C:Usersjkr792DocumentsFinal Desert Rose ARCHITECTURAL +...

Date post: 14-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
50
20000 5000 20000 14000 20000 5000 20000 61000 20000 5000 20000 15000 20000 5000 20000 270000 20000 16000 20000 5000 20000 81000 LOT M 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 A B C D E F G A B C D E F G Team: Address: Contact: TEAM UOW UNIVERSITY OF WOLLONGONG WOLLONGONG NSW, AUSTRALIA 2522 sd - [email protected] www.desertrosehouse.com.au Client: Dubai Electricity and Water Authority AMENDMENTS REV. DESCRIPTION DATE DRAWN CHECK COPYRIGHT LOT # M DRAWER CHECKED DATE SCALE None; Project is Public SHEET: @ A3 1 : 2000 SOLAR HAI PLAN AR-001 J.ROTH V.PHAM 1 : 2000 Solar Hai 1 A B C D E F G H I J K L N O P Q R S T U V NORTH 2 30/01/18 VISUAL SCALE 1:2000 @ A3 200m 40m 160m 120m 80m 0m 3 Updated Annotations and Template Title 01/02/18 01 OF 01 Updated Plans and Detailing VP VP JR JR 20 February, 2018 1 Updated Plans and Detailing 19/01/18 VP JR 4 Updated to As-Built 14/09/18 VP JR
Transcript
  • 20000

    5000

    20000

    14000

    20000

    5000

    20000

    61000

    20000

    5000

    20000

    15000

    20000

    5000

    20000

    270000

    20000

    16000

    20000

    5000

    20000

    81000

    LOT M

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 2000

    SOLAR HAI PLAN

    AR-001J.ROTH

    V.PHAM

    1 : 2000

    Solar Hai1

    A

    B

    C

    D

    E

    F

    G

    H

    I

    J

    K

    L

    N

    O

    P

    Q

    R

    S

    T

    U

    V

    NORTH2 30/01/18

    VISUAL SCALE 1:2000 @ A3200m40m 160m120m80m0m

    3 Updated Annotations and Template Title 01/02/18

    01 OF 01

    Updated Plans and Detailing VP

    VP

    JR

    JR

    20 February, 2018

    1 Updated Plans and Detailing 19/01/18 VP JR

    4 Updated to As-Built 14/09/18 VP JR

  • DASHED LINE OF 10m x 10m SOLAR ENVELOPE ABOVE

    SOLAR HAI STREET

    SOLAR HAI STREET

    PROPOSED DESERT ROSEHOUSE

    240

    ENTRANCE

    EX

    IT

    CAR SPACE

    0

    5291

    720

    680320

    3589

    3537

    2627

    1536

    01:14 1:14

    1:1

    6

    1:16

    CONTINUOUS LINE OF 20m x 20mSOLAR ENVELOPE SURFACE LEVEL

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    SITE PLAN

    AR-002L. FAIDUTTI

    C.EIO

    1 : 100

    Site Plan1

    NORTH

    1

    2

    30/01/18

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    3

    Updated annotations and Template Title 01/02/18

    01 OF 014

    Centered Model, hid elements, created regions 03/02/18

    Updated Plans and Detailing VP

    VP

    VP

    JR

    JT

    JR

    20 February, 2018

    5

    Added spot elevation at the exit/ entrance 14/02/18 JR JT

    GREEN WALL & TIMBER SLATS

    PROPOSED ELECTRIC VEHICLE PARKING AREA 7800MM X 3200MM

    NOTES

    FOR ALL RAMP SLOPES AND RAMP DIMENSIONS, PLEASE REFER TO AR-401 - RAMP AND RAILING DIMENSIONS

    CURVEDGREENWALL

    Updated to As-Built 14/09/18 JR VP

  • AR-103

    N

    AR-104EAR-102 W

    AR-101

    S

    2

    RU-003

    2

    RU-003

    1

    AR-201

    1

    AR-201

    1

    AR-212

    1

    AR-212

    -

    1

    AR-211

    1

    AR-211

    1

    AR-202

    1

    AR-202

    2

    RU-004

    2

    RU-004

    1

    RU-003

    1

    RU-003 1

    RU-004

    1

    RU-004

    AR-403

    2

    AR-402

    2

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    GROUND FLOORVIEWS

    AR-003J.ROTH

    V.PHAM

    1 : 100

    Section and Elevation Views1

    NORTH

    Updated annotations and template title 01/02/18

    2 03/02/18

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    VP

    01 OF 01

    Updated Plans and Detailing VP

    20 February, 2018

    1

    JR

    JR

    3 09/09/18Updated Layout VP JR

    4 Updated to As-Built 14/09/18 VP JR

  • DOTTED LINE OF ROOF ABOVE

    CAR SPACE

    2010

    BACKDECK

    FRONTDECK

    BACK RAMP

    7910 6722

    11020

    3840

    1600

    EN

    TR

    AN

    CE

    EX

    IT

    240

    0

    1600

    1600

    FRONT RAMP

    720

    320 680

    720

    0

    1600

    2911

    1600

    1600

    840

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    GROUND FLOORPLAN

    AR-011J.ROTH

    C.EIO

    1 : 100

    AR - Exterior Features1

    NORTH

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    20 February, 2018

    1

    2

    30/01/18

    3

    Updated Plans, Detailing and Template Adjustments 01/02/18

    4

    Centered Model, hid elements, created regions 03/02/18

    Updated Plans and Detailing JR

    VP

    VP

    VP

    JT

    JR

    01 OF 01

    GREEN WALL & TIMBER SCREEN

    EXTENDING AROUND DECK

    AREA

    NOTES

    FOR ALL RAMP SLOPES AND RAMP DIMENSIONS, PLEASE REFER TO AR-401 - RAMP AND RAILING DIMENSIONS.

    5

    09/09/18Updated Layout VP JR

    GREEN WALL

    Updated to As-Built 14/09/18 JR VP

  • PLANTROOM

    GUESTBEDROOM

    MASTER BEDROOM

    BATHROOM

    273 4900 116 3694 273 3498 273

    13049 OA

    10886 O

    A

    13049 OA

    273

    2946

    468

    3597

    116

    2094

    116

    1894

    273

    11796 O

    A

    1233 1090 1650 1090 1523 1090 1580 3771

    273 4298 273 2728 273 3238 273 1400 273

    4843 614 1500 614 1392 1660 459 1945

    273

    3194

    116

    3600

    116

    3294

    273

    LIVINGROOMDINING ROOM

    KITCHEN

    ENTRANCE W.C.

    1038

    1450

    823

    2010

    603

    1090

    100

    1015

    411

    8557

    ROOF DASHED LINE

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    GROUND FLOORPLAN

    AR-012J.ROTH

    V.PHAM

    1 : 100

    AR - Walls and Openings1

    NORTH

    1

    2

    30/01/18

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    3

    Updated Plans, Detailing and Template Adjustments 01/02/18

    4

    Centered model, added dimensions, hid elements 03/02/18

    Updated Plans and Detailing VP

    VP

    VP

    JR

    JT

    JR

    18 January, 201801 OF 01

    5

    Edited dimensions 06/09/18 VP JR

    Updated to As-Built 14/09/18 JR VP

  • 4900 116 3694 273 3498

    3294

    116

    3600

    116

    3194

    320

    910

    1080

    1290

    12481

    10320

    4298 3273 3510 1400

    668 1080 910 780 1350 112 1161297 1090 1580 49 2950 500

    3173 1015 3418 1015 2350 1510

    2697 116 9668

    12481

    116

    49

    1990

    55

    116

    1894

    3597

    116

    2094

    116

    1894

    7817

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    GROUND FLOORPLAN

    AR-013J.ROTH

    V.PHAM

    1 : 100

    AR - Interior Openings1

    GUEST BEDROOM

    DINING ROOM

    MASTER BEDROOM

    ENTRANCE

    PLANT ROOM

    W.C

    BATHROOMLIVING ROOM

    KITCHEN

    NORTH

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    20 February, 2018

    1 Updated Plans and Detailing 19/01/18

    2 30/01/18

    3 Updated Plans, Detailing and Template Adjustments 01/02/18

    VP

    4 Centered model, added dimensions, hid elements 03/02/18

    Updated Plans and Detailing VP

    VP

    VP

    JR

    JR

    JR

    JR01 OF 01

    NOTES

    FOR RULES COMPLIANCE INFORMATION REGARDING THE FLOOR PLAN, PLEASE SEE RU-301 - RULES COMPLIANCE FLOOR PLAN.

