+ All Categories
Home > Documents > DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS...

DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS...

Date post: 13-Jan-2016
Category:
Upload: martha-blake
View: 214 times
Download: 0 times
Share this document with a friend
29
1 DA HIEF YSTEMS NGINEER ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM 16 November 2009
Transcript
Page 1: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

1

DA HIEF

YSTEMS NGINEER

ASN (RDA)Chief Systems Engineer

ASN (RDA)Chief Systems Engineer

DoN PoPS to

ICPM Core Common Metrics and OSD DAPS

NDIA ICPM

DoN PoPS to

ICPM Core Common Metrics and OSD DAPS

NDIA ICPM

16 November 2009

Page 2: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

2

DA HIEF

YSTEMS NGINEER

DoN Probability of Program Success (PoPS)to ICPM Core Common Metrics and

Defense Acquisition Program Support (DAPS)

Requested to compare/contrast ICPM and PoPS

Also looked at DAPS to PoPS

Page 3: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

3

DA HIEF

YSTEMS NGINEER

3

Program Health

Factors

Metrics

Criteria

Program Requirements

Program Resources

Program Planning/Execution

External Influencers

Parameter Status

Scope Evolution

CONOPS

Budget and Plan

Manning

Acquisition Management

Sustainment

Industry/Company Assessment

Software

Total OwnershipCost Estimating

Government Program Office Performance

Test and Evaluation

Contract Planning and Execution

Technical Maturity

Fit in Vision

Program Advocacy

Interdependencies

Naval PoPS 2.0

Technology Protection

Naval Probability of Program SuccessNaval Probability of Program Success (PoPS) v2.0 (PoPS) v2.0

6 October 2008 PDASN Memo Naval PoPS Guidance:

o Required for all DoN Gate Reviews and any time program health is discussed

o Standard DoN method of representing the health of all ACAT Programs and any other programs subject to the DoN Acquisition process

o Use the methods and tools described in the Naval PoPS Guidebook and supplemental Handbooks

Consistent means to assess program health, criteria adjusts as Program matures

Used for Portfolio Assessments and identification of Department wide systemic issues

PoPS Criteria Scoring (Example)

Page 4: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

4

DA HIEF

YSTEMS NGINEER

4

ICPM Core Common Metrics

Under Development by NDIA ICPM

Shared view of program performance by customers and industry

Establishes critical behaviors / techniques for program success

Portfolio management

Metrics

Program Health

FactorsRequirements

Stability &

Completeness

Predictive Measures of

Program Performance

Critical Skills

Requirements Volatility

TBD/TBR Burn down

Risk / Opportunity Summary

Funding Stability &

Contract Health

Technical Performance &

Productivity Variance

Risk & Opportunity

Management

Program Cost &

Schedule

Staffing & Critical

Skills

Program Funding Plan

Program Funding Status

Contract Change Volume

TPM (Summary quick look)

TPM Progress/Regress Burn Down Chart

Software Productivity

Cost Performance Index

Schedule Performance Index

Cum CPI vs. TCPIEAC

Baseline Execution Index

Requirements Traceability

Risk / Opportunity relative to MR

Risk Mitigation Plan

Late/On-time Starts

Critical Path

Staffing Profile

Supply Chain

Performance

Parts Demand Fulfillment

Supplier Acceptance Rate

Supplier Late Starts

Top 8 IT Readiness Indicators

Resources

Physical Inventory, Maintenance, Records, Relief of Stewardship

Action Tracking / Burndown

Issues/Help

Needed

Customer

Satisfaction

CPAR

Award Fee

Product Performance

Transparency of data to avoid surpriseso Clear Understanding of Requirementso Transparency of Technical Performanceo Cost / Schedule Performance, Risk Management,

Resources, and Supplier Performanceo Help Needed Culture – Across All Program Lines and

Open Communication Relative to Issueso Clear, Continuous Feedback from the Customer

Categories

Page 5: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

5

DA HIEF

YSTEMS NGINEER

Defense Acquisition Program Support (DAPS)

Defines the PSR approach to assess defense system development programs by the OSD Program Support Team.o not a checklist to be followed rigidly, nor must each assessment address all

assessment areas and sub-areas listed. o Tailorable to ensure important areas are not overlooked and comprehensively

examinedo Includes an extensive list of programmatic and technical factors that are used to

build the review plan.

