Document of The World Bank FOR OFFICIAL USE ONLY CZ42 ZILiL 4z, Report No..8392-BD STAFF APPRAISAL REPORT BANGLADESH THIRD FISHERIES PROJECT MAY 2, 1990 Agriculture Operations Division Country Department I Asia Region This document has a resricted distdbdion and may be used by re_iemb ony In the pedfome of their offiefl dulies. Its contents may not othewise be dieosed w Wodd Ban Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Transcript
Page 1: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Document of

The World Bank

FOR OFFICIAL USE ONLY

CZ42 ZILiL 4z,

Report No..8392-BD

STAFF APPRAISAL REPORT

BANGLADESH

THIRD FISHERIES PROJECT

MAY 2, 1990

Agriculture Operations Division

Country Department IAsia Region

This document has a resricted distdbdion and may be used by re_iemb ony In the pedfome oftheir offiefl dulies. Its contents may not othewise be dieosed w Wodd Ban

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

CURRENCY EQUIVALENTS

Currency Unit - Taka (Tk)US $ 1 = Tk 32.27 (March 1990)Tk 1 = US$ 0.03

GOVERNMENT OF BANGLADESH FISCAL YEAR

July 1 - June 30

WEIGHTS AND MEASURES

km - kilometerm u metercm = centimeterg = gramkg - kilogramton - metric tonha - hectare

sq km = square kilometer

ABBREVIATIONS AND ACRONYMS USED

ADB Asian Development BankADP Annual Development Programme of GOBBFDC Bangladesh Fisheries Development CorporationBWDB Bangladesh Water Development BoardDFO District Fisheries OfficerDOF Departtent of FisheriesERD External Resources DivisionERR Economic Rate of ReturnFRI Fisheries Research InstituteFRR Financial Rate of ReturnFY Financial YearGOB Government of BangladeshICB International Competitive BiddingLCB Local Competitive BiddingMF Ministry of FinanceMFL Ministry of Fisheries and LivestockMIWDFC Ministry of Irrigation, Water Development and Flood ControlML Ministry of LandMP Ministry of PlanningMTA Technical Assistance for DOF ManagementNFMP New Fisheries Management PolicyOCC Opportunity Cost of CapitalODA Overseas Development Administration (U.K)PD Project DirectorPLANCOM Planning CommissionPP Project Proformapy Project YearSCP Shrimp Culture ProjectSTA Technical Assistance for Technical and Social SupportTA Technical AssistanceTFP Third Fisheries ProjectUNDP United Nations Development ProgrammeWOP Without Project SituationWP With Project Situation

Page 3: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

FOR OMCIL USE ONLY

GLOSSARY

Beel Permanent water body in floodplain, flooding with river andrainwater annually.

Baor Lake formed by an isolated meander of a river.Carp. Bighead Zooplankton feeding carp, Aristichthys nobilis.Carp, Common Bottom feeding carp, Cyprinus carpio.Carp, Silver Phytoplankton feeding carp, Hypophthalmichthys molitrix.Catla Indigenous carp, Catla catla, surface/mid-water feeding.Catfish Indigenous, predatory fish eg. Aor (mystus aor), Magur

(Clarias batrachus).Floodplain Annually flooded, low-lying area associated with rivers.Fingerlings Juvenile fish from 2 - 15 cm long.Hatchery Fish seed farm for spawning and hatching.Hatchlings Larval fish up to about 4 days old.Hilsa Indigenous, migrating fish, Hilsa ilisha, constituting the

bulk of river/estuarine catch of Bangladesh.Jalmahal Traditionally leased fishing right in Bangladesh.Mrigal Indigenous carp, Cirrhinus mrigala, bottom feeding.Nursery Pond(s) where hatchlings are grown to fingerlings.Polders Embanked low-lying land.Post Larvae Young shrimp stage used for stocking in ponds.Primary prod. Phytoplankton growth; minute, aquatic,

single celled green plants.Rohu indigenous carp, Labeo rohita, bottom/ mid-water feeder.Shrimp, coastal Marine shrimp from coastal and brackish-waters; mainly Black

Tiger Shrimp, Penaeus monodon.Shrimp, fresh-w. Macrobrachium rosenbergii.Snakehead Indigenous, predatory, swamp-dwelling fish, Shol (Channa sp.)Upazila An administrative sub-district with an elected council and

chairman with large degree of autonomy; there are 464 inBangladesh.

IThis document has a restricted distribution and may be used by recipients only in the performanceof their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

Page 4: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

(i)

BANGLADESHTHIRD FISHERIES PROJECT

Credit and Project Summary

Borrower The People's Republic of Bangladesh

Amount SDR 34.6 million (US$ 44.6 million equivalent)

Terms Standard IDA terms with a maturity of 40 years

Cofinanciers ODA US$ 4.3 million equivalent; UNDP US$ 4.2 million

Proiect Description The project is designed to support a sectoral developmentprocess aiming at: (a) increasing incomes, particularlyof the poor, and fish production for domestic consumptionand export, (b) -upporting the fisheries developmentprogram in the west with emphasis on private sectorparticipation; (c) accelerating the expansion of fishproduction in floodplains; and (d) strengthening sectoralinstitutions. The project has six components: (a)Floodplain Fisheries, involving the stocking of 100,000ha of floodplains; (b) Coastal Shrimp Culture, makingimprovements in public infrastructure on 13,000 ha ofpoldered land already under shrimp culture; (c) OtherFisheries, including finance packages for a variety ofUpazila and District level programs; (d) InstitutionalSupport, financing facilities and incremental operationalcosts of DOF and BWDB related to the above investments;(e) Research related to the project; and (f) TechnicalAssistance for project management, financed by ODA, andfor technical and social support, financed by UNDP.

Benefits and Risks The project will produce 42,000 tons of fish and 1800tons of exportable shrimp per year, the latterrepresenting foreign exchange earnings of about Tk 268million (US$ 8.3 million). Additional benefits of theproject include: (a) the development of managerialroutines for exploiting major floodplains; (b) arevitalized fisheries administration; (c) improvements insectoral policies; (d) further mobilization of theprivate fish seed enterprises; (e) services to specialgroups; and (f) improvements in income distribution. TheERR of the project is estimated at 312. Directbeneficiaries would number 130,000 families. The projectredresses environmental problems created by populationpressure and infrastructure works.

Page 5: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

(ii)

The main project risks are (i) delayed or inadequateimplementation which may arise from failures inmanagement, but provision of substantial technicalassistance and reliance on the private sector reducesthese risks; (ii) lower-than-planned fish retrieval ratesin flood plains as well as disease and seasonal gluttingof fish markets; however, analysis indicates that theseare not likely to reach critical levels; and (iii)reduced public stocking, if GOB would not be able tosustain financing and recover the cost of stocking;intensive monitoring and studies, which will enable theformulation of a viable cost recovery policy, andappropriate legal undertakings minimize that risk.

Project Costs Local Foreign Total-US$ million - - - - - -

Estimated Costs

Floodplain Fisheries 17.7 1.9 19.6Coastal Shrimp Culture 11.9 6.0 17.9Other Fisheries 2.8 0.2 3.0Institutional Support .9 2.9 12.8Research 0.8 0.2 1.0Technical Assistance 3.8 4.6 8.4

Total a/ 46.9 15.8 62.7

Financing Plan

IDA 33.5 11.1 44.6GOB 9.6 0.0 9.6ODA 1.4 2.9 4.3UNDP 2.4 1.8 4.2

Total 46.9 15.8 62.7

Estimated Credit Disbursements:

FY91 FY92 FY93 FY94 FY95 FY96 FY97---------------------USX million----------------------

Annual 2.4 2.7 7.2 8.5 9.7 9.6 4.5

Cumulative 2.4 5.1 12.3 20.8 30.5 40.1 44.6

Economic Rate of Return: 31 Z

Map IBRD 21887

a/ Total project cost net of duties and taxes (US$ 3.9 million) is US$ 58.8million.

Page 6: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

t iii)BANGLADESH

THIRD FISHERIES PROJECTTable of Contents

Page No.I. INTRODUCTION 1

II. FISHERIES SECTOR

A. Role in Economy. 1B. Production. 2C. Demand and Markets. 2D. Resource Potential and Development Strategy. 3E. Institutions .8F. Regulations ........... .............................. 11G. Development Activities .............................. 12H. Bank Group Involvement .............................. 12

III. THE PROJECT

A. Project Objectives and Rationale ...... .............. 14B. Project Area ........................................ 14C. Project Design . ..................................... 15D. Project Components ............. ..................... 17E. Detailed Features .............. ..................... 17F. Project Cost ........................................ 23G. Financing ........................................... 24H. Procurement ......................................... 25I. Disbursement ........................................ 28

IV. ORGANIZATION AND MANAGEMENT

A. Implementing Agencies ............................... 29B. Phasing of Processing and Implementation .... ........ 32C. Monitoring and Evaluation ........ ................... 32

V. PRODUCTION, MARKETING AND PRICES

A. Production. ......................................... 33B. Markets ............................................ 33C. Prices ............................................ 34D. Financial Analysis ................................... 34

VI. BENEFITS AND JUSTIFICATION

A. Benefits, Beneficiaries and Employment ..... ......... 35B. Cost Recovery ........................................ 36C. Economic justification ............................... 38D. Sensitivity and Risk Analysis ........................ 39E. Environmental Impact. ............................... 40F. Effects on Women in Fisheries .......... ............. 41

VII. AGREEMENTS AND RECOMMENDATION 41

This report is based on an appraisal mission carried out in October/ November1989 and consisting of Messrs W. Roider, G. Faruq (IDA), R. Coutts (ODA) andA.B. Chowdhury, L.R. Munshi, Y. Tang (Consultants). Mr. N. Islam (DOF) alsoparticipated in the mission.

Page 7: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

(iv)

ANNEXES 1 Key Data: Fisheries Sector and Project Area2 Major GOB Fisheries Development Projects3 Selection Criteria for Activities to be Financed by IDA4 Terms of References FRI-Research5 Terms of Referencet Technical Assistance & Training for Project

Management (ODA)6 Terms of References Technical Assistance & Training for Technical

and Social Support (UNDP)7 Summary of Project Costs8 Disbursement Schedule9 Staffing of Coordination Cell at DOF-HQ and Divisional Offices10 Implementation Schedule

Overall ProjectCritical Path: Floodplain FisheriesCritical Path: Coastal Shrimp Culture

11 Financial and Economic PricesTable 1 Brackish Water Shrimp PricesTable 2 Major Other Prices

12 Financial Model CalculationsTable 1 Major FloodplainsTable 2 Minor FloodplainsTable 3 Shrimp/Rice Inside PoldersTable 6 Shrimp/Rice Outside PoldersTable 7 Shrimp Only Inside PoldersTable 8 Ponds

13 Economic CalculationsOverall ProjectFloodplain Fisheries ComponentCoastal Shrimp Culture ComponentOther Fisheries Component

14 Key Monitoring IndicatorsSelected Documents available in the Project File

Draft Procurement Documents for FingerlingsFisheries Resources and Development StrategiesFinancial Version of Cost TablesEconomic Version of Cost TablesCostab Program ListingFinancial and Economic Analysis TablesCost Recovery TablesCostben Program Listing

Chart Project Organization (Department of Fisheries)

MAP 21887 Project Area and Major Fisheries Resources

Page 8: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

BANGLADESH

THIRD FISHERIES PROJECT

I. INTRODUCTION

1.01 The Government of Bangladesh (GOB) has requested assistance fromIDA in financing the development of fisheries in Vestern Bangladesh. IDA hasfinanced fisheries development in Bangladesh since the mid-seventies andincreasingly has provided support for aquaculture. This project incorporateslessons learnt in previous projects. It focusses on stocking floodplains withcarp, developing infrastructure for coastal shrimp culture, advancing otherfisheries activities, improving fisheries institutions, promoting fisheriesresearch and providing technical assistance and training. The need for thisassistance was first identified in 1983 when IDA carried out a review of thefisheries sector in Bangladesh. The review stressed aquaculture techniques forthe country's extensive inland fisheries resources and institutionalstrengthening of the fisheries administration (para 2.57).

1.02 In 1988 GOB, IDA and the Asian Development Bank (ADB) agreed thatfuture IDA lending would focus in future on the western part of the country andADB lending on the eastern part. Preparation of this project was undertaken byFAO/CP, which issued an identification report in July 1988 and a preparationreport in March 1989.

II. THE FISHERIES SECTOR

A. Role in Economy

2.01 With a per capita income of US$ 170, Bangladesh remains one of thepoorest countries of the world and over 702 of its population of 110 millioncontinues to live in absolute poverty. The fisheries sector is importantbecause of its contribution to income, employment, nutrition and foreignexchange earnings. The sector generates 72 of agricultural GDP and 3.5Z oftotal GDP (Annex 1). Inland fisheries contribute most to fisheries production(732 in FY88) followed by artisanal coastal fisheries (262) and industrialmarine fisheries (12). Fisheries employs about 1.5 million full-timeprofessional fishermen or 5Z of the country's labour force. The number offull-time fishermen, who ate generally landless, has increased about 32 per yearover the past 15 years. In addition, there are about 11 million part-timefishermen and women, whose numbers peak in the flood season from June throughOctober.

2.02 Traditionally fish supplies most of the animal protein in theBengali diet, particularly among the low-income groups. As the population hasgrown faster than fish production (para 2.03). per capita consumption of fishhas decreased from 11.7 kg in FY72 to 7.5 kg in FY88. Nevertheless, fishremains an integral part of the traditional diet, providing 80Z of the animalprotein in the basic meal. Export of seafood generated close to US$ 140 millionin FY88, or 112 of the country's total export earnings. Seafood exports haveincreased by about 222 a year over the past ten years and seafood now ranksthird among all export comuodities behind jute (incl. jute products) andleather. Shrimp grown in brackish-water ponds represent about 852 of theseexports. Import of fish is negligible.

Page 9: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

B. Production

2.03 Bangladesh is a major producer of inland fish. Fish production inBangladesh declined between FY72 and FY80, from 824,000 tons to 646,000 tons(Annex 1). The decline was due to over-exploitation of fish resources and theadverse effect of flood control structures on fish habitat. It occurredprimarily in rivers and floodplains which together provide over 50Z of all fishlandings and over 70Z of the inland fish catch. Production began to pick upagain during the 1980s as a result of increased fishing in coastal artisanalfisheries and increases in fish and shrimp grown in ponds, and is presentlyestimated at 826,000 tons. Most of the fish is consumed domestically, butexport of cultured shrimp has developed quickly.

2.04 Shrimp exports of about 15,000 tons accounts for about 2.5 Z ofthe world trade. In FY87, production was estimated to be 73,000 tons of liveweight, head-on shrimp, corresponding to about 40,000 tons of processed de-headed shrimp. Wild caught fresh-water shrimp amounted for 43,000 tons andbrackish-water or marine shrimp to 30,000 tons, with about half of the latterproduced in ponds.

C. Demand and Markets

2.05 Fresh-water and iced, rather than frozen, fish are preferred bylocal consumers. Carps, the focus of this project, command relatively goodprices at about Tk 30/kg landed and around Tk 601kg retail. The domestic demandis growing fast. Due to population growth the demand for fish will increase toabout 1.1 million tons by the year 2000 and to about 1.4 million tons by theyear 2010.

2.06 Most of the sea fish produced in Bangladesh is consumed in theeastern part of the country and in the large urban centers. Most inland fish isconsumed where it is produced and only about one fourth is transported overlonger distances to the northern region or the big centers of Dhaka, Chittagongand Khulna. Fish marketing is almost exclusively in the private sector; it iscompetitive and reasonably efficient. Fish is handled fresh most of the time.For the long-distance trade icing is provided from several thousand ice-makingplants. Problems in fish hygiene are to a large extent linked to lack ofproblem awareness among the population. Fish traders are organized andsometimes reject accept improved fish landing and Llarket facilities provided bythe public sector.

2.07 Shrimp will remain the major export item in the fisheries sectorfor the foreseeable future, although there is potential to increase export offish and other seafood. Shipments to Japan represented 34X of shrimp exports inPY88; the USA and Europe purchased almost all fresh-water shrimp and their sharein exports i£ 30Z each. The werld demand for shrimp is expected to increase atabout 3 - 4! a year, according to a recent World Bank study of the Asia shrimpindustry. World marine shrimp harvest is not expected to increase, but culturedshrimp is expected to increase at a rate of about 5-7Z per year through 1993.Parm level prices for shrimp in Bangladesh and elsewhere fell sharply in July1989 due to abnormally high stocks and cautious buying by Japanese importers.Although prices are likely to remain depressed, shrimp production in Bangladeshremains profitable because production costs are low and the country hascomparative advantage in producing shrimp (para 2.17).

Page 10: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

D. Resource Potential and Development StrategyGeneral

2.08 The country and the project area have a vast potential forincreasing fish production, particularly inland fish production fromfloodplains, rivers, ponds, lakes and the estuaries. The extent to which thepotential is developed depends largely on the speed with which aquaculture 0technology will be applied to the country's inland floodplains. The highpotential of the country's inland fisheries resources and the floodplains inparticular, consists of the vast, nutrient-rich water areas, the tropicalclimate and the natural fertility of the land. The three major rivers, theJamuna, the Ganges and the Meghna, drain large volumes of nutrient-rich run-offwater from their catchment areas. The river water is further enriched withnutrients from soil and vegetation when spreading across the deltaic plain inthe flood season (June through October). Intensive agriculture aerates andfertilizes the soil of the plain and generates vegetation for fish to feed on.Nutrient-rich water, optimal temperature and intensive light radiation combineto result in a high level of biological productivity and primary productionconsisting of aquatic micro-organisms and phytoplankton on which fish can feed.

2.09 It is important that fish stocks are adapted to make best use ofthis primary production. A high pr.-portion of species that directly convert itinto fish meat is preferred over predator fish, because with each step in thefood chain 90Z of the caloric value of the preceding level is lost. One hectareof water of average suitability produces presently about 100 kg of fish duringthe 150 days of major annual flooding. Fish food is at its peak during thisperiod and a fish stock that contains an adequate share of fish species thatfeed on plankton, could produce 500 kg/ha of fish. When the water is permanentit can produce about 800 kg/ha in this way.

Floodplain,>

2.10 The floodplains are low-lying areas which are seasonally flooded byrivers. In western Bangladesh about 30 X of the land area is flooded in therainy season. The term floodplain is used in this report to denote the deeperfloodplains that hold water relatively longer; they are the most attractive forfisheries development. During the dry season the floodplains are used foragriculture, mostly paddy cultivation, often using groundwater and surface waterpumping for irrigation. The shallow parts of the floodplains carry deep waterrice even during the flood season. Human settlement is on river levies ornatural and artificial mounds. Rural life is adjusted to the seasons; almosteverybody is a part-time fishermen in the flood season when the agriculturalwork load is low. Professional fishermen constitute a small, specialized group;they fish all year round in the floodplain and the adjacent bigger rivers. Theircatches are high when flood waters recede and fish density rises.

2 11 As indicated in para 2.09 the fisheries potential of the floodplains isunder-utilized and there is the potential to increase production to 500 kg/hathrough appropriate stock management. Actual production is below the potentialbecause the available fish food is not well utilized by existing fish stocks.Fi,h stocks are depleted and their species composition is out of balance,because the natural reproduction of fish is disturbed by over-fishing caused byhuman population pressure and poverty, and by expanding water control and roadinfrastructure which interfere with the symbiotic exchange between rivers andfloodplains. Many fish species of economic importance migrate with rising and

Page 11: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 4 -

receding floods between the rivers and the floodplains. Rivers constituteretreat areas for the period of low water levels. Floodplains are the food-richbreeding, nursery and growth areas. Floodplain fisheries development is,therefore, not merely concerned with the increase in fish production from thefloodplain itself but also with the improvement of the catch in rivers.

2.12 Given the continued growth of population, in the foreseeable futureit will not be possible to effectively control over-fishing and reconstitute thepreviously balanced system of high natural reproduction. This would requireslowing down and adjusting road construction and flood control facilities and islikely to conflict with the interests of other sectors.

2.13 As a viable alternative, technologies that utilize more fully theproductive potential of floodplains are now available and are already practicedin Bangladesh in some lakes (para 2.55) and small floodplains. Thesetechnologies concentrate on artificial stocking of young fish of the carp familywhich already exist in the waters of Bangladesh. The composition and densitiesof the fish population are improved and conversion of the abundant primaryproduction is made more efficient. The project described in this report hasbeen designed to apply this technology on a broader scale and to generateadditional management approaches replicable on a larger scale.

2.14 In the project area, the floodplain areas with the highestpotential are in the Chalan beel area, the Gopalganj depression and the Khulnadepression (Map 21887). These large natural depressions contain about 550,000ha of water from July to November; located in the flat middle part of thecountry, each depression is divided into several major floodplains ofsubstantial extent. An additional potential of about 50,000 ha is found in theTeesta River area, the Nawabganj District and other dispersed areas; thispotential is located in areas adjacent to hilly terrain where the fastermovement of floodwater has created smaller and deeper floodplains, that usuallyhold water from July to March; the term minor floodplains is used for them.Altogether these floodplains and associated rivers now produce about 110kilograms of fish per ha or a total of 66,000 tons of fish. Stocking asproposed under the project would result in an incremental yield of 300 kglha inthe major floodplains and 700 Kg/ha in the minor flood plains.

2.15 The development of the major floodplains in the large naturaldepressions calls for direct public sector intervention, whereas the developmentof minor floodplains can be handled by the private sector. As the size of thefloodplains increases, it becomes more difficult for investors to controlfishing and to recover investment in stocking. Initially, it appears desirablethat the public sector limit itself to stocking major floodplains with a minimumsize of 5,000 ha, while refining knowledge about limits of private and publicsector activities in floodplains. This concept has guided the design of theproject.

2.16 A long term strategy for floodplain fisheries development inBangladesh should aim to increase the production of high-potential majorfloodplains through public stocking and to develop minor floodplains throughprivate stocking. Applied to western Bangladesh, the project area, such astrategy would increase annual fish production by about 200,000 tons, valued atabout Tk 4.0 billion (US$ 124 million). The major present constraints to such astrategy are managerial and financial and these would be addressed under the

Page 12: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

project. The technology is available and is beginning to be used by the privatesector to stock minor floodplains.

Coastal Shrimp Culture

2.17 Eighty percent of the national production and 60 X of exports ofshrimp originate in the project area (Annex 1). High profit margins haveallowed rapid expansion of brackish water shrimp culture -- an enterprise inwhich Bangladesh enjoys a large comparative advantage. This advantage is basedon a favorable climate assuring cheap natural food for shrimp as long asproduction intensity is in tune with it, extensive land areas within the tidalrange of saline water allowing low-cost water exchange and cheap labour. Shrimpculture alternates in most cases with a rice crop grown during the wet season.At present, production is of low intensity with yields averaging about 100 kg/haof exportable shrimp.

2.18 The present production of shrimp reaches only about 351 of itspotential, for two reasons. First, not all the land suitable for shrimp cultureis used for that purpose. Second, yields on land being used for shrimp cultureare low and do not make full use of the natural productivity of the environment.Yields are constrained by (a) lack of adequate water supply and drainage; (b)inadequate management; and (c) problems of access to adequate credit for on-farminvestment and operation costs. Rising cost of shrimp post-larvae may become aconstraint in the future, although hatchery-produced post-larvae shouldalleviate supply shortages. The hatchery technology is available in thecountry.

2.19 Water supply and drainage problems due to inadequate waterinfrastructure are found in poldered and non-poldered land of the shrimp culturearea. Problems are most marked on the 50,000 ha of land currently under shrimpculture within polders. In the poldered areas the previously dense network ofnatural tidal water supply and drainage channels has been interrupted. Shrimpfarmers near the polder embankment achieve adequate water exchange only bytampering with the peripheral polder embankments, which endangers the floodprotection of others. Farmers closer to the center of the polder cannot improvewater exchange. Additional water control structures are required to provideadequate water exchange for shrimp culture, while guaranteeing the safety of thepolders and respecting the requirements of agriculture. This type ofimprovement has to be provided by the public sector, as it owns and maintainsthe polder embankments. The ongoing Shrimp Culture Project (para 2.56) hastested successfully the feasibility of such improvements in one of the poldersin the project area and replication on a wider scale, incorporating theexperience gained, is possible.

2.20 Non-poldered areas, with some 30,000 ha under shrimp culture andan intact natural water exchange svstem, are dependent 'n technology adopted bythe individual farmer. The public sector role should be limited to overall waterplanning and provision of services such as research, extension and credit.

2.21 Managerial constraints pertain to limited know-how in productiontechnology and inadequate organization of small farmers. The major shortcomingsin production technology include the management of pond water and stocking, pondpreparation, fertilization, predator control, and post harvest care. Shrimpfarms with relatively higher yields encounter problems of cost and compositionof supplementary feeding and of disease prevention. Small farmers need to be

Page 13: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 6 -

organized into economically-sized blocks of land. Grouping them into blocks of70 to 100 ha would allow these farmers to operate shrimp culture on their own,rather than leasing their land to professional shrimp operators, and wouldimprove coordination between agricultural and fisheries activities.

2.22 Financing from institutional sources is limited due to the weaknessof the nationalized banks. Credit for the past expansion in shrimp culture wasmet essentially from non-institutional sources and this is expected to remainthe main source in tne near future. Financing is needed for investment inon-farm infrastructure and equipment which increases with intensification offarming activities; about Tk 6,000 (US$ 185)1per ha is required for thispurpose. Financing of a similar order is required for seasonal operation costs(para 3.14).

2.23 There is good potential for production increases in the Khulna,Shatkhira and Bagherhat districts of Western Bangladesh; production can beincreased at costs that will allow Bangladesh to remain competitive on the worldmarket. About 8,000 tons of live weight, exportable brackish-water shrimp areproduced today on the 80,000 ha of existing shrimp culture in the project areawith an average yield of 100 kgjha. By the year 2000, 37,500 tons -- over fourtimes the present level -- could be produced. To achieve this, the area undershrimp culture would have to expand to the 150,000 ha with good potential andaverage yields should rise to 250/kg ha, which is feasible.

2.24 The expansion of shrimp production into new areas should not be ledby the public sector. Public support, mainly the construction of publicinfrastructure, should occur once shrimp culture has moved into new agriculturalareas or once there is a well-documented popular demand to venture into newareas. The transition into shrimp culture is difficult for smallfarmer-landowners, with a holding size averaging below 1 ha, and forsharecroppers. The introduction of shrimp culture during the fallow period,after the rice crop, requires close coordination between agricultural andfisheries activities and often is associated with a change from subsistence tomarket orientation, which is difficult in spite of rising incomes.

2.25 A strategy for shrimp culture development in western Bangladeshshould aim to increase production to about 250 kg/ha by the end of the century.The public sector should be limited to support for water management, extensionand access to credit. Within polders showing a high benefit:cost ratio, publicwater infrastructure should be provided. Outside the polders efforts should befocussed on providing extension and access to credit (para 3.25).

Other Fisheries Resources

Rivers

2.26 The river and the floodplain environment are complementary (para2.11). Combined they produce 424,000 tons or 70t of the inland fish catch, withthe balance coming from pond culture (Annex 1). Rivers are intensively fished.The Department of Fisheries (DOF) attempts to counteract declining production inrivers by improving resource management and enforcing fisheries regulations(para 2.49), but it faces difficulties to implement this. The Department hasstarted to stock rivers on a small scale but cannot monitor results. There ispotential for pen and cage culture activities at the fringes of the rivers which

Page 14: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-7-

should attract private sector interest. The project would provide support to afew river fisheries initiatives (para 3.29).

Coastal Fisheries

2.27 Coastal or artisanal marine fisheries provide 262 of the country'sfish production and the project area accounts more than half of it. Catchlevels have increased rapidly in recent years and now have exceeded thesustainable maximum. The increase is attributed to rising fish prices andincreases in fishing efficiency that has come with motorization. There is alack of services for fishermen and boats, and the market is dominated bypowerful monopolies or oligopolies. However, knowledge about the aquaticresources and their exploitation is limited. Some studies on coastal fisheriesare currently being launched with Danish aid and UNDP support. Given theseconditions, the project would provide minor support to coastal fisheries at thisstage (paras 3.29 and 3.36).

Ponds, Minor Floodplains and Lakes

2.28 Ponds have a considerable potential for increased production. Atpresent they contribute about 150,000 tons, or 18? of national fish production.There are about 1.3 million ponds in the country covering an area of 147,000 ha.The average size of ponds is about 0.1 ha. Some 60? of the ponds -- 91,000hectares -- are located in the project area, where they produce some 68,000 tonsof fish. The average yield is 750 kg/ha. Yields vary widely, with flooding inthe rainy season and water-holding capacity in the dry season stronglydetermining production levels. Ultimately ponds in the project area couldproduce around 200,000 tons per year with average yields of more than 2,000kg/ha.

2.29 Compared to the potential, the present production is low becauseof the high risk associated with flooding and drought, and because pond ownersand operators lack technical know-how. Flood and drought risk cannot beeliminated, but knowledge can be improved through extension services. Existingtechnology must be presented in a manner that is adapted to suit the financialand technical realities of farm and market conditions. Pond production modelsshould be offered which acknowledge flooding or dry-season risks and provideprofitable new possibilities such as fingerling and fresh-water shrimpproduction. The basic pond model of the project includes pond rehabilitation,double stocking, fertilizing and supplementary feeding and raises fish yields inselected ponds from 300 kg/ha to about 1620 kg/ha. In ponds which have aperennial water supply, fresh-water shrimp can be a useful subsidiary crop.

2.30 There are about 50,000 ha of minor floodplains and lakes (baors,permanent beels) in the project area, generating yields of about 200 kg/ha. Thepotential yield with double stocking is about 900 kg/ha, representing anincrement of 35,000 tons. Minor floodplains and lakes differ from ponds in thatthey operate at a larger scale and place higher demands on financing, protectionfrom poaching and organization of fishing. The public sector could help byproviding extension advice, particularly to groups of fishermen and fisherwomenand rural communities.

2.31 Aquaculture in ponds, lakes and minor floodplains share a commontechnological approach, based on stocking and managing a confined body of water.The development of these aquaculture resources is driven on the supply side by a

Page 15: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

large informal private network of private technology and input distributors.Supported by DOF in the early stages, this network is now expanding rapidly onits own. The number of private "extension agents' is estimated at more than6,000, consisting of 300 private hatchery operators, 2,000 nursery operators and4,000 fingerling traders in the project area. Private hatcheries supply 90-952of the hatchlings used in nurseries and subsequent production stages, with 60government hatcheries providing the balance.

2.32 The expansion of private fingerling production for fish culture isconstrained mainly by effective market demand. Other constraints are found inlimited access to finance and to advanced techniques for managing hatcheries andnurseries. Training support is needed for small traders -- the illiterate andself-trained conveyors of technical messages to the fish farmers.

2.33 A public sector strategy to support aquaculture development wouldhave to adapt to these developments in the private sector hatchery and nurseryindustry. This will require a change in the DOF's established methods ofdisseminating basic aquaculture techniques and producing fish seed in the publicsector. Major efforts should be directed at disseminating more sophisticatedtechnology to the well-established pond, lake, floodplain, hatchery and nurseryoperators (para 4.08). DOF should withdraw from the seed industry and freefunds and personnel presently engaged in fish seed production for technologydissemination (para 3.34). Public effort of the fisheries administration alsoshould assist in linking fish farmers with banks and in providing access toinstitutional credit through the preparation of bankable financing plans. Atthe same time there is a need to reach the many uninformed small pond ownersthrough simple messages carried by fingerling traders (paras 3.33, 4.08).

E. InstitutionsPrivate sector

2.34 The private sector catches most of the fish and shrimp inBangladesh and produces or catches 95? of the fish seed. As indicated above(para 2.01) about 11 million part-time or subsistence fishermen are activeseasonally and about 1.5 million professional fishermen are active throughoutthe year. Most are not organized and fishing cooperatives exist in name only.Operators of the 1.3 million ponds in the country probably have strongerallegiance to agriculture than to fisheries and therefore do not manifestthemselves in fisheries groups. Relatively powerful groups engage in trade witha National Seafood Exporters Association and the several hundred big fishtraders finance and wholesale most of the hilsa and coastal fish. The fishhatchery and nursery operators and fish seed traders are important in thepromotion of aquaculture, but so far have no strong voice yet.

Public Sector

2.35 The Ministry of Fisheries and Livestock (MFL) is the major publicsector institution in the fisheries sector. For fisheries matters it contains aDepartment of Fisheries (DOF), the Fisheries Research Institute (FRI) and aBangladesh Fisheries Development Corporation (BFDC). The Upazila administrationcontains usually a fisheries office technically guided by DOF. Theadministration of the sector comprises about 5,200 persons, including some 1,200professionals, and in FY90 handled an annual budget of about Tk 840 million (US$26 million). Compared to the agricultural sector the fisheries administrationis small. It suffers from the deficiencies found also in other public services

Page 16: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 9 -

such as low salaries, lack of staff accountability and motivation, and poorlyformulated policies and programs. However, problems are recognized, are beingaddressed (paras 2.38, 2.53) and performance is improving (para 2.56).

2.36 MFL is responsible for policy, programming, and coordination offisheries and livestock activities. It employs about 100 professionals, 50 ofwhom work on fisheries under the leadership of a Joint Secretary. The MFLencounters problems in planning and management; planning and monitoringfacilities are undersized and under-funded. In the past, development prioritiesand GOB guidelines on private and public sector roles were not translated intoaction programs with realistic targets. Delegation of power for developmentactivities is insufficient. These problems will be addressed under the projectby creating planning and monitoring cells (paras 3.32, 3.33), technicalassistance (para 3.38), supporting a major part of the administration'sdevelopment program with well defined public and private sector roles (paras3.15) and by implementation mechanisms and conditionality stressing delegationof authority (para 4.07).

2.37 DOF is charged with implementing the policies and programs of MFL.Its duties cover the management and conservation of fish resources, developmentof aquaculture, operation of hatcheries and nurseries, enforcement ofregulations, training and dissemination of technical knowledge, formulation andexecution of development projects, quality control of exports, and collection ofstatistics. DOF operates 14 projects with an annual budget of about Tk 630million (US 19.5 million) in FY90. It has about 4,600 sanctioned posts, 4,300 ofwhich are filled. Professionals make up 282 of the staff.

2.38 The major shortcomings of DOF are in planning, projectimplementation, design of extension activities, and interagency coordination. AThese problems are based on four underlying conditions: (a) lack of a clearmandate, (b) structural weaknesses; (c) managerial constraints; and (d)insufficiently trained staff. A UNDP supported DOF Strengthening Projectresulted from this exercise and is under implementation (para 2.53).

2.39 The absence of a clear mandate for DOF allows it to continue activitieswhich are no longer required from the public sector. An example of this is theproduction of hatchlings. In the past, hatcheries and seed farms were developedin the public sector to spur aquaculture development. However, in recent yearsthe private sector has taken on fish seed production and now provides a majorshare of the national spawn and hatchling yield at lower cost than the publicsector hatcheries. The articulation of a clear mandate would result in DOFstaff to be shifted from seed production to more important activities such asproviding research, extension and training support to the private sector seedindustry. The project addresses this through conditionality (para 3.34), TAsupport (para 3.39) and financing training facilities for DOF staff (para 3.32).

