Date post: | 25-Jul-2015 |
Category: |
Health & Medicine |
Upload: | innobasque-agencia-vasca-de-la-innovacion |
View: | 2,047 times |
Download: | 1 times |
challenging to manufacture
tailor-made quality control regulatory uncertainty
silver-lining: tough to raise capital
• design GMP facility • certify GMP facility • establish batch record • scale-up manufacturing • scale-out manufacturing
• design GMP facility • certify GMP facility • establish batch record • qualify operators • “tailor-made” quality control
Phase 1 Phase 2 Phase 3Pre-clinical
• design & design GMP facility • establish batch record • scale-up manufacturing • qualify operators • “tailor-made” quality control
• scale-out manufacturing
• fine balance between flexibi- lity versus clear requirements • design & discuss clinical trials • request ATMP certification • request SME status • request orphan designations • request scientific advice
Phase 1 Phase 2 Phase 3Pre-clinical
• ATMP certification • SME status • design clinical trials
• orphan designations • scientific advice
Key aspects in fundraising: • team • geographical location • product / technology • IP • University spin-off
Amusing limiting steps: • right door • tradition • additional travelling (location) • placement agents vs. personal
Key aspects in fundraising: • team • geographical location • product / technology • IP • University spin-off