EngineeringProcurementConstructionpipe linetrunk lineflow linewater injection and water treatment stationpipingtankscivil work
Degassing stationGas Compressor stationGTUwell HeadEQUIPMENT INSTALLATIONHDD and boringInstrument ElectricalMaintenance NDTServices with other companies as joint venterour Equipmentour projects
Speech of ChairmanSpeech of CEOORGANIZATION CHARTBrief introductionOur Core ValuesCompany DepartmentQA\QCHSE Policy StatementRisk Assessment PolicySCOPE OF BUSINESS
5678101416182122
24262830384042445058
66676870727476788284868892
MSK Group 4 MSK Group5
My friends ....
Welcome in Iraq..
During the ten years of success, perseverance, honesty and dedication in work,
the (MSK) has been able to build a solid base from which to springboard to global
projects. Today the (MSk) group is one of the largest Iraqi companies operating in
the field of energy in its technical, engineering, and financial potentials with all the
expertise it possesses that qualifies it for the advancement in the oil sector in Iraq
and the Middle East. Fifteen Office in Iraq, thirty working site, thirty three offices
outside Iraq, and more than 4,000 Iraqi and foreign employees, with this we have
been able to keep a clear imprint and correct our steps in the field of energy con-
tracting. From one success to the other, we have been able to mix foreign exper-
tise and Iraqi dedication in the work, with sober plans. Our motto is fast delivery,
accuracy and safety. We have carried out hundreds of vital projects in Iraq and
we have been important partners with the investment companies in Iraq. We have
developed with them a number of oil fields such as Alahdab, Algarraf, Badra and
Alhalfaya, Albozorkan, Alrumaila and West Qurna. We have developed the Iraqi
personnel working with us by courses inside and outside Iraq in order to develop
their technical potential. Our company has given safety and the environment a
great attention, a thing that have had a significant impact on the success of our
work. Our company owns ISO certificate and possesses certifications in safety
and the environment, in addition to many sponsorship books from both, the Iraqi
government and foreign companies. We are the best and our goal is to stay at the
top and our goal is to be your partners to work in the field of energy and construc-
tion in Iraq and all the world. We thank you for your good opinion in our company
and we hope to open new doors to cooperate with you in all fields. Our hands and
hearts are with you to build a new Iraq.
Thank you again...
The speech of the President & Chairman's.. Mr. Abdullah Al-Shmeri
MSK Group 6 MSK Group7
CEO ANDGENERAL MANAGER
PRESIDENT &CHAIRMAN
ADMINSTRATIOF
DEPARTMENT
DEPARTMENT OFPROJECTS
DEPT. OFHSE
PLANNING &FOLLOW UP
RESEARCHES&
DEVELOPMENT
DEP. OF
MACHINES
PROJECTS
FOLLOW UP
DEP. OF
FACTORIES
QA/QC
DEPT. OFADMINSTRATION
COST &VISIBILITY STUDY
LEGALDEPT.
CONTRACTS
DIVISION
PROCEEDINGDIVISION
MACHINES & FACTORIES
PUBLICRELATIONAND MEDIA
DEPT.
DEPT.LOGESTICS
FINNANCEDEPT.
ACCOUNTS
DIVISION
ADMINSTRATIVE AFFAIRS
COMMERCIA
DEPT.
HRDivision
FINAL ACC0.
DIVISIONINCOMINGOUTGOING
PROCURMENTDIVISION
CONTROLAUDIT
DIVISIONPERSONNEL
UNIT
TRANSLATIONUNIT
PROPOSALSDIVISION
DEPT. OFPROJECTS
DEP. OF
MANTAINANCE
DEP. OF CIVILPROJECTS
(CWP)
DEP. OF OIL PROJECTS
ENGINEERING
DEP.MECH.& ELEC.
(MEP)
The “MSk “ Since its inception, has played a prominent role in contributing to the
implementation of the strategy of economic diversification.
The strategy is represented in the effective management of the company’s
investment projects, the creation of partnerships between the public and private
sector, and the direct investment of the group. The success of “MSk” is demonstrated
in its management of the subsidiaries of the group; the “ msk’’, which is working
in the oil and gas sector also embodies a perfect example of partnership between
the public and private sectors. In addition, the portfolio of the direct investments of
MSK includes the development and expansion of the oil sector, which represents
one of the most prominent and largest integrated companies in the oil industry
in Iraq. The “MSk” future plans are centered on achieving further excellence and
prosperity and also seek to expand the current projects and target more of the new
strategic investments that enhance the economic capacity of the company and
contribute to boost the national economy. Perhaps what distinguishes the “MSK”
from the other oil companies in Iraq, is the multiplicity of the investment methods,
which ranged between direct investment, as is the case in the Gulf region, and
through the distinctive and successful partnership investments with the private
sector. Today as we are on the threshold of a new phase with our high spirit and
an ambitious vision, we promise that we will continue to work and redouble our
efforts to remain at the forefront of the working on the development of the private
sector and on the fertile source, which is inexhaustible, to create economic entities,
with value-added, to contribute to the creation of investment opportunities, the
rehabilitation of the national staff and employing them, and strengthen the nation’s
march towards sustainable development.
The speech of the General Manager..& CEO. EngineerQusay al-Saadi
MSK ORGANIZATION CHART
MSK Group
MSK GROUP
OIL SERVICE
MSK Group9MSK Group 8
MSK Group is one of the larger Oil Service and Construction companies specialized in contracting
to the petroleum and petrochemical projects in Iraq. Our main activities include Engineering ,
Procurement and construction (Pipeline, Trunk line ,Flow line, water injection, water treatment
injection, piping, Tanks, civil work,Degassing station,Gas Compressor station ,GTU, wellhead,
HDD,Boring, Equipment Installation,Instrument, Electrical, Maintenance , commissioning Start –up
and Testing NDT)
We are abundant in financial capabilities and technical strength, and boast a large group of
technical talents and management professionals who are familiar with international practices,
advancedtechnologies and rich in experience.
