2/71
Work Profile in C & WWork Profile in C & W
Depots of IndianDepots of IndianRailwaysRailways
Presented by
M.T.Sujith Kumar SE / C&W / BBQ
8/4/2019 C&W_open_line
3/71
ENGINEERS & STAFF OFENGINEERS & STAFF OFOPEN LINEOPEN LINE
SENIOR SECTION ENGIN EER
JUNIOR ENGINEER
ARTIZANS (THREE GRADES)
8/4/2019 C&W_open_line
4/71
Work AreasWork AreasAs In-charge of Depot, IOH/ROH Sheds, Sick
line, M & P, Stores, Break Down, MIS andRake Maintenance activities in C & W Depots.As C&W, M&P and Safety Inspectors inDivisional and Zonal Headquarters.As Instructors & Lecturers at STCs and BTCs.As C&W Controllers in Divisional and Zonalcontrol offices.
8/4/2019 C&W_open_line
5/71
DUTIES ,RESPONSIBILITIES& REQUIREMENTS
OFOPEN LINEENGINEERS
8/4/2019 C&W_open_line
6/71
ADMINISTRATIVE DUTIESADMINISTRATIVE DUTIES
Depot InDepot In --chargechargeResponsible for all activities in the Depot.
-Technical, Administrative, Ministerial, etcand for Effective execution of administrativepolicies and plans.
Maintain Out-turn targets and train schedules.Efficient Stores & Material Management.Effective Human Resource Management.Provide on the job training for trainees,apprentices & conducting trade test, suitabilitytest etc.
8/4/2019 C&W_open_line
7/71
ADMINISTRATIVE DUTIESADMINISTRATIVE DUTIES Cont..Cont..
Plan for capacity augmentation in Infrastructure,machinery, plant, material and manpower.Preparation of Tender & Liaison with out sideagencies for Out sourcing, technical suitability,vendor rating, implementation of contractualobligation etc.Preparation of annual M&P and works programme
& maintenance of M&P and related equipments.Maintenance of Industrial peace, Staff discipline,DAR proceedings etc.
8/4/2019 C&W_open_line
8/71
ADMINISTRATIVE DUTIESADMINISTRATIVE DUTIES Cont..Cont..Ensure safety of Men, Material and Traveling
Public through intensive Supervision and QualityControl.Maintenance of Accident relief trains including
Re-railing equipment, First aid equipment, spares,cranes, etc.Effective Disaster Management. Restoring
normalcy during natural calamities and accidents.Maintain the integrity and punctuality of Trainservices during natural calamities like flood, stormetc.
8/4/2019 C&W_open_line
9/71
TECHNICAL DUTIESTECHNICAL DUTIES
Maintenance, Repair and Certification of the entireRolling Stock Inventory of Indian railways comprising 2.3lakh Wagons 48500 Coaches for Safe, Reliable and Punctual Train
operation.Planning of maintenance activities including placementof rakes in Pit Lines, balancing of rake occupation in PitLines.Detachment of Coaches and Wagons for Scheduledmaintenance activities like POH and IOH / ROH, etc.
8/4/2019 C&W_open_line
10/71
Preventive Maintenance activities of Coaches andWagons in Pit Lines and Yards. (Examination andrectification of each and every component, for anyfailures, abnormalities and unsafe condition, which mayendanger the safety of the train.Analysis and reporting of component failures.Certification of the entire train for its overall safety tillthe train returns to the originating station.Maintenance of all registers with respect to train service.Issuance of Brake Power Certificate.
TECHNICAL DUTIESTECHNICAL DUTIES Cont..
8/4/2019 C&W_open_line
11/71
TECHNICAL DUTIESTECHNICAL DUTIES Cont..
Maintenance and upkeep of Brake Down specials.
Planning and execution of re-railment andrestoration at accident sites.Maintenance activities in Sick lines and ROH/IOHSheds.Upkeep of Machineries and plants.Monitoring of trial components.Prevention and analysis of enroute failures liketrain parting, brake binding, hot axle, etc .
8/4/2019 C&W_open_line
12/71
Need to posses the complete technical knowledge / working knowledge of the rolling stock as a wholeand all its individual components.
Need to posses the technical knowledge of all the Rollingstock manufactured in the past few decades till theircomplete life span
Whenever new technologies are introduced, adapt to thenew technology by self-learning.
Impart training to field staff to update the latest technicaldevelopments in rolling stock.
