+ All Categories
Home > Documents > DARTS Unified Planning Work...

DARTS Unified Planning Work...

Date post: 14-Oct-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
Transcript
Page 1: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

DARTS Unified Planning Work Program FY 2020

www.dartsmpo.org

Page 2: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

2 | P a g e

Contents TITLE VI DISCLAIMER ..................................................................................................................................... 4

What is the Unified Planning Work Program? .............................................................................................. 5

Executive Summary ....................................................................................................................................... 6

PAGE RESERVED FOR RESOLUTION ............................................................................................................... 7

DARTS TRANSPORTATION COMMITTEE MEMBERS ...................................................................................... 8

POLICY COMMITTEE VOTING MEMBERS .................................................................................................. 8

TECHNICAL COORDINATING COMMITTEE MEMBERS .............................................................................. 9

TECHNICAL COORDINATING COMMITTEE Non – Voting Members .......................................................... 9

CITIZENS’ TRANSPORTATION COMMITTEE MEMBERS ........................................................................... 10

DARTS Meeting Schedule ............................................................................................................................ 11

ACRONYMS USED IN THIS DOCUMENT ....................................................................................................... 12

INTRODUCTION ........................................................................................................................................ 13

DARTS MPO BOUNDARY ......................................................................................................................... 13

Summary of DARTS Metropolitan Planning Organization ............................................................... 13

Purpose of the UPWP ........................................................................................................................... 14

Planning Factors (23 CFR 450.306) ............................................................................................................. 15

GOAL/LEGISLATION COMPARISON TABLE .................................................................................................. 18

Overview of DARTS MPO Planning Process, including MPO’s goals and objectives ................... 26

DARTS MPO PLANNING PRIORITIES ............................................................................................................ 27

DARTS Goals and Objectives ....................................................................................................................... 28

Sub-element 1.1 Program Coordination ................................................................................................. 32

Sub-element 1.2 Operations and Administration ................................................................................... 33

Sub-element 1.3 Training/Employee Education ..................................................................................... 35

Sub-element 1.4 Equipment and Supplies .............................................................................................. 37

Sub-element 1.5 Contracts/Grants ......................................................................................................... 38

Sub-element 1.6 UPWP ........................................................................................................................... 39

TASK #2 PUBLIC INVOLVEMENT .................................................................................................................. 40

Sub-element 2.1 Community Outreach/Education ................................................................................ 40

Sub-element 2.2 Environmental Justice/Title VI ..................................................................................... 42

Sub-element 2.3 Participation Plan ........................................................................................................ 43

TASK #3 DATA COLLECTION ........................................................................................................................ 44

Page 3: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

3 | P a g e

Sub-element 3.1 Socio-Economic Data/EJ Analysis Data ........................................................................ 44

Sub-element 3.2 Land Use Monitoring ................................................................................................... 45

Sub-element 3.5 System Monitoring ...................................................................................................... 46

Sub-element 4.3 Intermodal (i.e. airports and ports) ............................................................................. 47

Sub-element 4.5 Bike/Pedestrian ........................................................................................................... 48

Sub-element 4.7 GIS Development and Applications ............................................................................. 49

Sub-element 4.8 Highway Planning ........................................................................................................ 50

Sub-element 4.10 Freight Planning ......................................................................................................... 51

Sub-element 4.11 Metropolitan Transportation Plan (MTP) .................................................................. 52

Sub-element 4.12 Transportation Improvement Plan ............................................................................ 53

Sub-element 4.13 Special Studies ........................................................................................................... 54

TASK #5 TRANSIT PLANNING....................................................................................................................... 56

Sub-element 5.1 Program Support and Administration 44.21.00 .......................................................... 56

Sub-element 5.2 Unified Planning Work Program UPWP 44.21.00........................................................ 57

Sub-element 5.3 Long Range Transportation Planning -System Level 44.23.01 .................................... 58

Sub-element 5.4 Short-Range Transportation 44.24.00 ......................................................................... 59

Sub-element 5.5 Transportation Improvement Program 44.25.00 ........................................................ 61

