Energy AuditReportFor
Custom Capsules privateLimited, BoisarThe report presents finding of the energyaudit study at Custom Capsules privatelimited, Boisar. The overall potential forimprovement in the facility is Rs. 34.65Lakhs per annum for an investment of Rs31.50 Lac.
April2009
Prepared by:
A.R.S. ENERGY AUDITORS, VIRAR
8/6/2019 Custom Capsules Pvt. Ltd
2/68
50
ACKNOWLEDGEMENT
M/s A.R.S. Energy audi tors . team has carr ied out energy audi t s tudy
at M/s . Custom Capsules Pvt . Ltd. , Boisar dur ing the month of Apri l
2009. We hereby express our special thanks to
Mr. J.N Vyas CEO, Custom Capsules Pvt. Ltd.
And a l l o ther employees fo r thei r p roac tive support and cour tesy
extended to the visit ing energy audit team during the study.
For Team ARS:1. Mr.Sachin Deshpande, BE(Mech); BEE Certified
Energy Auditor.
Experience : 18 years
2. Mr. Sunil Apte, B.Tech (Civil); BEE Certified EnergyAuditor.
Experience : 30 years.
3. Mr. Atul Vartak, BE (EXTC); P.W.D Certified ElectricalSupervisor
Experience: 18 years.
4. Mr. Parag Nerurkar ,Dipl(Etrx), AMIE; AdvancedCertificate in Power Distribution and Management(ACPDM)
Experience : 3 years.
5. Mr. J .V. Kade, Dipl (Mech), Dipl (Elex)
Experience : 32 years.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
3/68
51
Energy Audit
Report|April 2009
6. TABLE OF CONTENTS
1. E X E C U T I V E S U M M A RY ........................................................................................................ 71.1 P R E L U D E : ............................................................................................................... 71.2 C U R R E N T E N E R G Y S C E N A R I O : ................................................................................... 7
1.3 T H E AU D I T AC T I V I T Y: ............................................................................................... 8
1.4 E N E R G Y S AV I N G ME A S U R E S : ...................................................................................... 91.5 P O T E N T I A L F OR E N E R G Y S AVINGS : ........................................................................... 10
B A C K G R O U N D ....................................................................................................................... 11P R E S E N T E N E R G Y S C E N A R I O .................................................................................................. 12
O V E RV I E W O F THE B U I L D I N G E N E R G Y U S A G E : .................................................................... 12H I S T O R I C A L D AT A AN A LY S I S ........................................................................................... 12
ME T H O D O L O G Y ..................................................................................................................... 16E L E C T R I C A L D I S T R I B U T I O N S YS T E M : ............................................................................... 16IN D O O R LI G H T I N G : ............................................................................................... ......... 16W I N D O W /S P L I T A IR C O N D I T I O N E R S ................................................................................ 17P U M P S : ........................................................................................................................ 18
4 .2UPS: ........................................................................................................... ......... 19C O M P R E S S E D A IR S YS T EM : ............................................................................................. 203H I S T O R I C A L D A T A AN A LY S I S ............................................................................................... 21
MO N T H LY E L E C T R I C I T Y B I L L S .......................................................................................... 21LOA D D I S T R I B U T I O N .......................................................................................... ............ 22LOA D P R O F I L E : ............................................................................................................. 23
T A R I F F AN A LY S I S : ......................................................................................................... 27ME A S U R E M E N T S , O B S E RVAT I O N S , AN D D AT A AN A LY S I S ............................................................. 28
B I L L I N G AN A LY S I S , E L E C T R I C A L D E M A N D AN D P O W E R F A C T O R : .......................................... 28C A PA C I T O R B ANKS : ..................................................................................................... .. 30L I G H T I N G : .............................................................................................................. ...... 31W I N D O W A I R C O N D I T I O N E R S : .................................................................................... ..... 34DX C H I L L E R S ............................................................................................................... 36C O M P R E S S E D A IR S YS T EM : ............................................................................................. 38P U M P S : ........................................................................................................................ 39UPS 40
7 E N E R G Y C O N S E RVAT I O N O P P O RT U N I T I E S .............................................................................. 42C A PA C I T O R B ANKS : ..................................................................................................... .. 42L I G H T I N G ...................................................................................................................... 42W I N D O W / S P L I T A IR C O N D I T I O N E R S : .............................................................................. 46C H I L L E R S ...................................................................................................................... 48C O M P R E S S E D A IR S YS T EM : ............................................................................................. 53P U M P S : ........................................................................................................................ 53
R E N E WA B L E E N E R G Y ............................................................................................................ 54S OLAR PV S Y S T E M : ....................................................................................................... 54S OLAR AN D W IN D E N E R G Y H YBRID S Y S T E M : ..................................................................... 57P A S S I V E D E S I G N T E C H N I Q U E S ......................................................................................... 5910. 1 EL ECTRO NIC BAL LAS TS ............................................................................... 63VO LTA GE CO NT RO LL ER FO R LI GH TI NG ............................................................. 6410. 3 T5 TU BE LI GH TS (2 8 WA TTS ) .................................................................... 6510.4 L I G H T I N G S E N S O R S ......................................................................................... ..... 66
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
4/68
50
10.5 C H I L L E R S ............................................................................................................ 67
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
5/68
51
Energy Audit
Report|April 2009
List of Tables
TA BLE NO .1 : HA RM ON IC S:............................................................................26
TABLE NO. 2: MONTHLY ENERGY BILLS......................................................28
TA BLE NO .3 : LI GH TI NG .................................................................................31
TABLE NO.4: COMPA RISON OF L PD VA LUE WITH ECBC NORMS.... .. .. .. .. .. .33
TABLE NO.5: COMPA RISON OF P RESE NT L UX L EVEL WITH NBC... ... .. .. .. .. .33
TABLE NO.6: MEAS UREME NTS AT W INDO W AI R-CON DITI ONERS ... .. .. .. .. .. .34
TAB LE NO. 7: DAT A A NAL YSI S WIN DOW AIR CON DIT ION ER.......................35
TABLE NO.8: DX CHILLER INPUT DATA.......................................................36
TABLE NO.9: DX CHILLER PERFORMANCE ANALYSIS.................................36
TAB LE NO.1 0: AIR COM PRE SSO R PUM P UP TES T RESUL TS.....................39
TA BL E NO .1 1: PU MP PE RF OR MA NC E...........................................................39
TABLE NO.12: UPS.........................................................................................40
TAB LE NO. 13 : BY MAI NTA INI NG POW ER FAC TOR UNI TY...........................42
TABLE NO. 14: SAVING BY REPLACEMENT OF CONVENTIONAL BALLASTSWI TH EL EC TRO NI C BA LLA STS .......................................................................43
TABLE NO. 15: SAVING BY INSTALLATION OF VOLTAGE REDUCTIONDEVICE............................................................................................................44
TABLE NO. 16: SAVING BY RETROFITTING PRESENT LIGHTING FIXTURESWITH ENERGY EFFICIENT LIGHTING FIXTURES T5:....................................45
TABLE NO. 17: SAVINGS BY INSTALLING ENERGY SERVER.......................46
TABLE NO. 18: SAVINGS DUE TO INSTALLATION OF CENTRAL AIRCO ND IT ION IN G SY ST EM................................................................................47
TABLE NO. 19: SAVING BY INSTALLING CENTRAL AIR CONDITIONINGSYSTEM .........................................................................................................48
TABLE NO. 20: SAVINGS BY INSTALLATION OF THERMAL STORAGESYSTEM...........................................................................................................52
TA BL E NO . 21 SA VI NG S BY AV OI DI NG LE AK AG E........................................53
TAB LE NO. 22 : S AVI NG BY INS TAL LIN G S OLA R P V S YST EM .......................57
TABLE NO.23: SAVING BY INSTALLING SOLAR AND WIND ENERGY HYBRIDSYSTEM...........................................................................................................59
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
6/68
50
List of Figures
FIG URE 1 : SEA SON AL PO WER C ONS UMP TI ON PAT TER N..........................13
FIGURE 2: DAILY POWER CONSUMPTION PATTERN...................................14
FIG URE 3: DAT E-W ISE POW ER CON SUM PTI ON PAT TER N...........................15
FIGURE 4: HISTORICAL DATA ANALYSIS.....................................................21
FI GU RE 6: LO AD DI ST RI BU TI ON BA SE D ON KW H.......................................22
FIGURE 7 LOAD PROFILE POWER..............................................................23
FIGURE 8: LOAD PROFILE - VOLTAGE..........................................................24
FIGURE 9 LOAD PROFILE POWER FACTOR................................................24
FIGURE 10 LOAD PROFILE DEMAND..........................................................25
FIGURE 11: LOAD PROFILE VOLTAGE HARMONICS...................................25
FIGURE 12: LOAD PROFILE CURRENT HARMONICS...................................26
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
7/68
51
Energy Audit
Report|April 2009
1.Executive Summary
1.1 Prelude :
M/s. ARS Energy Audi tors , Virar, conducted an energy audi t s tudy
at M/s . Custom Capsules Pvt . Ltd. , Boisar. The company is in the
f ie ld o f manufac tur ing empty hard ge la t in capsu les . The CCPL,
Boisar Plant was inaugurated in the year 1980.