    Updated to As-Built 14/09/18 JR JT5

  • FALL 3°

    FALL 10°

    FALL 10°

    FALL 10°

    BIPV-T ROOF

    COLORBOND METALROOF SHEETING 3

    150

    8623

    4406

    3310

    10865

    11772

    13026

    4843 2728 1684 3771

    13026

    9255 3771

    4217

    4406

    7716

    3150

    FALL 3°

    4649

    3973

    DASHED LINE OF 10m x 10m SOLAR ENVELOPE ABOVE

    CONTINUOUS LINE OF 20m x 20mSOLAR ENVELOPE SURFACE LEVEL

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    ROOF PLAN

    AR-021L.FAIDUTTI

    C.EIO

    1 : 100

    Roof Plan1

    1

    2

    30/01/18

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    3

    Updated Plans, Detailing and Template Adjustments 01/02/18

    01 OF 014

    Centered model, added dimensions, hid elements 03/02/18

    Updated Plans and Detailing VP

    VP

    VP

    JR

    JR

    JR

    NORTH

    NOTES

    ROOF CONSISTING OF 10° PITCH IS A SINGLE BIPV-T SYSTEM. NO INDIVIDUAL PV PANELS DEPECTED AS WHOLE 10° PITCHED ROOF IS ONE LARGE PV SYSTEM.

    LADDER RESTAINT BRACKET IS FOR ATTACHING LADDER TO ALLOW FOR ACCESS TO ROOF.

    = HARNESS ANCHOR POINT

    BIPV-T = BUILDING INTEGRATED PHOTOVOLTAIC -THERMAL

    LOCATION OF LADDER RESTRAINT BRACKET

    LOCATION OF WEATHER STATION

    18 January, 2018

    5

    Edited dimensions 06/09/18 VP JR

    GUTTER FALL

    FALL FALL

    FALL

    FALL

    Updated to As-Built 14/09/18 JR JT5

  • Surface Level

    0

    Ground Floor Level

    720

    Solar Envelope

    7000

    ACCESSIBLE RAMP

    BIPV-T ROOF

    Roof Level

    5231

    OUTDOOR WALL MOUNTED SCONCE LAMP

    PIVOT ENTRANCE DOOR (D5)

    LIGHT WEIGHT CONCRETE SECOND SKIN WALL

    WATERTANK

    WASTE WATERTANK

    DINING ROOM DOOR (D5)

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    BUILDINGELEVATIONSOUTH

    AR-101V.PHAM

    C.EIO

    1 : 50

    SouthS

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    BUILDINGELEVATIONSOUTH

    AR-101V.PHAM

    C.EIO

    1

    2

    01/02/18

    3

    Inserted the Piers 14/02/18

    Updated Plans, Detailing and Template Adjustments VP

    JAP

    JR

    JT

    20 February, 20184

    Updated Annotations and Dimensions for Deliverable #5 19/02/18 CE JR

    01 OF 015

    09/09/18Added annotation VP JR

    Updated to As-Built 14/09/18 JR VP

  • Surface Level

    0

    Ground Floor Level

    720

    Solar Envelope

    7000

    Roof Level

    5231

    LIGHT WEIGHT CONCRETE SECOND SKIN WALL

    BIPV-T ROOFCOLORBOND METAL ROOF SHEETING

    10° ROOF PITCH

    3° ROOF PITCHTIMBER PICKET FENCE &GREEN WALL

    ACCESSIBLE RAMP

    WATER TANK

    ACCESSIBLE RAMP

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    BUILDINGELEVATIONWEST

    AR-102V. PHAM

    C. EIO

    1 : 50

    WestW

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    BUILDINGELEVATIONWEST

    AR-102V. PHAM

    C. EIO

    1

    2

    01/02/18

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    3

    Inserted the Piers 14/02/18

    Updated Plans, Detailing and Template Adjustments VP

    JAP

    JT

    JT

    20 February, 2018

    Updated Annotations and Dimensions for Deliverable #5 19/02/18 CE VP

    401 OF 01

    Edited layout 06/09/18 VP JR

    Updated to As-Built 14/09/18 JR VP5

  • Surface Level

    0

    Ground Floor Level

    720

    Solar Envelope

    7000

    Roof Level

    5231

    VENTILATED FACADE WALL

    BIPV-T ROOF COLORBOND METAL ROOF SHEETINGWALL RECESSED SLIDING DOOR (D3) BIPV-T ROOF

    ACCESSIBLE RAMP

    CLERESTORY WINDOWS (W4)

    MASTER BEDROOM WINDOWS, NORTH KITCHEN WINDOW(W2)

    FRESH AIR GRILL

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    BUILDINGELEVATIONNORTH

    AR-103V.PHAM

    C.EIO

    1 : 50

    NorthN

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    1 Hid Section/Reference Lines 30/01/18

    2 01/02/18

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    3 Inserted the Piers 14/02/18

    JR

    Updated Plans, Detailing and Template Adjustments VP

    JAP

    VP

    JT

    JT

    20 February, 2018Updated Annotations and Dimensions for Deliverable #5 19/02/18 CE VP401 OF 01

    Updated to As-Built 14/09/18 JR VP5

  • Surface Level

    0

    Ground Floor Level

    720

    Solar Envelope

    7000

    Roof Level

    5231

    BIPV-T ROOF

    10° ROOF PITCH

    LIGHT WEIGHT CONCRETE SECOND SKIN WALL

    3° ROOF PITCH

    COLORBOND METAL ROOF SHEETINGEASTERN

    KITCHEN WINDOW (W3)EASTERN

    KITCHEN DOOR (D2)

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    BUILDINGELEVATION EAST

    AR-104V.PHAM

    C.EIO

    1 : 50

    EastE

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    1 Hid Section/Reference Lines 30/01/18

    2 01/02/18

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    3 Inserted the Piers 14/02/18

    JR

    Updated Plans, Detailing and Template Adjustments VP

    JAP

    JR

    JT

    JT

    20 February, 2018Updated Annotations and Dimensions for Deliverable #5 19/02/18 CE VP401 OF 01

    Updated to As-Built 14/09/18 JR VP5

  • Surface Level

    0

    Ceiling Level

    3330

    Ground Floor Level

    720

    1AR-331

    1AR-321

    2AR-341

    Solar Envelope

    7000

    LIVING ROOMKITCHEN ENTRANCE

    1AR-333

    Roof Level

    5231

    2AR-308

    10° ROOF PITCH

    3° ROOF PITCH

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    LONGITUDINALSECTION 1

    AR-201L.FAIDUTTI

    C.EIO

    1 : 50

    Section 1 - Longitudinal1

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    CEILING CAVITY CEILING CAVITY

    1 Hid Section/Reference Lines 30/01/18

    2 01/02/18

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    3 Inserted the Piers and Heights 14/02/18

    JR

    Updated Plans, Detailing and Template Adjustments VP

    JAP

    VP

    JT

    JT

    20 February, 201801 OF 01

    NOTES

    FOR ALL DIMENSIONS RELATING TO RAMPS OR RAILINGS, PLEASE REFER TO AR-401 - RAMP AND RAILING DIMENSIONS.

    4 Updated to As-Built 14/09/18 VP JR

  • Surface Level

    0

    Ceiling Level

    3330

    Ground Floor Level

    720

    Solar Envelope

    7000

    MASTER BEDROOMBATHROOMGUEST BEDROOM

    Roof Level

    5231

    AAR-305

    1AR-332

    2616

    2616

    1AR-322

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    LONGITUDINALSECTION 2

    AR-202L.FAIDUTTI

    C.EIO

    1 : 50

    Section 2 - Longitudinal1

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    CEILING CAVITYCEILING CAVITY

    1 Hid Section/Reference Lines 30/01/18

    2 01/02/18

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    3 Inserted the Piers 14/02/18

    Updated Plans, Detailing and Template Adjustments VP

    JAP

    JR

    JT

    JT

    20 February, 2018

    VP

    01 OF 014 Updated to As-Built 14/09/18 VP JR

  • Surface Level

    0

    Ceiling Level

    3330

    Ground Floor Level

    720

    Solar Envelope

    7000

    BATHROOM KITCHEN LIVING ROOM

    Roof Level

    5231

    2AR-317

    2616

    2616

    1AR-334

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    TRANSVERSALSECTION 1

    AR-211J.THIM

    J.ROTH

    1 : 50

    Section 1 - Transversal1

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    CEILING CAVITY

    CEILING CAVITY

    1 Hid Section/Reference Lines 30/01/18

    2 01/02/18

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    3 Inserted the Piers 14/02/18

    VP

    Updated Plans, Detailing and Template Adjustments VP

    JAP

    JR

    JT

    JT

    20 February, 201801 OF 01

    4 Updated to As-Built 14/09/18 VP JR

  • Surface Level

    0

    Ceiling Level

    3330

    Ground Floor Level

    720

    Solar Envelope

    7000

    Roof Level

    5231

    2616

    2616

    2597

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    TRANSVERSALSECTION 2

    AR-212V.PHAM

    C.EIO

    1 : 50

    Section 2 - Transversal1

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    ENTRANCEW.C. FRONT DECK GUEST BEDROOM

    CEILING CAVITYCEILING CAVITY

    1 Hid Section/Reference Lines 30/01/18

    2 01/02/18

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    3 Inserted the Piers 14/02/18

    VP

    Updated Plans, Detailing and Template Adjustments VP

    JAP

    JR

    JT

    JT

    20 February, 201801 OF 01

    4 Updated to As-Built 14/09/18 VP JR

  • KITCHEN

    LIVING ROOM

    ENTRANCE W.C.

