  • 8/13/2019 Daily Program Dec-2011

    1/21

    S.l.

    No.Description Work Program of 1st Dec. 2011 Achievement of 30th Nov Nov.2011

    Drainage pipe installation Drainage pipe installation in progress

    Sub-base materials laying Sub-base materials laying in progress

    Water Supply pipe Installation work Water Supply pipe Instal lation work in progress

    Layout of HT Cable Trench

    2 Segment 2A Settlement Record Settlement Record in progress

    Sand bagging for preloading work Sand bagging for preloading work in progress

    Surcharge material placement Surcharge material placement in progress

    Wall casting/Yard side/1st lift (CH 865-885) Concrete pouring of Base finished

    Concrete Pouring of Base (CH 885-900) Rebar fabrication executed

    5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in progress

    Shuttering of slab Shuttering of slab in progress

    Concrete pouring of Column

    7 W asa Relocation Newly installed line is functioning

    8 Laboratory / Field Test

    9 Interlocking Block ILB production ILB production in progress

    10 Dismantling work Mosque dismantling Mosque dismantling work in progress

    11 Released Material removing

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    Open Deep Drain4

    Segment 1A1

    Electric Sub station6

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program,1st Dec, 2011

    Segment 13

  • 8/13/2019 Daily Program Dec-2011

    2/21

    S.l.

    No.Description Work Program of 2nd Dec. 2011 Achievement of 1st Dec2011

    Drainage pipe installation Drainage pipe installation in progress

    Sub-base materials(Shingles) laying Sub-base materials(Shingles) laying in

    Water Supply pipe Installation work Water Supply pipe Installation work in p

    Earth excavation of HT Cable Trench Layout has given

    2 Segment 2A Settlement Record Settlement Record in progress

    Sand bagging for preloading work Sand bagging for preloading work in pr

    Surcharge material placement Surcharge material placement in progre

    Wall casting/Yard side/1st lift (CH 865-885) Concrete pouring of Base finished

    CC casting Soling executed

    5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in

    Shuttering of slab Shuttering of slab in progress

    Concrete pouring of Column

    Sheet Pile Sheet Pile casting Sheet Pile casting in progress

    RCC Drainage Pipe Concrete pouring Concrete Pouring in progress

    7 Wasa Relocation Newly installed line is functioning

    PDB Relocation Shutdown & new installed 33 KV line connection

    8 Laboratory / Field Test

    9 Interlocking Block ILB production ILB production in progress

    10 Dismantling work Mosque dismantling Mosque dismantling work in progress

    11 Released Material removing

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    Electric Sub station6

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program,2nd Dec, 2011

    Segment 13

    Open Deep Drain4

    Segment 1A1

  • 8/13/2019 Daily Program Dec-2011

    3/21

    S.l.

    No.Description Work Program of 3rd Dec.11 Achievement of 2nd Dec.11

    Drainage pipe installation Drainage pipe installation in progress

    Sub-base materials(Shingles) laying Sub-base materials(Shingles) laying in

    Water Supply pipe Installation work Water Supply pipe Installation work in p

    Earth excavation of HT Cable Trench Layout has given

    2 Segment 2A Settlement Record Settlement Record in progress

    Sand bagging for preloading work Sand bagging for preloading work in pr

    Surcharge material placement Surcharge material placement in progre

    Wall casting/Yard side/1st lift (CH 865-885) Concrete pouring of Base finished

    Rebar fabrication of Base CC executed

    5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in

    Shuttering of slab Shuttering of slab in progress

    Concrete pouring of Column Concrete pouring of Column in progres

    7 Sheet Pile Sheet Pile casting Sheet Pile casting in progress

    8 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring in progress

    9 Wasa Relocation Newly installed line is functioning

    10 PDB Relocation Dismantling of 11 KV Line Newly installed 33 KV line is live now.

    11 Laboratory / Field Test

    12 Interlocking Block ILB production ILB production in progress

    13 Dismantling work Mosque dismantling Mosque dismantling work in progress

    14 Released Material removing

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 3rd Dec,11

    Segment 13

    Open Deep Drain4

    Segment 1A1

    Electric Sub station6

  • 8/13/2019 Daily Program Dec-2011

    4/21

    S.l.