Mission

Capabilities /

Req’ts Generation

DoD DAPS

Readiness LevelsCONOPs

Analysis of Alternatives

Design Considerations

Resources ManagementTechnical

Process

Program

Performance

Special

Interest

Areas

Budget Sufficiency & Phasing

Staffing Level

Program Schedule Overview

Acquisition Strategy

Knowledge-based Decisions and

Milestones

Program & Project Management

Contracting

Effectiveness

Suitability

Survivability

Production

Capabilities

Requirements Development

Technical Baseline

Engineering Tools

Software

Design Verification

Supportability Planning

Program Assessment

Areas

Criteria

Sub-Areas

Pre-Milestone A

3.0 Management

3.1 Acquisition Strategy3.1.1 Credibility - The program manager (PM) is developing a credible Acquisition Strategy that will provide the basis for meeting program objectives and therefore will be an aid in gaining program acceptance and support.

3.1.1.Q1: How is the Acquisition Strategy realistic?

3.1.1.Q2: Does the program face any of the following pressures, which work against the realism of the Acquisition Strategy?

3.1.1.Q3: How is the Acquisition Strategy stable?

3.1.1.Q4: Are any of the potential causes of instability to the Acquisition Strategy present?

Etc.

Page 6: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

6

DA HIEF

YSTEMS NGINEER

Key Assessment Areas / FactorsICPM versus PoPS version 2.0

ICPM

Categories

DoN PoPS Factors

Requirements Stability & Completeness

Program Requirements

Customer Satisfaction Program Planning & ExecutionTechnical Performance &

Productivity Variance

Risk & Opportunity Management

Program Cost & Schedule

Supply Chain Performance

Resources

Funding Stability & Contract Health

Program Resources

Staffing & Critical Skills

Issues/Help Needed

External Influencers

ICPM DoN PoPS10 Categories 4 Factors30 Metrics 18 Metrics

Criteria* Criteria*

*Particular Criteria and number is dependent on

Life Cycle Phase

All ICPM Categories and Metrics are included in PoPS Factors and Metrics

Page 7: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

7

DA HIEF

YSTEMS NGINEER

ICPM DoN POPS

Requirements Stability and

Completeness

CONOPs Program RequirementsRequirements Volatility Scope Evolution

TBD/TBR Burn down

Requirements Traceability Parameter Status

Funding Stability & Contract Health

Program Funding Plan Total Ownership Cost Program Planning & ExecutionContract Change Volume Contract Execution

Program Funding Status Program Resources Factor- Budget

Technical Performance & Productivity Variance

TPM (Summary quick look) Technical Maturity Program Planning & ExecutionTPM Progress/Regress Burn Down Chart

Software Productivity Software

Risk and Opportunity Management

Risk/opportunity Summary Government Program Office Performance Program Planning & ExecutionRisk/Opportunity relative to MR

Risk Mitigation Plan

Program Cost and Schedule

Cost Performance Index Contract Planning and Execution Program Planning & ExecutionSchedule Performance Index

Statistical EACs

Cum CPI vs TCPIEAC

Baseline Execution Index

Late/On-Time Starts

Critical Path Acquisition Management

Summary ICPM versus PoPS

Page 8: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

8

DA HIEF

YSTEMS NGINEER

ICPM DoN POPS

Staffing & Critical SkillsCritical Skills Manning Program ResourcesStaffing Profile

Supply Chain Performance

Parts Demand Fulfillment Contract Planning & Execution Program Planning & ExecutionSupplier Acceptance Rate

Supplier Late Starts

ResourcesTop 8 IT Readiness Indicators Software Program Planning & ExecutionPhysical Inventory, Maintenance, Records, Relief of Stewardship