SPECIAL REQUIREMENTS of OPEN LINE ENGINEERS
8/4/2019 C&W_open_line
13/71
ACCOUNTABILITYACCOUNTABILITY
Custodian of all assets including Machineries andPlant, Stores and other related equipments worth
several crores.Planning and Running of special trainsSubject to Audit by the Divisional Audit Personnel.
For any failure of the system in train service.For out turn target of wagons/coaches in sick lines andIntermediate / Routine Overhauling.
For detention of trains on C&W accountFor any failure in components of the certified train.For any failure in the brake power.
8/4/2019 C&W_open_line
14/71
MULTIFACETED SKILLS & ROLESMULTIFACETED SKILLS & ROLESAdministrative abilities to manage and run Depots.Possess up to date Technical knowledge of various types of Rolling stock and its components.Managerial Skills to manage the work force to meet thequality and safety standards.Assess the knowledge level of work force under him forproper distribution of work.
Ministerial skills to ensure proper recording of the data.Technical scrutiny of tender papers for procurement of Rolling Stock components and services.
8/4/2019 C&W_open_line
15/71
MULTIFACETED SKILLSMULTIFACETED SKILLS ( Cont..)( Cont..)Tutor and mentor to educate the work force continuouslyto keep up with modernization.
Complete Knowledge of DAR proceedings to tackle erringstaff.Planning for improvements.
Crisis management for restoration in case of accident orbreakdown.Failure analysis and Investigation to find out and rectifythe reasons.Maintenance of Accident relief trains including Re-railingequipment, First aid equipment, spares, cranes, etc.
8/4/2019 C&W_open_line
16/71
Duties performed byDuties performed byOpen Line C&WOpen Line C&W
Engineers duringEngineers during
Train maintenanceTrain maintenance
8/4/2019 C&W_open_line
17/71
BASIN BRIDGECOACHING DEPOTCh ennai Division / S.Rly
is taken for Illustration
BBQ The only C&W maintenancedepot ISO certified for its entireoperations in Indian Railways.
8/4/2019 C&W_open_line
18/71
Coach Position of BBQCoach Position of BBQBARE REQUIREMENT - 755INEFFECTIVE - 75.48(12% FOR AC AND 10 % FOR NON AC) ----------
TOTAL (A) - 830.48TRAFFIC SPARE (B) - 94.38(12.5%) OF A ----------TOTAL REQUIREMENT (A+B) - 925ACTUAL AVAILABLE - 807SHORTAGE * - - 118
* The shortage results in coaches being cannibalized from otherincoming rakes to meet the demand depriving them of themandatory maintenance time
8/4/2019 C&W_open_line
19/71
Coach MaintenanceCoach Maintenance
Sick Lines / IOH ShedsBreak Down Attention & C-Schedule / IOH Attention
Yard / PlatformMaintenance of Accident
Relief Trains
PlatformsOther End Attention
PlatformsPlatform Turn-aroundAttention
Pit Lines in YardSecondary MaintenancePit Lines in Yard
Primary Maintenance
PlaceType
8/4/2019 C&W_open_line
20/71
Primary MaintenancePrimary Maintenance-- Carried out for the Train as a wholeCarried out for the Train as a whole
Need - Mandatory for every train.Place - Pit Lines in Coaching yards.Works - Safety, Amenity, Electrical, A/C, Internal
& External cleaning and Brake powertesting with certification.
Time - Minimum 6 Hrs in Pit lines.Day/Night - Both Day & Night.Lighting - Ambient light during day time and
primitive minor lamps during night.
Validity - Up to 3500 Kms Max.
8/4/2019 C&W_open_line
21/71
PITLINE MAINTENANCE
Inspection, testing and attention of all the vital safety components
both visually and using inspectiontools and gauges to ensure safety
of the whole train.
8/4/2019 C&W_open_line
22/71
Thorough examination and attention to the
brake system to ensure 100 % brake power.Inspection and testing of Passenger
emergency alarm system.Ensuring the availability of correct destination
and coach indication boards.
Testing and attention of all Electrical fittings& equipments(, batteries, alternators, lights &fans)
PITLINE MAINTENANCECont
8/4/2019 C&W_open_line
23/71
Ensuring availability and working of allpassenger amenity and safety fittings.Exterior and interior Cleaning of coachesusing chemicals and detergents.Watering of all the coaches.
Execution of all Preventive Maintenanceschedules.(A & B Schedules as per IRCApart IV)
PITLINE MAINTENANCECont..