    No.Description Work Program of 4th Dec.11 Achievement of 3rd Dec.11

    Drainage pipe installation Drainage pipe installation in progress

    Sub-base materials(Shingles) laying Sub-base materials(Shingles) laying in

    Water Supply pipe Installation work Water Supply pipe Installation work in p

    Earth excavation of HT Cable Trench Layout has given

    2 Segment 2A Settlement Record Settlement Record in progress

    Sand bagging for preloading work Sand bagging for preloading work in pr

    Surcharge material placement Surcharge material placement in progre

    Wall casting/Yard side/1st lift (CH 865-885) Concrete pouring of Base finished

    Concrete pouring of Base Rebar fabrication executed

    5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in

    Shuttering of slab Shuttering of slab in progress

    Concrete pouring of Column Concrete pouring of Column in progres

    7 Sheet Pile Sheet Pile casting Sheet Pile casting in progress

    8 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring in progress

    9 Wasa Relocation Newly installed line is functioning

    10 PDB Relocation Dismantling of 11 KV Line Newly installed 33 KV line is live now.

    11 Laboratory / Field Test

    12 Interlocking Block ILB production ILB production in progress

    13 Dismantling work Mosque dismantling Mosque dismantling work in progress

    14 Released Material removing

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    Electric Sub station6

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 4th Dec,11

    Segment 13

    Open Deep Drain4

    Segment 1A1

  • 8/13/2019 Daily Program Dec-2011

    5/21

    S.l.

    No.Description Work Program of 5th Dec.11 Achievement of 4th Dec.11

    Drainage pipe installation Drainage pipe installation in progress

    Sub-base materials(Shingles) laying Sub-base materials(Shingles) laying in

    Water Supply pipe Installation work Water Supply pipe Installation work in p

    Earth excavation of HT Cable Trench Layout has given

    2 Segment 2A Settlement Record Settlement Record in progress

    Sand bagging for preloading work Sand bagging for preloading work in pr

    Surcharge material placement Surcharge material placement in progre

    Wall casting/Country side/1st lift (CH 865-885) Concrete pouring of Base finished

    Concrete pouring of Base Rebar fabrication executed

    5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in

    6 Electric Sub station Shuttering of slab Shuttering of slab in progress

    7 Sheet Pile Sheet Pile casting Sheet Pile casting in progress

    8 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring in progress

    9 Wasa Relocation Newly installed line is functioning

    10 PDB Relocation Dismantling of 11 KV Line Newly installed 33 KV line is live now.

    11 Laboratory / Field Test

    12 Interlocking Block ILB production ILB production in progress

    13 Dismantling work Mosque dismantling Mosque dismantling work in progress

    14 Released Material removing

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 5th Dec,11

    Segment 13

    Open Deep Drain4

    Segment 1A1

  • 8/13/2019 Daily Program Dec-2011

    6/21

    S.l.

    No.Description Work Program of 6th Dec.11 Achievement of 5th Dec.11

    1 Yard Drainage(Seg-1A) Earth excavation and pipe installat ion

    2 Water supply line (Seg-1A) Earth Excavation for Pipe laying 250mm pipe welding (04 Nos)3 RMG Track (Seg-1A) Sub-base materials laying & Bed Rolling Shingles-Sand mixing (500cft)

    4 Segment 2A Settlement Record Settlement Record in progress for 45th day

    Sand bagging for preloading workSand bagging of preloading work in progress (

    Nos)

    Surcharge material placement Surcharge material placement (40,000cft)

    Wall casting/Country side/2nd lift ,CH 870-

    890,(Quantity=6cum)

    Wall casting/Country side/1st lift ,CH 910-

    930,(Quantity= 6cum)

    Earth excavation,soling,CC, CH755-765Wall casting/Yard side/1st lift ,CH 870-

    880,(Quantity=4.5 cum)

    7 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation in progress(CH 550-62

    Sub base watering & Shoulder preparation Sub base watering & Shoulder preparation in

    8 Electric Sub station Shuttering and Rebar binding of slab Shuttering and Rebar binding of slab in progr

    9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile (01 Nos)

    10 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=26 Nos)

    12 PDB Relocation Dismantling of 11 KV LineExcavation executed for pole driving (11KV

    Line),Quantity=7 Nos

    13 Laboratory / Field Test

    14 Interlocking Block ILB production ILB production in progress (Quantity=8000 No

    15 Released Material removing 2 trip Rail bit deposite to CPA Store no-1

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 6th Dec,11

    Segment 15

    Open Deep Drain6

  • 8/13/2019 Daily Program Dec-2011

    7/21

    S.l.

