARYING TRUSS ROOF CAVITY 0.02875 STEEL STUD & SOFT INSULATION 0.03522 CEILING TOP HATS -13 PLASTERBOARD CEILING 0.16
TOTAL THICKNESS: 378 mm (MINIMUM)R-VALUE: 5.08 m2K/W
135
130
109
45
35
50
300
35
120.00°
SHEET METAL FOLDED BACK ON SELF
SHEET METAL FOLDED BACK ON SELF
SHEET METAL FOLDED BACK ON SELF
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 5
ROOFCONNECTIONDETAILS 1
AR-334V.PHAM
J.ROTH
1 : 5
Flashing Details1
FLASHING
BARGE CONSTRUCTION
APRON FLASHING
NOTES
FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME.
BARGE FLASHING CONTAINS INTEGRATED VENTING PROFILE FOR NATURAL VENTILATION. FLASHING RUNS UNDERNEATH TRACTILE PANELS (ROOFING FINISH LAYER).
BARGE CONSTRUCTION CONSISTS OF 90x45 TIMBER ATTACHED DIRECTLY TO FRAME, WITH 19x125mm PLYWOOD ATTACHED TO TOP, WHICH JOINTLY SUPPORTS THE BARGE FLASHING.
APRON FLASHING OVERLAPS 3 DEGREE ROOF FINISH (TRIMDEK), AND ATTACHES BEHIND WALL CLADDING LAYER (WEATHERTEX).
WALL CLADDING (WEATHERTEX)
3 DEGREE ROOFFINISH (TRIMDEK)
BARGE FLASHING TAB UNDERLAPPING TRACTILE ROOF FINISH
APRON FLASHINGATTACHMENT POINT
BARGE FLASHING PROFILE
APRON FLASHING PROFILE
20 August, 2018
1 Updated to As-Built 14/09/18 VP JR
150
4593.00°
125
230
176
48
135
61
40
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 5
ROOFCONNECTIONDETAILS 2
AR-335V.PHAM
J.ROTH
1 : 5
3 Degree Box Gutter Detailing1
NOTES
FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME.
3 DEGREE ROOF FLASHING UNDERLAPS END OF LYSAGHT TRIMDEK, AND WRAPS INTO BOX GUTTER.
BOX GUTTER LEADS WATER TO DOWNPIPE. PLACED WITHIN SOFFIT BOXING CONSTRUCTION.
FASCIA FLASHING WRAPS OVER OUTSIDE EDGE OF BOX GUTTER, CREATING EXTERIOR FINISHING.
BOX GUTTERROOF FLASHING FASCIA FLASHING
FASCIA FLASHING
BOX GUTTER
3 DEGREEROOF FLASHING
BOX GUTTER END CAPPING
GUTTER ASSEMBLY
FASCIA FLASHING
BOX GUTTER
3 DEGREE ROOF FLASHING
WEATHERTEX FASCIA
TIMBER BRACKET
20 August, 2018
1 Updated to As-Built 14/09/18 VP JR
150
45
100.
00°
125
230
176
48
135
61
40
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 5
ROOFCONNECTIONDETAILS 3
AR-336V.PHAM
J.ROTH
1 : 5
10 Degree Box Gutter Detailing1
BOX GUTTER ROOF FLASHINGFASCIA FLASHING
FASCIA FLASHING PROFILE
BOX GUTTER PROFILE
10 DEGREE ROOF FLASHING PROFILE
BOX GUTTER END CAPPING
GUTTER ASSEMBLY
10 FASCIA FLASHING
BOX GUTTER
ROOF FLASHING
WEATHERTEX FASCIA
TIMBER BRACKET
NOTES
FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME.
3 DEGREE ROOF FLASHING UNDERLAPS END OF TRACTILE SOLAR CELLS, AND WRAPS INTO BOX GUTTER.
BOX GUTTER LEADS WATER TO DOWNPIPE. PLACED WITHIN SOFFIT BOXING CONSTRUCTION.
