+ All Categories
Home > Documents > DAQ fo KL and TOF

DAQ fo KL and TOF

Date post: 06-Jan-2016
Category:
Upload: linore
View: 23 times
Download: 0 times
Share this document with a friend
Description:
DAQ fo KL and TOF. Jean-Sebastien Graulich, Geneva. General Information Status of Synchronization problem FEE for TOF2. Reminder. TOF Front End KL Front End. Issues (1). Cross Talk Possible sources Splitter RC Shaper Twisted pair cable Affecting both TOF and KL - PowerPoint PPT Presentation
13
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 1 DAQ fo KL and TOF DAQ fo KL and TOF o General Information o Status of Synchronization problem o FEE for TOF2 Jean-Sebastien Graulich, Geneva
Transcript
Page 1: DAQ  fo  KL and TOF

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 1

DAQ fo KL and TOFDAQ fo KL and TOF

o General Information

o Status of Synchronization problem

o FEE for TOF2

Jean-Sebastien Graulich, Geneva

Page 2: DAQ  fo  KL and TOF

ReminderReminder

TOF Front EndTOF Front End

KL Front EndKL Front End

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 2

Page 3: DAQ  fo  KL and TOF

Issues (1)Issues (1)

Cross TalkCross Talk Possible sources

Splitter RC Shaper Twisted pair cable

Affecting both TOF and KL Cabling done in such a way that Requiring

coincidence between opposite PMTs reduce the effect strongly but not completely

Needs some dedicated studies

Action: A better splitter is under Action: A better splitter is under production in Genevaproduction in Geneva

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 3

Page 4: DAQ  fo  KL and TOF

Cross TalkCross Talk

Consequence:Consequence:

Dead Channel unnoticed ! (rate Dead Channel unnoticed ! (rate != 0)!= 0)

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 4

- S6 in TOF 1 (ch 73)

- Disconnected in the hall

- Probably for the entire September run

TDC01 Channel Number

Co

un

ts

TDC00 Channel Number

Co

un

ts

Page 5: DAQ  fo  KL and TOF

Issues (2)Issues (2)

Discriminator dead timeDiscriminator dead time Minimum width of logic signal after

discriminator:

100 ns100 ns Double pulse resolution: 110 nsDouble pulse resolution: 110 ns

In a given TOF PMT, it is IMPOSSIBLE to see two hits in the same burst !

Complying with specifications but a Complying with specifications but a real limitationreal limitation

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 5

Page 6: DAQ  fo  KL and TOF

Issues (3)Issues (3)

Noise in FADCNoise in FADC Fluctuating baseline Seems to be time correlated with the particle

trigger

Affects Charge resolutionAffects Charge resolution Needs dedicated studies

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 6

Page 7: DAQ  fo  KL and TOF

Synchronization Synchronization ProblemProblem

TOF and KL FEE in different VME TOF and KL FEE in different VME CratesCrates

Each crate receives separate DAQ trigger at the end of the spill

Perfect Synchronization needed for Perfect Synchronization needed for correlation between TOF and KLcorrelation between TOF and KL

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 7

Page 8: DAQ  fo  KL and TOF

Understanding the Understanding the ProblemProblem

Synchronization can be lost because ofSynchronization can be lost because of Unstable electronics in DAQ trigger distribution Unstable behavior of the VME/Pci Interface

The DAQ software release the busy The DAQ software release the busy and enables the DAQ trigger receiver and enables the DAQ trigger receiver channel after readoutchannel after readout

Must go through the VME/Pci Interface It happens that one of the two commands is not

executed properly… Unpredictable Cured only by a power cycle

Has to be monitoredHas to be monitored

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 8

Page 9: DAQ  fo  KL and TOF

DAQ Trigger MonitorDAQ Trigger Monitor

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 9

Number of LDC receiving a DAQ Trigger per DAQ event

LDC Number

cou

nts

# o

f D

AQ

Tri

gg

ers

Page 10: DAQ  fo  KL and TOF

Particle Trigger Particle Trigger monitormonitor

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 10

Equipment number

LDC Number

Co

un

ts#

of

Pa

rt T

rig

ger

s

V1724FADCsScalar ch0

TDCs

V1731FADC

Page 11: DAQ  fo  KL and TOF

FADC behaviorFADC behavior

During September RunDuring September Run One FADC didn’t accept particle triggers at

all I am suspecting a hardware failure

Another FADC missed all the particle triggers for 1 single spill at the beginning of the run and then behaved normally

Need to be sorted out with CAENNeed to be sorted out with CAEN I need help here

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 11

Page 12: DAQ  fo  KL and TOF

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 12

FEE for TOF2 FEE for TOF2

Needs (ignoring cabling and HV)Needs (ignoring cabling and HV) 1 TDC V1290 5 FADC V1724 Splitters and Shapers available in Geneva

To be shipped

IssuesIssues NIM crate room

Not sure the power supply will stand a full load VME crate room

All TOF TDC must be in the same crate TOF FADC will go to KL crate

A major update of crate layout is necessary !

Page 13: DAQ  fo  KL and TOF

SummarySummary

TOF0/1 and KL in good shapeTOF0/1 and KL in good shape Cross talk needs attentionCross talk needs attention Synchronization has to be monitoredSynchronization has to be monitored TOF2 installation is not trivialTOF2 installation is not trivial

MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 13


Recommended