Report Date: 05/27/2016
DOE: 8
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: LARRY TERRELL / N/A
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
002
Spud Date: 11/28/2015
DOL: 2 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 11
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 64.00
API #: 4210542309
Current Activity: TOE PREP-STANDBY FOR ADJACENT WELL OPERATIONS.
24 Hr Summary: PREP PAD FOR FRAC OPS, CUT RAT HOLE BELOW B SECTION, MODIFY CELLAR SKIRTING
STANDBY FOR ADJACENT WELL OPERATIONS.24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:00 1.00 P SITEPRE 44 WOD WAITING FOR DAYLIGHT TO RESUME OPERATIONS
07:00 07:30 0.50 P SITEPRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA WITH CONSTRUCTION CREW ON OPERATIONS
07:30 14:00 6.50 P SITEPRE 18 OTHR INSTALL ROCK TO REPAIR LOCATION
14:00 14:30 0.50 P SITEPRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA WITH LEASE CREWS ON OPERATIONS.
PERFORMED HOT WORK PERMIT AND CONFINED SPACE ENTRY PERMIT.
14:30 17:30 3.00 P SITEPRE 09 EQRP CUT RAT HOLE BELOW CASING VALVES. WELDED CAP ON TOP. MODIFIED CELLAR SKIRTING,
CUTTING THE SIDE SLIGHTLY TO BE ABLE TO INSTALL FLOWBACK EQUIPMENT ON CASING
VALVES
17:30 06:00 12.50 P SITEPRE 73 WOOWO STANDBY FOR COMPLETION OF 41-10-OH TOE PREP
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
5/28/2016 8:02:21AMPrinted: Page 1 of 1
Report Date: 05/29/2016
DOE: 10
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: LARRY TERRELL / N/A
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
003
Spud Date: 11/28/2015
DOL: 3 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 30
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 204.00
API #: 4210542309
Current Activity: TOE PREP- WAITING ON DAYLIGHT TO RUN RISERS TO ZIPPER MANIFOLD
24 Hr Summary: NU FRAC STACK, MIRU ELU, MIRU PUMPDOWN EQUIPMENT
RUN RISERS TO ZIPPER, TEST FRAC STACK AND ZIPPER24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:00 1.00 P MIRU 44 WOD WAITING ON DAYLIGHT TO RESUME OPERATIONS
07:00 08:00 1.00 P MIRU 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS. HELD ORIENTATIONS ON
LOCATION
08:00 12:00 4.00 P MIRU 01 MIRU MIRU LAFAYETTE CRANE. UNLOAD FRAC WELL CONTROL EQUIPMENT
12:00 20:00 8.00 P WHDTRE 16 NUND INSTALLED FRAC STACK CONSISTING OF 7-1/16" 10K: MANUAL MASTER VALVE, HYDRAULIC
MASTER VALVE, 3"X2" FLOW CROSS, FRAC HEAD, HYDRAULIC CROWN VALVE. ASSEMBLED
ZIPPER MANIFOLD
20:00 06:00 P WHDTRE 18 OTHR SDFN
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
5/30/2016 8:01:11AMPrinted: Page 1 of 1
Report Date: 05/31/2016
DOE: 12
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: LARRY TERRELL / N/A
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
004
Spud Date: 11/28/2015
DOL: 4 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 14
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 84.00
API #: 4210542309
Current Activity: TOE PREP- MONITORINF SURFACE CASING ANNULUS
24 Hr Summary: TESTED PRODUCTION CASING, SHIFTED TOE SLEEVE
AWAITING RISER INSTALATION24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 13:00 7.00 P WHDTRE 73 WOOWO WAITING FOR COMPLETION OF ADJACENT WELL OPERATIONS
13:00 16:30 3.50 P WHDTRE 16 NUND REPLACED 7 1/16" 10K CROWN VALVE DUE TO PACKING LEAKING. TESTED FRAC STACK TO 250
PSI LOW AND 10,000 PSI HIGH. ALL TESTS GOOD.
16:30 19:30 3.00 P WBP 08 DHEQ PRIMED FTSI PUMPS. TESTED LINES TO 9,500 PSI. OPENED WELL. TESTED CASING TO 250 PSI
LOW, 7,700 AND 8,000 PSI HIGH. HELD FOR EACH FOR 15 MINS. ALL TESTS GOOD. PRESSURED
UP TO 8,200 PSI. WAITED 2 MINS. WALKED PRESSURE TO 8,400 PSI. WAITED 2 MINS. WALKED
PRESSURE TO 8,600 PSI. WALKED PRESSURE TO 8,800 PSI. WAITED 2 MINS. WALKED
PRESSURE TO 8,929 PSI SHIFTING SLEEVE. ESTABLISHED INJECTION RATE OF 10 BPM @4,800
PSI.
ISIP- 2,809 PSI
1 MIN- 2,160 PSI
3 MIN- 2,003 PSI
5 MIN- 1,965 PSI
SHUT WELL IN. PRESSURED UP ON 9 5/8" ANNULUS TO 1,500 PSI. PRESSURE BLED BACK TO
960. PRESSURED BACK UP TO 1,500 PSI.
1 MIN 1,488 PSI
3 MIN 1,430 PSI
5 MIN 1,407 PSI
CONTACTED HOUSTON. DECISION WAS MADE TO LEAVE PRESSURE ON SURFACE TO MONITOR
OVERNIGHT.
19:30 06:00 10.50 P WBP 18 OTHR SWIFN
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
5/31/2016 8:04:07AMPrinted: Page 1 of 1
Report Date: 06/02/2016
DOE: 14
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: LARRY TERRELL / N/A
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
011
Spud Date: 11/28/2015
DOL: 7 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 0
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 0.00
API #: 4210542309
Current Activity: AWAITING DAYLIGHT TO RESUME OPERATIONS
24 Hr Summary: INSTALLED RISERS FROM FRAC HEAD TO ZIPPER MANAFOLD
REPLACE THREADED RISERS, RETEST ZIPPER24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 10:00 4.00 P WHDTRE 18 OTHR STARTING LATE DUE TO WORKING LATE NIGHT BEFORE
10:00 10:30 0.50 P WHDTRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS
10:30 21:30 11.00 P WHDTRE 30 SEQP INSTALLED RISERS TO ZIPPER FROM FRAC HEAD. TESTED TO 250 PSI LOW AND ATTEMPTED TO
TEST TO 9,500 PSI HIGH. THREADED PEICE OF 3" FLOWBACK IRON SEPERATED.
21:30 06:00 8.50 P WHDTRE 18 OTHR SDFN
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/2/2016 8:05:06AMPrinted: Page 1 of 1
Report Date: 06/03/2016
DOE: 15
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: LARRY TERRELL / N/A
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
012
Spud Date: 11/28/2015
DOL: 8 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 0
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 0.00
API #: 4210542309
Current Activity: WAITING ON DAYLIGHT TO INSTALL REPLACEMENT RISER IRON
24 Hr Summary: INSPECTED RISER IRON, RD RISER IRON
REPLACE RISERS, AND 2" FLOWBACK IRON, RETEST ZIPPER24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:00 1.00 N WHDTRE 30 SEQP WAITING ON DAYLIGHT TO RESUME OPERATIONS
07:00 07:30 0.50 N WHDTRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS
07:30 14:00 6.50 N WHDTRE 30 SEQP INSPECTED EVERY JOINT OF SPARTAN IRON AGAINST CERTIFICATIONS. DECISION WAS MADE
TO REPLACE ALL RISER AND FLOWBACK IRON.
14:00 19:30 5.50 N WHDTRE 30 SEQP RDMO ALL SPARTAN 3" RISER IRON AND 2" FLOWBACK IRON
19:30 06:00 10.50 N WHDTRE 18 OTHR SDFN
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/3/2016 8:06:42AMPrinted: Page 1 of 1
Report Date: 06/04/2016
DOE: 16
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: LARRY TERRELL / N/A
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
013
Spud Date: 11/28/2015
DOL: 9 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 0
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 0.00
API #: 4210542309
Current Activity: TOR PREP COMPLETE AWAITING FRAC OPS
24 Hr Summary: REINSTALLED RISERS TO ZIPPER AND TEST
MIRU FTSI24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 N WHDTRE 44 WOD WAITING ON DAYLIGHT TO RESUME OPERATIONS
06:30 07:00 0.50 N WHDTRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS.
07:00 01:30 18.50 N WHDTRE 16 NUND INSTALLED RISERS FROM FRAC TREE TO ZIPPER MANIFOLD. VERIFIED ALL CAPS ON ZIPPER
MANIFOLD WERE TIGHT. REPOSITIONED ACCUMULATORS TO MIRU CRANE. TEST RISERS TO
250 PSI LOW HELD FOR 5 MINS. ATTEMPT TO TEST TO 8,500 PSI HIGH. IDENTIFIED MULTIPLE
LEAKS IN RISER IRON. REPLACED WECO SEALS. FLANGE ALSO LEAKING ON FRAC HEAD
RISER FLANGE ON ZIPPER. RETORQUED THE HEAD. SHELL TEST ALL ZIPPER AND RISER
COMPONENTS TOGETHER (ALL THREE WELLS) TO 250 PSI LOW HELD FOR 5 MINS. AND 8,500
PSI HIGH FOR 15 MINS. BOTH TESTS WERE GOOD.TEST MANUAL VALVES ON ZIPPER TO 250
LOW FOR 5 MINS AND 8,500 PSI HIGH FOR 15 MINS. ALL TESTS GOOD. TEST HYDRAULIC
VALVES ON ZIPPER TO 250 LOW FOR 5 MINS AND 8,500 PSI HIGH FOR 15 MINS. ALL TESTS
GOOD. BLED ALL PRESSURE FROM ZIPPER AND SECURED WELL BY BLOSING ALL VALVES ON
TREE AND ZIPPER.
01:30 06:00 4.50 P WHDTRE 18 OTHR FINAL REPORT- AWAITING FRAC MIRU
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/4/2016 8:03:09AMPrinted: Page 1 of 1
Report Date: 06/08/2016
DOE: 20
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/TERREL, L. / J. CASTILLO/ GOSS, DJ
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
015
Spud Date: 11/28/2015
DOL: 11 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: RIG UP FRAC
24 Hr Summary: RIG UP FRAC
START FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P MIRU 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION
06:30 17:30 11.00 P MIRU 01 MIRU SET SAND SILOS, MIRU FTSI FRAC SPREAD. MIRU FTSI WIRELINE AND ASSOCIATED
EQUIPMENT. tEST 3" RISERS, STACK & ZIPPER TO 9500 PSI. TEST WIRELINE BOP TO 8000 PSI.
17:30 06:00 12.50 P MIRU 01 MIRU RIG UP AND TEST FRAC AND WIRELINE EQUIPMENT
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/8/2016 8:03:47AMPrinted: Page 1 of 1
Report Date: 06/09/2016
DOE: 21
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/TERREL, L. / J. CASTILLO/ GOSS, DJ
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
016
Spud Date: 11/28/2015
DOL: 12 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WIRELINE POH
24 Hr Summary: 1 WIRELINE
START FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P MIRU 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 08:30 2.00 P MIRU 01 MIRU CONTINUE RIG UP AND TESTING SURFACE EQUIPMENT
08:30 09:30 1.00 P MIRU 28 SFTYMTG HELD PRE-PAD MEETING WITH PROJECT ENGINEER, OPERATIONS SUPERVISOR, AND ALL
ASSOCIATED SUPERVISION ON LOCATION. GO OVER WELL PROCEDURES AS WELL AS SAFETY
AND ADMINISTRATIVE NOTES.
09:30 14:00 4.50 P MIRU 01 MIRU CONTINUE RIG UP AND TESTING SURFACE EQUIPMENT
14:00 20:00 6.00 P STG01 73 WOOWO WOOWO
20:00 01:40 5.67 P STG01 35 STIM TOE PREPARATION: PUMPED 20 BBL INJECTION 13 BPM @ 7,350; 30 BBL HCL;ACID HIT PSI
DROPPED TO 6,700 PROCEED WITH FLUSH, 36 BPM @ 6,800; 517 TOTAL FLUID.