Sustainment

Government Program Office Performance

Customer Satisfaction

CPAR Industry and Company Assessment Program Planning & ExecutionAward Fee Contract Planning and Execution

Product Performance Technical Maturity

Test and Evaluation

Program Requirements Factor – Parameter Status

Issues/Help NeededAction Tracking /Burndown Assessed at DoN SETRs and

Gate Reviews

Summary (cont.) ICPM versus PoPS

Page 9: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

9

DA HIEF

YSTEMS NGINEER

Key Assessment Areas / FactorsDAPS versus PoPS version 2.0

OSD DAPS Areas

DoN PoPS Factors

Mission Capabilities / Requirements Generation

Program Requirements

Resources Program Resources

Management External Influences

Program Planning & ExecutionTechnical Process

Program Performance

Special Interest Areas – Technical Readiness

OSD DAPS DoN PoPS6 Areas 4 Factors

22 Sub-Areas 18 Metrics

59 Factors

-Criteria*•Questions*

-Criteria*

*Particular Criteria and number is dependent on

Life Cycle Phase

Page 10: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

10

DA HIEF

YSTEMS NGINEER

OSD DAPS DoN POPSMission Capabilities / Requirements Generation

CONOPs CONOPs Program RequirementsAnalysis of Alternatives Scope Evolution

Capabilities Parameter Status

Resources Program Schedule Overview Acquisition Management Program Planning & ExecutionBudget Sufficiency & Phasing Total Ownership Cost Estimating

Budget Program ResourcesStaffing Level Manning

Management Acquisition Strategy Fit in Vision External InfluencesProgram Advocacy

Acquisition Management Program Planning & ExecutionKnowledge-Based Decisions & Milestones

Contracting Contract Planning & Execution

Industry / Company Assessment

Program & Project Management Government Program Office Performance

Interdependencies External Influences

Technical Process Design Considerations Program Planning & ExecutionRequirements Development Technical Maturity

Technical Baseline

Engineering Tools

Software Software

Design Verification Test and Evaluation

Supportability Planning Sustainment

Special Interest Areas Readiness Level Technical Maturity

Program Performance Effectiveness

Test and Evaluation

Suitability Sustainment

Survivability Test and Evaluation

Production Industry / Company Assessment

SummaryDAPS versus PoPS

DoN Gate Review

and DoN SETR

Process

Page 11: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

11

DA HIEF

YSTEMS NGINEER

Summary ICPM and DoN PoPS

o ICPM appears to serve Executive Level discussions

o ICPM assessment factors similar to those in PoPS

o However differences in Criteria may be warranted ICPM – Health of Program from Contractor view PoPS – Health of Program from Government view

DAPS and DoN PoPSo DAPS is a mix of Executive and Management Level informationo DAPS factors covered by

DoN Gate Reviews Core Criteria and PoPS (Exec / Management Level) Systems Engineering Technical Reviews (SETRs) (Management / Detail Level)

DoN PoPSo Executive Level with input from Management / Detail Reviews (SETR)

o Used continuously for life of Program

o As input for Major Decision Reviews (Gate and Milestone)

o Applicable to All ACAT Programs

Page 12: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

12

DA HIEF

YSTEMS NGINEER

Back-upBack-up

Page 13: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

13

DA HIEF

YSTEMS NGINEER

Details of Core Criteria and Templates by Gate - URL: https://nserc.navy.mil/asnrda/asn_rda_pops/pops20dev/Step%202%20Draft%20Documents/Forms/AllItems.aspx?RootFolder=%2fasnrda%2fasn%5frda%5fpops%2fpops20dev%2fStep%202%20Draft%20Documents%2f0%20Draft%20Core%20and%20Briefing%20Templates%20in%20Exec%20Staffing&FolderCTID=&View=%7b7AEE306D%2d7B71%2d4326%2d999E%2dDEEC9A1DF241%7d

