+ All Categories

CV MSK

Date post: 25-Mar-2016
Category:
Upload: -
View: 218 times
Download: 1 times
Share this document with a friend
Description:
 
Popular Tags:
50
MSK Group MSK Group INTRODUCTION 2014 M S K G R O U P OIL SERVICE
Transcript
Page 1: CV MSK

MSK Group1

MSK Group

MSK Group

INTRODUCTION

2014

MSK GROUP

OIL SERVICE

Page 2: CV MSK

MSK Group3

MSK Group

MSK GROUP

OIL SERVICE

Contents

EngineeringProcurementConstructionpipe linetrunk lineflow linewater injection and water treatment stationpipingtankscivil work

Degassing stationGas Compressor stationGTUwell HeadEQUIPMENT INSTALLATIONHDD and boringInstrument ElectricalMaintenance NDTServices with other companies as joint venterour Equipmentour projects

Speech of ChairmanSpeech of CEOORGANIZATION CHARTBrief introductionOur Core ValuesCompany DepartmentQA\QCHSE Policy StatementRisk Assessment PolicySCOPE OF BUSINESS

5678101416182122

24262830384042445058

66676870727476788284868892

Page 3: CV MSK

MSK Group 4 MSK Group5

My friends ....

Welcome in Iraq..

During the ten years of success, perseverance, honesty and dedication in work,

the (MSK) has been able to build a solid base from which to springboard to global

projects. Today the (MSk) group is one of the largest Iraqi companies operating in

the field of energy in its technical, engineering, and financial potentials with all the

expertise it possesses that qualifies it for the advancement in the oil sector in Iraq

and the Middle East. Fifteen Office in Iraq, thirty working site, thirty three offices

outside Iraq, and more than 4,000 Iraqi and foreign employees, with this we have

been able to keep a clear imprint and correct our steps in the field of energy con-

tracting. From one success to the other, we have been able to mix foreign exper-

tise and Iraqi dedication in the work, with sober plans. Our motto is fast delivery,

accuracy and safety. We have carried out hundreds of vital projects in Iraq and

we have been important partners with the investment companies in Iraq. We have

developed with them a number of oil fields such as Alahdab, Algarraf, Badra and

Alhalfaya, Albozorkan, Alrumaila and West Qurna. We have developed the Iraqi

personnel working with us by courses inside and outside Iraq in order to develop

their technical potential. Our company has given safety and the environment a

great attention, a thing that have had a significant impact on the success of our

work. Our company owns ISO certificate and possesses certifications in safety

and the environment, in addition to many sponsorship books from both, the Iraqi

government and foreign companies. We are the best and our goal is to stay at the

top and our goal is to be your partners to work in the field of energy and construc-

tion in Iraq and all the world. We thank you for your good opinion in our company

and we hope to open new doors to cooperate with you in all fields. Our hands and

hearts are with you to build a new Iraq.

Thank you again...

The speech of the President & Chairman's.. Mr. Abdullah Al-Shmeri

Page 4: CV MSK

MSK Group 6 MSK Group7

CEO ANDGENERAL MANAGER

PRESIDENT &CHAIRMAN

ADMINSTRATIOF

DEPARTMENT

DEPARTMENT OFPROJECTS

DEPT. OFHSE

PLANNING &FOLLOW UP

RESEARCHES&

DEVELOPMENT

DEP. OF

MACHINES

PROJECTS

FOLLOW UP

DEP. OF

FACTORIES

QA/QC

DEPT. OFADMINSTRATION

COST &VISIBILITY STUDY

LEGALDEPT.

CONTRACTS

DIVISION

PROCEEDINGDIVISION

MACHINES & FACTORIES

PUBLICRELATIONAND MEDIA

DEPT.

DEPT.LOGESTICS

FINNANCEDEPT.

ACCOUNTS

DIVISION

ADMINSTRATIVE AFFAIRS

COMMERCIA

DEPT.

HRDivision

FINAL ACC0.

DIVISIONINCOMINGOUTGOING

PROCURMENTDIVISION

CONTROLAUDIT

DIVISIONPERSONNEL

UNIT

TRANSLATIONUNIT

PROPOSALSDIVISION

DEPT. OFPROJECTS

DEP. OF

MANTAINANCE

DEP. OF CIVILPROJECTS

(CWP)

DEP. OF OIL PROJECTS

ENGINEERING

DEP.MECH.& ELEC.

(MEP)

The “MSk “ Since its inception, has played a prominent role in contributing to the

implementation of the strategy of economic diversification.

The strategy is represented in the effective management of the company’s

investment projects, the creation of partnerships between the public and private

sector, and the direct investment of the group. The success of “MSk” is demonstrated

in its management of the subsidiaries of the group; the “ msk’’, which is working

in the oil and gas sector also embodies a perfect example of partnership between

the public and private sectors. In addition, the portfolio of the direct investments of

MSK includes the development and expansion of the oil sector, which represents

one of the most prominent and largest integrated companies in the oil industry

in Iraq. The “MSk” future plans are centered on achieving further excellence and

prosperity and also seek to expand the current projects and target more of the new

strategic investments that enhance the economic capacity of the company and

contribute to boost the national economy. Perhaps what distinguishes the “MSK”

from the other oil companies in Iraq, is the multiplicity of the investment methods,

which ranged between direct investment, as is the case in the Gulf region, and

through the distinctive and successful partnership investments with the private

sector. Today as we are on the threshold of a new phase with our high spirit and

an ambitious vision, we promise that we will continue to work and redouble our

efforts to remain at the forefront of the working on the development of the private

sector and on the fertile source, which is inexhaustible, to create economic entities,

with value-added, to contribute to the creation of investment opportunities, the

rehabilitation of the national staff and employing them, and strengthen the nation’s

march towards sustainable development.