We are furnished with state-of-the art technologies, superior engineering and construction equipment
and rich resources for Oil and Gas projects.
We have thedemonstrated capability to provide comprehensive project services from front-
end development to feasibility study, HSE assessment, geo-survey, engineering, procurement,
construction, manufacture, PMC, commissioning, start-up, operation and maintenance according to
international standards and practices under the plateau, desert and seashore conditions.
We consistently abiding by the operation philosophy of “Credibility, Quality, Harmony and Safety”
and keep on improving the Q&HSE management system at MSK Group.
Brief introduction
Vision & Mission
12
EnvironmentThe environment we live and work in is important
to us and we strive to do everything we can to
make sure it remains safe and sustainable.
The Management have formulated a HSE
statement and are working with the latest experts
in HSE to continually improve its HSE policy.
Public welfareSocial responsibility is paramount in our practices
and ensuring that the communities and people are
content is rewarding in itself.
These are the principles that support our mission:
Credibility, Quality, Harmony and Safety
VisionTo be the premier choice Oil Service and Construction
group in the region.
Mission To be our clients’ premier choice and most trustworthy
partner in all our business verticals through the
impassioned and unswerving engagement of our
people, by considering every single operation as
“mission critical” and successfully delivering the best
services available following quality-driven processes
in a safe and environmentally responsible manner.
To bring significant value to our home communities in
all our markets through our responsible culture,
being partners in our clients’ success, and protecting
our shared environment.
ValuesCredibility, Quality, Harmony and Safety
MSK Group11MSK Group 10
Our Clients: Providing excellence in all areas of client service has been the cornerstone of
our business. We pride ourselves on listening to our clients, being responsive to their project
requirements, and exceeding their expectations. We "do it right" the first time.
Our Partners:MSK Group has an exceptional reputation for employing the best trades people in
the area and regionally from Turkey, India and Pakistan. Our sub-contractors are our
long-term business partners. We hold our sub-contractors to the same high standards of quality
and professionalism as we do our employees.
Our Projects: MSK Group provides exceptional performance in all aspects of facility and Oil
Service construction; planning, pre-construction services, Design/Build, medical, institutional,
and industrial new construction. We believe in building into the future, and recognize the
importance of environmental conscientiousness. We incorporate Green Construction practices
in all of our projects.
Our Core Values3
MSK Group13MSK Group 12
Our Employees: Working at MSK Group is not just a job; it is our career; and
more importantly, it is our passion. Teamwork, mutual respect, and a safe and
healthy workplace have been an integral part of our culture for more than 10
years.
Our Community: Every Project is part of a community. We take our responsibility
of making sure our projects becomes part of the greater neighbourhood and
builds on that community spirit and sustainability.
Our Promise:As far as we are able, MSK Group aims to provideenvironmentally
responsible design and building practices, the construction management, skilled
trades, specialized expertise, integrity, professionalism, and services required
to accomplish your Projects We are confident that our dedication, experience,
and ability to deliver your project with maximum efficiency will exceed your
expectations.
We have successfully completed the feasibility study, engineering, construction,
PMC and EPC contracts of quite a number of long-distance oil/gas pipelines, large-
scale oil/gas storage terminals and tank farms, power plants, roads, bridges, and
other municipal utilities successfully in Iraq.
These proud achievements have helped us winning high appraisement and trusts
from the clients, local governments and the pubic in general.
Last year we won a total project value of more than 200 Million USD and over the
recent 10 years, we have constructedmore than 48 Multi-million dollar projects. We
look forward to fulfilling your Oil Service and Construction requirements in Iraq.
4
MSK Group 14 MSK Group15
A- Department of Projects:
1- Division of Oil projects…
2- Division of civil works Projects (CWP).
3- Division of Electrical & Mechanical Projects (MEP).
4- Division of Maintenance.
5- and Division of Engineering designs
It is a department run by a group of Professional qualified engineers and consultants and in all disciplines that
supervise and manage projects and carry out the completion of engineering designs and maintenance.
B- Department of Planning & Follow-up
1- Division of development & Research
2- Division of follow-up of projects.
It is a department run by a group of academics engineers that carry out the planning for projects and also the
development and follow-up of projects and supervise the training courses.
C- Department of Safety & Environment:
It is a technical department run by a group of highly trained staff that has international certificated in the field
of safety and preserving the environment.
D- Department of Quality Control & Quality Assurance (QC/QA):
It is a department run by a group of professional engineers that have an experience and certificates of
experience in the field of quality control & quality assurance (QC/QA).
E- Department of cost and feasibility study:
It is a department based on the study of the Iraqi markets and feasibility study of projects.
F- Department of Logistics:
A department supervises the supplying of all projects' supplies from inside and outside Iraq.
G- Department Mechanisms and PRODUCTIVE Factories:
1- Division of Mechanisms.
2- In addition, Division of Factories.
A department includes the supervision on the company's mechanisms and its
factories.
Administrative Structure (Authority):
A- Department of Administration:
1- Division of Human Resources (HR).
2- Division of Administrative affairs:-
2-A Unit of incoming and outgoing,
2-B Unit of personnel.
2-C Unit of Translation.
This department carries out the follow-up on all staff and human resources and the
supply of staff to projects.
3- Commercial Department:
3-A Division of Purchase (Procurement).
3-B Division of proposals
B- Department of Finance:
1- Division of Accounts.
2- Division of Final Accounts.
3- Division of Control and Division of Audit
Company Department
Technical Structure (authority):
This division supervises all financial
transactions of the company
C- Legal Department:
1- Division of Contracts.