T he un it i s sp re ad ov er a n ~5 a cr e a rea a nd c on ta in s a
manufacturing block and administrative unit connected together.
T he b ui ld in g i s p ro vi de d w it h u ti li ti es l ik e a ir c on di ti on in g,
l ig ht in g, p um pi n g e tc . A D X t y pe a ir c on di ti on in g s ys te m w it h
package un it s i s p rov ided fo r the manufac tur ing b lock and theadminis t ra t ive block contains a mixture of Window and Spl i t type
Air condi tioners. Approximate ly 150 persons a re p resent a t any
given point of t ime. The building operates from 9.00 AM to 6.00 PM
and a n igh t sh if t i s insta ted when the p roduc t ion demands a re
higher.
The focus o f the s tudy was on to iden t ify and eva luate energy
conservation opportunities in the facil i ty.
1.2 Current Energy Scenario:
M/s Custom Capsules Pvt . Ltd. (CCPL) has an annual bi l l of Rs.
56.27 Lac for the e lectric i ty consumed. Total annual e lectric i ty
usage a between the months Apri l 2008 t i l l March 2009 is shown
as under:
Annual Electricity usage:
Electricity bill kWh/year 576144
Rs. /year 5627196
Contract demand kVA 500
Billing Demand kVA 203
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
8/68
50
Power Factor 0.99 (in past 5 months)
Energy Charges Rs. /kWh 6.20
1.3 The Audit Act ivi ty:
In order to conduct the comprehensive energy audi t s tudy, ARS
Energy Auditor evaluated performance of individual equipments
l ik e C hi ll er s, w at er p um pi ng s ys te ms , l ig ht in g, m ot or s, A ir
c om pre ss ors e tc . a s p er Bu re au o f En erg y E ff ici en cy ( BEE)
guidelines.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
9/68
51
Energy Audit
Report|April 2009
1.4 Energy Saving Measures:
Power Factor Improvement:
Improve the power factor by install ing capacitors at suitable load
centers
Lighting:
Replace the conventiona l ba ll ast s wi th e lec t ron ic ba ll ast s . Af te r
insta ll ing e lec t ron ic chokes, insta ll vo ltage reduc ing device fo r
lighting feeder.
OR
Replace the present 52 W and 48 W tube lights with energy efficient
T-5 tube lights having electronic ballast
Window Air Conditioners:
Install ing energy saving devices l ike t imer based ON-OFF system for
present window/split air-conditioners
OR
Replace present air conditioner system with central air conditioner
system
DX type Package Air Conditioners:
Replace present air conditioner system with central air conditioner
system
OR
Replace present air conditioner system with Thermal storage system
Air Compressor:
Avoid the leakage present at receiver.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
10/68
50
1.5 Potentia l for Energy Savings:
Sr.No Section Scheme
Powersaving
kWh/Annum
EnergySaving
Lac Rs. / Year
Investment
Lac Rs.
SimplePay
Back,
MonthsElectric Energy:
Capacitorbank Improvement of power factor Unity 1.01 1.13 13
1 InteriorLighting
Option I : Step I -Replacement of Convention ballastwith electronicballast
6772 0.66 0.57 10
Option I: Step II-installation of reducing operatingvoltage from 235 Vto 210 V
6235 0.61 1.10 22
Option II:By retrofittingpresent lightingfixtures withenergy efficientlighting fixtures (T-5)
13628 1.33 2.00 18
2
Window /Split airConditioner
Option I:Installing EnergySaver
21542 2.10 1.20 7
Option II:Installing Centralair conditioner
152064 14.84 15.20 12
Chillers
Option I:Installing Centralair conditioner
177408 17.32 13.50 9
3Option II:Installing thermalstorage system
368640 32.72 230.40 85
4 AirCompressor
By avoidingleakage at receiver
2323 0.22
5 Total : 345013 34.65 31.50
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
11/68
51
Energy Audit
Report|April 2009
BackgroundM SEB has init iated sev eral demand side management
p ro gr am me s w it h t he o bj ec ti ve o f p e ak c li pp in g, s tr at e gi c
e ne rg y c on se rv at io n, v all ey f il li ng a nd l oa d sh if ti ng i n
accordance with direct ive issued by the MERC. The consumers
included for such study have contract demand of 1000 KVA and
above, both in commercial and industrial sectors.
As a par t of th is in i t ia t ive , ARS Energy Audi tors , Virar carr ied
out energy audit activity at M/s. Custom Capsules Pvt. Ltd. This
report relates to the findings of the energy audit activit ies.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
12/68
8/6/2019 Custom Capsules Pvt. Ltd
13/68
51
Energy Audit
Report|April 2009
Seasonal Variations:
Figure 1: Seasonal Power Consumption Pattern
Seasonal variation
42000
44000
46000
48000
50000
52000
A p r - 0
8
M a y - 0
8 J u
n - 0 8
J u l - 0
8
A u g - 0
8
S e p - 0
8
O c t - 0
8 N o
v - 0 8
D e c - 0
8 J a
n - 0 9
F e b - 0
9
M a r - 0
9
Months
U n
i t
C o n s u m p
t i o
0
0.2
0.4
0.6
0.8
1
1.2
P o w e r
F a c t o
Unitconsumptionkwh
P.F.
T he S ea so na l v ar ia ti on s ho ws t ha t t he m ax im um e le ct ri ci ty
consumption was in the month of February and minimum
elect r ic i ty consumpt ion in the month o f September due to l ess
usage of machinery.
The CCPL, Boisar operates between 10.00 hours to 18:00 hours.
The laboratory equipments and l ight ing, computers contr ibute to
regular loads; while space condit ioning sy ste ms like air
conditioners, fans etc. contribute to t ime-bound / seasonal loads.
To u nd er st an d t he p ow er c on su mp ti on p at te rn , t he e le ct ri ca l
measurements for the period of 5 days at incoming LT meter were
carried out to capture the loading pattern of the facil i ty.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
14/68
50
Figure 2: Daily Power Consumption Pattern
180.00
Daily power consumption pattern from 16 t h Apri l 2009 to 21 s t April
2009 is as shown above. Being weekly OFF, the power consumption
was less on 18 t h and 19 t h April .
T he ab ov e g rap h s how s t ha t t he p ow er c ons ump ti on i s i n
incre asing tre nd from 8: 50 AM onward and reaches peak
consumption of 130 kW at around 9:50 AM. It remains stable in the
range of 120 kW to 140 kW between 9:50 AM to 5:50 PM and af ter
that , i t shows receding t rend upto 11.00 PM (30 kW) and remains
s ta bl e u pt o 6 :0 0 A M. F ro m 6 : 00 A M o nw ar ds t he c on su mp ti on
s ta r t s inc reas ing and reaches 48 kW and remains cons tan t up to
8 .5 0 A M. Ni ght l oad i s 3 0 k W, wh ich i s ma in ly du e t o p lan t
machinery.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
15/68
51
Energy Audit
Report|April 2009
Figure 3: Date-wise power Consumption Pattern
Power Consumption, kWh/day
0.00
500.00
1000.00
1500.00
2000.00
2500.00
16-Apr 17-Apr 18-Apr 19-Apr 20-AprDate
k W h / d a
Power Consumption, kWh/ day
The power consumption pattern for five days is represented above,
it may be important to note that, 18th and 19th April being weekly
OFF, the power consumpt ion on Monday, 20 t h Apr i l i s more than
normal working day, due to high start-up load.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
16/68
50
Methodology
Electrical Distribution System:
Scope of Work:
Measure/Record the 24 hrs. Load distribution.
To suggest various energy efficient measures with first order
cost benefit analysis
Methodology:
A . Census:
Find out the electrical normal & emergency loading.