Sub-element 5.6 Training& Employee Education 44.24.00 .................................................................... 62

UNFUNDED PROJECTS ............................................................................................................................. 63

SUMMARY BUDGET TABLE ......................................................................................................................... 64

APPENDIX .................................................................................................................................................... 66

Metropolitan Planning Factors to be considered in the 2018 UPWP ......................................................... 67

MPO Self-Certification ................................................................................................................................ 69

DARTS BYLAWS ........................................................................................................................................... 74

COMMENTS ................................................................................................................................................. 80

FY 2020 Unified Planning Work Program (UPWP) ...................................................................................... 81

FHWA Comments ........................................................................................................................................ 81

Page 4: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

4 | P a g e

TITLE VI DISCLAIMER

DARTS MPO is committed to assuring full compliance with, all civil rights provisions of federal

statutes and related authorities that prohibit discrimination in programs and activities receiving

federal financial assistance. These laws include but are not limited to Title VI of the Civil Rights

Act of 1964 ("Title VI"), the Civil Rights Restoration Act of 1987 (P.L. 100.259), Section 162 (a)

of the Federal-Aid Highway Act of 1973 (23 USC 324) (sex), Americans with Disabilities Act of

1990, Section 504 of the Rehabilitation Act of 1973, and the Age Discrimination Act of 1975, as

amended.

DARTS MPO does not discriminate against persons in the provision of its programs, services or

activities.

Page 5: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

5 | P a g e

What is the Unified Planning Work Program?

Every year the Dougherty Area Regional Transportation Study Metropolitan Planning Organization

(DARTS MPO) prepares its budget. This budget is known as the Unified Planning Work Program (UPWP)

as it incorporates and describes all transportation planning activities and associated funding for the

MPO.

The FY 2020 UPWP describes the transportation planning activities that are proposed to be conducted

during the period from July 1, 2019 through June 30, 2020. The program is organized with in several

work elements.

The UPWP guides transportation planning activities towards adopted goals and objectives of the

Metropolitan Transportation Plan (MTP). This program continues the transportation planning process

with an emphasis on detailing the plans and programs that have been developed. Areas of the work

program concentrate on developing the information, data, and procedures that are necessary to

maintain a viable and effective transportation planning process.

This year’s program focuses on an update to the Metropolitan Transportation Plan for 2045 to ensure it

meets the federal requirements for Performance Based Planning and Programming (PBPP). The

following pages describe in detail what the DARTS MPO is, the regulations that we must follow as well as

our planned expenditures and the current year’s work.

Page 6: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

6 | P a g e

Executive Summary

The Unified Planning Work Program (UPWP) document outlines transportation planning priorities and

work tasks for the Dougherty Area Regional Transportation Study (DARTS) Metropolitan Planning

Organization (MPO) for Fiscal Year 2020 . FY 2020 begins July 1, 2019, and ends June 30, 2020.

Preparation of the UPWP is required by the federal transportation legislation known as Fixing America’s

Surface Transportation (FAST) Act, and the Metropolitan Planning Code of Federal Regulations (23CFR

450.308) of the United States Department of Transportation. The UPWP must present a continuing,

cooperative, and comprehensive (the “3C”) approach to transportation planning activities. The UPWP is

prepared with cooperation and guidance from federal, state, and local agencies, as well as state & public

transportation operators.

In fiscal year 2019, DARTS was able to kick off its update of the 20-year Metropolitan Transportation

Plan (MTP) This endeavor focused heavily on community involvement as well as planning with current

and expected trends. This process also enabled the region to have an updated travel demand model

and new socio-economic data.

The focus for fiscal year 2020 will be an update to the Bicycle and Pedestrian Plan and an update for the

Freight Profile for the region. FY 20 will also see the completion and adoption of the Metropolitan

Transportation Plan.