2- Division of proceedings (Claims,
lawsuits)
This division supervises the contracts
and legal claims.
D- Department of Public relations (PR)
and Media.
1- Division of Media
This department supervises the Public
relations (PR) of the company and
supervising the issuance of publications
and newspapers by the company
4
MSK Group17MSK Group 16
Quality policy statement: MSK Group is committed to supplying
construction services of consistent quality that conform fully with company
and statutory requirements and in meeting our client’s documented and
implied expectations in terms of technical, budget and time compliance.
We are dedicated to the continual review, development and improvement
of all aspects of our business, in particular:
• The development and improvement of our construction services in line
with client’s needs and expectations.
• The development of an efficient and effective Quality System and
generally accepted best practices in the management of Construction
Projects, a system which not only ensures that the construction quality
is consistent, but also helps to ensure minimal wastage in all our
construction phases.
• The evaluation, training and development of our employees in order to
meet the company’s objectives.
• The ongoing development of the corporate culture that incorporates
constant problem solving and continuous improvement, encouraging all
employees to take total pride in, and responsibility for, their work and the
development of better working practices.
• Establishing and reviewing quality objectives for all levels that are
realistic, achievable and measurable taking into cognizance preventive
action for outside influences that could prevent the achievement of the
objectives.
Management will communicate this policy to all employees and staff in
such a way that it is properly understood and followed.
QA\QC5
MSK Group19MSK Group 18
The long-term business success of MSK Group depends on our ability
to continually improve the quality of our services and products while
protecting people and the environment. Emphasis must be placed on
ensuring human health, operational safety, environmental protection,
quality enhancement, and community goodwill. This commitment
is in our best interests and the best interest of our customers, our
employees and contractors, our stockholders, and the communities in
which we live and work.
MSK Group requires the active commitment to, and accountability
for, QHSE from all employees and contractors. Line management
has a leadership role in the communication and implementation of,
and ensuring compliance with, QHSE policies and standards. We are
committed to
• Protect, and strive for improvement of, the health, safety and security
of our people at all times;
• Eliminate Quality non-conformances and HSE accidents;
• Meet specified customer requirements and ensure continuous
customer satisfaction;
• Set Quality & HSE performance objectives, measure results, assess
and continually improve processes, services and product quality,
through the use of an effective management system;
• Plan for, respond to and recover from any emergency, crisis and
business disruption;
• Minimize our impact on the environment through
pollution prevention, reduction of natural resource
consumption and emissions, and the reduction and
recycling of waste;
• Apply our technical skills to all HSE aspects in the
design and engineering of our services and products;
• Communicate openly with stakeholders and ensure
an understanding of our QHSE policies, standards,
programs and performance. Reward outstanding QHSE
performance;
• Improve our performance on issues relevant to
our stakeholders that are of global concern and on
which we can have an impact, and share with them
our knowledge of successful QHSE programs and
initiatives.
This Policy shall be regularly reviewed to ensure
ongoing suitability. The commitments listed are in
addition to our basic obligation to comply withall
applicable laws and regulations where we operate.
This is critical to our business success because it
allows us to systematically minimize all losses and
adds value for all our stakeholders.
HSE Policy Statement:6
MSK Group 20 MSK Group21
Risk Assessment Policy7The idea of not increasing lifetime risk by more than one in a million has become commonplace in public health discourse and policy. It is a heuristic measure. It provides a numerical basis for establishing a negligible increase in risk.Environmental decision-making allows some discretion for deeming individual risks potentially "acceptable" if less than one in ten thousand chance of increased lifetime risk. Low risk criteria such as these provide some protection for a case where individuals may be exposed to multiple chemicals e.g. pollutants, food additives or other chemicals.In practice, a true zero-risk is possible only with the suppression of the risk-causing activity.
Stringent requirements of 1 in a million may not be technologically feasible or may be so prohibitively expensive as to render the risk-causing activity unsustainable, resulting in the optimal degree of intervention being a balance between risks vs. benefit. For example, emissions from hospital incinerators result in a certain number of deaths per year. However, this risk must be balanced against the alternatives. There are public health risks, as well as economic costs, associated with all options. The risk associated with no incineration is potential spread of infectious diseases, or even no hospitals. Further investigation identifies options such as separating noninfectious from infectious wastes, or air pollution controls on a medical incinerator.Intelligent thought about a reasonably full set of options is essential. Thus, it is not unusual for there to be an iterative process between analyses, consideration of options, and follow up analysis.
MSK Group 22 MSK Group23
SCOPE OF BUSINESS8
Construction
Procurement
Engineering
Services
MSK Group 24 MSK Group25
Our design group has the technical and practical experience for designing and engineering
by a professional and high experience design engineers group including all speciality such
as mechanical , electrical , instruments , civil , HSE , chemical and processdesign .
All design works shall be according to the dependable standards from ( API , ANSI , ASME ,
and HSE requirements ) .
Our design experience in oil and gas design include but not limited the followings :
-Pipe line design ( flow line , trunk line , water pipe line , compressed gas pipe line )
-Crude oil manifolds ( field manifold , production manifold , test manifold )
-Industrial and drinking water systems .
-Crude oil floating roof and fixed roof tanks ( flow wash tank , storage tank , fire fighting
tanks ) according to standard API 620 and API 650 .
-Fire fighting system according to NFTA standards .
-Pig launcher and receiver design .
-River , railway , rods , cable and pipes crossings .
-Over all degassing station design
-Pumping system design
-Cathode protection design
-Electrical design ( power , lighting , load calculation ….etc. )
-Process design and calculation according to hisses and gipsa … etc. )
-Civil design for roads , buildings , bridge , earth work ….etc. )
-Instrumentation with pneumatic system ,scada , tv camera , electronic system , …etc Our
design works shall be done
by the followings programs :
- 2 D , 3 D Auto cad, Mech.