01:40 04:45 3.08 P STG01 21 PERF WL STAGE # 1. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ DUMMY PLUG & 8 - 1' x 3
1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT
5,823'. PU & PERF STAGE # 1 ON THE FLY AT 16,465' - 16,632' O/A. POH TO 500' & STANDBY
FOR FRAC. POH. ALL SHOTS FIRED. PUMPED 1059 BBLS
04:45 06:00 1.25 P STG01 73 WOOWO STANDBY FOR ADJACENT WELL OPERATIONS
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/9/2016 8:02:41AMPrinted: Page 1 of 1
Report Date: 06/10/2016
DOE: 22
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/TERREL, L. / J. CASTILLO/ GOSS, DJ
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
017
Spud Date: 11/28/2015
DOL: 13 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOOWO
24 Hr Summary: 1 FRAC, 1 WIRELINE
START FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG01 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 11:00 4.50 P STG01 35 STIM FRAC STAGE # 1 SLICKWATER - SICP 2,110. PUMP 60 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 6.631. ATR 72.9. MTP 8.213.
MTR 92.2. ISIP 2,635. FG 0.86 TCF 7,446 BBLS.
11:00 19:20 8.33 P STG02 73 WOOWO WOOWO
19:20 23:30 4.17 P STG02 21 PERF WL STAGE # 2. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ MAGNUM CPB & 6 - 1' x 3
1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/ MARKER JT AT
5,823'. SET PLUG @ 16,448' PU & PERF STAGE # 2 ON THE FLY AT 16,314' - 16,432' O/A. POH
TO 500' & STANDBY FOR FRAC. POH. ALL SHOTS FIRED. PUMPED 857 BBLS
23:30 06:00 6.50 P STG02 73 WOOWO STANDBY FOR ADJACENT WELL OPERATIONS
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/10/2016 8:03:28AMPrinted: Page 1 of 1
Report Date: 06/11/2016
DOE: 23
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/TERREL, L. / J. CASTILLO/ GOSS, DJ
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
018
Spud Date: 11/28/2015
DOL: 14 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOOWO
24 Hr Summary: 3 FRACS, 2 WIRELINE
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG02 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 09:30 3.00 P STG02 35 STIM FRAC STAGE # 2 SLICKWATER - SICP 1,960. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 6,276. ATR 76.4. MTP 7,762.
MTR 9.1.4. ISIP 2,971. FG 0.91 TCF 7,034 BBLS.
09:30 12:30 3.00 P STG03 21 PERF WL STAGE # 3. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ MAGNUM CPB & 8 - 1' x 3
1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT
5,823'. SET PLUG @ 16,448' PU & PERF STAGE # 3 ON THE FLY AT 16,233' - 16,282' O/A GUN 4-8
DID NOT FIRE. POH TO 500' & STANDBY FOR FRAC. POH. PUMPED 954 BBLS
NOTE: ONLY THREE GUNS FIRED.
12:30 14:00 1.50 N STG03 09 EQRP LAY DOWN LIVE GUNS, RE-HEAD WIRELINE TOOLS
14:00 17:45 3.75 N STG03 21 PERF CONTINUE WL STAGE # 3. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ DUMMY PLUG &
5 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 30 SHOTS. CORRELATE W/
MARKER JT AT 5,823'. CONT PERF STAGE # 3 ON THE FLY AT 16,114' - 16,215' (TOTAL STG 3
PERFS 16,114'-16,282') O/A. POH TO 500' & STANDBY FOR FRAC. POH. ALL SHOTS FIRED.
PUMPED 563 BBLS
17:45 22:55 5.17 P STG03 35 STIM FRAC STAGE # 3 SLICKWATER - SICP 2,218. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 6,107. ATR 74.1. MTP 7,628.
MTR 91.5. ISIP 3,258. FG 0.95 TCF 6,846 BBLS.
22:55 01:00 2.08 P STG04 21 PERF WL STAGE # 4. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ MAGNUM CPB & 8 - 1' x 3
1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT
5,823'. SET PLUG @ 16,097' PU & PERF STAGE # 4 ON THE FLY AT 15,915' - 16,081' . POH TO
500' & STANDBY FOR FRAC. POH. PUMPED 871 BBLS
01:00 02:00 1.00 P STG04 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS
02:00 04:00 2.00 P STG04 35 STIM FRAC STAGE # 4 SLICKWATER - SICP 2,281. PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 6,048. ATR 73.8. MTP 7,717
MTR 90.6. ISIP 3,236. FG 0.95 TCF 6,353 BBLS.
04:00 06:00 2.00 P STG04 73 WOOWO WOOWO
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/12/2016 8:07:05AMPrinted: Page 1 of 1
Report Date: 06/12/2016
DOE: 24
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
019
Spud Date: 11/28/2015
DOL: 15 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOOWO
24 Hr Summary: FRAC STG 5
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG05 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 09:00 2.50 P STG05 73 WOOWO WOOWO
09:00 11:00 2.00 P STG05 21 PERF WL STAGE # 5. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ MAGNUM CPB & 8 - 1' x 3
1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT
5,823'. SET PLUG @ 15,897' PU & PERF ON THE FLY AT 15,715' - 15,881' . POH TO 500' &
STANDBY FOR FRAC. POH. PUMPED 888 BBLS
11:00 12:00 1.00 P STG05 43 WOW SHUT DOWN DUE TO LIGHTENING
12:00 18:30 6.50 P STG05 73 WOOWO WOOWO
18:30 20:30 2.00 P STG05 35 STIM FRAC STAGE # 5 SLICKWATER - SICP 2,103. PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,636. ATR 73.8. MTP 7,541
MTR 90.7. ISIP 3,336. FG 0.97 TCF 6,673 BBLS.
20:30 21:00 0.50 P STG06 73 WOOWO WOOWO
21:00 22:30 1.50 P STG06 21 PERF WL STAGE # 6. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ W/ 5.5 TC CFP & 8 - 1' x 3
1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT
5,823'. SET PLUG @ 15,698' PU & PERF ON THE FLY AT 15,516' - 15,679' . POH TO 500' &
STANDBY FOR FRAC. POH. PUMPED 623 BBLS
22:30 06:00 7.50 P STG06 73 WOOWO WOOWO
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/12/2016 8:02:51AMPrinted: Page 1 of 1
Report Date: 06/13/2016
DOE: 25
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
020
Spud Date: 11/28/2015
DOL: 16 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOOWO
24 Hr Summary: FRAC STG 6
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG06 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 08:30 2.00 P STG06 43 WOW SHUT DOWN DUE TO LIFGTENING AND SEVERE STORM
08:30 20:00 11.50 P STG06 73 WOOWO WOOWO
20:00 22:00 2.00 P STG06 35 STIM FRAC STAGE # 6 SLICKWATER - SICP 1,928. PUMP 30 BBLS 15% ACID.30 PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,567. ATR 71.9. MTP 7,193
MTR 92. ISIP 3,371. FG 0.97 TCF 6,697 BBLS.
22:00 06:00 8.00 P STG07 73 WOOWO WOOWO
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/13/2016 8:01:31AMPrinted: Page 1 of 1
Report Date: 06/14/2016
DOE: 26
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
021
Spud Date: 11/28/2015
DOL: 17 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOOWO
24 Hr Summary: WOOWO
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG06 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 06:00 23.50 P STG07 73 WOOWO WOOWO
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/14/2016 8:02:07AMPrinted: Page 1 of 1
Report Date: 06/15/2016
DOE: 27
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
022
Spud Date: 11/28/2015
DOL: 18 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOOWO
24 Hr Summary: 1 FRAC, 1 WIRELINE
STANDBY FOR CT OPERATIONS ON 4110 OH24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG07 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 20:30 14.00 P STG07 73 WOOWO WOOWO
20:30 23:30 3.00 P STG07 21 PERF WL STAGE # 7. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ ECO BOSSHOG CPB & 8 - 1'
x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT
AT 5,823'. SET PLUG @ 15,498' PU & PERF STAGE # 4 ON THE FLY AT 15,314' - 15,478' . POOH
TO 500' & STANDBY FOR FRAC. POH. PUMPED 765 BBLS
23:30 02:00 2.50 P STG07 35 STIM FRAC STAGE # 7 SLICKWATER - SICP 1,879. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,957. ATR 69.3. MTP 8,046.
MTR 89.2. ISIP 3,548 FG 1 TCF 6,681 BBLS.
02:00 06:00 4.00 P STG08 73 WOOWO WOOWO-STANDBY FOR CT OPERATIONS ON 4110 OH
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/15/2016 8:01:04AMPrinted: Page 1 of 1
Report Date: 06/16/2016
DOE: 28
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
023
Spud Date: 11/28/2015
DOL: 19 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOOWO
24 Hr Summary: WOOWO
STANDBY FOR CT OPERATIONS ON 4110 OH24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG07 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 06:00 23.50 P STG07 73 WOOWO WOOWO
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/16/2016 8:01:59AMPrinted: Page 1 of 1
Report Date: 06/17/2016
DOE: 29
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
024
Spud Date: 11/28/2015
DOL: 20 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: FRAC IN PROGRESS
24 Hr Summary: 2- FRAC 3- WIRELINE
STANDBY FOR CT OPERATIONS ON 4110 OH24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG08 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 10:30 4.00 P STG08 73 WOOWO WOOWO
10:30 12:30 2.00 P MIRU 01 MIRU MIRU WLU AND ASSOCIATED EQUIP TO RESUME SIM-OPS
12:30 15:45 3.25 P STG08 21 PERF WL STAGE # 8. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB & 7 -
1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/ MARKER
JT AT 5,823'. SET PLUG @ 15,299' PU & PERF ON THE FLY AT 15,118' - 15,253' . POOH TO 500' &
STANDBY FOR FRAC. POH. PUMPED 540 BBLS
15:45 18:00 2.25 P STG08 35 STIM FRAC STAGE # 8 SLICKWATER - SICP 1,866. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,550. ATR 71.2. MTP 7,785.
MTR 95.5. ISIP 3,179 FG .94 TCF 7,299 BBLS.
18:00 19:00 1.00 P STG09 73 WOOWO WOOWO
19:00 19:30 0.50 P STG09 18 OTHR WATER TRANSFER PROBLEM
19:30 21:30 2.00 P STG09 21 PERF WL STAGE # 9. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB & 7 -
1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/ MARKER
JT AT 5,823'. SET PLUG @ 15,099' PU & PERF ON THE FLY AT 14,917' - 15,084' . POOH TO 500' &
STANDBY FOR FRAC. POH. PUMPED 520 BBLS
21:30 22:45 1.25 P STG09 73 WOOWO WOOWO
22:45 00:45 2.00 P STG09 35 STIM FRAC STAGE # 9 SLICKWATER - SICP 2,296. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,988. ATR 62.5. MTP 8,037.
MTR 89.4. ISIP 3,512 FG 1.0 TCF 6,776 BBLS.