2.40 The major structural problem within DOF is the dichotomy thatexists between the revenue and development activities. This dichotomy leads totwo discrete establishments operating in DOF -- the relatively large, under-funded and poorly-staffed revenue budget establishment financed by thegovernment, and the smaller, well-funded and staffed project operations fundedprimarily by donors. Interaction between the two establishments is limited. Thedevelopment projects report directly to the Director of Fisheries or theSecretary of HFL. Once a development project is completed, staff is retainedunder the revenue budget or placed in other development projects. This leads to

Page 17: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 10 -

staff proliferation. Other problems include a diffuse and incompleteorganization at headquarters and the lack of simple chain of command betweencentral and Upazila services. The project addresses the above problems throughits program approach that combines revenue and development budget staff (para3.07).2.41 Managerial weaknesses in DOF are linked to the organization'sdiffuse structure and weak personnel management. Lack of delegation, monitoringand evaluation and problems in procurement figure prominently (paras 2.55,2.56). These problems are addressed under the project (paras 3.32, 3.38, 4.07,4.18).

2.42 Most of the professional staff of DOF have graduate degrees in oneof the natural sciences. However very few staff are skilled in the area ofproduction, planning, economics, social science, management, finance andaccounting. The ongoing UNDP funded DOF Strengthening Project (para 2.53; Annex2) focusses on these issues and the project will support training (para 3.32).

2.43 FRI was created in 1984 as a spin-off operation from the researchfunctions of DOF and the Bangladesh Fisheries Development Corporation (BFDC).It has a staff of 250, with a mandate to carry out applied fisheries research.Its current five-year master plan focuses on pond fish and shrimp culture, whichare of direct relevance to the project. However, areas important for thefisheries development program in western Bangladesh such as floodplain andcoastal fisheries are not yet covered. FRI has stations in several areas of thecountry, but is absent from the northwest despite the importance of fisheriesresources in this region (para 2.14, Map 21887). The project will support FRI(para 3.36).

2.44 BFDC is designed to operate as a commercial enterprise in fishprocessing, production of nets and boats, trawling and operating fish markets.However, it has been unprofitable and would require substantial reforms in orderto improve its performance. It is expected that the institutional strengtheningof DOF (para 2.53, Annex 2) will help also to clarify the mandate of BFDC andlead to its reform.

2.45 Over 502 of the staff of the fisheries administration work in theUpazila fisheries offices (Annex 1). Their main task is to provide fisheriesextension. In most cases, however, they have no clear work programs and lackthe basic material means to fulfill their role. The operational budget isminimal and means of communication such as bicycles or motorbikes are absent.Development projects used to bypass them. The work situation of Upazilafisheries staff is especially frustrating for the young and eager professionalwho start their career at Upazila level. The project addresses these problemsby integrating staff of selected Upazilas into project activities and providingthem with meaningful work programs, equipment, finance for operational cost andtraining (para 3.33). The project also provides funds that allow particularlyactive officers to intensify their development activities beyond the routinelevel (para 3.29).

2.46 The MFL maintains technical links with the Ministry of Irrigation,Water Development and Flood Control (MIWDFC) and the Bangladesh WaterDevelopment Board (BWDB); the Mirnistry of Lands (ML); the Universities; theMinistry of Agriculture (MOA); and the Ministry of Local Government and RuralDevelopment and Cooperatives (MLGRDC). MIWDFC oversees the Bangladesh WaterDevelopment Board (BWDB) which will develop the polder infrastructure for the

Page 18: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 11 -

project's shrimp culture component. ML administers the floodplain waters thatare an important part of the project. Universities, particularly the BangladeshAgricultural University, are the sources of professional staff. MOA has commonconcerns and clients with MFL, and a closer coordination between the two wouldimprove the efficiency of services. Links with the MLGRDC exist via its role inoverseeing Upazilas and cooperatives.

2.47 MFL also maintains administrative links with entities relevant toits mandate. It has strong links with the Ministry of Planning (MP). ThePlanning Commission (PLANCOM) clears projects and budget allocations and theExternal Resources Division (ERD) coordinates aid inputs. The Ministry ofFinance (MP) provides the recurrent and development budgets and should beinterested in the institutional efficiency, expenditure, and cost recoveryaspects of the project. The Bangladesh Bank (BB) provides refinance andguidance to the financial sector, which is currently undergoing major reforms.

Non Governmental Organizations (NGOs)

2.48 NGOs are increasingly active in the fisheries sector. There areclose to 300 in the country -- about 30Z of them funded externally. The largestones active in the project area are the Bangladesh Rural Advancement Committee,Proshika and Caritas. NGOs normally practice a holistic rural and groupdevelopment approach which focuses on income generation among the poor andbuilds increasingly on the profitability of aquaculture and the availability ofunder-utilized bodies of water. NGOs can be employed advantageously in socio-economic survey and extension work for public sector projects (para 3.39); theyare especially effective in providing disadvantaged groups with assistance intraining and organization, and in facilitating their access to resources andinputs.

F. Regulations

2.49 All regulations in the fisheries sector are rendered less effectiveby problems of enforcement. The two major regulations affecting inlandfisheries are the Protection and Conservation Act of 1950 and the New FisheriesManagement Policy (NFMP) of 1986. The Protection and Conservation Act isdesigned to protect fish stocks from over-fishing, but population pressure hasmade the Act largely inoperative. The NFMP was introduced in FY87 with theobjective of strengthening equity, conservation of fish resources and costrecovery. The policy limits access to public water bodies to genuine fishermen,assuming that these fishermen are deprived of income by entrepreneurs who aresaid to fish without regard to the sustainability of production. Transferringfishing rights to fishermen is expected to lead to voluntary restraint infishing effort or to compensation by stocking. The implementation of thispolicy now occupies much of the field capacity of DOF and some Upazilas; it isbeing monitored with support by the Ford Foundation. Difficulties are beingencountered in limiting licenses to genuine fishermen, collecting fees, andpromoting a sense of collective responsibility among fishermen.

G. Development ActivitiesNational Plans

2.50 National development strategies and programs for the fisheriessector are formulated in the context of preparing the country's five-year plans.

Page 19: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 12 -

The Third Five Year Plan (TFYP), 1986 - 1990 foresaw a total of Tk 4 billion(US$ 140 million) of public expenditure in the fisheries sector. This amountedto 1.4Z of total plan expenditure.

2.51 Because past plans were over-optimistic, public expenditures haveachieved only about 25Z of their targets. This shortfall reflects the absenceof consistent programs and the poor implementation capacity of the fisheriesadministration. It points to the need for region-specific plans for fisheriesthat can be updated regularly. Public sector production campaigns have not beenas effective as private sector development.

2.52 Much as previous plans, the Fourth Five-Year Plan (FFmY; 1991-1995)is expected to emphasize (a) increasing fish production, consumption andnutrition derived from fish, (b) increasing employment, and (c) increasingfisheries exports. Better utilization of the floodplain resources throughstocking programs and the intensification of shrimp culture are expected tofigure prominently in the FPYP. Financial allocations to the sector may rise,as government and donors begin to recognize the development potential offisheries, particularly in floodplains. The proposed project will constitute amajor portion of the FFYP's planned fisheries sector expenditures. The plan isalso likely to reflect many of the project design concepts (para 3.06),particularly on private and public sector roles, as officials responsible forplanning in fisheries participated actively in the project's formulation andappraisal process. GOB's evolving perceptions of private and public sectorroles in fisheries already result in questions about the need for the governmentto operate hatcheries and project agreements aim in the same direction (para3.34).

Major Development Programs

2.53 Major development efforts relevant to the project include theSecond Aquaculture Development Program financed by ADB, the Shrimp CultureProject (IDA) (para 2.55), the Beel and Baor Project (IFAD), and the DOFInstitutional Strengthening Project (UNDP). The Second Aquaculture DevelopmentProgram and the Institutional Strengthening Project are of particular relevance.The Second Aquaculture Program focusses on carp and shrimp culture in variousparts of the country and floodplain stocking in eastern Bangladesh. Refinancingof credit is an important element and the program provides refinance of creditneeded mainly in the shrimp culture component of the project. The InstitutionalStrengthening Project will provides inter alia plans for the rehabilitation ofDOF training facilities which will be financed under the project. These and theother projects are described in Annex 2.

H. Bank Group Involvement

2.54 IDA support began in the mid-1970s with a fisheries sub-project ofthe Karnafuli Irrigation Project (Cr. 605-BD). The sub-project incorporatedtechnical assistance for a carp hatchery and training, and was successfullycompleted in 1982. The sub-project focused on the adverse effects on inlandfisheries from flood control, drainage, and irrigation projects and correctedthese through inclusion of aquaculture-based fishery components in the projects.

2.55 The first free-standing IDA fisheries project was the Oxbow LakesFisheries Project (Cr. 890-BD; FY79; US$ 6 million; closed on 6/30/1986). Theproject provided financing for hatchery and fingerling rearing facilities for

Page 20: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

_ 13 -

six lakes. The Project Performance Audit Report (1989) states that itsuccessfully demonstrated the application of aquaculture techniques in waterbodies of around 300 ha which increased yields from 150 kglha to about 800 kg/hawithout additional feeding. The experience of that project verifies the basicconcept of floodplain stocking employed under this project. Small-scalehatcheries, also demonstrated under the Oxbow Lakes Project, were an importantspin off benefit. One weakness of the project was the insufficient delegationof tasks to the beneficiaries -- tasks involving hatchling and fingerlingsupply, stocking. lake management, and fish marketing. The project alsodisplayed DOF's weakness in project implementation and procurement functions.The principal lesson learnt was not to entrust government agencies withcommercial fishery operations or, in particular cases, plan from the outset thetransition from public sector to private sector management. These specificlessons have been incorporated in the project design; project management hasbeen reinforced by TA; fingerlings are procured from the private sector (para3.46); agreements aim at the divestment of surplus public hatcheries (para 3.34)and criteria for the selection of project activities exclude the public sectorfrom commercial operations (Annex 3).

2.56 The ongoing Shrimp Culture Project (Cr. 1651-BD; FY85; US$ 22million; closing 12131/1991) aims to improve shrimp culture within polders on7,000 ha, 5.600 ha of which are located in the eastern Cox's Bazar area, whereshrimp culture during the wet season alternates with salt pans. The other 1400ha of polder land are located in a polder in the project area and they are partof a large-scale test for improved shrimp culture in the shrimp/paddy rotation.The project also includes hatchery development, extension services, credit and atechnical assistance component financed by UNDP and executed by IDA. Itinvolves an NGO for organizing shrimp farmers. The project has developedadequate momentum and is progressing satisfactorily. Although the improvedwater infrastructure has only been in operation for one shrimp season, theproject concept appears sound; farmers are satisfied and yields have alreadyincreased from 75 to 135 kg/ha in the pilot area. BWDB performed well. DOFmanagement has been adequate and professional field staff performed well.Currently identified DOF weaknesses are in procurement, delegation ofresponsibility, monitoring and cost recovery. Development of public shrimpculture land and acquisition of private land for water supply and drainagechannels have caused delays. Hatchery development has proved difficult becauseof managerial problems in DOF and limited response from the private sector.Institutional credit for on-farm development and for hatchery development andmarketing improvement has been very limited. The TA component has proved to bevital and the NGO has been effective in promoting beneficiary participation inthe project. The lessons learnt from this project have been fully integrated inthe project design (paras 3.06).

2.57 IDA reviewed the fisheries sector in FY83 (para 1.01). The reportsummarizing the review findings drew GOB's attention to inland fisheriesdevelopment and the institutional problems of the fisheries administration (para2.38). In 1985, a report on the DOP's institutional strengthening (para 2.38)intensified IDA's dialogue with GOB on the fisheries sector. IDA review of thefisheries sector is at an advanced stage, updating and extending data collectedduring an agricultural sector review conducted in FY87. It is due forcompletion in FY90 and it stresses the need for accelerated fisheriesdevelopment. The preliminary findings of this review have been taken intoaccount in the project design.

Page 21: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 14 -

III. THE PROJECT

A. Proiect Obiectives and Rationale

3.01 The project is designed to support a sectoral development processaiming at: (a) increasing incomes, particularly of the poor, and fish productionfor domestic consumption and export, (b) supporting the fisheries developmentprogram in the west with emphasis on private sector participation; (c)accelerating the expansion of fish production in floodplains; and (d)strengthening sectoral institutions.

3.02 IDA involvement in the project is warranted for three reasons.First, fisheries development is a priority in the GOB's development program andin IDA's lending strategy because of its high potential for growth and povertyalleviation. Second, IDA has developed experience and a capability to assistdevelopment in the sector through projects and sector work; the time has come toaccelerate investments on a larger scale, using the experience gained from thestudies and smaller projects. Third, IDA is a major source of funding and playsan important role in mobilizing donor resources; its interest in the sector islikely to help reverse a past trend of stagnation and decline.

B. Project Area

Western Bangladesh

3.03 As explained in para 1.02 the western part of the country wasselected as project area in FY88. The physical area covers about 77,000 squarekilometers, or 62Z of the national territory (Annex 1 and Map 21887). It ishome for about 55 million people -- 50? of the national population -- andproduces about 532 of GNP. The major economic activities are crop agriculturewith associated livestock -- providing 552 of national production -- andfisheries --providing 53? of national production; the area produces about 60Zof exported shrimp.

3.04 The project area is defined in the north and west by about 900 kmot border with India, in the east by the Jamuna-Meghna River, and to the southby the Bay of Bengal. The Jamuna River obstructs communication with the centersof buying power -- Dhaka and Chittagong. However, communication will improvewith the completion in 1995 of the proposed Jamuna bridge in the northern apartof the project area and with the ongoing improvement of road and ferryconnections in the southern part. As a result, the market for fisheriesproducts of the project area can be expected to improve. The southern fringe ofthe project area comprises the Sundarbans which are closed to permanent humanhabitation because the terrain is still unstable and the area is important as anature reserve.

3.05 The project area is divided by the Ganges river into two distinctregions -- the North and the South. The North is synonymous with the RajshahiDivision. It covers 352 of the project area and contains 49t of its population.It is comparatively richer than the south because of its fertile floodplainswhich support a high level of agricultural production. The North also containsthe arid Barind Tract -- an area of about 5,700 sq km with a small populationand low incomes. The South consists of the Khulna and part of the Dhaka

Page 22: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 15 -

Divisions. It comprises 652 of the project area and contains 51? of itspopulation. Limited groundwater facilities and severe annual flooding allowless intensive agriculture in the South and poorer living conditions.Altogether 3 Divisions, 37 Districts and 244 Upazilas occupy the project area,

C. Project Design

3.06 The project has been designed to translate the objectives describedin para 3.01 into components which reflect the sectoral potentials andconstraints in the project area and strategies discussed in Chapter II. Theproject is conceived as the first in a series of sector-wide fisheries projectsplanned for IDA support in the western part of the country (para 1.02).

3.07 The program approach was chosen because it allowed to respond tothe need to initiate accelerated development, while simultaneously strengtheningthe fisheries institutions and making full use of the findings made in studies,pilot projects and small-scale projects. Such an approach was also consideredthe most suitable to maintain a long term perspective, focus the fisheriesadministration's development activities (para 2.50), address its core managerialissues (para 2.38) and introduce flexibility to transfer project resources fromslow activities to faster ones (para 4.12).

3.08 The project is expected to be completed by June 30, 1996 and theCredit would be closed by December 31, 1996. The project's duration of sixyears is one years less than the profile of similar projects in Bangladesh. Theshorter duration was chosen because the government had expressed its preferencefor a shorter project period. Its strong commitment to the project, visible intimely contributions during the preparation stages, raises the expectation thatthe project objectives can be achieved in time. This also has been confirmed bycritical path tests for the main components (annex 10). Finally, a follow-upproject could pick-up unaccomplished tasks, as the project is meant to be one ina series of prospective sectoral projects in the same project area.

3.09 The project has two distinct groups of components. One addressesthe production objectives and comprises three components, floodplain fisheries,coastal shrimp culture, and other fisheries. The other group, comprisinginstitutional support, research, and technical assistance and training, providessupport to the production components by focussing a critical mass of institutionbuilding, social support measures and policy improvements required to supportthe accelerated development program.

3.10 The composition of the production components follows the importanceof the various fisheries resources in the project area and their potential forrapid and sustained production increases. Floodplain fisheries receive specialattention because of their high production potential (para 2.10). Shrimpculture, a leading foreign exchange earner with potential for expansion (para2.07), calls for sustained support focussing on infrastructure development (para2.25). Other fisheries is a residual component grouping mainly the otherresources (para 3.29). The production components allow clear delimitation ofimplementation responsibilities; thus the DOF headquarters is the primeresponsible for the floodplain fisheries component, the DOF field services forthe other fisheries component and the BWDB for the shrimp culture component.

3.11 The scale of the production components was determined by theimplementation capacity of the public and private sector entities involved.

Page 23: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 16 -

The capacity of the private sector to produce and deliver fingerlings forstocking (para 2.31) was the limiting factor in the floodplain fisheriescomponent; the idea of the public sector producing fingerlings was abandonedearly because of its weak performance in this area (para 2.39). The capacity ofBWDB to develop infrastructure decided the scale of the shrimp culturecomponent, and the absorption capacity of the DOF field services down to theUpazila level determined the size of the other fisheries component.

3.12 The impact areas of the production activities hinge onconsiderations of size and safety of returns to project investments. The areaswith the highest resource concentration were chosen in floodplain fisheries(para 2.14) and their location in three different parts of the project area (Map21887) provides safeguards against potential local failures in management,fingerling supply or other unforseen fields. In shrimp culture the areas withthe highest resource concentration and the lowest per unit cost ofinfrastructure development have been designated or prescribed by selectioncriteria (para 3.26, Annex 3). The same criteria and the mode of attributingfunds also guide activities under the Other Fisheries component towards high andsafe returns (para 3.29).

3.13 The composition of the support components is consistent with theroles of the various GOB and donor agencies. The institutional supportcomponent provides support to DOF, the Upazila fishery offices and to BWDB; itsinternal breakdown allows the agencies to recognize easily the projectcontributions which concern them most. The research component is solely forFRI. The two technical assistance sub-components are determined by the distinctnature of the contributions from two grant aid donors, with ODA focussing on DOFmanagement support and UNDP on technical and social support.

3.14 The project does not include credit and market components.Substantial credit funds have been provided under the Second Aquaculture Projectof ADB for shrimp and fish farmers in the project area (para 2.53, Annex 2) andthese funds have not yet been utilized. Moreover, banks do not lack funds butneed well prepared loan proposals and eligible clients; this is one of thethrust areas of institutional support to the fisheries administration (para4.07). Actions to adjust the financial sector of the country, includingagricultural credit, already are being supported by IDA and include inter aliastopping the use of refinance as an instrument for subsidized credit. Againstthis background, a credit refinance component would work against the efforts tostreamline institutional credit. Instead emphasis has been placed on developingwithin DOF capacity for better collaboration with the banks. In order tosimplify design, project involvement in fish and shrimp marketing is limited toextension contacts of DOF with the trade and processors, and monitoring ofseasonal and long term market trends by project management. Moreover, ptivatesector marketing is fairly efficient (para 2.06).

3.15 Policy improvements are incorporated in the project. Under theproject long-term roles for the private and public sectors have been translatedi-ito specific task allocations. For example, the project does not financepublic sector production operations (Annex 3) and supports the closure ofexisting production operations (para 3.34). Instead the project focuses publicsector activity on extension operations complementing and improving the existinginformal private extension network (para 2.31). The project will help to limitthe size of the fisheries administration by encouraging the use of servicecontracts with private firms and by making full use of the underemployed DOF and

Page 24: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 17 -

Upazila staff under the revenue budget. Cost recovery which is important forthe financial sustainability of floodplain fisheries development, is addressedthrough appropriate studies (para 3.39, Annex 6) and agreements (paras 6.14,6.19, 6.20). The issue of subsidies on shrimp exports was covered duringnegotiations (para 5.06).

3.16 The scale of the support components was determined by the appraisalteam and the GOB officers closely associated with it, as being required toachieve the project objectives, taking into account support available from othersources. The biggest elements are the support to DOF and the Upazila fisheriesoffices and technical assistance and training. The TA component had to besubstantial for several reasons. First, GOB insists that most local consultantservice are financed from grant- rather then GOB or Credit funds; this increasesthe size of the technical assistance components; local services account forabout 25 Z of the project's TA cost. Second, technical assistance had to ensurethat the main areas of past DOF weaknesses in management, procurement,monitoring and delegation of authority to the field, the assistance needs of theyoung FRI and of improvements in policies were sufficiently well covered byforeign and local expertise and training. The floodplain fisheries componentcalled for particularly strong support in fingerling procurement and monitoringthe effects of stocking. Third, the equity objectives of the project alsoincreased the scale of technical assistance. Newly created service pointsaddressing the needs of an increasing number of mostly destitute women active infisheries and income distribution aspects in coastal shrimp culture andfloodplains had to be supported by expertise and substantial NGO services.

D. Prouect cemponents

3.17 The project has six components: (a) Floodplain Fisheries; (b)Coastal Shrimp Culture; (c) Other Fisheries; (d) Institutional Support; (e)Research ; and (f) Technical Assistance. Floodplain fisheries involves thestocking of 29,000 ha of major floodplains in project year two, increasing to100,000 ha in project year five and six. The coastal shrimp culture involvesimprovements in infrastructure for public water control on 13,000 ha of polderedland already under shrimp culture. Other Fisheries includes 55 finance packagesfor Upazila- and District-level programs to develop freshwater fish and shrimpponds, minor floodplains, riverine fisheries, and women's involvement infisheries. Institutional support encompasses the financing of incrementalfacilities and operating costs of DOF and BWDB. Research involves the provisionof funds to FRI to carry out applied research related to the project. TechnicalAssistance includes two packages -- one for project management and one fortechnical and social support.

E. Detailed FeaturesFloodplain Fisheries

3.18 The project will support investment in the development oftechnology for cost-effective stocking of floodplains. About 20Z of the majorfloodplain resources would be stocked with carp species fingerlings. The typeof fingerlings stocked would be silver and bighead (70Z), mrigal, catla, androhu (20Z), and common (10Z) carp -- all selected because of fast growth, earlyspawning and balanced species composition. Stocking would take place in June,with the onset of the monsoon and when the natural food supply for fish isparticularly high and the loss of fingerlings due to fishing is lowest. The

Page 25: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 18 -

fingerlings would be released from boats at different locations in the central,deeper parts of the plains.

3.19 Releases would be given much local publicity and would be precededby special extension campaigns to generate awareness about the negative impactof catching fingerlings and young fish. The fingerlings would be inspectedbefore and during stocking. For a few weeks immediately following the release,guards would be placed around the release areas to prevent any fishing of yetundispersed fingerlings. The volume and size of fingerlings stocked --important to reduce loss from predators -- would gradually increase over thelife of the project. In Project Year 2, 20 kg/ha would be stocked; in ProjectYear 3, 25 kg/ha and in Project Year 4 and onwards, 30 kg/ha. The weight andsize of fingerlings would increase from 7.4 g, 9.5 cm in Project Year 2 to 11 g,14 cm in Project Year 4. The progression in size of fingerlings is important toreduce mortality and will allow suppliers to adapt gradually to thc demand forlarger fingerlings.

3.20 The base cost of stocking would be Tk 45 (US$ 1.40) per kilogram ofthe 14 cm size fingerlings or Tk 1,350 (US$ 41.80) per ha as of Project Year 4.The annual base cost of this component would increase from Tk 43.5 million (US$1.4 million) in Project Year 2 to Tk 135.0 million (USS 4.2 million) in ProjectYears 5 and 6. IDA would initially finance 1OOZ of the cost (para 3.53) inorder to ensure the availability of funds at all times and confer initially aninvestment status to the stocking operations and instill supplier confidence inquick payment.

3.21 Because a timely supply of fingerlings is crucial for the successof the component, managerial routines for public stocking will be developed.The quantities of fingerlings required are substantial -- in Project Years 5 and6 about 3,000 tons of fingerlings will be needed, three to four times thepresent fingerling production of the project area. Although the existingprivate hatcheries and nurseries are capable of expanding output fast, skilledmanagement will be needed to effectively organize the supply. To ensureadequate organization, TA support would be provided to DOF and fingerlings willbe bought from a limited number of firms. After pre-qualification, supplierswill be selected on the basis of tenders and will arrange for sub-contractingwith the many small nurseries and fingerling producers (para 3.46). Draftprocurement documents have been prepared during appraisal.

3.22 Preparations for stocking would take place in Project Year 1, andactual stocking would begin in Project Year 2 on 29,000 ha. One floodplainwould be stocked in each Division in the first two years. The floodplains to bestocked initially have been selected because they are typical of the sarroundingpotential and because they are easily accessible. These floodplains include theChanda beel area in the Gopalganj depression (Dhaka Division), the poldered BSKEplain in the Khulna depression (Khulna Division) and the poldered Halti beelarea in the Chalan depression (Rajshahi Division). Intensive monitoring will becarried out in each of these floodplains over a period of three years (para4.20, Annex 6). For each of these areas a monograph depicting the main physicaland economic features has been prepared.

3.23 Stocking of these first areas will provide the technical andmanagerial experience required for expansion into adjacent areas. Since thefloodplains selected are typical of the surrounding potential, they will provide

Page 26: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 19 -

experience with the variety of conditions which are likely to be encountered inthe floodplains.

3.24 In Project Year 4, stocking will be expanded to other floodplains.Four floodplains are identified for this - the Boro beel (DhakalGopalgaaJ), theChenchuri polder (Khulna), the Uthrail and Hilna beels (Rajshahi) - but projectmanagement will be permitted to make its own choice as long as it employsselection criteria outlined in Annex 3. By Project Year 5, 100,000 ha will bestocked each year, out of the total major floodplain potential of 550,000 ha inwestern Bangladesh. The Dhaka Division will account for 30,000 ha, the KhulnaDivision for 30,000 ha, and the Rajshahi Division for 40,000 ha.

Coastal Shrimp Culture

3.25 This project component represents a continuation and expansion ofthe ongoing Shrimp Culture Project (para 2.56). Its purpose is to improve thewater exchange infrastructure on pcldered shrimp land to increase shrimpproduction and exports. About 13,000 ha of shrimp land have been earmarked fordevelopment. On these, 3,000 ha of detail planning and 7000 ha of generalplanning have been completed. The base cost of the component is Tk 417.3million or US$ 12.9 million. The component has been designed recognizing thatBWDB, the implementing agency for infrastructure, can accommodate a program of3.000 to 4,000 ha/year without straining its present implementation capacity.DOF will provide extension for poldered and non-polder areas and TA will supportinfrastructure planning and participant organization. Extension activities willfocus on the 13,000 ha in order to optimize returns on the infrastructureinvestment. They will complement the activities of ADB's Second AquacultureProject, which initially will refinance the on-farm credit. Extension supportwould be provided to all brackish-water shrimp areas, whether poldered or not,and would be financed from the Institutional Support and the TA components.Production of fresh-water prawns would be supported under the Other FisheriesDevelopment component.

3.26 Polders have been selected for water infrastructure improvementtaking into account both least cost of infrastructure per hectare of landcuirently under shrimp culture and production potential. A priority list ofpolders has been established using inf.rmation available from the ongoing ShrimpCulture Project. The list includes, in order of priority: Polders No. 23, 5,16, 18/19, 31, 32,and 33. Polders 23 and 5 have been selected for earlyimplementation and detailed planning has been completed. Polder 23 is locatedin the area where shrimp culture alternates with paddy cultivation. It has thelargest concentration of shrimp culture (3,700 ha) and the start there should beeasy due to early support from staff working on nearby polder 20 under theShrimp Culture Project. Polder 5 is located in an area where shrimp arecultivated during 9 months of the year and paddy cannot be cultivated any morein the remaining short period. About 1,000 ha of land have been selected forimprovement as a pilot operation for this type of shrimp culture withcomparatively higher yields.

3.27 During Project Year 1, the following activities would be carriedout in polders 23 and 5 : (a) a baseline social survey; (b) a projectparticipation agreement for the concerned population (Annex 6); and based on it(c) the selection of shrimp culture blocks for development. Civil works willbegin in Project Year 2 and be completed in Project Year 3. Detailed planningfor the other polders will begin in Project Year 2 and general planning for

Page 27: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 20 -

remaining 3,000 hectares will begin in Project Year 3. This planning will befunded under the TA component. During negotiations agreement was reached withGOB that the selection of polders for improvement in later years will be made byproject management and be based on the selection criteria in Annex 3.

3.28 BWDB will improve the polder embankments, build sluices and developsome footbridges needed to cross water channels. DOP will provide extensionwith the assistance of local consultants (NGOs) and expatriate experts.Extension would also be given to improve production of shrimp culture on some2,000 ha outside of polders. A project cell under the Divisional DeputyDirector for Khulna will provide DOF support, and draw on the manpower availablein the ongoing Shrimp Culture Project and in the Districts and Upazilas. Shrimpfarmers will be responsible for building or improving water distribution anddrainage systems, with organizational assistance from local consultants (NGO)and engineering assistance from BWDB. The building of sluices by BWDB will beconditional on the shrimp farmers agreeing to develop the water and drainagesystem. It is envisaged that the public sector will have to assist with theconstruction of some main channels, where farmers fail to develop an adequatesystem. For this intervention a provision of 20Z of total estimated cost ofmain water supply and drainage channels has been made. This approach differsfrom that previously adopted under the Shrimp Culture Project, where BWDB builtthe main channels. It reflects GOB's desire to lower the cost of publicinfrastructure and to minimize land acquisition.

Other Fisheries

3.29 The other fisheries component will provide localized support toprivate sector development at District and Upazila level. This will includemainly intensified study and extension services at the local level for (a) pondsand lakes, (b) minor floodplains, (c) rivers, (d) fresh water shrimp promotion,.e) assistance to underprivileged groups such as women and (f) other activitiesthat may appear important during project implementation. For planning purposes,funds for these services have been grouped into a number of packages to indicatethe variety and dispersed nature of target groups and implementing servicesinvolved. These services may include special studies, surveys, and training,temporary personnel service for extension and technical advice, fielddemonstrations and pilot operations including coverage of operating costs. Thepackages should be of particular value to the newly created Women in Fisheriescells at HQ and Division level (paras 3.32 and 3.33). These cells would promotethe increased participation of women in GOB's fisheries activities in westernBangladesh. Supported by Technical Assistance (Annex 6) they should be able toinitiate local development activities early in the project. The other fisheriespackages have been grouped under the disbursement category of study and servicecontracts. Financing for the Upazilas and DFOs will be allocated by thedivisional heads of DOF on the basis of agreed plans, which the District andUpazila officers will prepare with guidance from the divisional level. Duringnegotiations agreement was reached with GOB that only activities which conformto the selection criteria outlined in Annex 3 would be eligible for projectfinancing and that a substantial part of the funds available under thiscomponent would be used for activities related to women in fisheriesdevelopment.

3.30 A total of 55 Other Fisheries packages have been identified, at abase cost of Tk 66.0 million (US$ 2.0 million). The cost of the average packageis Tk 1.2 million (US$ 37,150). The actual cost of a package will vary with the

Page 28: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 21 -

type of problem addressed, the problem's importance and the state ofinformation. The estimated number of packages for ponds is 17, (Dhaka 3, Khulna6, Rajshahi 8); minor floodplains, 13 (Dhaka 3, Khulna 4, Rajshahi 6); rivers, 9(Dhaka 2, Khulna 4, Rajshahi 3); women's development, 8 (Dhaka 2, Khulna 3,Rajshahi 3); freshwater shrimp 5 (Dhaka 1, Khulna 2, Rajshahi 2);co,.stal/estuarine fisheries, 3 (Khulna 3). The packages are expected to resultin production increases on about 9,000 ha of minor floodplains and 4,500 ha ofother fisheries resources, mainly ponds.

Institutional Support

3.31 This component will support project implementation and someinstitutional improvements for DOF (para 2.37), the Upazilas (para 2.45), andBWDB (para 2.46), as required to attain sustainable development. The base costof the component is Tk 318.2 million (US$ 9.9 million). The project willfinance incremental costs of vehicles, office and field equipment, officeconstruction, building rehabilitation, operation and maintenance, and staff.The project draws primarily on staff already employed on the recurrent anddevelopment budgets. For the latter, only incremental operational costs will befinanced. In order to increase the transparency of disbursement againstincremental staff costs, agreement was reached with GOB that the submission byDOF, BWDB and FRI of a proiect related staffing plan indicating funding underthe development and the revenue budget will be a condition of disbursement.

3.32 DOF support will be divided between headquarters and the fieldservices. Headquarter support will fund the Project Coordination Cell;rehabilitation of training facilities, and equipment and operational costs ofother DOF units involved in the project. The Project Coordination Cell (para4.06) will consist of 11 professional staff working in 7 sub-cells i.e. projectmanagement, planning, monitoring and evaluation, procurement, administration andfinance, women in fisheries, and training. Detailed plans for rehabilitation oftraining facilities will be prepared under the ongoing UNDP/FAO InstitutionalStrengthening Project by March 1992. During negotiations agreement was reachedwith GOB that the plans for rehabilitation of DO? training facilities andproject related budget plans for the other DOF headquarter units would besubmitted to IDA for approval.

3.33 Strengthening the field level will include incremental costs of 24Districts and 70 Upazilas which are involved in the project and not funded fromother sources. Each of the three divisions will be allocated professional staffto cover project management, extension and training, floodplain fisheries andregulation, credit, women's development, and administration and finance. Khulnawill be strengthened by 23 staff, Rajshahi by 12 and Dhaka by 11. In Khulna 11staff will concentrate on shrimp culture. During negotiations agreement wasreached with GOB that Khulna Division extension staff from the ongoing ShrimpCulture Project (para 2.56) will be formally transferred to the project by June30,1991. The objective of this transfer is to make maximum use of existingmanpower; the transfer should pose no problems, as the main activity of theShrimp Culture Project in the project area, i.e. the development of polder 20,is finished. Staff at the district level will consist of the DFO and anadditional Subject Matter Specialist. To provide better working facilities tothe DFOs who generally use operate out of hired, frequently very inadequateoffices, during negotiations un understanding was reached with GOB that theconstruction of up to 15 selected District Fisheries Offices with a an estimatedcosts of Tk 21 million (USS 650,000) would also be financed under the project,

Page 29: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 22 ..

without increasin8 the volume of the Credit. The Upazilas will continue to bestaffed with three junior professionals.

3.34 A major institutional improvement of DOF would be the divestment ofDOF fish seed units which have become redundant because the private sectorproduces fish seed more effectively (paras 2.31, 2.39). Such a step would freescarce financial, staff and managerial resources which the department needs foraccelerated fisheries development. During negotiations agreement was reachedwith GOB that it would establish an inter-ministerial committee on divestment ofpublic fish seed farms, under TOR and membership satisfactory to IDA, by July 1,1992, furnish the recommendations of the committee to IDA for comment, by March1. 1993, and thereafter implement the recommendations according to an agreedtime schedule. The inter-ministerial committee will comprise MF, MFL and MP asthe principal members. Supporting studies will be prepared under the STAcomponent before the committee is created to assist their deliberations (para3.39, Annex 6). The timing takes into account the implementation capacities ofMFL, DOF and STA.

3.35 Strengthening BWDB will include the purchase of vehicles and boatsand the funding of project related operation and maintenance expenses andadministrative overheads.

Research

3.36 The objective of this component is to provide research support bythe Bangladesh Fisheries Research Institute (FRI) in areas directly related toproject activities. The component does not overlap with the Second AgriculturalResearch Project (Cr. 1455 BD). Research will focus on fish food, fish diseaseand fishing gear in floodplains and on catch and effort parameters in coastalfisheries. The base cost of the component will be Tk 26.5 million (USS 0.8million), which will cover four research projects and an allocation forunforeseen research and a small field station in Western Bangladesh. Duringnegotiations agreement was reached with GOB that the field station plans of FRIwould have to be cleared by IDA. Terms of reference for the research componentfigure in Annex 4. Expert support will be provided under the TechnicalAssistance Component.