Type of tariff
Rating of installed transformer
General hygiene as per standard maintenance practices
D at a o n o pe ra ti ng h ou rs d at a w as c ol le ct ed f ro m t he
operating staff
B. Performance audi t:
Electric load recording with: Vol ta ge , c ur re nt , k W, k Wh , P.F., H ar mo ni c Vol ta ge a nd
Current
Indoor Lighting:
Scope of Work:
To s tudy exis t ing l ight ing scenar io of faci l i ty and ver i fy the
building data
To find out the performance of l ighting fixtures
To calculate the ILER (Lux/wat t /m 2 ) and compare lux wi th
the bench mark/prevailing standard in the facil i ty
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
17/68
51
Energy Audit
Report|April 2009
To suggest various energy efficient measures with first order
cost benefit analysis
Methodology:
A. Census: U pt o 8 0 % o f t he l ig hti ng f ix tu re s w er e in sp ec te d f or
following:
No. of l ights installed and no. of l ights working
Type of l ights
General hygiene as per standard maintenance practices
D at a o n o pe ra ti ng h ou rs d at a w as co ll ect ed f ro m t he
operating staff
B . P er fo rm an ce au di t:
10 % of the to ta l connec ted l igh t ing load f rom the Census wasstudied in detail as per following:
Measurement of lux level
Measurement of room dimensions
Power drawn by the l ighting system
Window /Split Air Conditioners
Scope of Work: To s tu dy e xi st in g w in do w a ir c on di ti on er s o f f ac il it y a nd
verify the building data
To find out the performance of air conditioners
To compare the specif ic energy consumption with the benchmark/prevailing standard in the facil i ty
To ident i fy the causes of deviat ion in the performance and
suggest recommendations for corrective actions
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
18/68
50
To suggest various energy efficient measures with first order
cost benefit analysis
Methodology:
A. Census: Upto 10 % of the window a i r condi t ioners were inspec ted fo r
following:
N o. o f w in do w a ir c on di ti on er s i ns ta ll ed a nd n o. o f a ir
conditioners working
Type of window air conditioners
General hygiene as per standard maintenance practices
D at a o n o pe ra ti ng h ou rs d at a w as co ll ect ed f ro m t he
operating staff
B. Performance audit:
10 % of the to ta l connec ted window a i r condi t ioners f rom the
Census was studied in detail as per following:
Measurement of air f low quantity across ev aporator
Measurement of temperatures of the supply air and room
Power drawn by the air conditioner
Pumps:
Scope of Work: To s tudy ex i st ing pumping system of faci l ity and veri fy the
building data
To carry out analysis
To find out the performance of pumping system
To compare the operating efficiency with the bench
mark/prevailing standard in the facil i ty
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
19/68
51
Energy Audit
Report|April 2009
To i de nt if y t he c au se s o f d ev ia ti on i n t he p e rf or ma nc e a nd
suggest recommendations for corrective actions
To suggest var ious energy eff ic ient measures with f i rs t order
cost benefit analysis
Methodology:
A. Census: All water pumps were audited for following:
Total no. of pumps installed
Total no. of pumps working
Pressure gauge working
Ammeter working
General hygiene conditions
D at a o n o pe ra ti ng h ou rs d at a w as co ll ect ed f ro m t he
operating staff
B. Performance audit:
All working pumps from the Census were s tudied in detai l as perfollowing:
Water flow rate m 3 /hr
Head generated mWC
Power drawn by thepump kW
4.2 UPS:
Input and output power consumption of UPS was carried out
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
20/68
50
Compressed Air System:
Scope of Work: To s tudy exis t ing Compressed Air system of faci l i ty and ver i fy
the building data
To carry out analysis
To find out the performance of Compressed Air system
To compare the operating efficiency with the bench
mark/prevailing standard in the facil i ty
To i de nt if y t he c au se s o f d ev ia ti on i n t he p e rf or ma nc e a nd
suggest recommendations for corrective actions
Methodology:
F ol lo wi ng p ar am et er s w ou ld b e m ea su re d f or e va lu at in g t he
performance of the air compressors:
Load pressure kg/cm 2
Unload pressure kg/cm 2
Average load time Sec
Average unload time Sec
Suction fi l ter area M 2
Temperature of inle t air C
Load power consumption kW
Unload power consumption kW
Energy consumption per hour kWh/hr
Volume of the receiver andpiping
m 3
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
21/68
51
Energy Audit
Report|April 2009
3 Historical Data Analysis
Monthly Electricity Bills
MSEB i s d i s t r ibu tor o f the e lec t r i ca l power fo r CCPL, Boisa r. The
monthly e lectr ical bi l l analysis for CCPL Boisar i s a s pe r under.
T he a nn ua l e le ct ri ca l u ni t c on su mp ti on d ur in g A pr il , 2 00 8 t o
M ar ch , 2 00 9 w as 56 27 19 2 k Wh . T he a nnu al e le ct ri ca l u ni t
consumption with month wise break-up is as under.
Figure 4: Historical Data Analysis
Monthly Bill analysi
42000
4300044000
45000
4600047000
48000
49000
5000051000
52000
A p r - 0
8
M a y - 0
8 J u n
- 0 8 J u l - 0 8
A u g - 0
8 S e p
- 0 8 O c
t - 0 8 N o
v - 0 8 D e
c - 0 8
J a n - 0 9
F e b - 0 9
M a r - 0
9
Month
U n i
t C o n s u m p t
i o n
k W h
0
100000
200000
300000
400000
500000
600000
B i l l a m o u n t R s .
Consumption kwh Bill am ount Rs .
T he h is to ri ca l d at a s ho ws t ha t t he m ax im um e le ct ri ca l u ni t
consumption was in the month of February and minimum electrical
unit consumption in the month of September.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
22/68
50
Load Distribution
Load Distribution based on kWh:
Figure 6: Load Distribution based on kWh
Power Consumption, kWh/day
Lighting9%
Window/Split AC24%
Computers
6%Chillers20%
Equipments37%
Compressor4%
As the energy aud i t was conduc ted in the month o f Apr i l , 2009 ,
t he re w as m ax i mu m r eq ui re me nt o f a ir c on di ti on in g s ys te m,
l igh t ing . The rest o f energy was consumed by P lan t machinery,
pumps, computers, printers etc. The load dis t r ibut ion based on uni ts is 2160 kWh/day. The major
contributors are Plant Machinery (37%), window air condi tioners
(24%), Chillers (20%), l ighting (9%),), Computer (6%), Compressor
(4%).
In order to calculate kWh/day i t was assumed that the equipment
load is 100 kW and working hours of all loads is 8 hour.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
23/68
51
Energy Audit
Report|April 2009
Load Profile:
During study load profile recorded for five days, Load profile given
below is dated 21 s t April 2009
Power:
Figure 7 Load Profile Power
Power
0.00
20.00
40.00
60.00
80.00100.00
120.00
140.00
160.00
180.00
3 : 2 0 : 0
0 A M
4 : 5 0 : 0
0 A M
6 : 2 0 : 0
0 A M
7 : 5 0 : 0
0 A M
9 : 2 0 : 0
0 A M
1 0 : 5 0 :
0 0 A M
1 2 : 2 0 :
0 0 P M
1 : 5 0 : 0
0 P M
3 : 2 0 : 0
0 P M
4 : 5 0 : 0
0 P M
6 : 2 0 : 0
0 P M
7 : 5 0 : 0
0 P M
9 : 2 0 : 0
0 P M
1 0 : 5 0 :
0 0 P M
1 2 : 2 0 :
0 0 A M
2 : 0 0 : 0
0 A M
Time
k W
The maximum power consumption during data logging was 152 kW
a nd t he m in im um p ow er c on su mp ti on w as 3 1 k W. T he a ve ra ge
power consumption was 82 kW.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
24/68
50
Voltage Variation
Figure 8: Load Profile - Voltage
Voltage Variation
390.00
400.00
410.00
420.00
430.00
440.00
450.00
3 : 2 0 : 0 0
A M
5 : 4 0 : 0 0
A M
8 : 0 0 : 0 0
A M
1 0 : 2
0 : 0 0 A M
1 2 : 4
0 : 0 0 P
M
3 : 0 0 : 0 0
P M
5 : 2 0 : 0 0
P M
7 : 4 0 : 0 0
P M
1 0 : 0
0 : 0 0 P
M
1 2 : 2
0 : 0 0 A M
3 : 0 0 : 0 0
A M
Time
V o l t a g
The average Voltage recorded during data logging was 430V.
Power factor:
Figure 9 Load Profile Power Factor
Power Factor
0.00
0.20
0.40
0.60
0.80
1.00
1.20
3 : 2 0 : 0
0 A M
5 : 2 0 : 0
0 A M
7 : 2 0 : 0
0 A M
9 : 2 0 : 0
0 A M
1 1 : 2 0
: 0 0 A M
1 : 2 0 : 0
0 P M
3 : 2 0 : 0
0 P M
5 : 2 0 : 0
0 P M
7 : 2 0 : 0
0 P M
9 : 2 0 : 0
0 P M
1 1 : 2 0
: 0 0 P M
1 : 3 0 : 0
0 A M
Time
P . F
The average power factor recorded during data logging was
0.93.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
25/68
51
Energy Audit
Report|April 2009
Demand:
Figure 10 Load Profile Demand
20.00E+3
40.00E+3
60.00E+3
80.00E+3
100.0E+3
120.0E+3
140.0E+3
160.0E+3
180.0E+3
VA
1:25:00.000 PM4/20/2009
3:20:00.000 PM4/21/2009
5 Hours/Div1:01:55:00 (D:H:M:S)
20.00E+3
40.00E+3
60.00E+3
80.00E+3
100.0E+3
120.0E+3
140.0E+3
160.0E+3
180.0E+3
VA
1:25:00.000 PM4/20/2009
3:20:00.000 PM4/21/2009
5 Hours/Div1:01:55:00 (D:H:M:S)
The maximum demand recorded during data logging was 164
kVA.