Page 7: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

7 | P a g e

PAGE RESERVED FOR RESOLUTION

Page 8: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

8 | P a g e

DARTS TRANSPORTATION COMMITTEE MEMBERS

POLICY COMMITTEE VOTING MEMBERS

The Policy Committee is the decision making body and is represented by elected

officials from the member jurisdictions and an official from the Georgia Department of

Transportation (GDOT). The committee is responsible for taking into consideration the

recommendations from the Citizen’s Advisory Committee and the Technical Coordinating

Committee when adopting plans or setting policy.

Jim Quinn Chair, Mayor, City of Leesburg

Dorothy Hubbard Mayor, City of Albany

Michael McCoy Dougherty County Administrator

Sharon Subadan Albany City Manager

Chris Cohilas Dougherty County Commission

Rozanne Braswell Vice Chair, Lee County Director of Planning &

Engineering

Rick Muggridge Lee County Commission

Bob Alexander Leesburg City Manager

Russell McMurry GDOT Commissioner

Chad Hartley GDOT District Engineer, District 4

* Five (5) voting members are required for a quorum.

Non-Voting Members

FHWA Division Administrator

Page 9: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

9 | P a g e

TECHNICAL COORDINATING COMMITTEE MEMBERS

The Technical Coordinating Committee membership includes staff from the member

jurisdictions, various federal, state, and local agencies and associations that have a technical

knowledge of transportation or planning. The TCC evaluates transportation plans and projects

based on whether or not they are technically warranted and financially feasible.

Paul Forgey Chair, Director, Planning & Development Services

Michael Persley Albany Chief of Police

Richard Bramlett Public Works Director (City)

Bruce Maples Albany Director of Engineering

David Hamilton Transportation Director

Don Gray Albany Facilities Management Director

Larry Cook Dougherty County Public Works Director

Jeremy Brown Vice Chair, Dougherty County Engineering Manager

Jackie Battle Dougherty County Chief of Police

Rozanne Braswell Lee County Director of Planning & Engineering

Bob Alexander Leesburg Public Works Director

Kimberly Brooks Southwest Georgia Regional Commission

Kerrie Davis Transportation Planner, DARTS MPO

Tennasha Green-Gresham Transit Planner, DARTS MPO

Hunter Hines SWGA Regional Airport Superintendent of Operations

Jacqueline Williams GDOT Office of Planning, Transportation Planner, Atlanta

Tim Warren GDOT Assistant District Engineer, District 4

Ken Breedlove Albany Traffic Engineering Manager

Orlando Rambo Destiny Tours

Hubert Smigelski Marine Corp Logistic Base

* Nine (9) voting members required for a quorum.

TECHNICAL COORDINATING COMMITTEE Non – Voting Members

Mary Teter Planning Manager

Charles Ryan Walker GDOT Office of Intermodal Programs, Atlanta

Dennis Carter GDOT, District 4 Intermodal Programs

Thomas Caiafa GDOT, Branch Chief

Ann Marie Day U. S. Department of Transportation, FHWA

Sanford Hillsman Albany Dougherty Planning Commission

Walter Sharpe Citizens’ Transportation Committee Representative

Bob Alexander Leesburg Engineer

Page 10: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

10 | P a g e

CITIZENS’ TRANSPORTATION COMMITTEE MEMBERS

The Citizens Advisory Committee consists of volunteer members who are interested in

transportation issues. They are appointed by their member jurisdictions. The CAC is

responsible for ensuring that values and interests of the citizens in Dougherty County,

City of Albany, City of Leesburg and a portion of Lee County are taken into

consideration in the transportation planning process.

Dr. Surendra Pandey Dougherty County Appointment Tommy Gregors Dougherty County Appointment Glenn “Tyler” Harris Dougherty County Appointment Lee Johnston Lee County Appointment Dr. Peter A. Ngwafu Lee County Appointment Vacant City of Leesburg Appointment Larry McClain City of Albany Appointment Henry Allen Baggs City of Albany Appointment Diane Slomka City of Albany Appointment Billy Merritt Albany/Dougherty Planning Commission

Appointment

Page 11: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

11 | P a g e

DARTS Meeting Schedule (All meetings are held quarterly in room 380 at 240 Pine

Avenue, meeting times and dates are subject to change).