Technical Assistance and Training

3.37 The main objective of the technical assistance and training (TA)component is to strengthen DOF (para 2.37) while embarking on acceleratedfisheries development activities. The base cost of the component is Tk 224.0million (US$ 6.9 million). About 45 Z of the cost is for local services.Because of financial constraints of obtaining grant aid from donors fortechnical assistance, the component has been divided into two packages -- onefor management (MTA) and one for technical and social support (STA). Terms ofreferences for these packages are presented in Annexes 5 and 6.

3.38 The management technical assistance package, to be financed andadministered by ODA, provides for assistance in project management both at DOFheadquarters and at the divisional level. Long-term and short-term expertisefrom local and expatriate sources will be provided in project management andplanning, procurement, project monitoring, computer services, training and foran independent stocking inspection service. Training will be providedon-the-job, in-service training and overseas in the form of 24 training awards,

Page 30: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 23 -

mainly in management related areas. About 240 man-months of expatriateassistance and 162 man-months of local services will be required.

3.39 The support technical assistance package, to be financed by UNDPand executed by IDA, will provide expertise for technical and socio-economicstudies, services for organizing shrimp farmers and fishermen, technicaladvisory services for DOF, FRI and BWDB, and study tours. Studies and serviceswill be geared to the major project components as well as policy mattersconcerning cost recovery in floodplains and divestment of public sectorhatcheries. Monitoring of production in stocked floodplains and NGO services toshrimp farmers will receive special attention. Study tours will take 100persons to Asian countries and provide for 100 in-country training tours. Over130 man-months of expatriate assistance and 4,100 man-months of local consultantservices will be required.

Status of Project Preparation

3.40 Detailed plans have been prepared for the main investmentcomponents, floodplain fisheries and coastal shrimp culture through Project Year3. For floodplains, the areas to be stocked initially with fingerlings and thetechnical and administrative parameters of the stocking program are defined.Civil works are substantial only in the coastal shrimp culture component; theyare planned to begin in Project Year 2. Civil works for the first 3,000 ha tobe developed in Project Years 2 and 3 have been planned to the detailed designlevel.

F. Project Cost

3.41 The cost of the project is Tk 2,323.3 million (US$ 62.7 million),including physical and price contingencies (Table 3.1). Duties and taxesrepresent Tk 144.2 million (US$ 3.9 million) or 6.22 of project costs andforeign exchange Tk 578.4 million (US$ 15.8 million) or 25 Z of project costs.Detailed project costs are presented in Annex 7.

3.42 Cost estimates for the project are updated October 1989 prices.Cost estimates for civil works under the Coastal Shrimp Culture component arebased on detailed engineering designs. The costs of other components representthe actual costs of similar items. Physical contingencies account for 7.6 Z ofbase costs. The rate for fingerlings, civil works, office and laboratoryequipment, staff and operating costs is 102. No physical contingencies areapplied to transport, equipment, consultants, lump sum allocations and, incompliance with UNDP rules, the complete Support Technical Assistance component.Price contingencies based on Bank projections amount to 28.1Z of base costs.Price contingencies on foreign costs were based on projected foreign inflationrates of 4.9Z up to FY95, and 4.32 in FY96. Price contingencies on local costswere based on projected local inflation rates of 1OZ in FY90, 9Z in FY91, 82 inFY92 and 7Z thereafter. The exchange rates used between FY90 and FY96 are 32.7,33.9, 35.3, 36,4, 37.2, 38.0 and 38.7 respectively.

Page 31: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 24 -

Table 3.1 Project Cost Summar(Million)

Take us2 S Totel**<<---- ----- *e-v-*---*------ U foreign ease

Local Foreign Total Local Foreign Total Esohse Costs... ~~~~~~~~~~- - - - -. -. - - .... __ . ._ ._...... --- - ... __.__ -.... __....... ...__. ......_ ...

A. FP1OOOPLAIN FISHERIES1. Publ. Stckting Ohaka Div. 101.8 12.1 120.0 8.4 0.4 3.7 10.0 8.12. Pubi Steeking Khulne Div 137.2 16.2 162.4 4.3 0.5 4.7 10.0 10.2S. Publ. Stock. Rajabohi 01i 148.6 10.6 168.0 4.6 0.5 6.1 10.0 11.1

Sub-Total 894.2 48.6 438.0 12.2 1.4 18.6 10.0 29.49. COASTAL S*RIP CULTUI

1. Poldr 5 26.8 18.4 39.2 0.8 0.4 1.2 84.1 2.62. Pelder 23, Phse 1 41.0 21.1 83.0 1.3 0.7 2.0 33.5 4.23. Pold.23Ph.2,Pold.8lPh.1 68.0 43.3 128.3 2.0 1.3 4.0 8.8 8..64. Other Poidors (Phase 1) 61.6 32.1 98.9 1.9 1.0 2.9 84.2 6.8S. Other Poldere (Phase 2) 60.9 32.0 92.9 1.9 1.0 2.9 $4.4 6.2

Sub-lTotl 276.4 141.9 417.3 J.5 4.4 12.9 84.0 28.0C. OTHER FSIERtIS OEY.

S. O.Fihertle ODhk.o Div. 12.5 0.7 13.2 0.4 0.0 0.4 8.n 0.92. 0.FPiareso Khulae 01D. 25.1 1.3 26.4 0.8 0.0 0.8 5.0 1.61. O.Fisharise Rajahabi 0IV 2S.1 1.J 26.4 0.0 0.0 0.6 5.0 1.8

Sub-Total 627 3.8 0.0 1.9 0.1 2.0 5.0 4.40. INSTITJTINOL SUPPORT

1. net.Sup. DOOf- 71.8 31.8 103.6 2.2 1.0 8.2 80.7 7.02. Thet.Sup. DOF-Ohaka Div. 24.6 5.0 30.8 0.0 0.2 0.9 16.6 2.03. Inst.Sup. 0Of-Khulna 61.2 16.1 76.3 1.9 O.S 2.4 19.8 5.14. Inst.Sup. DOf-Rajahahi 09.1 18.7 87.8 2.1 0.6 2.? 21.3 5.9S. Inst.Sup. tm 16.t 8.? 20.2 0.6 0.1 0.6 18.3 1.4

Sub-Total 243.3 74.9 318.2 7.5 2. 23.5 21.4E. RESEARCH (FRI) 20.4 6.0 26.5 0.6 0.2 0.8 22.8 1.8F. TECIEICAL ASSIST.a TRAN.

1. TA - Project Ianaemt 86.6 .8 113.4 1.1 2.4 3.5 67.7 7.62. TA - Project Support 83.1 4?.4 110.5 2.0 1.6 3.4 42.9 7.4

Sub-Total 9.7 124.3 224.0 8.1 3.9 6.9 655.5 1.0

Totel ASEUN COSTS 1090.7 894.2 1429.0 44.0 12.2 46.2 20.5 100.0Phytical Contingeils 90.2 22.9 113.2 2.8 0.7 3.5 20.8 7.6Price Contingencies 56U.9 181.8 720.2 10.2 2.8 13.0 21.8 26.2

Total PROJECTS COSTS 1744.9 578.4 2328.2 46.9 16.0 62.7 25.1 1358

G. Financing

Table 3.2 Finacins Plan by Category of Disbursement(US$ Million)

IDA ODA UNDP Oovernmnt Tots I Loca -…~~~~~~~~~-- -- ;;f----i-- ;Un;---;-For. (Ent I. Outise

Amount S Asount S Amount S Axount S Amount S Exch. Tax.9) Dut.

A. Land Acquisition 0.0 0.0 0.0 0.0 0.0 0.0 0.1 100.0 0.1 0.1 0.0 0.1 0.0B. Civil ornks 14.7 00.0 0.0 0.0 0.0 0.0 8.7 20.0 10.4 29.8 0.2 10. 6 1.7C. Equipent and Vshicla 8.1 77.0 0.0 0.0 0.0 0.0 0.9 23.0 4.1 6.6 1.0 1.J 0.90. Stff 2.1 71.6 0.0 0.0 0.0 0.0 0.6 28.4 2.9 4.8 0.0 2.9 0.0E. 06 $8.9 7C.4 0.0 0.0 0.0 0.0 1.8 29.7 6.S . 1.0 4.0 0.6F. Fingerlinns 17.1 87.2 0.0 0.0 0.0 0.0 2.6 12.6 19.6 31.2 1.9 17.3 0.4a. S tedy/Sic Contrat 8.7 100.0 0.0 0.0 0.0 0.0 0.0 0.0 3.7 S.9 0.2 8.3 0.2iH. In_t TA (ODA) 0.0 0.0 4.S 100.0 0.0 0.0 0.0 0.0 4.8 0.0 2.8 1.4 0.11. Support TA (UOP) 0.0 0.0 0.0 0.0 4.2 100.0 0.0 0.0 4.2 6.7 1.0 2.8 0.1

Total Disbursemnt 44.0 71.1 4.8 6.6 4.2 8.7 9.7 16.4 62.7 100.0 16.0 43.0 3.9

Page 32: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 25 -

3.43 The project would be financed as shown in Table 3.2. IDA and GOBwill finance the Floodplain Fisheries, Coastal Shrimp Culture, Other Fisheries,Institutional Support and Research components. ODA would finance 100? of themanagement component of technical assistance and UNDP 1OOZ of the supportcomponent of technical assistance. The IDA Credit will be channelled by GOBthrough its annual development budget to DOF, BWDB, and FRI. DOF would handleUS$ 28.0 million (63Z), BWDB US$ 15.8 million (35Z) and FRI US$ 0.8 million (2Z)of the Credit. The approval of the Project Proformas for 1PL, covering the DOF,FRI and TA parts of the project, and for MIWDFC, covering the BWDB part of theproject, is a condition of Credit effectiveness. ODA would administer its ownfunds. UNDP funds would be channeled through IDA as the executing agency.

3.44 GOB will provide adequate budget allocations to the project inaccordance with Annex 8. It is a condition of Credit effectiveness that GOBwould include US$ 2.2 million equivalent in its FY91 Annual Development Programfor the project.

H. Procurement

3.45 The project will require the procurement of fingerlings, civilworks, equipment and vehicles, consultants' services, trainirg, and some land(table 3.3). Procurement will be handled by DOF, BWDB, FRI, ODA and IDA, as theexecuting agency for UNDP. The project Coordination Cell of DOF (paras 3.32,4.05) will include a procurement unit of two officers, assisted by an expatriateadvisor and a local assistant (para 3.38) provided under MTA. The procurementunit will prepare procurement that is handled by the Director of Fisheries andassist him in supervising and advising the Divisional PDs in their respectiveprocurements.

3.46 The supply and stocking of fingerlings represents a largeprocurement category -- Tk 738.1 million (USS 19.6 million) includingcontingencies. Procurement procedures for it are guided by three principalconsiderations: (a) for manageability, the number of contracts should not exceednine; (b) floodplains should be subdivided into lots, and bidders should be pre-qualified to minimize the risk of non-performance; and (c) the size of theindividual contract should be large enough to remain attractive to majorcontractors. Although initial contracts are not likely to be large enough toattract international contractors, ICB rules are followed during the pre-qualification stage to allow foreign participation.. Contractors will act asagents for the purchase, transport and delivery of fingerlings from many localnurseries. Because the risks and costs of long-distance transport and bordertransit of live animals are high, the fingerlings will have to be bred andraised within Bangladesh. Contractors will be pre-4ualified each year beforetendering for fingerlings.

3.47 Draft pre-qualification and tender documents have been preparedfor the first stocking at the end of Project Year 2. The main features offingerling procurement for Project Year 2 are as follows. Three lots between2,000 and 4,500 ha would be tendered for each of the three floodplains stocked.A total of nine lots would be tendered, each subject to a separate offer. Onecontract could cover a maximum of two lots. At least twelve offers, three morethan the maximum number of contracts possible, should be obtained from bona fidefirms. Contract values will range from Tk 4 million to Tk 18 million (US$

Page 33: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 26 -

120,000 to 560,000). The experience of the first stocking may be used to varylot and contract sizes for future stockings after consultation with IDA.

Table 3.3 Procurement Method \a

Category ICB LCB Other NA Total Cost------ US$ million----------------------

Fingerlings 19.6 - 19.6(17.1) - _ _ (17.1)

Civil Works - 18.3 - - 18.3- (14.7) - - (14.7)

Operation & Maintenance _ - 63 \b - 6.3(3.9) (3.9)

Local Services - - 5.8 \c - 5.8- (3.7) (3.7)

Expatriate Services - - 5.4 \d - 5.4

Equipment, Vehicles 3.5 0.5 0.3 \e - 4.3(2.5) (0.5) (0.1) - (3.1)

Staff - - 2.9 \f 2.9(2.1) (2.1)

Land - - 0.1 - 0.1

TOTAL 23.1 18.8 17.9 2.9 62.7(19.6) (15.2) (7.7) (2.1) (44.6)

\a Figures in parenthesis are the amounts to be financed by the Credit.\b Includes US$0.5 million from UNDP and US$0.3 from ODA.\c Includes US$1.6 million from UND? and US$0.5 million from ODA.\d US$3.3 million from ODA and US$2.1 million from UNDP. Includes training costs

of US$0.5 million from UNDP and US$0.4 million from ODA.\e Includes US$0.2 million from ODA.\f GOB staff and allowances.

3.48 Firms will be selected by the Director of Fisheries, using IDAguidelines for the procurement of goods and services under ICB. IDA will reviewpre-qualification and tender documents, and advertising procedures before bidsare invited. IDA will also approve bid evaluations before cor-tract award.Firms will be invited on a broad basis to participate in pre-qualification. TheDirector of Fisheries will be responsible for inspecting the quantity andquality of fingerlings stocked and for providing certification of performance toIDA so that reimbursement can be made. In order for DOF to have a field checkon stocking reports, a locally-based certification firm will be employed underthe MTA component to prepare independent reports on quantities and speciescomposition of each lot.

3.49 Civil works procurement will cost Tk 681.7 million (USS 18.3million). BWDB will construct sluices, footbridges, canals and rehabilitateembankments for Tk 663.4 million (US$ 17.9 million) under the Coastal Shrimp

Page 34: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 27 -

Culture component. Under the Institutional Support component DOF willrehabilitate buildings. BWDB civil works will consist mainly of small sluices.Whenever possible, BWDB would group its works into lots comprising a polder orspecific development phase. For lots estimated at more than US$ 1 million BWDBwould follow ICB. LCB will, however, be the predominant way of procurementsince (a) international companies will not be interested in bidding forcontracts where individual works are small and dispersed over areas withdifficult communication, and (b) the participatory approach in decision makingabout civil works (para 3.28) makes it difficult to prepare lots large enoughfor ICB. One new office building in Xhulna and rehabilitation of other officeswill be procured using LCB. Before bids are invited and awarded, IDA willapprove tender documents and bid evaluations for the first contract for eachtype of civil works and for any contract exceeding US$ 150,000; IDA would thusreview contracts representing about 502 of the financial volume of civil works.For all other works, bid evaluation reports and contracts will be furnished toIDA before reimbursement is sought.

3.50 Consulting services to complete detailed design under the coastalshrimp culture component will cost Tk 22.3 million (US$ 0.62 million) and willbe procured by BWDB following IDA guidelines for the use of consultants.Contracts under the financial packages of the Other Fisheries component (para3.29) amounting to Tk 107.6 million (US$ 2.9 million) will be handled by theDivisional PDs of DOF. DOF will use GOB procedures acceptable to IDA for theprocurement of local consultants. IDA will review the first five letters ofinvitation and all contracts above US$ 50,000 before contract award. UNDP fundedSTA and training services will be procured by IDA, as Executing Agency, inaccordance with World Bank guidelines. Consulting and training servicesprovided under ODA-funded technical assistance will be procured using ODAprocedures.

3.51 Equipment cost will be about Tk 151.1 million (US$ 4.3 million)covering vehicles; boats and engines; office fittings, furnishings andequipment; computers, printers, and software. Wherever possible, items would beprocured in bulk following ICB procedures. For procurement under ICB, localmanufacturers will receive a preference in bid evaluation of 15X of the CIFprice or the prevailing customs duty, whichever is lower. Items costing lessthan US$ 100,000 per contract, but not exceeding an aggregate amount of US$500,000, will be procured using LCB. Items costing less than US$ 10,000 percontract but not exceeding an aggregate amount of US$ 100,000 will be procuredafter soliciting prices from at least three independent suppliers in accordancewith procedures acceptable to IDA. Tender documents and advertising proceduresfor all ICB procurement will be reviewed by IDA before bids are invited, and bidevaluations will be approved before contracts are awarded. No equipment will beprocured under the STA component financed by UNDP and executed by IDA. ODA willapply its own procedures for procuring equipment for the MTA component.

3.52 As currently planned, land acquisition will only be required toexpand the DOF office in Khulna; land costs are estimated at Tk 2.4 million (US$0.1 million). Land acquisition might be needed as part of the infrastructureallocation in the coastal shrimp culture (para 3.27). All land acquisition isexclusively funded by GOB.

Page 35: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 28 -

I. Disbursement

3.53 Disbursement from the proposed IDA Credit will cover:

(a) 1002 of the expenditures for fingerling procurement through FY94and 80 thereafter;

(b) OOX of the foreign expenditure for directly imported vehicles andequipment;

(c) 1002 of the ex-factory price of equipment manufactured withinBangladesh, or 70? of local expenditures for other items procuredlocally;

(d) 100l of service and study contracts;(e) 802 of the expenditure on civil works for new construction and

rehabilitation including construction material, engineering andsupervision of construction;

(f) 902 of the cost of incremental staff costs, maintenance of civilworks and equipment and other operating costs; through FY92; 70? inFY93 and PY94; and 602 thereafter.

3.54 Full documentation will be sent to IDA in support of withdrawalapplications for items (a), (b), (c), (d) and te) above. Certified statement ofexpenditure will be required to support withdrawal applications for contractsunder (c) costing less than USS 10,000, for civil works under (d) costing lessthan US$ 50,000, and for expenditure under (f). The actual supportingdocumentation for Statement of Expenditures will be retained by DOF, FRI, andBWDB at a central location and will be made available for review by IDArepresentatives on request.

Proiect Special Account

3.55 Three Special Accounts will be opened in the Bangladesh Bank (BB)to facilitate disbursement of the Credit. The accounts will be used by DOF, BWDBand FRI. The authorized allocation for the accounts will be US$ 1.5 million forDOF, 0.8 million for BWDB, 0.1 million for FRI. The allocation represents fourmonth's expenditure requirements. The Director of Fisheries will coordinatespecial account funding for the three Divisional Deputy Directors withresponsibilities of Project Directors (para 4.07).

Accounts and Audit

3.56 DOF, FRI, and BWDB will maintain complete records of allexpenditures incurred. The accounts of these agencies are reviewed by their owninternal audit staff and audited by the Comptroller and Auditor General ofBangladesh (GAG). The CAG has a special unit which handles the financial auditsof foreign-financed projects. These audit arrangements are satisfactory to IDA.The auditor's reports for DOF, FRI, and BWDB will be sent to IDA within ninemonths of the close of each fiscal year. Separate opinions as to whether theCredit funds disbursed against statements of expenditure have been used for theintended purposes will also be made available by the CAG to IDA within ninemonths of the close of the fiscal year.

Page 36: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 29 -

IV. ORGANIZATION AND MANAGEMENT

A. Implementing Agencies

4.01 The Ministry of Fisheries and Livestock (MEL) wiil be the leadministry for the project. The Department of Fisheries (DOE) will be the mainimplementing agency, accompanied by the Fisheries Research Institute (FRI) andthe Bangladesh Water Development Board (BWDB). ODA will execute the ManagementTA and IDA the Support TA financed by UNDP.

4.02 MFL will oversee the policy, strategy and institutional developmentfocus of the project and will coordinate with other GOB agencies at the ministrylevel, such as MIWDFC, PLANCOM, ERD, and MF. Coordination committees at centraland at divisional level will improve coordination (para 2.38). The creation offour proiect coordinating committees, satisfactory to IDA, at the central (one)and divisional levels (three), is a condition of Credit effectiveness. MEL willensure that the approach of other projects under its purview is consistent withthat of the Third fisheries Project. MEL will be responsible for the activitiespertaining to cost recovery (para 0.13) and the divestment of redundant publicfish seed farms (para 3.34).

4.03 The Department of Fisheries (DOF) will be responsible foroverseeing the physical implementation of the project. It will also coordinatethe activities of GOB and donor agencies involved in the implementation of thisand other ongoing projects. Implementation of the project will involve thecomplete administrative chain from the Director of Fisheries via Divisional andDistrict Fisheries Offices down to the Upazila Fisheries Officer ( ProjectOrganization Chart). However, the pivotal points of project management will bethe Director of Fisheries and his Coordination Cell, and the heads of the threeDivisional Fisheries Offices.

4.04 The Director of Fisheries will have the overall responsibility butwill delegate a large degree of management authority to the PDs. The DF willretain direct responsibility for project activities which are beyond thecapacity of the PDs, viz. (a) stocking contracts under the floodplain component;(b) institution-building activities at headquarters; (c) ICB procurement ofequipment and vehicles for headquarters and Divisions; and (d) coordination ofTA inputs allocated to headquarters. The Director will provide regular supportto the Divisional Deputy Directors without infringing on their managementprerogatives. He will coordinate with the headquarters of related agencies,particularly BWDB, FRI, and private entities.

4.05 Since the Director of Fisheries is currently responsible for 13development projects, he will be assisted by an Coordination Cell headed by anofficer of the Aiditional Director rank to whom the Director of Fisheries maydelegate part of his overall and project specific responsibilities. The cellwill be responsible for preparing all project related work for the Director ofFisheries and transmitting it in some cases to subordinate parts of DOFheadquarters and field units. The cell's functions will include managementsupport, planning, monitoring and evaluation, procurement, administration andfinance, women's development and training. It will employ 11 DOP professionalsand two 2 expatriate and 3 local experts in management, procurement,monitoring/evaluation and computers, provided under the ODA financed MTA (para3.38).

Page 37: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 30 -

4.06 The cell will draw upon existing units at DOF headquarters as muchas possible, particularly upon those dealing with training and extension. Itwill cooperate closely with the training and organizational components of theUNDP/FAO Institutional Strengthening Project. The cell will be considered atemporary aid for the Director of Fisheries, until the Department of Fisheriesitself can be reorganized and strengthened and its functions taken over byactive DOF line units. The appointment of the head of the Coordination Cell isa condition of Credit effectiveness. Additionally agreement was reached withGOB that the cell would be staffed in accord with a plan satisfactory to IDA byOctober 31, 1990.

4.07 The Deputy Directors of the DOF Dhaka, Khulna, and RajshahiDivisions (or any other officers appointed to head such divisional offices) willbe delegated the financial and administrative powers equal to those of a ProjectDirector and will be responsible for all implementation activities in theirrespective zones of influence. The purpose of this is to combine their existingadministrative function as Division Head under the revenue budget with a highdegree of autonomy in project implementation under the development budget.Previous projects lacked sufficient field level executive authority (para 2.56).A Deputy Project Director will be placed in Faridpur to oversee in the field theproject activities in this western part of Dhaka Division and to overcome thespecific communication problems of the Dhaka Division. The Divisional DeputyDirectors will be responsible for detailed project planning, implementing andmonitoring the institutional support and other fisheries development components,the general extension work, some activities related to the major floodplains,and for coordinating TA inputs allocated to their Division. It is a conditionof Credit effectiveness that the Divisional Deputy Directors would be delegatedthe financial and administrative powers of a Project Director, and that theDeputy Project Director of Faridpur is appointed . All Divisional DeputyDirectors will emphasize involving the private sector in extension, preparingbankable fisheries credit proposals (para 2.33), encouraging women in fisheries(para 2.01), and making effective use of the other fisheries packages (para3.29). The Divisional Deputy Directors will be assisted by professioralscovering the fields of planning/monitoring, extension/training,floodplainslregulations, credit, women development, administration/finance, and,.in Khulna, shrimp culture (para 3.33). Agreement was reached with GOB that thedivisional offices will be staffed in accord with a plan satisfactory to IDA,not later than October 31, 1990.

4.08 District Fisheries Offices will play a key role the project. Thoselacking subject matter specialists will receive them. They are to provideexpert advice and training to advanced extension clients such as NGOs andoperators of nurseries and hatcheries, fingerling traders (para 2.32) andUpazila Fisheries Officers (para 2.45). The quality of these specialists isimportant and DOF will have to carefully examine candidates and provide adequatetraining (para 2.53).

4.09 The Upazila Fisheries Officers will be responsible for programmingand implementation in their areas; they will serve as the main link between thefisheries administration and the Upazila Councils, fishermen groups, andoperators of ponds and minor floodplains. Their experience will provide ideasand guidance for utilizing the various local fisheries packages (para 3.29).These officers will be encouraged to change their focus from public sectorproduction to extension activities. The funding available to them under the

Page 38: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

_ 31 -

Other Fisheries component does not cover public sector production or inputsupply activities (Annex 3).

4.10 FRI will be responsible for undertaking project related researchthrough its contract personnel and for developing a field station in RajshahiDivision (Annex 4). As DOF would divest fish seed farms with pond and hatcheryfacilities also needed in a field research station, a transfer of one DOF seedfarm to FRI seems appropriate. During negotiations agreement was reached withGOB that a DOF fish seed farm in a suitable location in Raishahi Division wouldbe transferred to FRI by December 31, 1991.

4.11 BWDB will be responsible for implementing, maintaining, andoperating the civil works under the coastal shrimp culture component (para3.25). Implementation will take place within the established BWDB managementchain. In the field, the Executive Engineers of Khulna Operation andMaintenance Division II and of Satkhira Operation and Maintenance Division 2would be appointed in time as the responsible officers. In each polder underdevelopment, the Executive Engineer will be supported by one Sub-divisionalEngineer and three Section Officers for a period of four years, beginning oneyear before construction begins. To avoid the delays experienced during theShrimp Culture Project, detailed design for these civil works will be undertakenunder one contract by a BWDB-appointed design consultant for the duration of thecomponent. The appointment of the Executive Engineers of Khulna Operation andMaintenance Division II and Shatkhira Operation and Maintenance Division I asproject officers responsible for the execution of the BWDB part of the coastalshrimp culture component is a condition of Credit effectiveness.

4.12 All GOB agencies operate under the Project Proforma system.Investment and operational funds for the project will be described in theProject Proforma in a global manner, under the selection criteria for projectactivities in Annex 3. This will allow the implementing agencies moreflexibility and avoid the need to obtain time-consuming PLANCOM approval forminor revisions.

4.13 ODA will, in consultation with GOB, select a consulting firm toundertake the Management TA component (para 3.38). MTA staff will beresponsible to the Director of Fisheries and the Divisional Deputy Directors,but their administration will be coordinated by ODA's Senior Management Advisorin the Coordination Cell. For overseas training under the project, ODA willmake an allocation within its overall scholarship program administered by theBritish Council. To ensure close coordination, ODA will participate in IDAsupervision missions.

4.14 IDA is expected to be the executing agency for the UNDP-financedSupport TA (para 3.39). Since the role of the UNDP component is merely of asupporting nature and does not cover core management areas of the project, noconflict of interest will arise between IDA's roles of lender and executingagency. IDA will contract out the implementation of this component to aninternational consulting firm with experience in planning, fisheries, ruraldevelopment and Southeast Asian countries. The selected firm will be differentfrom that employed under the Management Technical Assistance component. Thefirm will enter into a cooperation agreement with a domestic consulting firmexperienced in the same areas and with a NGO for the social support activities.For this purpose IDA will provide a list of acceptable local consultants andNGOs, in consultation with GOB. The international consulting firm will operate

Page 39: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 32 -

out of hired premises as Dhaka, but DO? will make an office available in theProject Coordination Cell at DOF headquarters to ensure continuous contact withproject management. Assurances were obtained that GOB will provide adequateoffices for TA staff. UNDP will be invited to participate in IDA supervisionmissions.

4.15 The cofinanciers have Indicated that the effectiveness of their TAagreements will be conditional on the signing of the IDA Credit. The signing ofTA agreements between GOB and ODA and UNDP will be a condition of Crediteffectiveness.

B. Phasing of Processing and Implementation

4.16 The project is scheduled to become effective on September 1, 1990and to close on June 30, 1996.

4.17 A detailed implementation plan for the project is presented inAnnex 10. For the two main activities, floodplain fisheries and coastal shrimpculture development, a critical path analysis has been made. This analysisintegrates the major contributions from the other project components such asResearch and Technical Assistance. The project will gain the most momentumduring Project Years 2 and 3. as shown in the expenditure plans (Annex 7);floodplain stocking will dominate the pace.

C. Monitoring and Evaluation

4.18 Monitoring will be handled through (a) the regular, management-related monitoring, (b) specific monitoring of important aspects of the projectand (c) studies which indirectly assist in monitoring.

4.19 Management-related monitoring will be handled by a monitoring andevaluation unit set up in the Project Coordination Cell of DOF headquarters(para 4.05). This unit will consist of two DOE professional staff and a localexpert under the Management Technical Assistance component. A planning andmonitoring unit will be situated at each of the divisional offices, whereinformation technology will be introduced to facilitate data processing. EachDivisional Deputy Director will be responsible to ensure that data areadequately collated, analyzed and stored, and that some of it is transmitted toDOF headquarters Project management will have to ensure that monitoringremains simple and related to its role as a management aid.

4.20 Specific monitoring will be undertaken in order to assess theimpact of stocking on fish production, catch and the distribution of the catchin the major floodplains (Annex 6). This monitoring will also provide technicaldata to use in fine-tuning the rates, size and species composition of stocking.Specific monitoring will represent a substantial effort; it will be handledunder the Support TA component.

4.21 The studies that provide indirect assistance in monitoring theproject are included in the Research (Annex 4) and the Support TA ComponentsAnnex 6).

Page 40: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 33 -

V. PRODUCTION, MARKETING & PRICES

A. Production

5.01 The project will result in an increase in the production of fishand shrimp. At full development, the incremental annual fish production will be42,000 tons, valued at Tk 845 million (US$ 26 million) at October 1989 prices.The public stocking of 100,000 ha of major floodplains will yield 30,000 tons(712), and 9000 ha of minor floodplains developed by the private sector, 6,400tons (15Z) and the other fisheries -- mainly ponds -- 5,900 tons (14S). Theseproduction increases are based on incremental yield assumptions as follows: 300kglhhi in the major floodplains (para 2.14), 710 kglha in the minor floodplains(para 2.30) and 1300 kg/ha from ponds (para 2.29).

5.02 At full development, the incremental annual production ofexportable shrimp will be 1,840 tons with a pond side value of Tk 202.4 million(USS 6.3 million). The annual yields of exportable shrimp will increase by 120kg/ha from combination shrimp-paddy areas within polders (12,000 ha), by 200kg/ha from exclusive shrimp areas within polders (1,000 ha) and by 100kg/ha!year from areas outside of polders (2,000 ha).

B. Markets

5.03 Adequate demand is expected for the fish to be produced under theproject. The estimated annual incremental production of fish in the project'sfinal year (FY96) represents about 5? of present annual domestic consumption.During that period the domestic demand for fish will have grown by 182 due topopulation growth alone. Growth in supply of fish from sources outside theproject will not be sufficient to meet this increase in demand. During the1980s, fish production has increased at a rate equal to population growth, butthe major source of growth -- coastal fisheries -- is considered to have peaked.Aquaculture in ponds is the second largest source of growth; it is expanding,but not fast enough to close the gap, as it begins from a small base level. Ifsupply increases faster than population growth -- a possibility that cannot beruled out completely -- fish prices will stabilize or even fall, leading to adesirable increase in per capita consumption, particularly of lower incomegroups. The project can cope with lower fish prices (para 6.22). Fish ismarketed efficiently by the private sector, and existing arrangements will beadequate to absorb the increases in fish volume, as it builds up gradually andis spread over a wide area.

5.04 The anticipated incremental shrimp production represents a head-offweight of about 1,200 tons, which is about 5Z of the present export volume.This production will be exported on the world market, where Bangladesh iscurrently a minor supplier. No problems in marketing this shrimp areanticipated, as Bangladesh is a low-cost producer (para 2.17). Shrimp marketingfrom farm to processor does not pose problems, as there are many processors withexcess packing capacity competing for raw material. Problems of hygiene alongthe marketing chain is being addressed mainly through price premiums;processors grade shrimp at the factory gate for species, size and freshness andfix their buying price accordingly. DOF extension work would assist farmers toimprove hygiene at the pond side and during transport to the collection points.

Page 41: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 34 -

C. Prices

5.05 Financial and economic prices of fish, shrimp and major inputs aredetailed in Annex 11. The financial price of fish is assumed to be Tk 20 (US$0.62)/kg at the floodplain or pond site. This price is lower than the currentlyobserved landing price of about TK 25 to 30 per kilogram for carp of the samespecies to allow for a potential seasonal de.line in price.

5.06 The long-term price projections of exportable shrimp have beenestimated with particular care. The pond-side price of head-on shrimp of the21-25 per pound count is calculated to be Tk 110 (US$ 3.40) per kilogram. Thisprice is substantially lower than the prices observed over the last five yearsand represents the low level reached during the first months of FY90, when themarket collapsed. Although prices have risen again since then, the long-termoutlook is still uncertain (para 2.07); this low price has therefore been usedin the calculations. Shortly before negotiations and late in FY90, GOBannounced export incentives for FY90 that were to alleviate the financial lossesexporters incurred by the price slump of July 89 (para 2.07). IDA found thesubsidies inappropriate and during negotiations an understanding was reachedwith GOB that it will exchange views with IDA on how to respond to difficultexogenous shrimp market developments, including the treatment of shrimp exportincentives, in future.

5.07 Fingerlings are the major input in floodplain fisheries,representing 50X of total production costs (Annex 12). The price of fingerlingsafter two stocking seasons when the fingerling size would be 14 cm, is assumedto be Tk 45 (US$ 1.40) per kg at the stocking site. The price includestransport and is based on currently observed market prices and futureprojections.

5.08 Shrimp fry (post-larvae) account for close to 402 of the productioncosts in shrimp culture. The price used in the financial calculations is Tk 500per one thousand post-larvae and is based on observed recent market prices ofabout Tk 300 to 400 per thousand plus a margin for increase due to changes indemand and supply. Shrimp fry can be obtained from natural riverine sourceswhich are expected to contiraue for some time. However, the price of Tk 500 perthousand also represents a level at which commercial fry hatcheries couldoperate with a comfortable profit margin. Hatchery technology is beingintroduced under the ongoing Shrimp Culture Project.

5.09 Unit costs of putblic infrastructure construction follow currentBWDB rates.

D. Financial Analysis

5.10 Financial viability of project components was analyzed usingrepresentative models. The floodplain models indicate that, as benefits arerealized within half a year of stocking, the financial cash flow is positive andattractive to the participants, even with strict cost recovery (Annex 12, tables1 and 2). The dominant models in shrimp culture -- shrimp in rotation withpaddy inside polders -- and fish ponds display financial rates of returns on thebeneficiaries capital of about 50 Z without financing and about 902 withfinancing (Annex 12, tables 3 and 6).