Voltage and Current Harmonics:
Figure 11: Load Profile Voltage Harmonics
0.60
0.80
1.000
1.200
1.400
1.600
%
1:25:00.000 PM4/20/2009
3:20:00.000 PM4/21/2009
5 Hours/Div1:01:55:00 (D:H:M:S)
0.60
0.80
1.000
1.200
1.400
1.600
%
1:25:00.000 PM4/20/2009
3:20:00.000 PM4/21/2009
5 Hours/Div1:01:55:00 (D:H:M:S)
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
26/68
50
Figure 12: Load Profile Current Harmonics
5.000
10.00
15.00
20.00
25.00
30.00
%
1:25:00.000 PM4/20/2009
3:20:00.000 PM4/21/2009
5 Hours/Div1:01:55:00 (D:H:M:S)
5.000
10.00
15.00
20.00
25.00
30.00
%
1:25:00.000 PM4/20/2009
3:20:00.000 PM4/21/2009
5 Hours/Div1:01:55:00 (D:H:M:S)
Table No.1: Harmonics:
Area MaximumV T H D %
Maximum I T H D %
R Phase 1.5 26
Y Phase 1.4 29
B Phase 1.6 31
IEEE standard 519-1992 defines the l imits of various parameters
are shown as under:
PARAMETER LIMIT
%Voltage variation Upto 5%
% V THD 1.5 5%
% I THD Upto 10%
% Frequencyvariation Upto 3%
% Unbalanced V Upto 2%
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
27/68
8/6/2019 Custom Capsules Pvt. Ltd
28/68
50
Measurements, Observations, and Data Analysis
Billing Analysis, Electrical Demand and Power Factor:
Billing Analysis:
The 12 months electricity bil l data is tabulated and analyzed from
which average electrical unit cost is calculated.
Table No. 2: Monthly Energy Bills
Bill analysis December 2007 to November 2008
Month
Unitconsumpti
on
kWH
Billamou
nt
Rs.
Rs./kWH
P.F.
Demand
Charg
es
P.F.Incentive
/Penalty
Rs.
Billedmaximu
mdemand
KVA
Recorded
maximum
demandKVAApr-08 47366
457787 9.66
0.85 30000 22805 200 209
May-08 48337
493618 10.21
0.79 30000 46412 200 233
Jun-08 50377 525208 10.430.79 30000 49307 200 220
Jul-08 47110 479511 10.180.78 30000 48355 200 210
Aug-08 47298
505574 10.69
0.78 30000 51040 200 226
Sep-08 45192
438538 9.70 0.9 30000 0 200 226
Oct-08 46158
428495 9.28
0.99 30000 -19346 200 188
Nov-08 45355
413464 9.12 1 30000 -26615 200 167
Dec-08 50087
477503 9.53
0.99 30000 -21573 200 168
Jan-09 48806 457561 9.38 1 30000 -29474 200 183
Feb-09 51421
485195 9.44
0.99 30000 -22110 200 193
Mar-09 48637
464742 9.56
0.99 30000 -20998 200 208
Total 57614456271
96 9.760.90 202.58
From the above table i t is observed that maximum unit
consumpt ion was in the month o f Feb 2009 . From Apr i l 2008 to
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
29/68
51
Energy Audit
Report|April 2009
August 2008 power factor penal ty was added in the bi l l and af ter
Se pt . 2009 power factor was maintai n ne ar to unity . For
maintaining power factor above 0.95 during this per iod, Recorded
demand was never exceeding sanct ioned demand of 500 kVA and
the facil i ty received incentive of total Rs. 1.4 Lac.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
30/68
50
Capacitor Banks :
Observation:
I t w a s o b s e r v e d t h a t 2 n o s . o f 5 0 k VA R a n d 1 n o . o f 2 5 k VA Rcapac ito rs were p rov ided fo r power facto r correct ion which was
operated manually by operator.
Analysis:
Following data were measured for evaluating performance of capacitors:
Sr.No. Particular
Capacitor
Rating(kVAR)
Actual Current(A)
Required
Current(A)
Remark R Y B
1 Capacitor C1 50 63.9 63.4 64.1 65 Ok
2 Capacitor C2 50 46.9 45.4 46.1 65 De-rated
3 Capacitor C3 25 32.5 32.2 32.4 32.5 Ok
It was found that actual current of capacitor 2 was low as compared
t o t he r at ed c ur re nt , w hi ch i nd ic at ed t ha t t he c ap ac it or w as
derated.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
31/68
51
Energy Audit
Report|April 2009
Lighting:
Observations:
The faci l i ty is having 172 nos. of 52 wat ts tube l ights , 113 nos.of 48 tube lights, 81 nos. of 36 watts PLC.
The office l ighting remains ON during 10 AM to 6.00 PM
Following is the measured data of l ighting system of CCPL, Boisar
at various floors:
Table No.3: Lighting
Name of DepartmentArea,
m 2Lux
level
Total
watts
W/m2
Lux/W/m 2
Lux/m 2
Lux/W
Ground floor
Conference Room 38.44 230 1535 40 6 5.97 0.15
Manager's Room IGR-16 7.68 94 340 44.3 2 12.24 0.28De-dusting IGR-10 6.96 226 104 15 15 32.40 2.17Stores IGR-18 33.64 125 416 12 10 3.72 0.30AC Storage 5.22 123 104 20 6 23.47 1.18Documentation & Executive
Area IGR-1722.94 143 736 32 4 6.24 0.19
Library IGR-14 18.6 177 628 34 5 9.53 0.28Product Development IGR-15 4.21 152 96 23 7 35.95 1.58
Product Development IGR-15 24.79 397 624 25 16 15.99 0.64
Lounge 57.66 103 1061 18 6 1.78 0.10
Pantry IGR-12 31.19 56 192 6 9 1.78 0.29Electrical Panel Room 8.19 123 52 6 19 15.06 2.37Entry Lobby 7.69 296 208 27 11 38.47 1.42
Female Change 10.25 248 208 20 12 24.16 1.19Male Change 10.53 229 208 20 12 21.75 1.10Air Lock IGR-26 4.3 227 104 24 9 52.67 2.18Over gowning 8.19 189 104 13 15 23.04 1.81Dispensing Area IGR-41 10 296 416 42 7 29.63 0.71Air Lock 5.76 307 104 18 17 53.21 2.95
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
32/68
50
Name of Department
Area,m 2
luxlevel
Total
watts
W/m 2 Lux/W/m 2Lux/m
2Lux/
W
Ground floorAerosol 10.92 59 80 7 8 5.37 0.73Air Lock-1 3.64 486 104 29 17 133.52 4.67Granulation IGR-30 24.07 102 160 7 15 4.25 0.64Blending igr-31 11.27 259 208 18 14 22.94 1.24Capsulation IGR-39 10.56 335 208 20 17 31.74 1.61Washing IGR-32 3.00 218 208 69 3 72.59 1.05Clean Hold 3.44 195 104 30 6 56.69 1.88Compression - II IGR-33 11.4 154 208 18 8 13.49 0.74
Compression - I IGR-34 10.26 97 208 20 5 9.41 0.46IPQC IGR-35 7.6 362 208 27 13 47.66 1.74Coating IGR-36 12.36 102 80 6 16 8.21 1.27Blister Packing IGR-37 23.28 418 624 27 16 17.97 0.67Quarantine IGR-38 6.66 404 624 94 4 60.62 0.65Corridor 1 21.83 347 416 19 18 15.87 0.83Corridor 2 28.35 123 416 15 8 4.32 0.29Staircase - 75 416 - - - 0.18First Floor
Manager Cabin-1 IFR-5 8.75 174 288 33 5 19.83 0.60Manager Cabin-3 IFR-7 8.75 143 375 43 3 16.31 0.38
Passage-1 21 172 1236 59 3 8.18 0.14
Cabin-1 IFR-10 12.25 173 314 26 7 14.12 0.55Director's Cabin IFR-9 19.25 91 192 10 9 4.71 0.47Changing Room IFR-14 12 191 528 44 4 15.92 0.36Instrument Room IFR-17 81 198
3028 37 5 2.45 0.07
Passage 45 164 984 22 8 3.64 0.17
Instrument room- 27 295 1392 52 6 10.93 0.21
UPS Room IFR-25 6 59 144 24 2 9.79 0.41Documentation RoomIFR-20 18 170 192 11 16 9.44 0.89
Wet Chemistry IFR-29 36 229 471 13 18 6.37 0.49
Wet Chemistry IFR-32 36 211 2522 70 3 5.87 0.08
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
33/68
51
Energy Audit
Report|April 2009
Instrument room-3 17.87 92 436 24 4 5.13 0.21
Following table indicates norm of ECBC Norm (w/m 2 ) for LPD:
Table No.4: Comparison of LPD value with ECBC Norms
Typical RoomsECBC LPD
ValuesW/m 2
PresentLPDValuesW/m 2
%Increa
se
Office Enclosed 11.84 26 119Conference rooms 13.99 40 185
Toilet and Restrooms 9.69 20 106Staircase 6.46 7 8Equipment room 12.92 33 155Electrical/ MechanicalRoom 16.15 20 23
Following table indicates Lux level required as per National
Building Code:
Table No.5: Comparison of present lux level with NBC
Typical Rooms Illumination LuxPresent
Lux Level
%Increase
/Decreas
eEntrance and Reception Area 150 155 + 3Conference rooms and ExecutiveOffices 300 230 - 24
General Office 300 122 - 59Staircase 100 75 - 25Corridors and Lift Cars 70 181 + 159
It was observed that the present LPD (w/m 2 ) i s higher than
ECBC norm by 99 % but average i l lumina tion (Lux) l eve l i sgreater by 10 % as compare with National Building Code.