The speech of the General Manager..& CEO. EngineerQusay al-Saadi

MSK ORGANIZATION CHART

MSK Group

MSK GROUP

OIL SERVICE

Page 5: CV MSK

MSK Group9MSK Group 8

MSK Group is one of the larger Oil Service and Construction companies specialized in contracting

to the petroleum and petrochemical projects in Iraq. Our main activities include Engineering ,

Procurement and construction (Pipeline, Trunk line ,Flow line, water injection, water treatment

injection, piping, Tanks, civil work,Degassing station,Gas Compressor station ,GTU, wellhead,

HDD,Boring, Equipment Installation,Instrument, Electrical, Maintenance , commissioning Start –up

and Testing NDT)

We are abundant in financial capabilities and technical strength, and boast a large group of

technical talents and management professionals who are familiar with international practices,

advancedtechnologies and rich in experience.

We are furnished with state-of-the art technologies, superior engineering and construction equipment

and rich resources for Oil and Gas projects.

We have thedemonstrated capability to provide comprehensive project services from front-

end development to feasibility study, HSE assessment, geo-survey, engineering, procurement,

construction, manufacture, PMC, commissioning, start-up, operation and maintenance according to

international standards and practices under the plateau, desert and seashore conditions.

We consistently abiding by the operation philosophy of “Credibility, Quality, Harmony and Safety”

and keep on improving the Q&HSE management system at MSK Group.

Brief introduction

Vision & Mission

12

EnvironmentThe environment we live and work in is important

to us and we strive to do everything we can to

make sure it remains safe and sustainable.

The Management have formulated a HSE

statement and are working with the latest experts

in HSE to continually improve its HSE policy.

Public welfareSocial responsibility is paramount in our practices

and ensuring that the communities and people are

content is rewarding in itself.

These are the principles that support our mission:

Credibility, Quality, Harmony and Safety

VisionTo be the premier choice Oil Service and Construction

group in the region.

Mission To be our clients’ premier choice and most trustworthy

partner in all our business verticals through the

impassioned and unswerving engagement of our

people, by considering every single operation as

“mission critical” and successfully delivering the best

services available following quality-driven processes

in a safe and environmentally responsible manner.

To bring significant value to our home communities in

all our markets through our responsible culture,

being partners in our clients’ success, and protecting

our shared environment.

ValuesCredibility, Quality, Harmony and Safety

Page 6: CV MSK

MSK Group11MSK Group 10

Our Clients: Providing excellence in all areas of client service has been the cornerstone of

our business. We pride ourselves on listening to our clients, being responsive to their project

requirements, and exceeding their expectations. We "do it right" the first time.

Our Partners:MSK Group has an exceptional reputation for employing the best trades people in

the area and regionally from Turkey, India and Pakistan. Our sub-contractors are our

long-term business partners. We hold our sub-contractors to the same high standards of quality

and professionalism as we do our employees.

Our Projects: MSK Group provides exceptional performance in all aspects of facility and Oil

Service construction; planning, pre-construction services, Design/Build, medical, institutional,

and industrial new construction. We believe in building into the future, and recognize the

importance of environmental conscientiousness. We incorporate Green Construction practices

in all of our projects.

Our Core Values3

Page 7: CV MSK

MSK Group13MSK Group 12

Our Employees: Working at MSK Group is not just a job; it is our career; and

more importantly, it is our passion. Teamwork, mutual respect, and a safe and

healthy workplace have been an integral part of our culture for more than 10

years.

Our Community: Every Project is part of a community. We take our responsibility

of making sure our projects becomes part of the greater neighbourhood and

builds on that community spirit and sustainability.

Our Promise:As far as we are able, MSK Group aims to provideenvironmentally

responsible design and building practices, the construction management, skilled

trades, specialized expertise, integrity, professionalism, and services required

to accomplish your Projects We are confident that our dedication, experience,

and ability to deliver your project with maximum efficiency will exceed your

expectations.

We have successfully completed the feasibility study, engineering, construction,

PMC and EPC contracts of quite a number of long-distance oil/gas pipelines, large-

scale oil/gas storage terminals and tank farms, power plants, roads, bridges, and

other municipal utilities successfully in Iraq.

These proud achievements have helped us winning high appraisement and trusts

from the clients, local governments and the pubic in general.

Last year we won a total project value of more than 200 Million USD and over the

recent 10 years, we have constructedmore than 48 Multi-million dollar projects. We

look forward to fulfilling your Oil Service and Construction requirements in Iraq.

4

Page 8: CV MSK

MSK Group 14 MSK Group15

A- Department of Projects:

1- Division of Oil projects…

2- Division of civil works Projects (CWP).

3- Division of Electrical & Mechanical Projects (MEP).

4- Division of Maintenance.

5- and Division of Engineering designs

It is a department run by a group of Professional qualified engineers and consultants and in all disciplines that

supervise and manage projects and carry out the completion of engineering designs and maintenance.

B- Department of Planning & Follow-up

1- Division of development & Research

2- Division of follow-up of projects.

It is a department run by a group of academics engineers that carry out the planning for projects and also the

development and follow-up of projects and supervise the training courses.

C- Department of Safety & Environment:

It is a technical department run by a group of highly trained staff that has international certificated in the field

of safety and preserving the environment.

D- Department of Quality Control & Quality Assurance (QC/QA):

It is a department run by a group of professional engineers that have an experience and certificates of

experience in the field of quality control & quality assurance (QC/QA).

E- Department of cost and feasibility study:

It is a department based on the study of the Iraqi markets and feasibility study of projects.

F- Department of Logistics:

A department supervises the supplying of all projects' supplies from inside and outside Iraq.

G- Department Mechanisms and PRODUCTIVE Factories:

1- Division of Mechanisms.

2- In addition, Division of Factories.

A department includes the supervision on the company's mechanisms and its

factories.

Administrative Structure (Authority):

A- Department of Administration:

1- Division of Human Resources (HR).

2- Division of Administrative affairs:-

2-A Unit of incoming and outgoing,

2-B Unit of personnel.

2-C Unit of Translation.

This department carries out the follow-up on all staff and human resources and the

supply of staff to projects.

3- Commercial Department:

3-A Division of Purchase (Procurement).

3-B Division of proposals

B- Department of Finance:

1- Division of Accounts.

