DAFTAR PUSTAKA
Barlishen, K.D., Baetz, B.W. 1996. Development of a Decision Support Systems for
Municipal Solid Waste Management Systems Planning. Waste Management and
Research, 14(1), p.71-86.
Basri, H.B. 1996. Planning Operation Using an Intelligent System, Proceeding of the
twelfth Internatinal Conference On solid Waste Technology and Management.
The Journal Of Solid Waste Technology and Management, November, p.17-20.
Basri, H.B, Steinfors, E.I. 1995. Expert Systems in Solid Waste Management. Waste
Management and Research. 13(1), 01-23.
Danur Isnantyo, Fajar. 1996. Perancangan Basis Data Pendukung Sistem Manajemen
Keselamatan dan Kesehatan Kerja Pada Industri Tekstil Indonesia. Jurnal Teknik
Lingkungan. p. 9-18.
Hartono, Jogiyanto. 1999. Pengenalan Komputer, Dasar Ilmu Komputer, Pemrograman,
Sistem Informasi dan Intelegensi Buatan. Penerbit Andi. Yogyakarta.
Josuttis, Nicolai. 1999. C++ Standard Library: A Tutorial and Reference. Addison
Wesley. Massachusetts.
Departemen Pekerjaan Umum, Direktorat Jenderal Cipta Karya. 2006. Penyusunan
Perhitungan Biaya Spesifik Investasi Bidang Persampahan. Jakarta.
Greatfhouse, Daniel., Clements, jay. 1989. Expert System Technology Tool for
Developing Intelligent Advisory Systems for Waste Management Programs.
Municipal Solid Waste Technical Conference Proceedings, San Diego, 1-92-1-98.
Hadi, Cendra. 2003. Memahami Struktur dan Elemen Pada Bahasa Pemrograman.
www.ilmukomputer.com.
Lionardi, Michael. 2003. Memahami Konsep OOP dengan C++.
www.ilmukomputer.com
xiv
McCauley-Bell, Reinhart. 1997. Development of a waste composition Study Planning and
Analysis Tool (MSW-Xpert. State University Sytem of Florida, Florida Center for
Solid and Hazardous Waste Management, Report # 97-3.
Padmi, Tri dan Enri Damanhuri. Diktat Kuliah Pengelolaan Sampah. Departemen Teknik
Lingkungan, ITB. Bandung.
Patterson, D.W. 1990. Introduction to Artificial Intelligence and Expert System. Prentice-
Hall, Inc. USA.
Raharjo, Budi. 2006. Pemrograman C++ (Mudah dan Cepat Menjadi Master C++
dengan Mengungkap Rahasia-rahasia Pemrograman dalam C++). Penerbit
Informatika. Bandung.
Rostlon, D.W. 1998. Principles of Artificial Intelligence and Expert Systems
Development. McGraw-Hill, Inc., USA.
Satriyo Nugroho, Anto. 2003. Pengantar Softcomputing. www.ilmukomputer.com. p.1-2.
SNI 03-3242-1994-SK SNI T-12-1991-03. Tata Cara Pengelolaan Sampah Di
Permukiman.
SNI 19-2454-2002. Tata Cara Teknis Operasional Pengelolaan Sampah Perkotaan.
Sugeng, Winarno. 2002. Diktat Kuliah Dasar Komputer. Jurusan Teknik Elektro,
ITENAS. Bandung.
Tchobanoglous, George, 1993. Integrated Solid Waste Management, Engineering
Principles and Management Issues. McGraw-Hill International Editions.
Triastuti, Driah. 2003. Pengembangang Program Pendukung Teknis Operasional
Pengelolaan Sampah Kota di Jakarta. Tesis Magister, Program Magister Teknik
Lingkungan ITB. Bandung.