T he m ai n r ea so ns o f t hi s l ow er l ux l ev el s a nd h ig he r p ow er
consumption are:
Poor house-keeping, and
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
34/68
50
Improper layout and selection of improper luminaries
Window Air Conditioners:
Observations:
At CCPL,Boisar, the ins tal led a i r-condi t ioners ( to ta l 40
nos. ) of 1 ton, 1.5 ton and 2 ton configuration.
At the t ime of aud i t , mos t o f the a i r condi t ion ing machines
were in operation, being Summer season
Maximum nos . o f the a i r condi tioners i s insta ll ed on F i rs t
Floor.
For evaluat ing window air condi t ioner performance, fol lowing ai rconditioners were selected on sample basis.
The fol lowing paramete rs were measured for evaluati ng
performance of window air conditioners:
Table No.6: Measurements at Window Air-Conditioners
LocationDuctArea(m 2 )
AirVelocity (m/s)
SupplyTemperature
(C)
RoomTemperature
(C)
Powerconsumptio
n
(kW)DBT WBT DBT WBTUPS Room 0.04 3.78 10.00 9.00 19.00 18.00 2.01Controlsample room 0.40 3.36 16.00 14.50 21.00 15.50 1.91
Change room 0.04 3.45 18.00 17.00 24.00 23.00Measurement of powerwas notpossible
1 st floorpassage 0.04 0.93 20.00 15.00 28.00 22.00
Managercabin 0.03 3.03 14.00 12.00 21.00 19.00
Server room 0.05 3.38 9.00 8.00 15.00 13.00 1.8
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
35/68
51
Energy Audit
Report|April 2009
Following is the analysis of window air conditioners:
Table No.7: Data analysis Window air conditioner
Location Rated
TRTR KW/T
RUPS Room 2 1.40 1.44Control sample room 1.5 1.26 1.52Change room 1.5 0.99 0.001st floor passage 1.5 0.37 0.00Manager cabin 1 0.67 0.00Server room 2 0.95 1.86
Air condi t ioners for UPS room, Control sample Room and Change
r oo m a re d el iv e ri ng a cc ep ta bl e c oo li n g ( TR ), h ow ev e r, t he a ir
conditioner installed at the first f loor passage, and at server Room
are no t pe rforming as desi red and need c r i t i ca l overhau l ing or
Refrigerant re-charging.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
36/68
50
DX Chillers
Observations:
Apart f rom Window Air-condi t ioners , 9 nos . DX type Chi l l e rof different capacities have been installed
At the t ime of audit Chiller no. 5 and 8 were not working
All chillers are installed on Ground Floor
Table No.8: DX Chiller input data
Identificati
on
DuctArea(m 2 )
AirVelocit
ym/s
SupplyTemperature
(C)
RoomTemperatu
re (C)Power
consumption(kW)
DBT WBT DBT WBT
AHU 1 0.38 1.91 14.00 10.00 25.5021.0
0 17.70
AHU 2 0.43 1.15 18.00 16.50 23.5021.0
0 4.68
AHU 3 0.44 2.83 25.00 20.50 29.5024.0
0 9.98
AHU 4 0.38 1.42 19.00 15.00 23.0020.0
0 5.03
AHU 6 0.41 1.05 19.0
016.50 23.00 20.5
04.54
AHU 7 0.49 2.05 19.00 16.00 24.0020.5
0 9.70
AHU 9 0.43 0.86 19.00 16.00 23.0021.0
0 4.82
Table No.9: DX Chiller performance Analysis
Location RatedTRMeasured
, TR kW/TR
AHU 1 12 7.80 2.27
AHU 2 3 2.44 1.92AHU 3 7 5.41 1.84AHU 4 3 2.82 1.79AHU 6 5 1.93 2.35AHU 7 7 4.80 2.02AHU 9 5 2.00 2.40
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
37/68
51
Energy Audit
Report|April 2009
The SEC of chillers is high as compared to the norm of 1.2 kW/TR .
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
38/68
50
Compressed Air System:
Observations:
Compressed ai r i s required for var ious machines l ike for packing,for operat ing pneumatic tools, e tc . Compressed ai r i s suppl ied by
Compressor #1 . Compressor #1 opera tes be tween pressures o f
6 .4 bar to 6 .0 bar. Compressed a i r f rom rece iver i s supp l ied to
plant via air cooler.
During the f ie ld s tudy, Pump-up tes t was carr ied out to determine
c om pr es so r a ct ua l f re e a ir d el iv er y a nd c om pr es se d a ir l in e
l ea ka ge t es t t o de te rm in e t ot al q ua nt it y of a ir l ea ka ge i n
compressed air l ine.
I t was observed tha t Leakage was observed a t the Rece iver and
the same was notified to the coordinator.
Analysis:
Pump Up test:
Pump up test on the compressor shows that compressor i s no t
w or ki ng e ff ic ie nt l y, h av in g t he i r s pe ci fi c p ow er c on su mp ti on( 28.14 kW/100 cfm ) h igh compare to the s tandard va lue o f 16
kW/100 cfm . The specif ic power consumption of compressor and
its actual free air delivery (cfm) is shown in the following table:
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
39/68
51
Energy Audit
Report|April 2009
Table No.10: Air Compressor Pump Up test results
Parameters UoMAir
Compressor
Compressor type Reciprocati
ngCapacity CFM
Capacity Measurement
By Pump Up Test
Air generation rate Cfm 41Power consumption during
generation kWh 11.7
Specific Energy Consumption,SEC
kW/100scfm 28.14
% leakage % 29.82
Leakage quantity m3
/hr 18.74
T he co mp re ss ed a ir l ea ka ge r at e i s 3 0% w hi ch c an b e
further reduced by improving ro uti ne maintenance
practices.
Pumps:
Observations:
2 nos. x 3 HP monobloc pumps have been installed and only one
pump is operated for transferring water to overhead tank, while
other pump is stand-by.
The ra ted Head of the ins ta l l ed pump i s ve ry h igh , whi le the
operating Head is very low; s t i l l pump does not offer excessive
flow and at the same time consumes full power.
Table No.11: Pump performance
PumpIdentification
Flow, m 3 /hr Head, m Power, kW Efficiency, %Rated Actual
Rated
Actual
Rated Actual
Rated Actual
Water pump no.2for overhead
tank
14.00 12.00 25 -20 15 2.20 2.10 40% 23%
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
40/68
50
Water pump no.1for overhead
tank
14.00 13.00 25 -20 15 2.20 2.30 40% 23%
The pump eff ic iency is poor but as these pumps are operated foronly 20 minutes in a day, i t is not feasible to replace these pumps
with energy efficient pumps.
UPS
Observations:
2 nos. x 10 kVA and 1 no. x 40kAV UPS have been installed
UPS no 3 (40 kVA rating) was observed to be overloaded
W hi le m ap pi ng t he l oa d- pr of il e, i t w as o bs er ve d t ha t, t he
current Harmonics were p redominan t during the n igh t hours,
when other motive loads were at minimum. There is a possibili ty
of UPS might be generat ing Harmonics and there is a need for
separate study to assess the Harmonics issue.
Table No.12: UPS
UPS InputIdentification
Phase
Voltage Current
Power
PowerFactor
%Loading
UPS MainR 432 26.3 18.3 0.91
Y 433 21.9 14.5 0.88B 433 22.3 14.9 0.89
UPS 1(10kVA)
R 433 7.29 5.45 172.63 Y 433 2.05 1.45 0.95
B No Current
UPS 2(10 kVA)
R 434 3.31 2.25 0.983.78 Y 432 3.61 2.46 0.9
B 432 4.07 2.83 0.93
UPS 3 R 433 21.4 14.3 0.89 119.10
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
41/68
51
Energy Audit
Report|April 2009
(40 kVA) Y 433 20.3 13.6 0.89B 431 22.3 14.5 0.87
UPS OutputIdentificatio
nPhase
Voltage Current Power
PowerFactor
UPS 1 R 405 8.59 5.81 0.96(10 kVA) No Current
UPS 2 231 5.17 1.04 0.87(10 kVA)
UPS 3 R 232 11.4 2.11 0.8(40 kVA) Y 232 10.2 1.91 0.81
B 231 9.63 1.98 0.89
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
42/68
50
7 Energy Conservation Opportunities
Capacitor Banks:
I t i s r ec om me nd ed t o r ep la ce t he f au lt y c ap ac it or w it h n ew
capaci tor. Also, as present capaci tors are operated manual ly, i t i s
recommended to install automatic power factor sensing device.