2- Division of Final Accounts.

3- Division of Control and Division of Audit

Company Department

Technical Structure (authority):

This division supervises all financial

transactions of the company

C- Legal Department:

1- Division of Contracts.

2- Division of proceedings (Claims,

lawsuits)

This division supervises the contracts

and legal claims.

D- Department of Public relations (PR)

and Media.

1- Division of Media

This department supervises the Public

relations (PR) of the company and

supervising the issuance of publications

and newspapers by the company

4

Page 9: CV MSK

MSK Group17MSK Group 16

Quality policy statement: MSK Group is committed to supplying

construction services of consistent quality that conform fully with company

and statutory requirements and in meeting our client’s documented and

implied expectations in terms of technical, budget and time compliance.

We are dedicated to the continual review, development and improvement

of all aspects of our business, in particular:

• The development and improvement of our construction services in line

with client’s needs and expectations.

• The development of an efficient and effective Quality System and

generally accepted best practices in the management of Construction

Projects, a system which not only ensures that the construction quality

is consistent, but also helps to ensure minimal wastage in all our

construction phases.

• The evaluation, training and development of our employees in order to

meet the company’s objectives.

• The ongoing development of the corporate culture that incorporates

constant problem solving and continuous improvement, encouraging all

employees to take total pride in, and responsibility for, their work and the

development of better working practices.

• Establishing and reviewing quality objectives for all levels that are

realistic, achievable and measurable taking into cognizance preventive

action for outside influences that could prevent the achievement of the

objectives.

Management will communicate this policy to all employees and staff in

such a way that it is properly understood and followed.

QA\QC5

Page 10: CV MSK

MSK Group19MSK Group 18

The long-term business success of MSK Group depends on our ability

to continually improve the quality of our services and products while

protecting people and the environment. Emphasis must be placed on

ensuring human health, operational safety, environmental protection,

quality enhancement, and community goodwill. This commitment

is in our best interests and the best interest of our customers, our

employees and contractors, our stockholders, and the communities in

which we live and work.

MSK Group requires the active commitment to, and accountability

for, QHSE from all employees and contractors. Line management

has a leadership role in the communication and implementation of,

and ensuring compliance with, QHSE policies and standards. We are

committed to

• Protect, and strive for improvement of, the health, safety and security

of our people at all times;

• Eliminate Quality non-conformances and HSE accidents;

• Meet specified customer requirements and ensure continuous

customer satisfaction;

• Set Quality & HSE performance objectives, measure results, assess

and continually improve processes, services and product quality,

through the use of an effective management system;

• Plan for, respond to and recover from any emergency, crisis and

business disruption;

• Minimize our impact on the environment through

pollution prevention, reduction of natural resource

consumption and emissions, and the reduction and

recycling of waste;

• Apply our technical skills to all HSE aspects in the

design and engineering of our services and products;

• Communicate openly with stakeholders and ensure

an understanding of our QHSE policies, standards,

programs and performance. Reward outstanding QHSE

performance;

• Improve our performance on issues relevant to

our stakeholders that are of global concern and on

which we can have an impact, and share with them

our knowledge of successful QHSE programs and

initiatives.

This Policy shall be regularly reviewed to ensure

ongoing suitability. The commitments listed are in

addition to our basic obligation to comply withall

applicable laws and regulations where we operate.

This is critical to our business success because it

allows us to systematically minimize all losses and

adds value for all our stakeholders.

HSE Policy Statement:6

Page 11: CV MSK

MSK Group 20 MSK Group21

Risk Assessment Policy7The idea of not increasing lifetime risk by more than one in a million has become commonplace in public health discourse and policy. It is a heuristic measure. It provides a numerical basis for establishing a negligible increase in risk.Environmental decision-making allows some discretion for deeming individual risks potentially "acceptable" if less than one in ten thousand chance of increased lifetime risk. Low risk criteria such as these provide some protection for a case where individuals may be exposed to multiple chemicals e.g. pollutants, food additives or other chemicals.In practice, a true zero-risk is possible only with the suppression of the risk-causing activity.

Stringent requirements of 1 in a million may not be technologically feasible or may be so prohibitively expensive as to render the risk-causing activity unsustainable, resulting in the optimal degree of intervention being a balance between risks vs. benefit. For example, emissions from hospital incinerators result in a certain number of deaths per year. However, this risk must be balanced against the alternatives. There are public health risks, as well as economic costs, associated with all options. The risk associated with no incineration is potential spread of infectious diseases, or even no hospitals. Further investigation identifies options such as separating noninfectious from infectious wastes, or air pollution controls on a medical incinerator.Intelligent thought about a reasonably full set of options is essential. Thus, it is not unusual for there to be an iterative process between analyses, consideration of options, and follow up analysis.

Page 12: CV MSK

MSK Group 22 MSK Group23

SCOPE OF BUSINESS8

Construction

Procurement

Engineering

Services

Page 13: CV MSK

MSK Group 24 MSK Group25

Our design group has the technical and practical experience for designing and engineering

by a professional and high experience design engineers group including all speciality such

as mechanical , electrical , instruments , civil , HSE , chemical and processdesign .

All design works shall be according to the dependable standards from ( API , ANSI , ASME ,

and HSE requirements ) .

Our design experience in oil and gas design include but not limited the followings :

-Pipe line design ( flow line , trunk line , water pipe line , compressed gas pipe line )

-Crude oil manifolds ( field manifold , production manifold , test manifold )

-Industrial and drinking water systems .

-Crude oil floating roof and fixed roof tanks ( flow wash tank , storage tank , fire fighting

tanks ) according to standard API 620 and API 650 .

-Fire fighting system according to NFTA standards .

-Pig launcher and receiver design .

-River , railway , rods , cable and pipes crossings .

-Over all degassing station design

-Pumping system design

-Cathode protection design

-Electrical design ( power , lighting , load calculation ….etc. )

-Process design and calculation according to hisses and gipsa … etc. )

-Civil design for roads , buildings , bridge , earth work ….etc. )

-Instrumentation with pneumatic system ,scada , tv camera , electronic system , …etc Our

design works shall be done

by the followings programs :

- 2 D , 3 D Auto cad, Mech.