LAMPIRAN
A-1
LAMPIRAN A
Rekapitulasi Model Persamaan Biaya Spesifik Investasi Bidang
Persampahan
Tabel A.1 Kapasitas Pelayanan Transfer Depo
Cakupan Pelayanan Harga Perolehan
No. Peralatan Kapasitas KK Jiwa (Rp)
Sub Sistem Pengumpulan
1 Transfer Depo I 200 m2 700 40000 150.000.000 2 Transfer Depo II 60-100 m2 1000 20000 80.000.000-100.000.000 3 Transfer Depo III 10-20 m2 1000 4000 33.000.000
+ Container
Tabel A.2 Biaya Spesifik Investasi Pemindahan Sampah (Rp/orang)
Biaya Spesifik Investasi Persampahan Rp/orang terlayani No Komponen
Rata-rata SD Interval Model Pemindahan sampah
1 Transfer depo Tipe 1 (a) 4074 297 3963 - 4185 y = 13588x-0,0979 Transfer depo Tipe 1 (b) 3750 - - - - y = 3750 2 Transfer depo Tipe 2 (a) 5168 190 5097 5239 y = 9319x^-0,0495 Transfer depo Tipe 2 (b) 5000 - - - - y = 5000 3 Transfer depo Tipe 3 (c) 8984 884 8654 - 9315 y = 24512x^-0,1014 Transfer depo Tipe 3 (d) 8250 - - - - y = 8250
Keterangan : a = simulasi 20.000 sampai dengan 400.000 jiwa dengan interval 10.000 jiwa b = simulasi 40.000 sampai dengan 1.000.000 jiwa dengan interval 40.000 jiwa
c = simulasi 2000 sampai dengan 50.000 jiwa dengan interval 1000 jiwa d = simulasi 40.000 sampai dengan 1.000.000 jiwa dengan interval 40.000 jiwa
A-2
Tabel A.3 Biaya Spesifik Investasi Pemindahan Sampah (Rp/ m3)
Biaya Spesifik Investasi Persampahan Rp/m3 Sampah No Komponen
Rata-rata SD Interval Model
Pemindahan sampah 1 Transfer depo Tipe 1 (a) 2.113.441 99.004 2.076.405 - 2.150.478 y = 3E+06x^-0,064 Transfer depo Tipe 1 (b) 2.000.000 - - - - y = 2E+06 2 Transfer depo Tipe 2 (a) 2.067.252 76.186 2.038.763 2.095.741 y = 3E+06x^-0,0424 Transfer depo Tipe 2 (b) 2.000.000 - - - - y = 2E+06 3 Transfer depo Tipe 3 (c) 3.285.649 353.669 3.153.398 - 3.417.900 y = 5E+06x^-0,1101 Transfer depo Tipe 3 (d) 3.000.000 - - - - y = 3E+06
Keterangan : Idem tabel A.2 Tabel A.4 Biaya Spesifik Investasi Pemindahan Sampah (Rp/ ton)
Biaya Spesifik Investasi Persampahan Rp/ton Sampah No Komponen
Rata-rata SD Interval Model Pemindahan sampah 1 Transfer depo Tipe 1 (a) 6.453.765 396.176 6.305.602 - 6.601.911 y = 1E+07x-0,083 Transfer depo Tipe 1 (b) 6.000.000 - - - - y =6E+06
2 Transfer depo Tipe 2 (a) 8.269.009 304.745 8.155.053 8.382.965 y =
1E+07+x^0,0495 Transfer depo Tipe 2 (b) 8.000.000 - - - - y = 8E+06
3 Transfer depo Tipe 3 (c) 11.142.598 1.414.678 10.613.594 - 11.671.601 y = 2E+07x^-
0,1279 Transfer depo Tipe 3 (d) 10.000.000 - - - - y =1E+06
Keterangan : Idem tabel A.2 Tabel A.5 Analisa Statistik Deskriptik Biaya Spesifik Operasi dan pemeliharaan Sistem Pemindahan Sampah
Kota/Kabupaten Biaya (Rp/th) Biaya (Rp/m3) Surabaya 506,46 Medan 1.569.095.722,85 2.944,65 Bandung 11.860.500.211,43 4.600,46 Jakarta Barat 6.197.446.690,00 3.250,25 Jakarta Selatan 1.869.624.406,00 1.667,83 Jakarta Pusat 9.456.401.535,55 6.547,30 Jakarta timur 3.611,39 Depok Manado Bogor 1.540,15
A-3
Kota/Kabupaten Biaya (Rp/th) Biaya (Rp/m3) Yogyakarta 6.053,91 Samarinda 2.623,66 Makasar 892,29 Balikpapan 10.485,07
Rata-rata 6.190.613.713,21 3.726,95 Standar Deviasi 4.550.890.210,15 2.849,29
Maksimum 11.860.500.211,43 6.547,30 Minimum 1.569.095.722,85 1.667,83
Range (Interval) 10.291.404.488,58 4.879,47 Median (Q2) 6.197.446.690,00 3.250,25
Q3 9.456.401.535.55 4.600,46 Q1 1.869.624.406,20 2.944,65
Interquartile Range 7.586.777.129,35 1.655,81
Keterangan : Biaya merupakan biaya penyesuaian tahun 2006
Tabel A.6 Kapasitas Pelayanan Alat Angkut
Cakupan Pelayanan Harga Perolehan
No. Peralatan Kapasitas KK Jiwa (Rp)
Sub Sistem Pengangkutan
1 Truk Biasa 6 m3 700 7000 150.000.000 2 Dump Truk 8 m3 1000 10000 200.000.000 3 Arm Roll 8 m3 1000 10000 250.000.000 4 Compactor Truk 8 m3 1300 10000 300.000.000
Tabel A.7 Biaya Spesifik Investasi Pengangkutan Sampah (Rp/ orang)
Biaya Spesifik Investasi Persampahan Rp/orang terlayani No Komponen
Rata-rata SD Interval Model Pengangkutan Sampah