8/4/2019 C&W_open_line
24/71
Vital Safety ComponentsVital Safety ComponentsRunning Gear ComponentsSuspension Gear ComponentsDraw & Buffing gear componentsBrake gear componentsUnder frame & Bogie ComponentsAir-conditioning equipmentsElectrical Equipments
8/4/2019 C&W_open_line
25/71
Components that must be ExaminedComponents that must be Examined
During Pit ExaminationDuring Pit Examination
1012 mts46 mts (Aprox)Pipe Lines
6666303Total
2420110Under Gear
143065Brake Gear
61628Draw & BuffingGear
176080Suspension Gear
44020Running Gear
Per rake of 22Coaches
Major Components /Coach
8/4/2019 C&W_open_line
26/71
2640 Sq Mtrs120 Sq MtrsExterior cleaned
22010Doors & Fasteners(Main / Toilet) &
Vestibules
158472
Window shutters &
Fastenings
35200 ltrs1600 ltrsWater to be filled
30814Flush/Push cocks,
Taps & Valves
Rake of 22 CoachesPer Coach
Other Components & ActivitiesOther Components & Activities
8/4/2019 C&W_open_line
27/71
This apart the availabilityand correctness of more than
145 Cotters & Split pins&
150 Bolts and nuts
in every coach need to bephysically ensured
8/4/2019 C&W_open_line
28/71
PLATFORM MAINTENANCERECEPTION
ROLLING IN EXAMINATION(Visual inspection of dangling parts, hearing for any unusualsound)
AXLE BOX FEELING
(Sensing the temperature of axle boxes by thermo hunters / hand by kneeling down in the gap between platforms andcoach)
RELEASING OF BRAKES(Manually pulling of DV release valve by kneeling down in the
gap between platforms and coach)
8/4/2019 C&W_open_line
29/71
DESPATCH
PLATFORM MAINTENANCE(Examination,cleaning ,watering and certification of platformturnaround trains and pass through trains ensuring safety)
CONTINUITY CHECK(Connecting all the air hoses of coaches and ensuring the continuity of air pressure through the formation)
ROLLING OUT EXAMINATION(Visual inspection of dangling parts, hearing for any unusual sound)
PLATFORM MAINTENANCE Cont..
8/4/2019 C&W_open_line
30/71
SICK LINE MAINTENANCE
Execution of preventive Maintenance SchedulesIOH & C- Schedule as per IRCA Part IV.
Carrying out break-down maintenance.(To maintain the prescribed ineffective percentageof 2.5% of total coach holding)
Any other special works nominated by authorities.
8/4/2019 C&W_open_line
31/71
To be alert on duty round the clock and respondingto the accident / derailment with in 20 min.
Arranging protection to passengers and theirbelongings.
Render first aid and arrange for medical assistance.Restoration of track and traffic (re - railing) within
the shortest possible time.
Investigation of causes and recommendation forpreventive action.Reclamation of assets.
ACCIDENT RELIEF TRAINS
8/4/2019 C&W_open_line
32/71
OTHER ACTIVITIES
Assessment , Procurement and Maintenance of Machinery and Plants & Tools and Plants.
Maintenance of saloons and inspection vehicles .Planning ,Procurement ,stocking and issue of items
required for day to day maintenance activities.Planning and processing of Outsourcing activities/
services.Maintenance of Management Information
Systems(MIS).Processing and maintaining ISO certification ,etc.
8/4/2019 C&W_open_line
33/71
8/4/2019 C&W_open_line
34/71
Defects affecting Train safetyDefects affecting Train safety
222245360445473Under Gear
138181129179218Draw &
Buffing Gear
464492527634632Brake Gear278325445378461Suspension5105466531142861Running Gear
20072006200520042003Nature of Defects
8/4/2019 C&W_open_line
35/71
Interior DefectsInterior Defects
9511180113713121355Total
6087117166188Body Panel &Carpentry
167257228214203Berth & WindowShutters
275301332507505Main Door, Lav.
Door, PassageDoor & Vestibules
449535460425459Plumbing & Watertank repairs
20072006200520042003
8/4/2019 C&W_open_line
36/71
DASH POT SPRING BROKEN
8/4/2019 C&W_open_line
37/71
AXLE BOX COVER
PUNCTURED
8/4/2019 C&W_open_line
38/71
BOGIE FRAME CRACK
8/4/2019 C&W_open_line
39/71
BRAKE HANGER PIN MISSING
8/4/2019 C&W_open_line
40/71
BSS HANGER MISSING
8/4/2019 C&W_open_line
41/71
BUFFER PLUNGER BROKEN
8/4/2019 C&W_open_line
42/71
SIDE BEARER PILLAR CRACKED
8/4/2019 C&W_open_line
43/71
PITTED WHEEL
8/4/2019 C&W_open_line
44/71
SHELLED TREAD
8/4/2019 C&W_open_line
45/71
WORK ENVIRONMENTOpen- to - sky environment facing hot sun , heavy rain,
storms, cold weather etc.,
Physical handling and working with coach componentssplashed with human excreta and other animal wastes.