Cad

- Auto plant

- Penalty

- Cesar II

- E- tank

- Sketch up

- Primavera

- Microsoft project

management

- Microsoft office

- Etc.

Engineering9

Page 14: CV MSK

MSK Group 26 MSK Group27

It is MSK Groups’ ambition to work on lasting relationships with a selected number of construction

partners, in which entrepreneurship and specific knowledge in the field of product, market and process

are leading. The making and implementing of the right choices in this are the success factors of the

procurement policy.

Within decentralisedorganisational structure, the procurement column is organisedin accordance

with the coordination principle. No choice has been made for either centralised procurement or

decentralised procurement. The level at which to pursue strategic procurement processes is

determined for each sub-segment. The MSK Procurement model can therefore be best qualified as a

'coordinated' approach.

The benefits of scales of economy are derived by pursuing procurement activities in such a manner

that, on the one hand, local management retains the flexibility and control of its processes and, on

the other hand, the entire MSK Group organization enjoys the quantitative and qualitative economies

of scale.

Due to the nature of the sector in which MSK Group is active, primary processes focus on obtaining

and completing projects in as efficient and effective a manner as possible. Accordingly, procurement

activities should share this focus. As many projects pursued within and outside a specific region

or by an operating company, respectively, have shared procurement segments and processes,

combining them can generate substantial and structural procurement economies of scale. This

applies to supply/equipment supplies, subcontractors, suppliers involved in the supporting facility

management process and intra-organisational sup

Procurement Policy Statement10

Page 15: CV MSK

MSK Group29MSK Group 28

Construction11

Page 16: CV MSK

MSK Group31MSK Group 30

Pipe line-All works shall conform to the scope of work, SOR .specification approved for construction drawings,

data sheets, technical standards, codes and technical specifications

- Time schedule and organization chart for our work.

- Site Survey works and marking.

- Right of way. Clearing and grading

- Piping transportation and stringing.

- Trenching (Excavation of pipeline ditch according to the design requirements and backfilling with clean

soil).

- Main roads, secondary roads, and earth roads, railways, small river crossings according to the cross

section mentioned in the drawings (API-1102)

- Reinforced concrete of pipelines weighting and slabs for Mechanical protection.

- All civil works relevant to cathodic protection.

- Civil works relevant to terminals, tie-ins, including scraper traps

- Preparing the welding procedures (WPS) and procedure qualification records (PQR).

- Welders qualification.

- Pipeline sections Welding activities (750- 1200) meter / section

- NDT

- Pipeline lowering & backfilling.

- Tie-in welding

- Cathodic protection system installation (option)

- Pipeline lowering using side booms and roll cradles.

- Tie –in welding

- Joint coating and repairs of coating or any damage caused to Line pipes during installation

- Pig Launching and receiving installation.

- Valve station installation (piping, valves, and supports).

- Well head connections.

- Hydrostatic test preparation (test headers manufacturing, cleaning, filling, dewatering & water

supplying)

- Pre-commissioning and provide assistance during Commissioning as part of the Commissioning Team

- As-Built drawing.

Page 17: CV MSK

MSK Group33MSK Group 32

Pipe Line

Page 18: CV MSK

MSK Group35MSK Group 34

Pipe Line

Page 19: CV MSK

MSK Group37MSK Group 36

Pipe Line

Page 20: CV MSK

MSK Group 38 MSK Group39

Trunk line

Page 21: CV MSK

MSK Group 40 MSK Group41

Flow line

Page 22: CV MSK

MSK Group43MSK Group 42

Water Injection And Water Treatment Station

Page 23: CV MSK

MSK Group 44 MSK Group45

PIPINGCarbon SteelStainless SteelAlloy SteelLow-Temperature Alloy SteelGRE pipe

Page 24: CV MSK

MSK Group 46 MSK Group47

Page 25: CV MSK

MSK Group 48 MSK Group49

Page 26: CV MSK

MSK Group 50 MSK Group51

TanksPresentation for erection badra tanks

1- Done designs for all the tanks and according to stander ( API650)

2- Manufacture of materials according to drawings and transported to the work site

3- Completion of civil works and reservoir Included foundation& cathode protection

4-Mechanical works included

a -Install annular plats& Bottom plats ,Equipment's used (Crane, forklift, welding machine(manual

&auto)) Examination( Visual test ,XRAY, Vacuum test)

b – Install first course &make fit up& welding for V joint, Equipment's used (Crane, forklift, welding

machine ,tools) Examination ( Visual test ,XRAY ,plumpness, Peking ,reduce, penetration test)

c- Manufacture Temporary support for floating roof in the work shop of the company(MSK)

and Install from inside tank. Examination(level by Surveyor)

d- – Install 2nd course &make fit up&welding for V joint, & H joint, Equipment’s used (Crane, forklift,

welding machine(manual &auto) Examination ( Visual test ,XRAY ,plumpness, Peking, banding ,

penetration test)

e- Install bottom deck &make fit up &welding for floating roof. Equipment’s used (Crane, welding

machine(manual &auto ) ) Examination ( Visual test , Vacuum test ,).

f—Install structure roof &make fit up &welding. Equipment’s used (Crane, welding machine, chin look)

Examination ( Visual test ,leak test ,)

g- Install top deck &make fit up &welding for floating roof. Equipment’s used (Crane, welding

machine(manual &auto ) ) Examination ( Visual test , pneumatic test ,).

h- Install (3th ,4th.5th.6th .7th .8th course )and make fit up& welding for V joint, & H joint, Equipment’s used

(Crane, forklift, welding machine(manual &auto) Examination ( Visual test ,XRAY ,plumpness, Peking,

banding , penetration test)

i—Install shell Nozzle& roof Nozzle &make fit up &welding. ) Examination ( Visual test , pneumatic test,)

k-Install accessories (stairway ,Rolling ladder ,Guide pool, walkway ,Top angle .Roof drain system)

. Equipment’s used (Crane, welding machine ,lift Man )

l- Hydrostatic test for the tank.