1 Truk Biasa (a) 24.571 2089 23.790 - 25.352 y = 105890x^-0,1445 Truk Biasa (b) 21.719 402 - - - y = 28220x^-0,0203 2 Dump Truk (a) 23.238 2081 22.460 - 24.016 y = 152476x^-0,1845 Dump Truk (b) 20.000 0 - - - y = 20000 3 Arm Roll (a) 28.029 2081 27.251 - 28.807 y = 134579x^-0,1538 Arm Roll (b) 25.000 0 - - - y = 25000 4 Compactor Truk (a) 60.130 6243 57.769 - 62.465 y = 526472x^-0,2128 Compactor Truk (b) 50.000 0 - - - y = 50000
Keterangan : a = simulasi 7000 sampai dengan 50.000 jiwa dengan interval 1000 jiwa b = simulasi 50.000 sampai dengan 1.000.000 jiwa dengan interval 50.000 jiwa
A-4
Tabel A.8 Biaya Spesifik Investasi Pengangkutan Sampah (Rp/ m3)
Biaya Spesifik Investasi Persampahan Rp/m3 Sampah No Komponen
Rata-rata SD Interval Model Pengangkutan Sampah
1 Truk Biasa (a) 10.304.040 835.719 9.991.532 - 10.616.548 y = 2E+07x^-0,1381 Truk Biasa (b) 9.129.519 160.910 9.044.424 - 9.214.613 y = 1E+07x^-0,0193 2 Dump Truk (a) 9.629.500 832.436 9.318.219 - 9.940.780 y = 2E+07x^-0,1783 Dump Truk (b) 8.000.000 - - - - y = 8E+06 3 Arm Roll (a) 11.629.500 832.436 11.318.219 - 11.940.780 y = 2E+07x^-0,1484 Arm Roll (b) 10.000.000 - - - - y = 1E+07 4 Compactor Truk (a) 24.888.499 2.497.308 23.954.657 - 25.822.340 y = 6E+07x^-0,2059 Compactor Truk (b) 20.000.000 - - - - y = 2E+07
Keterangan : Idem tabel A.7
Tabel A.9 Biaya Spesifik Investasi Pengangkutan Sampah (Rp/ ton)
Keterangan : Idem tabel A.7 Tabel A.10 Analisa Statistik Deskriptik Biaya Spesifik Operasi dan pemeliharaan Sistem Pengangkutan Sampah
Kota/Kabupaten Biaya (Rp/th) Biaya (Rp/m3) Surabaya 506,46 Medan 2.092.126.983,45 3.925,30 Bandung 8.486.396.022,48 4.213,38 Jakarta Barat 12.303.171.168,99 6.425,40 Jakarta Selatan 2.149.944.345,71 1.911,13 Jakarta Pusat 13.619.333.455,95 7.428,86 Jakarta timur 3.740,19 Depok 237.399.560,10 2.155,05 Manado
Biaya Spesifik Investasi Persampahan
Rp/m3 Sampah No Komponen
Rata-rata SD Interval Model Pengangkutan Sampah
1 Truk Biasa (a) 35.216.159 3.342.875 33.966.127 - 36.466.191 y = 5E+07x^-0,1606 Truk Biasa (b) 30.518.075 643.641 30.177.698 - 30.858.451 y = 3E+07x^-0,023 2 Dump Truk (a) 36.517.998 3.329.743 35.272.876 - 37.763.120 y = 6E+07x^-0,1877 Dump Truk (b) 30.000.000 - - - - y = 3E+07 3 Arm Roll (a) 46.517.998 2.072.642 45.742.956 - 47.293.041 y = 7E+07x^-0,1484 Arm Roll (b) 40.000.000 - - - - y = 4E+07 4 Compactor Truk (a) 99.553.995 9.989.230 95.818.629 - 103.289.361 y = 2E+08x^-0,2059 Compactor Truk (b) 80.000.000 - - - - y = 8E+07
A-5
Kota/Kabupaten Biaya (Rp/th) Biaya (Rp/m3) Bogor 6.194,41 Yogyakarta 3.013,36 Samarinda 971,59 Makasar 2.039.52 Balikpapan 16.762,25
Rata-rata 5.555.481.648,10 4.236,71 Standar Deviasi 5.800.648.864,00 4.249,49
Maksimum 13.619.333.455,95 7.428,86 Minimum 2.092.126.983,45 1.911,13
Range (Interval) 11.527.206.471,51 5.517,73 Median (Q2) 8.486.396.022,48 4.213,38
Q3 12.303.171.168,99 6.452,40 Q1 2.149.944.345,71 3.925,30
Interquartile Range (Interval) 10.153.226.823,27 2.527,10
Keterangan : Biaya merupakan biaya penyesuaian tahun 2006
Tabel A.11 Model Biaya Investasi Instalasi Pengomposan Sampah
Nilai No. Lokasi Model
Determinasi (R2) 1 Indonesia, Biaya Investasi (Rp)
y = 2E+07e^0,0035x 0,9832
2 Luar Negeri, Biaya
Investasi (US$)
y = 993,002e^0,0052x 0,6818
3 Indonesia, biaya Spesifik (Rp)
y = 4E+06e^0,0008x 0,8415
Tabel A.12 Biaya Spesifik Investasi Instalasi WTE Uap, Liatrik, Uap dan Listrik
Biaya Spesifik Investasi Persampahan (US $ / Ton) No Komponen
Rata-rata SD Interval Model
Waste To Energy 1 Energi Uap 153.307 148.122 29.454 - 277.160 y = -60,247Ln(x)+510,774 2 Energi Listrik 14.897 932 14.633 - 15.160 y = 37,417x^0,1294 3 Energi Uap &
Listrik 135.220 8.192 130.775 - 139.664 y = 204364x^-0,0682
A-6
Tabel A.13 Biaya Spesifik Investasi Alat Berat TPA
Biaya Spesifik Investasi Persampahan No Komponen
Rata-rata SD Interval Model Alat Berat TPA (Buldozer)
1 Rp/orang 8.608 965 8.247 - 8.969 y = 32810x^-1,1026
2 Rp/m3 3.266.332 385.988 3.121.996 - 3.410.668 y = 7E+06x^-
0,1076 3 Rp/ton 11.065.330 1.543.951 10.487.986 - 11.642.674 y = 2E+07^-0,1249
Tabel A.14 Analisa Statistik Deskriptik Biaya Spesifik Operasi dan pemeliharaan Sistem Pembuangan Akhir Sampah