00:45 03:00 2.25 P STG10 21 PERF WL STAGE # 10. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB & 7
- 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/ MARKER
JT AT 5,823'. SET PLUG @ 14,900' PU & PERF ON THE FLY AT 14,741' - 14,860' . POOH TO 500' &
STANDBY FOR FRAC. POH. PUMPED 640 BBLS
03:00 04:00 1.00 P STG10 73 WOOWO WOOWO
04:00 06:00 2.00 P STG10 35 STIM FRAC IN PROGRESS
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/17/2016 8:02:06AMPrinted: Page 1 of 1
Report Date: 06/18/2016
DOE: 30
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
025
Spud Date: 11/28/2015
DOL: 21 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOOWO
24 Hr Summary: 1 WL
STANDBY FOR CT OPERATIONS ON 4110 OH24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG11 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,
AND FALL PROTECTION
06:30 09:30 3.00 P STG11 21 PERF WL STAGE # 11. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB & 8
- 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER
JT AT 5,823'. SET PLUG @ 14,700' PU & PERF ON THE FLY AT 14,518' - 14,686' . POOH TO 500' &
STANDBY FOR FRAC. POH. PUMPED 533 BBLS
09:30 06:00 P STG11 73 WOOWO WOOWO
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/19/2016 8:03:49AMPrinted: Page 1 of 1
Report Date: 06/19/2016
DOE: 31
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: H. RAMIREZ / M. SHIELD / G. ALLGOOD / J. GARCIA / L. TERRELL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
026
Spud Date: 11/28/2015
DOL: 22 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: FRAC OPS- WAITING ON COMPLETION OF ADJACENT WELL OPERATIONS
24 Hr Summary: WAITING ON COMPLETION OF ADJACENT WELL OPERATIONS, FRAC STAGE 11
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 17:30 11.50 P STG11 73 WOOWO STAND BY FOR CT OPERATIONS ON THE "OH" WELL.
17:30 18:00 0.50 P STG11 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.
18:00 03:00 9.00 P STG11 73 WOOWO STAND BY FOR OPERATIONS ON THE "OH" WELL.
03:00 06:00 3.00 P STG11 35 STIM FRAC STAGE # 11 SLICKWATER - SICP 1,329. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,883. ATR 68.3. MTP 7,810.
MTR 94.1. ISIP 3,041 FG .92 TCF 6,855 BBLS.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/20/2016 8:06:25AMPrinted: Page 1 of 1
Report Date: 06/20/2016
DOE: 32
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / L. TERRELL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
027
Spud Date: 11/28/2015
DOL: 23 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: FRAC OPS- WL STAGE 13
24 Hr Summary: WL STAGES 12-13, FRAC STAGE 12
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 15:15 9.25 P STG12 73 WOOWO STANDBY FOR ADJACENT WELL OPERATIONS.
15:15 17:15 2.00 P STG12 21 PERF WL STAGE # 12. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
5 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 30 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 14,501' PU & PERF ON THE FLY AT 14,342' - 14,438'. POOH
TO 500' & STANDBY FOR FRAC. POH. ALL SHOTS FIRED. PUMPED 518 BBLS.
17:15 18:30 1.25 P WHDTRE 09 EQRP SCHEUDLED MAIINTENANCE - GREASE ZIPPER VALVES AND HYDRAULIC MASTER VALVE.
18:30 20:30 2.00 P STG12 35 STIM FRAC STAGE # 12 SLICKWATER - SICP 1,644. PUMP 30 BBLS 15% ACID.30 PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,567. ATR 71.9. MTP 7,193
MTR 92. ISIP 3,371. FG 0.97 TCF 6,775 BBLS.
20:30 03:30 7.00 P STG13 73 WOOWO STANDBY FOR "OH" AND "NH" OPERATIONS.
03:30 05:30 2.00 P STG13 21 PERF WL STAGE # 13. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 30 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 14,325' PU & PERF ON THE FLY AT 14,143' - 14,287'. POOH
TO 500' & STANDBY FOR FRAC. POH. ALL SHOTS FIRED. PUMPED 581 BBLS.
05:30 06:00 0.50 P STG13 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS WITH THE DAY CREW
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/20/2016 8:01:50AMPrinted: Page 1 of 1
Report Date: 06/21/2016
DOE: 33
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / L. TERRELL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
028
Spud Date: 11/28/2015
DOL: 24 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: FRAC OPS- WL STAGE 15
24 Hr Summary: WL STAGES 14-15, FRAC STAGE 13-14
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:00 1.00 P STG13 21 PERF SB FOR "OH" FRAC STG 10. FINISH POH. LD WL. ALL SHOTS FIRED.
07:00 09:00 2.00 P STG13 35 STIM FRAC STAGE # 13 SLICKWATER - SICP 1,990. PUMP 30 BBLS 15% ACID.30 PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,400. ATR 70.6. MTP 7,726
MTR 90.9. ISIP 2,864. FG 0.89 TCF 7,062 BBLS
09:00 15:00 6.00 P STG14 73 WOOWO STANDBY FOR "OH" AND "NH" FRAC AND WL OPERATIONS.
15:00 17:30 2.50 P STG14 21 PERF WL STAGE # 14. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 14,125' PU & PERF ON THE FLY AT 13,943' - 14,063'. POOH
TO 500' & STANDBY FOR FRAC. PUMPED 516 BBLS.
17:30 19:30 2.00 P STG14 35 STIM FRAC STAGE # 14 SLICKWATER - SICP 1,646. PUMP 30 BBLS 15% ACID.30 PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,400. ATR 70.6. MTP 7,726
MTR 90.9. ISIP 2,864. FG 0.89 TCF 7,167 BBLS
19:30 01:30 6.00 P STG15 73 WOOWO STANDBY FOR "OH" AND "NH" FRAC AND WL OPERATIONS.
01:30 02:00 0.50 P STG15 18 OTHR REHEAD WIRELINE ROPE SOCKET.
02:00 05:30 3.50 P STG15 21 PERF WL STAGE # 15. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 13,926' PU & PERF ON THE FLY AT 13,742' - 13,911'. POOH
TO 500' & STANDBY FOR FRAC. PUMPED 549 BBLS.
05:30 06:00 0.50 P STG15 28 SFTYMTG HELD SAFETY MEETING AND REVIEW JSA'S ON OPERATIONS WITH DAY CREW
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/22/2016 8:04:20AMPrinted: Page 1 of 1
Report Date: 06/22/2016
DOE: 34
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / R.MULL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
029
Spud Date: 11/28/2015
DOL: 25 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: READY TO PERF STAGE 18
24 Hr Summary: COMPLETE STAGE 15-17
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 P STG15 35 STIM FRAC STAGE # 15 SLICKWATER - SICP 1,790. PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,737. ATR 71.2. MTP 7,666
MTR 95.5. ISIP 3,156. FG 0.94 TCF 6,941 BBLS
08:00 14:00 6.00 P STG16 73 WOOWO STANDBY FOR "OH" AND "NH" OPERATIONS.
14:00 16:15 2.25 P STG16 21 PERF WL STAGE # 16. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 13,926' PU & PERF ON THE FLY AT 13,546' - 13,712'. POOH
TO 500' & STANDBY FOR FRAC. PUMPED 487 BBLS.
16:15 16:45 0.50 P STG16 73 WOOWO STANDBY FOR WL TO REHEAD AND START WL ON "OH".
16:45 19:00 2.25 P STG16 35 STIM FRAC STAGE # 16 SLICKWATER - SICP 2,171. PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,737. ATR 71.2. MTP 7,666
MTR 95.5. ISIP 3,156. FG 0.94 TCF 7,024 BBLS
19:00 22:00 3.00 P STG17 73 WOOWO STANDBY FOR "OH" AND "NH" OPERATIONS.
22:00 00:30 2.50 P STG17 21 PERF WL STAGE # 17. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 13,527' PU & PERF ON THE FLY AT 13,345' - 13,512'. POOH
TO 500' & STANDBY FOR FRAC. PUMPED 547 BBLS.
00:30 03:00 2.50 P STG17 35 STIM FRAC STAGE # 17 SLICKWATER - SICP 2,395 PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,737. ATR 71.2. MTP 7,666
MTR 95.5. ISIP 3,156. FG 0.94 TCF 7,214 BBLS
03:00 05:30 2.50 P STG18 73 WOOWO STANDBY FOR "OH" AND "NH" OPERATIONS.
05:30 06:00 P STG18 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH DAY SHIFT PERSONNEL. ( REHEAD WIRELINE.)
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/23/2016 8:02:28AMPrinted: Page 1 of 1
Report Date: 06/23/2016
DOE: 35
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / R.MULL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
030
Spud Date: 11/28/2015
DOL: 26 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: FRAC STG 20 IN PROGRESS
24 Hr Summary: COMPLETE STAGE 18-19, WIRELINE STAGE 20
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 P STG18 21 PERF WL STAGE # 18. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 13,327' PU & PERF ON THE FLY AT 13,145' - 13,312'. POOH
TO 500' & STANDBY FOR FRAC. PUMPED 498 BBLS.
08:30 09:00 0.50 P STG18 72 DRLCMT WOOWO
09:00 11:00 2.00 P STG18 35 STIM FRAC STAGE # 18 SLICKWATER - SICP 2,395 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,339. ATR 73. MTP 6,617 MTR
92.8. ISIP 3,371. FG 0.97 TCF 6,965 BBLS
11:00 11:30 0.50 P STG19 18 OTHR "NH" STACK DOWN FOR LEAK REPAIR. DECIDE TO MOVE TO "MH" AND WL STAGE 19.
11:30 13:45 2.25 P STG19 21 PERF WL STAGE # 19. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
7 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 13,128' PU & PERF ON THE FLY AT 12,946' - 13,111'. POOH
TO 500' & STANDBY FOR FRAC. PUMPED 465 BBLS.
13:45 18:30 4.75 P STG19 72 DRLCMT WOOWO
18:30 19:30 1.00 P WHDTRE 09 EQRP SCHEDULED MAINTENANCE - TORQUE AND GREASE FRAC STACK AND ZIPPER
19:30 22:00 2.50 P STG19 35 STIM FRAC STAGE # 19 SLICKWATER - SICP 2,243 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,339. ATR 73. MTP 6,617 MTR
92.8. ISIP 3,371. FG 0.97 TCF 6,825 BBLS
22:00 23:00 1.00 P STG20 72 DRLCMT WOOWO
23:00 02:00 3.00 P STG20 21 PERF WL STAGE # 20. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 12,926' PU & PERF ON THE FLY AT 12,746' - 12,913'. POOH
TO 500' & STANDBY FOR FRAC. PUMPED 496 BBLS.
02:00 05:00 3.00 P STG20 72 DRLCMT WOOWO
05:00 06:00 1.00 P STG20 35 STIM FRAC STG 20 IN PROGRESS
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/23/2016 8:07:33AMPrinted: Page 1 of 1
Report Date: 06/24/2016
DOE: 36
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / R.MULL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
031
Spud Date: 11/28/2015
DOL: 27 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOOWO
24 Hr Summary: COMPLETE STAGE 20-22, WIRELINE STAGE 23
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:45 2.75 P STG20 35 STIM FRAC STAGE # 20 SLICKWATER - SICP 2,193 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,202. ATR 74. MTP 6,824 MTR
90. ISIP 3,398. FG 0.98 TCF 7,010 BBLS
08:45 11:45 3.00 P STG21 21 PERF WL STAGE # 21. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 12,727'. PU & PERF ON THE FLY AT 12,547' - 12,667'. PUH
TO 500' & STANDBY FOR FRAC. POH. LD WL. ALL SHOT. PUMPED 434 BBLS.
11:45 14:30 2.75 P STG21 73 WOOWO STAND BY FOR "NH" FRAC AND "OH" WL.
14:30 17:00 2.50 P STG21 35 STIM FRAC STAGE # 21 SLICKWATER - SICP 2,333 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,418. ATR 72.6. MTP 6,646
MTR 90.9. ISIP 3,146. FG 0.94 TCF 6,897 BBLS
17:00 19:30 2.50 P STG22 21 PERF WL STAGE # 22. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 12,527'. PU & PERF ON THE FLY AT 12,347' - 12,516'. PUH
TO 500' & STANDBY FOR FRAC. POH. LD WL. ALL SHOT. PUMPED 410 BBLS.
19:30 21:30 2.00 P STG22 73 WOOWO STAND BY FOR "NH" FRAC AND "OH" WL.
21:30 00:00 2.50 P STG22 35 STIM FRAC STAGE # 22 SLICKWATER - SICP 1,915 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,438. ATR 75.9. MTP 7,158
MTR 91.0. ISIP 3,364. FG 0.97 TCF 6,501 BBLS
00:00 03:00 3.00 P STG23 21 PERF WL STAGE # 23. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 12,327'. PU & PERF ON THE FLY AT 12,148' - 12,315'. PUH
TO 500' & STANDBY FOR FRAC. POH. LD WL. ALL SHOT. PUMPED 434 BBLS.