Cad
- Auto plant
- Penalty
- Cesar II
- E- tank
- Sketch up
- Primavera
- Microsoft project
management
- Microsoft office
- Etc.
Engineering9
MSK Group 26 MSK Group27
It is MSK Groups’ ambition to work on lasting relationships with a selected number of construction
partners, in which entrepreneurship and specific knowledge in the field of product, market and process
are leading. The making and implementing of the right choices in this are the success factors of the
procurement policy.
Within decentralisedorganisational structure, the procurement column is organisedin accordance
with the coordination principle. No choice has been made for either centralised procurement or
decentralised procurement. The level at which to pursue strategic procurement processes is
determined for each sub-segment. The MSK Procurement model can therefore be best qualified as a
'coordinated' approach.
The benefits of scales of economy are derived by pursuing procurement activities in such a manner
that, on the one hand, local management retains the flexibility and control of its processes and, on
the other hand, the entire MSK Group organization enjoys the quantitative and qualitative economies
of scale.
Due to the nature of the sector in which MSK Group is active, primary processes focus on obtaining
and completing projects in as efficient and effective a manner as possible. Accordingly, procurement
activities should share this focus. As many projects pursued within and outside a specific region
or by an operating company, respectively, have shared procurement segments and processes,
combining them can generate substantial and structural procurement economies of scale. This
applies to supply/equipment supplies, subcontractors, suppliers involved in the supporting facility
management process and intra-organisational sup
Procurement Policy Statement10
MSK Group29MSK Group 28
Construction11
MSK Group31MSK Group 30
Pipe line-All works shall conform to the scope of work, SOR .specification approved for construction drawings,
data sheets, technical standards, codes and technical specifications
- Time schedule and organization chart for our work.
- Site Survey works and marking.
- Right of way. Clearing and grading
- Piping transportation and stringing.
- Trenching (Excavation of pipeline ditch according to the design requirements and backfilling with clean
soil).
- Main roads, secondary roads, and earth roads, railways, small river crossings according to the cross
section mentioned in the drawings (API-1102)
- Reinforced concrete of pipelines weighting and slabs for Mechanical protection.
- All civil works relevant to cathodic protection.
- Civil works relevant to terminals, tie-ins, including scraper traps
- Preparing the welding procedures (WPS) and procedure qualification records (PQR).
- Welders qualification.
- Pipeline sections Welding activities (750- 1200) meter / section
- NDT
- Pipeline lowering & backfilling.
- Tie-in welding
- Cathodic protection system installation (option)
- Pipeline lowering using side booms and roll cradles.
- Tie –in welding
- Joint coating and repairs of coating or any damage caused to Line pipes during installation
- Pig Launching and receiving installation.
- Valve station installation (piping, valves, and supports).
- Well head connections.
- Hydrostatic test preparation (test headers manufacturing, cleaning, filling, dewatering & water
supplying)
- Pre-commissioning and provide assistance during Commissioning as part of the Commissioning Team
- As-Built drawing.
MSK Group33MSK Group 32
Pipe Line
MSK Group35MSK Group 34
Pipe Line
MSK Group37MSK Group 36
Pipe Line
MSK Group 38 MSK Group39
Trunk line
MSK Group 40 MSK Group41
Flow line
MSK Group43MSK Group 42
Water Injection And Water Treatment Station
MSK Group 44 MSK Group45
PIPINGCarbon SteelStainless SteelAlloy SteelLow-Temperature Alloy SteelGRE pipe
MSK Group 46 MSK Group47
MSK Group 48 MSK Group49
MSK Group 50 MSK Group51
TanksPresentation for erection badra tanks
1- Done designs for all the tanks and according to stander ( API650)
2- Manufacture of materials according to drawings and transported to the work site
3- Completion of civil works and reservoir Included foundation& cathode protection
4-Mechanical works included
a -Install annular plats& Bottom plats ,Equipment's used (Crane, forklift, welding machine(manual
&auto)) Examination( Visual test ,XRAY, Vacuum test)
b – Install first course &make fit up& welding for V joint, Equipment's used (Crane, forklift, welding
machine ,tools) Examination ( Visual test ,XRAY ,plumpness, Peking ,reduce, penetration test)
c- Manufacture Temporary support for floating roof in the work shop of the company(MSK)
and Install from inside tank. Examination(level by Surveyor)
d- – Install 2nd course &make fit up&welding for V joint, & H joint, Equipment’s used (Crane, forklift,
welding machine(manual &auto) Examination ( Visual test ,XRAY ,plumpness, Peking, banding ,
penetration test)
e- Install bottom deck &make fit up &welding for floating roof. Equipment’s used (Crane, welding
machine(manual &auto ) ) Examination ( Visual test , Vacuum test ,).
f—Install structure roof &make fit up &welding. Equipment’s used (Crane, welding machine, chin look)
Examination ( Visual test ,leak test ,)
g- Install top deck &make fit up &welding for floating roof. Equipment’s used (Crane, welding
machine(manual &auto ) ) Examination ( Visual test , pneumatic test ,).
h- Install (3th ,4th.5th.6th .7th .8th course )and make fit up& welding for V joint, & H joint, Equipment’s used
(Crane, forklift, welding machine(manual &auto) Examination ( Visual test ,XRAY ,plumpness, Peking,
banding , penetration test)
i—Install shell Nozzle& roof Nozzle &make fit up &welding. ) Examination ( Visual test , pneumatic test,)
k-Install accessories (stairway ,Rolling ladder ,Guide pool, walkway ,Top angle .Roof drain system)
. Equipment’s used (Crane, welding machine ,lift Man )
l- Hydrostatic test for the tank.