    No.Description Work Program of 9th Dec.11 Achievement of 8th Dec.11

    1 Yard Drainage(Seg-1A) CC casting 500mm pipe fixing (5 Nos)

    2 Water supply line (Seg-1A) Welding & Placing Earth Excavation executed

    3 RMG Track (Seg-1A) Earth excavation (remaining 26m) Rolling

    4 Segment 2A Settlement Record Settlement Record in progress for 48th

    Sand bagging for preloading workSand bagging of preloading work in pro

    Nos)

    Surcharge material placement Surcharge material placement (42,000c

    PVD Driving

    Wall casting/Country side/3rd lift ,CH 900-

    920,(Quantity=7cum)

    Wall casting/Country side/1st lift ,CH 93

    950,(Quantity= 6cum)

    Bracing fixing

    Soling,CC, CH 1000-1020 Earth Excavation

    Sub base preparation (CH 550-620) Sub base preparation in progress(CH

    Sub base watering & Shoulder preparation Sub base watering & Shoulder prepara

    8 Electric Sub station Shuttering and Rebar binding of slab Shuttering and Rebar binding of slab i

    9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile (01 Nos

    10 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=21 Nos

    12 PDB Relocation Pole erection Pole erection (2 Nos)

    13 Laboratory / Field Test

    14 Interlocking Block ILB production ILB production in progress (Quantity=1

    15 Released Material removing

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 9th Dec,11

    Open Deep Drain6

    Rail Relocation7

    Segment 15

  • 8/13/2019 Daily Program Dec-2011

    8/21

    S.l.

    No.Description Work Program of 10th Dec.11 Achievement of 9th Dec.11

    1 Yard Drainage(Seg-1A) 300 mm pipe fixing CC casting executed

    2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress

    3 RMG Track (Seg-1A) Sub-base material laying Earth excavation executed for

    Ballast mixing & laying

    4 Segment 2A Settlement Record Settlement Record in progress

    Sand bagging for preloading workSand bagging of preloading wo

    Nos)

    Surcharge material placement Surcharge material placement

    PVD Driving PVD Driving in progress

    Shuttering/Yard side/3rd lift ,CH 900-920Wall casting/Country side/3rd l

    920,(Quantity= 6cum)

    Bracing fixing Bracing fixing in progress

    Soling,CC, CH 1000-1020

    Sub base preparation (CH 550-620) Sub base preparation in progr

    Sub base watering & Shoulder preparation Sub base watering & Shoulder

    8 Electric Sub station Shuttering and Rebar binding of parapet Shuttering and Rebar binding o

    9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile

    10 RCC Drainage Pipe Concrete pouring(300mm)Concrete Pouring (300mm dia=

    nos)

    12 PDB Relocation Pole erection Pole erection (3 Nos)

    13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in

    14 Interlocking Block ILB production ILB production in progress (Qu

    15 Released Material removing

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 10th Dec,11

    Open Deep Drain6

    Rail Relocation7

    Segment 15

  • 8/13/2019 Daily Program Dec-2011

    9/21

    S.l.

    No.Description Work Program of 11th Dec.11 Achievement of 10th Dec.11

    1 Yard Drainage(Seg-1A) Base CC & Side CC Casting CC Casting of 3 Nos Gullyhole

    2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress

    3 RMG Track (Seg-1A) Sub-base material laying Earth excavation executed for r

    Ballast mixing & laying Ballast mixing & laying in pro

    4 Segment 2A Settlement Record Settlement Record in progress

    Sand bagging for preloading workSand bagging of preloading wo

    Nos)

    Surcharge material placement Surcharge material placement

    PVD Driving PVD Driving in progress (3000

    Wall casting/Country side/2nd lift ,CH 860-

    880,(Quantity= 5cum)

    Wall casting/Country side/2nd l

    900,(Quantity= 5cum)

    Bracing fixing Bracing fixing in progress

    CC Casting CH (1020-1040) CC Casting executed (CH 100

    Sub base preparation (CH 550-620) Sub base preparation in progr

    Sub base watering & Shoulder preparation Sub base watering & Shoulder

    8 Electric Sub station Shuttering and Rebar binding of parapet Concrete casting of Parapet (P

    9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile

    10 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=

    12 PDB Relocation Cable fitting Pole erection (3 Nos)

    13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in p

    14 Interlocking Block ILB production ILB production in progress (Qu

    15 Released Material removing

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 11th Dec,11

    Open Deep Drain6

    Rail Relocation7

    Segment 15

  • 8/13/2019 Daily Program Dec-2011

    10/21

    S.l.