FASCIA FLASHING WRAPS OVER OUTSIDE EDGE OF BOX GUTTER, CREATING EXTERIOR FINISHING.
20 August, 2018
1 Updated to As-Built 14/09/18 VP JR
49
234
334
80.00°
93.00°
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 5
ROOFCONNECTIONDETAILS 4
AR-337V.PHAM
J.ROTH
1 : 5
Roof Join Flashing Detail1
NOTES
FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME.
ROOF JOIN FLASHING COMPLETELY COVERS JOIN BETWEEN 10 DEGREE ROOF FINISH AND 3 DEGREE ROOF FINISH.
ROOF JOIN FLASHING PROFILE
ROOF JOIN FLASHING
10 DEGREE ROOF FINISH
3 DEGREE ROOF FINISH
20 August, 2018
1 Updated to As-Built 14/09/18 VP JR
36
200
45
126.0
0°
139
218
40
15
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 5
ROOFCONNECTIONDETAILS 5
AR-338V.PHAM
J.ROTH
1 : 5
Clerestory Flashing Details1
NOTES
FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME
10 DEGREE ROOF FASCIA ENCOMPASSES END OF 10 DEGREE ROOFING. FASCIA OVERLAPS FINISHED TRACTILE LAYER, AND HAS DRIPPING EDGE TO ALLOW FOR WATER RUNOFF.
APRON FLASHING OVERLAPS 3 DEGREE ROOF FINISH (TRIMDEK), AND ATTACHES BEHIND WALL CLADDING LAYER (WEATHERTEX).
10 DEGREEROOF FASCIA
3 DEGREEAPRON FASCIA
CLERESTORY WINDOW FRAME
3 DEGREEROOF FINISH
10 DEGREE ROOF FASCIA PROFILE
3 DEGREE APRON FLASHING PROFILE
20 August, 2018
1 Updated to As-Built 14/09/18 VP JR
50mm LIGHT WEIGHT CONCRETE SECOND SKIN WALL
SHADING & VENTILATION CAVITY (VARYING WIDTH)
REFER TO 'EXTERIOR WALL DETAIL' FOR WALL SPECIFICATIONS
9.5mm 'WEATHERTEX' CLADDING
1mm VAPOUR RETARDER MEMBRANE
100mm RIGID INSULATION
9mm STRUCTURAL PLYWOOD
90mm STEEL STUD &BRADFORD BLACK INSULATION BATTS
13mm PLASTERBOARD WITH PAINTED FINISH
45mm AIR GAP WITH TIMBER STUDS & ENVIROSEAL PROCTORWRAP CW
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 10
WALL SECTIONS/CONSTRUCTIONDETAILS
AR-341V.PHAM
C.EIO
1 : 10
Second Skin Detail1
1 : 10
Exterior Wall Detail2
VISUAL SCALE 1:10 @ A31m0.2m 0.8m0.6m0.4m0m
1 Updated Plans, Detailing and Template Adjustments 01/02/18
2 05/02/18
JR
Hide Lines JR
EXTERNAL WALL CONSTRUCTION DETAILS
THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK) FIRE RATING CLASS*
50 SECOND SKIN WALL - NOT REQUIREDVARYING AIR GAP - NOT REQUIRED
9.5 CLADDING - NOT REQUIRED45 AIR GAP - NOT REQUIRED100 RIGID INSULATION 0.028 NOT REQUIRED1 AIR TIGHT MEMBRANE 2.3 NOT REQUIRED9 STRUCTURAL PLYWOOD 0.13 NOT REQUIRED90 STEEL STUD & SOFT INSULATION 0.035 A13 PLASTERBOARD WALL WITH FINISH 0.16 A
TOTAL THICKNESS: 317.5 mm (MINIMUM)R-VALUE: 6.21 m2K/W
3 18/02/18Adjusted wall layerings and sheet layout JR
20 February, 2018
VP
VP
VP
01 OF 014 Updated to As-Built 14/09/18 VP JR
BRACKETS - SEE DRAWING X92
13mm 'GYPROCK' WALL LINING WITHPAINTED SURFACE FINISH
90mm STEEL STUD & BRADFORD BLACK INSULATION BATTS
13mm 'GYPROCK' WALL LINING WITHPAINTED SURFACE FINISH