• CTC ( Citizens Transportation Committee )…..9:00AM

September 18, 2019

January 15, 2020 (Lee County)

April 15, 2020

June 17, 2020

• TCC ( Technical Coordinating Committee )…..9:00AM

September 19, 2019

January 16, 2020 (Lee County)

April 16, 2020

June 18, 2020

• PC ( Policy Committee )…..10:00AM

September 19, 2019

January 2020 (Lee County)

April 16, 2020

June 18, 2020

Page 12: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

12 | P a g e

ACRONYMS USED IN THIS DOCUMENT

• 3C - Continuing, Comprehensive, Cooperative

• APTA - American Public Transit Association

• APA - American Planning Association

• ATS - Albany Transit System

• CFR - Code of Federal Regulations

• CTC - Citizens Transportation Committee

• DARTS - Dougherty Area Regional Transportation Study

• EPA - Environmental Protection Agency

• FHWA - Federal Highway Administration

• FRA - Federal Railroad Administration

• FTA - Federal Transit Administration

• GDOT - Georgia Department of Transportation

• GIS - Graphic Information Systems

• HPMS - Highway Performance Monitoring System

• HSIP - Highway Safety Improvement Program

• ITS - Intelligent Transportation Systems

• LEP - Limited English Proficiency

• MTP - Long Range Transportation Plan

• MAP-21 - Moving Ahead for Progress in the 21st Century

• MPO - Metropolitan Planning Organization

• NEPA - National Environmental Protection Act

• PBPP – Performance Based Planning and Programming

• PC - Policy Committee

• PEL - Planning and Environmental Linkages

• PL - Planning Funds (Highway) Allocated for the MPO

• RTP - Regional Transportation Plan

• SRTS - Safe Routes to School

• STIP - State Transportation Improvement Program

• SWGRC - Southwest Georgia Regional Commission

• TCC - Technical Coordinating Committee

• TDP - Transit Development Plan

• TAZ - Traffic Analysis Zone

• TE - Transportation Enhancement

• TIP - Transportation Improvement Program

• UPWP - Unified Planning Work Program

Page 13: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

13 | P a g e

INTRODUCTION

DARTS MPO BOUNDARY

Summary of DARTS Metropolitan Planning Organization

A Metropolitan Planning Organization (MPO) is a federally mandated and federally

funded transportation policy making organization that is made up of representatives

from local government and governmental transportation authorities. The Dougherty

Area Regional Transportation Study (DARTS) was formalized in 1965 as a Continuous,

Comprehensive and Cooperative Process as was initially authorized in the Highway Act

of 1962.

The purpose of the Dougherty Area Regional Transportation Study (DARTS) is to ensure

that federal-aid transportation projects are planned in a continuous, coordinated, and

comprehensive manner. The study area of DARTS, the designated Metropolitan

Planning Organization (MPO), includes the existing urbanized area for the City of

Page 14: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

14 | P a g e

Albany, Dougherty County, the City of Leesburg, the southern half of Lee County, and

those areas that are expected to become urbanized over the next 20 years.

Purpose of the UPWP

A Unified Planning Work Program (UPWP) is an annual statement of work identifying

the planning priorities and activities to be carried out within a metropolitan planning

area. At a minimum, a UPWP includes a description of the planning work and resulting

products, who will perform the work, time frames for completing the work, the cost of

the work, and the source(s) of funds.

The UPWP is an MPO’s work program that describes what planning work activities the

MPO will perform during the grant period. It is the management plan for the

metropolitan planning program. UPWP’s are statements of work that:

• Document eligible planning work activities a MPO proposes to undertake with

FHWA and FTA planning funds.

• Detail the estimated costs (Federal and matching funds to perform these

activities.

• Identify who will perform the work

• Include proposed funding by work activity and an overall budget summary that

identify the category of Federal funds and the source of matching funds.

