www.trinit
The YodProgram
The Yodpedestria
The Yodan NCHR
When usNCHRP
FAILURDAMAAND V
Specif
• 6' le• 24" w• 46" • Emp• Full:
Featur
1. Inter2. Fill C3. Light4. Drain5. Fork
Recom
• Drain
tyhighway.com
D
dock® 2001 m (“NCHRP”
dock® 2001 an channeli
dock® 2001 RP Report 3
sed with the Report 350
RE TO FGE OR C
VEHICLE O
ications
ngth width height
pty: 130 lbs 1500 lbs
es
rlocking CouCap & Port t Box Recesn Hole & Plu
klift Ports
mmended T
n Wrench
m
DEPLOYM
has been t) Report 35
is a plastic zation, road
is eligible fo50 TL-3 long
Steel Rail KTL-3 longitu
FOLLOW CAUSE PEOCCUPA
s. .
upler
ss ug
Tools
MENT G
tested purs50 specificat
Longitudinad closure, a
or Federal Hgitudinal bar
Kit, the Yodoudinal barrier
INSTRUCERSONA
ANTS.
1
1
GUIDE –
suant to Nattions.
al Channeliznd perimete
Highway Admrricade.
ock® 2001 is r.
CTIONS AL INJURY
2
© 2017
Yodock
tional Coop
zing Deviceer security f
ministration
eligible for
MAY REY / DEAT
3
7 Trinity HighwCreate
k® 2001
perative Hig
(“LCD”) usfor vertical c
(“FHWA”) re
FHWA reim
SULT IN TH TO PE
Part No. 62way Products
ed September
ghway Rese
ed for trafficconstruction
eimburseme
bursement a
PROPEREDESTRIA
5
21423 s, LLC r 2017
earch
c and n.
ent as
as an
RTY ANS
4
www.trinit
Longit
1. Da
2. Du
3. If a
NOT
4. E5. If 6. C7. A
A
C
tyhighway.com
tudinal Ch
Determine louthority or p
Deploy the basing an Inte
f a connectiond join it to t
a. Ensurb. Use th
separ
TE: It is not
Ensure that af not already
Completely fiAttach Fill Ca
1) The L
2) The L
3) The L
4) The L
5%
C
m
hannelizi
ocation of Yproject manaarricades, emrlocking Couon is requirethe adjacentre that Connhe Interlockirate runs of Y
required to f
all Drain Plugdone, remoll each Yodo
aps to preven
LCD may be
LCD may be
LCD has the
LCD has the
Cross Slope
Hill
ing Devic
Yodock® 200ager (if availampty or full,upler. ed to make t barricade rector Pins ang CouplerYodock® 200
fill the Corne
gs are propeove one (or bock® 2001 wnt water loss
placed on c
placed on lo
ability to con
ability to con
2
ce (LCD) D
01 deploymable). in line with
a corner, usrun using anare securely to connect e01 Barricade
er Connecto
erly secured.both) Fill Cap
with water to s and to kee
cross slopes
ongitudinal s
nform to a h
nform to a d
5%
D
B
Deploym
ment and fol
each other a
se the YodoInterlockingin place.
each side of es.
or with water
. ps. the top of th
ep debris out
up to 5% (3
slopes up to
hill up to 5%
ditch up to 5%
Longit
D
Create
ment
llow instruct
and join eac
ock® 2001 Cg Coupler.
f the Corner
r.
he Fill Port. t of the barri
3). – Figure
5% (3). – F
(3). – Figur
% (3). – Fig
tudinal Slop
Ditch
ed September
tions of hig
ch unit to the
Corner Conn
Connector t
cade.
A
Figure B
re C
gure D
pe
r 2017
hway
e next
nector
to the
www.trinit
Yodoc
1. L
2. R
3. A
4. E
Option
1. R
2. S
3. T
tyhighway.com
ck® 2001 R
oosen Fill C
Remove Drai
After barricad
Empty barrica
nal Corne
Remove the I
Slide the Cor
The Corner C
m
Removal
Caps to facilit
n Plug at ba
de is empty,
ades can no
er Connec
Interlocking
rner Connect
Connector ca
Hinge Plu
Hi
tate water re
ase of barrica
attach Drain
ow be remov
ctor Rem
Coupler from
tor away fro
an now be re
ug
nge
Corner
3
emoval.
ade and let w
n Plug, Fill C
ved for transp
oval
m both sides
m each barr
emoved for t
Connec
Connect
water drain
Cap, and rem
port and sto
s of the Corn
ricade run.
transport an
Corne
ctor Pin
tor
Create
completely.
move Interloc
rage.
ner Connect
d storage.
r
ed September
cking Couple
tor.
r 2017
er.
www.trinit
Longit
Deploy
1. Etw
2. Wp
3. WR
4. Ath
5. Inwe
6. Uco
7. Slinpfas
8. Shfab
9. R
NOTE
12
Note: F
3
4
5
6
tyhighway.com
tudinal Ba
Impo
yment
Each Rail Kit wo Connecto
With two peolace.