Kota/Kabupaten Biaya (Rp/th) Biaya (Rp/m3) Surabaya 66,17 Medan 784.547.618,62 1.472,32 Bandung 4.275.974.106,71 15.282,93 Jakarta Barat 13.275.996.771,07 6.962,59 Jakarta Selatan 274.331.500,80 2.600,20 Jakarta Pusat 12.764.524.575,68 6.962,59 Jakarta timur 1.170,09 Depok 27.160.389,10 246,55 Manado Bogor 3.278,02 Yogyakarta 2.349,34 Samarinda 517,62 Makasar 509,88 Balikpapan 1.885,29
Rata-rata 5.233.755.827,00 3.331,05 Standar Deviasi 6.225.872.510,02 653.971,00
Maksimum 13.275.996.771,07 15.282,93 Minimum 274.331.500,80 1.472,32
Range (Interval) 13.001.665.270,27 13.810,61 Median (Q2) 4.275.974.106,71 6.962,59
Q3 12.764.524.575,68 6.962,59 Q1 784.547.618,62 2.600,20
Interquartile Range (Interval) 11.979.976.857,06 4.362,39
Keterangan : Biaya merupakan biaya penyesuaian tahun 2006
A-7
Tabel A.15 Analisa Statistik Deskriptik Biaya Spesifik Sistem Pengelolaan Sampah
Kota/Kabupaten Biaya (Rp/th) Biaya (Rp/m3) Surabaya 1.079,08 Medan 4.445.770.324,93 8.342,27 Bandung 24.622.870.340,63 24.096,77 Jakarta Barat 31.776.614.630,06 16.665,24 Jakarta Selatan 4.293.900.252,71 6.179.17 Jakarta Pusat 35.840.259.567,19 20.938,76 Jakarta timur 8.521,67 Depok 264.559.949,20 2.401,60 Manado Bogor 11.012,57 Yogyakarta 11.416,61 Samarinda 4.112,87 Makasar 3.441,69 Balikpapan 29.132,61
Rata-rata 16.873.995.844,12 11.333,92 Standar Deviasi 15.687.225.488,58 8.866,03
Maksimum 35.840.259.567,19 24.096,77 Minimum 4.293.900.252,71 6.179.17
Range (Interval) 31.546.359.314,47 17.917,60 Median (Q2) 24.622.870.340,63 16.665,24
Q3 31.776.614.630,06 20.938,76 Q1 4.445.770.324,93 8.342,27
Interquartile Range (Interval) 27.330.844.305,14 12.596,49
Keterangan : Biaya merupakan biaya penyesuaian tahun 2006
B-1
LAMPIRAN B Grafik Hasil Simulasi Model Biaya Spesifik Investasi
Biaya Investasi Transfer Depo 1y = 3734x + 6E+07
R2 = 0.9889
0200000000400000000600000000800000000
10000000001200000000140000000016000000001800000000
0 100000 200000 300000 400000 500000
Jumlah Penduduk (orang)
Biay
a In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 1
y = 13588x-0.0979
R2 = 0.9057
01000
200030004000
50006000
0 100000 200000 300000 400000 500000 600000
Jumlah Penduduk (orang)
Bia
ya S
pesi
fik(R
p/or
ang)
Biaya Investasi Transfer Depo 1
y = 3750xR2 = 1
0500000000
1000000000150000000020000000002500000000300000000035000000004000000000
0 200000 400000 600000 800000 1000000
1200000
Jumlah Penduduk (orang)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 1
y = 3750R2 = #N/A
0
1000
2000
3000
4000
0 200000 400000 600000 800000 1000000 1200000
Jumlah Penduduk (orang)
Bia
ya S
pesi
fik(R
p/or
ang)
B-2
Biaya Investasi Transfer Depo 1y = 2E+06x + 5E+07
R2 = 0.9932
0
500000000
1000000000
1500000000
2000000000
2500000000
0 200 400 600 800 1000 1200 1400
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi TransferDepo 1 y = 3E+06x-0.064
R2 = 0.8973
0500000
10000001500000
20000002500000
3000000
0 200 400 600 800 1000 1200 1400
Volume Sampah (m3)
Bia
ya S
pesi
fik (R
p/m
3)
Biaya Investasi Transfer Depo 1y = 2E+06x
R2 = 1
0500000000
1000000000150000000020000000002500000000300000000035000000004000000000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi TransferDepo 1
y = 2E+06R2 = #N/A
0
500000
1000000
1500000
2000000
2500000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Bia
ya S
pesi
fik (R
p/m
3)
B-3
Biaya Investasi Transfer Depo 1y = 6E+06x + 5E+07
R2 = 0.9932
0
500000000
1000000000
1500000000
2000000000
2500000000
0 50 100 150 200 250 300 350
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 1
y = 1E+07x-0.083
R2 = 0.9021
0
2000000
4000000
6000000
8000000
10000000
0 50 100 150 200 250 300 350
Berat sampah (ton)
Bia
ya S
pesi
fik (R
p/to
n)
Biaya Investasi Transfer Depo 1y = 6E+06x
R2 = 1
0500000000
1000000000150000000020000000002500000000300000000035000000004000000000
0 100 200 300 400 500 600 700
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 1 y = 6E+06
R2 = #N/A
01000000200000030000004000000500000060000007000000
0 100 200 300 400 500 600 700
Berat sampah (ton)
Bia
ya S
pesi