Table No.13: By maintaining power factor unity
Improving Power Factor to unity:Particulars UoM ValuePresent power factor 0.99Propose power factor 1Present Demand kVA 200
Propose Demand kVA 198Demand charges Rs./kVA 150
Saving in demand chargesRs./month 300
Annual saving in demand chargesRs./annum 3600
Present average bill charges (of past 12 months)Rs./annum
5026826
Propose P.F. incentive due to improve in power factor tounity
Rs./annum
100537
Cost of 50 kVAR and real time power factor improvement
panel Rs.
11250
0Payback Period Months 13.0
Lighting
7.2.11 For inter ior light ing:
I . O pt ion I:
Step I:
By replacing conventional ballasts with electronic
ballasts:
At present 285 nos. l igh t ing f ixtu res a re f i t ted wi th magne t ic
bal las ts and consume 12 W of power per bal las t . Also, l ight ing
f ix tu re s c on su me 4 0 Wat ts p ow er p er f it ti ng . T hu s, p ow er
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
43/68
51
Energy Audit
Report|April 2009
c on su mp ti on o f s in gl e l ig ht in g f ix tu re i nc lu di ng m ag ne ti c
b al l as ts i s 5 2 W p er f i tt in g. I t i s p ro po se d t o r ep la ce t he se
lighting fixtures with electronic ballasts which consume 2 W per
ballast . The expected savings shall be as under:
Table No. 14: Saving by replacement of conventional ballasts with electronic ballasts
Parameters UoM ValuePresent Status
No. of magnetic ballast installed no. 285Power consumption of magneticballast W 12Operating duration hr/day 9
days/month 20
Electrical unit cost Rs./kWh 9.76Present electrical energyconsumption kWh/year 7387
Status after replacement with Electronicballast
No. of electronic ballast required no. 143Power consumption of electronicballast W 2Propose electrical energyconsumption kWh/year 616Savings kWh/year 6772
Rs/year 66091Implementation cost Rs./unit 400Rs. 57000
Simple payback period Months 10
Step II:
After replacing with e lectronic bal las ts , ins ta l l vol tage reducing
device that shal l reduce operat ing vol tage f rom 235 V to 210 V.
The savings shall be as under:
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
44/68
50
Table No. 15: Saving by installation of voltage reductiondevice
Present Status UoM ValueNo. of 52 W Tube fittings No. 172Power consumption W 42No. of 48 W Tube fittings No. 113Power consumption W 38No. of 36 W Tube fittings No. 81Power consumption W 36Operating duration hr./day 9
days/month 20Electrical unit cost Rs./kWh 9.76Electrical unit consumption kWh/year 31177
Status after installation of lighting
transformerElectrical unit consumption kWh/year 24942Savings kWh/year 6235
Rs./year 60858Size of lighting transformer kVA 21Investment Rs. 110000Simple Payback period Month 22
Step III:
By installing motion / occupancy sensors
Feature of motion sensors:
Motion sensor is a ful ly automatic indoor and out door l ight ing
controller. Capable of controlling up to 1000 W incandescent or
30x 10 fluorescent of l ighting.
At night , bui l t in passive infrared (PIR) motion sensor turns on
connect ion l ight ing system, when i t detects motion in i ts cover
a re a. D uri ng t he d ay i n b ui lt i n p ho to ce ll se ns or s av es
electricity by deactivating the l ight.
The adjustable t imer lets you select how long the l ights stay on
activation the l ights.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
45/68
51
Energy Audit
Report|April 2009
Lux ad jus tment de termine a t what l eve l l igh t ing system wi ll
start operating when you set motion sensor to automatic mode.
I t i s not pos sibl e t o quant i fy s av ing a ch i eve by i ns ta ll i ng
motion sensor.
II . Option II:
By retrofit t ing 172 nos. l ighting fixtures with 52 watts T-5
and 113 nos. l ight ing f ix tu re s o f 48 wat t s w ith ene rg y
efficient l ighting fixtures T-5:
The present 285 nos. l ight ing f ixtures consume 52W power per
f i t t ing. I t i s proposed to re t rof i t these l ight ing f ixtures with T-5
tube l ights which consume 30 W power per f i t t ing. The savings
shall be as under:
Table No. 16: Saving By retrofit t ing present Lightingfixtures with energy efficient l ighting fixtures T5:
Parameters UoM ValuePresent status:No. of 52 W Tube fittings No. 172Power consumption W 52
No. of 48 W Tube fittings No. 113Power consumption W 48Operating duration hr./day 9.76
days/month 20Electrical unit consumption kWh/year 33655Status after replacement with T5Power consumption W 30Electrical unit consumption kWh/year 20027Savings kWh/year 13628Electrical unit cost Rs./kWh 9.76Total savings kWh/year 13628
Rs./year 133010Investment Rs. 199500Simple payback period Months 18
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
46/68
50
Window/ Split Air Conditioners:
Option I:
By installing Energy Saver device: The power consumption of present compressor is about 1.7 kW per
TR. The power consumption af ter ins ta l l ing the energy saver will
reduce upto 15%. The savings shall be as under:
Table No. 17: Savings by installing energy server
Installing Energy Saver:UOM Value
ParametersQuantity of Window Air Conditioner Nos. 40
Present power consumption per unit kW 1.70Proposed Power consumption afterinstalling Energy Saver device @ 15%Saving
kW 1.45
Saving by Installing Energy Saver kW 0.26Operating hours per annum Hour 2112
Total Units Saved by Energy Saver kWh/annum 21542
Cost of Energy Saver Device Rs./Unit 3000 Total Cost of Energy Saver devices Rs. 120000
Cost Per unit Rs./kWh 9.76Total Saving per annum Rs./annum 210254
Simple Payback Period Months 7
Option II:
Replace present Sp li t Ai r condi tioners a t f i rs t f loor wi th
central air conditioning system
Speci f ic power consumpt ion of p resent sp il t AC i s 1.7 kW/TR
which is very high when compared with the central ai r
condi tioning system, (Water cooled Screw Chil ler) . The Specific
energy Consumption (SEC) of the proposed system shal l be 0.80
kW/TR ; resulting in saving of 0.9 kW/TR.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
47/68
51
Energy Audit
Report|April 2009
Table No. 18: Savings due to installation of central air conditioning system
Installing Central Air Conditioning Plant:Parameters UoM Value
Requirement of TR TR 80Present specific energy consumption per unit kW/TR 1.70
Proposed specific energy consumption afterinstalling Central Air Conditioning Plant kW/TR 0.80
Saving by Installing Central Air ConditioningPlant kW/TR 0.90
Operating hours per annum Hour 2112 Total Units Saved by Central Air ConditioningPlant
kWh/annum
152064
Cost Per unit Rs./kWh 9.76
Total Saving per annumRs./annum
1484145
Cost of Central Air Conditioning Plant Rs. 1520000Simple Payback Period Months 12
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
48/68
50
Chillers
Option I:
The power consumpt ion of p resent DX type ch il l e r insta ll ed a tground f loor is about 1.85 kW /TR . The power consumption af ter
insta ll ing the Centra l a i r condi tioning system shal l be 0 .80 kW
/TR . The savings shall be as under:
Table No. 19: Saving by installing central air conditioningsystem
Installing Central Air Conditioning Plant:Parameters UoM Value
Requirement of TR TR 80Present specific energy consumption per unit kW/TR 1.85
Proposed specific energy consumption afterinstalling Central Air Conditioning Plant kW/TR 0.80
Present power Consumption 312576Saving by Installing Central Air ConditioningPlant kW/TR 1.05
Operating hours per annum Hour 2112
Propose power Consumption kWh/annum13516
8
Total Units Saved by Central Air ConditioningPlant kWh/annum 177408Cost Per unit Rs./kWh 9.76
Total Saving per annum Rs./annum17315
02
Cost of Central Air Conditioning Plant Rs. 1350000Simple Payback Period Months 9
Option II:
In o rder to op timize the performance of a i r-condit ion ing system
and to av ai l be ne fits of Time of the day ( TOD ) tari ff , it i s
recommended to install Thermal Storage System , which would
opera te (charge) during lean t a ri ff t ime a t fu ll load and would
discharge during the peak tariff hours.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
49/68
51
Energy Audit
Report|April 2009
Demand Management through Thermal Storage System:
In most of the s ta tes in India , industr ia l consumers pay separate
charges for electricity consumed and maximum kVA or kW demand.
At Boisa r, MSEB a ls o h as a n a tt ra c ti ve l ow n ig ht - ti me t ar if f between 24.00 hrs . to 8 .00 hrs . Fol lowing is the TOD tar i ff deta i ls
schedule at CCPL,Boisar :
Hours Paise / kW2200 hrs - 0600 hrs - 750600 hrs - 0900hrs 00900 hrs 1200 hrs 501200 hrs 1800 hrs 01800 hrs 2200 hrs 100
Consumers with large refr igerat ion and ai r-condi t ioning load can
u se t he c on ce pt o f t he rm al s to ra ge t o r ed uc e t he i r m ax i mu m
demand, reduce peak t ime energy consumpt ion and avai l t a ri ff
rebates.
