9
Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK, Oct 20-24 1 darkenergydetectives.org Y1A1 tile DES2111-0124 (Stripe 82)
Transcript
Page 1: Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

Dark Energy Survey (DES)(Presenter: Douglas Tucker)

• DES is observing (Aug. 15th – Feb. 15th)

• Year 2 Operations

• Collaboration Meeting in Sussex, UK, Oct 20-24

1darkenergydetectives.org

Y1A1 tile DES2111-0124 (Stripe 82)

Page 2: Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

Y2 Observing Summary

• So far DES has had 47 scheduled observing nights, 10 half-nights and 42 full nights.

2

#Nights

TotalHours

Hours Observing

Lost Camera or Telescope

Lost Obs. Error

Lost Weather

Aug. 9 92 ¾ 58 ¾ 0 0 34

Sept. 18 181 ¼ 122 ¼ ¾ 0 58 ¼

Oct. 21 201 ½ 165 ½ 2 ¼ ¼ 33 ½

Total 47 475 ½ 346 ½ 3 0 125 ¾

100% 73% ½ % 0% 26%

• The first 7 half-nights were great and included seeing records in all DES filters

• Next 6 weeks was among the worst in 31 yrs CTIO• Improved since mid-October

Page 3: Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

Y2 WF Survey Status

• Individual WF exposures are graded “Good” or “Bad” as part of the DESDM “1st Cut” output. This informs the “Exposure Table” on the mountain so OBSTAC knows if the exposure needs to be redone.

• Right: WF tilings after night of Oct. 31– Lt Blue: last Yr, Dk blue: this Yr, Red: last night

• Y1 gaps getting filled in nicely• Especially in r, i-band 3

# WF Images

# WF Good

# WF “Bad”

Aug. 1382 955 (69%) 427

Sept. 3023 2056 (59%) 967

Oct. 3297 2407 (73%) 890

Total 7702 5418 (70%) 2284

Page 4: Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

Y2 SN Survey Status

• In Y1 the SN fields had a median # days between revisits of about 6.5 days. The maximums gaps were 11 to 16 nights.

• Gaps so far in Y2 are 12 to 21+ nights (see right)

• In Y2, bad weather bracketed a 3 night stretch when DES didn’t have the telescope.

• Improved somewhat since

4

Oct 31# Completed Shallow

Fields# Completed Deep Fields

Aug. 12 7

Sept. 35 32

Oct. 34 34

Page 5: Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

• New Dome Environmental Controls: 2 large glycol-cooled air-handlers will better maintain the primary mirror at or just below the air-temperature, minimal temperature gradient within the dome, and internal and external air temperatures matched. Finished, now commissioning automatic controls.

• New Primary Mirror Support Pad air-pressure controls– The present system controls mirror shape depending on gravity vector with an

astigmatic correction. 33 of 33 with higher resolution air-pad controls installed. Perhaps some improvement in seeing is already being attained.

– New “Hexapod” (Focus ) Default– D0Nut studies indicate that primary mirror aberrations can be better zeroed-out.

This new system will need commissioning to achieve the improvement.

• December 1-5 Engineering. A FNAL Team to – Replace LN2 pump, improve 1 of the LN2 line segments, repair a

scroll pump

5

Recent Improvements for DECam/Blanco

We started keeping image quality records in Y1. This year we have new records in all filters.

Page 6: Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

DES Observers

• Y2 DES Observers so far from FNAL, Texas A&M, CTIO, U. Chicago, ANL, BNL, Brazil, SLAC, LBL, U.K., OSU, Barcelona, ETH Zurich – most of the collaboration institutions

6

Page 7: Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

Year 1 Annual Reprocessing: Calibrations

7

Year 1 Relative Calibrations• Goal: 4% rms • Achieved: < 2% rms

-3.0%

0.0%

+2.0%

Credit: Eli Rykoff

Credit: Eli Rykoff

Page 8: Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

Summary & Perspective

• Y2 started great. Then we has 6 weeks of lots of clouds. Lately the weather has improved. It should just get better as it warms up in Chile.

• When the dome is open we are doing well. Ahead of last year’s pace because the seeing has been better and we’ve been about 5% faster.

• DECam NEO from TOO: “Working for you to save the planet” (picture from Frank Valdes, NOAO)

8

Page 9: Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

Gaps 10/30/14 Better View

9


Recommended