The Fiscal Year 2019 Unified Planning Work Program describes the organization’s

planning goals and activities for the period of July 1, 2019 through June 30, 2020. The

document is organized into the following sections:

• Administration

• Public Involvement

• Data Collection

• System Planning

• Proposed Funding Source By Task

The five sections of the UPWP include information on the parties’ responsible for

carrying out the various planning activities.

Page 15: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

15 | P a g e

Planning Factors (23 CFR 450.306) The UPWP is developed to provide comprehensive, cooperative and continuing transportation

planning (known as the 3-C Process). The FAST Act requires that the metropolitan planning

process consider and analyze the following ten factors for each planning activity. These factors

continue to influence the program of the UPWP. The ten planning activity factors with associated

goals and objectives are show below and are integrated into the UPWP task elements.

• Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency while promoting consistency among transportation improvements and state and local planned growth and economic development patterns. Goal: Promote Economic Development

➢ Minimize congestion ➢ Enhance freight connection ➢ Provide transportation alternatives ➢ Implement projects to support freight movement

• Increase the safety of the transportation system for motorized and non-motorized users; Goal: Maintain and improve transportation system safety and security for motorists, pedestrians and bicyclists

➢ Review traffic crash data to systematically identify potential safety problems on roadway sections, bridges, and intersections with traffic and develop a list of projects necessary to eliminate deficiencies

➢ Prioritize and schedule roadway, bikeway, and sidewalk maintenance expenditures to maintain safe conditions for travel

➢ Provide adequate access for emergency service vehicles throughout the system ➢ Program and carry out safety improvements throughout the TIP process ➢ Assist Albany Transit in continually improving the safety and efficiency of its

active vehicle fleet

• Increase the security of the transportation system for motorized and non-motorized users. Goal: Maintain and improve transportation system safety and security for motorists, pedestrians and bicyclists.

➢ Review traffic crash data to systematically identify potential safety problems on roadway sections, bridges, and intersections with traffic and develop a list of projects necessary to eliminate deficiencies

➢ Prioritize and schedule roadway, bikeway, and sidewalk maintenance expenditures to maintain safe conditions for travel

➢ Provide adequate access for emergency service vehicles throughout the system ➢ Program and carry out safety improvements throughout the TIP process ➢ Assist Albany Transit in continually improving the safety and efficiency of its

active vehicle fleet

• Increase the accessibility and mobility of people and for freight;

Page 16: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

16 | P a g e

Goal: Provide a transportation system that affords sufficient mobility to accommodate the travel demands of Dougherty and South Lee County residents and businesses

➢ Expand the transportation system to accommodate a variety of travel modes and minimize reliance on any singe mode

➢ Design and manage the transportation system to meet a minimum level of service (LOS) “C” on roadways classified as arterials and collectors

➢ Encourage transportation services that accommodate the needs of the transportation disadvantaged.

➢ Identify roadway sections and intersections operating or projected to operate at less than the area level of service standard and develop a list of projects necessary to eliminate deficiencies

➢ Program and implement transportation improvements through the TIP process.

• Protect and enhance the environment, promote energy conservation, improve the quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns. Goal: Limit and mitigate adverse environmental impacts associated with traffic and transportation system development through facilities design and system management.

➢ Develop future MTP’s within the context of the Statewide Transportation Plan (SWTP) to meet federal, state and local air, water and noise standards

➢ Apprise the EPD, EPA and Army Corps of Engineers of transportation system development projects at the earliest opportunity to identify project related environmental issues and to ensure compliance with federal and state air water, wetland and noise standards

• Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight. Goal: Provide a multimodal transportation system which offers cost-effective alternatives to the automobile, supports efficient freight movement, provides for bicyclists and pedestrians, and encourages continued use and development of air transportation facilities.

➢ Designate, prepare and maintain a map of the Truck Route System ➢ Consider freight and truck utilization and impacts on adjacent land uses ➢ Proposed transportation projects should consider incorporating features to

enhance freight movement and provide adequate design to accommodate large freight vehicles

➢ Work with Albany Transit System to provide continued high-quality transit service to City of Albany residents and businesses and transportation disadvantaged

➢ Support transit-oriented development through zoning and land-use policy ➢ Design complete streets that include provisions for transit access, including

complementary pedestrian and bicycle facilities ➢ Provide and maintain safe and comfortable transit amenities (i.e. shelters,

benches).