Page 27: CV MSK

MSK Group 52 MSK Group53

Page 28: CV MSK

MSK Group 54 MSK Group55

Tanks

Page 29: CV MSK

MSK Group57MSK Group 56

Page 30: CV MSK

MSK Group 58 MSK Group59

Civil Work

Pipe Rack Foundation- Tank Foundation - Pipe Support Foundation - Steel Structure Foundation- Equipment Foundation- Light pole Foundation - Under Ground - Steel Structure Construction - Manhole's , Valve Pit , ETC …Pipe Support Foundation - Steel Structure Foundation- Light pole Foundation - Under Ground - Manhole's , Valve Pit , ETC

CIVIL ENGINERING CATEGOREIS:

A STRUCTURAL ENGINEERING1-CONCRETE STRUCTURES2-STEEL STRUCTURES3-COMPOSIT STRUCTURES4 - HYDRAULIC STRUCTURES

B- GEOTECHNICAL ENGINEERING1 -SOIL ENGINEERING2 -FOUNDATION ENGINEERIN ( RAFT , STRIP , DRIVEN PILES , POUR PILES )

C HIGHWAY AND BRIDGES ENGINEERING1- HIGHWAY ENGINEERING2- BRIDGES ENGINEERING3- TRAFFIC ENGINEERING

D- IRRIGATION ENGINEERINGE- SURVEY ENGINEERINGF- PROJECT MANGEMENT ENGINEERINGG- SANITARY AND ENVIRNOMENT ENGINEERING

Page 31: CV MSK

MSK Group 60 MSK Group61

raft foundation

driven piles installation

Civil Work

Page 32: CV MSK

MSK Group 62 MSK Group63

Page 33: CV MSK

MSK Group65MSK Group 64

Page 34: CV MSK

MSK Group67

Oil and gas processing

MSK-GROUP have the experience to erect Various types of oil and

gas stations as follows:

• Degassing stationWe have experience in the erection and installation of the stations

that separates crude oil and associated gas, where we have

the potential to erect large separators (Dry oil banks and wet oil

banks installation, Salt processing units, Manifolds fabrication and

installation) , rotating machines , pipe fabrication works, electrical

works and instrumentation works and also we can do the pre-

commissioning, commissioning and startup .

• Gas compressor station We have the capabilities and expertise accumulated sufficient for

the execution of the construction of gas compressor stations (after

the completion of the degassing and drying process) and includes the

erection of Gas compressor , Gas blower, Gas air cooler assemblage

and installation, Piping fabrication and erection , Pumps installation

and flare Sticks unit installation

MSK Group 66

Page 35: CV MSK

MSK Group 68 MSK Group69

• Gas treatment unit (GTU)Also we carry out the construction of dehydration gas stations, where we have the

necessary manpower’s and equipment to implement all the electrical , mechanical

and instrumentation works(PLC ,SCADA systems ). Where the works included the

following systems

• TEG- Gas contactor tower installation

• TEG reboiler installation

• TEG air cooler installation

• Vessels installation

• Piping fabrication and installation

• Pumps installation

• Flare Sticks unit installation

• Also we have the expertise for construction the following stations

Where we have the human resources and equipment necessary for the

implementation of the various stations that are used in the field of industries of oil

, gas and energy, as follows

• Waste Water Treatment unit

• Pigging Station

• Pumping Station

• Water injection Station

• Slug Catcher

• Water Treatment Unit

Page 36: CV MSK

Well HeadThe scope of MSK services in this part consists of provision of tools, equipment and personnel of Wellhead Services

to provide the operations and services of the wellhead equipment installation and maintenance as per Company

specifications and contract requirements. MSK could be capable of handling Operation at least on 3 Rigs at the

same time.

Such applications of these services are rely on one or more of the following features:

• Repair and services Gate valves, X-mass tree Valves. Included but not limited to Changing Gate, Seat,

o-ring, gaskets, packing, lubricant and so on.

• Check & Inspect Spool, fully connect Gate valves on spool side outlets.

• Fully Install Spools and tree on position and fully tighten nut & bolt.

• Set & remove the VR-Plug in/from spool. (Zero pressure & under pressure operation.)

• Supervise Measuring, Cut, Beveling & smoothing the Casing Neck before welding casing head housing

• Pressure Test Welding area on Casing Head Housing

• Check and preparing Casing slips and seal assembly

• Set Casing slips & seal assembly on position.

• Supervise Measuring, Cut, Beveling & smoothing the Casing Neck before installing Casing & Tubing

Spools

• Supervise Measuring, Beveling & welding casing for Extend Old Casing neck

• Verify that the pack-off seals are the correct size for the equipment and casing being run. Record the stock

number and serial numbers

• If the seal assembly is installed in the wellhead equipment. Remove it and inspect the seal holding pocket.

Verify that the seals are the correct size for the casing being run and reinstall them.

• Injecting and testing of isolation seals energized with sealant for all Casing & Tubing Spools and X-Mass

tree Bonnets.

• Recovery of sealant for m-install of wellhead equipment.

• Check and preparing to Work Tubing Hanger

• Inspect the seal pocket of tubing hanger bonnet to be clean and free of gouges or scars. Clean the test port

and control line ports to be free of debris.

• Drift the X-Mass tree with the BPV.

• Rabbit the tubing hanger and any sub to be used.

• Set a BPV in the hanger to check the socket.

• Fully retracted the lockdown screws and guide screws on the tubing head spool

• Run in all the lockdown screws making sure they go in 3 to 4 turns before contacting the hanger

• Set the BPV through the rotary table.

• After BOP Nipple-down, Clean off the hanger mandrel, set seal ring or ring gasket in position,

disconnect the excess control line from the top of the nipple or remove the pipe plug whichever was used.

Fill the tubing spool bowl with test fluid.

• Thoroughly clean the tubing bonnet and pick up the tree in as straight a position as possible.