fik (R
p/to
n)
B-4
Biaya Investasi Transfer Depo 2y = 5000x + 2E+07
R2 = 0.9978
0
500000000
1000000000
1500000000
2000000000
2500000000
0 100000 200000 300000 400000 500000
Jumlah Penduduk (orang)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 2 y = 9319x-0.0495
R2 = 0.8717
01000200030004000500060007000
0 50000 100000 150000 200000 250000 300000 350000
Jumlah Penduduk (orang)
Bia
ya S
pesi
fik
(Rp/
oran
g)
Biaya Investasi Transfer Depo 2y = 5000x
R2 = 1
0
1000000000
2000000000
3000000000
4000000000
5000000000
6000000000
0 200000 400000 600000 800000 1000000 1200000
Jumlah Penduduk (orang)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 2 y = 5000
R2 = #N/A
0100020003000400050006000
0 200000 400000 600000 800000 1000000 1200000
Jumlah Penduduk (orang)
Bia
ya S
pesi
fik
(Rp/
oran
g)
B-5
Biaya Investasi Transfer Depo 2y = 2E+06x + 2E+07
R2 = 0.9978
0
500000000
1000000000
1500000000
2000000000
2500000000
0 200 400 600 800 1000 1200
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi TransferDepo 2 y = 3E+06x-0.0424
R2 = 0.8422
0500000
10000001500000
200000025000003000000
0 200 400 600 800 1000 1200
Volume Sampah (m3)
Bia
ya S
pesi
fik(R
p/m
3)
Biaya Investasi Transfer Depo 2y = 2E+06x
R2 = 1
0
1000000000
2000000000
3000000000
4000000000
5000000000
6000000000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi TransferDepo 2 y = 2E+06
R2 = #N/A
0
500000
1000000
1500000
2000000
2500000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Bia
ya S
pesi
fik(R
p/m
3)
B-6
Biaya Investasi Transfer Depo 2y = 8E+06x + 2E+07
R2 = 0.9978
0
500000000
1000000000
1500000000
2000000000
2500000000
0 50 100 150 200 250 300
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 2 y = 1E+07x-0.0495
R2 = 0.8717
0200000040000006000000
80000001000000012000000
0 50 100 150 200
Berat sampah (ton)
Bia
ya S
pesi
fik(R
p/to
n)
Biaya Investasi Transfer Depo 2y = 8E+06x
R2 = 1
0
1000000000
2000000000
3000000000
4000000000
5000000000
6000000000
0 100 200 300 400 500 600 700
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 2
y = 8E+06R2 = #N/A
0
2000000
4000000
6000000
8000000
10000000
0 100 200 300 400 500 600 700
Berat sampah (ton)
Bia
ya S
pesi
fik(R
p/to
n)
B-7
Biaya Investasi Transfer Depo 3y = 8270.2x + 1E+07
R2 = 0.9939
0
100000000
200000000
300000000
400000000
500000000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (orang)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 3
y = 24512x-0.1014
R2 = 0.846
02000400060008000
100001200014000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (orang)
Bia
ya S
pesi
fik
(Rp/
oran
g)
Biaya Investasi Transfer Depo 3 y = 8250xR2 = 1
01000000000200000000030000000004000000000500000000060000000007000000000
0 200000 400000 600000 800000 1000000
Jumlah Penduduk (orang)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 3
y = 8250R2 = #N/A
0
2000
4000
6000
8000
10000
0 200000 400000 600000 800000 1000000
Jumlah Penduduk (orang)
Bia
ya S
pesi
fik
(Rp/
oran
g)
B-8
Biaya Investasi Transfer Depo 3y = 3E+06x + 1E+07
R2 = 0.9939
0
100000000
200000000
300000000
400000000
500000000
0 20 40 60 80 100 120 140
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi TransferDepo 3
y = 5E+06x-0.1101
R2 = 0.8496
0
1000000
2000000
3000000
4000000
5000000
6000000
0 20 40 60 80 100 120 140
Volume Sampah (m3)
Bia
ya S
pesi
fik(R
p/m
3)
Biaya Investasi Transfer Depo 3y = 3E+06x
R2 = 1
0
1000000000
2000000000
30000000004000000000
5000000000
6000000000
7000000000
0 500 1000 1500 2000 2500
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi TransferDepo 3 y = 3E+06
R2 = #N/A
0500000
100000015000002000000250000030000003500000
0 500 1000 1500 2000 2500
Volume Sampah (m3)
Bia
ya S
pesi
fik(R
p/m
3)
B-9
Biaya Investasi Transfer Depo 3y = 1E+07x + 1E+07
R2 = 0.9939
0
100000000
200000000
300000000
400000000
500000000
0 5 10 15 20 25 30 35
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 3
y = 2E+07x-0.1279
R2 = 0.8569
0
5000000
10000000
15000000
20000000
0 5 10 15 20 25 30 35
Berat sampah (ton)
Bia
ya S
pesi
fik(R
p/to
n)