    DINING ROOM

    PLANTROOM

    GUESTBEDROOM

    MASTER BEDROOM

    BATHROOM

    W2.2

    D6.2 D7.1

    W2.1W3.1

    D7.2

    W1.1

    D1.1

    W2.3

    D3.1D7.3

    D2.1

    D6.1

    D8.1

    D5.1

    D9.1

    D4.1

    D7.4

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    DOOR ANDWINDOWLOCATIONS - GF

    AR-301L.FAIDUTTI

    V.PHAM

    1 : 100

    Door and Window Tags1

    Window Tags

    Mark Location REF Drawing No.

    W1.1 Guest Bedroom AR - 304

    W2.1 Master Bedroom, Kitchen AR - 305

    W2.2 Master Bedroom, Kitchen AR - 305

    W2.3 Master Bedroom, Kitchen AR - 306

    W3.1 Kitchen AR - 307

    W4.1 Dining Area AR - 308

    W4.2 Dining Area AR - 308

    W4.3 Dining Area AR - 308

    Door Tags

    Mark Location REF Drawing No.

    D1.1 Dining Room AR - 312

    D2.1 Kitchen AR - 313

    D3.1 Back Patio AR - 314

    D4.1 Plant Room AR - 315

    D5.1 Entrance AR - 316

    D6.1 Dining Room AR - 317

    D6.2 Guest Bedroom AR - 317

    D7.1 Guest W.C. AR - 318

    D7.2 Bathroom AR - 318

    D7.3 Bathroom AR - 318

    D7.4 Living Room AR - 317

    D8.1 Master Bedroom AR - 319

    D9.1 Living Room AR - 320

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    1 Updated Plans and Detailing 17/01/18

    2 01/02/18

    VP

    Updating door tag numbers CE

    JR

    JR

    07 September, 2018

    NORTH

    01 OF 01

    3 07/09/18Updating door tag numbers VP JR

    WINDOW TAGS

    DOOR TAGS

    TAGS LEGEND

    4 Updated to As-Built 14/09/18 VP JR

  • W4.1 W4.2 W4.3

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    DOOR ANDWINDOWLOCATIONS - CL

    AR-302J. ROTH

    V.PHAM

    1 : 100

    Window Tags - Celestory1

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    Window Tags

    Mark Location REF Drawing No.

    W1.1 Guest Bedroom AR - 304

    W2.1 Master Bedroom, Kitchen AR - 305

    W2.2 Master Bedroom, Kitchen AR - 305

    W2.3 Master Bedroom, Kitchen AR - 306

    W3.1 Kitchen AR - 307

    W4.1 Dining Area AR - 308

    W4.2 Dining Area AR - 308

    W4.3 Dining Area AR - 308

    NORTH

    20 February, 201820 February, 201801 OF 01

    WINDOW TAGS

    DOOR TAGS

    TAGS LEGEND

    1 Updated to As-Built 14/09/18 VP JR

  • W2MASTER BEDROOM, KITCHEN

    NORTH

    W1GUEST BEDROOM

    W3KITCHEN EAST

    W4DINING AREA

    1090

    1440

    1450

    1440

    1090

    1440

    1810

    600

    ELEVATIONELEVATION ELEVATION ELEVATION

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    WINDOWSCHEDULE

    AR-303J.ROTH

    V.PHAM

    AR-301 Window Schedule

    Type Mark Count Window Style Operation Location Width Height

    W1 1 Awning Window Automated Guest Bedroom 1450 1440

    W2 3 Awning Window Automated Master Bedroom,Kitchen

    1090 1440

    W3 1 Casement Window Manual Kitchen 1090 1440

    W4 3 Transom Awning Window Automated Dining Area 1810 600

    1 : 25

    Window Legend VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    1

    2

    18/01/18

    3

    29/01/18

    4

    Updated Plans, Detailing and Template Adjustments 01/02/18

    Minor grammar/sizing update

    VP

    Schedule/Placement/Scale VP

    VP JR

    JR

    JR

    01 OF 0106 September, 2018Edited Tags 06/09/18 VP JR4

    5 Updated to As-Built 14/09/18 VP JR

    NOTES

    WINDOWS FIXED DIRECTLY TO STEEL FRAME USING MINIMUM OF 2 BUGAL SCREWS ON BOTH LEFT AND RIGHT SIDES OF WINDOW FRAME

  • 40 65 1240 65 40

    1450

    40

    65

    1205

    90

    40

    1440

    ELEVATION VIEW

    325

    26

    273

    26

    1450

    65

    60

    200

    1440

    960

    325

    2400

    EXTERIOR

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    WINDOWDETAILING (W1)

    AR-304J.ROTH

    V.PHAM

    1 : 25

    Window Detailing (W1)

    1 Updated Plans and Detailing 19/01/18

    2 Placement and Annotations 29/01/18

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    3 Updated Plans, Detailing and Template Adjustments 01/02/18 VP

    VP

    VP

    F.F.L.

    SECTION VIEW

    PLAN VIEW

    20 February, 2018

    JR

    JR

    JR

    01 OF 01

    NOTES

    WINDOW FRAME MADE OF RECYCLED HARDWOOD.WINDOW AUTOMATED.

    FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:

    4mm CLEAR TOUGHENED + MICROSHADE10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED

    CSR VIRIDIAN MICROSHADE MESH TO BE INSTALLED ON GLAZING SURFACE. MICROSHADE TYPE: MS-A.

    HARDWARE NOT SHOWN IN DRAWING.

    GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS

    WINDOW GLAZING COMPLIANT WITH IRC SECTION R308

    THERMAL RESISTANCE (R) VALUE FOR WINDOW DETAIL (W1): 1.047Km2/W

    4 Updated to As-Built 14/09/18 VP JR

  • 40 65 880 65 40

    1090

    40

    65

    1205

    90

    40

    1440

    ELEVATION VIEW

    1440

    960

    325

    2400

    26

    273

    26

    200

    60

    65

    1090

    325

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    WINDOWDETAILING (W2)

    AR-305J. ROTH

    V.PHAM

    1 : 25

    Window Detailing (W2)

    1 Updated Plans and Detailing 19/01/18

    2 Placement and Annotations 29/01/18

    PLAN VIEW

    SECTION VIEW

    F.F.L.

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    3 Updated Plans, Detailing and Template Adjustments 01/02/18 VP

    VP

    VP

    20 February, 2018

    JR

    JR

    JR

    EXTERIOR

    01 OF 01

    NOTES

    WINDOW FRAME MADE OF RECYCLED HARDWOOD.WINDOW AUTOMATED.

    FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:

    4mm CLEAR TOUGHENED + MICROSHADE10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED

    HARDWARE NOT SHOWN IN DRAWING.

    GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS

    WINDOW GLAZING COMPLIANT WITH IRC SECTION R308

    THERMAL RESISTANCE (R) VALUE FOR WINDOW DETAIL (W2): 1.079Km2/W

    4 Updated to As-Built 14/09/18 VP JR

  • 40 65 880 65 40

    1090

    40

    65

    1230

    65

    40

    1440

    ELEVATION VIEW

    26

    273

    26

    325

    1090

    65

    60

    200

    1440

    325

    EXTERIOR

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    WINDOWDETAILING (W3)

    AR-307J. ROTH

    V.PHAM

    1 : 25

    Window Detailing (W3)

    PLAN VIEW

    SECTION VIEW

    F.F.L.

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    1 Updated Plans and Detailing 19/01/18

    2 Placement and Annotations 29/01/18

    3 Updated Plans, Detailing and Template Adjustments 01/02/18 VP

    VP

    VP

    20 February, 2018

    JR

    JR

    JR

    01 OF 01

    NOTES

    WINDOW FRAME MADE OF RECYCLED HARDWOOD.

    FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:

    4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED

    LOCK / LEVER SET TO BE MANUFACTURED.

    HARDWARE NOT SHOWN IN DRAWING.

    GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS

    WINDOW GLAZING COMPLIANT WITH IRC SECTION R308

    THERMAL RESISTANCE (R) VALUE FOR WINDOW DETAIL (W3): 1.047Km2/W

    4 Updated to As-Built 14/09/18 VP JR

  • 40 65 1600 65 40

    1810

    40

    65

    365

    90

    40

    600

    ELEVATION VIEW

    26

    273

    26

    325

    1810

    65

    60

    200

    600

    325

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    WINDOWDETAILING (W4)

    AR-308J. ROTH

    V. PHAM

    1 : 25

    Window Detailing (W4)

    1 Updated Plans and Detailing 19/01/18

    2 Placement and Annotations 29/01/18

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    3 Updated Plans, Detailing and Template Adjustments 01/02/18 VP

    VP

    VP

    PLAN VIEW

    SECTION VIEW

    20 February, 2018

    JR

    JR

    JR

    EXTERIOR

    01 OF 01

    NOTES

    WINDOW FRAME MADE OF RECYCLED HARDWOOD.WINDOW AUTOMATED.