32mm (2x16mm) 'GYPROCK' WALL LINING FOR 2HOUR FIRE RATING
90mm STEEL STUD & BRADFORD BLACK INSULATION BATTS
13mm 'GYPROCK' WALL LINING WITHPAINTED SURFACE FINISH
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 10
INTERIOR WALLDETAILS
AR-342V.PHAM
J.ROTH
1 : 10
Interior Wall Detail1
1 : 10
Interior Wall Detail - Plant Room2
20 August, 2018
NOTES
INTERIOR WALL DETAIL
13mm GYPROCK GRADED TO 1 HOUR FIRE RATING COMPLIANT WITH COMPETITION GUIDELINES
INTERIOR PLANT ROOM WALL DETAIL
2x16mm (32mm) GYPROCK FYRCHEK GRADED TO 3 HOUR FIRE RATING COMPLIANT WITH COMPETITION GUIDELINES
1 Updated to As-Built 14/09/18 VP JR
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 25
PARTITIONDETAILS
AR-351V.PHAM
J.ROTH
LIVING ROOMDINING ROOM
1 : 25
Partition Callout1
VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m
1 Updated Plans, Detailing and Template Adjustments 01/02/18 JR
20 February, 2018
VP
01 OF 01
NOTES
FURTHER DETAILS ARE PROVIDED IN AR-320 -DOOR DETAILING (D11).
NORTH2 Updated to As-Built 14/09/18 VP JR
EX
IT
320 680
720
720240
840
2007
1600
1600
3840
1600 4620 49001500
1600
6201
ENTRANCE
2954 3768
7910 6722
2983
3218
0
01:14 1:14
1:1
4
1:1
6
1:16
1600
2911
1600
1600
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
RAMP ANDRAILINGDIMENSIONS
AR-401V.PHAM
L.FAIDUTTI
1 : 100
Ramp Dimensions1
01 OF 0120 February, 2018
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
1 Updated dimensions and detailing 20/02/18 VP JR
NORTH2 Updated dimensions and detailing and editing familes 13/09/18 V JR
3 Updated to As-Built 14/09/18 VP JR
720
240
3840
1600
1645
1645 7910 1900
0
1640
Surface Level
0
Ground Floor Level
720
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
NORTHERNRAMP
AR-402V.PHAM
J.ROTH
Northern Ramp 3D3
1 : 100
Northern Ramp Plan View1
01 OF 0120 February, 2018
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
As
N.T.S.
1 Updated dimensions and detailing 20/02/18 VP JR
1 : 100
Northern Ramp South Elevation2
NOTES
ALL RAMPS, RAILINGS AND LANDINGS COMPLY WITH THE FOLLOWING CODES:
THE BUILDING REGULATION & FACILITIES FOR THE DISABLED – UNITED ARAB EMIRATES CODEUAE FIRE AND LIFE SAFETY CODE OF PRACTICE 2017LIVABLE HOUSING AUSTRALIA DESIGN BUILDING CODE OF AUSTRALIASDME2018 RULES VERSION 4DELIVERABLE #7 APPENDIX 1
HANDRAILS AND INTERMEDIATE HANDRAILS ARE PROVIDED AT 950mm AND 700mm (TYP.) HEIGHTS RESPECTIVELY, AND HAVE A CIRCULAR 43mm DIAMETER.
HANDRAILS CONTINUE UNINTERUPTED ALONG ENTIRE LENGTH OF ALL RAILED AREA, EXTENDING 300mm AT RAIL ENDS.
A CLEAR SPACING OF 58mm EXISTS BETWEEN HANDRAIL EDGE AND TOP RAIL.
LANDINGS ARE (MINIMUM) 1500mm X 1500mm.
WIRE BALUSTRADES ARE PROVIDED AT 80mm CTC SPACINGS (TYP.).
UPSTAND CONTRASTS VISUALLY WITH THE RAMP. UPSTAND HEIGHT OF 150mm FROM RAMP SURFACE.
