+ All Categories
Home > Documents > Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2...

Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2...

Date post: 18-Jan-2016
Category:
Upload: benjamin-berry
View: 220 times
Download: 0 times
Share this document with a friend
Popular Tags:
20
Kodiak Electric Association, Inc. Darron Scott, President/CEO
Transcript
Page 1: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Kodiak Electric Association, Inc.Darron Scott, President/CEO

Page 2: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Kodiak, Alaska

Page 3: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Kodiak Electric Association, Inc.

Page 4: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Project Timeline

2007 2008 2009 2010 2011 2012 2013 2014 2015

3 - 1.5 MW Wind Turbines

3 - 1.5 MW Wind Turbines

2 - 1.5 MW BESS

1 - 10 MW Hydroelectric

Turbine

System Power Factor Upgrade

Hydroelectric Governor Upgrade

2 - 1 MW FESS

Page 5: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

99.7 % Renewable since 2014

Rates are lower than in 2000

Results

Page 6: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Common Direction

Challenge:

Page 7: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

In 2007, the Board of Directors adopted a Vision Statement that read:

-

“Endeavor to produce 95% of energy sales with cost effective renewable power solutions

by the year 2020”

Solution

Page 8: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Logistics

Challenge

Page 9: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

A lot of planning and communication

Solution

Page 10: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Wind Turbine Operation & Maintenance

Challenge

Page 11: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

GE Bridge Training former Diesel Electricians

Solution

Page 12: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Wind Integration Penetration rate ≈ 25 – 30 %

Challenge

Page 13: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Curtailment Capacitor Banks Governor upgrade

at hydroelectric plant

Solution

Page 14: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

More wind integration Penetration rate ≈ 65%

Challenge

Page 15: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

BESS Modification to hydroelectric plant

Solution

Page 16: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

How do we pay for ALL of these projects

Challenge

Page 17: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

State of Alaska – Renewable Energy Fund Clean Renewable Energy Bonds (CREBs)

Solution

Page 18: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Large, electric shipping crane BESS decay

Current Challenge

Photo via Matson Inc.

Page 19: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

FESS Cascading energy storage

Solution

Page 20: Darron Scott, President/CEO. 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 - 1.5 MW Wind Turbines 2 - 1.5 MW BESS 1 - 10 MW Hydroelectric Turbine.

Recommended