    FRAME REBATE SET TO 44mm- ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:

    4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED

    HARDWARE NOT SHOWN IN DRAWING.

    WINDOW OPENING MECHANISM TO BE ELECTONIC AND CONNECTED TO THE HOME BUILDING AUTOMATION SYSTEM

    GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS

    WINDOW GLAZING COMPLIANT WITH IRC SECTION R308

    THERMAL RESISTANCE (R) VALUE FOR WINDOW DETAIL (W1): 0.930Km2/W

    4 Updated to As-Built 14/09/18 VP JR

  • DOOR D4PLANT ROOM

    DOOR D1DINING ROOM

    DOOR D5EXTERNAL ENTRANCE

    DOOR D2KITCHEN

    DOOR D3EXTERNAL BACK PATIO

    15001015

    2440

    2440

    1660

    F.F.L.

    880

    21402680

    2950

    2440 RECESSED

    WALL

    DOOR D8MASTER BEDROOM

    DOOR D7INTERNAL SLIDING

    GUEST W.C, LIVING ROOM, BATHROOM

    DOOR D6INTERNAL HINGED

    GUEST BEDROOM, DINING ROOM

    13501015 10603600

    DOOR D9LIVING ROOM

    F.F.L.

    2160

    2140

    2440

    2140

    CAVITY

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    DOOR SCHEDULE

    AR-311J.ROTH

    V.PHAM

    AR-311 Door Locations

    Mark Location Description

    D1.1 Dining Room D1

    D2.1 Kitchen D2

    D3.1 Back Patio D3

    D4.1 Plant Room D4

    D5.1 Entrance D5

    D6.1 Dining Room D6

    D6.2 Guest Bedroom D6

    D7.1 Guest W.C. D7

    D7.2 Bathroom D7

    D7.3 Bathroom D7

    D7.4 Living Room D7

    D8.1 Master Bedroom D8

    D9.1 Living Room D9

    AR-311 Door Quantities

    Description Count Height Width Thermal Resistance (R)

    D1 1 2680 1500 N/A

    D2 1 2440 1015 1.053

    D3 1 2440 2950 N/A

    D4 1 2140 914 0.9823

    D5 1 2440 1660 N/A

    D6 2 2180 1015 1.045

    D7 4 2160 1940 N/A

    D8 1 2140 1350 N/A

    D9 1 2440 3600 N/A

    1 : 50

    Door Legend External

    1 : 50

    Door Legend Internal VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    1 Minor grammar/sizing update 17/01/18

    2 29/01/18

    VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

    3 Schedule & Legend rearrangement on sheet 02/02/18

    JR

    4 Replaced Plant Room Door 07/02/18

    Schedule/Placement/Scale JR

    CE

    JR

    VP

    VP

    VP

    VP 20 February, 201801 OF 01

    NOTE

    ALL INTERNAL DOORS DESIGNED TO HAVE (AT MINIMUM) A CLEAR WIDTH OF 800mm, AND EXTERNAL DOORS DESIGNED TO HAVE (AT MINIMUM) A CLEAR WIDTH OF 900mm.

    5 Updated to As-Built 14/09/18 VP JR

  • 40 68 1284 68 40

    323 139 773

    40

    460

    40

    2100

    40

    2680

    40

    68

    324

    68

    40

    93

    1857

    140

    10

    40

    1500

    1500

    40 485 935 40

    25

    273

    23

    320

    2

    AR-312

    320

    214 40 3 54 9

    58

    350

    40

    40

    20

    390

    140

    10

    40

    257

    54

    9

    320

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3As indicated

    DOOR DETAILING(D1)

    AR-312C.MCDOWELL

    L.FAIDUTTI

    1 : 25

    Door Detailing (D1)ELEVATION VIEW

    PLAN VIEW

    1 Updated Plans and Detailing 19/01/18

    2 29/01/18

    3 Updated Plans, Detailing and Template Adjustments 01/02/18

    VP

    Plan Views and Annotations VP

    VP

    JR

    JR

    JR

    20 February, 201801 OF 01

    NOTES

    DOOR FRAME MADE OF RECYCLED HARDWOOD.DRAINAGE GUTTER IN SILL TO BE MANUFACTURED.

    FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:

    4mm CLEAR TOUGHENED + MICROSHADE10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED

    VIRIDIAN MICROSHADE MESH TO BE INSTALLED ON GLAZING SURFACE OF DOOR & WINDOW. MICROSHADE TYPE:

    MS-D ON WINDOWMS-A ON DOOR

    HARDWARE NOT SHOWN IN DRAWING.

    DOOR & WINDOW OPEN OUT.

    GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS

    WINDOW GLAZING COMPLIANT WITH IRC SECTION R308

    44mm REBATE MAX.30mm IGU DETAILS IN NOTES

    3mm WINDOW SEAL TYP.

    INTERIOROF HOUSE

    3mm DOOR SEAL TYP.

    44mm REBATE MAX.30mm IGU DETAILS IN NOTES

    3mm WINDOW SEAL TYP.

    44mm REBATE MAX.30mm IGU DETAILS IN NOTES

    ELECTRONIC ACTUATOR.

    1 : 5

    Frame Details (D1)2

    1 : 5

    Rebated Door Section (D1)3

    DOOR GLASS

    4 Updated Detailing 26/02/18 LF CM

    WALL LAYERING

    BRASS STRIP TYP.

    DOOR BRUSH SEALS TBC.

    F.F.L.

    1

    5 Updated to As-Built 14/09/18 VP JR

  • 1015

    40

    2360

    40

    2440

    40 935 40

    24

    273

    24

    2

    AR-313

    40 935 40

    1015

    320

    454340219

    320

    390

    130

    10

    40

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3As indicated

    DOOR DETAILING(D2)

    AR-313C.MCDOWELL

    L.FAIDUTTI

    1 : 25

    Door Detailing (D2) VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    ELEVATION VIEW

    PLAN VIEW

    1 Updated Plans and Detailing 19/01/18

    2 07/02/18

    VP

    Updated Plans and Detailing JR

    JR

    VP

    20 February, 201801 OF 01

    1 : 5

    Frame Details (D2)3

    BRASS STRIP TYP.

    DOOR BRUSH SEALS TBC.

    NOTES

    DOOR FRAME MADE OF RECYCLED HARDWOOD.DRAINAGE HOLES TO BE MANUFACTURED ON SITE.

    FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:

    4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED

    HARDWARE NOT SHOWN IN DRAWING.

    DOOR OPENS OUT.

    GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS

    WINDOW GLAZING COMPLIANT WITH IRC SECTION R308

    44mm REBATE MAX30mm IGU DETAILS IN NOTES

    3mm DOOR SEAL TYP.

    INTERIOROF HOUSE

    3 Updated Detailing 26/02/18 LF CM

    F.F.L.

    1 2

    4 Updated to As-Built 14/09/18 VP JR

  • 2950

    10101940

    2

    AR-314

    4092090840908409040

    4097040186040

    333

    182

    515

    RECESSEDWALL

    2440

    1020

    40

    2360

    40 1

    40

    2115

    90

    24 181 54 10 54 168 24

    515

    65

    80

    18

    22

    130

    10

    205 54 10 54 10 182

    515

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3As indicated

    DOOR DETAILING(D3)

    AR-314C.MCDOWELL

    L.FAIDUTTI

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    ELEVATION VIEW

    PLAN VIEW

    1 Updated Plans and Detailing 19/01/18

    2 07/02/18

    VP

    Updated Plans and Detailing JR

    JR

    VP

    20 February, 201801 OF 01

    1 : 25

    Door Detailing (D3) 1 : 5

    Frame Details (D3)3

    NOTES

    DOOR FRAME MADE OF RECYCLED HARDWOOD.DRAINAGE HOLES TO BE MANUFACTURED ON SITE.

    FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:

    4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED

    HARDWARE NOT SHOWN IN DRAWING.

    GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS

    WINDOW GLAZING COMPLIANT WITH IRC SECTION R308

    44mm REBATE MAX.30mm IGU DETAILS IN NOTES

    17mm X 22mm DEEP TRACK.

    DOOR SEAL

    DOOR BRUSH SEALS TYP. TBC.

    3 Updated Detailing 26/02/18 LF CM

    DECKING BOARDS

    44mm REBATE MAX.30mm IGU DETAILS IN NOTES

    WALL LAYERING

    F.F.L.