Carefully land the tree onto the tubing hanger

• Make up the connection fully

• Remove the BPV

• Provision of reports:

• Detailed Wellhead and X-Mass tree Equipment Technical report

• Detailed chronology of operations,

• Analysis of technical difficulties encountered,

• Inventory list of products and-consumables consumed and remaining on the worksite,

• post analysis of any equipment failure or services non-conformance,

MSK Group71MSK Group 70

Page 37: CV MSK

MSK Group73MSK Group 72

EQUIPMENT INSTALLATION

Page 38: CV MSK

MSK Group75

MSK Groups known as the first Iraqi Private Company that

established HDD Techniques in Iran. We have completed lot

of River Crossings and pull back 12 inch Up to 40 inch Pipes

by HDD Method Successfully

HDD & BORING

MSK Group 74

Our company focus to use

only certify equipments &

lifting accessories during HDD

& Boring work according to

international standards and

client requirement.

All equipments with

inspection certification from

international third party

companies.

boring machine with valid

inspection certification.

sideboom with valid inspection

certification.

excavator with valid inspection

certification.

lifting accessories with valid

inspection certification.

webbing sling

Chackles.

Steel wire rope.

Boring machine

from 6” to 16” one set.

Boring machine

from 16” to 24” one set

Boring machine

from 24” to 36” one set

HDD machine

from 6” to 24” one set.

HDD machine

from 24” to 36” one set

HDD machine

from 36” to 56” one set

Page 39: CV MSK

MSK Group77MSK Group 76

instruminetControl system works,

Design ,maintenance, repair .

As we know the control system have two branch's :

The first one is the electronic part ,which that deals with electronic equipment's such as PLC ,CONTROLER ,

INDECATORS ,MONETORING SYSTEMS ,…

And most of these equipment's fitted inside control rooms buildings

The second one is the mechanical part , such as controlling equipment's "valves, mechanical level controller

,pressure regulators , transmitters,…

Our jobs :

DESIGN :

Design controlling system for all

process by using high technical

methods ,and in simples why

,also with high performance and

reliability.

Maintenance:

Of our priorities in maintenance

that do all work under safety

regulations ,precision at work

,respect the time.

MANAGEMENT PROJECTS:

Management and run all

projects with specialist team

"technician & engineering"

All team work under high

efficiency and experience

Adherence to safety standards.

Page 40: CV MSK

MSK Group 78 MSK Group79

Electrical WorkELECTRICITY IS ONE OF OUR SPECIALITIESElectricity:Our company is well known in the field of Electricity for constructing, testing and commissioning of generation, transmission and distribution of sub-station and power networks.The staff of expert engineers and well trained technicians is capable of conducting excellent projects management and accurate performance of maintenance schedulesELECTRICITY:TRANSMISSION: Construction, Testing and commissioning of Power Transmission Networks (400-132 Kv) Substations and Power Lines.DISTRIBUTION: Construction, Testing and commissioning of Distribution Networks including 33/11 Kv Sub-Stations with 33, 11Kv Power Lines.LV PANNELS: Construction of LV Power and Control Panels.

Page 41: CV MSK

MSK Group 80 MSK Group81

Cathodic Protection

A fully comprehensive service is offered in the field of Cathodic Protection (CP).The Company is committed to

designefficient, cost effective cathodic protection systems

MSK- provides the following services:

• System analysis and design

• Terrain (Soil) Conductivity Surveys for Well Casing Cathodic Protection Design

• Impressed current system design, installation and commissioning

• Sacrificial anode system design and installation

• Survey, design & commissioning services for conventional pipeline systems and

potential surveys.

• Cathodic protection in hazardous environments.

• Cathodic protection of reinforced concrete structures.

• Evaluation of existing Cathodic Protection System and development of comprehensive CP retrofit.

• Provision of specialised pipeline survey techniques and interpretation of results.

• Turnkey cathodic protection systems.

• CP Design of process plant, storage tanks and large diameter pipelines.

• Monitoring and maintenance services on new or existing pipelines.

Cathodic Protection Materials:

• Material supply includes: CP Rectifiers (Oil Cooled, Air Cooled-Single

Phase Three Phase) Junction Boxes (Aluminum, Stainless Steel & Fiber

Glass),Test Stations, Loresco Back Fill, Impressed Current and Sacrificial

Anodes, CP Cable and Remote Monitoring System

SCADA SYSTEMS SCADA application in petrochemical industries

• Tank Management systems

• Blending Control

• Industrial water and waste water treatment

SCADA Water SolutionsSystem Management and Optimization

• System-wide integration (multiple plants)

• Enterprise historian and report generator

• System-wide asset manage¬ment and reliability programs

• Interface to LIMS, CMMS, GIS, CIS/FIS, plant security systems, and

design database

Plant Controls and Monitoring Systems

• Distributed control system (HMIs, controllers, network, etc.)

• Plant historian and report generator

• Electronic documentation

• Integration with other systems and

intranet/Internet

• Fieldbus solutions (HART, Foundation

fieldbus, PROFI¬BUS, DeviceNet, etc.)

• Simulation

• ControlWave RTUs and PLCs

Simulation

• First-principle simulation

• Algorithmic simulation

• Tie-back simulation

Equipment Condition Monitoring

• Online/portable vibration monitoring

• Motor diagnostics

• Infrared thermography

• Laser alignment/balancing

• Oil analysis

Intelligent Device Management

• Health monitoring

• Calibration

• Configuration

• Audit trails

Intelligent Field Devices

• Pressure, temperature, flow, and level

transmitters

• Liquid/gas analyzers

• Valves and valve actuators

Electrical and Auxiliaries

• UPS, Power conditioning, and

distribution

• Motors

• Couplings

• Gear reduction drives

• Backup power generators

Page 42: CV MSK

MSK Group83MSK Group 82

Maintenance

Page 43: CV MSK

MSK Group 84 MSK Group85

Testing NDT

Testing NDTVisual and Optical Testing (VT)

Penetrant Testing (PT

Magnetic Particle Testing (MT.