Page 42: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 35 -

VI. BENEFITS & JUSTIFICATION

A. Benefits, Beneficiaries & Employment

6.01 The major quantifiable benefits of the project will be the annualincremental production of about 42,000 tons of fish and 1,840 tons of exportablehead-on shrimp. These benefits will result in increased net incomes tosubsistence and professional fishermen, shrimp farmers, pond owners, women,nursery and hatchery operators, and their families. The export of shrimp -willgenerate annual foreign exchange earnings of close to Tk 267.9 million (USS 8.3million) or 0.7Z of the country's total FY89 exports at full development.

6.02 Additional benefits of the project include: (a) the development ofmanagerial routines for exploiting major under-utilized floodplains; (b) arevitalized and strengthened fisheries administration; (c) improvements insectoral policies; (d) further mobilization of the private fish seedenterprises; (e) increased services to special groups; and (f) improvements inequity and income distribution.

6.03 Managerial routines will be developed to allow for low-cost productionincreases on up to 550,000 ha of under-utilized floodplain resources in westernBangladesh. This can potentially provide 25Z of national fish production. Themanagerial routines could also be applied in eastern Bangladesh.

6.04 The fisheries administration will be strengthened in several ways.First, its strategic focus will be sharpened and its program made more compact -- with more immediate and achievable targets. Second, the problems associatedwith the lack of integration of the recurrent and development budget will beresolved. Third, the motivation of field staff will be improved through morerelevant work programs, better working conditions and greater delegation ofauthority. Fourth, management capabilities will be strengthened throughimproved monitoring services. Fifth, credit will be made more accessible to thesector through more and better prepared credit dossiers. Sixth, FRI and DOFinitiatives will be integrated into a system of applied research with a commondevelopment goal. Seventh, the resources of ongoing projects will be betterused; the UNDPIFAO Institutional Strengthening Project will receive investmentsupport from the project and ADB's Second Aquaculture Project will have greateruse for its bank credit funds. Finally, it can be expected that other donorswill in future employ project implementatior. mechanisms and strategies similarto those under the project, with the effect of a more consistent DOF program.

6.05 Improvement in policies will lead to increases in governmentrevenues. Project studies and covenants address ways to improve cost recoveryand to divest unprofitable fish seed farms. Other studies will provide a betterunderstanding of resources, important for future private and public sectorinvestment planning.

6.06 Private fish seed production will be enhanced by procuringfingerlings for public stocking and by re-orienting fisheries services includingextension from public to private sector production.

6.07 More attention and services will be provided to certain needygroups such as women and fingerling traders.

Page 43: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 36 -

6.08 Equity will be improved through the conveyance of benefits tofishermen in the floodplains and income transfers from larger to smaller landowners and operators in shrimp culture.

6.09 Directly more than 130,000 families will benefit -- 67,000 inmajor floodplains, 15,000 in shrimp culture, and 47,000 in pond culture or otherfisheries. Indirectly the country as a whole will benefit through improvednutrition and a better trade balance.

6.10 About 702 of the population living in the area of major floodplainsdepend on fisheries for all or part of its income. The density of thispopulation averages about four per hectare of stocked area; since 100,000 hawill be stocked, about 400,000 persons or some 67,000 families will benefit fromthe major floodplain activities of the project. Of these about 376,000 would bepart-time fishermen, among them many destitute women and children. About 50X ofthe incremental production of the floodplains, 15,000 tons, will go to them.The increase in income to these people, who have negligible catch costs, will bearound Tk 720 (USS 22) per year and per person in cash or in kind; thisrepresents about 14Z of their current annual incomes of about Tk 5,000 (US$155). About 24,000 persons would be full-time fishermen; with father and sonsfrequently working together, this group may represent about 6,000 families.Full-time fishermen could increase their annual incomes by Tk 3,750 (US$ 116)per person after deducting their non-labor catch costs; this would increasetheir present incomes by 75Z. Since access to fisheries is not controlled, theincrease in income could very well be diverted into increased employment oflower-income groups in the sector. Assuming that 302 of the income potentialgoes to existing professional fishermen and 70Z goes to newcomers, the project'sfloodplain component will create 12,600 new full-time fishermen jobs.

6.11 About 15,000 families owning and operating shrimp cultureenterprises will benefit from the project. This group includes about 90,000individuals. The annual net incomes would increase by Tk 4,300 (US$ 133) perfamily. Direct opportunities for increased employment through shrimp culturewill be limited. However, the investment of profits from shrimp culture in newhome construction and trade indirectly would create many new employmentopportunities.

6.12 The 40,000 or so pond-owning families in the project will increasetheir annual net income by Tk 710 (US$ 22) per family, an increase of over 7Zover their present annual income of about Tk 10,000 (US$ 309). Part-time andprofessional fishermen in the 9.000 ha of minor floodplains would benefit aswell; the annual incremental net income of some 36,000 part-time iishermen willincrease by Tk 640 (US$ 20) per person, while that of 2000 professionalfishermen will increase by about Tk 5,100 (US$ 158) per person.

B. Cost Recovery

6.13 Recovery of public sector costs of investments and operationsfinanced under the shrimp culture and floodplain components would be essentialto ensure sustainability. Below are the cost recovery measures which would beundertaken and the institutional arrangements which would be made to facilitateperiodical assessments and adjustments.

6.14 For shrimp culture the administratively most effective way torecover cost would be through a cess on shrimp exports. However, concerns have

Page 44: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 37 -

been raised regarding the fairness of recovering all the costs in this way,since presently much of the shrimp production comes from sources which do notbenefit from investments in shrimp culture. Additionally, if the cess is toohigh, this could result in production disincentives. Because of suchconsiderations, the cost recovery covenant under the on-going Shrimp CultureProject (para 2.56) requires the introduction by December 31, 1990 of an annualbetterment levy of TK 1,500 (US$46) per ha of improved shrimp land or throughequivalent charges for water and a cess of 0.9Z on the FOB value of all shrimpexport. This covenant will be replicated under the project. In addition, sincethis is a new recovery instrument, its effectiveness should be assessed after ithad been enforced for a period of three years. Agreement was reached with GOBthat it would:(a) carry out a program designed to recover the full cost ofinvestment and operation and maintenance of the embankments and regulatorsconstructed or rehabilitated under the project. To this effect GOB would byDecember 31, 1990 enact legislation and take all other measures necessary to setrecovery charges which will ensure full cost recovery within a 20 year period;it would make such biennial adiustments to the charges as warranted by actualinvestment and operation and maintenance costs; and improve its collectionprocedures as necessary to ensure full payment of the recovery charges; (b)review the effectiveness of the measures introduced and submit to IDA proposalsfor improvement by September 30, 1993 ; and (c) introduce such improvements byJune 30, 1994.

6.15 For floodplains it should be possible to recover much of thestocking costs. Three major cost recovery methods are being discussed: (a) theauctioning of fishing rights; (b) specific taxes at Upazila level; and (c) feeson fishing licenses. However, it should be taken into account that most of thebeneficiaries are likely to be landless or operators of minuscule farms, whobelong to the poorest segments of the population. As indicated in para 2.01,during the flood season the number of fishermen increases to 11 million, most ofwhich fish in the floodplains.

6.16 The revival, in its old or modified form, of the traditionalmechanism of revenue collection in fisheries in Bangladesh, auctioning fishingrights at district level, has probably the greatest potential for adequate costrecovery. It still exists for floodplains, rivers and other bigger fisheryresources, but the bid process has become a method of distributing fishingrights at low rates to low-income and landless groups which include alsoprofessional fishermen. As a result, the revenue recovered at present is farless than the true auction value of fishing rights. There are also grounds tobelieve that the equity impact is rather limited, since often professionalfishermen are used by wealthy individuals for access to the cheap public fishingrights. Modifications to the auction system would be necessary to improve theconcept through safer income transfer mechanisms minimizing equity distortionsand to improve its administration to allow the bid process to be fullycompetitive and reflect the benefits that can be drawn from a particularfisheries resource.

6.17 The licensing of fishermen and respective license fees havebeen introduced under the New Fisheries Management Policy (NPMP) in 1987 (para2.49). The license system, as practiced is not geared towards aggressive costrecovery, but is more intended to limit the number of fishermen to avoid over-fishing. License fees are low and do not reflect the potential benefits to thelicense holder. As indicated (para 2.49) the NFPP is in its trial phase and is

Page 45: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 38 -

monitored with assistance from Ford Foundation. It is anticipated that thismonitoring will outline ways to improved recovery through licenses.

6.18 The Upazilas could represent another possibility of costrecovery. It is expected that most of the benefits from stocking thefloodplains will accrue in the surrounding of the stocking location. TheUpazilas may be required to pay the cost of stocking in part or in full. Theycould finance the cost from their budget and/or additional taxes. Thewillingness of the Upazila to pay will depend on the magnitude of the stockingbenefits. If, as anticipated, the benefits would be substantial and clearlyrelated to stocking, the Upazilas are likely to be under pressure from theirconstituencies to pay, as otherwise DOF could refuse to stock the Upazila'sfloodplains.

6.19 In order to formulate a viable cost recovery policy, themagnitude of benefits from stocking the floodplains and their locations must beclearly determined. This information is expected to be available after theresults of the first two stocking operations are known, i.e. in January 1994.During negotiations agreement was reached with GOB that it would (a) submit adraft policy paper on cost recovery in floodplains to IDA for comment bySeptember 30, 1993, which defines the means of achieving at least 202 recoveryof annual public stocking costs before July 1, 1995 and 30 Z recovery beforeJuly 1995; and (b) after taking into account IDA comments, implement the agreedpolicy by June 30, 1994.

6.20 The above cost recovery steps require backing by adequateinstitutional arrangements. The analysis of the cost recovery situation,indicates the need to have a standing high level committee for cost recovery infisheries to analyze the results of studies related to cost recovery (para 3.39,Annex 6) and formulate cost recovery policies. The Monitoring and EvaluationUnit at DOF headquarters will serve as the secretariat for the committee.During negotiations agreement was reached with GOB that an Inter-MinisterialHigh Level Committee for Cost Recovery in Fisheries (including Shrimp culture),with terms of reference and membership satisfactory to IDA, would be establishedby December 31, 1992.

C. Economic Justification

6.21 The economic rate of return (ERR) of the project is estimated at 312. The project's discounted economic benefits from the incremental productionof fish and shrimp would be Tk 3.88 billion (US$ 120.3 million) at Oct.89prices. The project's discounted costs are Tk 2.80 billion (US$ 86.9 millioa).The project's net present value is Tk 1.08 billion (USS 33.4 million). Theeconomic rate of return includes all project costs -- the investment andrecurrent costs of the directly productive components such as floodplainfisheries, coastal shrimp culture and other fisheries, and the cost of theservice components such as institutional support, research and technicalassistance. Economic costs and benefits are net of taxes and transfer elementsand corrected by using a standard conversion factor of 0.8. The overall ERR isdriven by a high rate of return of the floodplain component in which benefitsarise within a short period of time. If calculated without the costs of theproject's service components, the floodplain component's rate of return is over1002. The rate of return of the shrimp culture component is 202 and of theother fisheries component 77?. The economic rate of return calculations arepresented in Annex 13.

Page 46: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 39 -

D. Sensitivity and Risk Analysis

6.22 The sensitivity of the ERR to changes in the parameters andassumptions made in the economic analysis was analyzed by calculating switchingvalues for the main variables. The switching values at a discount rate of 12 2are shown in table 6.1 below. The tests and the risk discussion indicate thatonly large and, in their magnitude, unlikely changes could render the projecteconomically non-viable.

Table 6.1 Sensitivity Analysis

Switching ValueVariable Tested (percentage change)

Reduction of all Benefits - 28Increase of all Costs + 39Reduction in Benefits from Floodplains - 50Reduction in Benefits from Shrimp Culture -134Reduction in Benefits from Other Fisheries -118Lag in Benefits (in years) 3

6.23 The main risks are weak project management, lower than plannedyield or prices for fish from the floodplains and lack of funds for sustainedfloodplain stocking. Risks of inefficiencies in DOF management are minimized bythe strong technical assistance component and the transfer of many of themanagerial tasks to the private sector.

6.24 Yield risks in floodplains pertain to lower than planned retrievalrates of stocked fish and mass disease. The retrieval rate has beer, cautiouslyestimated at 122, taking into account natural and human predation offingerlings. The latter will be controlled by guarding of stocking sites andcontrol of fishing gear. The retrieval rate would have to fall to 62 in orderto make the overall ERR decline below 12 2. The risk of project-induced healthrisks are minimized by low stocking denst.ies and inspection of fingerlingsuppliers. The recent outbreak of a aisease called the Ulcerative EpizooticSyndrome had only a minor effect on the species of carps which will be stockedunder this project. Although difficult to measure, the effects of ahypothetical mass disease should not lead to more loss of production than 50Zover five years of the projects lifetime of 20 years or to more than 102 ofoverall production -- an occurrence which would bring the ERR down to about 25Z.

6.25 The major price risk is seasonal glutting of markets due theconcentrated harvesting season for floodplain fish. This has been accounted forin price assumptions. If such glutting occurs adjustments are expected to bemade in production from other fish sub-sectors such as ponds, where the timingfor harvesting and marketing is more flexible and production costs are higher.However, given the high rate of population growth and the fact that theproduction increases will be gradual, such risk is remote.

6.26 Sustainability of the floodplain stocking operations would beat risk, if GOB would not be able to give continued financial support and torecover the cost of stocking; intensive monitoring and studies (para 4.20; Annex6) enable viable cost recovery policy and appropriate legal undertakings (paras6.19, 6.20) minimize that risk.

Page 47: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 40 -

E. Environmental Impact

6.27 The project will help to redress some of the environmental problemsthat have been created in recent years and address environmental concerns inboth floodplains fisheries and coastal shrimp culture. The project'senvironmental assessment rating is B.

6.28 The areas of environmental concern in floodplain fisheries are thediversity of fish species and health hazards associated with increased movementand densities of fish. The balance of the aquatic environment and the fishpopulation has been severely disturbed by water control measures and over-fishing. The project contributes to correcting this imbalance through stocking.The fish species selected for stocking are capable of efficiently utilizing theabundant natural food sources. Three of the six species used are indigenous tothe area and three were introduced into Bangladesh over two decades ago for pondculture purposes with no deleterious effect. The silver and bigheud carps.which represent 70? of the stocked fish, feed on plankton. Since there is moreplankton available than is needed to meet their needs, the two species are notlikely to challenge fish now in the floodplains. The project also provides forsubstantial monitoring of production and biological effects, and research thatwill lead to a better understanding of the floodplain environment (Annexes 4 and6).

6.29 The project will reduce health hazards by increasing the trade offingerlings from nurseries. The careful control of hatcheries, nurseries andstocked fish by the inspection system under the project is likely to prevent theoutbreak of disease or help to limit the impact if one does occur. The stockingdensities in floodplains are not likely to be high enough to promote disease.Although not favorable to the project, the population of predatory fish in thefloodplains is likely to increase in response to the availability of prey.Furthermore, the escape of stocked fish from the floodplains will enhance thepopulation of fish in the rivers.

6.30 The potential environmental concerns in shrimp culture couldpertain to effects on agriculture, coastal mangrove forests, and the naturalstock of shrimp. The project will intensify shrimp culture. However, the areato be developed is, except for a few hundred hectares, already under shrimpculture. In the shrimp/paddy environment, the effect of intensification will bepositive for agriculture. The improved water management infrastructure willhelp to control the intrusion of saline water into non-shrimp agriculturalareas, flush salinity in preparation for rice cultivation, and supportirrigation for paddy. The participatory approach will insure that the interestsof agriculture are balanced with those of shrimp culture. The mangrove land inthe project area is clearly demarcated as Sundarban Forest Reserve. The projectdoes not encroach on this land but improves shrimp culture in an area whereshrimp culture and paddy cultivation have been practiced for many years. Sincethe Sundarbans are a vast protected nursery ground, the development proposed inthe project is not likely to seriously deplete the stock of post-larvae shrimp.A more important limiting factor in the future is likely to be the increasedpressure on offshore adult shrimp due to commercial trawling.

Page 48: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 41 -

F. Effects on Women in Fisheries

6.31 The project introduces important innovations in the country'sfisheries administration, with respect to gender issues. The project createsWomen in Fisheries cells at DOF headquarters and divisions (paras 3.32, 3.33),assists these cells through TA in studies and the formulation of programs (Annex6) and provides program funding (para 3.29). The task of these cells is also toassure that extension messages and methodology, and credit are geared to theneeds of women in fisheries, whether they are spouses of professional fishermen,full- or part-time fisherwomen themselves, pond operators or collectors of fishand shrimp fry or in other ways linked to fisheries. It is difficult, at thisstage, to quantify effects of the project on women in fisheries, because thelack of precise data them does not allow the formulation of quantifiabletargets. The project will, however, enable the fisheries administration toimprove its knowledge about women in fisheries and address specific issues.

VII. AGREEMENTS AND RECOMMENDATION

7.01 Agreements have been obtained from GOB that:

(a) Project activities not defined in detail at appraisal and changesin the project will be subject to agreed criteria (paras 3.27, 3.29and 3.24);

(b) Plans for DOF training institutes anc headquarter units and projectrelated budget plans of selected DOF units (para 3.32), and a planof FRI's research station (para 3.' ) will be submitted to IDA forapproval;

(c) Staff of the Shrimp Culture Project in Khulna Division will betransferred to the project (para 3.33);

(d) GOB will form an inter-ministerial committee on divestment ofpublic hatcheries and implement its recommendations (para 3.34);

(e) The DOF units and posts at headquarters and the divisional levelwill be staffed as per paras 4.06 and 4.07;

(f) DOF will transfer one fish seed farm in a suitable and centrallocation of western Bangladesh to FRI (para 4.10);

(g) DOF will provide adequate office space to Technical Assistancestaff (para 4.14);

(h) GOB will carry out and improve cost recovery for the shrimp culturecomponent (para 6.14);

(i) GOB will draft a policy paper on cost recovery in floodplains andimplement the policy agreed with IDA (para 6.19);

(j) GOB will establish an inter-ministerial committee for cost recoveryin fisheries (para 6.20).

7.02 The following will be conditions of effectiveness:

(a) Approval of Project Proformas by GOB (para 3.43);(b) Allocation of US$ 2.2 million for the project in the FY91 ADP (para

3.44).(c) Creation of one coordinating committee at central level and of

three coordinating committees on divisional levels (para 4.02);(d) Appointment or designation of the head of the DOF Project

Coordination Cell, the Dy. Project Director Faridpur, the BWDB

Page 49: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 42 -

Executive Engineers and the delegation of powers of ProjectDirectors to the Divisional Deputy Directors, as per paras 4.06,4.07, and 4.11;

(e) Signing of the co-financing agreements between GOB and ODA, andbetween GOB and UNDP (para 4.15);

7.03 The submission of a staffing plan (para 3.31) will be a conditionof disbursement.

7.04 With the above conditions and agreements, the proposed projectconstitutes a suitable basis for an IDA Credit of SDR 34.6 million (USS 44.6million equivalent) on standard IDA terms with a maturity of 40 years. TheBorrower would be the People's Republic of Bangladesh.

Page 50: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 43 -

, PRO

Key Data PFisherlse Sector

it" Yer it Bangladesh Project Ares

Peofiufition 1098849 i llon 118 6S 8O1979-80 Mi li in 87 40 461970-71 11i llion 87 26 TO

Azm 000 Oqk- 124 6t2

90P Fisheries HilIion T. 1S09 6894 5STotel II il liont Ti 480237 288628 oSFieheries in Total 2 2.9 2.1

Admini-tration Divisions No 4 2.8 186DiOtricte No 64 S 7i87Unand 1, o 460 244 ES

FrOf lo.1l Inland 000 8i 328 38Karin* O 2 45S/Total f t 31

Prrt-time Inland 000 #26 4068 48Merino 000 5ifrot am QO22L8 SoS/Tota lOQ § rs

Tot- I 000 1240 890S 49

Ft 000 oPtur VFie$lains 0Q°t 182 88 48Ri verse 000 t 184 82 45Sundarans a 000t 6 8 t10Beet e 000 t 46 1L 29Keptai tlakes 00 4tS/Totl a 000t 424 19 45

Culture Fish iPonds 000 t 149 68 4Sfaora/*bow I.ke 000 t 1 t 10O

Shrimp for" 000 t 25 0OS/Total 000 t 8 9 S1

Total Snland 87/88 000t S 99 280 S179/80 000 t 824 288 4STO/71 000 729 828 48

Morine Industrial * 000 t 10 4 40Artisan * 000 t R.

Totat Morine 678 OO t 5379/80 000 t 122 4770/71 000 t 95 61 SS

Total 8angladesh 87/88 000 t 826 401 4879/80O 000 t 648 292 4870/71 0200t t324 879 46

Consumption of Fish 8, 71/72 kg/capita 11 7 17 14S79/80 kg/cap i ta 7.4 10 1SS87/88 kg/capita 7.8 9 120

Fish Price Rt t978 Tk/kg 14 10 71198O Tk/kg 29 2 931988 T7/kg 76 68 681989 Tk/kg 108 69 66

Hulft l1978 Tk/kg 8 8 10019tt0 Tk/ka 16 18 1001988 T./kg 82 8S 11o1989 Tk/kg 41 41 100

Ftish/Rive Price iptua 12/iui/R;ce 1978 ratio 2.6 2.2 79

19809 ratio 8.0 8.8 69Hi tla/Rice 1978 ratio 1.6 1.8 i1S

1989 ratio 8.2 8.8 108

Dom, Demand for Fish tt 2000 000 t 115 n.s n.a2010 000 t 1400 n. n.a

Fitnri¢o f eort IQ/Sh rip 1979-0 000 t 8 9 60

19087-8 000 t 18 9 601988-89 000t 416 9 871970-S0 hil lI on Tk. 470 280 591987-88 R;i #on Tk 8610 2160 591968-8 N tl ion Tk 8810 2170 87

Fish and other 1979-80 000 t 3 2 601987-88 000 t 9 4 461988-89 000 t 9 581979-80 Ill ion Tk 102 6 661987-88 htll Ion Tk 980 440 471988-89 Million Tk 910 700 77

Total 1979-80 000 t 8 S 621987-ea 000 t 24 1a 841968-89 000 t 28 14 561979-80 hi l ion Tk 872 848 601987-88 Million Tk 4540 2600 571988-49 hM I I ion Tk 4720 2870 60

Page 51: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 44 -

Stem I unit Ibneladesh Project are-

Sitot MaeStf pr+i lb 126 n.c n.s- Support tl 88 n.e nne

S/Totl b 4 1e.j n, 0.5Olvisolns Otet-ten ; tX S ~ ~ ~ ~~~~~~~~4 a 24

- Suport lb1

Oiotricts- tolnt o270 70 2 26

TOTAL S4NOWPOINom2Vehicles NO .18

Total ND lb 1/Vatcheries lb 108 es elTruii;o Inatltute Nl b 4

UDj;Is Fiehr Staf_ ProieaslonlI NO 40

poort Nl 4ITotal lb S a 8

Jalmahala f(ish-ery Rimhtwh tb tOlU1 5.161 St

Irin ' T pture Floodplain. 000 he 2.00 1.478 62Rivers f/ X000 ha 1.0=1 69 69

Sundarban 000 ha It0 550 100Seatl @o0 ha 114 40 96Kaptal lake 000 ha _Sfotel OCO he 2.a4 60

Culture Fih pos" 0O0. 'e t fomt; IlIlion 1.8 4.6 48

Shrimp Dond 000 ha 94 94BAmo/osbow lake 000 ha 6 6 100S/Total 00 he 247 18 72

S/Total Inland am he 4.845 2 944 68Marine Industrial 000 ha 6.514 3.014 46

Artisana, 00 ha 5S/Total abrino 0 W4 49

Total Fisheries 000 ha 14,842 7 940 63

Hatcheres A Fieh Se"d Fara VPri vate Mo I 500 SO 80

Tota l; cOY I 62PMli I tI7 I d

Public hatcheriee t 2 1 Natural eores s o6

Fintirlioa ProductionwL r vote nursr million @O.0 426.0 64lovernmnt nurseries million Sit

Total 11 i ;on i4Fishing CraftNon mechan. Intend 000 141 49 85

Pori"e 0soS/Ttal 000 _6

Mechanized Marine (Industrial) No l2 21 40Marine (Artisanal) lb sOS/Total "a 49

Total 00I 15902 Sa021 a6

Vattill "a 99 48 46Capacity / 000 tfyear 112 60 54Capacit utilisation 1 20 20 100

Note : Untls otherwise stated. the date refer to 1987/58 and rely on bangladesh 'ureau of Statistics. The project area is on eastof the laaunc river of bangloadeh.j ~ Mission estiante.

Includes 75 prof.eaional and 210 support staff at DOV Iq under ADP. The vehiles include only those under the revenuebudgt. Under devlepxmet projects theer are 1S jeeps 16 pickup-. 1 car and 31 mtorcycles so for reported.Sourc COF. Rivers lncludes estuarie excludine Sunderts.Pish production includes shrimp capture form inland *nd mrine sources which amounted to 8,O000 t and 16,000 t respectively.20.000 t and 9.0 t tore from the project ara. With the pro4uction from culture, the total shrimp production amounted to70,000 t sith 49 000 t fr, the prjelct *resc

/ Consuption equals production.ssumsptIons: 2.4S annual growth ot population.

/Source DOF. 196687 report of 8S.Source OO.

_Asausas 260 orIng d per year.Source EPdPr. vilha l 19W6 flurSource: Oxp rt_ient of gIculture Karing. The fixh price under "bpnglodesh' is the hokte wholesale fish morkt price.Th fish price fior tUe proJect ar e th Rajehhi ton whole sale market price.

1/ The fish opric/ ric price ratioi-t result of dividing fish *holeele price/kg by the rice (mdium qunlity) wholesslepr;ce/kg in rectiv ret..

Page 52: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 45 -

Annex 2Page 1

BANGLADESHTHIRD FISHERIES PROJECT

Major GOB Fisheries Development Programs

1. Major development programs relevant to TFP the Second AquacultureDevelopment Program of ADB and the DOF Institutional Strengthening Project ofUNDP/FAO; they are described below. Others are the Beel and Boars, theIntegrated Fisheries Development and the Parbatipur Projects. The ShrimpCulture Project has been described in the maintext.

2. The ADB assisted Second Aguaculture Development Program is a majorfisheries development program in the country and in the TFP project area. TheTFP plans to cover its shrimp and fish culture credit from this source in theinitial years. The ADB project focusses on carp and shrimp culture in ponds,stocking floodplains in the north eastern part of the country, the developmentof public hatcheries and the provision of extension staff and facilities inselected districts. A credit agreement overing Tk 1,400 M (US 43 M) was signedin 1987 and became effective in 1988; the project was planned to close in FY92,but will most likely be extended, as substantial project activity had not yetstarted at the time of appraising the TPP. The delay was over issues inconsultant procurement. Activities are now planned to start during the secondhalf of FY90.

3. The project includes a 27 Million USS credit component of whichADB would finance 20 million. A banking plan has been agreed upon in March 1989and the participating banks are Agrani, Rupali and BKB. The credit wouldfinance shrimp culture and carp culture. About US $ 20 million or 75Z areearmarked for medium-term credit for shrimp culture and the rest of 25? for carpculture. For shrimp culture out of the four selected districts three are withinthe TPP project area (Khulna, Shatkira, Bagerhat) and the totality of the shrimpculture area under TFP is thus covered. Credit for shrimp culture would finanpeupgrading of ponds, construction of new ponds, hatcheries, nurseries and frydealers. The eligibility criteria a wide and allow the full use of the creditfunds by TFP (total medium term credit requirement in shrimp culture of theorder of US$ 4.0). The ADB project also provides credit for carp and otheracquaculture development in 21 districts of the 37 districts in the projectarea. As the participating banks of the ADB project are also active in otherdistricts and problems of credit are not lack of funds of bank, refinance forcredit for aquaculture under TFP can be expected, subject to good extension andcredit preparation. The medium term credit requirements for other fisheriesunder TFP are of the order of US$ 2 million.

4. The Institutional Strengthening of DO? Project (UNDPIPAO)has acost of Tk 93 M (US 2.9M); the project duration is four years; the projectbecame effective in late FY89. It follows from the 1986 IDAIUNDP DOFinstitution study started (para 2.38). It aims at improving management of DOFthrough preparing an organisation cum-implementation plan, developing atraining program, supporting pond and fresh-water shrimp culture throughdemonstration and staff training and through improving selected public fish seedfarms. The project provides 225 MM of international and 261 MH of nationalconsultants. Its present closing date is June 1992, but it will most likelylast til April 1993.

Page 53: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 46 -

Annex 2Page 2

Fiancial links to the TFP are TFP's allocations for the rehabilitation oftraining facilities of DOP, at a level estimated by the project leader. As bothaim in their own and complementary way at institutional improvement of DOF andas the UNDPJFAO project would reach full swing before the TFP even starts, theTFP will be able to incorporate many useful proposals into its program.

5. The Beel and Boar Small Scale Fisheries Proiect is the IFADDANIDA/WFP financed successor to the IDA supported Oxbow Lakes Project. It isactive in the districts of Jessore, Jenaidha and Faridpur, all in westernBangladesh, and covers about 2,200 ha dispersed over some 35 lakes. It willencourage pond and cage culture on a limited scale. The total projectexpenditure is about Tk 310 M (US 9.5M). Project activities have just startedand are programmed to finish in FY95. There will be limited need for TFPactions in the above districts, as they are covered by this project. Therewill, however be a need of coordination between both projects via the Directorof Fisheries, the Project Director of this project and the Divisonal PD Khulna.

6. The Integrated Fisheries Development Project, financed solely byGOB, is a country-wide operation aiming to create 60 public mini-hatcheries inthe Upazilas and 7 public regional hatcheries, to stock selected floodplains andto survey all public water bodies in the country. Fifty percent of themini-hatcheries and three regional hatcheries are planned for Western Bangladesh(Barisal, Bogra, Rangpur). The project expenditure is estimated at Tk 400 M (US12.3M). It started in FY88 and its planned completion date is June 90. So farthe project has progressed slowly.

7. The Parbatipur Hatchery & Fish Seed Multiplication Project with atotal cost of about Tk.92 M (US 2.8) is supported by ODA. It planned todevelops one major public hatchery in Dinajpur and supports extension activitiesin the the districts of Dinajpur, Takurgaon and Panchagarh. It started in FY87.The project is currently under review by MFL/DOF and ODA.

Page 54: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 47 -

Annex 3Page 1

BANGLADESHTHIRD FISHERIES PROJECT

Criteria for the seleccion of activities to be financed under the IDA Credit

Background

1.01 The following criteria apply to all activities to be financedunder the project. In particular they apply to activities to be financed underthe other fisheries component. The aim is to increase flexibility in projectimplementation and planning, while ensuring that institutional and sectoralpolicies and strategies are adhered to.

Criteria

1.02 An activity eligible for financing under the IDA credit would

(a) Comprise public sector support to fisheries activities of the privatesector, including NGO's;

(b) Not increase the number of permanent civil servants;

(c) Focus on the project area or have a national focus;

(d) Improve income distribution and promote small scale operations and thedisadvantaged;

(e) Be environmentally sound and sustainable;

(f) Be economically and financially viable, i.e have economic rates ofreturn of not less than 12Z and financial rates of return of not lessthan 25Z;

(g) Not duplicate other fisheries development efforts;

1.03 An explanation of each criterion follows. The initial letterrefers to the numbering of the criteria in para 1.02.

(a) Public sector support activities are defined as policy formulation,planning, infrastructure development, research, training, extension andregulatory activities in support of private sector activities infisheries production, processing and marketing as well as in fisheriesrelated input production and distribution.

Fisheries is defined as involving inland, estuarine and marinefisheries, capture as well as culture fisheries where fin fish and shellfish are produced.

Financial support activities to the private sector would only be throughcredit; it would be handled by banks and ,to a limited scale, by NGOs.

Page 55: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 48 -

Annex 3Page 2

Support activities with prime impact on other sectors, but with onlyindirect and limited impact on fisheries, would be excluded.

Excluded from financing would be commercial public sector production anddistribution of fish and shrimp, of seed and other fisheries inputs, ofcommercial output processing and marketing of fish and shrimp by thepublic sector. Only activities of a limited scale and number which areindispensable for research, training and extension, or of nature notpermitting adequate recovery of investment or operation costs by theprivate sector, such as in the case of stocking major flood plains,rivers or marine waters, would be eligible. The finance packages underthe 'Other Fisheries' component would thus not support production inpublic ponds or waters or fish seed farms and shrimp hatcheries, unlessthey are leased or transferred in some way to the private sector orNGOs.

Activities promoting the transfer of activities or assets from thepublic to the private sector would be eligible for financial supportunless they conflict with other criteria such as (d).

(b) The intent of the restriction on numbers of civil servants, is that theImprovement or expansion of support services would rely largely on thegreater efficiency of existing public services and the use of temporaryemployees and consultants (private sector or NGOs).

(c) Activities outside the focussed project area should be of nationalinterest and not of prime interest for other parts of the country.

(d) Support activities would be designed to promote primarily small-scaleproducers and the disadvantaged such as the landless and women.

(e) The environmental impact of the activity would be assessed by abiologist at the Project Director level; in cases of significantenvironmental impact ..here would be referral to NFL. Directives ontheconduct of environmental impact studies for sensitive areas will beprovided by IDA separately.

(f) Economic and financial viability would be checked with the usual toolsof economic rate of return analysis and financial analysis coveringfinancial sustainability at GOB budget level as well as financialviability for beneficiaries.

Page 56: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 49 - ANNEX 4Page 1

BANGLADESH

Third Fisheries ProjectResearch Component

Terms of Reference

I. INTRODUCTION

The project research component's objective is to receive directresearch support from FRI, to involve the institute in the project area byengaging it in themes important to the project and to prepare thus forresearch needs which are likely to emerge in the follow-up project.

FRI current five year research master plan covers a wide range ofresearch topics and includes some which are of direct interest for theproject. Current focus is strongly towards pond fish and shrimp culture,already covering areas which are of direct consequence to the project.However, areas important for the fisheries development program in WesternBangladesh such as floodplain fisheries and coastal fisheries are not yetcovered. 'While FRI is present through its stations in other areas of thecountry it is absent from the North West (Rajshahi Division) despite theexistence of important fisheries resources and area specific problems there.

The project would assist FRI to establish a field research stationin the Rajshahi Division. As to actual research the project would focus onthree floodplain, and one coastal, fisheries themes. For floodplainsresearch, it is planned to complement the monitoring exercise under theSupport Technical Assistance (STA) component which aims at providing theessential yield, socio-economic, hydrological and landuse data. The FRIresearch would add information on parametres influencing the production suchas fish food, fish disease and fishing gear. The combined information wouldlater be utilized in production modelling studies with aim of improving theunderstanding of the fish production process in relation to basicenvironmental parametres. In coastal fisheries FRI would look at basic catchand effort parametres of inshore and estuarine fishermen.

Research themes are kept few and methodology simple. This takesinto account that FRI is young and only began to function in 1986. Care hasbeen taken not to duplicate other ongoing or planned work by the institute andto avoid influencing the structure of FRI in a way that could be incompatiblewith its future plans. Consequently, it is proposed that project research isconducted only with existing or contracted staff.