MSK Group 52 MSK Group53
MSK Group 54 MSK Group55
Tanks
MSK Group57MSK Group 56
MSK Group 58 MSK Group59
Civil Work
Pipe Rack Foundation- Tank Foundation - Pipe Support Foundation - Steel Structure Foundation- Equipment Foundation- Light pole Foundation - Under Ground - Steel Structure Construction - Manhole's , Valve Pit , ETC …Pipe Support Foundation - Steel Structure Foundation- Light pole Foundation - Under Ground - Manhole's , Valve Pit , ETC
CIVIL ENGINERING CATEGOREIS:
A STRUCTURAL ENGINEERING1-CONCRETE STRUCTURES2-STEEL STRUCTURES3-COMPOSIT STRUCTURES4 - HYDRAULIC STRUCTURES
B- GEOTECHNICAL ENGINEERING1 -SOIL ENGINEERING2 -FOUNDATION ENGINEERIN ( RAFT , STRIP , DRIVEN PILES , POUR PILES )
C HIGHWAY AND BRIDGES ENGINEERING1- HIGHWAY ENGINEERING2- BRIDGES ENGINEERING3- TRAFFIC ENGINEERING
D- IRRIGATION ENGINEERINGE- SURVEY ENGINEERINGF- PROJECT MANGEMENT ENGINEERINGG- SANITARY AND ENVIRNOMENT ENGINEERING
MSK Group 60 MSK Group61
raft foundation
driven piles installation
Civil Work
MSK Group 62 MSK Group63
MSK Group65MSK Group 64
MSK Group67
Oil and gas processing
MSK-GROUP have the experience to erect Various types of oil and
gas stations as follows:
• Degassing stationWe have experience in the erection and installation of the stations
that separates crude oil and associated gas, where we have
the potential to erect large separators (Dry oil banks and wet oil
banks installation, Salt processing units, Manifolds fabrication and
installation) , rotating machines , pipe fabrication works, electrical
works and instrumentation works and also we can do the pre-
commissioning, commissioning and startup .
• Gas compressor station We have the capabilities and expertise accumulated sufficient for
the execution of the construction of gas compressor stations (after
the completion of the degassing and drying process) and includes the
erection of Gas compressor , Gas blower, Gas air cooler assemblage
and installation, Piping fabrication and erection , Pumps installation
and flare Sticks unit installation
MSK Group 66
MSK Group 68 MSK Group69
• Gas treatment unit (GTU)Also we carry out the construction of dehydration gas stations, where we have the
necessary manpower’s and equipment to implement all the electrical , mechanical
and instrumentation works(PLC ,SCADA systems ). Where the works included the
following systems
• TEG- Gas contactor tower installation
• TEG reboiler installation
• TEG air cooler installation
• Vessels installation
• Piping fabrication and installation
• Pumps installation
• Flare Sticks unit installation
• Also we have the expertise for construction the following stations
Where we have the human resources and equipment necessary for the
implementation of the various stations that are used in the field of industries of oil
, gas and energy, as follows
• Waste Water Treatment unit
• Pigging Station
• Pumping Station
• Water injection Station
• Slug Catcher
• Water Treatment Unit
Well HeadThe scope of MSK services in this part consists of provision of tools, equipment and personnel of Wellhead Services
to provide the operations and services of the wellhead equipment installation and maintenance as per Company
specifications and contract requirements. MSK could be capable of handling Operation at least on 3 Rigs at the
same time.
Such applications of these services are rely on one or more of the following features:
• Repair and services Gate valves, X-mass tree Valves. Included but not limited to Changing Gate, Seat,
o-ring, gaskets, packing, lubricant and so on.
• Check & Inspect Spool, fully connect Gate valves on spool side outlets.
• Fully Install Spools and tree on position and fully tighten nut & bolt.
• Set & remove the VR-Plug in/from spool. (Zero pressure & under pressure operation.)
• Supervise Measuring, Cut, Beveling & smoothing the Casing Neck before welding casing head housing
• Pressure Test Welding area on Casing Head Housing
• Check and preparing Casing slips and seal assembly
• Set Casing slips & seal assembly on position.
• Supervise Measuring, Cut, Beveling & smoothing the Casing Neck before installing Casing & Tubing
Spools
• Supervise Measuring, Beveling & welding casing for Extend Old Casing neck
• Verify that the pack-off seals are the correct size for the equipment and casing being run. Record the stock
number and serial numbers
• If the seal assembly is installed in the wellhead equipment. Remove it and inspect the seal holding pocket.
Verify that the seals are the correct size for the casing being run and reinstall them.
• Injecting and testing of isolation seals energized with sealant for all Casing & Tubing Spools and X-Mass
tree Bonnets.
• Recovery of sealant for m-install of wellhead equipment.
• Check and preparing to Work Tubing Hanger
• Inspect the seal pocket of tubing hanger bonnet to be clean and free of gouges or scars. Clean the test port
and control line ports to be free of debris.
• Drift the X-Mass tree with the BPV.
• Rabbit the tubing hanger and any sub to be used.
• Set a BPV in the hanger to check the socket.
• Fully retracted the lockdown screws and guide screws on the tubing head spool
• Run in all the lockdown screws making sure they go in 3 to 4 turns before contacting the hanger
• Set the BPV through the rotary table.
• After BOP Nipple-down, Clean off the hanger mandrel, set seal ring or ring gasket in position,
disconnect the excess control line from the top of the nipple or remove the pipe plug whichever was used.
Fill the tubing spool bowl with test fluid.
• Thoroughly clean the tubing bonnet and pick up the tree in as straight a position as possible.
