CYCLIC QUASI-STATIC LOAD TESTS ON MICROPILES Cory J.E. Yacyshyn, P.Eng. West Branch Combined Sewer Overflow (CSO) Facility Wet & Dry Shotcrete Structural Shotcrete Seismic Anchors Micropiles / Minipiles Cementitious Grouting Chemical Grouting
Transcript

CYCLIC QUASI-STATIC LOAD TESTS ON MICROPILESCory J.E. Yacyshyn, P.Eng.

West Branch Combined Sewer Overflow (CSO) Facility

• Wet & Dry Shotcrete

• Structural Shotcrete

• Seismic Anchors

• Micropiles / Minipiles

• Cementitious Grouting

• Chemical Grouting

• Recently, 212 GEWI-Piles were installed in New Westminster, BC, to support a 20,000 m3 partially submerged buried storage tank subject to cyclic loading.

• Following, two pre-production full scale verification cyclic load tests are reviewed

• “Cyclic” loading, as described in this paper, refers to quasi-static alternating compression and tensile loads, with no dynamic component. Details of this type of pile response are provided.

• The GEWI-Piles were installed by a local specialty foundation contractor, Southwest Contracting Ltd.

CSO FacilityINTRODUCTION

CSO Facility

Figure 2a. GEWI-Pile Layout Plan

DESIGN

CSO Facility

Figure 2b. Tank Section

DESIGN

DESIGN CSO Facility

• The tank structure required foundations to resist uplift forces due to buoyancy caused by groundwater table rise and compression forces caused by filling of the tank.

Cyclic loading per GEWI-Pile:

• Max. factored tension load = 380 kN

• Max. working tension load = 200 kN

• Max. working compression load (including 12 mm creep effect) = 600 kN

• Max. working compression load (no creep effect) = 140 kN

“Heel”

• The Engineers designed the “heel” to resist uplift forces due to buoyancy along the perimeter of the tank so no cyclic effects.

• Long term creep in the soils near the centre of the tank was anticipated to be, as much as, 12 mm.

CSO FacilityDESIGN

Figure 3. Micropile Shop Drawing

CSO FacilityGENERALIZED SOIL PROFILE

interbedded SILT or CLAY and SAND> 2 mUnit c

medium dense to dense SAND12 to 15 mUnit b2

loose to medium dense sand2 to 2.5 mUnit b1

soft to firm sandy SILT - FILL?4 to 5 mUnit a2

silty sand, sandy silt – FILL0 to 1.5 mUnit a1

DescriptionThicknessSoil Unit

(Uthayakumar and Macleod 2004)

Table 1. Generalized Soil ProfileFigure 1. CPT04-3 Log

CSO FacilityDRILLING

Drill string advancement

Due to the sandy soils and high groundwater table, a cased direct circulation drill system was specified with the objective to minimize disturbance at the soil-grout interface and ground loss.

• Disposed cuttings shall not exceed 110% of the theoretical drill hole volume.

• Casing shall not have an O.D. < 133 mm

• The use of air drilling is not permitted

• Drilling using augers is not permitted

CSO FacilityDRILLING

• Drilling was performed inside a full cut-off wall, extending to a silt/clay layer at -22 m elevation located at the crest of a sloped excavation.

• The drill hole was advanced from -6.8 m elevation during on-going dewatering activities.

• Diesel/hydraulic rig utilizing double head duplex overburden drilling method advanced a 133 Øtemporary casing.

CSO FacilityDRILLING

• Medium class hydraulic crawler drill rig

• Rotary-Rotary drill head configuration

• Water flush with potable water

• As-drilled hole diameter = 152 mm

CSO FacilityINSTALLATION

• Full length GEWI-Piles were installed using a zoom boom type machine

• No couplers used since GEWI-Piles ordered full-length from the factory.

•GEWI-Piles installed immediately after drilling then tremie grouted

CSO FacilityGROUTING

• Microsil Anchor Grout

A high early strength, thixotropic, cement grout

• Water : Cement Ratio < 0.35 was specified

• Primary grouting to 517 kPa minimum

• Pressure grouting thru the top of the casing at intervals as the casing was being pulled.

• One stage of post-grouting to 5,170 kPa minimum was performed prior to any testing.

• A subsequent test program, on-site, showed post-grouting had little influence on test results.

CSO FacilityCYCLIC LOAD TEST ARRANGEMENT

• Reaction I-Beam repeatedly tilted during tension loading and translated laterally due to slight off-centered loading.

• Further alterations to the initial framework were ruled out. Consequently the jacking arrangement was modified.

• During each load reversal the top nuts of each reaction pile and test pile were loosened and tightened, respectively, in order to change loading direction.

Test setup 1

CSO FacilityCYCLIC LOAD TEST ARRANGEMENT

Test setup 1

CSO FacilityCYCLIC LOAD TEST ARRANGEMENT

• Added test beams overtop the original test setup

• Test setup did not meet ASTM standards with respect to spacing of the reaction piles and test pile. No standard was specified during tendering.

• Recommend future test setups meet ASTM standard D3689 for tension tests and ASTM D1143-81 for compression tests.

Test setup 2

CSO FacilityCYCLIC LOAD TEST ARRANGEMENT

Test setup 2

Two 590 kN tension jacks synchronized by hydraulically connecting each to the same hydraulic power pack.

1,470 kN compression jack

CSO FacilityCYCLIC PERFORMANCE TEST PROCEDURE

Four performance verification tests in total were performed on each test GEWI-Pile in the following sequence:

1. A 250 kN tension test in accordance with PTI-1996.

2. A 175 kN compression test in accordance with PTI-1996

3. A cyclic test starting from a 250 kN tension alignment load to 600 kN compression load by increasing compression loading 75 kN each successive cycle.

4. A 450 kN tension test in accordance with PTI-1996

Grout Collar isolated from the pile

CSO FacilityPERFORMANCE & EXTENDED CREEP TEST RESULTS

CSO FacilityPERFORMANCE & EXTENDED CREEP TEST RESULTS

CSO FacilityPERFORMANCE & EXTENDED CREEP TEST RESULTS

The shape of cycle 7 shows similar unloading stress histories and shows departure from a linear,

reproducible cyclic loading pattern.

CSO FacilityPERFORMANCE & EXTENDED CREEP TEST RESULTS

CSO FacilityPERFORMANCE & EXTENDED CREEP TEST RESULTS

CSO FacilityPERFORMANCE & EXTENDED CREEP TEST RESULTS

Log-linear increasing displacement to –0.71 mm during the final two log cycle

Non-log-linear displacement to – 0.61 mm during the final two log cycle

CSO FacilityCONCLUSIONS & FINAL REMARKS

Recommendations

1. Use of strain gauges in future tests to determine shape of the load distribution along the fixed anchor and its behavior under cyclic loading

2. Repeated cyclic loading at design load to determine how the number of load cycles affects load holding capacity.

Based on the test results of the two verification cyclic load tests, the installed GEWI-Piles were considered adequate to sustain their design loads