Details of PoPS Criteria and Templates by Gate - URL: https://nserc.navy.mil/asnrda/asn_rda_pops/pops20dev/Step%202%20Draft%20Documents/Forms/AllItems.aspx?RootFolder=%2fasnrda%2fasn%5frda%5fpops%2fpops20dev%2fStep%202%20Draft%20Documents%2fProposed%20PoPS%20v2%20Criteria%20and%20Templates%20in%20Exec%20Staffing&FolderCTID=&View=%7b7AEE306D%2d7B71%2d4326%2d999E%2dDEEC9A1DF241%7d

Page 14: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

14

DA HIEF

YSTEMS NGINEER

ICPMRequirements Stability and Completeness Category

DoN POPSProgram Requirements Factor

Metric Metric

CONOPs

Requirements VolatilityScope Evolution

TBD/TBR Burn down

Requirements Traceability Parameter Status

Requirements Assessment ICPM versus PoPS

Page 15: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

15

DA HIEF

YSTEMS NGINEER

ICPMFunding Stability & Contract Health Category

DoN POPSProgram Planning & Execution Factor

Metric Metric

Program Funding Plan Total Ownership Cost Estimating

Contract Change Volume Contract Execution

Program Funding Status Program Resources Factor -

Budget

Resources Assessment ICPM versus PoPS

Page 16: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

16

DA HIEF

YSTEMS NGINEER

ICPMTechnical Performance & Productivity Variance Category

DoN POPSProgram Planning & Execution Factor

Metric Metric

TPM (Summary quick look)

Technical MaturityTPM Progress/Regress Burn Down Chart

Software Productivity

Software

Resources Assessment ICPM versus PoPS

Page 17: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

17

DA HIEF

YSTEMS NGINEER

ICPMRisk & Opportunity Management Category

DoN POPSProgram Planning & Execution Factor

Metric Metric

Risk / Opportunity Summary

Government Program Office PerformanceRisk / Opportunity relative to MR

Risk Mitigation Plan

Resources Assessment ICPM versus PoPS

Page 18: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

18

DA HIEF

YSTEMS NGINEER

ICPMProgram Cost & Schedule Category

DoN POPSProgram Planning & Execution Factor

Metric Metric

Cost Performance Index

Contract Planning and Execution

Schedule Performance Index

Statistical EACs

Cum CPI vs. TCPIEAC

Baseline Execution Index

Late/On-time Starts

Critical PathAcquisition Management

Resources Assessment ICPM versus PoPS

Page 19: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

19

DA HIEF

YSTEMS NGINEER

ICPMStaffing & Critical Skills Category

DoN POPSProgram Resources Factor

Metric Metric

Critical Skills Manning

Staffing Profile

Resources Assessment ICPM versus PoPS

Page 20: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

20

DA HIEF

YSTEMS NGINEER

ICPMSupply Chain Performance Category

DoN POPSProgram Planning & Execution Factor

Metric Metric

Parts Demand Fulfillment

Contract Planning & ExecutionSupplier Acceptance Rate

Supplier Late Starts

Resources Assessment ICPM versus PoPS

Page 21: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

21

DA HIEF

YSTEMS NGINEER

ICPMResources Category

DoN POPSProgram Planning & Execution Factor

Metric Metric

Top 8 IT Readiness Indicators Software

Physical Inventory, Maintenance, Records, Relief of Stewardship

Sustainment

Government Program Office Performance

Resources Assessment ICPM versus PoPS

Page 22: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

22

DA HIEF

YSTEMS NGINEER

ICPMIssues/Help Needed Category

DoN POPS

Metric Metric

Action Tracking / Burndown

Resources Assessment ICPM versus PoPS

Assessed at DoN Gate

Reviews and SETRs

Page 23: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

23

DA HIEF

YSTEMS NGINEER

ICPMCustomer Satisfaction Category

DoN POPSProgram Planning & Execution Factor

Metric Metric

CPAR Industry and Company Assessment

Award Fee Contract Planning & Execution

Product Performance

Technical Maturity

Test and Evaluation

Program Requirements Factor -

Parameter Status

Resources Assessment ICPM versus PoPS

Page 24: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

24

DA HIEF

YSTEMS NGINEER

OSD DAPSMission Capabilities / Requirements Generation Area

DoN POPSProgram Requirements Factor

Sub Area Factor Metric

CONOPs Mission Description CONOPsFoS / SoS Dependencies / Interfaces

Analysis of Alternatives

Validity and Currency Scope EvolutionLinkages and Traceability

Capabilities Reasonableness, Stability, and Testability Parameter StatusKPP / KSA