Biaya Investasi Transfer Depo 3y = 1E+07x
R2 = 1
0
1000000000
2000000000
3000000000
4000000000
5000000000
6000000000
7000000000
0 100 200 300 400 500 600
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiTransfer Depo 3
y = 1E+07R2 = #N/A
0
20000004000000
6000000
800000010000000
12000000
0 100 200 300 400 500 600
Berat sampah (ton)
Bia
ya S
pesi
fik(R
p/to
n)
B-10
Biaya Investasi Pengangkutan(Truk Biasa)
y = 21311x + 7E+07R2 = 0.9742
0200000000400000000600000000800000000
100000000012000000001400000000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (Orang)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Truk Biasa) y = 105890x-0.1445
R2 = 0.9497
05000
100001500020000250003000035000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (Orang)
Bia
ya S
pesi
fik (R
p/O
rang
)
Biaya Investasi Pengangkutan(Truk Biasa)
y = 21395x + 9E+07R2 = 1
0
5000000000
10000000000
15000000000
20000000000
25000000000
0 200000 400000 600000 800000 1000000
1200000
Jumlah Penduduk (Orang)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Truk Biasa) y = 28220x-0.0203
R2 = 0.8288
21000
21500
22000
22500
23000
23500
0 200000 400000 600000 800000 1000000 1200000
Jumlah Penduduk (Orang)
Bia
ya S
pesi
fik (R
p/O
rang
)
B-11
Biaya Investasi Pengangkutan(Truk Biasa)
y = 9E+06x + 7E+07R2 = 0.9742
0200000000400000000600000000800000000
100000000012000000001400000000
0 20 40 60 80 100 120 140
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Truk Biasa)
y = 2E+07x-0.1381
R2 = 0.9489
02000000400000060000008000000
100000001200000014000000
0 20 40 60 80 100 120 140
Volume Sampah (m3)
Bia
ya S
pesi
fik (R
p/m
3)
Biaya Investasi Pengangkutan(Truk Biasa) y = 9E+06x + 9E+07
R2 = 1
0
5000000000
10000000000
15000000000
20000000000
25000000000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Truk Biasa) y = 1E+07x-0.0193
R2 = 0.8284
8800000
9000000
9200000
9400000
9600000
9800000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Bia
ya S
pesi
fik (R
p/m
3)
B-12
Biaya Investasi Pengangkutan(Truk Biasa)
y = 3E+07x + 7E+07R2 = 0.9742
0200000000400000000600000000800000000
100000000012000000001400000000
0 5 10 15 20 25 30 35
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Truk Biasa) y = 5E+07x-0.1606
R2 = 0.9517
0
10000000
20000000
30000000
40000000
50000000
0 5 10 15 20 25 30 35
Berat Sampah (ton)
Bia
ya S
pesi
fik (R
p/to
n)
Biaya Investasi Pengangkutan(Truk Biasa) y = 3E+07x + 9E+07
R2 = 1
0
5000000000
10000000000
15000000000
20000000000
25000000000
0 100 200 300 400 500 600 700
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Truk Biasa) y = 3E+07x-0.023
R2 = 0.8299
295000003000000030500000310000003150000032000000325000003300000033500000
0 100 200 300 400 500 600 700
Berat Sampah (ton)
Bia
ya S
pesi
fik (R
p/to
n)
B-13
Biaya Investasi Pengangkutan(Dump Truk)
y = 19164x + 1E+08R2 = 0.9394
0
200000000
400000000
600000000
800000000
1000000000
1200000000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (Orang)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Dump Truk)
y = 152476x-0.1845
R2 = 0.9696
05000
100001500020000250003000035000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (Orang)
Bia
ya S
pesi
fik (R
p/O
rang
)
Biaya Investasi Pengangkutan(Dump Truk) y = 20000x
R2 = 1
0
5000000000
10000000000
15000000000
20000000000
25000000000
0 200000 400000 600000 800000 1000000
1200000
Jumlah Penduduk (Orang)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Dump Truk) y = 20000
R2 = #N/A
0
5000
10000
15000
20000
25000
0 200000 400000 600000 800000 1000000 1200000
Jumlah Penduduk (Orang)
Bia
ya S
pesi
fik (R
p/O
rang
)
B-14
Biaya Investasi Pengangkutan(Dump Truk) y = 8E+06x + 1E+08
R2 = 0.9394
0
200000000
400000000600000000
800000000
1000000000
1200000000
0 20 40 60 80 100 120 140
Volume sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Dump Truk) y = 2E+07x-0.1783
R2 = 0.9691
02000000400000060000008000000
100000001200000014000000
0 50 100 150
Volume sampah (m3)
Bia
ya S
pesi
fik (R
p/m
3)
Biaya Investasi Pengangkutan(Dump Truk) y = 8E+06x
R2 = 1
0