03:00 06:00 3.00 P STG22 73 WOOWO STAND BY FOR "NH" FRAC AND "OH" WL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/25/2016 8:01:43AMPrinted: Page 1 of 1
Report Date: 06/25/2016
DOE: 37
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / R.MULL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
032
Spud Date: 11/28/2015
DOL: 28 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WAITING @ 500' & STANDBY FOR "OH" FRAC
24 Hr Summary: COMPLETE STAGE 23-25, WIRELINE STAGE 26
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 P STG23 35 STIM FRAC STAGE # 23 SLICKWATER - SICP 2,051 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,274. ATR 72.3. MTP 7,543
MTR .97. ISIP 3,380. FG 0.97 TCF 6,882 BBLS
08:30 11:45 3.25 P STG24 21 PERF WL STAGE # 24. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 12,133'. PU & PERF ON THE FLY AT 11,948' - 12,116'. PUH
TO 500' & STANDBY FOR "OH" FRAC. POH. LD WL. ALL SHOT. PUMPED 378 BBLS.
11:45 15:00 3.25 P STG24 73 WOOWO STANDBY FOR ADJACENT WELL FRAC AND WL OPERATIONS.
15:00 17:30 2.50 P STG24 35 STIM FRAC STAGE # 24 SLICKWATER - SICP 2,051 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,476. ATR 73.1. MTP 7,319
MTR .91.1. ISIP 3,137. FG 0.94 TCF 6,902 BBLS
17:30 18:00 0.50 P STG25 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.
18:00 19:00 1.00 P STG25 18 OTHR GREASE WELLHEAD & ZIPPER VALVES
19:00 22:30 3.50 P STG25 21 PERF WL STAGE # 25. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 11,931'. PU & PERF ON THE FLY AT 11,749' - 11,916'. PUH TO
500' & STANDBY FOR "OH" FRAC. POH. LD WL. ALL SHOT. PUMPED 416 BBLS.
22:30 01:30 3.00 P STG25 73 WOOWO STANDBY FOR ADJACENT WELL FRAC AND WL OPERATIONS.
01:30 04:30 3.00 P STG25 35 STIM FRAC STAGE # 25 SLICKWATER - SICP 2,102 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,720. ATR 69.3. MTP 8,037
MTR .91.6. ISIP 3,215. FG 0.94 TCF 7,153 BBLS
04:30 06:00 1.50 P STG26 21 PERF WL STAGE # 26. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 11,731'. PU & PERF ON THE FLY AT 11,549' - 11,717'. PUH TO
500' & STANDBY FOR "OH" FRAC.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/26/2016 8:03:00AMPrinted: Page 1 of 1
Report Date: 06/26/2016
DOE: 38
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: J. CASTILLO / G. ALLGOOD / J. GARCIA / R.MULL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
033
Spud Date: 11/28/2015
DOL: 29 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: READY TO FRAC STAGE 28
24 Hr Summary: COMPLETE STAGE 26-27, WIRELINE STAGE 28
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 10:00 4.00 P STG26 21 PERF STANDING BY AT 500' FOR "OH" FRAC. POH. LD WL. ALL SHOT. PUMPED 418 BBLS.
10:00 12:00 2.00 P STG26 35 STIM FRAC STAGE # 26 SLICKWATER - SICP 2,218 PUMP 60 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,113. ATR 71.7. MTP 7,050
MTR 91.1. ISIP 3,328. FG 0.96 TCF 6,391 BBLS.
12:00 12:30 0.50 P WLWORK 09 EQRP SCHEDULED MAINTENANCE - REHEAD WL.
12:30 15:00 2.50 P STG27 21 PERF WL STAGE # 27. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 11,532'. PU & PERF ON THE FLY AT 11,350' - 11,517'. PUH TO
500' & STANDBY FOR "OH" FRAC. FINISH POH. LD WL. ALL SHOTS FIRED. PUMPED 349 BBLS.
15:00 17:30 2.50 P STG27 73 WOOWO STAND BY FOR ADJACENT WELL FRAC AND WIRELINE OPERATIONS.
17:30 18:00 0.50 P STG27 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.
18:00 19:00 1.00 P STG27 18 OTHR RE-TORQ WELLHEAD & ZIPPER VALVES
19:00 22:00 3.00 P STG27 35 STIM FRAC STAGE # 27 SLICKWATER - SICP 2,277 PUMP 60 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,250. ATR 73.7. MTP 7,263
MTR 93.1. ISIP 3,460. FG 0.93.2 TCF 6,713 BBLS.
22:00 23:30 1.50 N STG28 43 WOW SHUT DOWN FOR LIGHTENING & HIGH WIND
23:30 00:30 1.00 P STG28 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
00:30 02:30 2.00 P STG28 21 PERF WL STAGE # 28. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 11,332'. PU & PERF ON THE FLY AT 11,174' - 11,318'. PUH TO
500' & STANDBY FOR "OH" FRAC. FINISH POH. LD WL. ALL SHOTS FIRED. PUMPED 394 BBLS.
02:30 05:30 3.00 P STG28 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
05:30 06:00 P STG28 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH DAY SHIFT PERSONNEL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/27/2016 8:02:29AMPrinted: Page 1 of 1
Report Date: 06/27/2016
DOE: 39
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: J. CASTILLO / G. ALLGOOD / J. GARCIA / R.MULL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
034
Spud Date: 11/28/2015
DOL: 30 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WOWOW
24 Hr Summary: FRAC STAGE 28, PERF STAGE 29
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 14:30 8.50 P STG28 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
14:30 16:30 2.00 P STG28 35 STIM FRAC STAGE # 28 SLICKWATER - SICP 2,053 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,432. ATR 69.7. MTP 7,179
MTR 91.4. ISIP 3,283. FG 0.96 TCF 6,569 BBLS.
16:30 17:30 1.00 N STG29 43 WOW LIGHTENING INDICATED NEARBY. LD WL LUBRICATOR AND BOOM DOWN CRANE. STAND BY
FOR WEATHER TO PASS.
17:30 18:00 0.50 N STG29 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.
18:00 02:00 8.00 N STG29 43 WOW LIGHTENING INDICATED NEARBY. LD WL LUBRICATOR AND BOOM DOWN CRANE. STAND BY
FOR WEATHER TO PASS.
02:00 04:30 2.50 P STG29 21 PERF WL STAGE # 29. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 11,150'. PU & PERF ON THE FLY AT 10,975' - 11,071'. PUH
TO 500' & STANDBY FOR "OH" FRAC. FINISH POH. LD WL. ALL SHOTS FIRED. PUMPED 378
BBLS.
04:30 05:30 1.00 P STG29 73 WOOWO WOOWO.
05:30 06:00 0.50 P STG29 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/27/2016 8:04:41AMPrinted: Page 1 of 1
Report Date: 06/28/2016
DOE: 40
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: J. CASTILLO / G. ALLGOOD / L. TERRELL / R.MULL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
035
Spud Date: 11/28/2015
DOL: 31 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: RIH W/DUMMY PLUG BHA
24 Hr Summary: FRAC STAGE 29-30, PERF STAGE 31 & LOST GUN BHA
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:00 1.00 P STG29 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
07:00 09:00 2.00 N STG29 43 WOW WAITING ON LIGHTNING TO CLEAR AREA.
09:00 11:15 2.25 P STG29 35 STIM FRAC STAGE # 29 SLICKWATER - SICP 1,631 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,802. ATR 66.3. MTP 7,579
MTR 90.2. ISIP 3,100. FG 0.93 TCF 6,519 BBLS.
11:15 15:00 3.75 P STG30 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
15:00 17:30 2.50 P STG30 21 PERF WL STAGE # 30. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 10,960'. PU & PERF ON THE FLY AT 10,775' - 10,942'. PUH
TO 500' & STANDBY FOR "NH" FRAC. FINISH POH. LD WL. ALL SHOTS FIRED. PUMPED 288
BBLS.
17:30 18:00 0.50 P STG30 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.
18:00 20:30 2.50 P STG30 35 STIM FRAC STAGE # 30 SLICKWATER - SICP 1,965 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,500. ATR 76.6. MTP 7,203
MTR 92.8. ISIP 3,384. FG 0.97 TCF 6,191 BBLS.
20:30 23:30 3.00 P STG31 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
23:30 01:20 1.83 P STG31 21 PERF WL STAGE # 31. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
5 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 10,758'. PU & PERF ON THE FLY AT 10,671' & 10,743'.
CONTINUE PU 10' & HUNG UP WITH CCL @ 10,700' CCL DEPTH, PUTTING SETTING SLEEVE @
APPROX 10,722'. PUMPED BACK DOWN TO 10,750'EOT DEPTH. PULLED BACK UP TO 10,700' CCL
DEPTH AND STILL HUNG UP. REPEAT PROCESS SEVERAL TIMES WITH SAME RESULT.
01:20 05:30 4.17 N STG31 55 PERFPROB NOTIFIED OPERATIONS SUPERVISOR & CONTACTED PROJECT ENGINEER TO INFORM OF
SITUATION AND OFFER OPTIONS. PUMPED BACK DOWN AND SURGED WELL TO FB TANK. BHA
CAME FREE. CONTINUED PERFORATING. FOURTH GUN SHOT AND WHEN ATTEMPTING TO
SHOOT FIFTH GUN WENT TO SHORT AND WE LOST CCL. PULLED UP 50' AND PUMPED BACK
DOWN TO ENSURE WE STILL HAD BHA. CONTINUE POOH EASY. TOOL STRING LOST IN WELL
WIRE APPEARED TO BE CUT BY PERF SHOT. CONTACTED HOUSTON. THE DECISION WAS
MADE BETWEEN THE PROJECT ENGINEER AND COMPLETION MANAGER TO PUMP GUNS TO
BOTTOM. RUNNING DUMMY TO CFP# 32 SETTING DEPTH AT REPORT TIME, AND ABANDON
STAGE. WL TOOLS WERE LOST @ 10,666' AND AFTER PUMPING THEM DOWN THEY SHOULD BE
@ 10,930' TOF
05:30 06:00 P STG31 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/28/2016 8:01:34AMPrinted: Page 1 of 1
Report Date: 06/29/2016
DOE: 41
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: J. CASTILLO / G. ALLGOOD / L. TERRELL / R.MULL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
036
Spud Date: 11/28/2015
DOL: 32 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: CHANGING OUT BLENDER, READY TO FRAC STAGE 33
24 Hr Summary: FRAC STAGE 32, PERF STAGE 33
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:30 1.50 N WLWORK 58 DHEQF RIH W/ DUMMY RUN - 3 1/8" WEIGHT BAR, CCL, 4.37" DUMMY PLUG - 18.5' O/A. PUMP DOWN TO
10,640' W/ NO PROBLEM. ALL CLEAR. POH W/ WL. PUMPED 277 BBLS.
07:30 09:15 1.75 P STG32 21 PERF WL STAGE # 32. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 10,620'. PU & PERF ON THE FLY AT 10,447' - 10,567'. POH.
LD WL. ALL SHOTS FIRED. PUMPED 256 BBLS.
09:15 17:30 8.25 P STG32 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
17:30 18:00 0.50 P STG32 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.
18:00 21:00 3.00 P STG32 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
21:00 00:00 3.00 P STG32 35 STIM FRAC STAGE # 32 SLICKWATER - SICP: 1,747 PUMP 60 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,340. ATR: 73.7. MTP: 7,291
MTR: 92.7. ISIP: 3,310. FG 0.97 TCF: 6,529 BBLS.
00:00 02:30 2.50 P STG33 21 PERF WL STAGE # 33. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 10,428'. PU & PERF ON THE FLY AT 10,248' - 10,416'. POH.
LD WL. ALL SHOTS FIRED. PUMPED 355 BBLS.