    1 2

    4 Updated to As-Built 14/09/18 VP JR

  • 2140

    40

    2100

    320880

    40 400 400 40

    880

    2140

    40

    2100

    4040040040

    880

    24

    273

    24

    320

    140

    40

    140

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    DOOR DETAILING(D4)

    AR-315J. ROTH

    V. PHAM

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    PLAN VIEW

    DETAILED VIEW

    F.F.L.

    1 : 25

    Door Detailing (D4)

    ELEVATION VIEW

    1 Updated Plans and Detailing 19/01/18

    2 29/01/18

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    3 Updated Plans, Detailing and Template Adjustments 01/02/18

    VP

    Plan Views and Annotations VP

    VP

    JR

    JR

    JR

    20 February, 201801 OF 01

    1

    4 Updated to As-Built 14/09/18 VP JR

    NOTES

    DOOR MANUFACTURED BY AUSFLAM FIRE SYSTEMS PTY LTD. TO A 2HR FIRE RATING AS SPECIFIED IN SDME RULES AND BUILDING CODE V4.

    PRODUCT INFORMATION:

    2 x 400Wmm x 2097Hmm 2HR DOUBLE DOOR AND RETRO FIT FRAME AFS FR270

  • 40

    2360

    40

    65

    2230

    65

    2440

    40 470 40 1070 40

    65 340 65

    1660

    24

    273

    24

    320

    40 1580 40

    2

    AR-316

    5

    AR-316

    65

    40

    233 54 37

    24 273 24

    320

    40

    10

    40

    72 47 77168

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3As indicated

    DOOR DETAILING(D5)

    AR-316C.MCDOWELL

    L.FAIDUTTI

    1 : 25

    Door Detailing (D5)

    ELEVATION VIEW

    PLAN VIEW

    1 Updated Plans and Detailing 19/01/18

    2 01/02/18

    3 Updated Plans, Detailing and Template Adjustments 01/02/18

    VP

    Rearrange views on sheet CE

    VP

    JR

    JR

    JR

    20 February, 201801 OF 01

    NOTES

    DOOR FRAME MADE OF RECYCLED HARDWOOD.

    WINDOW FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:

    4mm CLEAR TOUGHENED10mm ARGON4mm PERFORMATECH PH12(30) CLEAR TOUGHENED8mm ARGON4mm ENERGYTECH CLEAR TOUGHENED

    HARDWARE NOT SHOWN IN DRAWING.

    PIVOTING DOOR OPENS IN.

    WINDOW IS FIXED.

    GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS

    WINDOW GLAZING COMPLIANT WITH IRC SECTION R308

    1 : 5

    Window Frame Details (D5)2

    1 : 5

    Door Frame Details (D5)3

    75mm X 35mm FULL LENGTH HANDLE

    DOOR BRUSH SEALS TBC.

    44mm REBATE MAX.30mm IGU DETAILS IN NOTES

    4 Updated Detailing 26/02/18 LF CM

    F.F.L.

    1

    5 Updated to As-Built 14/09/18 VP JR

  • 40

    2100

    40

    2180

    1015

    40 935 40

    110

    1015

    40 935 40

    35

    110

    40

    2180

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    DOOR DETAILING(D6)

    AR-317J. ROTH

    V. PHAM

    1 : 25

    Door Detailing (D6)

    DETAILED VIEWELEVATION VIEW

    PLAN VIEW

    F.F.L.

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    1 Updated Plans and Detailing 07/02/18 JR VP

    20 February, 201801 OF 01

    1

    2 Updated to As-Built 14/09/18 VP JR

  • 2160

    2100

    60

    SLIDING DOORCAVITY

    CAVITY FOR DOOR STOP

    50 860 40 1000 40

    1990

    116

    110

    60

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    DOOR DETAILING(D7)

    AR-318J. ROTH

    V. PHAM

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    1 : 25

    Door Detailing (D7)

    ELEVATION VIEW

    PLAN VIEW

    DETAILED VIEW

    F.F.L.

    1 Updated Plans and Detailing 19/01/18

    2 29/01/18

    3 Updated Plans, Detailing and Template Adjustments 01/02/18

    VP

    Plan Views and Annotations VP

    VP

    JR

    JR

    JR

    20 February, 201801 OF 01

    1

    4 Updated to As-Built 14/09/18 VP JR

  • 2140

    1350

    2100

    40

    40 335 935 40

    110

    40 338 932 40

    1350

    36

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    DOOR DETAILING(D8)

    AR-319J. ROTH

    V. PHAM

    1 : 25

    Door Detailing (D8) VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    PLAN VIEW

    DETAILED VIEW

    F.F.L.

    ELEVATION VIEW

    1 Updated Plans and Detailing 19/01/18

    2 29/01/18

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    3 Updated Plans, Detailing and Template Adjustments 01/02/18

    VP

    Plan Views and Annotations VP

    VP

    JR

    JR

    JR

    20 February, 201801 OF 01

    1

    4 Updated to As-Built 14/09/18 VP JR

  • 3600

    40 3520 40

    2440

    40

    2360

    40

    90

    2115

    140

    13 54 10 54 10 54 10 54 13

    273

    32 17 47 17 47 17 96

    273

    18

    22

    40 90 768 90 768 90 768 90 768 90 40

    3600

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3As indicated

    DOOR DETAILING(D9)

    AR-320C.MCDOWELL

    L.FAIDUTTI

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    ELEVATION VIEW

    PLAN VIEW

    1 Updated Plans and Detailing 19/01/18

    2 07/02/18

    VP

    Updated Plans and Detailing JR

    JR

    VP

    20 February, 2018

    1 : 25

    Door Detailing (D9)

    01 OF 01

    1 : 5

    Frame Details (D9)2

    NOTES

    DOOR FRAME MADE OF RECYCLED HARDWOOD.

    FRAME REBATE SET TO 44mm - ALLOWING FOR A 30mm IGU. IGU DETAILS ARE AS FOLLOWS:

    4mm CLEAR TOUGHENED

    REBATED PULL TO BE MANUFACTURED. NOT SHOWN IN THE DRAWING.

    DOOR WILL REQUIRE LOCKING / DROP BOLTS. LOCKING / DROP BOLTS ARE NOT SHOWN IN THE DRAWING.

    GLAZING MATERIAL SPECIFICATIONS AS FOLLOWS:4TF GRADE AAS/NZS 2208LIC NO. 770SAFETY GLASS

    WINDOW GLAZING COMPLIANT WITH IRC SECTION R308

    17mm X 22mm DEEP TRACKS

    3 Updated Detailing 26/02/18 LF CM

    F.F.L.

    1

    4 Updated to As-Built 14/09/18 VP JR

  • 15mm FROSTED OAK ENGINEERED TIMBER FLOORING

    21mm STRUCTURAL PLYWOOD TIMBER SHEETING

    9mm STRUCTURAL PLYWOOD

    152mm STEEL STUD & 2X75mm BRADFORD BLACK INSULATION BATTS

    1mm VAPOUR RETARDER MEMBRANE

    40mm RIGID INSULATION

    4mm RUBBER UNDERLAY

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 10

    FLOORCONSTRUCTIONDETAILS

    AR-321J.ROTH

    C.EIO

    1 : 10

    Interior Floor Detail1

    VISUAL SCALE 1:10 @ A31m0.2m 0.8m0.6m0.4m0m

    1 Updated Plans, Detailing and Template Adjustments 01/02/18 JR

    FLOOR CONSTRUCTION DETAILS

    THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK) FIRE RATING CLASS*

    19 FROSTED OAK ENGINEERERD TIMBER FLOORING 0.13 -4 RUBBER UNDERLAY 0.83 -21 STRUCTURAL PLYWOOD TIMBER SHEETING 0.13 C152 STEEL STUD & SOFT INSULATION 0.035 A9 STRUCTURAL PLYWOOD 0.13 C1 VAPOUR RETARDER MEMBRANE 2.3 B40 RIGID INSULATION 0.028 A

    TOTAL THICKNESS 242 mmR-VALUE 6.12 m2K/W

    20 February, 2018

    VP

    01 OF 01

    2 Updated to As-Built 14/09/18 VP JR

  • 1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 10

    BATHROOM ANDW/C FLOORDETAILS

    AR-322V. PHAM

    J. ROTH

    1 : 10

    Bathroom and W/C Floor1

    FLOOR CONSTRUCTION DETAILS

    THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK) FIRE RATING CLASS*

    8 PORCELAIN TILE 1.5 -3 TILE GLUE MCB A50 ADHESIVEVARYING SCREED 0.13 C2 WATERPROOF MEMBRANE19 CEMENT SHEETING 0.5100 STEEL STUD & SOFT INSULATION 0.035 A9 STRUCTURAL PLYWOOD 0.13 C1 VAPOUR RETARDER MEMBRANE 2.3 B40 RIGID INSULATION 0.028 A