    No.Description Work Program of 12th Dec.11 Achievement of 11th Dec.11

    1 Yard Drainage(Seg-1A) 500mm pipe fixing Base CC & Side CC Casting ex

    2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress(

    3 RMG Track (Seg-1A) Sub-base material laying Sub-base material laying in pro

    Ballast mixing & laying Ballast mixing & laying in pro

    4 Segment 2A Settlement Record Settlement Record in progress

    Sand bagging for preloading workSand bagging of preloading wo

    Nos)

    Surcharge material placement Surcharge material placement

    PVD Driving PVD Driving in progress (3200

    Shuttering and Rebar binding ,CH 840-860Wall casting/Country side/2nd l

    880,(Quantity= 5cum)

    Bracing fixing Bracing fixing in progress

    Rebar binding of Base CC Casting executed CH (100

    Sub base preparation (CH 550-620) Sub base preparation in progre

    Sub base watering & Shoulder preparation Sub base watering & Shoulder

    8 Electric Sub station Concrete casting of Parapet Concrete casting of Parapet in

    9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile

    Transverse Sleeper Concrete pouring Concrete pouring in progress(1

    10 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=

    12 PDB Relocation Cable fitting Pole erection (3 Nos)

    13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in p

    14 Interlocking Block ILB production ILB production in progress (Qu

    15 Released Material removing

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 12th Dec,11

    Open Deep Drain6

    Rail Relocation7

    Segment 15

  • 8/13/2019 Daily Program Dec-2011

    11/21

    S.l.

    No.Description Work Program of 13th Dec.11 Achievement of 12th Dec.11

    600 mm dia Pipe fixing 500mm pipe fixing in progress (0

    Base casting of Gully hole

    2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress(0

    Levelling & Rolling Sub-base material(520mm thick

    Ballast mixing & laying Ballast mixing & laying in prog

    4 Segment 2A Settlement Record Settlement Record in progress fo

    Sand bagging for preloading work Sand bagging of preloading wor

    Surcharge material placement Surcharge material placement in

    Concrete pouring of Base(CH 1000-1020)Wall casting/Country side/2nd lif

    880,(Quantity= 5cum)

    Bracing fixing Bracing fixing in progress

    Rebar binding of Base CC Casting executed CH (1000

    Sub base preparation (CH 550-620) Sub base preparation in progres

    Sub base watering & Shoulder preparation Sub base watering & Shoulder p

    8 Electric Sub station Concrete casting of Parapet Concrete casting of Parapet in p

    9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile (

    10 Transverse Sleeper Concrete pouring Concrete pouring in progress(12

    11 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2

    12 PDB Relocation Cable fitting Cable fitting in progress

    13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pr

    14 Interlocking Block ILB production ILB production in progress (Qua

    15 Dismantling work CC Dismantling CC Dismantling in progress

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    3

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 13th Dec,11

    Open Deep Drain6

    Rail Relocation7

    Segment 15

    Yard Drainage(Seg-1A)1

    RMG Track (Seg-1A)

  • 8/13/2019 Daily Program Dec-2011

    12/21

    S.l.