02:30 05:30 3.00 P STG33 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
05:30 06:00 P STG33 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/29/2016 8:07:13AMPrinted: Page 1 of 1
Report Date: 06/30/2016
DOE: 42
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: J. CASTILLO / G. ALLGOOD / L. TERRELL / R.MULL
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
037
Spud Date: 11/28/2015
DOL: 33 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: WL STAGE # 36 IN PROGRESS
24 Hr Summary: COMPLETE STAGES 34-35
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:45 2.75 N STG33 09 EQRP REPLACE FRAC BLENDER.
08:45 11:00 2.25 P STG33 35 STIM FRAC STAGE # 33 SLICKWATER - SICP: 2,060 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,091. ATR: 72.2. MTP: 7,528
MTR: 89.1. ISIP: 3,470. FG 0.98 TCF: 6,729 BBLS
11:00 14:00 3.00 P STG34 21 PERF WL STAGE # 34. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 10,034'. PU & PERF ON THE FLY AT 10,048' - 10,216'. PUH
TO 500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 279 BBLS.
14:00 17:30 3.50 P STG34 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
17:30 18:00 0.50 P STG34 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.
18:00 20:30 2.50 P STG34 35 STIM FRAC STAGE # 34 SLICKWATER - SICP: 1,785 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,477. ATR: 74.5. MTP: 7,668
MTR: 94.8. ISIP: 3,275. FG 0.95 TCF: 6,753 BBLS
20:30 21:30 1.00 P STG35 09 EQRP RE-HEAD WIRELINE TOOLS
21:30 00:00 2.50 P STG35 21 PERF WL STAGE # 35. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 10,034'. PU & PERF ON THE FLY AT 9,849' - 10,016'. PUH TO
500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 322 BBLS.
00:00 02:30 2.50 P STG35 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.
02:30 05:00 2.50 P STG35 35 STIM FRAC STAGE # 35 SLICKWATER - SICP: 2,055 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,605. ATR: 77.1. MTP: 7,233
MTR: 93.9. ISIP: 3,211. FG 0.94 TCF: 6,757 BBLS
05:00 05:30 0.50 P STG36 21 PERF WL STAGE # 36. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 9.832'. PU & PERF ON THE FLY AT 9,649' - 9,817'. PUH TO
500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 283 BBLS.
05:30 06:00 P STG35 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
6/30/2016 8:05:23AMPrinted: Page 1 of 1
Report Date: 07/01/2016
DOE: 43
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
038
Spud Date: 11/28/2015
DOL: 34 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: FRAC STAGE 38 IN PROGRESS
24 Hr Summary: FRAC STAGES 36-37, PERF STAGE 38
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG36 28 SFTYMTG SAFETY MEETING:FOCUSED ON H.E.L.P.
06:30 12:00 5.50 P STG36 73 WOOWO WOOWO
12:00 14:30 2.50 P STG36 35 STIM FRAC STAGE # 36 SLICKWATER - SICP: 1,846 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,024. ATR: 71. MTP: 6,893
MTR: 95.1. ISIP: 3,320. FG 0..96 TCF: 6,732 BBLS
14:30 17:30 3.00 P STG37 21 PERF WL STAGE # 37. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 9,632'. PU & PERF ON THE FLY AT 9,450' - 9,616'. PUH TO
500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 246 BBLS.
17:30 18:00 0.50 P STG37 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.
18:00 20:30 2.50 P STG37 73 WOOWO WOOWO
20:30 23:00 2.50 P STG37 35 STIM FRAC STAGE # 37 SLICKWATER - SICP: 1,984 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,995. ATR: 77.1. MTP: 6,880
MTR: 92.2. ISIP: 3,098. FG 0..93 TCF: 6,801 BBLS
23:00 23:30 0.50 P STG38 09 EQRP RE-HEAD WIRELINE TOOLS
23:30 02:00 2.50 P STG38 21 PERF WL STAGE # 38. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 9,433'. PU & PERF ON THE FLY AT 9,250' - 9,416'. PUH TO
500' AND STAND BY FOR FRAC. LD WL. ALL SHOTS FIRED. PUMPED 244 BBLS.
02:00 04:15 2.25 P STG38 73 WOOWO WOOWO
04:15 05:30 1.25 P STG38 35 STIM FRAC STAGE # 38 IN PROGRESS
05:30 06:00 P STG38 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/1/2016 8:05:06AMPrinted: Page 1 of 1
Report Date: 07/02/2016
DOE: 44
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
039
Spud Date: 11/28/2015
DOL: 35 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: BEGIN FRAC STAGE 41
24 Hr Summary: FRAC STAGES 38-40, PERF STAGE 41
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:00 1.00 P STG38 35 STIM FRAC STAGE # 38 SLICKWATER - SICP: 1,809 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,222. ATR: 75.1. MTP: 7,391
MTR: 93.2. ISIP: 3,391. FG 0..97 TCF: 6,830 BBLS
07:00 09:30 2.50 P STG39 21 PERF WL STAGE # 39. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 9,233'. PU & PERF ON THE FLY AT 9,051' - 9,214'. PUH TO
500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 219 BBLS.
09:30 12:30 3.00 P STG39 72 DRLCMT WOOWO
12:30 14:30 2.00 P STG39 35 STIM FRAC STAGE # 39 SLICKWATER - SICP: 2,053 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 3,142. ATR: 73.8. MTP: 6,167
MTR: 94.7. ISIP: 3,578. FG 1.0 TCF: 6,632 BBLS
14:30 17:30 3.00 P STG40 21 PERF WL STAGE # 40. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 9,034'. PU & PERF ON THE FLY AT 8,851' - 9,018'. PUH TO
500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 212 BBLS.
17:30 18:00 0.50 P STG40 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.
18:00 22:30 4.50 P STG40 72 DRLCMT WOOWO
22:30 01:00 2.50 P STG40 35 STIM FRAC STAGE # 40 SLICKWATER - SICP: 2,340 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,696. ATR: 73.3. MTP: 6,370
MTR: 91.6. ISIP: 3,478. FG .99 TCF: 6,996 BBLS
01:00 03:30 2.50 P STG41 21 PERF WL STAGE # 41. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
7 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 8,834'. PU & PERF ON THE FLY AT 8,654' - 8,796'. PUH TO
500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 204 BBLS.
03:30 05:30 2.00 P STG41 72 DRLCMT WOOWO
05:30 06:00 P STG41 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/3/2016 8:07:59AMPrinted: Page 1 of 1
Report Date: 07/03/2016
DOE: 45
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
040
Spud Date: 11/28/2015
DOL: 36 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: READY TO FRAC STAGE 44
24 Hr Summary: FRAC STAGES 41-43, PERF STAGE 44
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 P STG41 35 STIM FRAC STAGE # 41 SLICKWATER - SICP: 1,852 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,602. ATR: 73.9. MTP: 6,022
MTR: 89.7. ISIP: 3,633. FG 1.01 TCF: 6,451 BBLS
08:00 09:00 1.00 P STG42 73 WOOWO TORQUE, GREASE AND RE-HEAD
09:00 12:00 3.00 P STG42 21 PERF WL STAGE # 42. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 8,635'. PU & PERF ON THE FLY AT 8,452' - 8,619'. PUH TO
500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 178 BBLS.
12:00 15:15 3.25 P STG42 73 WOOWO WOOWO
15:15 17:00 1.75 P STG42 35 STIM FRAC STAGE # 42 SLICKWATER - SICP: 2,020 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,025. ATR: 69.8. MTP: 6,650
MTR: 92.1. ISIP: 3,748. FG 1.03 TCF: 6,814 BBLS
17:00 17:30 0.50 P STG43 73 WOOWO WOOWO
17:30 18:00 0.50 P STG43 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.
18:00 20:00 2.00 P STG43 73 WOOWO WOOWO
20:00 22:30 2.50 P STG43 21 PERF WL STAGE # 43. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 8,435'. PU & PERF ON THE FLY AT 8,253' - 8,420'. PUH TO
500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 170 BBLS.
22:30 01:00 2.50 P STG43 35 STIM FRAC STAGE # 43 SLICKWATER - SICP: 2,287 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,961. ATR: 77.1. MTP: 7,330
MTR: 93.2. ISIP: 3,126. FG .93 TCF: 6,972 BBLS
01:00 03:30 2.50 P STG44 73 WOOWO WOOWO
03:30 05:30 2.00 P STG44 21 PERF WL STAGE # 44. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
5 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 30 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 8,236'. PU & PERF ON THE FLY AT 8,054' - 8,221'. PUH TO
500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 160 BBLS.
05:30 06:00 P STG44 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/4/2016 8:03:14AMPrinted: Page 1 of 1
Report Date: 07/04/2016
DOE: 46
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
041
Spud Date: 11/28/2015
DOL: 37 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: FRAC STAGE # 47 IN PROGRESS
24 Hr Summary: FRAC STAGES 44-46, PERF STAGE 47
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:15 2.25 P STG44 35 STIM FRAC STAGE # 44 SLICKWATER - SICP: 1,859 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,671. ATR: 73.7. MTP: 6,767
MTR: 89.9. ISIP: 3,408. FG .98 TCF: 6,869 BBLS
08:15 11:00 2.75 P STG45 73 WOOWO WOOWO
11:00 14:00 3.00 P STG45 21 PERF WL STAGE # 45. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 8,036'. PU & PERF ON THE FLY AT 7,845' - 8,020'. PUH TO
500' AND STAND BY FOR "NH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 128 BBLS.
14:00 15:45 1.75 P STG45 35 STIM FRAC STAGE # 45 SLICKWATER - SICP: 1,910 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,447. ATR: 73.4. MTP: 6,829
MTR: 89.3. ISIP: 3,388. FG .97 TCF: 6,680 BBLS
15:45 17:30 1.75 P STG46 73 WOOWO WOOWO
17:30 18:00 0.50 P STG46 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.
18:00 20:30 2.50 P STG46 21 PERF WL STAGE # 46. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 7,837'. PU & PERF ON THE FLY AT 7,654' - 7,822'. PUH TO
500' AND STAND BY FOR "NH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 126 BBLS.
20:30 23:00 2.50 P STG46 35 STIM FRAC STAGE # 46 SLICKWATER - SICP: 2,090 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,922. ATR: 78.2 MTP: 7,352
MTR: 91.7. ISIP: 3,077. FG .92 TCF: 7,005 BBLS
23:00 02:00 3.00 P STG46 73 WOOWO WOOWO
02:00 04:15 2.25 P STG47 21 PERF WL STAGE # 47. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 7,637'. PU & PERF ON THE FLY AT 7,455' - 7,622'. PUH TO
500' AND STAND BY FOR "NH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 114 BBLS.
04:15 05:30 1.25 P STG47 35 STIM FRAC STAGE # 47 IN PROGRESS
05:30 06:00 0.50 P STG47 28 SFTYMTG SAFETY MEETING
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/5/2016 8:05:07AMPrinted: Page 1 of 1
Report Date: 07/05/2016
DOE: 47
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
042
Spud Date: 11/28/2015
DOL: 38 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: READY TO FRAC STAGE 49
24 Hr Summary: FRAC STAGES 47-48, PERF STAGE 49
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P STG47 35 STIM FRAC STAGE # 47 SLICKWATER - SICP: 1,808 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,878. ATR: 77.8 MTP: 7,363
MTR: 91. ISIP: 3,148. FG .93 TCF: 6,651 BBLS
06:30 08:30 2.00 P STG48 73 WOOWO WOOWO
08:30 10:30 2.00 P STG48 21 PERF WL STAGE # 48. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 7,436'. PU & PERF ON THE FLY AT 7,255' - 7,374'. PUH TO
500'. ALL SHOTS FIRED. PUMPED 76 BBLS.
10:30 17:30 7.00 P STG48 73 WOOWO WOOWO
17:30 18:00 0.50 P STG48 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.