5000000000
10000000000
15000000000
20000000000
25000000000
0 500 1000 1500 2000 2500 3000
Volume sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Dump Truk) y = 8E+06
R2 = #N/A
0
2000000
4000000
6000000
8000000
10000000
0 500 1000 1500 2000 2500 3000
Volume sampah (m3)
Bia
ya S
pesi
fik (R
p/m
3)
B-15
Biaya Investasi Pengangkutan(Dump Truk) y = 3E+07x + 1E+08
R2 = 0.9394
0
200000000
400000000600000000
800000000
1000000000
1200000000
0 5 10 15 20 25 30 35
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Dump Truk) y = 6E+07x-0.1877
R2 = 0.9698
0
10000000
20000000
30000000
40000000
50000000
0 10 20 30 40
Berat Sampah (ton)
Bia
ya S
pesi
fik (R
p/to
n)
Biaya Investasi Pengangkutan(Dump Truk) y = 3E+07x
R2 = 1
0
5000000000
10000000000
15000000000
20000000000
25000000000
0 100 200 300 400 500 600 700
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Dump Truk) y = 3E+07
R2 = #N/A
05000000
100000001500000020000000250000003000000035000000
0 200 400 600 800
Berat Sampah (ton)
Bia
ya S
pesi
fik (R
p/to
n)
B-16
Biaya Investasi Pengangkutan(Arm-roll Truk) y = 23955x + 1E+08
R2 = 0.9394
0
500000000
1000000000
1500000000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (Orang)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi Pengangkutan(Arm-roll Truk)
y = 134579x-0.1538
R2 = 0.9671
0
10000
20000
30000
40000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (Orang)
Bia
ya S
pesi
fik
(Rp/
oran
g)
Biaya Investasi Pengangkutan(Arm-roll Truk) y = 25000x
R2 = 1
05000000000
1000000000015000000000200000000002500000000030000000000
0 2E+05 4E+05 6E+05 8E+05 1E+06 1E+06
Jumlah Penduduk (Orang)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi Pengangkutan(Arm-roll Truk)
y = 25000R2 = #N/A
05000
1000015000200002500030000
0 200000 400000 600000 800000 1000000 1200000
Jumlah Penduduk (Orang)
Bia
ya S
pesi
fik
(Rp/
oran
g)
B-17
Biaya Investasi Pengangkutan(Arm-roll Truk) y = 1E+07x + 1E+08
R2 = 0.9394
0
500000000
1000000000
1500000000
0 50 100 150
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi Pengangkutan(Arm-roll Truk)
y = 2E+07x-0.1484
R2 = 0.9667
02000000400000060000008000000
10000000120000001400000016000000
0 20 40 60 80 100 120 140
Volume Sampah (m3)
Biay
a Sp
esifik
(Rp/
m3)
Biaya Investasi Pengangkutan(Arm-roll Truk)
y = 1E+07xR2 = 1
05000000000
1000000000015000000000200000000002500000000030000000000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi Pengangkutan(Arm-roll Truk)
y = 1E+07R2 = #N/A
0
2000000
4000000
6000000
8000000
10000000
12000000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Biay
a Sp
esifik
(Rp/
m3)
B-18
Biaya Investasi Pengangkutan(Arm-roll Truk)
y = 4E+07x + 1E+08R2 = 0.9394
0
500000000
1000000000
1500000000
0 10 20 30 40
Berat Sampah (Ton)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi Pengangkutan(Arm-roll Truk)
y = 7E+07x-0.1484
R2 = 0.9667
0
10000000
20000000
30000000
40000000
50000000
60000000
0 5 10 15 20 25 30 35Berat Sampah (ton)
Biay
a Sp
esifik
(Rp/
ton)
Biaya Investasi Pengangkutan(Arm-roll Truk)
y = 4E+07xR2 = 1
05000000000
1000000000015000000000200000000002500000000030000000000
0 200 400 600 800
Berat Sampah (Ton)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik Investasi Pengangkutan(Arm-roll Truk)
y = 4E+07R2 = #N/A
0
10000000
20000000
30000000
40000000
50000000
0 100 200 300 400 500 600 700Berat Sampah (ton)
Biay
a Sp
esifik
(Rp/
ton)
B-19
Biaya Investasi Pengangkutan(Compactor Truk)
y = 47909x + 3E+08R2 = 0.9394
0
500000000
10000000001500000000
2000000000
2500000000
3000000000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (Orang)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Compactor Truk)
y = 526472x-0.2128
R2 = 0.9718
0
20000
40000
60000
80000
100000
0 10000 20000 30000 40000 50000 60000
Jumlah Penduduk (Orang)
Bia
ya S
pesi
fik (R
p/O
rang
)
Biaya Investasi Pengangkutan(Compactor Truk)
y = 50000xR2 = 1
0100000000002000000000030000000000400000000005000000000060000000000
0 200000 400000 600000 800000 1000000
1200000