    TOTAL THICKNESS 232 mmR-VALUE 5.10 m2K/W

    8mm PORCELAIN TILE

    3mm TILE GLUE MCB A50 ADHESIVEVARYING DEPTH SCREED2mm WATERPROOF MEMBRANE

    19mm CEMENT SHEETING100mm STEEL STUD AND SOFT INSULATION

    9mm STRUCTURAL PLYWOOD

    1mm VAPOUR RETARDER MEMBRANE

    40mm RIGID INSULATION

    20 February, 2018

    1 Updated to As-Built 14/09/18 VP JR

  • 152mm STEEL STUD & 2X75mm BRADFORD BLACK INSULATION BATTS

    1mm WATER TIGHT MEMBRANE

    10mm AIR GAP WITH TIMBER BATTERNS

    80mm RIGID INSULATION

    87mm 'TRACTILE' SOLAR TILE ROOFING

    21mm TOP HATS

    12mm STRUCTURAL PLYWOOD

    13mm PLASTERBOARD CEILING

    1mm ENVIROSEAL PROCTORWRAP HTR

    1 : 10

    10Deg Roof (Raked Ceiling)1

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 10

    ROOF DETAILS -10DEG ROOF

    AR-331L.FAIDUTTI

    C.EIO

    1 Updated Plans,Template Adjustments, Removed Tractile Info. 01/02/18 JR

    RAKED ROOF CONSTRUCTION DETAILS

    THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK)

    87 'TRACTILE' SOLAR TILE ROOFING -21 TOP HATS -10 AIR GAP 0.0281 ENVIROSEAL PROCTORWRAP HTR -80 RIGID INSULATION 0.131 WATER TIGHT MEMBRANE 2.412 STRUCTURAL PLYWOOD 0.13152 STEEL STUD & SOFT INSULATION 0.03513 PLASTERBOARD CEILING 0.16

    TOTAL THICKNESS 372 mmR-VALUE 4.99 m2K/W

    VP

    01 OF 01

    VISUAL SCALE 1:10 @ A31m0.2m 0.8m0.6m0.4m0m

    20 February, 2018

    2 Updated to As-Built 14/09/18 VP JR

  • 87mm 'TRACTILE' SOLAR TILE ROOFING21mm TOP HATS ROOFING10mm AIR GAP1mm ENVIROSEAL PROCTORWRAP HTR80mm RIGID INSULATION1mm WATER TIGHT MEMBRANE

    12mm STRUCTURAL PLYWOOD BOARD

    75mm STEEL BOTTOM CHORD & BRADFORD BLACK INSULATION BATTS

    75mm STEEL STUD & BRADFORD BLACK INSULATION BATTS

    TRUSS ROOF CAVITY

    22mm CEILING TOP HATS

    13mm PLASTERBOARD CEILING

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 10

    ROOF DETAILS -10DEG ROOF

    AR-332V.PHAM

    J.ROTH

    1 : 10

    10Deg Roof (Flat Ceiling)1

    TRUSS ROOF (TRACTILE) CONSTRUCTION DETAILS

    THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK)

    87 'TRACTILE' SOLAR TILE ROOFING -21 TOP HATS -30 AIR GAP 0.0281 SARKING -80 RIGID INSULATION 0.131 WATER TIGHT MEMBRANE 2.412 STRUCTURAL PLYWOOD BOARD 0.1375 STEEL STUD & SOFT INSULATION 0.035VARYING TRUSS ROOF CAVITY 0.02875 STEEL STUD & SOFT INSULATION 0.03522 CEILING TOP HATS -13 PLASTERBOARD CEILING 0.16

    TOTAL THICKNESS: 397 mm (MINIMUM)R-VALUE: 5.08 m2K/W

    20 February, 2018

    VISUAL SCALE 1:10 @ A31m0.2m 0.8m0.6m0.4m0m

    01 OF 01

    1 Updated to As-Built 14/09/18 VP JR

  • 13mm PLASTERBOARD CEILING

    TRUSS ROOF CAVITY

    75mm STEEL BOTTOM CHORD & BRADFORD BLACK INSULATION BATTS

    22mm CEILING TOP HATS

    1mm WATER TIGHT MEMBRANE12mm STRUCTURAL PLYWOOD BOARD

    80mm RIGID INSULATION

    30mm AIR GAP 1mm ENVIROSEAL PROCTORWRAP HTR

    40mm ROOF BATTENS

    29mm 'LYSAGHT TRIMDEK' ROOF

    75mm STEEL STUD & BRADFORD BLACK INSULATION BATTS

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 10

    ROOF DETAILS -3DEG ROOF

    AR-333V.PHAM

    J .ROTH

    1 : 10

    3Deg Roof (Flat Ceiling)1

    01 OF 0120 February, 2018

    1 Updated to As-Built 14/09/18 VP JR

    TRUSS ROOF (TRACTILE) CONSTRUCTION DETAILS

    THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK)

    29 'LYSAGHT TRIMDEK' ROOF -40 ROOF BATTENS -30 AIR GAP 0.0281 ENVIROSEAL PROCTORWRAP HTR -80 RIGID INSULATION 0.131 WATER TIGHT MEMBRANE 2.412 STRUCTURAL PLYWOOD BOARD 0.1375 STEEL STUD & SOFT INSULATION 0.035VARYING TRUSS ROOF CAVITY 0.02875 STEEL STUD & SOFT INSULATION 0.03522 CEILING TOP HATS -13 PLASTERBOARD CEILING 0.16

    TOTAL THICKNESS: 378 mm (MINIMUM)R-VALUE: 5.08 m2K/W

  • 135

    130

    109

    45

    35

    50

    300

    35

    120.00°

    SHEET METAL FOLDED BACK ON SELF

    SHEET METAL FOLDED BACK ON SELF

    SHEET METAL FOLDED BACK ON SELF

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 5

    ROOFCONNECTIONDETAILS 1

    AR-334V.PHAM

    J.ROTH

    1 : 5

    Flashing Details1

    FLASHING

    BARGE CONSTRUCTION

    APRON FLASHING

    NOTES

    FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME.

    BARGE FLASHING CONTAINS INTEGRATED VENTING PROFILE FOR NATURAL VENTILATION. FLASHING RUNS UNDERNEATH TRACTILE PANELS (ROOFING FINISH LAYER).

    BARGE CONSTRUCTION CONSISTS OF 90x45 TIMBER ATTACHED DIRECTLY TO FRAME, WITH 19x125mm PLYWOOD ATTACHED TO TOP, WHICH JOINTLY SUPPORTS THE BARGE FLASHING.

    APRON FLASHING OVERLAPS 3 DEGREE ROOF FINISH (TRIMDEK), AND ATTACHES BEHIND WALL CLADDING LAYER (WEATHERTEX).

    WALL CLADDING (WEATHERTEX)

    3 DEGREE ROOFFINISH (TRIMDEK)

    BARGE FLASHING TAB UNDERLAPPING TRACTILE ROOF FINISH

    APRON FLASHINGATTACHMENT POINT

    BARGE FLASHING PROFILE

    APRON FLASHING PROFILE

    20 August, 2018

    1 Updated to As-Built 14/09/18 VP JR

  • 150

    4593.00°

    125

    230

    176

    48

    135

    61

    40

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 5

    ROOFCONNECTIONDETAILS 2

    AR-335V.PHAM

    J.ROTH

    1 : 5

    3 Degree Box Gutter Detailing1

    NOTES

    FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME.

    3 DEGREE ROOF FLASHING UNDERLAPS END OF LYSAGHT TRIMDEK, AND WRAPS INTO BOX GUTTER.

    BOX GUTTER LEADS WATER TO DOWNPIPE. PLACED WITHIN SOFFIT BOXING CONSTRUCTION.

    FASCIA FLASHING WRAPS OVER OUTSIDE EDGE OF BOX GUTTER, CREATING EXTERIOR FINISHING.

    BOX GUTTERROOF FLASHING FASCIA FLASHING

    FASCIA FLASHING

    BOX GUTTER

    3 DEGREEROOF FLASHING

    BOX GUTTER END CAPPING

    GUTTER ASSEMBLY

    FASCIA FLASHING

    BOX GUTTER

    3 DEGREE ROOF FLASHING

    WEATHERTEX FASCIA

    TIMBER BRACKET

    20 August, 2018

    1 Updated to As-Built 14/09/18 VP JR

  • 150

    45

    100.

    00°

    125

    230

    176

    48

    135

    61

    40

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 5

    ROOFCONNECTIONDETAILS 3

    AR-336V.PHAM

    J.ROTH

    1 : 5

    10 Degree Box Gutter Detailing1

    BOX GUTTER ROOF FLASHINGFASCIA FLASHING

    FASCIA FLASHING PROFILE

    BOX GUTTER PROFILE

    10 DEGREE ROOF FLASHING PROFILE

    BOX GUTTER END CAPPING

    GUTTER ASSEMBLY

    10 FASCIA FLASHING

    BOX GUTTER

    ROOF FLASHING

    WEATHERTEX FASCIA

    TIMBER BRACKET

    NOTES

    FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME.