II. FISH FOOD IN PLOODPLAINS

Background Fish production in the stocked floodplains depends on theconversion of nutrients contained in flood water and soils through a chain ofphytoplankton, zooplankton, bacteria, benthos and macrophytes. An estimationof the production and conversion of these fish food sources will permit moreeffective stocking and prediction of stocking requirements and fishproduction. There is practical experience that the waters of floodplains are

Page 57: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 50 -ANNEX 4

Page 2

generally rich in food sources and highly productive but there is littleunderstanding about the biological processes involved. Consequently, planningfor stocking both in terms of priority areas for stocking remains crude andthe stocking densities and species composition empirically determined. Thereis a need to create information about the basic environmental parametersinfluencing food availability in floodplains and this is conveniently done inthose floodplains which the project proposes to stock.

Oblective To create information on fish food availability in floodplains.

Scope and Timing

The basic parameters to be covered by FRI are seasonal fish foodavailability of each initially stocked floodplain in relation to water andsoil characteristics. In each floodplain sampling stations reflecting themajor sub-zones would be selected, regular samples taken and analyzed. Ineach floodplain a field team consisting of a biologist and 3 researchassistants would be stationed for a period of three years. They would operateout of hired premises in the vicinity and this would also house a simple fieldlaboratory.

For fish food, weekly samples would cover phytoplankton,zooplankton and benthos for which analysis can be done in the field lab.Every month during the flood season bacterial abundance would be analysed inrelation to phytoplankton in the Mymensingh lab or another nearby lab with ahigh speed centrifuge. A monthly sample of macrophytes would also be analyzedin the field lab. Monthly sampling of stomach contents of major carps caughtin the floodplains would be carried out and analysis undertaken in the fieldlab.

Water would also be sampled weekly at the same stations andanalyzed in the field for turbidity, temperature (top, mid, lower watercolumn), hardness, pH, anmonialnitrite levels, dissolved oxygen, carbondioxide.

Soil from the area of the sample stations would be analyzed priorto the flooding season. The sample would cover top- and sub-soil and beaccompanied by a description of the natural environment. Analysis would bemade for texture, composition, organic matter content, pH, nitrogen, carbondioxide levels and phosphates. Sampling and analysis would be done by a soillab hired by FRI.

Under the STA component provision has been made for supportingadvice and reference. Annual reports would be prepared by FRI and circulatedamong the interested parties.

Fieldwork would begin in February 1991 and continue up to February1994 and would thus cover the flood season preceding first stocking and thentwo stocked seasons.

Costs will include FWD vehicle, equipment, reagents, field baserent, boat hire and operating expenses.

Page 58: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

ANNEX 4Page 3

Inputs

2.5 MY; 1 senior scientist9.5 MY; 3 biologists23.0 MY; 9 field assistants

Administration The task would be implemented by FRI.

Outputs Data on fish food availability that can be used in laterproduction modelling;3 annual reports;FRI involvement in floodplain research.

III. FISH DISEASE IN FLOODPLAINS

Background Little is known about the occurrence of fish disease infloodplains and its implications for large scale stocking programs. It istherefore necessary to establish a basic knowledge about the types of disease,their occurrence and effects on fish in floodplains.

Objective To obtain information on fish disease in floodplains.

Scope and timing The activity would consist of sampling fingerlings stockedand fish landed throughout the fishing season on a monthly basis and moreintensively if a disease outbreak is reported. Research would start inOctober 1990 and end in March 1994. It would be undertaken in the threefloodplains selected for initial stocking. The task would be handled by asenior fish pathologist operating out the FRI HQ at Mymensingh and wouldconcentrate on fieldwork and lab. analysis for 7 months/year and writingduring the rest of the year. FRI would report annually and the specialistwould available to project management for advice.

The STA provides for external expert advice and support to thisactivity. Costs include a FWD vehicle, equipment, reagents, boat hire andoperating expenses.

Inputs

3.5 MY 1 senior Scientific Officer3.5 MY 1 lab technician

Administration The task would be implemented by FRI.

Outputs Information on fish disease in floodplains that can be used inproduction modelling and management;Three Reports.

IV. FISHING GEAR

Background Successful stocking of floodplains will require measures to limitpredators and to protect early growth stages of stocked fingerlings fromfishing pressure eg. guarding, net mesh size restriction. There is a need toestablish a rational basis for such measures. In particular, gill nets are

Page 59: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 52 - ANNEX 4

Page 4

blamed for the high mortality of small fish; the selectivity by species andsize, of this and other fishing methods, should be tested before partial orcomplete banning. Information will be required on alternative methods whichwill allow fishing to continue for other species.

Obiective To understand the impact of fishing gear on fish populations infloodplains.

Scope and timing The activity would cover the full fishing season of one ofthe first stocked floodplains. The approach would be to sample fishermens'catches for the species composition and size distribution in relation to thefishing gear employed. Costs would include equipment, travel and operationalexpenses and contingencies.

Inputs

0.75 MY; 1 Senior Scientific Officer;4 MY; 5 Research Assistants for 9 months

Administration The task would be undertaken by FRI.

Outputs A report on the selectivity of the various fishing gear infloodplains;Reduced losses of stocked fish.

V. COASTAL FISHERIES

Background Coastal fisheries are important but not well known. This lack ofknowledge hinders development under the Third Fisheries Project. It isnecessary to start collecting information whilst build-up FRI experience incoastal fisheries. A descriptive overview survey of the fisheries activitiesaround Dubla Point would serve this purpose together with information gatheredby others (DANIDA, UNDP/Sundarbans; Bay of Bengal Project). The survey wouldfocus on inshore and estuarine artisanal fisheries and concentrate on the fishlandings and the fishing craft and gear employed.

Scope and timing Two SSOs would be based in Dubla throughout the fishingseason to record landings and numbers of fishing craft, details of fishinggear and approximate estimates of the composition of the catches. Groundobservation would be supported by some aerial reconnaissance of fishingactivity. This exercise would start in October 1992 and continue for threefishing seasons to encompass variations. STA would provide advice and supportfor study design and implementation. Costs include minor equipment, travel,operating expenses and contingencies.

Inputs

4 MY; 2 Senior Scientific Officers 8 months each/ year

Administration Implemented by FRI

Output Three reports on the Dubla fisheries.

Page 60: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

53 - ANNEX 4Page 5

VI. UNFORESEEN RESEARCH

During the implementation of the project additional themes forresearch may become important eg. fingerling production and transport, shrimpbroodstock and post larval abundance and fish supply/demand. As of PY4, US$50,000/year will be allocated for this unforeseen research. FRI wouldidentify and plan these studies according to priorities in consultation withproject management.

VII. RESEARCH STATION

In PY2 and PY3 The sum of USS 150,000 vill be allocated in each PY2 andPY3 allocation for development of the research station in the WesternBangladesh. FRI will be responsible for producing the plans for thisdevelopment.

Page 61: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 54 -

Annex 5Page 1

BANGLADESHThird Fisheries Project

ODA Technical Assistancefor Project ManagementTerms of Reference

I. INTRODUCTION

1.1 The Third Fisheries Project is a large project with a variety ofobjectives and innovative features both technically and administratively. TheManagement of the Department of Fisheries (DOF) continues to be weak,particularly in program and project management, and is in need of support. Tofurnish this support, ODA would provide management-orientated technicalassistance (MTA) via an experienced consulting company which would hireexpatriate and local staff.

1.2 The MTA would focus on advising DOF in the implementation andmanagement of the project according to the schedule and conditions laid down inthe IDA Credit agreement. It would provide management-specific training inorder to ensure a smooth takeover of management duties by DOF at projecttermination.

1.3 MTA would be deployed in management at DOF headquarters andDivisions, at critical decision-making points for the project. A core of long-term advisors would provide continuity in training and short-term local whileforeign consultants would assist with specific technical and managerialproblems.

1.4 The consulting firm would bp selected by ODA, London, inconsultation with GOB. It would then select and manage its own expatriate andlocal manpower. It would also appoint a locally based firm to certify thedelivery of fingerlings and would be responsible for seeing that the local firmsatisfactorily fulfilled its obligations.

1.5 In addition to its responsibilities to the counterpartorganization DOF, the consulting firm would report to ODA. ODA would providefunds for project vehicles, equipment, operation and maintenance costs, localstaff and local expenditures. ODA would participate in the regular supervisionmissions of IDA. Furnished offices would be provided for the firm within DOFheadquarters and at the Divisions.

II. DOF HEADQUARTERS

2.1 General

The Third Fisheries Project will be implemented by the DOF under theoverall responsibility of the Director of Fisheries, who will have directresponsibility for executing the floodplain stocking program. The Director ofFisheries will be assisted in this task by an Coordination Cell containing

Page 62: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 55 -Annex 5

Page 2

eleven DOF officers and one senior officer. TA would be provided by 2expatriate long-term advisers (86 mm) and 3 local long-term advisers (132 mm)over a period of 5 years. The expatriates would include a senior projectmanagement advisor, who would also serve as the team leader for the executingconsulting firm, and a procurement advisor. Local consultants would includespecialists in monitoring/evaluation, computer services, and procurement. Theteam leader would have the flexibility to call upon an allocation of 20 mm ofshort-term expatriate consultants and 30 mm of short-term local consultants overthe five-year period of invclvement in the project. Two special areas havealready been identified: (i) training and advising the DOF fingerling supplyinspectors in Project Year 1, and (ii) participating in the project preparationmission in Project Year 5. Any remaining short-term man-months would be used toresolve previously unidentified technical oL management problems. The ODA-appointed consulting group would subcontract a reputable local inspection andcertification firm to provide independent certification of the fingerling supplyunder the floodplain component of the project.

2.2 Senior Project Management Advisor

Background All project decisions will be prepared for the Director of Fisheriesat the Project Coordination Cell. The cell would have to maintain permanentcontact and collaboration with other DOF headquarter units -- particularlytraining, planning, extension, and administration. The cell has been conceivedto eventually be phased out and integrated into the new DOF headquarters afterit is reinforced through the UNDP/FAO Strengthening Project.

Scope and Timing

The senior project MTA manager would be required to spend 52 man-months ofresidential service in Bangladesh over a period of 5 years beginning inSeptember 1990. The manager would assist and advise the head of theCoordination Cell and simultaneously head the MTA team. In his or her advisorycapacity to DOF, the manager would advise on all project matters, focussing onorganization and management issues, including policies, planning of strategies,monitoring and evaluation, management and training of DOF and TA staff,accounting, and floodplain stocking. As team leader, the manager wouldcoordinate and represent at the central level other long-term and short-termconsultants within the ODA contract, report on team matters and project progressto the parent firm. As a side function the manager would advise British Councilon the selection of candidates to receive project-related TC training awards andassist in coordinating official requests for overseas training.

Profile

The MTA manager should be between 40 and 55 years of age and have considerableexperience at the management or project director level, both in public andprivate sector operations; have more than 10 years experience in developingcountries; possess exceptionally good planning, personnel and financialmanagerial skills; have the ability to operate under difficult conditions withdiplomacy and tact yet show firmness and resolve on issues critical to projectsuccess.

Experience in and understanding of fisheries and aquaculture development andtheir management would be an advantage, but a strong inclination to comprehend,

Page 63: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 56 -Annex 5

Page 3

debate and resolve the special technical problems involved is essential. Theability to clearly define priorities and objectives is also important.

2.3 Procurement

Background The procurement of goods and services has always been a majorproblem in past fisheries projects, and the success of the Third FisheriesProject will depend on efficient procurement. The large scale procurement offingerlings is especially critical because it is a core component of floodplainfisheries and is a novel undertaking in Bangladesh. It is therefore essentialthat good technical advice be readily available for DOF procurement staff.Procurement advice is especially needed in the early stages of the project whenthe first lots of fingerlings and the bulk of the equipment are being procured.Long-term MTA would be provided by an expatriate procurement advisor and a localprocurement assistant. They would work in the Coordination Cell and assist thetwo DOF headquarters staff and the d'visional project directors. Sheat-term MTAwould be provided for two special functions which are associated with successfulprocurement: (i) the training and advising of DOF fingerling supply inspectorsand (ii) an independent fingerling supply certification system.

2.3.1 Expatriate Procurement Advisor

Scope and Timing The expatriate procurement advisor would spend a total of 34man-months of residential service over a three-year span commencing in September1990, the expected starting month of the project. He or she would advise on allaspects of DOF project procurement according to World Bank and GOB guidelines.which training counterpart staff on the job. Items to be procured include carpfingerlings and stocking services, civil works, consulting services, andequipment. In addition to advising on procurement, the advisor would also signoff on tender documents, selection protocols and contracts that have to bereferred to IDA.

Profile The advisor should be 35-55 years of age and have at least 8 years ofexperience in designing and handling major procurement operations in developingcountries; experience in fish culture would be an advantage. He or she shouldhave: a dynamic approach to problem solving and be able to exercise considerableresolve in difficult situations; a good grasp of public sector and donor agencyprocurement procedures but have the ability to generate ideas and propose waysto overcome bureaucratic bottlenecks; an ability to communicate decisions firmlyyet tactfully; some linguistic ability, as he would be required to learn someBengali; willingness to train and supervise local staff and consultants.

2.3.2 Local Procurement Assistant

Scope and Timin8 The local procurement assistant would be required for a totalof 51 man-months of service over a four-year span commencing in September 1990.The assistant would report to the Procurement Advisor and assist in all aspectsof project procurement, especially with advice on local practice and conditions.The assistant would be capable of training, orienting, and supervising others.He or she would have to travel extensively and maintain communications at thelocal level.

Profile The assistant should be 35-55 years of age and have at least 8 years ofexperience in procurement for industry and development projects in Bangladesh.

Page 64: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 57 -Annex 5Page 4

Some experience in fish culture would be an advantage. He or she should bedynamic and have a good grasp of public sector and donor agency procurementprocedures.

2.3.3 Training Specialist for Fingerling Stocking Inspectors

Scope and Timing The local specialist for training fingerling stockinginspectors would be required for 2 man-months during March and April 1991. Heor she would report to the Procurement Adviser and assist: in designing a DOFfingerling inspection system for the DOF and training DOF fingerling inspectors.Training would cover the estimation of quantities, sampling for fingerling size,species composition, vitality, and freedom from disease. He or she wouldconcentrate on instilling a rigorous working method and reporting system withthe inspectors. Ultimately this person would report to project management onthe suitability of individual inspectors for the task.

Profile The training specialist should have at least 8 years of experience indealing with carp farming in Bangladesh, with both the private and publicsectors. He or she should be familiar with carp hatchery and nursery operationsand very experienced in the transport and distribution of carp fingerlings. Heor she should be assertive, dynamic, thorough and practical in approaching thetask.

2.3.4 Stocking Certification

Scope and Timing A locally based firm would be subcontracted to provideinspection and certification services for the fingerling quantities deliveredand stocked by contractors in floodplains. The firm would be retained on thebasis of a percentage of the stocking contract, amotinting to about 0.5Z offingerling stocking costs. The services would be required for about 2 weeks peryear, between June 15 and July 1, depending on the onset of the flood season,for 3 years. The purpose of the system is to provide independent certificationof the quantities delivered in order to validate contractors' claims for paymentand to provide a countercheck to DOF's fingerling inspection system during itsformative years. The firm would provide certification and reports to projectmanagement at DOF headquarters; these documents would be made available to IDAand project evaluation missions on request.

Profile A reputable, internationally-recognized local inspection andcertification firm, such as those employed in export and insurance, wouldundertake the task. For ease of administration, the firm would be sub-contracted by the MTA Consultant, who would advise ODA and IDA on the choice ofappointment.

2.4 Monitoring

Background Monitoring and reporting has been a problem in past fisheriesprojects. DOF lacks these skills because project staff have been absorbed inimplementation tasks. Because the Third Fisheries Project emphasizesmonitoring, MTA in the form of a long-term monitoring specialist is required tosystematically introduce the proper working methods and skills. These skillsare already available in Bangladesh but public sector remuneration dissuadesskilled professionals from entering public service. The MTA temporarilyacquires them for DOF through consulting services.

Page 65: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- s8- Annex 5

Page 5

2.4.1 Local Monitoring and Evaluation Assistant

Scope and Timing The local monitoring and evaluation assistant would begin workin October 1990 and continue working for 51 man-months over 5 years. He or shewould be responsible to the Senior Project Management Advisor and would advisecell in all matters concerning monitoring and reporting. Working in closecooperation with the computer specialist, the assistant would help to set upthe PC and database system to monitor production and project performance atheadquarters and in the Divisions. He or she would help to establish a systemfor monitoring project performance through physical and financial targets,provide feedback on project monitoring and evaluation procedures to the DOF, andorganize regular in-service training for DOF staff on monitoring, statisticaland computing techniques.

Profile The monitoring and evaluation assistant should be between 30-40 yearsof age, have previous experience and proven ability in the monitoring andevaluation of development projects at the management level, in project planningand in monitoring small-scale rural operations in developing countries. He/sheshould have knowledge of PC computer systems and databases, analysis of data,basic statistical techniques and report generation, and should be able totransmit statistical information in a clear manner. He or she should be capableof training, guiding and supervising staff and be willing to travel extensivelyin rural areas.

2.5 Computing

Background DOF is in the process of installing PC-based work station services.The project will procure and install a number of compatible units. The use ofsuch equipment is limited at present by a general lack of computer know-howamong DOF staff. Staff will have to be trained and equipment installed andserviced; this calls for technical back-up.

2.5.1 Local Computer Advisor

Scope and Timing MTA would provide a total of 30 man-months for the services ofa local computer specialist over a five-year span commencing in January 1991.The specialist would report to the Senior Project Management Advisor and wouldassist DOF in installing, making operational and maintaining the PC computersystem for project purposes; training, orienting and supervising project and DOFpersonnel in computer use; and advising on appropriate software packages, thedesign and installation of the project monitoring database system, and computersuppliers and service agents.

Profile He/she should be 30-40 years of age; have at least 5 years of experiencein PC computers, word processing, spreadsheet, database, accounting and othermanagement software; have a dynamic approach and show initiative in problemsolving.

III. DIVISIONAL DOF OFFICES

Background DOF's Divisional Deputy Directors will directly manage a largeportion of the project's field operations. Currently the divisional offices aresmall and lack management manpower and skills. Although manpower will be

Page 66: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 59 Annex 5Page 6

increased, management skills will remain scarce unless MTA support is provided.Each of the three Divisions will receive one expatriate management advisor.

3.1 Divisional Management Advisors

Scope and Timing Each of the three advisors will be retained for 45 man-monthsover a five-year span, commencing in January 1991. The advisors would bepermanently based in Faridpur, Khulna and Rajshahi, where they would providecore management assistance. They would be the counterparts of the projectdirectors and assist in planning, organization, management, monitoring, andreporting of all divisional project activities. They would pay particularattention to the inspection and certification system for fingerling stocking;planning and coordinating the protection of stocked areas; planning anddeveloping an active extension and credit program for fisheries, supporting theactivities of the short-term consultants in the field and proposing candidatesfor ODA training.

Profile The advisors should be 35-45 years of age and have at least 8 years ofexperience in managing projects in developing countries. Experience infisheries, extension and credit would be a considerable advantage. They shouldbe dynamic and be able to cope with difficult work and living conditions, have agood grasp of financial management and project accounting procedures; be able togenerate and communicate ideas and set clear priorities, use computers andtrain, orientate and supervise staff.

IV. OVERSEAS TRAINING

Background The shortage of management skills in the fisheries sector hasalready been noted. To achieve the long-term institutional strengthening of DOF,in-service training activities of the MTA should be supplemented by trainingawards outside of the country. These awards would be reserved for those projectstaff with the prospect of entering the management stream of DOF and thosealready involved in management.

Scope and Timing. A total of 24 training awards would be issued in the form oftechnical cooperation scholarships to Britain or approved institutes in otherdeveloping countries. These awards would be given out at a rate of six per yearover a period of four years, beginning in Project Year 2. Most of these awardsare expected to be used for management-orientated training courses of shortduration. The awards would be administered through the British Council inDhaka.

Page 67: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Annex 6

- 60 - Page 1

BANGLADESH

Third Fisheries ProjectTechnical Assistance and Training

for Project Support(UNDP/IDA)

Terms of Reference

I. INTRODUCTION

1.1 According to COB, technical assistance (TA) is to be used forfinancing the importation of expertise not available in the country and toprovide for services to be procured from foreign and domestic consultants. Thisannex describes the technical assistance in Project Support (STA) to be financedby UNDP and executed by IDA. The component is complementary to the technicalassistance in Project Management (MTA) which is Zinanced and executed by ODA.Because neither of the likely TA sources could finance all of the technicalassistance required under the Third Fisheries Project (TFP), two distinctcomponents have been defined to be financed from different sources.

1.2 The STA component concentrates on providing study and planningsupport to the project and on field activities with social dimension. The STAcomponent addresses specific fields of project activity as follows:

(a) Floodplain Fisheries(b) Coastal Shrimp Culture(c) Other Fisheries(d) Research(e) Sector Policies(f) Training

1.3 The sub-component is expected to be executed IDA. IDA, in turn,would contract out implementation to a reputable international consulting firmwith experience in planning, fisheries and rural development; it should haveexperience in south east asian countries where experience in a wide range offisheries activities is abundant. The selected firm would be distinct from thatemployed under the MTA. An association of the firm with others havingparticular expertise would be welcome. At the outset the firm would enter intoa cooperation agreement with a reputable domestic consultant firm withexperience in the same areas and with a reputable NGO for the social supportactivities; a list of acceptable local associates and NGOs would be provided byIDA in consultation with GOB. Selection of the Consultant (international firm)would hinge strongly on the quality of associates and senior international andlocal experts offered. The firm would operate out of hired premises in Dhaka,but an office would also be made available to it in the project advisory cell atDOF headquarters to ensure full contact with project management.

1.4 Below follow descriptions and terms of reference for each area andactivity. Background, objectives, scope and timing, inputs, administration andoutputs are given. Specific and detailed terms of reference, particularly thoseof individual consultants would be drawn up by the Consultant in consultationwith IDA.

1.5 For planning purpose, the cost per man-month (mm) of internationaland local personnel includes all costs associated with the consulting personnel

Page 68: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 61 - Annex 6Page 2

such as salaries, social costs, firm's overhead, fee or profit, and overseasallowances, and reimbursable items such as international travel, subsistence,and other allowances. The estimated cost per mm for a foreign expert is US$10,500 (Tk 240,000); for a local expert it is Tk 40,000. Other cost items suchas local transport and office costs, including comunuication, editing, andproduction of reports (50 copies each) are costed at a pro rata basis per mm.These costs are estimated at 152 of the mm cost for international consultants,and at 402 for local consultants. Costs have been estimated in this way toavoid the usual over-investment in equipment and vehicles, and to give theconsultant maximum flexibility. The cost of other personnel has been estimatedseparately, using current local rates. All costs are detailed in the projectfile. The susmmary costs given below include price contingencies but excludephysical contingencies.

II. FLOODPLAIN FISHERIES

2.1 General

Activities under this heading support the TYP's core floodplainfisheries component. The activities comprise ti) monitoring the effect ofstocking on fish catches and income distribution (ii) carrying out detailplanning studies, (iii) providing assistance to organize fishermen, and (iv)improving the exchange of ideas through workshops. The inputs for STAcoordination and management also figure under this heading, because floodplainsattract most of the STA inputs.

2.2 Monitoring of Production

Background The stocking of rivers and floodplains is a recent activity inBangladesh. Although production parameters are fairly well understood they havenot yet been verified in the field, and it will be difficult to carry outcontinued stocking on a substantial scale without credible evidence of itsimpact on production and incomes. An efficient monitoring system is needed toprovide this data. A monitoring system also will provide information requiredto modify stocking rates, sizes, species composition, and management measures in '.order to obtain optimum yields. It will provide information with which toassess the efficiency of cost recovery mechanisms and the impact on fishingcatches and incomes. In order to be impartial and to concentrate fully oncorrect data collection, monitoring of this type should be done by units outsidethe agency which is implementing the stocking program. For ease of management,monitoring must be as simple as possible and must focus on a few essentialelements. These elements include the total catch of fish before and after thestart of stocking activities, the size and composition of species, and a break-down between part-time and full-time fishermen, and between holders of fishingrights holders (lessees, licensees). A description also is needed of thephysical characteristics of the respective floodplains in terms of water areaand depth, and land use. These data would complement the data gathered underthe FRI research component.

Objectives To create sufficient data on the effects of floodplain stocking topermit an evaluation of its financial and economic viability.

Scope and Timing An intensive monitoring system would be installed in each ofthe three floodplains selected for initial stocking. These systems would remainin place for three years, commencing in the year prior to stocking, which would

Page 69: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-62 - Annex 6Page 3

serve as the baseline year. After the three years extensive monitoring could becontinued by the Fisheries Resources Survey System.

The intensive monitoring system would comprise a core team and asupplementary team. The core team would collect and summarize data on catchesfrom a representative sample of fishermen observed and interviewed on a regularbasis. he small supplementary team would conduct additional specific studies,for example, in selected villages and fish markets inside and outside of thefloodplains.

An initial study lasting 5 months would serve to collect theinformation needed to draw up a representative sample of fisherman by type ofgear used and full or part-time activity. At the same time, the study wouldcollect data on basic social indicators to use in later social impact studies.The study would be able to use the monographs prepared for project appraisal oneach of the floodplains. The following minimum parameters would be monitoredfor each fisherman sampled: daily catch, location of catch (jalmahals, etc.),catch/effort by type and size of gear, composition of fish species and size(weight) -- particularly for major carps. Total landings will be inferred byextrapolation of individual catches within the statistical confidence limits ofthe sample.

The data also will permit an assessment of the social impact ofstocking, as the sample will include both full-time and part-time of fishermen.

The core team in each floodplain also would report regularly onwater coverage and depth, land use, rainfall, temperature, and any other obviousmacro-environmental conditions, such as the occurrence of pesticide andfertilizer use, in relation to estimated catch. To cover this monitoringelement, the Consultant would have to provide geographic expertise. Early on,the Consultant would establish contacts with BWDB on water-related matters andwith BMS for meteorological data.

The data would have to be promptly analyzed and reported to projectmanagement at DOF headquarters, the Divisional offices, and FRI. A preliminary '.

analysis of the data and a technical report on each floodplain should be madeavailable to DOF project management within 6 weeks of the end of the particularfloodplain fishing season. The final report on each floodplain should bepresented within 12 weeks of the end of the fishing season. All data should bestored on computer from the outset to ensure that they are accessible topotential users. The existing computers in DOF and FRI should be examined todetermine this compatibility for the purpose.

The initial study to set up the sample framework would begin inNovember 1990 and would last five months. Intensive monitoring in each of the 3floodplains would begin in April 1991 and continue through April 1994. Thesupplementary team would work over the same period.

InPuts

Cost: US$ 542,600

Manpower requirements:

Initial study (5 months):

Page 70: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-63 - Annex 6Page 4

3 man-months for foreign expertise in social and fisheries surveywork;

5 man-months for a local expert with a similar background;3 man-months for a local specialist ingeography/surveying/cartography;15 man-months for field team leaders;225 man-months for enumerators.

(The teams would work for the full 5 months either in the field orin trainir.g, since they would form the core of later monitoringteams).

Core team (3 years):

6 man-months for foreign expertise in social and fisheries surveywork;36 man-months for local monitoring/coordination expertise;12 man-months for local specialist in geography;9 man-months for local computer expertise (3 man-months/year);

216 man-months for local field team leaders;1,080 man-months for enumerators;

(There would be three teams each with 1 team leader and 5enumerators to cover 100 fishermen in sample in each floodplain)

Supplementary team (3 years):

18 man-months for local expert in what area? (6 man-months/year)54 man-months for enumerators (18 mm/year)

Administration The task would be carried out by the Consultant within theterms of its contract with IDA.

Outputs Data to support a socio-economic evaluation of floodplain stocking;A better managed stocking program under the project;

A Computer-based data system for monitoring of floodplainproduction;A Well documented description of the physical floodplainenvironment.

2.3. Planning

Background. The floodplain component of the project is considered a dynamicprocess in which public stocking will expand from 30,000 ha in Project Year 2 to100,000 ha in Project Year 6. The initial floodplains -- Chanda, Halti, andBSKB beels -- have been surveyed. However, others remain to be selected andplanned. This study will provide support to DOF in surveying and studying areasfor development later in the project.

Obiective To assist DOF in the selection and detailed planning of floodplainstocking by surveying and reporting on the physical and socio-economic characteristics of selected floodplain areas with specificreference to their suitability for stocking.

Page 71: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 64 - Annex 6Page S

Scope and Timing The selection of floodplains to be developed would be made onthe basis of information available from existing maps, reports prepared in 1989,and work done by the FRSS. The planning task would involve: collecting andcounter-checking existing information on hydrology and topography, in thedesignated floodplain areas in order to create maps that show the monthly waterareas; analyzing and reporting on the socio-economic characteristics of thearea; collating existing information on the population, activity, and currentcatches of fishermen; reporting on special features of the area which mightaffect fisheries development, such as agricultural characteristics anddevelopment plans; and presenting the draft and final reports with supportingmaps, charts, and data according to schedule. The study team would work inclose collaboration with project management, and project management would reviewthe team's detailed terms of reference. The work will involve examininginformation available at the Dhaka, Dlistrict, and Upazila levels, andinterviewing fishermen and others in the area. Field level work would notexceed 4 weeks per floodplain. The study would begin in November 1992 and wouldbe completed in April 1995. Altogether 5 studies would be prepared in eachstudy season, running from November to April.

Inputs

Cost: US$ 97,9000

Manpower requirements:

45 man-months for local experts;

Administration The task would be carried out by the Consultant within theterms of its contract with IDA.

Outputs Well planned expansion of public stocking in floodplains;

Detailed planning studies for 15 floodplains.

2.4 Organization of Fishermen

Background The floodplain stocking program under TFP will present greatlyimproved opportunities in terms of larger catches and increased income offishermen, who are usually the poorest amongst the population. To availthemselves of these opportunities the fishermen will require assistance andadvice in technical and socio-economic matters. Technical advice would arisefrom the work of the UPOs, whilst fishermen organization for social improvement(share in catch, access to fishing rights, access to credit, access to extensionadvice, bargaining power on the fish market, etc.) would have to be done byspecialized NGO services. The major floodplains are big entities covering alarge area and population and it would be unrealistic to expect completecoverage by NGO services within the project period; it is therefore proposed tobegin working in limited, representative areas as a basis for gaining experiencefor future expansion.

Objective To improve, in a pilot area, the fisherman's share of the benefitscreated by floodplain stocking.

Scope and Timing One NGO would be selected by the Consultant. This NGO wouldplace a small team in one of the three floodplains after the initial surveyresults are in from the production monitoring exercise. Waiting for these

Page 72: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-65- Annex 6Page 6

results will help the NGO to select its relevant areas of operation. The teamwill consist of a field supervisor, 5 field social workers, and 25 link workers.The team will be installed in April 1992 and will work throughout the projectperiod; it also is assumed that the will continue to work under the follow-upproject. The NGO would operate in the traditional manner, focussing onorganizing, motivating, training, and supporting the fishermen in a variety ofarea through revolving fund credit and other means. The NGO's terms ofreference would emphasize fisheries. The NGO would keep field diaries andprepare biannual reports of its activities and plans. A local sociologist wouldvisit the NGO twice a year to review its progress.

Inputs

Cost: USS 149,300

Manpower requirements:

5 man-months for a local sociologist27 man-months for a coordinator57 man-months for Field supervisors255 man-months for Field social workers

1,1275 man-months for Link workers

Administration The NGO service will be a subcontract of the Consultant'scontract with IDA; the accompanying sociology expertise will be supplied by theConsultant under its contract with IDA.

Outputs Improved share of the poor in benefits from floodplain stocking;Improved participation of fishermen in fisheries management;Better understanding of fishermen and fisher women for improvedproject planning.

2.5 Floodplain Fisheries Workshops

Background A primary objective of the project is to increase fish productionthrough the public and private stocking of floodplains. Although the massproduction of fish seed is now well established in Bangladesh, the concept ofannually renewing fish stocks in natural waters is relatively new and itsmanagement has yet to be developed through the project. During the project twoworkshops would be arranged at a central location so that public and privateagents involved in floodplain fisheries could meet to discuss the technical andsocio-economic aspects of the activity.

Obiective To provide a forum for discussion and consensus on all aspects offloodplain fisheries development in Bangladesh.

Scope and Timing The task would be to plan, orgpnize, and run two workshops onfloodplain stocking and management for uplto 60 local participants inBangladesh, in April 1993 and in April 1995; to assist in previewing, selecting,and editing papers to be presented; and to assist in preparing and publishingthe workshop proceedings. Funds would be provided to organize and run theconference, for publicity, materials and services, transport, accommodation andsubsistence of delegates, editing and publishing a workshop report, and to bringin international keynote speakers with experience in floodplains and large scalestocking. Donor organizations interested in supporting fisheries developmentwould be invited to send representatives as observers. The papers from the

Page 73: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-66 - Annex 6Page 7

workshop would be published in a report not later than 6 months after themeeting. Each workshop would take place over a three-day period.

Inputs

Cost: US$ 42,000

This includes US$ 20,000 for operating funds for Workshop of60 participants (travel, subsistence of participants,materials, hire of equipment, reproduction of papers,publication of report).

Manpower requirements:

1 man-months for Foreign specialists (keynote speakers)2 man-months for Local consultant (conference organization

specialist)

Administration FRI would be responsible for selecting, reserving, andpreparing the venue. A local consultant specializing in conference organizationand public relations would be appointed by the Consultant to assist inorganizing the workshop. Two foreign floodplains specialists appointed by theConsultant would act as keynote speakers and assist in running the sessions.

Outputs Improving understanding of floodplain stocking and management issues inBangladesh and strengthened relationships between public and privateparties in the sector. Two workshop reports documenting theachievements of the floodplain program.

Recommendations and guidelines for future projects.

2.6 STA Coordination and Management

Background The STA program is large and involves substantial amount ofmanpower. To manage this large program the Consultant will have to maintain aforeign ( team leader) and a local coordinator (assistant) in permanent liaisonwith project management and counterpart organizations. They would have toprepare and supervise the implementation of contracts under the SAT. Thecoordinators initially would be full-time in the country; their mm allocation dtails off towards the end of the project period.

Objective A strong presence in the country to ensure efficient management ofthe STA component.

Input

Cost; US$ 721,900

Manpower requirement:

51 man-months Foreign Coordinator51 man-months Local Coordinator

Administration STA-management and coordination would be handled by theConsultant under the terms of the contract with IDA.

Page 74: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 67 - Annex 6Page 8

Output A well coordinated and efficiently run STA component.

III. COASTAL SHRIMP CULTURE

3.1 General

The development of the coastal shrimp culture is the second mostimportant component of the project. In western Bangladesh this improvementrepresents a continuation and expansion of the activities of the Shrimp CultureProject (IDA Cr 1651 BD, UNDPIBGD/85/020). Infrastructure development would beimplemented by BWDB and technical extension services would be provided by DOF.The technical assistance offered would complement ongoing activities with (i)support for organizing shrimp farmers; (ii) detailed planning studies; and (iii)technical expertise in shrimp culture technology.

3.2 Organization of Shrimp Farmers

Background: In the ongoing Shrimp Culture Project, local consultants (NG0s)have proven indispensable in organizing shrimp farmer groups to supportdevelopment and project objectives. In western Bangladesh these organizingefforts have been limited to one polder (Polder 20, 20/1) covering 1.500 ha witha planned project completion date of June 1991. The project proposes expandinginfrastructure improvements and extension to another 13,000 ha of polderedshrimp culture. The development approach chosen differs from the previous onein that public infrastructure development would be limited to large-scale watercontrol works, while the shrimp farmers themselves would construct and managethe water distribution network. This change will call for a greater effort inorganizing shrimp farmers to participate in the project and cooperate amongthemselves.