THE RAMP SURFACE IS HARD AND NON SLIP.
BACK DECK TO CONTAIN SURROUNDING GREEN WALL TO ACT A BARRIER BETWEEN DECK SURFACE AND THE GROUND.
2 Updated to As-Built 14/09/18 VP JR
Surface Level
0
Ground Floor Level
720
720
680320
1500
1:14 1:14
1:14
4620 4900
840
1600
1600
2007
1640
2908
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 100
SOUTHERNRAMP
AR-403V.PHAM
J.ROTH
Southern Ramp 3D3
1 : 100
Southern Ramp Elevation2
1 : 100
Southern Ramp Plan View1
01 OF 0120 February, 2018
VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m
As Indicated
N.T.S.
1 Updated dimensions and detailing 20/02/18 VP JR
NOTES
ALL RAMPS, RAILINGS AND LANDINGS COMPLY WITH THE FOLLOWING CODES:
THE BUILDING REGULATION & FACILITIES FOR THE DISABLED – UNITED ARAB EMIRATES CODEUAE FIRE AND LIFE SAFETY CODE OF PRACTICE 2017LIVABLE HOUSING AUSTRALIA DESIGN BUILDING CODE OF AUSTRALIASDME2018 RULES VERSION 4DELIVERABLE #7 APPENDIX 1
HANDRAILS AND INTERMEDIATE HANDRAILS ARE PROVIDED AT 950mm AND 700mm (TYP.) HEIGHTS RESPECTIVELY, AND HAVE A CIRCULAR 43mm DIAMETER.
HANDRAILS CONTINUE UNINTERUPTED ALONG ENTIRE LENGTH OF ALL RAILED AREA, EXTENDING 300mm AT RAIL ENDS.
A CLEAR SPACING OF 58mm EXISTS BETWEEN HANDRAIL EDGE AND TOP RAIL.
LANDINGS ARE (MINIMUM) 1500mm X 1500mm.
WIRE BALUSTRADES ARE PROVIDED AT 80mm CTC SPACINGS (TYP.).
UPSTAND TO CONTRASTS VISUALLY WITH THE RAMP. UPSTAND HEIGHT OF 150mm FROM RAMP SURFACE.
THE RAMP SURFACE IS HARD AND NON SLIP.
BACK DECK TO CONTAIN SURROUNDING GREEN WALL TO ACT A BARRIER BETWEEN DECK SURFACE AND THE GROUND.
2 Updated to As-Built 14/09/18 VP JR
150
76
80
80
80
80
80
80
80
89
ø 43
920
45
950
1510
1308
150
58
700
CLEAR SPACING (HANDRAIL TO HANDRAIL)
CLEAR SPACING (UPSTAND TO UPSTAND)
OVERALL RAMP WIDTH
45mm POST NOTCHING
BLACKBUTT 135x22 UPSTAND
BLACKBUTT 90x45 POST
3.2mm 316 MARINE GRADE WIRE BALUSTRADE
BLACKBUTT 43mm DIAMETER CIRCULAR HADRAIL
80mm STAINLESS HANDRAIL BRACKETS
BLACKBUTT 90x45 TOP RAIL
90
45 1600 45
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 10
RAMP RAILINGCROSS-SECTION
AR-404V.PHAM
J.ROTH
1 : 10
Handrail Detail Cross Section1
NOTES
ALL RAMPS, RAILINGS AND LANDINGS COMPLY WITH THE FOLLOWING CODES:
THE BUILDING REGULATION & FACILITIES FOR THE DISABLED – UNITED ARAB EMIRATES CODEUAE FIRE AND LIFE SAFETY CODE OF PRACTICE 2017LIVABLE HOUSING AUSTRALIA DESIGN BUILDING CODE OF AUSTRALIASDME2018 RULES VERSION 3 DELIVERABLE #7 APPENDIX 1
HANDRAILS AND INTERMEDIATE HANDRAILS ARE PROVIDED AT 950mm AND 700mm (TYP.) HEIGHTS RESPECTIVELY, AND HAVE A CIRCULAR 43mm DIAMETER.