Carefully land the tree onto the tubing hanger
• Make up the connection fully
• Remove the BPV
• Provision of reports:
• Detailed Wellhead and X-Mass tree Equipment Technical report
• Detailed chronology of operations,
• Analysis of technical difficulties encountered,
• Inventory list of products and-consumables consumed and remaining on the worksite,
• post analysis of any equipment failure or services non-conformance,
MSK Group71MSK Group 70
MSK Group73MSK Group 72
EQUIPMENT INSTALLATION
MSK Group75
MSK Groups known as the first Iraqi Private Company that
established HDD Techniques in Iran. We have completed lot
of River Crossings and pull back 12 inch Up to 40 inch Pipes
by HDD Method Successfully
HDD & BORING
MSK Group 74
Our company focus to use
only certify equipments &
lifting accessories during HDD
& Boring work according to
international standards and
client requirement.
All equipments with
inspection certification from
international third party
companies.
boring machine with valid
inspection certification.
sideboom with valid inspection
certification.
excavator with valid inspection
certification.
lifting accessories with valid
inspection certification.
webbing sling
Chackles.
Steel wire rope.
Boring machine
from 6” to 16” one set.
Boring machine
from 16” to 24” one set
Boring machine
from 24” to 36” one set
HDD machine
from 6” to 24” one set.
HDD machine
from 24” to 36” one set
HDD machine
from 36” to 56” one set
MSK Group77MSK Group 76
instruminetControl system works,
Design ,maintenance, repair .
As we know the control system have two branch's :
The first one is the electronic part ,which that deals with electronic equipment's such as PLC ,CONTROLER ,
INDECATORS ,MONETORING SYSTEMS ,…
And most of these equipment's fitted inside control rooms buildings
The second one is the mechanical part , such as controlling equipment's "valves, mechanical level controller
,pressure regulators , transmitters,…
Our jobs :
DESIGN :
Design controlling system for all
process by using high technical
methods ,and in simples why
,also with high performance and
reliability.
Maintenance:
Of our priorities in maintenance
that do all work under safety
regulations ,precision at work
,respect the time.
MANAGEMENT PROJECTS:
Management and run all
projects with specialist team
"technician & engineering"
All team work under high
efficiency and experience
Adherence to safety standards.
MSK Group 78 MSK Group79
Electrical WorkELECTRICITY IS ONE OF OUR SPECIALITIESElectricity:Our company is well known in the field of Electricity for constructing, testing and commissioning of generation, transmission and distribution of sub-station and power networks.The staff of expert engineers and well trained technicians is capable of conducting excellent projects management and accurate performance of maintenance schedulesELECTRICITY:TRANSMISSION: Construction, Testing and commissioning of Power Transmission Networks (400-132 Kv) Substations and Power Lines.DISTRIBUTION: Construction, Testing and commissioning of Distribution Networks including 33/11 Kv Sub-Stations with 33, 11Kv Power Lines.LV PANNELS: Construction of LV Power and Control Panels.
MSK Group 80 MSK Group81
Cathodic Protection
A fully comprehensive service is offered in the field of Cathodic Protection (CP).The Company is committed to
designefficient, cost effective cathodic protection systems
MSK- provides the following services:
• System analysis and design
• Terrain (Soil) Conductivity Surveys for Well Casing Cathodic Protection Design
• Impressed current system design, installation and commissioning
• Sacrificial anode system design and installation
• Survey, design & commissioning services for conventional pipeline systems and
potential surveys.
• Cathodic protection in hazardous environments.
• Cathodic protection of reinforced concrete structures.
• Evaluation of existing Cathodic Protection System and development of comprehensive CP retrofit.
• Provision of specialised pipeline survey techniques and interpretation of results.
• Turnkey cathodic protection systems.
• CP Design of process plant, storage tanks and large diameter pipelines.
• Monitoring and maintenance services on new or existing pipelines.
Cathodic Protection Materials:
• Material supply includes: CP Rectifiers (Oil Cooled, Air Cooled-Single
Phase Three Phase) Junction Boxes (Aluminum, Stainless Steel & Fiber
Glass),Test Stations, Loresco Back Fill, Impressed Current and Sacrificial
Anodes, CP Cable and Remote Monitoring System
SCADA SYSTEMS SCADA application in petrochemical industries
• Tank Management systems
• Blending Control
• Industrial water and waste water treatment
SCADA Water SolutionsSystem Management and Optimization
• System-wide integration (multiple plants)
• Enterprise historian and report generator
• System-wide asset manage¬ment and reliability programs
• Interface to LIMS, CMMS, GIS, CIS/FIS, plant security systems, and
design database
Plant Controls and Monitoring Systems
• Distributed control system (HMIs, controllers, network, etc.)
• Plant historian and report generator
• Electronic documentation
• Integration with other systems and
intranet/Internet
• Fieldbus solutions (HART, Foundation
fieldbus, PROFI¬BUS, DeviceNet, etc.)
• Simulation
• ControlWave RTUs and PLCs
Simulation
• First-principle simulation
• Algorithmic simulation
• Tie-back simulation
Equipment Condition Monitoring
• Online/portable vibration monitoring
• Motor diagnostics
• Infrared thermography
• Laser alignment/balancing
• Oil analysis
Intelligent Device Management
• Health monitoring
• Calibration
• Configuration
• Audit trails
Intelligent Field Devices
• Pressure, temperature, flow, and level
transmitters
• Liquid/gas analyzers
• Valves and valve actuators
Electrical and Auxiliaries
• UPS, Power conditioning, and
distribution
• Motors
• Couplings
• Gear reduction drives
• Backup power generators
MSK Group83MSK Group 82
Maintenance
MSK Group 84 MSK Group85
Testing NDT
Testing NDTVisual and Optical Testing (VT)
Penetrant Testing (PT
Magnetic Particle Testing (MT.