Objective To improve the use of extension and infrastructure provided by thepublic sector, reduce public sector infrastructure investment perunit of land, and improve income the distribution effects of theproject on 13,000 ha.

Scope and Timing The first task of the local consultant (NGO) would be to takea social baseline survey of the areas chosen for development and to identify andorganize shrimp farmers and other groups. The NGO then would stimulate andorganize a documented majority vote of the concerned farmers, in favor ofproject activities, committing them to the development of water supply anddrainage channels and block boundary dikes of a certain standard within a givenperiod of time. The next task would be a continuous process of motivating andtraining the groups to increase this cohesion, participation in projectactivities, interest in shrimp culture, receptivity to extension messages, andgeneral socio-economic development. Themes of special importance would includereducing dependency on exploiting forces, coordinating the timing of paddy andshrimp operations, and transmitting implementation problems and suggestions tothe DOF extension service and BWDB. Activities would begin in Project Year 1and in each particular area they would be phased one year prior to constructionwork; initially the activities would be intensive, and after S years they wouldgradually be reduced. The local consultant would work in parallel with the DOFextension service, but both would coordinate closely at the field and divisionallevel. The local consultant (NGO) would submit biannual progress reports to theConsultant and project management. A back-stopping service, recordingexperiences and suggesting improvements, would accompany the NGO activities andalso report biannually.

Page 75: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 68 - Annex 6Page 9

Inputs

Cost: US$ 648,800

Manpower requirementss

69 man-months for a senior field coordinator301 man-months for field supervisors (1 per 5 field social workers)1,494 man-months for field social workers (1 per 5 link workers)7,747 man-months for Link workers (1 per block of 100 ha)

Local Back-stopping services:

48 man-months for a senior local consultant120 man-months for research officers

Administration The service of the local consultant (NGO) will be a subcontractunder the Consultant's contract with IDA; the Consultant would name the localconsultant -- most likely a major NGO well known by IDA. The back-stoppingservices would be provided by a reputable local consultant or recognized localresearch institute in the field of social science, under subcontract with theConsultant.

Outputs The organization of about 13,000 shrimp farmers on 13,000 ha ofshrimp culture in polders;The effective use of extension and infrastructure from the publicsector;

Reduced public sector infrastructure investment per unit of land;Improved income distribution effects from the project.

3.3 Detailed Planning Studies

Background General planning for the areas to be served with improved waterinfrastructure was carried out on 10,000 ha, before project appraisal. Detailedplanning also has been completed for the first 3,000 ha to be developed inpolders 5 and 23. Still remaining to be completed are general planning for3,000 ha and detailed planning for 10,000 ha.

Obiective To carry out general planning studies for 3,000 ha anddetailed planning studies for 10,000 ha, in preparation fordeveloping shrimp culture infrastructure in these areas.

Scope and Timing General planning includes estimating the water requirements ofshrimp farms, examining the topography and hydrography of the area, preparingbase maps (scale 4' : 1 mile), identifying subareas, and preparing costestimates and detailed model engineering plans for the water infrastructure.The detailed planning includes engineering surveys for the water controlstructures including spot checks on topography, installation of gauges, andpreparation of detailed maps for use in engineering (scale 16' : 1 mile); thepreparation of detailed engineering designs for the water control infrastructureof model farms and outline designs for the water control infrastructureelsewhere, selected subsoil investigations, and a tentative land acquisitionplan.

Page 76: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-69- Annex 6Page 10

Administration The task would be implemented by the local associate of theConsultant or it would be subcontracted to another local firm. The studies andsurveys would be carried out by reputable local consultants experienced shrimpculture engineering, who would work on call, at the discretion of projectmanagement.

Inputs

Cost: US$ 263,000 (based on a per ha rate)

outputs A technically well-planned development of water infrastructure and acorrespondingly efficient investment program for an incremental13,000 ha of shrimp culture.

3.4 Shrimp Culture .echnolosy

Background

Although Bangladesh has a local pool of technical experience inshrimp culture from previous projects, the country can still benefit from thetechnological improvements and innovations that have been made in similarenvironments in other countries. The extension activities of the project willrequire a regular injection of technological support from experienced sources.

Obiective To provide the private sector and DOF extension agents in theproject area with technical advice to improve the shrimp.

Scope and timinx Within its contract, the Consultant would be able to hireshort-term expertise, preferably from Southeast Asia to restore specifictechnical problems that arise during project implementation and disseminateknowledge on advance in shrimp culture technology from the region. Areas inwhich advice may be needed include: disease, hatchery operations, nutrition,harvesting, and marketing. Advice would be needed as of Project Year 2 andwould be made available through Project Year 6.

Inputs

Cost: USS 284,200

Manpower requirements:

15 man-months for foreign consultants25 man-months for local consultants

Administration Project management would request from the Consultant short-termtechnical assistance in specific areas, when needed.

Outputs A technologically progressive program of shrimp culture development.

IV. OTHER FISHERIES

4.1 General

The project provides for the development of a variety of otherfisheries resources and activities. Resources cover primarily freshwater fish

Page 77: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 70 - Annex 6Page 11

and shrimp ponds, minor floodplains, rivets, and coastal fisheries. Activitiesinclude the promotion of women in fisheries. The STA activities included underthis heading are: (i) minor floodplain development; (ii) women in fisheries;and (iii) general technical support.

4.2 Minor floodplain development

Background The major thrust of the project is to support public stockingprograms in major floodplains. However, the stocking of smaller areas such asminor floodplains would contribute to inland fish production and may well bewithin the investment and practical capabilities of private individuals andgroups of fishermen. Studies are needed to define the limits of thesecapabilities with respect to the size of floodplain and factors affectingsocial organization. The studies would need to suggest socially acceptable waysof organizing in order to achieve economically sustainable stocking andharvesting.

Objective To determine the possibilities for and limits to privatesector development of floodplains and identify promotablesystems for achieving private sector stocking.

Scope and Timing This study will assemble the positive and negative experiencesof private individuals and groups practicing the stocking of minor floodplains,analyze them, and attempt to fashion a management approach that is likely towork best under typical minor floodplain conditions. The initial phase wouldinvolve assembling known cases of stocking of floodplains, beels, and lakes bythe private sector. Depending on the number of cases, some or all of them wouldbe visited in order to extract a basic set of information related to history,fisheries, managerial patterns, and problems. This information would be used todevelop typical patterns which later would be refined through more thorough casestudies.

The study would result in proposals for the respective roles of thepublic and private sector in floodplain development. The study leaders wouldwork closely with project management and would draw on the experience availablein the Upazilas. The study would start in November 1992 and be completed inJuly 1993.

Inputs

Cost: USS 106,200

Manpower requirements:

5 man-months for an expatriate rural sociologist;8 man-months for a local rural sociologist;5 man-months for a local fisheries expert;

20 man-months for a research assistant.

Administration The study would be undertaken by the Consultant within the Termsof its contract with IDA.

Output A better definition of public and private sector roles in floodplaindevelopment and resulting improvement in the floodplain and otherfisheries component program of the project.

Page 78: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-71 - Annex 6Page 12

4.3 Women in Fisheries

Background A preliminary study undertaken before project appraisal indicatesthat women. particularly poor women, frequently are involved in activities atthe margin of fisheries and, to an increasing degree, directly in fish cultureand fishing operations. Further studies are required to determine the role ofwomen in fisheries activities and ways of encouraging them to participate inmore fully the sector. For example, their roles would be increased by providingguidance to the 'women in fisheries* staff deployed under the project in theDivisions and by applying finance packages provided under the Other Fisheriesproject component.

Objective To carry out a study to develop operational plans for includingwomen in the fisheries activities of the project.

Scooe and Timing 'Women in fisheries' staff would be deployed right from thestart of the project. The best time to assist them would be after a 12-monthperiod of familiarization with the task and the project area. At this pointinitial action programs or concepts for programs might have evolved. The studyteam would intervene and provide conceptual support. The core study team of twowould visit each of the Divisions for about 3 weeks to assimilate existingplans, programs, and situations while developing plans, in close collaborationwith project staff, for feasible 'women in fisheries' programs. These programswould be gradually refined through specific case studies and would result inspecific operating plan for each Division for the duration of the project.Background information on fisheries, extension, credit, and technical issueswould be acquired through frequent contact with relevant project staff.Inputs

Cost: US$ 84,000

Manpower requirements:

5 man-months for a foreign expert in programming developmentfor rural women;

5 man-months for a local expert in programming development women;18 man-months for research assistants.

Administration The Study would be undertaken by the Consultant within the termsof its contract with IDA.

Output Better access for women to services offered by DOF and the project;An improved implementation program for the "Women in Fisheries"activities of the project.

4.4 General Technical Support

Background The component covering Other Fisheries Development activities ofthe project represents a wide range of activities which cannot be fully planned.yet. It therefore is necessary to make a lump sum allocation for general STAtechnical support.

Inputs

Cost: US$ 221,900

Page 79: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

72 - Annex 6Page 13

Manpower requirementst

12 man-months for a foreign consultant;20 man-months for a local consultant

Administration The Consultant would carry out these activities on demand fromproject management within the terms of the Consultants' contract with IDA.

V. RESEARCH

Background The project provides financing for FRI to conduct research onfloodplain fisheries and coastal fisheries. Because FRI is a young institutionand has not experience in these areas, STA is required in order to guideresearch. Research on floodplain topics should be directed to creating morebalanced stocking programs. FRI research would add to the knowledge developedfrom the monitoring activities of the project and identify areas in need of morescientific investigation. Thus, FRI would concentrate on monitoring theavailability of fish food, the incidence of fish diseases, the selectivity offishing gear, the stocking of host species, and the modelling of catches infloodplains. For coastal fisheries, FRI would produce a catch effort study.

Objective To guide FRI research programs under the project.

Scope and Timing The timing of the STA inputs will depend on the implementationof FRI's project research program. Generally, inputs would consist of expertsupport for the design of a particular study and for use as a reference sourceof methodological y and scientific advice during the execution and write up.

Inputs

Cost: US$ 289,600

Manpower requirements:

20 man-months for foreign consultants

Administration The specialized manpower would be provided by the Consultantunder terms of its contract with IDA.

Outputs A well planned and executed project research program of FRI.

VI. SECTOR POLICIES

6.1 General

This group of activities concentrates on policy and strategydevelopment at the national level, with particular reference to the projectarea. The activities includes (i) a study on cost recovery in floodplainswhich will serve as an input to the policy-making process of GOB, which iscovered by a timed covenant under the IDA Credit; (ii) a study on the divestmentof public hatcheries and fish seed farms, which also is covenanted; and (iii)the preparation of a fisheries master plan, which is to serve as input for thenext five-year planning exercise and set the framework for a follow-up project.

Page 80: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-73 - Annex 6Page 14

6.2 Cost Recovery in Floodplain.

Background The project proposes to demonstrate the technical and economicviability of stocking floodplains on a large scale with carp fingerlings inorder to augment the natural production of fish , which has been depleted byover-exploitation and flood control practices. Because the latter factorscannot be controlled over the medium term, the exercise aims to sustain fishproduction by annual stocking. In the major floodplains, an annual recurringcost of about Tk 1,350/ha would be incurred by the public sector. The twoexisting cost recovery mechanisms are the tendering of fishing rights and thelicensing of professional fishermen. They involve several different governmentdepartments. As currently practiced, neither mechanism is very effective inreserving a large portion of public sector costs. The fiscal, and equity, andproduction must be consolidated and translated into viable activities. A studyof options available to the Government for exercising adequate cost recover- isneeded in order to make the public stocking of floodplains financiallysustainable.

Obiective To study strategies for improving the Government's cost recovery ofinvestments in fisheries, particularly in floodplains. The studywould serve as an input to the Government's decision making processon cost recovery in floodplains, covenanted under the IDA Credit.

Scope and Timing The study would review the effectiveness of existing costrecovery mechanisms and propose alternative strategies and costed implementationprograms to achieve clearly defined production, cost recovery, and socialobjectives. The review should cover the auctioning of fishing rights andquotas, licensing of fishermen and gear, taxation of inputs and outputs, thepossibilities of area-specific approaches, and the impact of these measures onpopulation groups, the GOB's administration and budget, and the economy. Thework would involve reviewing existing documentation, particularly that of theongoing New Fisheries Management Policy sponsored by the Ford Foundation, andfield inspecting various measures in practice. It also would involve examiningthe administrative and legal factors. The study team would work closely withthe MFL/DOF, ML, MLG&RD, BVDB. Forestry Department, and the Upazilas and closelyliaise with NGOs on social aspects. The study work would begin in January 1993,when the results of the first stocking become available, and would be completedwithin 8 months. The leader of the study team would be avaiLable as a resourceperson for the GOB committee on cost recovery covenanted under the IDA Creditduring the 12-month period leading up to the release of a policy statement.

Inputs

Cost: USS 127,000

Manpower requirements:

6 man-months for an expatriate fisheries economist withexperience in fisheries management. He would work for 5months on the study and would be available for up to 1 monthfor consultations.

8 man-months for local experts in fisheries management andlegalladministrative matters.

Administration The study would be carried out by the Consultant within theterms of its contract with IDA.

Page 81: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

74 - Annex 6Page 15

Outputs Strategies for improving cost recovery in fisheries;Improved GOB policies for cost recovery in fisheries.

6.3. Public Fish Seed Farms

Background The release of a policy statement on the divestment of public fishseed farms is the subject of a timid covenant under the IDA Credit. There are103 public hatcheries operated by DOF in the project area; however, only 60 ofthem are in service, producing 1.5 tons of hatchlings. There also are 300private hatcheries in the project area, producing 16.5 tons. Many of the publichatcheries are redundant, and most run well below capacity. The publichatcheries incur an annual financial loss estimated at TX 100 million. Some arenon-functional for technical reasons; others operate below design capacity foradministrative reasons. A study is required to assist MPL/DOF prepare a policyfor divesting itself of surplus capacity and avoiding the construction ofadditional capacity.

Obiective To assist GOB with a study proposing a rational program ofalternatives for divesting of plus hatchery capacity.

Scope and Timing The study would and evaluate the physical and financialperformance of public and private fish and shrimp hatcheries. giving Particularreference to western Bangladesh. Scheduled options would be prepared forMFL/DOF to divest itself of surplus hatchery capacity and re-orientate itspolicy towards private fish and shrimp seed production. The study would involvereviewing existing documentation at DOP and other levels and incorporating theexperiences of other projects involved in public hatcheries. Proposals shouldconsider the effects of divestment on administration (particularly DOF),staffing, extension, GOB revenues, and the economy. The study team would workin close collaboration with project management, MFL/DOF, and MF. The 6-monthstudy would begin in January 1992, and the report would be available in July1992. This timing would allow the study team to observe the hatchery industryduring its seasonal operation period.

The team leader of the study would be available (1 mm) forconsultations with the GOB committee drafting the policy statement over thefollowing 12-month period.

Inputs

Cost: US$ 140,600

Manpower requirements:

7 man-months for expatriate consultants; a senior economistexperienced in divestment of public assets and a consultant infish farm management;

18 man-months for local consultants in fish farming, the legalsystem, public administration, and finance.

Administration The study would be carried out by the Consultant within theterms of its contract with IDA.

Output A better division of functions between the public and privatesectors in fish and shrimp seed production;

Page 82: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 75- Annex 6Page 16

A study proposing a rational program of alternatives for divestingof surplus hatchery capacity.

VII. TRAINING

Background As a rule, staff at the working level in Government organizationsin Bangladesh have had little exposure to the experience and methods of thisinternational counterparts, either in this professional specialties or inmanagement functions. Opportunities for travel and exchange of ideas within thecountry also are limited. This relative isolation of government staff limitstheir vision and ability to place working situations in proper perspective.Because study trips and overseas training are at a premium, they can be usedeffectively to motivate staff. It therefore is essential that a certain numberof well-prepared study tours be financed under the STA component.

Objective To improve the professional awareness of 200 key persons involved infisheries development in the project area.

Scope and timing Study tours and training experiencing lasting 4-6 weeksshould be arranged in a variety of countries. The topics addressed shouldinclude shrimp and fish culture, shrimp hatchery development, credit, low costaquaculture engineering, and extension. The consultants would have to prepare adetailed training plan within the first 9 months of the project for approval byIDA. The plan would be reviewed after 2 years. The experiences most relevantto Bangladesh generally can be found in South and Southeast Asia, wherefisheries operate in a similar tropical environment. However, tours tocountries outside of the region would not be completely excluded provided aparticular experience could be found then. Local study tours to points ofinterest also should be arranged. Those eligible to participate would includemale and female officers of the participating agencies and services, and theprivate sector. About 30Z of the tours should be reserved for the privatesector. Care should be taken to exclude individuals who already haveexperienced. This type of training and therefore would not be as likely toshare this knowledge with others.

Inputs

Cost: US$ 466,700

Manpower requirements:

2 man-months for a foreign consultant to prepare and revisetraining plan;

4 man-months for a local consultant for the same purpose;100 Overseas study tours100 Local training tours.

Administration The program would be handled by the Consultant within itscontract with IDA.

Outputs 100 overseas experiences;100 local experiences.

Page 83: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

BangladeshThird Fisheries Projoet

Take

Project Components by Yoar

Base Costs Tot l

90/91 91/92 92/93 93/94 94/96 96/96 Take USS

A. FLOOOPLAIN FISNERS1. Pubi. Stocking Dhaka Div. 0.0 9.0 0.0 21.6 40.6 40.6 120.6 8.72. Pubi. Stockila Khulna Div 0.0 19.6 19.6 82.4 40.5 40.5 152.4 4.73. Pubi. Stock. R.J.hchi Div 0.0 15.0 16.0 27.0 54.0 S4.0 165.0 6.1

sub-total 0.0 43.5 48.6 81.0 186.0 136.0 436.0 13.6B. COASTAL UIRIMI CULTUE1. Poldor 5 1.4 24.5 0.3 0.8 3.0 0.7 19.2 1.22. PoWder 28a Phase 1 2.3 39.0 14.9 0.6 5.0 1.2 03.0 2.0S. Pold.28Ph.2.Pold.SlPh.1 0.0 4.7 60.6 80.9 1.4 10.6 126.3 4.04. Other Polders (Phae 1) 0.0 0.0 3.5 80.0 23.1 7.8 98.9 2.9S. Other Poldor. (Phas 2) 0.0 0.0 0.0 3.5 e0.0 29.4 92.9 2.9

Sub-total 8.7 61.2 106.3 96.4 92.4 49.3 417.3 - 2.9C. OTHER FISHERESE DEV.

1. O.Fleborlos Dhaka Div. 0.0 0.0 2.4 4.8 $.6 2.4 13.2 0.42. O.Fleberls Khuln, Div. 0.0 4.0 4.8 6.0 4.8 6.0 26.4 0.68. O.Flsh rloe Rajehahi Div 0.0 2.4 7.2 7.2 7.2 2.4 26.4 0.8

-_____-_____________ __-_----------------------- ----------------

Sub-total 0.0 7.2 14.4 18.0 16.6 10.8 66.0 2.00. INSTITUIIONAL SUPPORT

1. I at.Sup. DOF-HQ 14.8 10.1 19.6 19.2 20.6 19.7 103.6 8.22. Inst.Sup. DOF-Dhaka Div. 6.9 8.8 3.9 4.0 4.1 4.1 30.3 0.93. ?net.Sup. DOF-Kbulna 16.7 21.1 11.6 8.6 9.1 9.8 76.3 2.44. Inst.Sup. DOF-Rajebahl 14.0 29.4 10.9 11.1 11.2 11.2 37.8 2.75. Inst.sup. BIDS 8.0 2.8 5.4 8.2 3.6 2.3 20.2 0.6

Sub-total 64.0 71.7 51.4 46.2 46.4 48.6 818.2 9.9E. RESEARCH (FRI) 4.2 6.8 7.8 2.9 2.6 2.1 26.5 0.8F. TECHNICAL ASSIST.& TRAIN.

1. TA - Project Managegent 20.1 28.6 20.1 24.4 11.3 0.7 113.4 3.62. TA - Projoct Support 12.6 23.6 31.1 20.8 13.4 8.9 110.6 3.4

Sub-total 32.7 52.6 59.2 45.1 24.7 9.6 224.0 0.0

Total BASELINE COSTS 94.7 250.0 264.6 298.8 318.6 263.4 1498.9 46.2Physical Contingencies 8.4 16.5 20.8 22.8 27.7 22.5 113.2 3.5Price Contingenieos 15.6 70.2 110.3 143.0 396.2 186.0 720.2 18.0

Total PROJECT COSTS 118.6 836.6 416.2 4S4.4 641.6 461.9 2323.8 02.7

Taxe* 18.0 28.8 28.2 26.7 28.7 19.4 144.2 8.9 lForeign Exchange 44.1 107.4 128.7 119.8 115.6 62.9 678.4 16.8 rb a-

- --------------------------------------------------------------------------------------------- bValues Scolod by 1000000.0 3/7J19S0 16:68 |

Page 84: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

BangladeshThird Fisheries Project

Taks

Summary Accounts by Year

Base Costs Foreign Exchange

90/91 91/92 92/93 93/94 94/S6 95/96 Total % Aount

I. INVESTMENT COSTS

A. Land Acquisition 2.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0

S. Civil Work* 0.1 70.5 11.86 90.2 96.6 60.1 432.0 34.4 148.5C. Equipmet 13.1 16.9 11.6 7.5 86 7.6 65.1 45.7 29.6D. Transport Equipment 206.5 23.2 0.6 0.0 0.0 0.0 50.2 48.6 24.SE. Study/Srvice Contract. 3.7 11.9 17.9 23.1 17.2 12.4 86.9 6.0 4.3

Total DNVESTMENT COSTS 45.4 122.6 148.6 128.0 122.2 70.1 685.5 32.0 207.0

It. RECURRENT COSTS

F. staft 32.4 55.9 61.7 61.3 33.2 20.0 264.6 45.0 114.64. Fingerliags 0.0 43.5 43.5 61.0 195.0 136.0 430.0 10.0 43.6H. Operation and Maintain. 14.1 26.6 30.2 27.1 27.6 27.6 152.4 16.6 28.33. Study/Service Contracts 2.6 2.3 2.6 0.4 0.7 0.7 9.6 6.0 0.6

Total RECURRENT COSTS 49.8 12.5 18.0 159.6 106.5 183.3 064.4 21.9 18.1 _ - --- - ------ - ---------------- - -- ---- - ----------

Total BASELINE COSTS 04.7 250.0 284. 288.8 316.6 258.4 1409.9 26.5 394.2Physical Continoncies 3.4 16.6 20.3 22.8 27.7 22.6 113.2 20.3 22.9Price Contingsnolse 16.6 70.2 110.3 143.0 195.2 188.0 720.2 22.4 161.3

_ -- _ -- _ _- -- -- --- - ---- -- - ---- - -- - -- -- -- - -- - - - --- _------_

Totel PROJECT COSTS 118.6 s83.6 415.2 454.4 541.6 461.9 2823.3 24.9 578.4

Taxes 18.0 2e.8 28.2 20.7 26.7 19.4 144.2 0.0 0.0Foretign Exchange 44.1 107.4 128.7 119.6 116.5 62.9 576.4 100.0 567.4

Value* Scaled by 1000000.0 3/7/1090 1658

t -

_4

Page 85: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

BangladeshThird Fisheries Project

Projects Components by Year

Totlus Including Contingencies Totals Including ContingencalsTake USS

S0/91 91/92 92/93 93/94 94/96 96/96 Tot.a 90/91 91/92 92/93 93/94 94/96 96/96 Tot I

A. FLOODPLAIN FISHERIES1. Publ. Stocking Dhaka Div. 0.0 32.6 18.3 84.0 89.8 74.7 205.4 0.0 0.4 0.4 0.9 1.0 1.9 6.42. PubI. Stocking KhuIas Div 0.0 27.3 29.3 62.2 69.8 74.7 263.3 0.0 0.6 0.8 1.4 1.6 1.9 6.73. PubI. Stock. RuJihahi D;v 0.0 21.0 22.6 43.6 93.1 99.6 279.0 0.0 0.8 0.6 1.2 2.4 2.6 7.4

Sub-Total 0.0 00.9 86.5 130.4 232.7 246.8 788.6 0.0 1.7 1.0 3.6 8.1 6.4 19.6

8. COASTAL SHRIMP CULTURE1. Polder 5 1.8 84.1 13.9 0.6 5.1 1.8 60.0 0.1 1.0 0.4 0.0 0.1 0.0 1.02. Polder 23, Phas 1 3.0 54.1 22.3 1.0 8.6 2.2 '1.1 0.1 1.5 0.0 0.0 0.2 0.1 2.63. Pold.2SPh.2,Pold.3lPh.1 0.0 0.6 120.6 49.5 2.8 19.9 196.8 0.0 0.2 3.3 1.3 0.1 0.6 6.44. Other Poldera (Phase 1) 0.0 0.0 6.3 96.1 39.6 13.8 154.4 0.0 0.0 0.1 2.6 1.0 0.4 4.15. Othor Polders (Phuse 2) 0.0 0.0 0.0 6.0 102.9 63.9 182.4 0.0 0.0 0.0 0.2 2.7 1.4 4.8

Sub-Total 4.0 94.7 181.9 162.8 168.4 90.6 663.4 0.1 2.7 4.4 4.1 4.2 2.3 17.9

C. OTHER FISHERIES DEV. .1. O.Fleherles Chokc Div. 0.0 0.0 3.6 7.7 8.2 4.4 22.0 0.0 0.0 0.1 0.2 0.2 0.1 0.82. O.FPiherioe Khulno Div. 0.0 6.7 7.2 9.7 8.8 11.1 43.0 0.0 0.2 0.2 0.a 0.2 0.8 1.2 23. O.F1sheries Rajehahi Div 0.0 3.4 10.8 11.6 12.4 4.4 42.7 0.0 0.1 0.8 0.3 9.3 0.1 1.1 co

Sub-Total 0.0 10.1 21.7 29.0 28.9 19.9 107.6 0.0 0.8 0.6 0.8 0.7 0.5 2.9

0. INSTITUTIONAL S1PPORT1. Inst.Sup. DOF-4I 17.4 13.4 27.4 20.8 33.1 83.7 168.4 0.5 0.4 0.8 0.8 0.9 0.9 4.22. Inst.Sup. DOF-Ohaks D01. 7.8 11.1 5.8 6.4 7.0 7.5 45.0 0.2 0.3 0.2 0.2 0.2 0.2 1.23. lnst.Sup. DOF-Khulno 20.8 28.8 17.2 14.0 16.6 17.0 112.3 0.0 0.8 0.5 0.4 0.4 0.4 3.14. Inst.Sup. DOF-Rojbshahi 17.3 39.2 16.3 17.8 19.2 20.5 130.3 0.5 1.1 0.4 0.6 0.5 0.6 3.65. Inst.Sup. BODB 3.6 3.7 7.6 4.0 5.0 4.0 29.1 0.1 0.1 0.2 0.1 0.1 0.1 0.8

Sub-Total 6.7 95.6 74.2 71.6 80.4 82.6 470.1 1.9 2.7 2.0 1.9 2.1 2.1 12.9

E. RESEARCH (FRI) 5.2 8.9 11.1 4.6 4.1 3.6 37.4 0.2 0.8 0.a 0.1 0.1 0.1 1.0F. TECHNICAL ASSIST.& TRAIN.

1. TA - Project Management 23.2 86.6 a8.6 86.9 18.2 1.3 163.8 0.7 1.0 1.1 1.0 0.6 0.0 4.32. TA - Project Support 14.6 29.9 42.3 30.2 20.8 14.8 162.8 0.4 0.8 1.2 0.8 0.6 0.4 4.2

Sub-Total 37.8 0.6 60.5 68.2 89.0 16.1 306.6 1.1 1.9 2.2 1.8 1.0 0.4 8.4

Total PROJECTS COSTS 113.6 838.8 416.2 464.4 641.6 461.9 2323.3 3.4 9.6 11.4 12.2 14.3 11.9 62.7

Values Scaled by 1000000.0 3/7/1990 16:67

ool gDl

Page 86: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Ban91ladeshThird Fisheries Project

Summary Accounts by Year

Totals Including Contingencies Totals Including Contingencies

Take US$

90/91 91/92 92/93 93/94 94/96 96/96 Tot.. 9 0/91 91/02 92/93 93/94 94/96 96/98 Total

I. INVESTMENT COSTS

A. and Acquisltion 2.4 0.0 0.0 0.0 0.0 0.0 2.4 0.1 0.0 0.0 0.0 0.0 0.0 0.1

B. Civil Works 0.2 97.2 173.1 166.2 164.8 90.8 861.8 0.0 2.8 4.8 4.2 4.3 2.3 18.4

C. Equipml nt 16.1 22.7 16.7 10.9 18.4 12.6 91.3 0.6 0.8 0.4 0.8 0.4 0.8 2.6

0. Transport Equipment 80.4 29.1 0.8 0.0 0.0 0.0 60.8 0.9 0.8 0.0 0.0 0.0 0.0 1.7

E. Study/Service Contracts 4.8 18.7 27.0 87.0 29.4 22.8 137.4 0.1 0.6 0.7 1.0 0.8 0.6 8.7

Total DNVESTMENT COSTS 63.8 166.6 216.6 204.1 207.1 126.0 973.2 1.6 4.7 5.9 5.6 5.4 3.3 26.4

1t. RECURRENT COSTS

A. staft 88.7 72.0 85.7 76.7 64.0 86.6 862.6 1.1 2.0 2.4 2.1 1.4 0.9 9.9

B. Fingerilng 0.0 60.9 66.6 130.4 282.7 248.8 788.3 0.0 1.7 1.8 8.6 0.1 6.4 19.8

C. Operation and Maintain. 17.8 86.2 48.9 42.6 46.6 50.8 288.8 0.6 1.0 1.2 1.1 1.2 1.8 0.4

0. Study/Service Contract* 8.8 8.0 3.6 0.7 1.2 1.8 13.1 0.1 0.1 0.1 O.O 0.0 0.0 0.4

Total RECURRENT COSTS 59.6 171.0 198.7 260.8 834.4 836.9 1850.1 1.6 4.8 C.6 6.7 0.8 8.7 86.3

Total PROJECT COSTS 118.6 8a6.6 416.2 454.4 541.6 461.9 2823.8 8.4 9.5 11.4 12.2 14.3 11.9 82.7

Value. Scaled by 1000000.0 8/7/1990 16t55

Q1 :S9> 3D

x4

Page 87: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

BangladeshThird Fisherios Project

Sumary Accounts Cost Summary

Taks US$ X Total---------- ----- - -------- - ---------- I Foreign Base

Local Foreign Total Local foreign Total Exchange Costs1. DIVESTMENT COSTS

A. Lead Aoqulsttlon 2.0 0.0 2.0 0.1 0.0 0.1 0.0 0.1U. Clivl Works 28.5 148.6 452.0 6.8 4.0 18.4 84.4 29.0C. Eiqulpmu 86.8 29.8 0S.1 1.1 0.0 2.0 45.7 4.4O. Transport Equlpnmet 25.7 24.5 50.2 0.8 0.6 1.0 48.6 8.4E. Study/Servle Contract 61.9 4.8 86.2 2.5 0.1 2.7 5.0 6.6

Total INVESIUENT COSTS 426.4 207.0 685.6 8.5 8.4 19.7 82.6 42.7

It. RCUEN COS

A. Stoft 139.9 114.5 254.6 4.8 8.6 7.9 45.0 17.1D. Flogerlings 894.2 48.6 4a8.0 12.2 1.4 18.6 10.0 29.4C. Oporatioo and Maintain. 124.0 28.8 152.4 8.6 0.9 4.7 16.6 10.20. Study/Srvlce Contraect 9.1 0.6 9.6 0.8 0.0 0.8 6.0 0.6Total REC.URRDT COSTS 067.8 167.1 65.4 20.7 6.6 26.5 21.9 67.3

_________ -_ ____-------- - - …

Total BASELINE COSTS 1096.7 894.2 1469.9 84.0 12.2 46.2 28.6 100.0Physlcal ContInsnclso 90.2 22.9 113.2 2.6 0.7 8.6 20.3 7.SPrice Contingencies 665.9 161.8 720.2 10.2 2.6 18.0 21.6 28.2Total PAOJECTS coSTS 1744.9 576.4 2825.8 4B.9 16.8 62.7 26.1 1856.

Vetl" Seclod by 1000000.0 - 8/7/1990 1S:66

Page 88: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

BangladeshThird Fisheries Project

Sum_ary Account by Project ComponentTaka

Pubi. Pubi. PubI. Other Other O.Fihor O.Fisher O.Flsheor

Stocking Stocking Stock. Polder Pold.2VP Poldora Polders ihe ite teoOhaks Khulna Rajehahi 28, h.2,Pold (Pha" (Phase Ohaka Khulaa Rajshahi

Div. Div Div Polder 6 Phase 1 .81Ph.1 1) 2) Div. Div. Div

t. INVESTMENT COST8

A. Land Acqulmiti.m 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

6. Clvil Works 0.0 0.0 0.0 88.1 67.6 119.6 86.0 08.6 0.0 0.0 0.0

C. EquIpmnt 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

D. Transport Equipment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

E. Study/Servxce Contracts 0.0 0.0 0.0 1.4 2.8 4.7 8.6 8.6 18.2 26.4 26.4

Total DNESTMENT'COStS 0.0 0.0 0.0 87.6 60.9 124.2 02.1 02.1 18.2 26.4 26.4

II. RECURRENT COSTS

A. Staff 0.0 0.0 0.0 0.8 0.7 1.1 0.6 0.2 0.0 0.0 0.0

B. Fingerling 120.6 162.4 186.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

C. Operation and Maintain. 0.0 0.0 0.0 1.6 2.4 8.0 1.2 0.0 0.0 0.0 0.0

0. Study/Service Contract. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0____________________--__-------- --------------------------- ----- -------------.------- ;.