Electromagnetic Testing (ET)

or Eddy Current Testing

Radiography (RT

Ultrasonic Testing (UT

Acoustic Emission Testing (AE

Leak Testing (LT

Hydro test

Conducted according ASME, API,

ASTM and ANSI

Page 44: CV MSK

MSK Group87MSK Group 86

WORKING AS JOINT VENTURE12• Cementing and acid treatments job design,

• Cement slurry design, developing and testing,

• Cementing jobs,

• Acid treatments jobs,

• Cementing and acid treatments operation parameters monitoring and recording

• Cement plugs,

• All types of pumping works.

In the framework of our Logging-Service, we perform the classical Formation-Logging Service for the

continuous geological maintenance, documentation and storage of the drilled geological formations.

The recording of the drilled geological formations is essentially based on cuttings and on recovered cores.

A drilling fluid gas monitoring service and a drilling progress measurement device (ROP) are deployed if

required. If a further on-site processing is required, our Drilling-Monitoring-System with extensive software

is available.

Formation-Logging Service

Depth corrected or lagged sample recovery, sample preparation and processing, the litho logical analysis

and the stratigraphic field definition of the samples are the basis of the documentation of the results.

The samples are prepared, labeled, either unwashed (in plastic sample bags) or processed (dry samples in

glass sample tubes or paper envelopes) and stored.

Further possible tests:

• for shows of oil by the use of UV light

• automated electronically analysis of the calcite/dolomite ratio (see GeoCalcit

• Electronically determination of the cutting/shale density

• potassium monitor

• Core handling: description, photographic documentation (reflected and transmitted light e.g. salt cores),

core sample preparation (e.g. waxing), logistics

• Continuous graphical documentation in the form of a mud-log (SamplerLog/LithoLog)

• Creation and transmission of reports by E-Mail or other means to the client and the clients’ offices.

• Immediate reporting of geological and drilling technical irregularities and their documentation.

• Separation, preparation and storage of sample material for further laboratory analysis according to the

instructions of the client.

• Competent core retrieval, cleaning and oriented storage in core boxes including complete labeling and

description.

• Photographic documentation of the core runs in reflected and transmitted light: classic or digital.

Development, reproduction and storage according to the instructions of the client.