    No.Description Work Program of 14th Dec.11 Achievement of 13th Dec.11

    300 mm dia Pipe fixing 600 mm dia Pipe fixing in progre

    Base casting of Gully hole Base casting of Gully hole in pro

    2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress(0

    3 RMG (Seg-1A) Ballast mixing & laying Ballast mixing & laying in prog

    4 Segment 2A Settlement Record Settlement Record in progress f

    Sand bagging for preloading work Sand bagging of preloading wor

    Surcharge material placement Surcharge material placement in

    Wall casting /1st l ift(CH 1000-1020) Concrete pouring of Base (9 cum

    Plastering & Net cement finishin

    Ballast mixing & laying Ballast mixing & laying in progre

    Concrete casting of Parapet Rebar fabrication & Shuttering e

    Shuttering of slab (2nd portion) Shuttering of slab in progress (2

    9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Rebar fabrication & Shuttering e

    10 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in progress(10

    11 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2

    12 PDB Relocation Cable fitting Cable fitting in progress

    13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pr

    14 Interlocking Block ILB production ILB production in progress (Qua

    15 Dismantling work CC Dismantling CC Dismantling in progress

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    Rail Relocation7

    5

    Yard Drainage(Seg-1A)1

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 14th Dec,11

    Segment 1

    Electric Sub station8

    Open Deep Drain6

  • 8/13/2019 Daily Program Dec-2011

    13/21

    S.l.

    No.Description Work Program of 15th Dec.11 Achievement of 14th Dec.11

    600 mm dia Pipe fixing & Side CC 300 mm dia Pipe fixing (03 Nos)

    Base casting of Gully hole Base casting of Gully hole in pro

    2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress(0

    3 RMG (Seg-1A) Ballast mixing & laying Ballast mixing & laying in prog

    4 Segment 2A Settlement Record Settlement Record in progress f

    Sand bagging for preloading work Sand bagging of preloading wor

    Surcharge material placement Surcharge material placement in

    6 Segment-2 Clearing & Grubbing

    Wall casting /1st lift/Yard Side(CH 1000-1020) Wall casting /1st lift / Navy Side

    Ballast mixing & laying Ballast mixing & laying in progre

    Concrete casting of Parapet Concrete casting of Parapet in p

    Shuttering of slab (2nd portion) Shuttering of slab in progress (2

    10 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile(0

    11 Transverse Sleeper Concrete pouring Concrete pouring in progress(10

    12 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2

    13 PDB Relocation Cable fitting Cable fitting in progress

    14 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pr

    15 Interlocking Block ILB production ILB production in progress (Qua

    16 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) in progr

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    9

    Open Deep Drain7

    Rail Relocation8

    5

    Yard Drainage(Seg-1A)1

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 15th Dec,11

    Segment 1

    Electric Sub station

  • 8/13/2019 Daily Program Dec-2011

    14/21

    S.l.

    No.Description Work Program of 18th Dec.11 Achievement of 17th Dec.11

    Gully hole wall shuttering & Casting (04 Nos) Base CC Casting (15rm),Side C

    Manhole CC Casting Manhole Base Casting (01 no)

    2 Water supply line (Seg-1A) 100 mm dia MS pipe welding 250 mm dia MS Pipe welding &

    3 RMG (Seg-1A) Ballast mixing & layingBallast mixing & laying in prog

    layer(1000 cft)

    4 Segment 2A Settlement Record Settlement Record in progress fo

    Sand bagging for preloading work Sand bagging of preloading wor

    Surcharge material placement Surcharge material placement in

    6 Segment-2 Clearing & Grubbing Clearing & Grubbing in progress

    Wall casting /1st lift/Navy Side(CH 1100-1105) Base Casting,10 cum (CH 1100-

    Wall casting /3rd lift/country Side(CH 890-908) Bracing fixing (18 Nos)

    Ballast mixing & laying

    Concrete casting of Parapet Concrete casting of Parapet in p

    Shuttering of slab (2nd portion) Shuttering of slab in progress (2

    10 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile(0

    11 Transverse Sleeper Concrete pouring Concrete pouring in progress(10

    12 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2

    13 PDB Relocation Cable fitting Cable fitting in progress

    14 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pr

    15 Interlocking Block ILB production ILB production in progress (Qua

    16 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) in progr

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    5

    Yard Drainage(Seg-1A)1

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 18th Dec,11

    Segment 1

    Electric Sub station9

    Open Deep Drain7

    Rail Relocation8

  • 8/13/2019 Daily Program Dec-2011

    15/21

    S.l.