Electromagnetic Testing (ET)
or Eddy Current Testing
Radiography (RT
Ultrasonic Testing (UT
Acoustic Emission Testing (AE
Leak Testing (LT
Hydro test
Conducted according ASME, API,
ASTM and ANSI
MSK Group87MSK Group 86
WORKING AS JOINT VENTURE12• Cementing and acid treatments job design,
• Cement slurry design, developing and testing,
• Cementing jobs,
• Acid treatments jobs,
• Cementing and acid treatments operation parameters monitoring and recording
• Cement plugs,
• All types of pumping works.
In the framework of our Logging-Service, we perform the classical Formation-Logging Service for the
continuous geological maintenance, documentation and storage of the drilled geological formations.
The recording of the drilled geological formations is essentially based on cuttings and on recovered cores.
A drilling fluid gas monitoring service and a drilling progress measurement device (ROP) are deployed if
required. If a further on-site processing is required, our Drilling-Monitoring-System with extensive software
is available.
Formation-Logging Service
Depth corrected or lagged sample recovery, sample preparation and processing, the litho logical analysis
and the stratigraphic field definition of the samples are the basis of the documentation of the results.
The samples are prepared, labeled, either unwashed (in plastic sample bags) or processed (dry samples in
glass sample tubes or paper envelopes) and stored.
Further possible tests:
• for shows of oil by the use of UV light
• automated electronically analysis of the calcite/dolomite ratio (see GeoCalcit
• Electronically determination of the cutting/shale density
• potassium monitor
• Core handling: description, photographic documentation (reflected and transmitted light e.g. salt cores),
core sample preparation (e.g. waxing), logistics
• Continuous graphical documentation in the form of a mud-log (SamplerLog/LithoLog)
• Creation and transmission of reports by E-Mail or other means to the client and the clients’ offices.
• Immediate reporting of geological and drilling technical irregularities and their documentation.
• Separation, preparation and storage of sample material for further laboratory analysis according to the
instructions of the client.
• Competent core retrieval, cleaning and oriented storage in core boxes including complete labeling and
description.
• Photographic documentation of the core runs in reflected and transmitted light: classic or digital.
Development, reproduction and storage according to the instructions of the client.
Cementing Services
Mud logging
MSK Group89MSK Group 88
Line Item N. Equipment Description Qty.1 Tower Crane 2
2 Mobile Crane 25 Ton 14
3 Mobile Crane 50 Ton 8
4 Mobile Crane 100 Ton 2
5 Crawler Crane100 Ton 2
6 Diesel Generator 50 KVA 60
7 Electric Welding Set 300
8 Diesel Welding Set 140
9 Fork Lift Truck 20
10 Excavator 50
11 Dump truck 30
12 Backhoe/ Loader 14
13 Sheepfoot Roller 10
14 Vibrating Roller 12
15 Roller 16
16 Plate Compactor 14
17 Air Compressor 20
18 Grader 16
19 Clamp Bending Machine 6
20 Automatic Submerged Arc Welding Machine 20
21 Semi Automatic Gas Shielded Welding Machine 40
22 Manual Welding Machine 300
23 Asphalt Plant Unit 4
24 Concrete Batching Unit 10
25 Spreader 20
26 Boom Truck 30
27 Water Pump 40
28 Bus 20
29 Manhaul Truck 6
30 Jack Hammer 8
31 Spray Painting Machine 10
32 Core Cutting Machine 8
33 Grit Blasting Equipment incl. compressor 20
34 Concrete Vibrator 8
35 Pick-Up Truck - 1/2 Ton 4x 2 20
36 Pick-Up Truck - 3/4 Ton 4x 4 40
37 Dump Truck - 15 C.M. 8
38 Dump Truck - 20 C.M. 10
39 Tractor Unit - 4 x 2 20
40 Water - 3800 Liters with Pump (1,000 GAL) 8
41 Water - 22700 Liters with Pump (6,000 GAL) 8
42 Vacuum - 22700 Liters (6,000 GAL) 6
43 Flatbed - 50 Tons with Tractor 8
44 Lowboy - 80 Tons with Tractor 6
45 Lowboy - 100 Tons with Tractor 4
46 Dolly, Pipe 6
47 Bobcat 14
48 Cat D8 or Equivalent 8
49 Cat D9 or Equivalent 6
50 Cat with Rock Drill 8
51 Trench Roller - Self Propelled - 2 Tons 2
52 Vibratory Roller - 10 Tons 6
53 Vibratory Roller - 20 Tons 4
54 Sheepsfoot Roller 2 x 60” 4
55 Barber-Greene (or equal) Asphalt Layer 10 ft wide 2
56 Road Brush - Self Propelled 6
57 Line Marker - Self Propelled 2
58 Asphalt Cutter 6
59 Steel-Wheeled Roller 8
60 Road Grader 8
61 Flat Bed Trailer 25 ton with Prime Mover 20
62 Low Bed Trailer 50 ton with Prime Mover 10
63 Flat Bed Truck 5 ton 20
64 Flat Bed Truck 10 ton 18
65 Truck 5 ton with Hiab Crane 20
66 Truck 15 ton with Hiab Crane 6
67 Overhead Line Bucket Truck 8
68 10 Ton Tipper Truck 40