With two peoRepeat the pAdjust the rahe forklift ponsert the pro
washer on boither a stand
Units with raorrespondin
Slide the Conne up the corovided 3/4”
asteners. Tigure to use a
Slide the adjooles. Insert
asteners witoth the bolt
Refer to the lo
ES:
. The begin
. When defeature toprocedurezone.
For steps 3 –
. The LCD
. The LCD
. The LCD
. The LCD
m
arrier (Yo
ortant: To b
contains twor Channelsople, place o
ple, lift the rrocess for thils on each srts. ovided Gradoth the bolt dard or pneuails are joing holes at bnnector Chaorresponding” x 5 1/2” Grghten all fasa washer onoining unit wthe providedh either a st head and ocal authorit
nning length ployed, the o oncominge to shield t
– 6 refer to p
may be plac
may be plac
has the abil
has the abil
odock® 20
be used onl
wo rails (one , and Gradeone rail on
rail and slidehe other sideside so that
e 8, 3/4” x 2head and n
umatic sockened togetheoth ends of
annel over thg bolt holesrade 8 boltssteners with n both the bwith rail intod 3/4” x 5 1/2standard or nut side of ty’s traffic co
of need for system wit
g traffic. Cthe blunt en
page 6.
ced on cross
ced on longi
ity to confor
ity to confor
4
001 with
ly with appr
for each sid 8 hardwareeach side o
e the protruse.
the corresp
2” bolts thronut side of eet wrench. er by a Conthe rails withhe end of th. Repeat forthrough theeither a sta
bolt head ano the attache2” Grade 8 bpneumatic weach fasten
ontrol plan fo
the Yodock®
h the Steel Consult locand or taper
s slopes up t
tudinal slope
rm to a hill up
rm to a ditch
Steel Ra
roved Steel
de of the unie. of the unit in
sions into the
ponding bolt
ough the holeach fastene
nnector Chah the providehe rail with tr the opposite Connector andard or pnnd nut side ed Connectobolts and tigwrench. Be ner. or proper de
® 2001 with Rail Kit ma
l highway athe end of
to 5% (3). –es up to 5%
p to 5% (3) up to 5% (3
Create
il Kit TL-3
l Rail Kit (se
t), two Interl
n preparatio
e Yodock® 2
holes on ea
les of the prer. Tighten a
annel that ed Grade 8 fthe open ente side of thChannel an
neumatic soof each fas
or Channel ghten the Co
sure to us
ployment.
Steel Rail Kay present aauthority onthe system
– Figure A
(3). – Figu
). – Figure C
3). – Figure
ed September
3)
ee p. 5).
locking Coup
on to set the
2001 forklift p
ach rail line
rotrusions. Uall fasteners
is bolted tofasteners.
nd facing ouhe unit. Placnd rail and aocket wrenchstener. and align al
onnector Chase a washe
Kit is 46’. a blunt-end n an approp
out of the
re B
C
D
r 2017
plers,
em in
ports.
up in
Use a s with
o the
t and ce the attach h. Be
ll bolt annel er on
road priate clear
www.trinit
STE
3/4” x Rail KHardw
tyhighway.com
EEL RAIL
Steel Rail
2”, Grade 8it Bolts and
ware
m
KIT COM
Kit Rails
Conne
8, d
MPONENT
ector Chann
5
TS
nel
Prottrusion
Imporie
Create
3/4” x 5-1/2Connector Bolts and H
portant: Nentation of
ed September
2”, Grade 8 Channel
Hardware
ote channel.
r 2017
www.trinit
Remov
1. R2. R3. R
p4. W
R
A
C
tyhighway.com
val
Remove the 3Remove the CRemove the 3
ossible reusWith two peoRepeat the p
5%
C
m
3/4” x 5 1/2”Connector C3/4” x 2” bol
se. ople, lift the rrocess for th
Cross Slope
Hill
bolts from CChannel fromts that hold
rail and slidehe other side
6
Connector Cm the steel rathe two (2) S
e the protruse.