Cementing Services

Mud logging

Page 45: CV MSK

MSK Group89MSK Group 88

Line Item N. Equipment Description Qty.1 Tower Crane 2

2 Mobile Crane 25 Ton 14

3 Mobile Crane 50 Ton 8

4 Mobile Crane 100 Ton 2

5 Crawler Crane100 Ton 2

6 Diesel Generator 50 KVA 60

7 Electric Welding Set 300

8 Diesel Welding Set 140

9 Fork Lift Truck 20

10 Excavator 50

11 Dump truck 30

12 Backhoe/ Loader 14

13 Sheepfoot Roller 10

14 Vibrating Roller 12

15 Roller 16

16 Plate Compactor 14

17 Air Compressor 20

18 Grader 16

19 Clamp Bending Machine 6

20 Automatic Submerged Arc Welding Machine 20

21 Semi Automatic Gas Shielded Welding Machine 40

22 Manual Welding Machine 300

23 Asphalt Plant Unit 4

24 Concrete Batching Unit 10

25 Spreader 20

26 Boom Truck 30

27 Water Pump 40

28 Bus 20

29 Manhaul Truck 6

30 Jack Hammer 8

31 Spray Painting Machine 10

32 Core Cutting Machine 8

33 Grit Blasting Equipment incl. compressor 20

34 Concrete Vibrator 8

35 Pick-Up Truck - 1/2 Ton 4x 2 20

36 Pick-Up Truck - 3/4 Ton 4x 4 40

37 Dump Truck - 15 C.M. 8

38 Dump Truck - 20 C.M. 10

39 Tractor Unit - 4 x 2 20

40 Water - 3800 Liters with Pump (1,000 GAL) 8

41 Water - 22700 Liters with Pump (6,000 GAL) 8

42 Vacuum - 22700 Liters (6,000 GAL) 6

43 Flatbed - 50 Tons with Tractor 8

44 Lowboy - 80 Tons with Tractor 6

45 Lowboy - 100 Tons with Tractor 4

46 Dolly, Pipe 6

47 Bobcat 14

48 Cat D8 or Equivalent 8

49 Cat D9 or Equivalent 6

50 Cat with Rock Drill 8

51 Trench Roller - Self Propelled - 2 Tons 2

52 Vibratory Roller - 10 Tons 6

53 Vibratory Roller - 20 Tons 4

54 Sheepsfoot Roller 2 x 60” 4

55 Barber-Greene (or equal) Asphalt Layer 10 ft wide 2

56 Road Brush - Self Propelled 6

57 Line Marker - Self Propelled 2

58 Asphalt Cutter 6

59 Steel-Wheeled Roller 8

60 Road Grader 8

61 Flat Bed Trailer 25 ton with Prime Mover 20

62 Low Bed Trailer 50 ton with Prime Mover 10

63 Flat Bed Truck 5 ton 20

64 Flat Bed Truck 10 ton 18

65 Truck 5 ton with Hiab Crane 20

66 Truck 15 ton with Hiab Crane 6

67 Overhead Line Bucket Truck 8

68 10 Ton Tipper Truck 40

69 25 Ton Tipper Truck 20

70 Hydrotest Water Tank 6

71 Feeding Pump 300m³/hr 5 barg 8

72 Filling Pump 210÷300m³/hr 40÷45 barg 8

73 Filling Pump 100÷200m³/hr 40÷45 barg 8

OUR EQUIPMENT13

Page 46: CV MSK

MSK Group91MSK Group 90

74 H. P. Pump 200 l/min 300 barg 8

75 H. P. Pump 100 l/min 300 barg 8

76 H. P. Pump 30 l/min 300 barg 8

77 H.P. Test Headers 6

78 Cleaning Filter Set (400÷600 m³/hr) 4

79 Hydrotest Equipment Set 8

80 140 cfm Compressor 20

81 250 cfm Compressor 20

82 350 cfm Compressor 16

83 750 cfm Compressor 8

84 1200 cfm Compressor 4

85 Air Dryer Equipment 8

86 Vacuum Drying Equipment 8

87 Induction Heating Seat 30

88 Induction Coils 14

89 Propane gas heating set 8

90 Wheel Tractor 4 x 4 40

91 Tow Tractor Cat D6 or equivalent 12

92 Tow Tractor Cat D7 or equivalent 8

93 Motor Welding Machine 400 amp 140

94 Electrical Welding Machine 400 amp 200

95 Pay welder 1 holder 20

96 Pay welder 2 holder x Automatic Weld/System 10

97 Pneumatic Internal Clamp 6”÷16” 6

98 Pneumatic Internal Clamp 18”÷28” 6

99 Pneumatic Internal Clamp 30”÷40” 6

100 Cut & Bevelling machine 8

101 Auger Boring/Pushing machine or equivalent 4

102 External Line Up Clamp 20

103 Pipe Bending Machine 38”÷48” 2

104 Pipe Bending Machine 16”÷30” 6

105 Pipe Bending Machine 6”÷20” 4

106 Pipe Facing Machine 32”÷48” 2

107 magnetic cutting machine 4

108 mobil AC ARC weding machine 20

109 inverter welding machine 6

110 plasma cutting machine 8

111 semi Automatic cutting machine 6

112 magnetic drilling machine 2

113 Radial drilling machine 2

114 Bench drilling machine 3

115 Beveling machine 4

116 Hydratest pump 6

117 handy hydraulic test pump 8

118 pipeline filling pump 4

119 Protable Air compressor 5

120 Air paint spraying machine 2

121 HP Air paint spraying machine 4

122 Internal Clamp 8

123 Fuel Tanker 3

124 clamp ammeter 5

125 pressure gauge calibrator 19

126 Concrete Plant 12

127 Truck mixer 16

128 Shovel 6

129 Compactor 7

130 Pickup 1 & ½ Tons 40

131 Grader machine 8

132 Cutting machine 6

133 Total station machine 18

134 Casting machines 4

135 Concrete pump machines ( 24 – 40 M ) 4

136 Bend & cut steel bar machines 20

137 Generator 100 KVA 18

138 Sand, Gravel and Sub-base Plant 2

139 Asphalt Plant 2

140 Bulldozer D8 4

141 Wheel Loader ( shovel ) 8

Page 47: CV MSK

MSK Group93MSK Group 92

OUR Projects 2012-2013

No. Project name Work location CLEINTValidity& CONTRACT

VALUE

1

Pipe line 48 inch 75 Km Baghdad Ministryof electricityContinue

2

Pipe line 32 inch 45 km BaghdadMinistry of electricity

COMPLETED

3

Pipe line 18 inch 100 km Basra SOC ON GOING

4

Tanks Basra south Rumaila CPECC-BP COMPLETED

5

Tanks degassing station 5 Basra north Rumaila CPECC-BP COMPLETED

6

Work Shop Fabrication Basra WQ1 Exxon mobile Continue

7

Camps Basra south Rumaila CPECC and SOC COMPLETED

8

Supply Equipment>s& Maintains Badra OIL Filed GAZPROM Continue

9

Camps Nasiriya- Thiqare CPP COMPLETED

10

FLOW LINE &Trunk Line MisanHalfaya CPECC COMPLETED

11

CPF2 Misanhalfaya CPECC Continue (Start work )

12

CPF ll Al-Ahdab Oil Filed CPECC Continue

13

Water injection 2 Al-Ahdab Oil Filed CPECC COMPLETED

14

Trunk lines Al-Ahdab Oil Filed CPECC COMPLETED

15

FLOW LINE Al-Ahdab Oil Filed CPECC COMPLETED

16

Gas station Al-Ahdab Oil FiledCPECC

COMPLETED

17

Civil work tanks foundation Al-Ahdab Oil Filed CPECC Continue

Page 48: CV MSK

MSK Group 94 MSK Group95

18

Water line 20 inch GRE35 km Al-Ahdab Oil Filed CPECC COMPLETED

19

DiyalahRiver crossing pipe BaghdadMinistry of electricity

Continue

20

Tank for Ahdab filed Al-Ahdab Oil Filed CPECC COMPLETED

21

Road 18 km O.G.M Al-Ahdab Oil Filed CNBC COMPLETED

22

PIPE Line 32 inch 53 KM Bazirgan oil filed CNOOC ON Going

23

PIPE Line 32 inch 9 KM Halfaya Oil Filed CPECC ON Going

24

PIPE Line 28 inch 9 KM Halfaya oil Filed CPECC ON Going

25

SERVISE ROADBADRA OIL Filed To Garrf Oil Filed

GAZPORM-CPP Continue

26

CIVIL WORK and R.W Garrf Oil Filed TO PS2 PETRONAS-CPP Completed

27

CONSTRUCTION 9 Tanks Badra Oil Filed Petrofac Completed

28

Piping Badra Oil Filed Petrofac Completed

29

Civil work CPF Badra Oil Filed Petrofac Completed

30

CPF 2 Al-Ahdab Oil Filed CPECC ON GOING

31

Construction 3 Tanks BADRA OIL Filed SAMSUNG ON GOING

32Piping ,Steel Structure, Equipment installation

BADRA OIL Filed SAMSUNG ON GOING

Page 49: CV MSK

MSK Group 96

Page 50: CV MSK

MSK Group 98

MSK Group

MSK GROUP

OIL SERVICE

MSK Group

Iraq Office

HQ:Baghdad -Al-Kradah -Al-Jadreah

Al-Basrah-Al-Jziaer

Wassit-Al-Haydreah

Irbeal-St.100

UAE -Office

Ajmain - Free Zone

Email:[email protected]

[email protected]

q u s a y @ m s k - g r o u p . o r g

Tel: 009647801977860

009647801977859

website:

www.msk-group.org

www.msk-iq.com


Recommended