18:00 22:00 4.00 P STG48 73 WOOWO WOOWO
22:00 01:00 3.00 P STG48 35 STIM FRAC STAGE # 48 SLICKWATER - SICP: 1,586 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,720. ATR: 78.2 MTP: 6,338
MTR: 92.1. ISIP: 3,114. FG .93 TCF: 6,994 BBLS
01:00 01:30 0.50 P STG49 73 WOOWO WOOWO
01:30 03:30 2.00 P STG49 21 PERF WL STAGE # 49. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 7,230'. PU & PERF ON THE FLY AT 7,056' - 7,176'. PUH TO
500'. ALL SHOTS FIRED. PUMPED 86 BBLS.
03:30 05:30 2.00 P STG49 73 WOOWO WOOWO
05:30 06:00 P STG49 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/5/2016 8:05:56AMPrinted: Page 1 of 1
Report Date: 07/06/2016
DOE: 48
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.
Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY
043
Spud Date: 11/28/2015
DOL: 39 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 78
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 312.00
API #: 4210542309
Current Activity: CONTINUE RDMO FRAC SPREAD
24 Hr Summary: FRAC STAGES 49-51, SET KILL PLUG
CONTINUE FRAC OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 P STG49 73 WOOWO WOOWO
08:00 10:00 2.00 P STG49 35 STIM FRAC STAGE # 49 SLICKWATER - SICP: 1,689 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,233. ATR: 70.1 MTP: 7,629
MTR: 92.2. ISIP: 3,319. FG ..96 TCF: 6,986 BBLS
10:00 12:30 2.50 P STG50 21 PERF WL STAGE # 50. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 7,039'. PU & PERF ON THE FLY AT 6,856' - 7,023'. PUH TO
500'. ALL SHOTS FIRED. PUMPED 64 BBLS.
12:30 15:30 3.00 P STG50 73 WOOWO WOOWO
15:30 17:30 2.00 P STG50 35 STIM FRAC STAGE # 50 SLICKWATER - SICP: 1,549 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,665. ATR: 73.5 MTP: 7,520
MTR: 95.3. ISIP: 3,718. FG .1.02 TCF: 6,832 BBLS
17:30 18:00 0.50 P STG51 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.
18:00 20:00 2.00 P STG51 21 PERF WL STAGE # 51. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &
7 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/
MARKER JT AT 5,970'. SET PLUG @ 6,839'. PU & PERF ON THE FLY AT 6,657' - 6,825'. PUH TO
500'. ALL SHOTS FIRED. PUMPED 57 BBLS.
20:00 22:00 2.00 P STG51 35 STIM FRAC STAGE # 51 SLICKWATER - SICP: 1,453 PUMP 30 BBLS 15% ACID. PUMP 325,034 LBS 100
MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/
230 SLICK WATER; PUMP 105,330 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 3,897. ATR: 71.2 MTP: 5,522
MTR: 96.7. ISIP: 3,920. FG 0.96 TCF: 6,451 BBLS
22:00 23:30 1.50 P STG51 73 WOOWO WOOWO
23:30 01:30 2.00 P STG51 27 SETP RU WL ON WELL. TEST WLPCE TO 8,000 PSI. RIH W/ 4.375" ECO SOLID CBP. CORRELATED
WITH MJ @ 6,269'5,970 SET PLUG @ 6,005'. WITH 1,495 PSI UNDERNEATH THE BRIDGE PLUG.
POH & PRESSURE TEST PLUG TO 7,000#. HOLD FOR 15 MINS (OK). BLEED OFF PRESSURE &
SHUT THE MANUAL MASTER VALVE
01:30 06:00 4.50 P RDMO 02 RDMO RDMO FRAC SPREAD
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/6/2016 8:03:37AMPrinted: Page 1 of 1
Report Date: 07/08/2016
DOE: 50
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
044
Spud Date: 11/28/2015
DOL: 40 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: RIGGING UP RISER
24 Hr Summary: MIRU COIL UNIT
TEST BOP'S, DRILL PLUGS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 10:00 4.00 P CTU 16 NUND NU LUBRICATOR, LUBE IN TUBING HANGER AND BPV, ND UMV AND LMV, PULL TUBING
HANGER AND BPV
10:00 15:00 5.00 P CTU 16 NUND MOVE IN FRAC TANKS AND OPEN TOPS AND SUPPORT EQUIPMENT, CONT PREPARING
LOCATION FOR CTU DRILL OUT
15:00 18:00 3.00 P MIRU 01 MIRU MIRU COIL UNIT, AND ALL SUPPORT EQUIPMENT.
18:00 06:00 12.00 P MIRU 01 MIRU MIRU 40 BBL CHEMICAL MIXING PLANT, 2’ DUAL HYD MANIFOLD 10K WITH FLOWBACK IRON
AND SAFETY RESTRAINTS, PLUG CATCHER AND GAS BUSTERS. FILLED FRAC TANKS WITH
FRESH WATER FROM LEASE POND AND CLEAN OUT CELLARS AND HAULED OFF FLUIDS FOR
DISPOSAL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/8/2016 8:06:10AMPrinted: Page 1 of 1
Report Date: 07/09/2016
DOE: 51
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
045
Spud Date: 11/28/2015
DOL: 41 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: SHORT TRIP
24 Hr Summary: DRILLED PLUGS 1-9
TEST BOP'S, DRILL PLUGS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 16:20 10.33 P MIRU 01 MIRU PRIMED FLUID PUMPS AND LOADED COIL UNIT REEL WITH WORKING FLUIDS, NU 3 X 10’
RISER TO COIL UNIT INJECTOR. INSTALLED COIL CONN WITH TEST PLATE AND PULLED TESTED
TO 25K & 35K,60K. PRESSURE UP ON COIL AND PRESSURE TESTED COIL CONN TO 5,000 PSI.
PRESSURE TESTED COIL CONN TO 250 PSI LOW AND 5,000 PSI HIGH.NIPPLE UP COIL UNIT 10K
BOP’S AND REMOVED PULL PLATE AND INSTALLED WASH TIP ON COIL CONN. TESTED BOPS
TO 250 PSI-LOW AND 9,000 PSI-HIGH - ALL TESTED GOOD AND CHARTED. (BOP TESTING
INCLUDES TESTING - BLINDS, 2 5/8’ PIPE RAMS, 2 5/8’ SECONDARY PIPE RAMS, BOTH SETS OF
WING VALUES ON BOP CROSSOVER, BOTH VALVES OF BOP KILL LINE, INSIDE THE REEL PLUG
VALVE, MANIFOLD ON COIL UNIT, ALL VALVES ON WELLHEAD FLOWCROSS, SHELL TESTING
ALL FLOW IRON, PLUG CATCHER AND 2’ HYD MANIFOLD )REMOVED WASH TIP AND INSTALLED
DUAL FLAPPER VALVE. PRESSURE UP AND TESTED BPV TO 5,000. – TEST GOOD AND CHARTED.
VERIFY BALL SIZE AND ALL DRIFTS FOR THE HYD DISCONN. MU AND BHA OF CONN, DUAL
FLAPPER VALVE, HYD JARS, HYD DISCONN, AGITATOR, 3 1/8” MOTOR WITH 4 3/4” INCH ROCK
BIT STAB INJECTOR HEAD ON BOPS, SHELL TEST TO 9,000 PSI -TEST GOOD. BLED DOWN
PRESSURE AND EQUALIZED BETWEEN SICP ON WELLHEAD AND COIL UNIT. OPEN WELL
WAITED TO BREAK CIR INTO FRAC TANKS, STARTED RIH @ 5 FPM PASSING WELLHEAD TREE
THEN INCREASING TO 60 - 80 FPM THEIR AFTER PUMPING & RETURNS @ 1 BPM. EOC @ KOP –
INCREASED PUMP RATE TO 4 BPM AND RETURNS TO 5 BPM, CONT RIH TO FIRST PLUG
LEAKS ON STEP UNIT AND LEAKS ON FLOW BACK
16:20 17:49 1.48 P CTU 40 WASH SHELL TEST TO 9,000 PSI -TEST GOOD. BLED DOWN PRESSURE AND EQUALIZED BETWEEN
SICP ON WELLHEAD AND COIL UNIT. OPEN WELL WAITED TO BREAK CIR INTO FRAC TANKS,
STARTED RIH @ 5 FPM PASSING WELLHEAD TREE THEN INCREASING TO 60 - 80 FPM THEIR
AFTER PUMPING & RETURNS @ 1 BPM. EOC @ KOP – INCREASED PUMP RATE TO 4 BPM AND
RETURNS TO 5 BPM, CONT RIH TO FIRST PLUG
17:49 18:12 0.38 P CTU 40 WASH TAG KILL PLUG @ 6,010' - 6 MIN , CIRC 3,800 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, CONT TO NEXT PLUG.
18:12 18:33 0.35 P CTU 40 WASH TAG PLUG #1@ 6,670' - 1 MIN , CIRC 3,600 PSI, WHP 100 PSI, PUMP RATE 5 BPM, RETURN RATE
4.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
18:33 19:08 0.58 P CTU 40 WASH TAG PLUG #2@ 6,840' - 4 MIN , CIRC 3,600 PSI, WHP 350 PSI, PUMP RATE 5 BPM, RETURN RATE
4.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
19:08 19:38 0.50 P CTU 40 WASH TAG PLUG #3@ 7,040' - 5 MIN , CIRC 3,500 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE 4.8
BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
19:38 00:06 4.47 P CTU 40 WASH TAG PLUG #4, PUMPED A 10 BBL GEL SWEEP 50 VIS. WAITED TILL SWEEP REACH EOT, THEN
STARTED MAKING THE SHORT TRIP TO TOP OF CURVE PUMPING ADDITIONAL GEL SWEEPS AS
NEEDED.
00:06 00:29 0.38 P CTU 40 WASH TAG PLUG #4@ 7,227' - 4 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE 3.8
BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
00:29 01:08 0.65 P CTU 40 WASH TAG PLUG #5@ 7,432' - 15 MIN , CIRC 3,600 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
3.8 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
01:08 01:58 0.83 P CTU 40 WASH TAG PLUG #6@ 7,634' - 26 MIN , CIRC 3,500 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
3.3 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
01:58 02:50 0.87 P CTU 40 WASH TAG PLUG #7@ 7,833' - 34 MIN , CIRC 3,600 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
3.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
02:50 03:17 0.45 P CTU 40 WASH TAG PLUG #8@ 8,033' - 10 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
03:17 04:00 0.72 P CTU 40 WASH TAG PLUG #9@ 8,232' - 10 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
04:00 06:00 2.00 P CTU 40 WASH TAG PLUG #10, PUMPED A 10 BBL GEL SWEEP 50 VIS. WAITED TILL SWEEP REACH EOT, THEN
STARTED MAKING THE SHORT TRIP TO TOP OF CURVE PUMPING ADDITIONAL GEL SWEEPS AS
NEEDED.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/9/2016 8:05:05AMPrinted: Page 1 of 1
Report Date: 07/10/2016
DOE: 52
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
046
Spud Date: 11/28/2015
DOL: 42 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: GIH TO TOP OF FISH
24 Hr Summary: DRILLED PLUGS 10-21
RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:45 0.75 P CTU 40 WASH CONT RIH TO PLUG 10
06:45 07:20 0.58 P CTU 40 WASH TAG PLUG #10@ 8,435' - 15 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
07:20 08:00 0.67 P CTU 40 WASH TAG PLUG #11@ 8,635' - 38 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
08:00 08:40 0.67 P CTU 40 WASH TAG PLUG #12@ 8,834' - 14 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
08:40 08:40 0.00 P CTU 40 WASH TAG PLUG #13@ 9,034' - 10 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
08:40 09:20 0.67 P CTU 40 WASH TAG PLUG #14@ 9,233' - 06 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
09:20 10:00 0.67 P CTU 40 WASH TAG PLUG #15@ 9,434' - 15 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
10:00 10:35 0.58 P CTU 40 WASH TAG PLUG #16@ 9,632' - 16 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
10:35 11:13 0.63 P CTU 40 WASH TAG PLUG #17@ 9,832' - 15 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
11:13 11:52 0.65 P CTU 40 WASH TAG PLUG #18@ 10,034' - 10 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE
4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
11:52 15:42 3.83 P CTU 40 WASH TAG PLUG #19@ 10,227' - 185 MIN , CIRC 3,700 PSI, WHP 250 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
15:42 00:52 9.17 P CTU 40 WASH TAG PLUG #20@ 10,428' - 288 MIN , CIRC 3,700 PSI, WHP 400 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
00:52 06:00 5.13 P CTU 40 WASH TAG PLUG #21@ 10,607' - 159 MIN , CIRC 3,700 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO TOP OF FISH.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/11/2016 8:06:17AMPrinted: Page 1 of 1
Report Date: 07/11/2016
DOE: 53
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
047
Spud Date: 11/28/2015
DOL: 43 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: GOING IN HOLE WITH OVERSHOT ASSEMBLY