Requirements Assessment DAPS versus PoPS

Page 25: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

25

DA HIEF

YSTEMS NGINEER

OSD DAPSResources Area

DoN POPSProgram Resources Factor

Sub Area Factor Metric

Budget Sufficiency & Phasing

Program Funding and Allocation Budget

Continuity and Stability Program Planning & Execution Factor -

Total Ownership Cost Estimating

Staffing Level Sufficiency of Numbers and Qualifications ManningContinuity and Stability

Program Schedule Overview

Viability Program Planning & Execution Factor -

Acquisition ManagementConstraints and Dependencies

Resources Assessment DAPS versus PoPS

Page 26: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

26

DA HIEF

YSTEMS NGINEER

OSD DAPSManagement Area

DoN POPSProgram Planning & Execution Factor

Sub Area Factor Metric

Acquisition Strategy

Credibility Acquisition Management

Acceptability External Influences - Program Advocacy

External Influences - Fit in Vision

Knowledge-Based Decisions & Milestones

Statuary & Regulatory Compliance & Guidance

Entrance & Exit/Success Criteria

Certifications

Program & Project Management

Program/ Plan/Schedule Government Program Office PerformanceWBS

Management Structure & Communications

Management Methods, Metrics, and Techniques

Information Management (IDE, IT, Data Rights)

Management of Dependencies & External Interfaces (FoS/SoS))

External Influences - Interdependencies

Contracting Prime Contractor Management Contract Planning & ExecutionSubcontractor Management

Value Engineering Industry / Company Assessment

Management Assessment DAPS versus PoPS

Assessed at DoN Gate

Reviews and SETRs

Page 27: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

27

DA HIEF

YSTEMS NGINEER

OSD DAPSTechnical Process Area

DoN POPSProgram Planning & Execution Factor

Sub Area Factor Metric

Design Considerations

System Assurance Technology Protection

Modular Open Systems Approach

Architecture

Environment, Safety, and Occupational Health

Spectrum Management

Sustainment as a Design Consideration

Corrosion

HSI

Requirements Development

Analysis and Decomposition

Management of Requirements

Technology and Maturity Integration Technical Maturity

Trade Studies and Approaches

Technical Baseline Technical Review Planning

Configuration Management

Baseline Stability

Technical Process Assessment DAPS versus PoPS

Assessed at DoN SETRs

Assessed at DoN Gate

Reviews and SETRs

Page 28: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

28

DA HIEF

YSTEMS NGINEER

OSD DAPSTechnical Process Area

DoN POPSProgram Planning & Execution Factor

Sub Area Factor Metric

Engineering Tools Systems and Software Engineering (SSE) Tools

M&S Tools

Producibility and Production Planning Tools

Software Software Development Plan SoftwareEstimation

Design Verification

Test and Evaluation Plan Test and EvaluationVerification Correlation

Supportability Planning

Acquisition Logistics SustainmentPerformance-Based Logistics (PBL)

Sustainment

Technical Process Assessment DAPS versus PoPS, Con’t

Assessed at DoN Gate

Reviews and SETRs

Page 29: DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.

29

DA HIEF

YSTEMS NGINEER

OSD DAPSProgram Performance Area

DoN POPSProgram Planning & Execution Factor

Sub Area Factor Metric

Effectiveness Design Capabilities Assessment Test and Evaluation

Technical MaturitySpecial Interest Areas - Readiness Level

Suitability Reliability Assessment SustainmentAvailability Assessment

Maintainability Assessment

Survivability Live Fire Test and Evaluation Assessment Test and Evaluation

Production Assessed Manufacturing Industry / Company AssessmentAssessed Quality

Program Performance Assessment DAPS versus PoPS


Recommended