    No.Description Work Program of 21th Dec.11 Achievement of 20th Dec.11

    300mm(8 Nos),700mm(6 Nos) dia pipe fixing 700 mm (06 Nos) & 300mm (08 N

    15rm Base CC & 45rm side CC casting

    2 Water supply line (Seg-1A) 100 mm dia MS pipe welding 250 mm dia MS Pipe welding & la

    3 RMG (Seg-1A) Ballast mixing & layingBallast mixing & laying in prog

    layer(1200 cft)

    Shingles laying (180mm layer)

    4 Pre-cast pile driving(Seg-1A) 02 Nos 03 Nos driving finished (Light

    5 Segment 2A Settlement Record Settlement Record in progress fo

    Sand bagging for preloading work Sand bagging of preloading work

    Surcharge material placement Surcharge material placement in

    7 Segment-2 Clearing & Grubbing Clearing & Grubbing in progress

    Wall casting /2nd lift/Port Side(CH 1100-1125) Rebar fabrication & Shuttering ex

    Ballast mixing & laying(Ch 0-200) Ballast mixing & laying in progres

    10 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab in progress (2n

    11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile(0

    12 Transverse Sleeper Concrete pouring Concrete pouring in progress(10

    13 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2

    14 PDB Relocation Cable fitting Cable fitting in progress

    15 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pro

    16 Interlocking Block ILB production ILB production in progress (Qua

    17 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) in progre

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    Open Deep Drain8

    Yard Drainage(Seg-1A)1

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 21th Dec,11

    Segment 1

    Rail Relocation9

    6

  • 8/13/2019 Daily Program Dec-2011

    16/21

    S.l.

    No.Description Work Program of 22th Dec.11 Achievement of 21th De

    15rm Base CC & 45rm side CC casting 300mm(8 Nos),700mm(6

    2 nos Gully hole wall cast

    Ballast mixing & laying 1st layer

    (Area=15mX22m)

    Ballast mixing & laying

    layer(Area=22mX10m))

    Shingles laying (180mm layer)

    Earth Excavation for 2nd portion (59 rm)

    4 Pre-cast pile driving(Seg-1A) 01 No (Anchor proof) 01 No driving finished (

    5 Segment 2A Settlement Record Settlement Record in pro

    Sand bagging for preloading work (2500 Nos) Sand bagging of preloadi

    Surcharge material placement (50,000 cft) Surcharge material place

    Clearing & Grubbing Clearing & Grubbing in pr

    150mm local sand laying 150mm local sand laying

    Wall casting /2nd lift/Navy Side(CH 1100-1125) Wall casting /2nd lift/Yard

    Wall casting /3rd lift/Navy Side(CH 900-915)

    Ballast mixing & laying(Ch 0-200) Ballast mixing & laying in

    10 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab in prog

    11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Shee

    12 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in prog

    13 RCC Drainage Pipe Concrete pouring(300mm=22 Nos)) Concrete Pouring (300mm

    14 PDB Relocation Cable fitting Cable fitting in progress

    15 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinde

    16 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in progre

    17 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) i

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    9

    6

    Open Deep Drain8

    Yard Drainage(Seg-1A)1

    RMG (Seg-1A)3

    Segment-27

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 22th Dec,11

    Segment 1

    Rail Relocation

  • 8/13/2019 Daily Program Dec-2011

    17/21

    S.l.

    No.Description Work Program of 24th Dec.11 Achievement of 23th De

    800mm(6 Nos) & 300mm (8Nos) Installation 300mm(8 Nos), installati

    15rm Base CC 15 rm Side CC 15rm Base CC 15 rm Sid

    2 RMG (Seg-1A) Shingles laying (180mm layer)Ballast mixing & laying

    layer(Area=22mX12m)

    3 Pre-cast pile driving(Seg-1A) 01 No (Pile No-01/Anchor proof) 01 No driving f inished

    4 Segment 2A Settlement Record Settlement Record in pro

    Sand bagging for preloading work (2500 Nos) Sand bagging of preload

    Surcharge material placement (50,000 cft) Surcharge material place

    Clearing & Grubbing Clearing & Grubbing in p

    150mm local sand laying 150mm local sand laying

    Wall casting /3rd lift/Navy Side(CH 1100-1125) Wall casting /2nd lift/Nav

    Wall casting /3rd lift/Country Side(CH 900-915)

    Bal last mixing & laying(Ch 0-200) Bal last mixing & laying in

    Sleepers & Rail bit fixing Sleepers & Rail bit fixing

    9 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab in prog

    10 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of She

    11 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in prog

    12 RCC Drainage Pipe Concrete pouring(300mm=22 Nos)) Concrete Pouring (300m

    13 PDB Relocation Shut down and Connection with main line Cable fitting completed

    14 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylind

    15 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in progre

    16 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2)

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    Open Deep Drain7

    Yard Drainage(Seg-1A)1

    Segment-26

    Rail Relocation8

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 24th Dec,11

    Segment 15

  • 8/13/2019 Daily Program Dec-2011

    18/21

    S.l.