5%
D
B
Channel – reails – retain Steel Rail K
sions out of
Longit
D
Create
tain for possfor possibleit halves tog
f the fork lift
tudinal Slop
Ditch
ed September
sible reuse. reuse.
gether – reta
ports of the
pe
r 2017
ain for
e unit.
www.trinit
Perime
1. P2. If
a(s
3. E4. R5. C
Fs
6. SPpth
7. Ina
8. Ifbs
tyhighway.com
eter Secu
Warnlevel g
Position eachf a connectiond join it tosee p. 3).
Ensure that aRemove bothCompletely f
ailure to coystem.
Slide RubberPanel on top
osts should he fill holes. nterconnect pproximately
f a wind debottom of tcreen grom
Dangein placresult injury
m
urity with
ning: The Yground.
h Yodock® 2on is require
o the adjace
all Drain Plugh Fill Caps. fill each Yoompletely f
r Grommets of the barriseat firmly i The chain lthe Fence
y 12” from thbris or privhe Fence P
mmets.
er: Do not ce) if wind gin tipping oor death to
Fence Pa
Yodock® 20
001 in line wed to make ent Yodock®
gs are prope
odock® 2001fill the barr
onto each icade and pin the base ink mesh sh
e Panels uhe top and bacy screen Panel Rails
attach windgusts are exof the syste
o pedestrian
Fence Clamps
Fence Pa
Rubber G
Fence
7
anel Dep
001 with Fen
with the nexta corner, us2001 Barri
erly secured.
1 Barricadericades cou
Fence Panelace the Feof the barric
hould be faceusing two bottom of the
is requireds using app
d debris or xpected to em that cou
ns and vehic
Panel s
nel
Grommet
e Panel Post
ployment
nce Panels
t using an Inse the Yodocade run us
.
e with wateuld result in
el Post. Witnce Panel Pcade with theed out from(2) Fencee Fence Pand, attach thproved pla
privacy screxceed 65
uld cause pcle occupan
Create
should only
nterlocking Cock® 2001 Csing an Inte
r to the topn unwanted
th two peopPosts into the Rubber Gthe barricadPanel Cla
nel. e screeningstic zip tie
reens (or remph. Failu
property dants.
ed September
y be deploye
Coupler. Corner Connerlocking Co
p of the fill d tipping o
ple, lift the Fhe fill holes. rommets sn
de. mps, each
g to the topes to secur
emove if alrre to do so
amage, pers
r 2017
ed on
nector oupler
port. of the
Fence The
nug in
one
p and re all
ready may
sonal
www.trinit
Perime
1. R
2. R
3. WR
4. R
5. W
6. E
Cold-W
1. C
2. C
3. U
No
1. Fw
2. Br
QUESTIHighway
tyhighway.com
eter Secu
Remove wind
Remove Fenc
With two peoRemove and
Remove Drai
When barrica
Empty barrica
Weather E
Choose the le
Choose the a
Use the appro
te: Use of
For those mwashed awa
Before an aregarding en
IONS: Foy at 888.496
m
urity with
d debris or p
ce Panel Cla
ople, lift theretain each
n Plug at bas
ade is empty
ades and Fe
Environm
evel of freez
anti-freeze ag
opriate anti-
the above
mixtures thaay with large
antifreeze snvironmental
or question6.3625 or vis
Fence Pa
rivacy scree
amps.
e Fence PaRubber Gro
se of each b
, attach Drai
ence Panels
ments and
ze point prote
gent from th
freeze agen
antifreeze
at may bee amounts o
olution isl requiremen
s, requestssit www.trin
8
anel Rem
ens (if attach
nel out of tmmet.
arricade and
in Plug, Fill C
can now be
d Anti-Fre
ection antici
he charts bel
nt when filling
agents doe
slick, if aof water and
chosen, thents.
s, or additnityhighway
moval
ed).
he barricade
d let water d
Caps and rem
removed for
eeze Reco
pated.
low.
g the Yodoc
es not guara
spill occurd the area sa
e user shou
tional copiey.com.
Create
e and place
rain complet
move Interlo
r transport a
ommend
ck® 2001.
antee freeze
rs, the soluanded to pre
uld check lo
es, please
ed September
e on the gro
tely.
ocking Coup
and storage.
ations
prevention.
ution shouldevent skiddin
ocal ordinan
contact Tr
r 2017
ound.
pler.
d be ng.
nces
rinity