69 25 Ton Tipper Truck 20
70 Hydrotest Water Tank 6
71 Feeding Pump 300m³/hr 5 barg 8
72 Filling Pump 210÷300m³/hr 40÷45 barg 8
73 Filling Pump 100÷200m³/hr 40÷45 barg 8
OUR EQUIPMENT13
MSK Group91MSK Group 90
74 H. P. Pump 200 l/min 300 barg 8
75 H. P. Pump 100 l/min 300 barg 8
76 H. P. Pump 30 l/min 300 barg 8
77 H.P. Test Headers 6
78 Cleaning Filter Set (400÷600 m³/hr) 4
79 Hydrotest Equipment Set 8
80 140 cfm Compressor 20
81 250 cfm Compressor 20
82 350 cfm Compressor 16
83 750 cfm Compressor 8
84 1200 cfm Compressor 4
85 Air Dryer Equipment 8
86 Vacuum Drying Equipment 8
87 Induction Heating Seat 30
88 Induction Coils 14
89 Propane gas heating set 8
90 Wheel Tractor 4 x 4 40
91 Tow Tractor Cat D6 or equivalent 12
92 Tow Tractor Cat D7 or equivalent 8
93 Motor Welding Machine 400 amp 140
94 Electrical Welding Machine 400 amp 200
95 Pay welder 1 holder 20
96 Pay welder 2 holder x Automatic Weld/System 10
97 Pneumatic Internal Clamp 6”÷16” 6
98 Pneumatic Internal Clamp 18”÷28” 6
99 Pneumatic Internal Clamp 30”÷40” 6
100 Cut & Bevelling machine 8
101 Auger Boring/Pushing machine or equivalent 4
102 External Line Up Clamp 20
103 Pipe Bending Machine 38”÷48” 2
104 Pipe Bending Machine 16”÷30” 6
105 Pipe Bending Machine 6”÷20” 4
106 Pipe Facing Machine 32”÷48” 2
107 magnetic cutting machine 4
108 mobil AC ARC weding machine 20
109 inverter welding machine 6
110 plasma cutting machine 8
111 semi Automatic cutting machine 6
112 magnetic drilling machine 2
113 Radial drilling machine 2
114 Bench drilling machine 3
115 Beveling machine 4
116 Hydratest pump 6
117 handy hydraulic test pump 8
118 pipeline filling pump 4
119 Protable Air compressor 5
120 Air paint spraying machine 2
121 HP Air paint spraying machine 4
122 Internal Clamp 8
123 Fuel Tanker 3
124 clamp ammeter 5
125 pressure gauge calibrator 19
126 Concrete Plant 12
127 Truck mixer 16
128 Shovel 6
129 Compactor 7
130 Pickup 1 & ½ Tons 40
131 Grader machine 8
132 Cutting machine 6
133 Total station machine 18
134 Casting machines 4
135 Concrete pump machines ( 24 – 40 M ) 4
136 Bend & cut steel bar machines 20
137 Generator 100 KVA 18
138 Sand, Gravel and Sub-base Plant 2
139 Asphalt Plant 2
140 Bulldozer D8 4
141 Wheel Loader ( shovel ) 8
MSK Group93MSK Group 92
OUR Projects 2012-2013
No. Project name Work location CLEINTValidity& CONTRACT
VALUE
1
Pipe line 48 inch 75 Km Baghdad Ministryof electricityContinue
2
Pipe line 32 inch 45 km BaghdadMinistry of electricity
COMPLETED
3
Pipe line 18 inch 100 km Basra SOC ON GOING
4
Tanks Basra south Rumaila CPECC-BP COMPLETED
5
Tanks degassing station 5 Basra north Rumaila CPECC-BP COMPLETED
6
Work Shop Fabrication Basra WQ1 Exxon mobile Continue
7
Camps Basra south Rumaila CPECC and SOC COMPLETED
8
Supply Equipment>s& Maintains Badra OIL Filed GAZPROM Continue
9
Camps Nasiriya- Thiqare CPP COMPLETED
10
FLOW LINE &Trunk Line MisanHalfaya CPECC COMPLETED
11
CPF2 Misanhalfaya CPECC Continue (Start work )
12
CPF ll Al-Ahdab Oil Filed CPECC Continue
13
Water injection 2 Al-Ahdab Oil Filed CPECC COMPLETED
14
Trunk lines Al-Ahdab Oil Filed CPECC COMPLETED
15
FLOW LINE Al-Ahdab Oil Filed CPECC COMPLETED
16
Gas station Al-Ahdab Oil FiledCPECC
COMPLETED
17
Civil work tanks foundation Al-Ahdab Oil Filed CPECC Continue
MSK Group 94 MSK Group95
18
Water line 20 inch GRE35 km Al-Ahdab Oil Filed CPECC COMPLETED
19
DiyalahRiver crossing pipe BaghdadMinistry of electricity
Continue
20
Tank for Ahdab filed Al-Ahdab Oil Filed CPECC COMPLETED
21
Road 18 km O.G.M Al-Ahdab Oil Filed CNBC COMPLETED
22
PIPE Line 32 inch 53 KM Bazirgan oil filed CNOOC ON Going
23
PIPE Line 32 inch 9 KM Halfaya Oil Filed CPECC ON Going
24
PIPE Line 28 inch 9 KM Halfaya oil Filed CPECC ON Going
25
SERVISE ROADBADRA OIL Filed To Garrf Oil Filed
GAZPORM-CPP Continue
26
CIVIL WORK and R.W Garrf Oil Filed TO PS2 PETRONAS-CPP Completed
27
CONSTRUCTION 9 Tanks Badra Oil Filed Petrofac Completed
28
Piping Badra Oil Filed Petrofac Completed
29
Civil work CPF Badra Oil Filed Petrofac Completed
30
CPF 2 Al-Ahdab Oil Filed CPECC ON GOING
31
Construction 3 Tanks BADRA OIL Filed SAMSUNG ON GOING
32Piping ,Steel Structure, Equipment installation
BADRA OIL Filed SAMSUNG ON GOING
MSK Group 96
MSK Group 98
MSK Group
MSK GROUP
OIL SERVICE
MSK Group
Iraq Office
HQ:Baghdad -Al-Kradah -Al-Jadreah
Al-Basrah-Al-Jziaer
Wassit-Al-Haydreah
Irbeal-St.100
UAE -Office
Ajmain - Free Zone
Email:[email protected]
q u s a y @ m s k - g r o u p . o r g
Tel: 009647801977860
009647801977859
website:
www.msk-group.org
www.msk-iq.com