24 Hr Summary: WASHED OVER FISH.
RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 09:45 3.75 P CTU 40 WASH CONT POOH
09:45 10:30 0.75 P CTU 40 WASH COIL AT SURFACE
10:30 11:00 0.50 P CTU 16 NUND BREAKING OFF BHA
11:00 12:30 1.50 P CTU 16 NUND NU 8- 5 1/8 10K RISERS
12:30 16:00 3.50 P CTU 16 NUND PUT ON NEW BHA FOR FISHING JOB PER ON CALL ENGINEER
16:00 16:30 0.50 P CTU 16 NUND TEST MOTOR ON SURFACE
16:30 17:30 1.00 P CTU 16 NUND SHELL TEST
17:30 21:29 3.98 P CTU 40 WASH RIH TO TOP OF FISH
21:29 04:00 6.52 P CTU 40 WASH TAG FISH AT 10,617' CTM. INCREASE PUMP RATE AND WASH DOWN TO 10,621' CTM. LOWER
PUMP RATE, PULL UP AND SAW 2/4K OVER PULLS 10' ABOVE FISH. GO IN HOLE AND TAG AT
10,617' CTM. INCREASE PUMP RATE AND WASH DOWN AGAIN TO 10,621' CTM. LOWER PUMP
RATE AND PICK UP 50'. RUN BACK IN HOLE AND TAGGED AT 10,617' CTM. INCREASED PUMP
RATE AND WASHED DOWN AGAIN TO 10,621' CTM. LOWER PUMP RATE TO 1 BBL AND PUSHED
DOWN ON FISH. PULL OUT OF HOLE SLOWLY. WE PULLED INTO DEBRIS A FEW TIMES WHILE
PULLING OUT OF HOLE.
04:00 06:00 2.00 P CTU 40 WASH OUT OF HOLE. LAY DOWN BHA. FOUND ALL INDICATER PINS LAYED DOWN AND A SHINY
RUBBED SPOT APPROXIMATLY 18' INSIDE OF WASH PIPE. WE APPEARED TO HAVE WASHED
OVER ENTIRE FISH. PICK UP OVER SHOT ASSEMBLY. TEST LUBRICATOR TO 9,000 PSI.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/11/2016 8:03:45AMPrinted: Page 1 of 1
Report Date: 07/12/2016
DOE: 54
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
048
Spud Date: 11/28/2015
DOL: 44 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: P.O.O.H.
24 Hr Summary: ATTEMPT TO FISH TOOLS.
RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 09:15 3.25 P CTU 40 WASH CONT RIH TO TOF @ 10,617'
09:15 13:10 3.92 P CTU 40 WASH TAG TOF, WORKED PIPE SEVERAL TIMES UP AND DOWN ON FISH, PULLED HEAVY, SAT BACK
DOWN ON TOF, POOH
13:10 14:00 0.83 P CTU 40 WASH BUMPED UP, RUN PIPE DOWN, NO FISH
14:00 16:35 2.58 P CTU 40 WASH MU NEW BHA PER ENGINEER PROCEDURE. SHELL TEST TO 9K, OPEN WELL, RIH
16:35 19:45 3.17 P CTU 40 WASH TAG AT 6,591' CTM. COULD NOT GET DOWN WITH CUT LIP GUIDE.
19:45 22:00 2.25 P CTU 40 WASH PULL OUT OF HOLE.
22:00 23:00 1.00 P CTU 40 WASH LAY DOWN BHA. PICK UP VENTURI, STUMP CATCHER, AND SHOE ASSEMBLY. TEST
LUBRICATOR TO 9,000 PSI.
23:00 02:50 3.83 P CTU 40 WASH OPEN WELL. GO IN HOLE.
02:50 03:00 0.17 P CTU 40 WASH TAG FISH AT 10,613' CTM. GAINED 300 PSI DIFFERENTIAL PRESSURE. PICK UP 20'.
03:00 04:00 1.00 P CTU 40 WASH TAG FISH AT 10,613' CTM. GAINED 350 PSI PRESSURE. SIT ON FISH FOR 30 MIN. PICK UP 20'
AND HAD A 2K OVERPULL. TAG FISH AT 10,613'. SIT ON FISH WITH MAXIMUM ALLOWED WEIGHT
FOR 30 MIN. PICK UP AND HAD A 4K OVERPULL.
04:00 06:00 2.00 P CTU 40 WASH PULL OUT OF HOLE.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/12/2016 8:01:47AMPrinted: Page 1 of 1
Report Date: 07/13/2016
DOE: 55
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
049
Spud Date: 11/28/2015
DOL: 45 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: GOING IN HOLE.
24 Hr Summary: RETRIEVED MOTOR ASSEMBLY. DRILLED PLUG TO TOP OF GUN FISH.
RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:45 1.75 P CTU 40 WASH CONT POOH
07:45 08:00 0.25 P CTU 40 WASH BUMPED UP, SHUT IN WELL
08:00 08:20 0.33 P CTU 40 WASH RIH, FISH OUT OF HOLE
08:20 09:10 0.83 P CTU 40 WASH BREAK DOWN FISHING BHA, MU DRILL OUT BHA, SHELL TEST, OPEN WELL RIH
09:10 12:50 3.67 P CTU 40 WASH RIH TO TOP OF FISH
12:50 13:10 0.33 P CTU 40 WASH TAGGED PLUG @ 10,635, CONT RIH TO TOP OF FISH @ 10,730'
13:10 16:55 3.75 P CTU 40 WASH POOH
16:55 00:00 7.08 P CTU 40 WASH BUMPED UP, NOTICED PIN HOLE IN PIPE AT 830', CUT 900' OF PIPE
00:00 04:00 4.00 P CTU 40 WASH MAKE UP NEW COIL CONNECTOR AND BHA. DUAL FLAPPER VALVE. PRESSURE UP AND
TESTED BPV TO 5,000. – TEST GOOD AND CHARTED. VERIFY BALL SIZE AND ALL DRIFTS FOR
THE HYD DISCONN. MU AND BHA OF CONN, DUAL FLAPPER VALVE, ACCELERATOR, HYD JARS,
HYD DISCONN, AGITATOR, 3 1/8” MOTOR, VENTURI, WASH PIPE, STUMP CATCHER. STAB ON
WELL. SHELL TEST TO 9,000 PSI.
04:00 06:00 2.00 P CTU 40 WASH OPEN WELL. GO IN HOLE.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/13/2016 8:04:14AMPrinted: Page 1 of 1
Report Date: 07/14/2016
DOE: 56
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
050
Spud Date: 11/28/2015
DOL: 46 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: GOING IN HOLE.
24 Hr Summary: ATTEMPTED TO FISH W/L TOOLS.
RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:15 1.25 P CTU 40 WASH CONT RIH TO TOP OF FISH
07:15 09:20 2.08 P CTU 40 WASH TAG TOP OF FISH @ 10,739', WORKED PIPE ON FISH SEVERAL TIMES, SEEN PSI INCREASE
09:20 12:40 3.33 P CTU 40 WASH POOH TO SURFACE
12:40 13:00 0.33 P CTU 40 WASH COIL AT SURFACE
13:00 13:20 0.33 P CTU 40 WASH REMOVED BHA, NO FISH, VENTURI FULL OF SLIPS AND PLUG PARTS AND SAND
13:20 15:40 2.33 P CTU 40 WASH MAKE UP NEW BHA
15:40 19:00 3.33 P CTU 40 WASH NU ON WELL, SHELL TEST, OPEN WELL, RIH TO TOP OF FISH
19:00 20:23 1.38 P CTU 40 WASH TAG FISH AT 10,733' CTM. INCREASE PUMP RATE. PICK UP 20'. TAG FISH AT 10,733'. KILL PUMP.
PICK UP 20'. TAG FISH 10,733'. INCREASE PUMP RATE TO 4 BBL PER MIN. ROTATE ON FISH FOR
30 MIN AND LOST SET DOWN WEIGHT. MILL DOWN TO 10,735'. COULD NOT GAIN ANY MORE
FOOTAGE.
20:23 00:00 3.62 P CTU 40 WASH PULL OUT OF HOLE.
00:00 01:00 1.00 P CTU 40 WASH LAY DOWN BHA. FOUND 1' OF WIRELINE INSIDE OF SHOE. WE DID NOT LAY DOWN INDICATOR
PIN 5' INSIDE OF SHOE.
01:00 04:18 3.30 P CTU 40 WASH CUT 100' OF COIL. INSTALL NEW COIL CONNECTOR AND BHA. DUEL FLAPPER, ACCELERATOR,
BI-DI JAR, DISCONNECT, TOE TAPPER, MOTOR, WASH PIPE, 4.625'' OD STANDARD SHOE.
04:18 06:00 1.70 N CTU 54 RIGPROB REPAIR LEVEL WIND ON COIL UNIT.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/14/2016 8:09:11AMPrinted: Page 1 of 1
Report Date: 07/15/2016
DOE: 57
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
051
Spud Date: 11/28/2015
DOL: 47 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: P.O.O.H.
24 Hr Summary: CLEAN OVER FISH. ATTEMPT TO LATCH FISH.
RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:40 2.67 P CTU 40 WASH CONT RIH TO TOP OF FISH
08:40 09:30 0.83 P CTU 40 WASH TAG TOP OF FISH @ 10,740' WASHED DOWN TO 10,761, POOH
09:30 12:30 3.00 P CTU 40 WASH COIL AT SURFACE, SHUT IN WELL
12:30 13:00 0.50 P CTU 40 WASH NO FISH, INDICATOR PINS SHOW WE WASHED 24 FEET OVER THE TOP OF FISH
13:00 16:20 3.33 P CTU 40 WASH MU FISHING BHA
16:20 16:30 0.17 P CTU 40 WASH DURING PRESSURE TEST NOTICED PIN HOLE IN PIPE
16:30 18:00 1.50 P CTU 40 WASH REMOVE TOOLS AND CUT 500 FEET OF PIPE
18:00 00:15 6.25 P CTU 40 WASH MU FISHING BHA, TEST COIL CONNECTOR AND BACK PRESSURE VALVE, EQUALIZE WELL, RIH
TO TOP OF FISH
00:15 01:20 1.08 P CTU 40 WASH TAG FISH AT 10,744' CTM. SET DOWN 2K AND KICK PUMP ON TO LATCH FISH. PICK UP 20'. NO
FISH. TAG FISH. SET DOWN 8K. KICK PUMP ON. GO IN HOLE 7'. SET DOWN 8K. LOST SET DOWN
WEIGHT. GO IN HOLE TO 10,781'. PICK UP TO 10,755'. GO IN HOLE TO 10,784'. SET DOWN 10K.
KICK ON PUMP. PULL UP 20' KICK PUMP ON. NO PRESSURE INCREASE. GO IN HOLE PUMPING
3 BBL PER MIN TO 10,797'. SWALLOW FISH. PULL UP 20' WHILE PULLING 15K OVER. KICK IN
PUMP AND HAD OVERPRESSURE.