    No.Description Work Program of 25th Dec.11 Achievement of 24th Dec.11

    800mm(6 Nos) & 300mm (8Nos) Installation 800mm(6 Nos) & 300mm (8Nos) Ins

    30 rm Side CC 15rm Base CC 15 rm Side CC comp

    CC Casting of 3 Nos Gully hole.

    2 RMG (Seg-1A) Shingles laying (180mm layer) Shingles laying (180mm layer),A

    3 Pre-cast pile driving(Seg-1A) 01 No (Pile No-01/Anchor proof) No driving for mechanical fault

    4 Segment 2A Settlement Record Settlement Record in progress for 6

    Sand bagging for preloading work (2500 Nos) Sand bagging of preloading work in

    Surcharge material placement (50,000 cft) Surcharge material placement in pro

    Clearing & Grubbing Clearing & Grubbing in progress

    150mm local sand laying 150mm local sand laying in progres

    Wall casting /3rd lift/Navy Side(CH 1100-1125) Bracing fixing (10 rm)

    Wall casting /3rd lift/Country Side(CH 900-915)

    Ballast mixing & laying(Ch 0-200) Ballast mixing & laying in progress (

    Sleepers & Rail bit fixing Sleepers & Rail bit fixing in progress

    9 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab in progress (2nd p

    10 Sheet Pile Concrete pouring of Sheet Pile(01 Nos)

    11 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in progress(10No

    12 RCC Drainage Pipe Concrete pouring(300mm=23 Nos)) Concrete Pouring (300mm dia=22N

    13 PDB Relocation Old pole removing connection of 11KV line completed

    14 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in progr

    15 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in progress (Quantit

    16 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) in progress

    Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    6

    Rail Relocation8

    NCT BACK-UP PROJECT, CHITTAGONG

    Work Program of 25th Dec,11

    Segment 15

    Open Deep Drain7

    Segment-2

    Yard Drainage(Seg-1A)1

  • 8/13/2019 Daily Program Dec-2011

    19/21

    S.l.

    No.Description Work Program of 27th Dec.11 Achievement of 26

    Base CC of 15rm (for 300mm) 800mm(1 No) ,700m

    Base casting of 4 Nos Gully hole Rebar binding of Ba

    2 Water Supply Line Welding of100mm dia pipe Welding of100mm d

    3 RMG (Seg-1A) Earth Excavation (Length=59m) Shingles laying (18

    4 Pre-cast pile driving(Seg-1A) 01 No (Pile No-02/Anchor proof) 01 No (Pile No-01/A

    5 Segment 2A Settlement Record Settlement Record i

    Sand bagging for preloading work (2500 Nos) Sand bagging of pre

    Surcharge material placement (50,000 cft) Surcharge material

    Clearing & Grubbing Clearing & Grubbing

    300mm sand blanket laying 150mm local sand la

    Navy gate wall casti

    Ballast mixing & laying(Ch 0-200) Ballast mixing & layi

    Sleepers & Rail bit fixing Sleepers & Rail bit f

    10 Electric Sub station

    11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of

    12 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in

    13 RCC Drainage Pipe Concrete pouring(500mm=05 Nos)) Concrete Pouring (5

    14 PDB Relocation Old pole removing Old pole removing in

    15 Laboratory / Field Test Regular Test (ILB/Cylinder) FDD Test of 150mm

    16 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in pr

    17 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg

    18

    Road maintainance

    work(Program of Prime

    Minister)

    Rolling & water sprayingPipe removing,Road

    progress

    Project Manager Sub Assistant Engineer-1 Sub Assistant Enginee

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    NCT BACK-UP PROJECT, CHITTAGON

    Work Program of 27th Dec,11

    Segment 16

    Yard Drainage(Seg-1A)1

    7

    Rail Relocation9

    Open Deep Drain8

    Segment-2

  • 8/13/2019 Daily Program Dec-2011

    20/21

    S.l.