Thermal S torage impl ies s tor ing the cool ing e ffec t in the l a ten t
h e at o f i ce b an ks ( re fe r t o t he f ig ur e b el ow ) o r e ut e ct i c s al t s
(which undergo a phase change) and using i t when required. Ice
b an ks a re b ei ng u se d i n d ai ri es f or t he p as t m an y y ea rs t o
overcome their peak cooling loads. The same concept can be used
to reduce energy cost by opera ting the ch il l er s during off-peak
hours and storing chilled for use during peak hours. This reduces
the number o f ch i l l e r s tha t may have to run to sa t i s fy the peak-
cooling load.
One thing worth mentioning here is that Thermal Storage system is
no t an energy conservat ion system. I t i s energy cost reduc tion
t ec hn iq ue b y w ay o f D em an d M an ag em en t. T he e ne rg y c os t
sav ings accrue due to reduc t ion in the reg i s te red Maximum KVA
a nd P e ak - ti me e ne rg y c ha rg es a nd r eb at e s ( if a pp li ca bl e ); t he
quantum of savings would depend on the load profile of the plant.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
50/68
50
Ice banks are a proven technology. A var ie ty of eutect ic sal ts are
available which can change from solid to l iquid phase at
temperatures ranging from 33 to +27C. The sal t hydrates are
enclosed in HDPE (High Density Poly-ethylene) nodules; a number
of such nodules are enclosed in a tank through which chilled wateror brine can be allowed to flow.
Schematic of a typical thermal sto rage tank is shown below:
During charging cycle, l iquid refrigerant is passed through the coil ,
absorbs heat f rom water or eutect ic sal t and evaporates . Sal t or
wate r undergoes a phase change . During the Discharge Cycle ,
br ine or water to be cooled is passed through the system. Ice or
salt nodules absorb latent heat of fusion from the cooling medium.Charging is done during OFF PEAK periods and Discharging is done
during PEAK pe riod thus lowe ring the maximum demand
registered.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
51/68
51
Energy Audit
Report|April 2009
T hi s t ec hn ol og y c an b e u se d v er y e ff ec ti ve ly t o r ed uc e a ir -
conditioning costs by way of demand management.
Option I:
I t i s p roposed to opera te bo th ch i l l e r s a t -5 deg . C . The ch i l l e r s
would be operated during off-peak hours i .e. between 24.00 hrs. to
8.00 hrs. to feed the Thermal storage system. This would generate
a bo ut 6 40 T RH o f T he rm al s to ra ge s ys te m d ur in g t he o ff - pe ak
period of 8 hours. Therefore, with the help of the Thermal storage,
i t w oul d be p ossi bl e t o me et t he ai r- co nd it io ni ng n ee ds o f
CCPL,Boisar w it ho ut t he n ee d t o o pe ra te t he c hi ll er s d ur in g
daytime since the entire requirement would be met by the Thermal
storage system.
At the same time, additional pumps would be required to circulate
chilled water from the Thermal storage system to the AHUs. At the
same time, savings due to non-working of chillers during peak and
normal tariff hours shall also be substantial .
Prepa red By : ARS Energy Aud i to r s .
Refrigerant
Vapour
Return
Water
Ice
eeeeee
Waterter
LiquidRefrigerant
Chilled Water toLoad
WaterIce
8/6/2019 Custom Capsules Pvt. Ltd
52/68
50
The savings shall be as under:
Table No. 20: Savings by installation of Thermal storagesystem
Thermal Storage System
Thermal Storage System UoMPresent specific energy consumption kW/TR 1.85Present TR generation TR 160.00Present power consumption kW 296.00Present operating hours Hours/day 8.00
Present energy consumption kWh/annum 852480
Proposed specific energy consumption kW/TR 1.05Proposed TR generation TR 160Proposed power consumption kW 168
Proposed operating hours Hours/day 8
Proposed energy consumption kWh/annum 483840
Saving in energy consumption kWh/annum36864
0Cost of power from 9.00 hours to 18.00hours Rs./kWh 6.30
Cost of power from 24.00 hours to 8.00hours Rs./kWh 5.45
Energy savings Rs./annum27336
96
Present demand charges Rs./annum 538182Savings in Demand Charges Rs./annum
538182
Total Savings Rs./annum32718
78
Cost of TSS Rs. 23040000Payback Period Months 85
Thus, by implementing Thermal storage scheme as above, i t would
b e p os si bl e t o m ee t t he a ir -c on di t io ni ng r eq ui re me nt s o f a ny
normal day wi thout runn ing the ch il l er s during normal work ing
hours.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
53/68
51
Energy Audit
Report|April 2009
Compressed Air System:
I t was observed that compressor shif ts on loading without using
compressed ai r because of 29 % leakage is present a t receiver.
Th is has been brought in the no t ice o f co-ord ina tor and CCPL,
B oi sa r h as p ro mi se d t o t ak e i mm ed ia te a ct io n a ga in st t hi s.
Howeve r, i f this l eakage is arrested, then the saving in
compressor power consumption shall be as under:
Table No. 21 Savings by avoiding leakage
Parameters UoM ValueCompressor loading one hour Min 12Compressor loading One hour Hours 0.2Power Consumption duringloading kW 11Power Consumption duringloading kWh/day 2.2
Unit rate Rs/Unit 9.4Operating hours hr/day 4
day/month 22
month/year 12
Total savings kWh/year 2323.2
Total savings Rs./year 21838Investment Rs Nil
Pay Back Period MonthsImmediate
P er fo rm an ce o f A ir C om pr ess or c an b e i mp ro ve d byoverhauling.
Pumps:
Even the efficiency of pump is poor i ts operating hour is less thenone hour. Hence, i t not advisable to replace present pumpswith energy efficient pumps.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
54/68
50
Renewable Energy
Solar PV system:
Sola r PV power generat ion systems cons i st s o f in te rconnec ted
c om po ne nt s, e ac h h av i ng s pe ci fi c f un ct i on . O ne o f t he m aj or
f ea tu re s o f P V s ys te ms i s m od ul ar it y. A s y ou r n ee ds g ro w,
i nd iv id ua l c om po ne nt s c an b e r ep la ce d o r a dd ed t o p ro vi de
increased power demand. Following are the main components of a
typical PV system.
Schematic of Solar PV System:
Solar Array
T he s ol ar a rr ay c om pr is es o f o ne o r m or e P V m od ul e s w hi ch
convert sunl ight in to e lectric energy. The modules are connected
in ser ies and/or paral le l to provide the vol tage and current levels
to mee t your power needs . The a r ray i s normal ly mounted on a
metal structure and inclined to face the sun.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
55/68
8/6/2019 Custom Capsules Pvt. Ltd
56/68
50
Optimization of Power System Demands
E xa mi ne y ou r p ow er c on su mp ti on a nd r ed uc e y ou r p ow er
needs as much as possible. Identify large and/or variable loads
( su ch a s w at e r p um ps , o ut do or l ig ht s, e le ct ri c r an ge s, A Cr ef ri ge ra to rs , e tc .) a nd t ry t o e li mi na te t he m o r e xa mi ne
a lt er na ti v es a va il ab le . R ep la ce i nc an de sc en t f ix tu re s w it h
f lu or es ce nt l ig ht s w he re ve r p os si bl e. F lu or es ce nt l am ps
provide the same level of i l lumination at lower wattage levels.
I f there i s a l a rge load that you cannot e l imina te, cons ider
using it only during peak sun hours or only during the summer.
Revise your Load Sizing.
Sizing of Battery Bank
Understand characte ri s ti cs o f Ba tte ries and then choose the
appropriate battery for your needs.
Determine the Sun Hours Available Per Day
Following factors influence how much sun power your modules
will be exposed to be:
When you wil l be using your sys tem summer, win ter, or
year-round.
Typ ic al l oc al w ea th er c on di ti on s.
F ix ed mo un ti ng s v s. tr ac ke rs .
L oc at io n a nd an gl e o f P V a rr ay.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
57/68
51
Energy Audit
Report|April 2009
Sizing of PV Array
Detailed study of above four factors will decide size of PV
system.