Jumlah Penduduk (Orang)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Compactor Truk) y = 50000
R2 = #N/A
0
1000020000
30000
4000050000
60000
0 200000 400000 600000 800000 1000000 1200000
Jumlah Penduduk (Orang)
Bia
ya S
pesi
fik (R
p/O
rang
)
B-20
Biaya Investasi Pengangkutan(Compactor Truk)
y = 2E+07x + 3E+08R2 = 0.9394
0
500000000
10000000001500000000
2000000000
2500000000
3000000000
0 20 40 60 80 100 120 140
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Compactor Truk)
y = 6E+07x-0.2059
R2 = 0.9712
05000000
100000001500000020000000250000003000000035000000
0 20 40 60 80 100 120 140
Volume Sampah (m3)
Bia
ya S
pesi
fik (R
p/m
3)
Biaya Investasi Pengangkutan(Compactor Truk)
y = 2E+07xR2 = 1
0100000000002000000000030000000000
400000000005000000000060000000000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Compactor Truk) y = 2E+07
R2 = #N/A
0
5000000
10000000
15000000
20000000
25000000
0 500 1000 1500 2000 2500 3000
Volume Sampah (m3)
Bia
ya S
pesi
fik (R
p/m
3)
B-21
Biaya Investasi Pengangkutan(Compactor Truk)
y = 8E+07x + 3E+08R2 = 0.9394
0
500000000
10000000001500000000
2000000000
2500000000
3000000000
0 5 10 15 20 25 30 35
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Compacto Truk)
y = 2E+08x-0.2059
R2 = 0.9712
020000000400000006000000080000000
100000000120000000140000000
0 5 10 15 20 25 30 35
Berat Sampah (ton)
Bia
yaSp
esifi
k (R
p/to
n)
Biaya Investasi Pengangkutan(Compactor Truk)
y = 8E+07xR2 = 1
0
1000000000020000000000
30000000000
4000000000050000000000
60000000000
0 100 200 300 400 500 600 700
Berat Sampah (ton)
Bia
ya In
vest
asi (
Rp)
Biaya Investasi Pengangkutan(Compacto Truk) y = 8E+07
R2 = #N/A
0
20000000
40000000
60000000
80000000
100000000
0 100 200 300 400 500 600 700
Berat Sampah (ton)
Bia
yaSp
esifi
k (R
p/to
n)
B-22
Grafik Simulasi Biaya Investasi Buldozer Vs Jumlah Penduduk
y = 7942.2x + 2E+08R2 = 0.9885
0
2000000000
4000000000
6000000000
8000000000
10000000000
12000000000
0 200000
400000
600000
800000
1E+06 1E+06 1E+06
Jumlah Penduduk (orang)
Bia
ya In
vest
asi (
Rp)
Biaya Spesifik InvestasiBuldozer TPA
y = 32810x-0.1026
R2 = 0.8214
02000400060008000
100001200014000
0 200000 400000 600000 800000 1E+06 1E+06 1E+06
Jumlah Penduduk Terlayani (orang)
Bia
ya S
pesi
fik
(Rp/
oran
g)
Grafik Simulasi Biaya Investasi Buldozer Vs Produksi Sampah
y = 3E+06x + 2E+08R2 = 0.9885
0
20000000004000000000
6000000000
800000000010000000000
12000000000
0 500 1000 1500 2000 2500 3000 3500
Produksi Sampah (m3/hari)
Bia
ya In
vest
asi (
Rp)
Grafik Simulasi Biaya Spesifik Investasi Buldozer Vs Produksi Sampah
y = 7E+06x-0.1076
R2 = 0.8237
01000000
20000003000000
40000005000000
6000000
0 500 1000 1500 2000 2500 3000 3500
Produksi Sampah (m3/hari)
Bia
ya S
pesi
fik(R
p/m
3)
B-23
Grafik Biaya Investasi Buldozer vs Berat Sampah
y = 1E+07x + 2E+08R2 = 0.9885
0
2000000000
4000000000
6000000000
8000000000
10000000000
12000000000
0 200 400 600 800
Produksi Sampah (ton/hari)
Bia
ya In
vest
asi (
Rp)
Grafik Biaya spesifik Investasi Buldozer Vs Berat Sampah
y = 2E+07x-0.1249
R2 = 0.8316
0
5000000
10000000
15000000
20000000
0 200 400 600 800
Produksi sampah (ton/hari)
Bia
ya S
pesi
fik(R
p/to
n)
C-1
LAMPIRAN C
Tampilan Program
Tabel C.1 Tampilan Menu Penjelasan Umum
Tabel C.2 Tampilan Menu Skala Penanganan Sampah
C-2
Tabel C.3 Tampilan Menu Sumber Sampah
Tabel C.4 Tampilan Menu Teknis Operasional Pengelolaan Sampah
C-3
Tabel C.5 Tampilan Menu Sistem Pengelolaan Sampah terpadu
Tabel C.6 Tampilan Menu Aspek Pembiayaan Persampahan
C-4
Tabel C.7 Tampilan Menu Biaya Spesifik Investasi Sistem Pengumpulan dan Pewadahan
Tabel C.8 Tampilan Menu Biaya Spesifik Investasi Sistem Pengangkutan
C-5
Tabel C.9 Tampilan Menu Biaya Spesifik Investasi Pengolahan Sampah
Tabel C.10 Tampilan Menu Biaya Spesifik Investasi Sistem Pembuangan Akhir Sampah
C-6
Tabel C.11 Tampilan Menu Biaya Spesifik Investasi Pengelolaan Sampah di Indonesia
Tabel C.12 Tampilan Menu Penentuan Biaya Spesifik Investasi Kota Besar di Indonesia
C-7
Tabel C.13 Tampilan Menu Penentuan Alternatif Biaya Investasi Dari Alat Berat