25
CUSTOM-MADE SOLUTIONS FOR HIGH-POTENTIAL FUEL CELL APPLICATIONS BASED ON MCFC. Michael Bode MTU Onsite Energy Fuel Cell Systems Ottobrunn, Germany CREA Fair, Verona 21 October 2008
Transcript

CUSTOM-MADE SOLUTIONS FOR HIGH-POTENTIAL FUEL CELL APPLICATIONS BASED ON MCFC.

Michael BodeMTU Onsite Energy Fuel Cell SystemsOttobrunn, Germany

CREA Fair, Verona21 October 2008

Page 2 / MTU Onsite Energy / 19.04.23

Strong Brands and Companies

Products

Fuel Cell Sytems

Injection Systems

Propeller Shafts

Diesel Engine Systems

Brands

Gas Engine Systems

Page 3 / MTU Onsite Energy / 19.04.23

Introducing the Company

Home base in Munich.

Fuel cell power plants for on-site energy.

Standardized building blocks for custom-made solutions.

A Tognum Group Company.

Page 4 / MTU Onsite Energy / 19.04.23

Introducing the Product Portfolio

Page 5 / MTU Onsite Energy / 19.04.23

Introducing the Value Proposition

Efficiency Quality Security

electrical efficiency 49 percent

thermal efficiencyup to 40 percent

part load independentefficiency

cogen, trigen

premium power

400°C usable heat

no pollutants

no vibrations

low noise level

on-site energy

fuel flexibility

grid independence

Page 6 / MTU Onsite Energy / 19.04.23

Unmatched Efficiency

Page 7 / MTU Onsite Energy / 19.04.23

Ultra-clean

Page 8 / MTU Onsite Energy / 19.04.23

Pathbreaking CO2 Footprint

60 % less CO2 emissions than a coal fired power plant

40 % less CO2 emissions thanthe German energy mix

0 100 200 300 400 500 600 700

Energy mixGermany

HotModule

g CO2/kWhel

Page 9 / MTU Onsite Energy / 19.04.23

Fuels, Target Markets, Clients

Power Generation

Cogeneration

Trigeneration

Target MarketsFuel Gases Clients

Data Centers

Telecom Industry

Hospitals

Food Industry

Waste Water Treatment Plant Operators

ESCO

Industrial Key Accounts

Natural Gas

Sewage Gas

Biogas

Methanol

Page 10 / MTU Onsite Energy / 19.04.23

Product Portfolio

SHORT TERM MID TERM LONG TERM

300 kW class

400 kW class

500 kW class

700 kW class

sewage treatment plants

1,000 kW class

2,000 kW class

HM310

HM330

HM hybrid

HM360

HM380

HM330L / M-HM330

HM340L

M-HM360

HM320LM-HM320

HM330XL

HM340XL / M-HM340XL

M-HM380XL

HM320XL

2008 2010 2013 2018

HM Hybrid

HM320

Page 11 / MTU Onsite Energy / 19.04.23

Achievements

Accumulated operating experience approx. 44 years.

More than 20 installations in Europe.

Cogen, trigen, DC applications and multi fuel capabilities demonstrated.

Page 12 / MTU Onsite Energy / 19.04.23

T-Systems Data Center Munich

Trigeneration application

Fuel: biomethane

Hours of operation: 5,420 h

Page 13 / MTU Onsite Energy / 19.04.23

DeTeImmobilien Munich

Trigeneration application

Fuel: natural gas

Hours of operation: 25,480

Seite 14 / MTU Onsite Energy / 19.04.23

Integrating the Fuel Cell into the Infrastructure of the Telecommunication Industry

Page 15 / MTU Onsite Energy / 19.04.23

Municipal Sewage Plant Moosburg

Cogeneration application

Sewage gas from municipal waste water

Heat utilization for fermenter and sludge treatment

Hours of operation: 6,310 h

Seite 16 / MTU Onsite Energy / 19.04.23

FellowSHIP

HotModule for low emission ships

Partner: DNV, Wärtsilä, Eidesvik, Vik-Sandvik

400 kW baseload power for

shipboard power supply system

LNG

Offshore test on Viking Lady as of May 2009

„Viking Lady“

Page 17 / MTU Onsite Energy / 19.04.23

Fermentation Plant Leonberg

Cogeneration application

Biogas from BMW

Hours of operation: 5,640 h

Page 18 / MTU Onsite Energy / 19.04.23

Hospital Bad Berka

Trigeneration application

Fuel: natural gas

Stack replacement in 2007

Hours of operation: 35,920 h

Page 19 / MTU Onsite Energy / 19.04.23

Vattenfall Berlin

Cogeneration application

Dual fuel mode (natural gas, methanol)

Hours of operation: 21,900 h

Page 20 / MTU Onsite Energy / 19.04.23

Scorecard

Pathbreaking system design→ HotModule®

Unique cell technology→ Eurocell®

Unmatched field experience→ Operating hours, application variety

MTU Onsite EnergyFuel Cell Systems

European technology leader aiming at a top ranking in the global market for stationary

fuel cell power plants

Page 21 / MTU Onsite Energy / 19.04.23

Picture Gallery

Page 22 / MTU Onsite Energy / 19.04.23

22

Manufacturing & Assembly

Page 23 / MTU Onsite Energy / 19.04.23

23

Manufacturing & Assembly

Page 24 / MTU Onsite Energy / 19.04.23

24

Shipping to the Customer

Page 25 / MTU Onsite Energy / 19.04.23

Thank you for your attention!

Michael Bode+ 49 89 20 30 42 600

[email protected]


Recommended