    No.Description Work Program of 29th Dec.11 Achievement of 28t

    300 mm dia (02 Nos) pipe installation 500mm(1 No) , 300m

    Base CC (30rm) Side CC (10rm)

    Gully hole base casting (01 no),wall casting (2

    nos),manhole base casting (1 no)

    Base casting of Gull

    1 no )

    Earth excavation Ballast laying (300m

    Rebar fabrication of longitudinal sleepers

    3 Pre-cast pile driving(Seg-1A) 01 No (Pile No-22/Anchor proof) 01 No (Pile No-03/A

    4 Segment 2A Settlement Record Settlement Record in

    Sand bagging for preloading work (2000 Nos) Sand bagging of pre

    Surcharge material placement (50,000 cft) Surcharge material p

    Clearing & Grubbing Clearing & Grubbing

    300mm sand blanket laying 300mm sand blanket

    Back filling at Navy gate Navy gate wall castin

    Earth excavation (CH 900-920)

    Ballast mixing & laying(Ch 0-400) Ballast mixing & layin

    Sleepers & Rail bit fixing Sleepers & Rail bit fix

    9 Road Type-1 Sub base material placement (2nd layer)

    10 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab (2n

    11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of S

    12 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in p

    13 RCC Drainage Pipe Concrete pouring(500mm=05 Nos)) Concrete Pouring (50

    14 PDB Relocation Old pole removing Old pole removing in

    15 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cy

    16 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in pro

    17 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-

    Project Manager Sub Assistant Engineer-1 Sub Assistant Enginee

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA

    6

    Rail Relocation8

    Open Deep Drain7

    Segment-2

    NCT BACK-UP PROJECT, CHITTAGON

    Work Program of 29th Dec,11

    Segment 15

    Yard Drainage(Seg-1A)1

    RMG (Seg-1A)2

  • 8/13/2019 Daily Program Dec-2011

    21/21

    S.l.

    No.Description Work Program of 31th Dec.11 Achievement o

    300 mm dia (02 Nos) pipe installation 500mm(1 No) ,

    Base CC (30rm) Side CC (10rm)

    Gully hole base casting (01 no),wall casting (2

    nos),manhole base casting (1 no)

    Base casting of

    1 no )

    Singles Laying 1st layer(520mm thick)Earth excavati

    phase)

    Rebar fabrication of longitudinal sleepersRebar fabricat

    progress

    3 Pre-cast pile driving(Seg-1A)All materials of load test reached at site and

    preparation in progress01 No (Pile No-

    4 Segment 2A Settlement Record Settlement Reco

    Sand bagging for preloading work (2000 Nos) Sand bagging of

    Surcharge material placement (50,000 cft) Surcharge mate

    Clearing & Grubbing Clearing & Grub

    300mm sand blanket laying 300mm sand bla

    Back filling at Navy gate Back filling at Na

    Earth excavation (CH 1000-1040) Earth excavatio

    Wall casting at Navy gate (Ch 1100-1125) /3rd lift

    /yard sideRebar fabricatio

    Ballast mixing & laying(Ch 0-600) Ballast mixing &

    Sleepers & Rail bit fixing(Ch 0-600) Sleepers & Rail

    9 Road Type-1 Sub base material placement (2nd layer) Sub base mater

    10 Electric Sub station Shuttering of slab (2nd portion) Shuttering of sla

    11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pourin

    12 Transverse Sleeper Concrete pouring (10 Nos) Concrete pourin

    13 RCC Drainage Pipe Concrete pouring(500mm=05 Nos)) Concrete Pourin

    14 PDB Relocation Old pole removing Old pole removi

    15 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (IL

    16 Interlocking Block ILB production (Quantity=13000 Nos) ILB production

    17 Dismantling work CC Dismantling (Seg-2) CC Dismantling

    Project Manager Sub Assistant Engineer-1 Sub Assistant En

    NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CP

    NCT BACK-UP PROJECT, CHITTAG

    Work Program of 31th Dec,11

    Segment 15

    Yard Drainage(Seg-1A)1

    RMG (Seg-1A)2

    6

    Rail Relocation8

    Segment-2

    Open Deep Drain7