Haphazardly and unscientifically constructed Pit lines
without sufficient working space and facilities
Exposure / Contact with chemicals and other hazardouscompounds used for cleaning due to parallel executionof various maintenance activities (Electrical, Undergear Maintenance, Interior & Exterior cleaning and Air-conditioning maintenance)
8/4/2019 C&W_open_line
46/71
Sewage water stagnation due to improper / defectivedrainage facilities.
Insufficient lighting with only the primitive Miner Lampsto carry out the maintenance during Night.
Flooded Pit lines during monsoon.
Mosquito , Snake , Rat , Cattle and Stray dog Menace.Continuous exposure to 110V DC Power system which is
detrimental to health.
Exposure to Sulphuric acid in batteries.
WORK ENVIRONMENT Cont..
8/4/2019 C&W_open_line
47/71
WORK ENVIRONMENT Cont..
The staff engaged in inspection of rake/train has to walk a minimum of 1.5Kms around the rake and has to inspectaround 6000 components of safetycategory with in short span of time by
exerting himself by kneeling andstanding several times.
8/4/2019 C&W_open_line
48/71
8/4/2019 C&W_open_line
49/71
8/4/2019 C&W_open_line
50/71
8/4/2019 C&W_open_line
51/71
8/4/2019 C&W_open_line
52/71
8/4/2019 C&W_open_line
53/71
C iC t i t
8/4/2019 C&W_open_line
54/71
ConstraintsConstraintsInsufficient Pit Maintenance Time
(Due to late running, Interconnection of trains, Bunching of Trains in both Departure and Arrival, Shunting movements, Crossmovements,etc.)
Haphazardly and Unscientifically constructed
Pit lines without sufficient working space andfacilities(Out of the 19 pit lines at BBQ only 2 conform to CAMTECH
norms)
Absence of proper Pit lighting & Yard lightingfor Night examination.
(Night Examination carried out with only primitive Miner lamps)
8/4/2019 C&W_open_line
55/71
ConstraintsConstraints Cont..Cont..
Lack of allocated spare coaches(Resort to cannibalization of coaches from otherrakes to replace sick coaches)
Indiscriminate running of Special Trainswithout sufficient Coaches.(Resulting in reduced maintenance time for
coaches)Shortage of Staff
8/4/2019 C&W_open_line
56/71
SPECIAL TRAINS
These are trains operated
throughout the year in addition tothe regular trains for various
reasons
8/4/2019 C&W_open_line
57/71
Special Trains are operated for variousreasons.
To Clear Wait Listed PassengersFor Summer/ Winter VacationsDuring Festival / Pooja SeasonDuring Sabarimala pilgrimage Season
For Organized Tour Package Special Trains / Coaches.VIP MovementsInspections
Handing over of Other Division/Zonal CoachesTrains of Sister Depots for want of Pit lines / FacilitiesDedicated VP Specials ( Parcel Vans)
SPECIAL TRAINS Cont
8/4/2019 C&W_open_line
58/71
SPECIAL TRAINS Cont..
The coaches for the Special trains are brought from theTraffic spare coaches pooled in Railway Zonal Level
which are over and above the holding of the Depot as perthe requirement of that Region/Depot.
Demand of Special Trains/Coaches will vary fromRegion to Region as per the season.
No additional remuneration or Incentive for Running
Specials and Extra Coaches is provided to motivate for theextra work load of the special trains which is over andabove stipulated work load and norms.
Special Trains Maintained at BBQ
8/4/2019 C&W_open_line
59/71
52783064351254TOTAL
00393MAR
27315554FEB
9555457834JAN
8545054432DEC
816451448NOV
352434553026016OCT
152252521423914SEP
152252321618812AUG
24012213121087JUL
540274542648027JUN880405403289850MAY
404212341381847APR
CoachesServicesCoachesServicesCoachesServicesMonth
2008 20092007 20082006 2007
p
8/4/2019 C&W_open_line
60/71
IN SPITE OF ALL THESE PROBLEMS
THE TRAINS ARE EXAMINED ANDCERTIFIED IN TIME ONLY
BECAUSE OF THE COMMITMENT &SINCERITY OF THE TECHNICALSTAFF
8/4/2019 C&W_open_line
61/71
Impact of TechnicalImpact of TechnicalAdvancement &Advancement &ModernizationModernization
8/4/2019 C&W_open_line
62/71
Unlike other areas, the benefits of Technical advancements viz- Improvedcomponent reliability and modernmaterials has not reduced the workloadof technical staff.- The number of components to be examined
and certified during each maintenance hasincreased over the years.