    3 DEGREE ROOF FLASHING UNDERLAPS END OF TRACTILE SOLAR CELLS, AND WRAPS INTO BOX GUTTER.

    BOX GUTTER LEADS WATER TO DOWNPIPE. PLACED WITHIN SOFFIT BOXING CONSTRUCTION.

    FASCIA FLASHING WRAPS OVER OUTSIDE EDGE OF BOX GUTTER, CREATING EXTERIOR FINISHING.

    20 August, 2018

    1 Updated to As-Built 14/09/18 VP JR

  • 49

    234

    334

    80.00°

    93.00°

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 5

    ROOFCONNECTIONDETAILS 4

    AR-337V.PHAM

    J.ROTH

    1 : 5

    Roof Join Flashing Detail1

    NOTES

    FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME.

    ROOF JOIN FLASHING COMPLETELY COVERS JOIN BETWEEN 10 DEGREE ROOF FINISH AND 3 DEGREE ROOF FINISH.

    ROOF JOIN FLASHING PROFILE

    ROOF JOIN FLASHING

    10 DEGREE ROOF FINISH

    3 DEGREE ROOF FINISH

    20 August, 2018

    1 Updated to As-Built 14/09/18 VP JR

  • 36

    200

    45

    126.0

    139

    218

    40

    15

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 5

    ROOFCONNECTIONDETAILS 5

    AR-338V.PHAM

    J.ROTH

    1 : 5

    Clerestory Flashing Details1

    NOTES

    FLASHINGS MANUFACTURED BY LYSAGHT TO 0.48mm, CONSTRUCTED FROM ZINCALUME

    10 DEGREE ROOF FASCIA ENCOMPASSES END OF 10 DEGREE ROOFING. FASCIA OVERLAPS FINISHED TRACTILE LAYER, AND HAS DRIPPING EDGE TO ALLOW FOR WATER RUNOFF.

    APRON FLASHING OVERLAPS 3 DEGREE ROOF FINISH (TRIMDEK), AND ATTACHES BEHIND WALL CLADDING LAYER (WEATHERTEX).

    10 DEGREEROOF FASCIA

    3 DEGREEAPRON FASCIA

    CLERESTORY WINDOW FRAME

    3 DEGREEROOF FINISH

    10 DEGREE ROOF FASCIA PROFILE

    3 DEGREE APRON FLASHING PROFILE

    20 August, 2018

    1 Updated to As-Built 14/09/18 VP JR

  • 50mm LIGHT WEIGHT CONCRETE SECOND SKIN WALL

    SHADING & VENTILATION CAVITY (VARYING WIDTH)

    REFER TO 'EXTERIOR WALL DETAIL' FOR WALL SPECIFICATIONS

    9.5mm 'WEATHERTEX' CLADDING

    1mm VAPOUR RETARDER MEMBRANE

    100mm RIGID INSULATION

    9mm STRUCTURAL PLYWOOD

    90mm STEEL STUD &BRADFORD BLACK INSULATION BATTS

    13mm PLASTERBOARD WITH PAINTED FINISH

    45mm AIR GAP WITH TIMBER STUDS & ENVIROSEAL PROCTORWRAP CW

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 10

    WALL SECTIONS/CONSTRUCTIONDETAILS

    AR-341V.PHAM

    C.EIO

    1 : 10

    Second Skin Detail1

    1 : 10

    Exterior Wall Detail2

    VISUAL SCALE 1:10 @ A31m0.2m 0.8m0.6m0.4m0m

    1 Updated Plans, Detailing and Template Adjustments 01/02/18

    2 05/02/18

    JR

    Hide Lines JR

    EXTERNAL WALL CONSTRUCTION DETAILS

    THICKNESS (mm) MATERIAL THERMAL CONDUCTIVITY (W/mK) FIRE RATING CLASS*

    50 SECOND SKIN WALL - NOT REQUIREDVARYING AIR GAP - NOT REQUIRED

    9.5 CLADDING - NOT REQUIRED45 AIR GAP - NOT REQUIRED100 RIGID INSULATION 0.028 NOT REQUIRED1 AIR TIGHT MEMBRANE 2.3 NOT REQUIRED9 STRUCTURAL PLYWOOD 0.13 NOT REQUIRED90 STEEL STUD & SOFT INSULATION 0.035 A13 PLASTERBOARD WALL WITH FINISH 0.16 A

    TOTAL THICKNESS: 317.5 mm (MINIMUM)R-VALUE: 6.21 m2K/W

    3 18/02/18Adjusted wall layerings and sheet layout JR

    20 February, 2018

    VP

    VP

    VP

    01 OF 014 Updated to As-Built 14/09/18 VP JR

    BRACKETS - SEE DRAWING X92

  • 13mm 'GYPROCK' WALL LINING WITHPAINTED SURFACE FINISH

    90mm STEEL STUD & BRADFORD BLACK INSULATION BATTS

    13mm 'GYPROCK' WALL LINING WITHPAINTED SURFACE FINISH

    32mm (2x16mm) 'GYPROCK' WALL LINING FOR 2HOUR FIRE RATING

    90mm STEEL STUD & BRADFORD BLACK INSULATION BATTS

    13mm 'GYPROCK' WALL LINING WITHPAINTED SURFACE FINISH

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 10

    INTERIOR WALLDETAILS

    AR-342V.PHAM

    J.ROTH

    1 : 10

    Interior Wall Detail1

    1 : 10

    Interior Wall Detail - Plant Room2

    20 August, 2018

    NOTES

    INTERIOR WALL DETAIL

    13mm GYPROCK GRADED TO 1 HOUR FIRE RATING COMPLIANT WITH COMPETITION GUIDELINES

    INTERIOR PLANT ROOM WALL DETAIL

    2x16mm (32mm) GYPROCK FYRCHEK GRADED TO 3 HOUR FIRE RATING COMPLIANT WITH COMPETITION GUIDELINES

    1 Updated to As-Built 14/09/18 VP JR

  • 1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 25

    PARTITIONDETAILS

    AR-351V.PHAM

    J.ROTH

    LIVING ROOMDINING ROOM

    1 : 25

    Partition Callout1

    VISUAL SCALE 1:25 @ A32.5m0.5m 2m1.5m1m0m

    1 Updated Plans, Detailing and Template Adjustments 01/02/18 JR

    20 February, 2018

    VP

    01 OF 01

    NOTES

    FURTHER DETAILS ARE PROVIDED IN AR-320 -DOOR DETAILING (D11).

    NORTH2 Updated to As-Built 14/09/18 VP JR

  • EX

    IT

    320 680

    720

    720240

    840

    2007

    1600

    1600

    3840

    1600 4620 49001500

    1600

    6201

    ENTRANCE

    2954 3768

    7910 6722

    2983

    3218

    0

    01:14 1:14

    1:1

    4

    1:1

    6

    1:16

    1600

    2911

    1600

    1600

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    RAMP ANDRAILINGDIMENSIONS

    AR-401V.PHAM

    L.FAIDUTTI

    1 : 100

    Ramp Dimensions1

    01 OF 0120 February, 2018

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    1 Updated dimensions and detailing 20/02/18 VP JR

    NORTH2 Updated dimensions and detailing and editing familes 13/09/18 V JR

    3 Updated to As-Built 14/09/18 VP JR

  • 720

    240

    3840

    1600

    1645

    1645 7910 1900

    0

    1640

    Surface Level

    0

    Ground Floor Level

    720

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    NORTHERNRAMP

    AR-402V.PHAM

    J.ROTH

    Northern Ramp 3D3

    1 : 100

    Northern Ramp Plan View1

    01 OF 0120 February, 2018

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    As

    N.T.S.

    1 Updated dimensions and detailing 20/02/18 VP JR

    1 : 100

    Northern Ramp South Elevation2

    NOTES

    ALL RAMPS, RAILINGS AND LANDINGS COMPLY WITH THE FOLLOWING CODES:

    THE BUILDING REGULATION & FACILITIES FOR THE DISABLED – UNITED ARAB EMIRATES CODEUAE FIRE AND LIFE SAFETY CODE OF PRACTICE 2017LIVABLE HOUSING AUSTRALIA DESIGN BUILDING CODE OF AUSTRALIASDME2018 RULES VERSION 4DELIVERABLE #7 APPENDIX 1

    HANDRAILS AND INTERMEDIATE HANDRAILS ARE PROVIDED AT 950mm AND 700mm (TYP.) HEIGHTS RESPECTIVELY, AND HAVE A CIRCULAR 43mm DIAMETER.

    HANDRAILS CONTINUE UNINTERUPTED ALONG ENTIRE LENGTH OF ALL RAILED AREA, EXTENDING 300mm AT RAIL ENDS.