Total RECURRENT COSTS 120.6 152.4 166.0 1.7 8.1 4.1 1.6 0.6 0.0 0.0 0.0

Total BASELINE COSTS 120.6 162.4 166.0 39.2 68.0 128.8 08.9 92.9 11.2 26.4 28.4

Physical Continmgncle 12.1 1C.2 16.6 3.9 6.8 12.6 9.4 9.8 1.8 2.6 2.0

Prile Contingoncels 72.7 66.6 96.1 18.6 21.8 67.8 61.1 60.2 7.6 18.9 18.6

Total PROJECT COSTS 206.4 268.8 279.6 68.6 91.1 198.8 154.4 182.4 22.0 43.0 42.7

Taxex 4.1 5.1 5.6 C.0 7.9 17.4 18.7 14.6 1.1 2.1 2.1

Foreln Echange 20.2 24.9 27.6 16.7 29.5 86.8 61.9 66.8 1.1 2.1 2.1

Values Scaled by 1000000.0 8/7/1990 16:54

Page 89: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Bang ladeshThird Fisheries Project

Summary Account by Project ComponontTaka

Inst.Sup Inst.Sup Inst.Sup TA -Proj et TA -

Inst.Sup DOF-Dhak DOF-Khul DOF-Raja Inst.Sup RESEARCH Manage. ProjectDOF-H1Q a Div. na hahi . BUDS (FRI) nt Support

I. INVESTMINT COSTS

A. Land Acquisition 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0B. Civil Works 32.6 0.0 4.0 0.0 0.0 6.0 0.0 0.0C. Equipment 42.8 2.6 6.4 7.4 0.0 6.4 0.9 0.00. Transport Equipment 8.8 6.1 13.8 18.0 8.5 1.6 4.6 0.0E. Study/ServIce Contracte 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0.0

Total INYESTIEIT COSTS 78.8 7.7 25.2 26.4 8.6 17.7 6.4 0.0

II. RECURRENT COSTS

A. Staff 0.6 10.9 21.0 22.7 0.0 2.6 90.2 88.7B. Fingerlings 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0C. Operation and Maintain. 18.0 11.0 29.4 89.6 10.7 0.2 7.6 14.60. Study/S.rvic. Contracts 0.0 0.0 0.0 0.0 0.0 0.0 2.8 7.8

Total RECURRENT COSTS 24.8 22.5 61.2 62.8 16.7 6.6 106.0 110.5 N

Total BASELINE COSTS 108.6 60.8 76.8 67.6 20.2 26.5 118.4 110.6Pholcal Contingencies 8.1 2.8 6.7 6.7 0.4 1.0 1.8 0.0Pric Contngncie 46.8 12.4 80.2 86.8 8.4 9.9 88.8 42.2

Total PROJECT COSTS 158.4 46.0 112.8 180.8 29.1 87.4 168.6 162.8

Taxe* 20.7 4.2 11.6 14.4 8.7 4.8 2.2 4.6Foretgn Exchange 46.7 7.8 20.6 26.8 5.0 8.0 102.0 64.7

Value Scaled by 1000000.0 8/7/1990 10564

OQ

X4

Page 90: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 83 -

AIiX 7Page 8

Bsngl* deshThird Fisheries Project

Sumary Account by Projoct ComponentTake

Physical PriceContingencies Contingencies

Total s Amount X Amount

S. DNESTlT COSTS

A. Land Acquisition 2.0 0.0 0.0 17.6 0.4S. Civil Works 482.0 9.1 89.4 48.7 210.1C. Equipment 85.1 8.8 2.2 87.0 24.19. Transport Equipment 60.2 0.0 0.0 20.0 10.1E. Study/Service Contract 86.2 9.4 8.1 50.0 48.1

Total INVESTMiENT COSTS 956.5 7.8 49.6 45.8 267.9

It. RECURRENT COSTS

A. Staff 264.5 8.0 7.7 89.4 100.81. Fingerlintg 488.0 10.0 48.6 56.0 256.5C. Operation and Maintain. 152.4 7.7 11.7 47.4 72.20. StwdylSrulce Contract 9.6 2.4 0.2 84.8 8.8

Total RECURRENT COSTS 654.4 7.4 6J.4 50.6 482.2

Total ASELAINE COSTS 1469.9 7.6 118.2 46.8 720.2Physical Contingeneies 118.2Price Contingeies 720.2 7.5 5".7

Total PROJECT COSTS 2828.8 7.2 106.6 81.0 720.2

Taxms 144.2 6.4 9.2Foreign Exchnge 576.4 6.6 82.6

Value Scaled by 1000000.0 8/7/1990 16t U

Page 91: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 84 -

ANNEX 8

BangladeshThird Fisheries Project

Disbursement by Financier by Semester(USS million)

IDA ODA UNDP Government TotalAmount Amount Amount Amount Amount

Semester1 2.4 0.3 0.2 0.2 3.12 0.0 0.3 0.2 0.2 0.73 0.0 0.5 0.4 0.5 1.44 2.7 0.5 0.4 0.5 4.15 3.3 0.5 0.6 0.7 5.16 3.9 0.6 0.6 0.7 5.87 3.9 0.5 0.4 0.7 5.58 4.6 0.5 0.4 0.8 6.39 4.6 0.2 0.3 1.4 6.510 5.1 0.2 0.3 1.4 7.011 5.1 0.1 0.2 1.3 6.712 4.5 0.1 0.2 1.2 6.013 4.5 0.0 0.0 0.0 4.5

Total 44.6 4.3 4.2 9.6 62.7

Page 92: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 85 -

man,~~~ ~S nnlnnsx C411aaeeere ef Fet.t

CO 10 DnWRmYn Tetntage

DOuty DieeoDv Ot rector _ 1

mnuuuo~Ln.La Addtle 0Z re.tor _1 1

Am.Oi rector _ IPreeur_nt tiffie r - ~ ~ ~~1 1

Prr""t_t ;-t "X ~ ~ ~ ~ ~~~ 1 1Procur _ r .t O fer _ IProcurement Asistant1

IC3tiU.ifllend gmi11t 1 Di rector1IUoon's beveleeefit

A_t. Director _ 1Adealglatratigg a Fnans.

Officer11Audit Account Officr 1 1

Joint Olrector/PD 1 - IFloo.olaitn Fishai Oeputi DirOctor (PD). Fnaldr 1 _ 1

Fld tOffer (Peultion) - 1

F;dh.Officer (Fiod 0plain) 2Field Ameltent 4 4

R..tonaidn A Tr.ini.,Aet.0i rector 1 ' 1

wom-A ay,owmntFilo.Officer11pleh.afficor 1 1

AoAnistrAtiv *nd Fin neA4en,.tre; 1n; r 1

Accoun* tffier_1 1

DF toict F;ch.Officer 3 3 SFi;d..Extenfin Officer/s - 3

UPAZDLA OFFICEr 'M Ui sFagile F;ch.Officor 10 - 10

Aest.Fleh.Offacer 10 t 10Field Aseletent 10 to

Joint DiOrector/PD I o 1Pt ennin. on.torinr. 1 1wus

Floadelein Fich.re A!ei.1tiotneAeetDir etor 1 1

Fie;hereo Off;ier (Reoultion) - I 1F;d&.Officer (Flodplain) 2 2Field A..t. 10 10bt;eon Aet. 0

COputy Dire (OFO) 1 1et. D;rector (Eten-irn) -2 2

I!rt;een Off ie r/F;d .Off icer - 4 4Aet.PF;dOffite (f tenctn) - 4 4

Feten-ein A TrainAn.Aeet.D;*rctor 1 - 1

Aeet.Di rectoer I Fi;d.Offiear (Credit) I 1

_ -en I.ulom.ntFida .Offi or (%o(n) - 1

nttive Officer 1

OXSTRXCT ~ Acont OffI eUr I

u riott Fidh.Off;eo 8 - SFisderioc Estenelen Offeor/S5I - 8

a ile s plh.Officor 20 _ 20tet. Fi;h.Officer 2D 20Fitld Aset. 20

8~~ ~ ~~~~~~~~~~~~~~ 1 4DXVXiX OFXCEtRAJSK4KI

Joist Di ectorl IDPlnnnoit in * f I t en~

Fl a 1.a.n Fidoroo RalsUc

Met Director 1 S 1et. Diecor1

Fi;.Officer 1 le4*1@;n- 2Flieh.Of icer 1 st1n _ I

Ehh.Gio OS$'M ti O; etor O 1 1

Amt O;roctor

rihaccutfficer11Fldcuat Off c * '

FiF h.Officer 13 i Fish.Estonion Officer/e 3 1OiSFlCT OFFI MUM"i

I"ail- F; O fic r40 - 40West a Fish.Offloor -04

Amt. Fl;h.Offic.r 40 40Field Aet. 40

tOTAL tRIUSH In JMEOW-TM an1 _ -

Page 93: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

BANGLADESHTHIRD FISHERIES PROJECT

Project Implementation Schedule

Deeft * 1V A 1 K d | t

-tf, h,of xx

I===w-'l " aq 111,! ##111 ;101 fto Is I" ; M 0IIS11111|1

0hm h*g 1633. P3*Mio

PI,O ,3 ,'i l z:::.. .i11z111# 11111

of. ft Pm,i C"I

* _.. . . . . . . . . . . . . . . . . .

P. .IN

. ...

a... ..

Ppm.Mv op pi,. VW"m

9.O.POtNi -0.4 WftU.:

'. g m400.3

Swetog Con ftt-W

- 3*~~~~

304~4 S% 00t

". oftw" Ite.. 104 m

Page 94: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 87 - Annex 10

Page 2

TFP-Floodplain Fisheries: Project Steps tCritical Path)

Project: FLDODPL 12-Oec-19i9

Name Responsible Duration Slack Start date Finish dateCode Description

SELINSP DOFIHO 3.00 N1th E 2.49 Nth E 1-Sep-1990 1-Dec-1990Selction of Finoerling Supply Inspectors

PFEPPROC DOF/hTA 3.00 Nth E 0.08 Nth E l-Sea-1990 1-Dec-1990Prepare Procurement Docs for Fingerling Supply

SETuMtION STA 2.00 Nth E 3.00 11th E l-Sep-1990 1-Mov-1990Set-up Field Staff of FPL Production Monitoring

RESFDI FRIiSTA 12.00 Ilth E 1(1.0(1 Mth E I-Oct-1990 1-Oct-1991Research on Fishdisease Year

INITSTUD STA 5.00 Nth E 3.00 Nth E 1-Nov-1990 2-Apr-1991Initial Study lChanda,1SK9,Halti)

PROFSUP DOF/hTA 4.00 11th E 0.08 nth E l-Dec-1990 2-Apr-1991Prequalification of Fingerling Suppliers for PY2

PEzFFI FRI/STA 12.00 11th E 10.00 N1th E i-Feb-1991 1-Feb-1992Research on Fishfood in Floodplains Year I

TRINSP DDF,HN 3.00 Nth E 11.48 N1th E 15-Feb-1991 17-hay-1991Training of Fingerling Supply Inspectors

TENDSUP DOF/11TA 4.00 Nth E 0.08 11th E 2-Apr-1991 2-Aug-1991Tender for Fingerlings Stocked in PY2

IPIONVI STA 12.00 N1th E 3.00 N1th E 2-Apr-1991 1-Apr-1992Intensive Production Monitoring 1st Year

PREFPPOD Suppliers 6.40 11th E 0.08 Nth E 2-Aug-1911 13-Feb-1992Prepare Fingerling Production for PY2

FEEDBACK FRI/DOF 9.02 11th E I-Oct-1991 1-Oct-1991Feedback to Floodplian Planning

PESFD2 FRI/STA 12.00 N1th E 13.02 11th E I-Oct-1991 I-Oct-1992Research on Fishdesease Year 2

FEEDBACK FRI/DOF 4.98 N1th F t-Feb-1992 1-Feb-1992Feedb back to Floodplain Planning

RESFF2 FRIISTA 12.00 11th E 8.98 Nth E 1-Feb-1992 1-Feb-1993Research an Fishfood year2

INSPSUPL DOF/IITA 4.00 Nth E 0.60 11th E 13-Feb-1992 13-Jun-1992Inspection of Fingerling Supoliers

HATCHING Suppl1DOF 0.50 N1th E 0.55 N1th E 15-Feb-1992 1-Har-1992Hatching for PY2 Stocking

Page 95: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-88- Annex 10Page 3

tFF-Floodplain Fisheries: Project StePs (Critical Path)

Project: FLOODPL 12-Oec-1989

hame Responsible Duration Slack Start date Finish dateCode Description

NtURSING Suppi/DOF 3.00 Nth E 0.48 lith E I-Nar-1992 1-Jun-1992Nursing of Fingerlings for PY2 Stacking

F15,wflrR6 STA 43.O0 Nth E 18.99 Nth E I-Aor-1992 2-JJIl-1997Fishermen Organization

FONQr2 STA 12.00 N1th E 5.91 1th E l-Apr-1992 2-Apr-1993Intensive Production Nonitoring Year 2

rEEDEACN SA 3.00 NIth E I-Apr-1992 1-Apr-1992Feedback to Floodplain Dev. Planning

STOCKING SupplIDOF 0.50 1th E 0.52 11th E 15-Jun-1992 30-Jun-1992Stocking in PY2

PROSUP DOF/NtA 2.00 11th E 0.05 Nth E 30-Jun-1992 30-Aug-1992Prequalification of Fingerling Suppliers for PY3

FESFG FRIUSIA 9.00 Nth E 7.05 N1th E 30-Jun-1992 31-llar-1993Reseach on Fishing Bear

TEM*SUP DOF/IHTA 2.50 N1th E 0.05 11th E 30-Aug-1992 14-Nov-1992Tendering for Fingerling Suppliers for PY3

FEEDBACK FRIIDOF 13.02 11th E I-Oct-1992 1-Oct-1992Feedback to Floodplain Planning

RESFM3 FRI/STA 12.00 Nth E 13.02 Nth E l-Oct-1992 1-Oct-1993Research on Fishdisease Year 3

flAbEiPI STA 3.00 NIth E 34.00 nth E l-Nov-1992 31-Jan-1993Planning for Further Floodplain -Dev. No I

PREFPROD Suppliers 3.00 11th E 0.05 Nth I 14-Nov-19"2 14-Feb-1993Prepare fingerling Production for PY3

FEEDBACK FRI 8.98 11th E l-Feb-1993 1-Feb-1993Feedback to Floodplain Planning

RESFF3 FRI/STA 12.00 11th E 8.98 nth E l-Feb-1993 1-Feb-1994Research on Fishfood Year 3

H4tCHING Suppliers 0.50 N1th E 0.49 Nth E 15-Feb-1993 2-flar-1993Hatching for PY3 Stacking

NURSING Suppliers 3.00 N1th E 0.44 Nth E 2-Par-1993 2-Jun-1993Nursing of Fingerlings for PY3 Stocking

FFLPSI DOFIStA 3.00 DvY E 5.91 N1th E 2-Apr-1993 5-Apr-1993Ist Flood Plain Fisheries Workshop

Page 96: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-89- Annex 10Page 4

TFP-Floodplain Fisheries: Project StePs (Critical Path)

F-osect: FLOOtDFL lU-Dec-1989

tiana Responsible Duration Slack Start date Finish dateCode Description

IPtlOIY; STA 12.00 11th E 7.00 11th E 2-Apr-1993 2-Apr-1994Intensaie Production Nonitoring Year 3

Ai. ITPY4 DOFI1TA 1.00 Nth E !.91 N1th E 5-Apr-l993 5-llav 1993Adapt Stoacing Progras of PY4

cTK, 11r SUP0D;DUF O.CQ Nth E 4.5 51th E 15-Jun-1993 IO-Jun-1993Stockirg in Pi3

I!;;TFY4 DOF,nTA N.DO nth E 4. f n1th E 3Q-Jun-9999 3-Jun-l4Implement Stodcing Progran PV4

FUDBAJ; FRI'DOF 13.02 N1th E I-Oct-1993 l-Oct-1993Feedback to Floodplain Planning

;LiANEJ2 STA 3.0u) 11th E 13.06 Nth E i-Noi-19i3 31-Jan-1994Planning For Further Floodplain Dev. No.2

FEEDtACr FRIiDOF 8.98 1th E l-Feb-1994 1-Feb-1994Feedback to Floodplain Planning

EPFHNvI FRSS 12.QD O1th E 14.89 a1th E 2-Apr-1994 2-Apr-1995Extensive Production Monitoring lear I

'EsUiEAU! STA/DOF 7.0Q th E 2-Apr-1994 2-Apr-19Q4Feedbick to FoodDlain Dev. Planning

IPPETOY5 DOF;1TA 12.00 nth E 12.04 1th E 3I0-Jun-1994 1-Jul-1995loplesent Stockinq Progras Pi5

!L4E£P3 STA 3.LO) Nth E 21.04 Nth E 1-Nov-1994 31-Jan-1995Plan for Further Floodplain Dev. No.3

etLWSZ' DOFiSTA 3.00 Dvs E 14.89 Nth E 2-4pr-1995 5-Apr-1995Flcodplain Workshop 2

EF1UN FRSS 12.0( Nth E 14.89 Nth E 5-Apr-199S 4-Apr-1996Extensive Prodcution Monitoring Year 2

Ir1;STPY6 DOFi,TA 12.00 N1th E 1.A4 Nth E 1-Jul-1995 30-Jun-1996lIplement Stocking Progras PY6

Page 97: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

-90 Annex 10Page 5

TFP-Coastal Shriop Culture: Froject Steps ICritical Fathi

Pro3ect: CSHRINPC 12-Dec-198?

ri.zt* Resoonsible Duration Slack Start date Finish dateIneg Descriotion

SelPeCen EXtWP 3.0t) Mit' E 1.o "th E l-sep-199t) 1-Oec-199Selection tf Design tla,ultants

e:jQoCon St4 3.(.) Ith E 1.?. n1th E I-See-trJ0 1-Dec-1990Select Social Consultants for Shri? 'ulture

[ftl,,.: '--XD C!fA; Mth E 1.?; Ftt E l-Dec-lqt;q) 3-Miav-1991Pet.Desimn o' Bluices. ;elders c and 23. Pnase I

-s F 5.T $.fil, nth E 1.02 Ntht E l-;e:-lB 0 3-tlar-1991Sv:3l Stur.es in Feljers 5 and 27: pnaie I

.. r . , CWiaons 6.(0 1th N 1.0 1Mth N :-Dec-195U 3-Ju-0991Outline Design Polder 31

CE F5.23 tOF, BDB !.Ofu hth E 1.tJ2 Ith E 1-Pav-1991 2-Jun-1991SSelect Shrina Plodcs to be Peveloo9d.Pold. 5.23

.AC 11th N 1.05 Mth W 3-3un-199 1-Oct-191,.nder for lonstr. of lluices.Folders 5.23

ssr'I-,l, &,^STACo-- 6.6 .0 11th E f.99 nth E `-Jun-1991 3-Dec-1991Social Survey Polders 23.:!

034 OF Werb 6.00 11th E 13.01 O1th E I-Oct-1991 I-Apr-0992Outline desi,n colders 31,32,0j;19.3

sl P'',.' #it,2 {.t.'. Xth E 1.C15 Hitb E 1-4QV-1991 l-Jun-19,7Constr. Sluices 1st Year. Folders 5 and 23

itF.3.31 ,nDOF4wD8!STA 1.00 Nth E 0.99 Nth E 3rDec-1991 2-Jan-1992Selection ct Strit,o Plocts,fold..",31

LW5F'-.i1 tttilCons 5.t0 nth E 0.97 N1th E 2-Jan-lq,A. 2-Jun-1992Det. Design, Polders '3 and 31

;- F 3Tti(ops 6.00 N1th E 3.03 1Mth E I-Apr-1992 30-Sep-1992Social Survey Pold. 31,12,.16I9.

,,iF ~ ~ ~ ~~~~~S hi,lf "th F 7.17 N,th r 5-111t"-t901 !-^w-

,ainv Season Stop of Construction

TC3.71 E'tAv 8.". lth E *.94 11t. E 2-Jun-192 2-Oct-1992Tenser for ronstr..pold. 23.31

5,5 DP DOF:STri;PD 1.00 Nth E 3.LO, nth E 30-Sep-1992 31-act-9M2Selection of Elocts Fold -1.'.. 16:1:.

tE t'F PBicons 5.Mis fth E '.03 M1th E 3l-)t-1iq2 i-Apr-1993Detail Desip ;old. 1,3i..I2i.3

Page 98: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 91- Annex 10Page 6

TFP-Coastat Shriep Culture: Project Steps ICritical Path)

Project: CShRINPC 12-Dec-1959

'4ee Respon,ible Duration Slack Start date Finish dateCode Description

ClP23,31 BPDP 7.00 nth E 1.02 "th E I-lov-1992 2-Jun-1993Construction of Sluices. Ist year, P23.31

C2 F5.23 8ND8 5.00 N1th W 2.08 N1th i 2-Nov-1992 I-Apr-lW3Constr. of Sluices, 2nd vear, Polder 5,23

TC FP ENDO 4.00 Nth E 3.03 Nth E l-Apr-l993 I-Aug-1993Tender Construction. Fold. 31.32,18119.3

Rain 5.00 Nth E 2.09 11th E 3-Jun-1993 2-Nov-1993Rainy Season Stop of Construction hDrk

C: DP DP7.00 tOth E 3.07 11th E l-Nov-1993 2-Jun-19MCopstructiop, 1st year. cold. 31,32,18/19,3

C2P23.31 EIDB 5.00 11th v 2.04 11th 1 2-Nov-1993 4-Apr-1994Construction Sluices, 2nd year, Pold.23.31

Pain 4.90 11th E 0.12 N1th E 3-Jun-1994 30-Okt-1l4Rainy season

C2 OF NDB 7.Q00 Nth E 0.09 N1th E 30-Oct-1994 31-1ay-195Construction. 2nd year, Pold.31.32,18/19,3

Pain 5.00 Ilth E 0.09 Nth E 3-Jun-1995 2-Nov-1995

C3 OF E11b 6.00 Ilth E 2-Nov-1995 3-ftay-l"6Construction, 3rd Year, pold. 31.32,18/19.3

Page 99: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 92 -

Table 1. Finaneil .. d coneenic CjgjgWi& no.la mY r Sii at 91- Sbrim per lb Munt eH..d l.ea

Srig Oct.8e 980 Ihord. I Oct.69 93/94 Onward

Financial Prcece

C & P WIkU g headle. 4.00 7.25 6.80 7.25Le. Pre!ght. tnilrding Us/kg b dl L5 145 4 5FOS Bangladesh, hadl e..Exchange Rats T2 8. 82#J 3. .5 32.5F08 Sanuladech T/h hldl es 22 24L eeo Tbx/g or ba dle. Lm Trxapert aid Hlliag

betweiin Preeormp and Ship T/hg hbdl.. 2Price at Processing Plant Tbh beadl e1.Lea Proceaing C.tjNsrgin Tbk beadle Proeorer Buyiag Price Tb/hg beadle. 1I AM 15Le Tranport A tbrkctine Cas

from FPnrate to Prceear Tb/hg beadle 25 26 20 20FPragte Pric k/e headle.. sI 15Faragte Price 2/ Ta/hg bah 15 ;

1/ xport te ef 1.4 11 en R8 valueto * pected to be introduced in FM91.Fa cter 0.85 fer cerwv fro head-en to leadle..

Table 2. Financial and Ecn t I'Peaf t.nrIm and Cut.u.t

Lt mmj F ;icmll Econoic

Carp Tb/hg 20 18Fingerling Tkb/h 41 S6Shrimp Fry Tb/lOO 500 400

Page 100: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 93 - Annee 12T*ble 1

THMR FISHMIRX PRPOW

Baaic Modl major Floodpla.ne (Oc cntntt. 196 Tb.)

W.thaut With Project

Project (Increnentel) With Project (rewta)

V.ew Point Coet/Benefit It_a Year 0 1 2 8-20 1 2 3-30

Laaa/ Cost/he Laa fee 30 7O 7o 1 760 760 138O

Lcenaa holder Catching 220 "60 760 00 80 U1000 110

Supervision 10 sO sO s0 40 40 40

Finance charge 10 25 225 405 23 215 418

TOTAL 270 i1s 1785 265 1935 20n 29S5

sefite/ha Fiah vwlue 6 t 0 2200 2600 S00 2m o 91 S a550

Not benef ta/ha 2t0 am 618 VA 018 1098 898

Prof Fisherman Cot/he Ewqipent I10 220 260 800 350 370 410

Catch-labour 110 220 260 300 D0 37O 410

TOTAL 220 440 820 lOO 60 740 820

esoefito/ha Catch Incoae 220 660 760 900 80 10S0 1120

Net benetsta/ha 0 220 260 300 220 260 300

Part-tiee Cost/ha Catch coat 110 220 260 300 330 370 410

Fishreen gunefite/he Fish value M60 2200 2600 3O00 2780 3130 3860

Not bnefit a/ha 440 19Q0 2340 2700 2420 2700 3140

ald Coat/he Stocking 0 1300 160 15 8I0 l0w 10 1350

A4ei.iatration 60 100 100 1O0 1O0 130 160

TOTAL SO 160 1600 1480 160 1680 1800

Be dita/ha (lesee feee) 30 780 7 1350 780 7nO 3

Net benset i t/he (20) (80) (80) (100) (870) (870) (120)

Ecosoee, Coat/ha Stock ing (GM 0 1SO3 10 1330 1.500) 1iSO 1350

Catching (Prof. F.) 220 440 820 6o 660 740 020

Catching (Port-tine P.) 110 220 260 300 330 37 410

Supervision 10 30 30 SO 40 40 40

dininetration (08 s0 100 100 100 1JO lJ 1SO

TOTA0. 390 2200 2410 2S00 2600 2o0 2770

eseit t/ha Total catch value 1100 4400 5200 6000 s80 6300 7100

Net benefitta/h 710 2110 2790 320 26 3500 4330

otee General - Year 1 (Y1) a the year when stoeking aterts. All coata/benefita are finncial. The finaciel price for fi h is 10 Tb/ke

(WOP) end 2c0k/he (P). Wild fisb is aotly *m_l and (on riced. The rtoleval rtae of atoebad flab to 126. Las holder - La /l.cen

fee e aasuaed to incraa sith the project to cover a03 atoeking ceta to S01 In Y1 md V2 ad 1008 a of n8. Catch cata are 6 Tk/kg of

fish caught by Prof. fiaheren. The leasn holder. with the help of Prof. fi;heen. eatea SOS of totel catch.

Supervision costa ere apvctod to riae froe 10 Tk/ha in Y0 to 30 Tb/ha In 1-0. Fine chare" r la*e to hl/Ie olders. They would

borroe SS of the laoaa/li;onse fea aaunt for a period of 6 agtha at a eanhbly intret rote of 10 f re away lendera. BeSnfits e SO0

of total catch. Profeinal fiaherne - Catch caa are in tha oderd of 4 Tb/hg of f*ah c_ugt of dhich 2 Tb e 'for equipment and 2 Tk for

labour. Coata are eapected to fll 1 *1I VP to 3 Tb/hg of which 1 Tb is for wqupant (due to better ut;l;-tien) and 2 for Tk/labour.

Senefits (VP) Per equ1 to catch costs plue a ea-gin of 4 Tb for increased income for tebour. Part-ties fieherman - Catch coee are 2 Tk/Xg fan,

Part-t. Fe catch 05= of total catch; half (- 25 S of totl catch) is caught in floodplaine nd half ln the river system. 008 - Stock.ng rate wP

is 20 kg/ha In Y1. 30k g in Y3i fingerling sais increae frtre 1S0 tmn./kg In 1 t 90/hg in Y3; cast be 3 8/hg im Y1 and

46 Tk in Y3. Floodplalna that w*Il be stocked in later years woid start at a stocing rate of 30 h/ha. Co"t of adoiniatration is eapected

to rise fro curronely C0 Tk/ha to 1O Tfl/ha due to heavier load of work. Saorffit t are tha revnue from leaee/1 tcen" fasa. Eeonomy -

8 nsita are equaI to value of totel cateh. Incremental yieldr/ha ore 220 kg i;n 7. 260 kg In Y2 and 5W kg in Y3.

ttcs:Teb-1)

Page 101: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 94 - amo 12'rable 2

TN180 F1S1IUr , A0 2

Baic Model MInor Floodplain. (in constant Oct. 16 Tbn)

Without With Project

Project (Incraantal) With Project (Total)

View Point Coot/Pamelit Item Y.ar 0 1 2 s 80 1 2 3-30

Lomas/ Coot/he Stock ins 0 SOOO $S60 4200 3000 3600 4200

Liense holder Leaee/Licon * fee 35 900 00 1620 935 9385 l65

Catchins 268 2040 2440 2840 2806 2705 3105

Supervision 'O 30 30 30 40 40 40

Financial char"e 10 1170 1880 1t46 lSO 136G 1756

TOTAL 320 7140 8320 104# 7460 66W 1078

anefita/ha Fish value 990 a6o 9760 11360 9160 10750 IE6

Not benseitt/ha 670 1020 1440 924 1690 2110 1594

Prof ,Fihoermn Coat/ha Catching 265 1224 1464 170O 1489 1729 1965

Senefi ta/he Catch 440 2040 2440 2840 2480 2880 3280

Not benefita/ha 178 816 976 1140 91 1151 1315

Part-time Coat/he Catching 175 204 244 184 379 419 489

Fiaheoren eefite/ha fila value 280 2040 2440 2840 220 21S60 8060

Not benofit/ha 45 1886 2196 2568 l81 2241 2601

coo Coat/ha Administration 50 100 100 100 SO 10 150

8enofita/ha Lsai fee. 35 g0 9o 1620 9u3 935 l65

Not bncfitat/hs (1) 800 800 1520 785 785 1SOS

Economy Coat/ha Stocking 0 3000 3600 4200 8000 3900 4200

catch cat Prof. Fihe_ean 265 14 1464 1704 1489 1720 1l69

p.rt-t;Me fishermen 175 204 244 284 379 419 459

SuperviVion-laae 10 30 30 30 40 40 40

holder

Administration-00 80 100 100 1OO 1SO l5 1SO

TOTAL NO0 455 g8 6318 SOS8 53 6818

8snfita/ha Total catch value lO1 10200 12200 14200 11300 10 1800

Net benefita/h. 60o 8642 6762 7892 6242 7362 8482

NoteS: Generl YI _e TabIe 1.

Lease Holder Stocking rate Y1 50 kg/he. Y2 60 kg/ha, Y3 70 kg/lh. Fingerling size i 125/ke. fingerling price ia 60 Tk/kg.

In amnec FPL's stacking rat-* er higher than in eajor fPP (2 atockinge aonth-, better recovery by invontor).

Leae./licone fee a 201 higher than in Najor floodplains.

Catch cots are 3 Tk.WOP and 5 Tk.WP. Catch cot. are lor cowpred to eajor floodplaina on account of

*"i;r fiehing.

Supervision and financial charge. me assumptions as In Table 3.

Benefit. : 68 of total catch.

Profeional Fiah.aen Increee in their ahare from 3 Tk/kg fi h to 8 Tk/kg fiah caught.

Part-ties Fiaherae Catch coat are 2 Tk/kg of fish cauht WP. WP benfita are 208 of total catch.

00lt No comentc.

Economw Total catch i 5Y S10 ke/ha. Y2 610 k/ht and V 73.0 kg/ha.

Page 102: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 95 Anna 12

Table 3

Th160 FISER=5 PpOrj5

Fare Model - Shri.w Culture in Rotation with Paddy in Polde*

V;thout Project WIth Project (Incroemntet) With Project (Total)

-------- - - - ---- - -- - - - ----- - ---- - - - ---- - --- - -____ -__-- ____ ___._ .¢_ ____-+__ - ---------- _-- ---- - ---- --- - ---------- -- -- -- ---

Yuer 0 1 2 9 4 5-? 6-20 1 2 3 4 S-7 8-20

Coat Tk/ha

On fora investment 0 327 351 0 0 0 0 327 931 0 0 0 0

Juveni les 6000 0 2000 2000 M0 3500 3SX0 6000 60 8000 9800 9800 9500

Forti I; er * Feed 600 0 "00 1200 1700 2400 2400 60o 1I00 180o 2300 3000 2400

OU Civi I Worke/Equipent 5S0 0 0 800 300 300 800 5O s6 660 860 860 300

Infrastructure chare 0 0 0 000 500 1100 1100 0 0 500 SOO 1100 1100

Land compensation 1oo 0 1SO 180 1SO 1OD 160 100 250 250 250 250 15O

Labour 1100 0 100 200 300 S3O 800 1100 1200 1800 1400 1400 300

Land Proparetion 600 0 0 0 0 0 0 000 S0o sao 600 SO SOO

Hi ClIIaneous to0 0 50 100 2a0 500 SO0 100 180 200 300 600 S0

Fmnancel charee (inw) 0 0 0 500 1500 3000 0 0 0 M0O l50 3000 0

Finfncial charge (op) 360 0 S8 496 744 924 924 360 718 85S 1104 1284 1284

TOTAL COSTS 9320 327 3909 8446 6694 12174 9174 9647 1J9 14760 18214 21494 18494

lensf i to

Shrivp kg/ha 100 0 S0 60 90 120 120 100 180 160 190 220 220

Price Ti/kg 110 11o 110 t10 110 110 110 110 110 110 1t0 110 11o

TOTAL B4A1TS 1100w0 0 300 0 "900 1300 13200 11000 14800 1i600 20900 24200 24200

Net Benefit'

Net benefits Ti/ha 1680 -327 -609 11S2 1006 1026 40Q6 l188 1071 28S2 268 2706 5706

Note: - Paddy b*nefite/coete not accounted for; paddy net c"hfel is p; oltive.

- Project year asdefined as year of completion of a,vice gate by OM.

- FRR is 95S.

- 1 fare feally hae 1 he of land. 1 shrimp fare i 25 ha.

- Constant October 1989 Tb.

(tce:Tab-S]

Page 103: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 96 -

Annex 12

Table 4

Th11 FISES P150VJE

Fare tdWl - Shrimp Culture Only inside Polder,

without Project With ProJect (Incremental) With Project (Total)

Ysr O 1 2 3 4 8-0 8-20 1 2 3 4 8-07 0-20

Cost Ti/he

an fae investmnt 0 327 a31 0 0 0 0 82? a81 0 0 0 0

Juveni les 9000 0 260D 300 6000 SOD 0 9000 15C00 12000 100 50 15000

FPrti I is tr Feed 180 0 750 183 2280 2680 2am0 1J50 2100 2680 3600 4200 4200

0MM Civil Workas/Eiuipsen 730 0 0 800 JO 300 800 780 730 1060 1030 1030 1030

Infreotructureo charge 0 0 0 800 b00 1100 1100 0 0 500 50O 1100 1100

Land commenastion 125 0 63 125 1iO 150 1SO 125 1SO 230 275 275 275

Labour 1840 0 140 200 420 420 420 1540 l160 1820 1260 1260 1960

Land Preparation 20D 0 0 0 0 0 0 260 250 280 2S0 250 250

Miecel Inew 200 0 100 200 400 60O 60O 200 S0 400 S6O 600 Go0

Loe of Paddy 0 0 600 1J60 1360 1I3O 1360 0 SO 1860 18S0 1350 1350

Financial chaore (iew.) 0 0 0 00 1500. M00 0 0 0 500 ISOO 3000 0

Financial chargee (op.) 58o 87 487 66 1122 127 19 567 96? 1195 162 1609 1809

TOTAL COSTS 13725 364 4941 840 1392 17049 14049 14069 10S6 22175 2717 30774 27774

8enef i te

Shr;i kg/ha 60 0 40 90 130 200 200 180 190 240 300 350 350

Price Tk/lg 110 110 110 t1O 110 1tO 110 110 110 110 110 110 110

TOTAL B8EEFlTS 165SO 0 4400 9200 16800 22000 22000 15C0 20900 26400 33000 38500 38500

Net Sbnef ito

Not bendi tt Tk/ha 2m -364 -541 1450 2606 4951 7951 2411 2234 4225 5211 7726 10728

Note: - Constant October 1969 Tk.

- Project year defined s- yfr of clecitio, of *aice gat. by OM.

- FRR of inremetal camlflea. witho* t financial dcargetI 1885.

- I fare as 25 ha.