Typical costing of 50 kW Solar PV system:
Table No.22: Saving by installing solar PV system
Installing Solar PV System:Solar PV System UoM Value
Present power consumption kWh/hr 25
Average sunshine hours per day Hours 6 Total no. of days per annum Days/annum 270
Operating hours per annum Hour 1620
Total power consumption kWh/annum 40500Cost of power Rs./kWh 10
Present Cost of power consumption Rs./annum 405000
Total sunshine hours per annum Hours/annum 1620
Propose Solar PV System kWh/hr 25
Power generation by Solar PV System kWh/annum 40500
Cost of Solar PV System Rs. 7500000Total Saving per annum Rs./annum 405000Simple Payback Period Months 222
Solar and Wind energy Hybrid system:
T he h yb ri d s ys te m m ak e s t he u se o f w in d a nd s ol ar e ne rg y t o
produce electr ic i ty. Hybrid system uses a combinat ion of energy
producing components that provide a constant flow of
uninterrupted power. Hybridization ensures that if any part of the
system is not be performing (solar -c loudy days, wind- no wind)
f or a ny r ea so n, y ou wi ll h av e a b ac k u p m ea ns o f p ro du ci ng
electricity.
T he m os t p op ul ar h yb ri d c ho ic e i s t ha t o f s ol ar a nd w in d. I t' s
g en er al ly w in dy t o s om e d eg re e d ur in g o ve rc as t d ay s, w hi ch
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
58/68
50
m ak e s w in d t ow er s a nd t ur bi ne s e ff ec ti ve w he n t he s un i sn 't
sh in ing . The wind co llecto rs wi ll a l so work a t n igh t , p rov id ing
there 's wind. Alone, the solar and wind systems both have f laws;
solar can ' t work without sun, and wind can ' t work without wind.
When the two systems are combined, they fa i r ly wel l cover eachothers ' weaknesses.
Hybr id systems work fo r bo th o ff-g rid so lu t ions ( such as using
propane generators to charge bat teries when the sky is overcast)
and for gr id- t ie systems (using wind turbines to supplement the
electricity you produce during in climate weather).
Schematic of Hybrid system:
Examples of Hybrid systems are:
Solar Electric and Wind:
Using wind turbines to supplement the electricity you produce
during in climate weather
Solar Electric and Generator:
Using a propane generator to charge batteries, when the sky is
overcast.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
59/68
51
Energy Audit
Report|April 2009
Solar Electric and Hydro:
Water from a running stream generates electricity on cloudy days
Wind and Diesel:
A wind generator can supplement a diesel generator
Table No.23: Saving by installing solar and wind energy hybrid system
Installing Solar Wind+ PV Hybrid System:Solar Wind + PV System UoM ValuePresent power consumption kW 25Average sunshine hours per day Hours 6
Total no. of days per annum Days/annum 270
Operating hours per annum Hour 1620 Total power consumption kWh/annum 40500
Cost of power Rs./kWh 9.76
Present Cost of power consumption Rs./annum 395280
Total sunshine hours per annum Hours/annum 1620
Power Generation by Solar PV + Wind System kWh/day 150Power generation per annum kWh/annum 40500
Cost of Solar PV + Wind Mill Rs. 11250000Total Saving per annum Rs./annum 395280Simple Payback Period Months 341
Passive Design Techniques
Day lighting:
Mumbais climate being humid, the need is to create pleasant day
lighting levels in the interiors for visual comfort while avoiding the
harsh direct solar gains by the use of the shading devices.D ay l ig ht in g i s a c on tr ol l ed a dm is si on t o r ed uc e o r e li mi na te
electric l ighting.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
60/68
8/6/2019 Custom Capsules Pvt. Ltd
61/68
51
Energy Audit
Report|April 2009
8 Other Techniques to be used to make the
structure a green building:
Rainwater Harvesting:
With the r is ing demand, the r is ing pressure on the exis t ing water
resources has g rown h igh . Ra in wate r ha rves t ing i s the age o ld
concept in reducing the run-off and reducing the por table water
demand.
In areas having ra infal l of considerable intensi ty, spread over alarge per iod in a year with short dry spel ls ra inwater harvest ing
f ro m r oo f t op i s a n i de al o pt io n f or a ug me nt in g w at e r s up pl y.
Ra inwate r i s e ssen tia lly bacte rio log ica l pure , f ree f rom organ ic
matter and sof t in nature . Recharge pi ts can be provided for the
surface water of the open grounds which would help to reduce the
run-off and help increase the ground water table.
Solar Lighting for the common areas:With the high demand of power and shortage of electricity, certain
areas o f the s t ruc ture can be conver ted to so la r energy. P laces
l ike common corr idors, passages , to il e ts , ga rden l igh t s can be
powered by solar energy. As CCPL, Boisar had a large amount of
terrace on top which is unutil ized can take solar panels.
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
62/68
50
Application of Reflective coating:
S un E xp os ed p ar t o f t he b ui ld in g l ik e r oo f a nd w al ls c an b e
painted with High albedo means ref lect ive paints to ref lect the
m ax im um i nc id en t s ol ar r ad ia ti on s. I t wi ll r ef le ct t he s ol ar
radia tions up 70-80% which he lps to main tain the roof o r wa ll
surface much cooler than unpainted or coated surface. Final ly i t
implies in reduction in cooling load on HVAC system.
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
63/68
51
Energy Audit
Report|April 2009
9 Vendor List
10.1 ELECTRONIC BALLASTS
Elmech Electronics
Lake Palace Building,
Marol Village Road, Marol,
Andheri (E), Mumbai
West Coast Instruments & Devices
1/1, Sahar Tower Parsiwada
Andheri Sahar Road, Mumbai
Philips India Ltd.
Business Group Lamps
P-65 Tarotalla Road
Calcutta 700 088
Euro-light Electricals Ltd.
20 Rahi Chambers, Sadashiv Peth,
L. B. S. Marg, Pune - 411 030
Crompton Greaves Ltd.
Lighting Business Group,
405, Concorde R.C. Dutt Road,Baroda 390 007
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
64/68
50
VOLTAGE CONTROLLER FOR LIGHTING
Prithvi Technologies PVT. LTD.
104 Devendra Industrial Estate,
Lokmanya Nagar, Pada No.2,
Yashodhan Nagar, Thane 400606
Contact no-9869059501
E-mail [email protected]
Anupushp Energy & Environmental Services Pvt Ltd.
917/ 19-A shivaji NagarFergusson College Road
Pune - 411 004
Energy Systems
No. 3660, 5th Cross, B- Block
Gayatri Nagar,
Banglore 560021
Beblec India Pvt Ltd
P.B. No 3411, 711, 6th Cross
3rd Block, Koramangala
Banglore --- 560 034
Vijay Energy Product Pvt Ltd
Sp -75 Ambattur Industrial Estates
Chennai 600 058
aceinnov@giasmd01. vsnl. net. in
Prepa red By : ARS Energy Aud i to r s
mailto:[email protected]:[email protected]8/6/2019 Custom Capsules Pvt. Ltd
65/68
51
Energy Audit
Report|April 2009
1 0. 3 T5 TUBE LI GHTS (2 8 WATTS)
Philips India Ltd.
Mahakali Caves Road,Chakala Andheri (East)
Mumbai400 093
Tele: 1-22 56912160
Fax: 91-22-56112184
Crompton Greaves Ltd.
Kanjur (East)Mumbai 400 042
Tele 022 - 25782451/ 25791990
Fax 022 - 2579488
Prepa red By : ARS Energy Aud i to r s .
8/6/2019 Custom Capsules Pvt. Ltd
66/68
50
10.4 Lighting Sensors Bajaj Electricals Limited.
15/17, Saint Savta Marg, Reay Road,
Mumbai 400 010
Tele Phone : 022 - 2372 4192, Extn. 402 / 462 / 253 /254
Hand Phone : 098216 94842 / 098704 551 18
Fax : 022 - 2374 0504 / 2373 0505
E-mail : [email protected]
Contact Person : Mr. Nat raj lye r, S r. Marke t ing Manager
GE India Industrial (Private) Ltd.
Address : Aifacs Building, # 1, Rafi Marg, New Delhi
Tele Phone : 011-41551000
Fax : 011 -23355955
E- mail : badal [email protected],
Contact Person : Mr. Bada l Bagri , Count ry Di rec to r Sales
Kaktiya Energy Systems Private Limited
Address : 3-6-272, NVK Towers Himayath Nagar,
Hyderabad- 500 029
Tele Phone : 040 - 2326 2540
Fax : 040 - 2326 2550
E-mail : [email protected],Websi te : www.natureswitch.com,
C on ta ct P e rs on : M r. Su re sh , Ma na ge r
Prepa red By : ARS Energy Aud i to r s
8/6/2019 Custom Capsules Pvt. Ltd
67/68
8/6/2019 Custom Capsules Pvt. Ltd
68/68
Thermax Ltd.
Address : 15, Sal Chambers, Pune Mumbai Road,Wakdewadi, Pune - 411 004
Tele Phone : 020-25511010
Fax : 020-25511943
E-mail : [email protected],
Websi te : www.thermaxindia.com,
Contact Person : Mr. Akhil Javagal - Asst Manager
Voltas Ltd.
Address : Electro-mechanical & RefrigerationBusiness Group
Voltas House B I . B. Kadam Marg,Chinchpokli , Mumbai - 400 033
Tele Phone : 022 - 6665 6214
E-mail : [email protected],
Websi te : www.voltas.com,
Contact Person : Mr. A. K. Joshi, EVP & COO