    A CLEAR SPACING OF 58mm EXISTS BETWEEN HANDRAIL EDGE AND TOP RAIL.

    LANDINGS ARE (MINIMUM) 1500mm X 1500mm.

    WIRE BALUSTRADES ARE PROVIDED AT 80mm CTC SPACINGS (TYP.).

    UPSTAND CONTRASTS VISUALLY WITH THE RAMP. UPSTAND HEIGHT OF 150mm FROM RAMP SURFACE.

    THE RAMP SURFACE IS HARD AND NON SLIP.

    BACK DECK TO CONTAIN SURROUNDING GREEN WALL TO ACT A BARRIER BETWEEN DECK SURFACE AND THE GROUND.

    2 Updated to As-Built 14/09/18 VP JR

  • Surface Level

    0

    Ground Floor Level

    720

    720

    680320

    1500

    1:14 1:14

    1:14

    4620 4900

    840

    1600

    1600

    2007

    1640

    2908

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 100

    SOUTHERNRAMP

    AR-403V.PHAM

    J.ROTH

    Southern Ramp 3D3

    1 : 100

    Southern Ramp Elevation2

    1 : 100

    Southern Ramp Plan View1

    01 OF 0120 February, 2018

    VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

    As Indicated

    N.T.S.

    1 Updated dimensions and detailing 20/02/18 VP JR

    NOTES

    ALL RAMPS, RAILINGS AND LANDINGS COMPLY WITH THE FOLLOWING CODES:

    THE BUILDING REGULATION & FACILITIES FOR THE DISABLED – UNITED ARAB EMIRATES CODEUAE FIRE AND LIFE SAFETY CODE OF PRACTICE 2017LIVABLE HOUSING AUSTRALIA DESIGN BUILDING CODE OF AUSTRALIASDME2018 RULES VERSION 4DELIVERABLE #7 APPENDIX 1

    HANDRAILS AND INTERMEDIATE HANDRAILS ARE PROVIDED AT 950mm AND 700mm (TYP.) HEIGHTS RESPECTIVELY, AND HAVE A CIRCULAR 43mm DIAMETER.

    HANDRAILS CONTINUE UNINTERUPTED ALONG ENTIRE LENGTH OF ALL RAILED AREA, EXTENDING 300mm AT RAIL ENDS.

    A CLEAR SPACING OF 58mm EXISTS BETWEEN HANDRAIL EDGE AND TOP RAIL.

    LANDINGS ARE (MINIMUM) 1500mm X 1500mm.

    WIRE BALUSTRADES ARE PROVIDED AT 80mm CTC SPACINGS (TYP.).

    UPSTAND TO CONTRASTS VISUALLY WITH THE RAMP. UPSTAND HEIGHT OF 150mm FROM RAMP SURFACE.

    THE RAMP SURFACE IS HARD AND NON SLIP.

    BACK DECK TO CONTAIN SURROUNDING GREEN WALL TO ACT A BARRIER BETWEEN DECK SURFACE AND THE GROUND.

    2 Updated to As-Built 14/09/18 VP JR

  • 150

    76

    80

    80

    80

    80

    80

    80

    80

    89

    ø 43

    920

    45

    950

    1510

    1308

    150

    58

    700

    CLEAR SPACING (HANDRAIL TO HANDRAIL)

    CLEAR SPACING (UPSTAND TO UPSTAND)

    OVERALL RAMP WIDTH

    45mm POST NOTCHING

    BLACKBUTT 135x22 UPSTAND

    BLACKBUTT 90x45 POST

    3.2mm 316 MARINE GRADE WIRE BALUSTRADE

    BLACKBUTT 43mm DIAMETER CIRCULAR HADRAIL

    80mm STAINLESS HANDRAIL BRACKETS

    BLACKBUTT 90x45 TOP RAIL

    90

    45 1600 45

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 10

    RAMP RAILINGCROSS-SECTION

    AR-404V.PHAM

    J.ROTH

    1 : 10

    Handrail Detail Cross Section1

    NOTES

    ALL RAMPS, RAILINGS AND LANDINGS COMPLY WITH THE FOLLOWING CODES:

    THE BUILDING REGULATION & FACILITIES FOR THE DISABLED – UNITED ARAB EMIRATES CODEUAE FIRE AND LIFE SAFETY CODE OF PRACTICE 2017LIVABLE HOUSING AUSTRALIA DESIGN BUILDING CODE OF AUSTRALIASDME2018 RULES VERSION 3 DELIVERABLE #7 APPENDIX 1

    HANDRAILS AND INTERMEDIATE HANDRAILS ARE PROVIDED AT 950mm AND 700mm (TYP.) HEIGHTS RESPECTIVELY, AND HAVE A CIRCULAR 43mm DIAMETER.

    HANDRAILS CONTINUE UNINTERUPTED ALONG ENTIRE LENGTH OF ALL RAILED AREA, EXTENDING 300mm AT RAIL ENDS.

    A CLEAR SPACING OF 58mm EXISTS BETWEEN HANDRAIL EDGE AND TOP RAIL.

    LANDINGS ARE (MINIMUM) 1500mm X 1500mm.

    WIRE BALUSTRADES ARE PROVIDED AT 80mm CTC SPACINGS (TYP.).

    UPSTAND TO CONTRAST VISUALLY WITH THE RAMP. UPSTAND HEIGHT OF 150mm FROM RAMP SURFACE.

    THE RAMP SURFACE WILL BE HARD AND NON SLIP.

    BACK DECK TO CONTAIN SURROUNDING GREEN WALL TO ACT A BARRIER BETWEEN DECK SURFACE AND THE GROUND.

    20 August, 2018

    1 Updated to As-Built 14/09/18 VP JR

  • Plan View

    Side View

    Front View

    3D View

    150 2310 150 1170 150 1410 150 1170 150 1410 150

    8370

    10

    1793

    937

    5790

    10

    1793

    937

    48101590

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10

    A

    B

    C

    D

    E

    F

    G

    A

    B

    C

    D

    E

    F

    G

    Team:

    Address:

    Contact:

    TEAM UOW

    UNIVERSITY OF WOLLONGONGWOLLONGONG

    NSW, AUSTRALIA 2522

    [email protected]

    Client:

    Dubai Electricity and Water Authority

    AMENDMENTS

    REV. DESCRIPTION DATE DRAWN CHECK

    COPYRIGHT

    LOT # M

    DRAWER

    CHECKED

    DATE

    SCALE

    None; Project is Public

    SHEET:

    @ A3 1 : 50

    DECK SCREEN

    AR-405V.PHAM

    J.ROTH

    1 : 50

    Deck Screen

    20 August, 2018

    1 Updated to As-Built 14/09/18 VP JR

    NOTE: CANVAS IS INSTALLED OVER TOP OF EQUIPMENT

    SheetsAR-001 - SOLAR HAI PLANAR-002 - SITE PLANAR-003 - GROUND FLOOR VIEWSAR-011 - GROUND FLOOR PLANAR-012 - GROUND FLOOR PLANAR-013 - GROUND FLOOR PLANAR-021 - ROOF PLANAR-101 - BUILDING ELEVATION SOUTHAR-102 - BUILDING ELEVATION WESTAR-103 - BUILDING ELEVATION NORTHAR-104 - BUILDING ELEVATION EASTAR-201 - LONGITUDINAL SECTION 1AR-202 - LONGITUDINAL SECTION 2AR-211 - TRANSVERSAL SECTION 1AR-212 - TRANSVERSAL SECTION 2AR-301 - DOOR AND WINDOW LOCATIONS - GFAR-302 - DOOR AND WINDOW LOCATIONS - CLAR-303 - WINDOW SCHEDULEAR-304 - WINDOW DETAILING (W1)AR-305 - WINDOW DETAILING (W2)AR-307 - WINDOW DETAILING (W3)AR-308 - WINDOW DETAILING (W4)AR-311 - DOOR SCHEDULEAR-312 - DOOR DETAILING (D1)AR-313 - DOOR DETAILING (D2)AR-314 - DOOR DETAILING (D3)AR-315 - DOOR DETAILING (D4)AR-316 - DOOR DETAILING (D5)AR-317 - DOOR DETAILING (D6)AR-318 - DOOR DETAILING (D7)AR-319 - DOOR DETAILING (D8)AR-320 - DOOR DETAILING (D9)AR-321 - FLOOR CONSTRUCTION DETAILSAR-322 - BATHROOM AND W/C FLOOR DETAILSAR-331 - ROOF DETAILS - 10DEG ROOFAR-332 - ROOF DETAILS - 10DEG ROOFAR-333 - ROOF DETAILS - 3DEG ROOFAR-334 - ROOF CONNECTION DETAILS 1AR-335 - ROOF CONNECTION DETAILS 2AR-336 - ROOF CONNECTION DETAILS