HANDRAILS CONTINUE UNINTERUPTED ALONG ENTIRE LENGTH OF ALL RAILED AREA, EXTENDING 300mm AT RAIL ENDS.
A CLEAR SPACING OF 58mm EXISTS BETWEEN HANDRAIL EDGE AND TOP RAIL.
LANDINGS ARE (MINIMUM) 1500mm X 1500mm.
WIRE BALUSTRADES ARE PROVIDED AT 80mm CTC SPACINGS (TYP.).
UPSTAND TO CONTRAST VISUALLY WITH THE RAMP. UPSTAND HEIGHT OF 150mm FROM RAMP SURFACE.
THE RAMP SURFACE WILL BE HARD AND NON SLIP.
BACK DECK TO CONTAIN SURROUNDING GREEN WALL TO ACT A BARRIER BETWEEN DECK SURFACE AND THE GROUND.
20 August, 2018
1 Updated to As-Built 14/09/18 VP JR
Plan View
Side View
Front View
3D View
150 2310 150 1170 150 1410 150 1170 150 1410 150
8370
10
1793
937
5790
10
1793
937
48101590
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A
B
C
D
E
F
G
Team:
Address:
Contact:
TEAM UOW
UNIVERSITY OF WOLLONGONGWOLLONGONG
NSW, AUSTRALIA 2522
Client:
Dubai Electricity and Water Authority
AMENDMENTS
REV. DESCRIPTION DATE DRAWN CHECK
COPYRIGHT
LOT # M
DRAWER
CHECKED
DATE
SCALE
None; Project is Public
SHEET:
@ A3 1 : 50
DECK SCREEN
AR-405V.PHAM
J.ROTH
1 : 50
Deck Screen
20 August, 2018
1 Updated to As-Built 14/09/18 VP JR
NOTE: CANVAS IS INSTALLED OVER TOP OF EQUIPMENT
SheetsAR-001 - SOLAR HAI PLANAR-002 - SITE PLANAR-003 - GROUND FLOOR VIEWSAR-011 - GROUND FLOOR PLANAR-012 - GROUND FLOOR PLANAR-013 - GROUND FLOOR PLANAR-021 - ROOF PLANAR-101 - BUILDING ELEVATION SOUTHAR-102 - BUILDING ELEVATION WESTAR-103 - BUILDING ELEVATION NORTHAR-104 - BUILDING ELEVATION EASTAR-201 - LONGITUDINAL SECTION 1AR-202 - LONGITUDINAL SECTION 2AR-211 - TRANSVERSAL SECTION 1AR-212 - TRANSVERSAL SECTION 2AR-301 - DOOR AND WINDOW LOCATIONS - GFAR-302 - DOOR AND WINDOW LOCATIONS - CLAR-303 - WINDOW SCHEDULEAR-304 - WINDOW DETAILING (W1)AR-305 - WINDOW DETAILING (W2)AR-307 - WINDOW DETAILING (W3)AR-308 - WINDOW DETAILING (W4)AR-311 - DOOR SCHEDULEAR-312 - DOOR DETAILING (D1)AR-313 - DOOR DETAILING (D2)AR-314 - DOOR DETAILING (D3)AR-315 - DOOR DETAILING (D4)AR-316 - DOOR DETAILING (D5)AR-317 - DOOR DETAILING (D6)AR-318 - DOOR DETAILING (D7)AR-319 - DOOR DETAILING (D8)AR-320 - DOOR DETAILING (D9)AR-321 - FLOOR CONSTRUCTION DETAILSAR-322 - BATHROOM AND W/C FLOOR DETAILSAR-331 - ROOF DETAILS - 10DEG ROOFAR-332 - ROOF DETAILS - 10DEG ROOFAR-333 - ROOF DETAILS - 3DEG ROOFAR-334 - ROOF CONNECTION DETAILS 1AR-335 - ROOF CONNECTION DETAILS 2AR-336 - ROOF CONNECTION DETAILS