(tet :Te-1

Page 104: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 97 -

Almen 12

Table 5

Far. tddi - UhPiap Culutue In ftatian with Paddy atsid Peldert

wtSwvt Proee With rojet (Incremental) VIt, Projet (roul)

Yer 0 1 2 8 4 5-20 1 2 8 4 520

ea"t lb/ha

Oanfr& a v.etamt 0 240 0 0 0 0 240 0 0 0 0

Juveni too 60 a 2000 200 350 800 GM00 am Sos o soo

PartS I lier a Fse O 00 0 0oo 120 10o 2400 s0 10 10 g3* 300

OAK c;vi I War*ejEtw.Spaas 780 a 0 to0 Soo 7 ?078 780 80 185 1480

Iafraatr .o. Chan". 0 0 0 0 0 0 0 0 0 0

Lan pei_ 100 0 so0 10O 120 l20 10 1to 200 20 220

Labour 10 0 1O 200 300 380 1100 1MO O 185 1400 1400

Land Pr.peratsem, N0 0 0 0 0 0 0oo 800 n0 StO 80O

imil tan... 10t a SO tO1 200 SCO 100 1t0 2500 SCO 0o

Financial chafe" (im.-) 0 0 S00 1000 1000 0 0 we 1w 10 0

Financial chage" Cap.) 86 0 847 414 741 a"4 865 712 779 1106 1209

TOAL. ClOSTS a4 240 8947 8114 61 lS14 785 18442 14S0t 184ti 17079

Shrimp kg/h in0 0 s0 s0 0 100 120 180 1tO 210 220

Price Tlb/h 110 1tO 110 1tO 110 110 0tO 110 100 110 110

TOTAL u93cco 12000 0 8800 660 9O90 10 1 ll lO 1s0o6 t190o 28000

Nat bad i. tl/ha 2306 -240 -6? 1401 989 2610 26 i0 89 S44 8121

Nets - ASS In conteat OCte_br 1*9 tb.

- 116a to nt .ev ted fo_; _*t be;fIte of padd cultiatlc. a eated tm ha increasingly p"ltive.

- Project roarIla the gearhate. stenalon and aredit pro eorative an farm, level.

-1 shrim form mere a ha ed gremoe 25 ahrt farmer..

Ctc:The R

Page 105: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

- 98 -

Tablo 6

mzB Fzgsi ERo r

Wdel for Pond .ith Rish of Flowding (in twnat Oct.8e Tblha)

Wthout Prwojet With Project (Incremental) With Projct (rotal)

.e.a 0 1 2 3 4 S 6-20 1 2 a 4 a 6-20

Cast Tb/ha

Pond veatmant 0 ISO 0 0 0 a 0 1V1 0 0 0 0 0

let stocking (MY) 0 2000 2000 3000 4000 4000 A00 2000 200 1000 400o 4000 40o0

2nd stocking (Cat) 0 0 2400 2860 3360 8160 3860 0 2400 2860, 860 160o 3Seo

Pend mint"enan 0 0 20 2890 2890 2120 2820 0 2120 2120 212 21 20

Ferti IIer & Feed 0 80 40e0 4040 4640 4640 4640 680 4060 4640 48 4140 4640

Sur,.sion 0 240 1600 2400 3200 3200 tO0 240 1600 2400 3200 S200 320U

Catching 600 480 2400 2960 3240 3240 8940 1O0 3000 366e 8s40 3840 3640

Lo" of WI Id Fish prodcutlon 0 700 3000 1000 3000 1000 r000 700 300 3000 3000 SO0O 3OOO

Repysant of M-credit 0 0 40O SCoo 5sO800 50 0 0 4000 5000 50 300 0

Finaenial charga oer. cost 0 403 16s 2038 S 325 226 32 2 408 1e6 26 2125 2325 2325

TOTAL COSTS 600 6233S 34 228 316 31885 26065 S6 2405 2 3215 24s5 2668

Bean its (Trl/b)

F;oh yield (et at/kg) so3 240 240 260 320 320 320 840 340 se0 820 620 620

Fish yield (2nd at/ko) 0 0 960 1200 1lS0 1300 1500 0 o90 I200 1300 1300 1300

F;as Price (Td/k#) 10 20 20 20 20 20 20 20 20 20 20 20 20

TOTAL 8EMIS lC00 40o0 24000 2960 12400 32400 32400 7800 27000 32600 35400 85400 35400

Hot Benef it's Cm/ha)

Nat benefit 2400 -1433 542 132 13i 816 6313 967 2042 S32 3216 2915 8715

Nate: - Projet year is when aatension covers the pond an Oscavation is done. fish pric. so. is loer becaus of

dom nce r smalil *Ild fi h.

- F- Is M7.

[tco:Teb-4]

Page 106: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Economic Analysis Total Third Flshorios Project (Oct 89 Th)

90 91 92 90 94 9O 9o 97 90 99-09Economic Cots

Eeon.Cost najor FPL*(TkM) - 41.6 61.9 102.0 187.4 226.8 225.8 225.0 225.6 225.6Eeon. Cost. CSC (Th I) 3.1 69.0 102.2 112.0 126.2 102.4 62.8 67.0 94.6 67.0Leon Cot. Other F. (1kM) - 10.0 28.8 56.4 S2.0 121.1 123.2 181.0 188.O 183.0LeoC CostInetitution (M) 86.6 46.3 86.8 82.5 84.6 82.8 82.8 82.8 82.6 82.0Eeon Cost Research (TkUi) 2.7 4.5 5.8 2.2 1.9 1.6 0.6 0.5 0.5 0.5Eeon. Cost TAT (Tkm) 29.6 47.6 58.1 40.6 22.8 8.8 2.0 2.0 2.0 2.0Total Eeon. Coat (TkM) 71.9 211.8 287.6 847.7 483.9 492.0 487.1 479.1 488.7 491.1Eeoomno Ie onaelt (Tk N)

Leon. Sooef. Floodplain - - 102.1 120.6 288.0 400.0 480.0 480.0 400.0 480.0Eeon. Ebnow. Shrimp - - - 19.0 C8.S 110.7 161.8 197.6 219.0 219.0£con. Ebnof.Other Fishor. - 1.0 16.8 46.1 104.7 170.0 204.1 210.0 216.9 216.9Total Eeon.Besef. - 1.0 117.4 167.7 446.2 760.7 645.9 894.1 917.9 917.0ELon. Net Bno Its (Thk)

Total Econ Mt Bnefit* -71.9 -210.6 -170.2 -160.0 -17.7 268.7 878.6 416.0 429.2 426.6=~ _m = = a=_ = =S/9j1990 8s42

I

NRLTOT PV at 12.00T = 1078.6Switching Values t 12.t 0RTOT PV at 12.001 X 88a2.4

BkRIA PV P t 12.001 a 2187.8ApprlisaI Switchlng Porcontgo BRI8 PV at 12.001 a 799.4Sta Volue Volv Change BRIC PV at 12.001 a 916.2-- -.---

2-6---6----------------- - -t

12.00 288.ORltOT 8662.4 2608.0 -27.63 C.OT PY at 12.001 a 1120.8CRlA PV at 12.00% a 6120.9CRIS PV at 12.01 a 681.9

C Rl"tO 28Oa.8 882,4 We.x CRlt a t 12.009 a 020.>g$'' ' _ 9t (l~~~~~~~~~~~~~~~~Ctot WV t 12.OOX 202.9CUil PV at 12.001 14.7

Nab, lb6 Prsent VslIe at OCC 12.01% 'LXi0 CRlF Pn at 12.00 * 151.5internal nta, of Return a 80.90Coupo" Eq"Ialont Rate of Ratute a 1a.S3

H

Page 107: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Present Value of Not Streme at a Discount Rate of 12.0%

1RlTOT UW 10o up 20% UW s60 DM 10o DOWN 20 D0W 51

CRITOT 107.8. 1460.9 1866.1 8O01.6 890.4 8o2.1 -882.6uP l0 798.2 1186.6 1674.7 2739.4 410.0 21.8 -1143.0UP 201 617.9 9".1 1294.8 2459.1 129.0 -268.0 -1428.8UP 601 -823.8 06.0 4U.2 1617.9 -711.6 -1099,S -2264.6

DONN 10 1889.0 1747.2 2185.6 8800.2 970.6 582.6 -582.20034 20X 1689.4 2027.8 2415.8 8580.6 1251.1 882.9 -801.8DOWN 50 2480.5 2018.7 8257.0 4421.7 2092.8 1704.0 5a9.8

R1TOT LAO1 LAO 2 LAO 3

CR1TOT 1078.0 62.6 291.2 -40.4UP 101 798.2 892.8 10.9 -820.7UP 20S 617.9 101.9 -209.6 -001.1UP 60 -M28.8 -789.2 -1110.0 -1442.8

DOM lOX 185s.0 948.0 571.0 240.0DOW 201 1089.4 1228.4 962.0 520.4DOWN 60X 2480.6 2064.6 108.1 1801.5

LAO 1 - 968.0 591.s 260.0LAO 2 - - 689.9 528.8LAG S - - - 77.7

ne rna l Rates of Returns of Net Strm -~~~~~~~~~~~~~~~~~~~o8R10 UP 101 UP 20% UP 501 DOW 101 003W 20 0o0 601

CR1TOt 80.916 86.484 41.708 56.899 24.8n7 18.111 NONEUP 101 26.447 80.916 56.998 49.676 19.412 12.434 NONEUP 201 20.469 26.921 30.916 44.206 14.804 0.796 NONEUP 650 0.796 12.948 10.111 80.915 -1.02b NONE NONE

OM3 101 87.070 42.824 48.245 63.098 80.916 24.163 -11.978DO 20M 44.208 60.20 55.898 71.570 87.818 80.916 1.984DOWN 50 70.425 88.890 91.032 110.980 os.577 0.265 .80.915

9170TT LA 1 LA 2 LAG

CR1TOT 80.915 20.817 14.898 11.602UP 10% 26.447 16.604 12.108 9.440UP 201 20.409 18.185 9.584 7.404UP 501 0.796 8.981 2.778 2.118

DOW 101 87.079 24.426 17.982 14.117DOW 201 44.206 29.070 21.441 10.987DOWN 5OX 76.426 4S.768 85.717 29.079

LAO 1 - 80.915 20.817 14.898LA 2 - - 80.916 20.317LAO - - - 30.915

Page 108: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Major Floodplairs: Economic Analysis (Oct.89 Tk) No Inst,RO,TAcostst_______________--__,___._____--__._________.__________________________

so 91 92 93 94 96-09_________________________________________._____________________________________ _.____

Area stocked ha

Dhake Division (ha) - 000.0 6000.0 16000.0 30000.0 30000.0Khulna Division (ha) - 18000.0 18000.0 24000.0 80000.0 80000.0Raijsbhb Division (ha) - 10000.0 10000.0 20000.0 40000.0 40000.0

Total area stocked (hb) - 29000.0 29000.0 0000.0 100000.0 10000.0Area harvested

Dhaka Dlvision (ha) - - 6000.0 6000.0 16000.0 80000.0Khulna Division - - 180Q0.0 18000.0 24000.0 80000.0Rajahaht Division - - 10000.0 10000.0 20000.0 40000.0

Total orea harvested - - 2900.0 20000.0 60000.0 100000.0co"ta

Stocking, C0C (Ti/ha) - 1600.0 1600.0 1380.0 1850.0 1860.0Stocking 008 total (T I) - 43.5 48.5 81.0 185.0 185.0Catching Prof .Fl hTk H) - - 19.1 22.6 64.0 90.0Catching Partt.Fe Ti ) - - 6.4 7.5 10.0 80.0Supervision Priv.(Tk H) - 0.9 0.9 1.8 8.0 8.0Administr.Coetroc. (Tb H) - 2.9 2.9 6.0 10.0 10.0

.____ ............ _. ..... __.._.__ -... _--_ .. .. ... ---. ----.. ;... -.-- o

Total Ftnan.Cost (Tk W) - 47.8 72.6 119.0 220.0 266.0

E.Cost Stock.from COSTAB - 38.5 88.5 71.6 119.4 119.4Total Icen. coot (Tk N) - 41.6 81.9 102.0 187.4 226.6

eneftita

Catch (kg/h) - - 220.0 200.0 800.0 800.0Total Catch (tons) - - 689.0 7540.0 19000.0 30000.0Price (Tk/ton) 20000.0 20000.0 20000.9 20000.0 20000.0 20000.0Total finas. BenetdTk M) - - 127.6 160.9 360.0 600.0

Total tcon. B8netit(Tk h) - - 102.1 120.6 286.0 460.0

Not SeneItst

Econ. Met boe tito (Tk h) - -41.5 40.1 16.7 100.6 254.2

8/9/1090 S:82(1) 8 niCote tncreomntal. In Oct 69 Tb Million; Harvet lagged ono year

oo~x

w

Page 109: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Preent Values of Hot Stie.. st a Discount Rate ot 12.06

ORITOT UP 10 UP 20X UP 50X DOWN 10X DOW9 20X DOWN S0

CRITOT 1040.8 1283.6 1480.4 2130.7 830.0 613.8 -37.1UP 10x 984.7 1161.6 1888.3 2018.8 718.0 601.2 -149.2UP 20X 822.6 1089.4 1266.2 106.5 606.9 889.1 -281.8UP SOX 486.8 708.1 919.9 1570.2 289.8 62.8 -697.6

OO1N lOX 1168.9 1876.7 1592.5 2242.8 942.1 726.4 75.003W4 20X 1271.0 1487.8 1704.6 2854.9 1064.2 887.6 187.1POM 506 1607.8 1824.1 2040.9 2691.2 1890.5 1178.8 628.4

BRlTOT LAO 1 L4A 2 LAO

CRIToT 1046.8 814.6 607.2 422.0UP 106 984.7 702.5 495.1 809.9UP 20X 822.6 690.4 888.0 197.8UP 56O 406.8 254.1 46.7 -188.4

D09N 106 1168.9 928.7 719.6 684.10OMN 20X 1271.0 1088.8 881.4 s4e.2DOWN 56 1607.8 1876.0 1107.7 9S2.6

LA4 I - 984.7 727.8 542.1LAO 2 - - 884.6 649.4LAO - - - 745.1

Internal Ret.. of Reur. of Not StreamI

IRITOT UP 10% UP 20X UP 6ox 0034 1OX DON 20X 0OM BOX

CRITOT 187.657 181.880 lS.048 268.165 118.505 89.109 6.016 BRITOT PV *t 12.00 a 2167.8UP 10X 115.700 187.617 19.170 223.812 98.685 70.961 NO CRITOT PV at 12.00% = 1121.0UP 206 97.299 117.627 187.517 196.898 78.876 65.a88 NONE NRLTOT PV at 12.OO = 1046.8UP 506 65.388 72.488 89.109 187.617 87.4#8 17.868 NONE

O03IO1 198.068 190.818 218.682 29C.781 187.517 110.817 24.678DOWN 203 196.898 228.605 266.165 846.497 187.286 187.527 44.884DOWN 506 875.422 423.486 471.599 616.775 827.676 279.916 187.517

R1OT LAG 1 LAO 2 LAO a

CRITOT 1$7.617 52.610 81.464 22.281UP 106 115.700 44.9a8 27.027 19.124UP 206 97.299 38.260 28.02 18.330 Switching Value at 12.0%UP 06N 55.886 21.948 1118.1 9.381

0O03 1O0 168.968 61.224 86.493 26.780 Appraisal Switching Percentage0OM3 206 1#.89a 71.429 42.286 29.726 Strem Value Value ChangeDOWN 506 875.422 117.857 67.484 46.681

LAG 1 - 1I7.617 62.610 81.484 BRlTOT 2167.8 1121.0 -48.x1LAO 2 - - 187.517 62.510LAO 8 - - - 187.617 CRlTOT 1121.0 2167.8 93.40

Not Proesnt Value at OCC 12.01 a 1046.8 xInternal Rat. of Roturn a 1S7.6X Coupon Equivalent Rat. of Return * 28.81 .

Page 110: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Coastal Shrimp Cultura.Econoetc Analysls(Oct.89Tk)NoInst.Res,TA Costal-- _--------------------------------------------------------..-- --. _.-_

90 91 92 93 94 9S 96 97 99 99-09

Areas In polders In he

Polder 6 (he) - 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0Polder 23, phas. 1 (ha) - 2000.0 2000.0 2000.0 2000.0 2000.0 2000.0 2000.0 2000.0 2000.0Poider 23, phase 2 (ha) - - 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0 10DO.0 1000.0Polder 31,phose I (h) - 3000.o 8000.0 3000.0 8000.0 3000.o 30o0.o 3000.0 3000.0Othsro,phaas 1 (hs) 3 _ - 8000.0 3000.0 3000.0 3000.0 3000.0 3000.0 3000.0Other ph.se 2 (ha) - - - - 3000.0 3000.0 ao00.o 3000.0 8000.0 3000.0Total Area In polidra (ha) - 3000.0 7000.0 10000.0 1300. 13000.0 130(0.0 13000.0 13000.0 13000.0Area utside polders (ha) - - - 2000.0 2000.0 2000.0 2000.0 2000.0 2000.0 2000.0

- -i_ - - - I -- - -- - -- -- - -- - -- -- - -- -- -- -- - -- -- - -- ............. - - - ... _- - - - - - -_-- - -- -- -- -Total area (ba) - 3000.0 7W00.0 12000.0 16000.0 15000.0 15000.0 15000.0 15000.0 150.0

Prlvate Cost Tk/ha (1)

Poider S - - 2943.0 7812.0 8736.0 10370.0 11070.0 11070.0 11870.0 11870.0polder 23,phrsel - - 2943.0 8359.0 3960.0 8160.0 7160.0 7160.0 7150.0 7160.0Polder 23,ph 2 - - - 2943.0 6869.0 3960.0 6150.0 7160.0 7150.0 7160.0Polder p8l,phl - - - 2493.0 8359.0 3960.0 6150.0 7160.0 7160.0 7160.0Oth,e. phl - - - - 2948.0 8a69.0 3060.0 8160.0 7160.0 7150.0othern phc. 2 - - - - - 2948.0 6369.0 8950.0 6160.0 7160.0Outside poldera - - - 2400.0 8100.0 3700.0 8e20.0 7640.0 7640.0 7640.0

Produation kg/ra

Polder 5 - 40.0 90.0 160.0 200.0 200.0 200.0 200.0polder 23 phi - - - 30.0 60.0 90.0 120.0 120.0 120.0 120.0polder 28 ph2 - 30.0 80.0 90.0 120.0 120.0 120.0poider 31,ph 1 - - - - 30.0 80.0 90.0 120.0 120.0 120.0other. phai .- - - - 30.0 60.0 90.0 120.0 120.0othrer phase 2 - - - - - 30.0 30.0 90.0 120.0 120.0Outside pold. - - - 30.0 60.0 90.0 100.0 100.0 100.0 100.0

Production In tons

Production In PId.ra - - - 100.0 330.0 760.0 1160.0 1460.0 1840.0 1640.0Production Outs. Polder - - - 80.0 120.0 180.0 200.0 200.0 200.0 200.0

Total Production - - - 160.0 460.0 930.0 1360.0 1660.0 1840.0 1840.0

Costs 7k h

PrIv co t In Polders TkU - - 8.3 80.6 48.9 68.9 91.5 64.9 94.5 97.5Priv. Cost outs. Pold.TkU - - - 4.8 6.2 7.4 13.2 16.1 16.1 15.1

-- - -- - -- -- - -- -_- -- - -- - - -- ;- - - - -_-- - - - - -- - -- - -- - -- _- - _-- ----- ----

Total Priv. Fln.cost Tk M - - 6.8 85.3 65.1 74.3 94.7 99.9 109.6 112.6Total Priv. Econ.cost Tkl - - 7.1 28.2 44.1 59.4 76.6 80.0 07.6 9c.0Tot.Publ.Econ.Inv+OAU TkM 8.1 59.9 95.1 83.8 81.1 43.0 7.0 7.0 7.0 7.0

________ -------- -------- -------- --------- -------- -------- -------- --- ---- -------- >q :1

Total Econ. Cost TkM 3.1 69.9 102.2 112.0 126.2 102.4 82.8 87.0 94.8 97.0 La- -- - - -- - -- -- --- - -- -- --- - -- -- --- - -- ----- - -- -- --- - -- -- --- ------ -------- ---------- -- --

Benefits in TK M w

Total finan.benet (tkM) - 17.8 49.5 102.3 149.6 182.6 202.4 202.4Total econ. benefits TkU - - - 19.0 53.6 110.7 181.8 197.6 219.0 219.0

Page 111: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Not enefit. Th N

Econ. Net Benef Its Tk M -8.1 -69.9 -102.2 -93.0 -71.7 0.2 79.1 110.6 124.8 121.9S2 UU UfU | aa Ca3 ~=##S=== aza n=:S=a:= __t aa

3/9/1990 8:35<1> from farmodela Financial cost les transfer (fin.charges,coot rec.)(2> From cetab, coastal shrimp culture coponent *con. Volvo

Switching Value at 12.01

ApprIsal Switching PercentageStrem Value Val" Change

- __ -_____ - ----- _--- BRITOT PV at 12.00X = 799.a

CRITOT 799 6881.8 -21.01 CR1TOT PV at 12.001 = 631.8NRLTOT Pv at 12.001 = 167.6

CalerM 631.6 799.8 21 CX

Net Prent Vale t OCC 12.01 * 167.5Internal Rate of Retrn a 20.01Coupon EquIvalnt Rate of Return * 16.41

II .0Q

,,.

Page 112: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Present Values of Net Streams at a Discount Rate of 12.0X

BRITOT UP 10 UP 20X UP 06N DOWN 10% DOWN 20% DOWN 60S

CR1TOT 187.6 247.4 827.4 687.2 87.8 7.0 -282.2UP 10x 104.8 164.3 264.2 604.0 24.4 -56.6 -296.4UP 206 41.1 121.1 201.0 440.8 -38.8 -118.7 -368.5UP 06X -148.4 -88.5 11.4 261.3 -228.4 -S0o.3 -548.1

DbO" lOX 280.7 810.6 890.0 630.4 150.8 70.8 -189.0DOWN 20X 298.9 878.s 468.7 698.6 213.9 184.0 -106.8DOWN 50X 488.4 588.4 643.3 s88.1 403.5 828.6 8.s

SRITOT LA I LA 2 LA4

CR1tOT 107.6 81.9 6.4 -62.9UP lOX 104.8 18.7 -67.8 -126.1UP 206 41.1 -44.5 -121.0 -169.3UP 50X -148.4 -284.1 -310.6 -878.8

DOWN 10 280.7 146.0 68.6 0.8DONN 20X 298.9 208.2 181.8 68.6DOWN 06X 408.4 897.0 21.8 265.0

LAO 1 - 149.6 78.1 4.8LAO 2 - - 188.6 66.8LAO - - - 119.2

Internal Rates of Returns of Not Strseas

8R1TOT UP 10 UP 206 UP SO DOWN 1OX DOWN 20X DOWN 06X

CRITOT 19.005 23.281 28.224 84.164 16.485 12.410 -s.485UP 1ox 16.775 1m.996 22.948 30.724 18.190 9.082 -20.370UP 206 18.819 17.065 19.095 27.648 10.180 5.842 NONEUP SOX 5.842 9.380 12.416 19.906 1.689 -4.228 NONE

DOWN 10 28.574 28.861 29.922 38.184 10.095 16.016 -2.029DOWN 20X 27.848 81.022 84.184 42.728 23.999 19.96 3.201DOWN 606 45.881 49.290 58.065 88.862 41.112 a8.567 19.996

9R9T1T UL I LA4 2 LAG 8

CRITOT 1.9." 16.206 12.182 10.118UP OX 1 16.775 12.701 10.186 8.391UP 20X 18.019 10.890 8.251 8.800UP SOX 5.U42 4.226 8.26 2.679

DOWN 1OX 23.674 17.971 14.484 12.009DOWN 20X 27.64s 21.076 18.963 14.128DOWN 6OX 46.381 84.000 27.236 22.694

LAO 1 - 19.996 1.200 12.162LAG 2 - - 19.995 16.200LAO 8 - - - 19.m95

Page 113: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Other Fisheries. Economic Analysi.(Oct.89 Tk)NoInstlt.,Resu.TA costs

90 91 92 98 94 96 96 97 98-09

Areas In ha

Ulnor Flood plain. py3 - - 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0Minor Flood Plains PY4 - - - 2000.0 2000.0 2000.0 2000.0 2000.0 2000.0Minor Flood Plains PYS - - - - 8000.0 3000.0 8000.0 8000.0 800.0Vinor Flood Plains PY- - 8000.0 8000.0 5000.0 8OO0.O

Total Minor Flood Plains - - 1000.0 8000.0 8000.0 9000.0 9000.0 9000.0 9000.0

Ponds Pn2 - 260.0 250.0 260.0 260.0 260.0 260.0 260.0 260.0Pond. PYsinOCl lOOhn pns - - 600.0 600.0 600.0 600.0 800.0 600.0 600.0Ponds PY4;incl. 200ha pen - - - 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0Ponds PYS;incl.200 he pen - - - - 1460.0 1460.0 1460.0 1460.0 1460.0Ponds PI - - - - - 1000.0 1000.0 1000.0 1000.0

Total Ponds - 20.0 960.0 2060.0 8600.0 4600.0 4600.0 4600.0 4500.0_- - ------ - -- -_- - -- -- -- - -- -- -- _- -- --- - - -_-- - -- -- _- -- -_- -_- -

Total Other Fisherioe - 260.0 1850.0 5060.0 9500.0 18500.0 185O0.O 18600.0 18600.0

Priv. Fin. Coats Tk/ha

Minor Flood Plain. P18 - - 46ss.0 5488.0 6818.0 6318.0 8818.0 6831.0 6818.0Minor Flood Plains PY4 - - - 4565.0 5488.0 8818.0 6818.0 6818.0 6818.0Minor Flood Plains PY5 - - - - 4568.0 6488.0 6818.0 8818.0 8818.0Minor Flood Plains PYe - - - - - 4658.0 5488.0 8a18.0 6818.0

Ponds PY2 - 19800.0 17800.0 21200.0 287e0.0 28760.0 28780.0 28780.0 28780.0Ponds PY8 - - 19600.0 17600.0 21200.0 28780.0 28780.0 28760.0 28780.0Ponds PY4 - - - 19600.0 17800.0 21200.0 28780.0 27860.0 28780.0Ponds PYS - - - - 19600.0 17800.0 21200.0 28780.0 28780.0Ponds PY8 - - - - - 19600.0 17800.0 21200.0 2878M.0

Costs

Priv.Fln.Cost FPL TkUl - - 4.6 14.8 80.9 48.9 64.2 56.9 58.9PrIvAFln.Cost Ponds TM - 4.9 16.2 89.6 68.4 91.0 97.2 104.4 106.9

Tot.Prlv.Fin. Co" Tkb - 4.9 20.8 54.1 99.3 140.0 151.5 161.2 188.8

Total Priv.Econ.Cost TkM - 8.9 18.6 48.2 79.4 112.0 121.2 129.0 131.0Total Publ.Econ cost TkM - 8.1 12.2 16.2 13.2 9.1 2.0 2.0 2.0 0

- -- -- - - -- - - --- - - - -- -- --- - -- -- --- - -- -- --- - -- ---- - -- - -- I- - -- -- --- b DTotal Economic cost TkM - 10.0 28.8 58.4 92.6 121.1 123.2 131.0 183.0 N m

Benefits W

Production kg/ha

Minor flood pln;ns PY3 - - 510.0 610.0 710.0 710.0 710.0 710.0 710.0

Page 114: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Minor Flood pltin. PY4 - - - 610.0 610.0 710.0 710.0 710.0 710.0Minor Flood plains PY6 - - 510.0 610.0 710.0 710.0 710.0Minor Flood plains PY6 - - - - - 610.0 610.0 710.0 710.0

Ponds PY2 - 240.0 1200.0 1480.0 1620.0 1620.0 1620.0 1620.0 1820.0Ponds PY8 - - 240.0 1200.0 1480.0 1620.0 1620.0 1820.0 1620.0Ponds PY4 - - - 240.0 12U0.O 1480.0 1620.0 1620.0 1620.0Ponds PYS - - - - 240.0 1200.0 1460.0 1620.0 1620.0Pondn PY8 - - - - - 240.0 1200.0 1480.0 1620.0

Production IMn.FPL* Ton. - - 610.0 1830.0 3460.0 6490.0 606O.0 6890.0 6390.0Prod. Pond tone - 6o.o 444.0 1876.0 3061.0 5188.0 6667.0 7150.0 7290.0

Totnl prod. Tone - 60.0 964.0 a0os.0 8641.0 10623.0 12767.0 13540.0 13660.0

Total Econ. Bens. Tk M - 1.0 16.3 48.1 104.7 170.0 204.1 211.6 210.9

Eton. Net Bonfits Tk 1 - -9.1 -13.6 -10.8 12.0 40.9 60.9 66.7 66.9

8/9/1900 8s30

Switebing Value at 12.O6 0

Appraisal Swittshing PercontgeStram Value Volvo Chang

BR4T0 916.1 621.0 -82.15

CR8T0T 821.0 918.1 47.41

Net Proeset Value at OCC 12.0X a 294.2Inrtern Rate of Return = 73.43Coupon Eqivolet Rate of Rtfurn = 20.45

IW0e

Page 115: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

Present Values of Not Streams at a Discount Rate of 12.0%

BR4TOT UP 10% UP 20% UP 60% DOWN IOX DOWN 20% DOWN 60X

CRBTOT 294.2 386.7 477.2 751.7 202.8 111.1 -183.4UP 10% 232.1 323.8 416.1 689.6 140.6 49.0 -226.6UP 20X 170.0 261.6 363.0 627.6 78.4 -18.1 -287.8UP 50x -16.3 76.2 166.7 441.2 -107.8 -199.4 -473.9

DOWN lOX 858.8 447.8 589.3 818.6 284.7 178.2 -101.8003W 20X 418.4 609.9 601.4 875.9 826.8 286.8 -39.2DOWN 5O0 804.6 896.2 787.7 1082.2 518.1 421.6 147.1

BR4TOT LAO 1 LAG 2 LAG 3

CROTOT 294.2 196.1 108.6 80.4UP 10% 232.1 184.0 46.5 -81.7UP 20% 170.0 71.9 -15.6 -93.8UP 60x -16.8 -114.4 -201.9 -280.1

DOWN 1OX 366.8 268.2 170.7 92.5DOWN 201 416.4 820.8 282.8 154.6DOWN sOX 604.6 506.6 419.0 840.9

LAU 1 - 202.8 176.1 98.9LAO 2 - - 284.5 156.3LAO - - - 209.4

Internal Rat., of Returns of Net Stream.

BR4TOT UP 10% UP 20X UP SOX DOW 1OX OWN 20% DOW 05X

CRsTOT 78.480 91.112 10t.754 182.257 65.669 37.184 NONEUP 10% 57.198 73.430 89.608 187.768 40.691 22.911 NONEUP 20% 43.403 58.560 78.430 117.689 27.626 8.929 NONEUP sOX 8.929 24.161 87.184 78.430 NONE NONE NONE

DOWN IOX 93.072 112.678 182.870 192.760 78.480 53.662 NONEDOWN 20% 117.589 189.796 162.257 232.018 96.522 78.430 -6.os0DOWN SOX 256.284 296.377 338.210 476.151 217.725 180.478 73.430

BR4TOT LAO 1 LAG 2 LAG 8

CRsTOT 78.430 30.607 18.838 13.485UP 10% 67.198 24.066 14.775 10.662UP 20% 48.408 18.182 11.110 7.921UP 6ox 8.929 8.059 1.807 1.279

DOWN 10% 93.072 38.073 23.402 16.728DOWN 20X 117.589 48.774 28.825 20.438DOWN 60X 268.2s4 88.370 51.137 86.069

LAO 1 - 73.430 30.607 18.836LAO 2 - - 73.430 30.607LAO 3- - - 73.430

xoD-

Page 116: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

¢~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~I I- V- X V ,_, ____- N- -- W.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~a la at be atK

5 ; i | tC i} i etML

1 5 Xt-|85 -, 2fi9}i S } .EsitWl2 Z -!,35-,'.0 | j!! i$! S 5i~~~C @ - __ - _ - W -_____ £'' ---- ° - _ S __

:~~~~~~~~~ 0nu. nnw S6o@^6 a cY

l __ _ X _ 0 S _ _ __ _ _ _ j __ _ _ _ X _ _ _ _ , IL 91

Page 117: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

BANGLADESHTHIRD FISHERIES PROJECTPROJECT ORGANI SATI ON

I*-------------.................... --............ .............

t iDD RQRCULURE EU '50 t........................................ .... 1 .....3

2 1f1S1TR0DS FISHERIES 430.0

3 RRDBCULTURE DEV. 412.5_

4 JEBGRtED FISHERIES DEV. 4e2. , I

5 II1P CULTURE DEV. 276.6 ADNIN ItC HI

6 S f fEED lt 2P8.6 ION _9__5__

7 X SEED HVULttPLICRStOH ~ 93.5 D| DY. DIR D|. DIR | DY. DIR | D|YW. DtR D|. DIR ii | Di. DIR |DR . D

8 r KswHo A 1t1HR5 E6.6 F C FRSS I.C. | 4l ILJ

9F 0fNPEC?IOH A OC. 35. -0

ISfl6IRE F SlIE 11516.6SURVEILLRHCE AOB 6.1

1 1R D6YO"{H tFISHERIES 9.1 .

V aibh.ioN I oWL Illg;ID AGIAUL URE 5.5 MA IE

FRiPTP5. DY. DIR | Y DI R Dr. DIR |Y .D|IRij Rll

13pHoSt6tpNL.STREHGTHENING 5.5 | -,",..- | lINIC G IJS |I|

.IAA _FISSRYCX| FD§RRYC" |DmLESEX HtHERIES TRINN INS6.t

m :~~~4SECTION 2,6

DFO DFO DFO

_ [-I umn 0om

....... _Lim or CO_IN?I@

DEUELOPNENT REVENUE

BUDGET BUDGET

tiRIECIAL VAV 198S/9G IIIUICI*L YV*R 191/91"

P?RSOIIeU No 26 Film 1,029 P38311. No 1to rim 2,026

3uT1 TX 698 (OSS 21.2) 1IILI.1 BUMl TX 14 (1S# 4.5) NLtUON

StAYFTUOOM alto 1WTX 523,M (USf 16,296) St1r1tiE3 I1Ot1O 1:tX 40B, (M5 1.NS)

Page 118: CZ42 ZILiL 4z, - World Bankdocuments.worldbank.org/curated/en/790991468006268459/pdf/multi-page.pdf · Proiect Description The project is designed to support a sectoral development

4Ws t X , ~~~~~~~~~~~~~B A N G L A D E S HTHIRD FISHERIES PROJECT

Aj>$,,-,4s, X <Nt ;v -- PROJECT AREA AND MOR FISHERIES RESOURCES'; rt Arfk>7L'-'L,Z ) INITIAL PROJECT SITES

-26, \[ COASTAL SHRIMP CULTURE

PROJECT AREA

MAJOR RIVERSRRI.I8PI.!~~~~~~~~~~~~~ - ~~~ROADS

- RAILROADS

o DISTRICT CAPITALS* NATIONAL CAPITAL

DISTRICT BOUNDARIES

v t \ \ .I N D I A DIVISION BOUNDARIES) -4 -* < . j tv_ _*_ INrERNATIONAL BOUNDARIES

INDIA~ ~~~ 'AKHP \ GP-

t ,, ,,f5vzPjP UAKHAtU B OLA \;tCm

_e 8 V S ( ~~~~~~~~~~~~~~~~ ~~~~~~~PATTY S o I #23* ,,- / t -}> .

EtIIMfS **_ *I \ o

-24-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1

n aee _ R . .u e i N D I

D- m nw1 noI.v osl BAZA'ALAMA

_d 85-M ' M.

I N D I B Cot. B N rI

| 2 KILOMETERS ClATK

GET

PARiSTAN. _ ...... ... 9|1 AR_UN

m*1~~~~~~~~~~~~~~~~~~~~~~~~~~*O.A ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 2-

PAKISTAN~~~~~~~~~~~~~~~~~~~~~IOMTR

/ SRI EANRA ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ MANA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ PP~~~~~~~~MIL


Recommended