01:20 06:00 4.67 P CTU 40 WASH PULL OUT OF HOLE SLOWLY WHILE PULLING OVER PICK UP WEIGHT.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/15/2016 8:07:02AMPrinted: Page 1 of 1
Report Date: 07/16/2016
DOE: 58
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
052
Spud Date: 11/28/2015
DOL: 48 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: DRILLING PLUGS
24 Hr Summary: DRILL PLUGS 22-35
RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 10:00 4.00 P CTU 40 WASH CONT POOH TO SURFACE
10:00 10:30 0.50 P CTU 40 WASH COIL AT SURFACE, BLED OFF ALL LINES
10:30 16:15 5.75 P CTU 40 WASH RUN PIPE DOWN, FISH WAS CAUGHT, ND RISIERS AND BHA, NU BHA AND TEST
16:15 22:10 5.92 P CTU 40 WASH OPEN WELL AND RIH
22:10 22:31 0.35 P CTU 40 WASH TAG PLUG #22 @ 10,758' - 1 MIN , CIRC 3,000 PSI, WHP 500 PSI, PUMP RATE 4.5 BPM, RETURN
RATE 4.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
22:31 22:58 0.45 P CTU 40 WASH TAG PLUG #23 @ 10,964' - 5 MIN , CIRC 3,400 PSI, WHP 600 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
22:58 23:31 0.55 P CTU 40 WASH TAG PLUG #24 @ 11,150' - 6 MIN , CIRC 3,700 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
23:31 00:01 0.50 P CTU 40 WASH TAG PLUG #25 @ 11,335' - 4 MIN , CIRC 3,600 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
00:01 00:20 0.32 P CTU 40 WASH TAG PLUG #26 @ 11,538' - 3 MIN , CIRC 3,800 PSI, WHP 475 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
00:20 00:42 0.37 P CTU 40 WASH TAG PLUG #27 @ 11,736' - 2 MIN , CIRC 3,600 PSI, WHP 400 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
00:42 01:10 0.47 P CTU 40 WASH TAG PLUG #28 @ 11,938' - 4 MIN , CIRC 3,600 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
01:10 01:39 0.48 P CTU 40 WASH TAG PLUG #29 @ 12,141' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
01:39 02:13 0.57 P CTU 40 WASH TAG PLUG #30 @ 12,327' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
02:13 02:46 0.55 P CTU 40 WASH TAG PLUG #31 @ 12,527' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
02:46 03:23 0.62 P CTU 40 WASH TAG PLUG #32 @ 12,727' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
03:23 04:04 0.68 P CTU 40 WASH TAG PLUG #33 @ 12,926' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
04:04 04:44 0.67 P CTU 40 WASH TAG PLUG #34 @ 13,128' - 4 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
04:44 05:30 0.77 P CTU 40 WASH TAG PLUG #35 @ 13,327' - 5 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
05:30 06:00 0.50 P CTU 40 WASH TAG PLUG #36 @ 13,527' - 4 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/17/2016 8:07:57AMPrinted: Page 1 of 1
Report Date: 07/17/2016
DOE: 59
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
053
Spud Date: 11/28/2015
DOL: 49 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: RIGGING DOWN.
24 Hr Summary: DRILL PLUGS 37-51.
MOVE IN WIRELINE.24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:10 0.17 P CTU 40 WASH CONT WASHING DOWN TO PLUG 37
06:10 06:50 0.67 P CTU 40 WASH TAG PLUG #37 @ 13,726' - 5 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
06:50 07:30 0.67 P CTU 40 WASH TAG PLUG #38 @ 13,926' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
07:30 08:25 0.92 P CTU 40 WASH TAG PLUG #39 @ 14,125' - 7 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
08:25 09:10 0.75 P CTU 40 WASH TAG PLUG #40 @ 14,325' - 5 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
09:10 09:55 0.75 P CTU 40 WASH TAG PLUG #41 @ 14,501' - 8 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
09:55 10:53 0.97 P CTU 40 WASH TAG PLUG #42 @ 14,700' - 7 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
10:53 11:53 1.00 P CTU 40 WASH TAG PLUG #43 @ 14,900' - 6 MIN , CIRC 3,700 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
11:53 13:00 1.12 P CTU 40 WASH TAG PLUG #44 @ 15,104' - 4 MIN , CIRC 3,600 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
13:00 14:09 1.15 P CTU 40 WASH TAG PLUG #45 @ 15,307' - 4 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
14:09 15:03 0.90 P CTU 40 WASH TAG PLUG #46 @ 15,506' - 5 MIN , CIRC 3,800 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
15:03 15:54 0.85 P CTU 40 WASH TAG PLUG #47 @ 15,701' - 4 MIN , CIRC 3,600 PSI, WHP 450 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
15:54 16:58 1.07 P CTU 40 WASH TAG PLUG #48 @ 15,914' - 5 MIN , CIRC 3,700 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
16:58 17:48 0.83 P CTU 40 WASH TAG PLUG #49 @ 16,114' - 1 MIN , CIRC 3,900 PSI, WHP 400 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
17:48 18:30 0.70 P CTU 40 WASH TAG PLUG #50 @ 16,316' - 1 MIN , CIRC 3,900 PSI, WHP 400 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.
18:30 19:30 1.00 P CTU 40 WASH TAG PLUG #51 @ 16,465' - 1 MIN , CIRC 3,300 PSI, WHP 450 PSI, PUMP RATE 5 BPM, RETURN
RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO TOE SLEEVE.
19:30 20:30 1.00 P CTU 40 WASH STOP AT P.B.T.D. PUMP SWEEPS. PULL OUT OF HOLE PUMPING SWEEPS AS NEEDED.
20:30 03:54 7.40 P CTU 40 WASH OUT OF HOLE WITH COIL. BULLHEAD 200 BBLS OF 2% KCL.
03:54 06:00 2.10 P CTU 40 WASH RIG DOWN AND RELEASE ALL EQUIPMENT.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/18/2016 8:03:02AMPrinted: Page 1 of 1
Report Date: 07/21/2016
DOE: 63
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DJ GOSS / BARRY BROUSSARD
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
056
Spud Date: 11/28/2015
DOL: 52 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: WORKING ON NH WELL.
24 Hr Summary: TUBE UP WELL.
WAITING ON FLOWBACK.24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 09:00 3.00 P WOR 25 RCST CONT TESTING BOP'S
09:00 16:00 7.00 P WOR 25 RCST MAKE UP ON/OFF TOOL, 1 JT. 2 7/8" 6,5# J-55 TBG, 1ST, GLV, CONTINUE IN HOLE PICKING UP
TBG. INSTALLING GLV AS PER DESIGN. TO TOP OF PKR. AT 6,250'.
16:00 18:00 2.00 P WOR 25 RCST CONTINUE IN HOLE LATCH PKR. PULL TEST TO 20K OVER PIPE WT. SET 10K DOWN ON PKR.
PRESSURE UP BACK SIDE TO 1,000 PSI PRESS ON TBG. 1,000 PSI HOLD FOR 15 MIN. CHART
SAME. PRESS UP TBG. TO 1,000 PSI BLEED PRESS. OFF OF CSG. TO "0" PSI, AND MONITOR
TBG. AND CSG. FOR 15 MINUTES. RELEASE PRESS. ON TBG. RELEASE ON/OFF TOOL SPACE
OUT LAND TBG. WITH 10K COMPRESSION, RUN IN HOLD DOWN PINS, INSTALL BPV
18:00 21:00 3.00 P WOR 25 RCST RIG DOWN RIG FLOOR, NIPPLE DOWN BOPS AND FINAL FRAC VALVE, NIPPLE UP PROD. TREE,
PULL BPV, INSTALL 2 WAY CHECK, TEST VOID TO 250 LOW AND 5,000 PSI HIGH AND MONITOR
SAME FOR 15 MIN. TEST TREE TO 250 LOW AND 5,000 PSI HIGH AND CHART SAME FOR 15 MIN.
BLOW OUT PLUG AT 2,200 PSI.
21:00 06:00 9.00 P WOR 16 NUND MOVE RIG TO NH WELL.
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/21/2016 8:04:25AMPrinted: Page 1 of 1
Report Date: 07/22/2016
DOE: 64
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: GARY WILHITE / N/A
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
057
Spud Date: 11/28/2015
DOL: 53 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 43
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 400.00
API #: 4210542309
Current Activity: MIRU FLOWBACK EQUIPMENT
24 Hr Summary: MIRU FLOWBACK EQUIPMENT
CONTINUE RIGGING UP FLOWBACK EQUIPMENT24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 09:00 3.00 P MIRU 42 WOEP WAITING ON PERSONNEL
09:00 09:30 0.50 P MIRU 28 SFTYMTG HELD PREJOB SAFETY MEETING. DISCUSSED RIG UP SAFETY
09:30 12:30 3.00 P MIRU 18 OTHR BREAK FOR LUNCH
12:30 15:00 2.50 P MIRU 01 MIRU CONTINUE RIGGING UP FLOWBACK EQUIPMENT TAKING BREAKS AS NEEDED AND STAYING
HYDRATED.
15:00 18:00 3.00 P MIRU 18 OTHR SHUT DOWN
18:00 06:00 12.00 P MIRU 18 OTHR SECURE WELL FOR THE NIGHT
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
7/23/2016 8:05:34AMPrinted: Page 1 of 1
Report Date: 08/05/2016
DOE: 78
Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00
Country: USAState: TEXASField: WOLFCAMP EAST
Supervisors: DAVID STRUTTON / N/A
Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY
071
Spud Date: 11/28/2015
DOL: 67 AFE Days: Last BOP T.:
Release Date:
Report Number:Daily Operations
Report Onshore
CSG Test:**Data shared on this report is CONFIDENTIAL**
Rig:
Rig Phone:KB(ft): 2,664.01
POB: 3
Event: COMPLETION LAND
Location: Lat:
Long:
Safety Meeting Topic:
31° 1' 30.33092 N
101° 9' 22.17900 W Manhours: 28.00
API #: 4210542309
Current Activity: FLOWBACK OPERATIONS DAY 14
24 Hr Summary: FLOWBACK WELL THROUGH PRODUCTION EQUIPMENT / GAS LIFTING
FLOWBACK OPERATIONS24 Hr Forecast:
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P FB 28 SFTYMTG JSA SAFETY MEETING (PPE)
06:30 18:00 11.50 P FB 23 PRDT FLOWBACK OPERATIONS
18:00 18:30 0.50 P FB 28 SFTYMTG JSA SAFETY MEETING (NORM)
18:30 06:00 11.50 P FB 23 PRDT 05:00, TP 189 PSI, CSG 903 PSI, 64/64 CK, 262 BOPD, 2,064 BWPD, TOR 1,345 BBLS, TFR 28,971
BBLS, 8.50% RCV'D, CHL 59,259, H2S 0.3 PPM, CO2 1%, API 40.7, 888 MCFD, 552 MCFD (INJ.),
336 MCFD (FORM) TURN WELL OVER TO PRODUCTION AT 5:00 AM
24 HR VOLUMES:
OIL 280 BBLS
H2O 2,113 BBLS
FORMATION GAS 334 MCFD
Daily Operations Comments:
NO SPILLS, INJURIES OR OFFICIAL VISITS.
CASING
Size(in) MD(ft)/TVD(ft) LOT(ppg)
/
/
/
/ 14.000 67.00 67.00
/ 9.625 1,005.00 1,005.00
FLOWBACK
Gas Rate:
Choke Size:
Avg. Tbg. Press:
Avg. Csg. Press:
Fluid Rate (Water):
Fluid Rate (Oil):
Tot. Load Recovered:
FLUIDSFluids Co:
Fluids Eng:
Brine Type:
Pit Temp:
Density:
Viscosity:
Gel Type:
Nitrogen:
NTU:
COMPLETION STRING DETAILS
Down Hole Tool Co: Tool Sup:
Qty Description ID OD Top Set
PERFORATIONS
Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments
8/5/2016 8:06:06AMPrinted: Page 1 of 1