- The responsibility of any failure still rests withthe Engineer last certified the train .
ImpactImpact Cont..Cont..
ImpactImpact CC t
8/4/2019 C&W_open_line
63/71
The advent of modern materials and technologyresulted in manifestation of new type of defects
and problems.- Introduction of Composite Brake Blocks resulted in7 new type of wheel failures.
The benefits of technical advancements areoffset by increased Kms and Load.- Validity of certification increased to3500 Kms for
Coaching and 7500 Kms for Wagons.
- Train composition increased to 60 wagons and 25Coaches.- Gross load of wagons increased up to 90 tons
ImpactImpact Cont..Cont..
ImpactImpact CC t
8/4/2019 C&W_open_line
64/71
ImpactImpact Cont..Cont..
The modern components with advanced
pneumatics and electronic controls demandsmore discretion and diversified knowledgeto maintain and repair.Eg.- CD Toilet System
Wheel Slide protectorsPneumatic suspension
Disc BrakesCoaching CBC , etc
ImpactImpact C tC t
8/4/2019 C&W_open_line
65/71
ImpactImpact Cont..Cont..
Types of Wagons and Coaches
increased over the years.No major change in Infrastructure andother facilities.New technology, materials and systemposes newer problems which need to be
addressed during maintenance withoutany prior training or guidance.
Technical v/s Commercial & Traffic StaffTechnical v/s Commercial & Traffic Staff
8/4/2019 C&W_open_line
66/71
Technical v/s Commercial & Traffic StaffTechnical v/s Commercial & Traffic Staff
directly involved in running of trainsdirectly involved in running of trains
Signal &Telecommunication
ControllersElectrical /AC
GuardsBridges
DriversAccount / AuditPermanent way
Yard Staff TTEsDiesel / Electric Loco
Station mastersBooking clerksC&W
TrafficCommercialTechnical
RECRUITMENT, QUALIFICATION ANDRECRUITMENT, QUALIFICATION AND
8/4/2019 C&W_open_line
67/71
TRAININGTRAININGJUNIOR ENGINEER (GP 4200)
50% - Direct recruitment through RRB3 Years Diploma in Engineering &1 Years In- plant training.
(Total 4 Years Qualification equal to Engineering
degree)
VI CPC observation that JE and Clerk are equal sinceboth have 3 years Qualification is wrong since JE hastotal 4 years Qualification.
Hence both pay cannot be equal and needs correctionHence both pay cannot be equal and needs correction .
8/4/2019 C&W_open_line
68/71
JUNIOR ENGINEERJUNIOR ENGINEER Cont..Cont..
The Duties and Responsibility of a JE is enormouswhen compared to a clerk with whom he isequated.JEs in open line bears highest responsibility in
safe running of trains.Have a direct element in running of trains alongwith drivers.
Drivers function start only after the issuance of BPC by Open line engineer
SECTION ENGINEER / Sr.SECTIONSECTION ENGINEER / Sr.SECTION
8/4/2019 C&W_open_line
69/71
ENGINEERENGINEER (GP 4600)(GP 4600)Both scales merged as SSEComposition of cadre 20% Direct recruits with 4 / 4 years Degree in Engineering
and One year In-plant training 80% promoted from Junior Engineers ( 4 Years total
qualification and 20 to 25 years of Experience)VI CPC observation that this category is equal to anyother Bachelor degree holder in arts, science orcommerce is totally wrong.SSE with such huge responsibility and accountability andOffice Superintendent cannot be kept in same scale inany angle of observation
8/4/2019 C&W_open_line
70/71
AVENUES OF PROMOTIONAVENUES OF PROMOTIONOnly one promotion for JE-II/JE- I from 4200
Grade Pay to SE/SSE with 4600 Grade Pay.
No promotion for SE/SSE with 4600 Grade
pay and must retire in same grade.
Only about 2% of Technical Supervisors inIndian Railways get promoted as Group Bofficers.
Even after this analysis submittedEven after this analysis submitted
8/4/2019 C&W_open_line
71/71
Even after this analysis submittedyin this study, if one decides thatin this study, if one decides that
JE = Clerk JE = Clerk SSE = OSSSE = OS