Page 17: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

17 | P a g e

➢ Provide for interconnected, direct, and area-wide bicycle and pedestrian circulation system linking recreational areas, schools, shopping areas, employment centers, and adjacent neighborhoods

➢ Utilize the Proposed Future Bicycle Corridor Map to guide future bicycle improvements to the Arterial and Collector system

➢ Integrate planning of pedestrian and bicycle facilities into development plan for determining bicycle and pedestrian facility projects review processes

➢ Utilize Regional Bicycle and Pedestrian

• Promote efficient system management and operation. Goal: An efficient transportation system

➢ Efficiently manage DARTS resources and priorities through the Transportation Improvement Program (TIP)

➢ Develop a transportation network that links DARTS subareas and reduces travel times for area residents and commerce-related trips

➢ Plan and improve routes to increase the efficiency of travel and movement of goods and services

➢ Use the functional classification system and road standards to guide public investment, determine funding requirements, and establish conditions for approval of private development projects

➢ Consider functional Classification in conjunction with land use designations in the preparation and amendment of both counties Comprehensive Plans

• Emphasize the preservation of the existing transportation system, Goal: Maintain and preserve the existing transportation system.

➢ Determine the backlog of deferred maintenance and the annual maintenance ➢ requirements of the area roadway system ➢ Determine area-wide roadway system reconstruction needs ➢ Prioritize and carry out maintenance and reconstruction activities through the

annual maintenance and reconstruction program process ➢ When projects are planned, designed, or constructed evaluate the life-cycle costs

and make appropriate decisions at each step to ensure that projects that are built are as maintenance free as possible

• Improve the resiliency and reliability of the transportation system and reduce mitigation storm water impacts of the surface transportation Goal – No stated goal in 2040 Long Range Plan

• Enhance travel and tourism. Goal: Improve the livability and quality of transportation system.

➢ Select projects that will improve the livability and quality of the area’s transportation system

➢ Pursue transportation enhancement activity funds for suitable projects ➢ Use community land use policies, plans, and ordinances to support historic

preservation, limit of outdoor advertising, landscaping and other beautification, and provisions for pedestrian and bicycle facilities

Page 18: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

18 | P a g e

GOAL/LEGISLATION COMPARISON TABLE

The FAST ACT requires states and local governments to establish transportation plans with specific performance standards, measure their

progress annually in meeting these standards; and periodically adjust their plans as necessary to achieve specific objectives. To align project

selection with the national objectives, DARTS MPO has developed a performance management process in which the focus of federal funding

meets the national performance goals. Utilizing our current Metropolitan Plan the goals from our plan and legislation are outlined below. **Side

Note: This UPWP was put together during the 2045 Metropolitan Plan update and listed goals may or may not change during this process.

FAST Act National Planning Factors

FAST Act National Goals

GA 2040 SWTP/2015 SSTP State Goals

Current DARTS 2040 MTP Regional Goals

Current DARTS 2040 MTP Objectives

Current DARTS 2040 MTP Update Regional Performance Measures

Data Source

Increase the

accessibility and

mobility of people and

for freight

To achieve a

significant reduction in

congestion on the

National Highway

System

To improve the

efficiency of the

surface transportation

system

Relieve

congestion

and improve

reliability

Improve

freight

movement and

economic

development

opportunities

Provide a

transportation system

that affords sufficient

mobility to

accommodate the

travel demands of

Dougherty and South

Lee County residents

and businesses

Expand the transportation system to

accommodate a variety of travel modes

and minimize reliance on any singe

mode

Design and manage the transportation

system to meet a minimum level of

service (LOS) “C” on roadways

classified as arterials and collectors

Encourage transportation services that

accommodate the needs of the

transportation disadvantaged.

Identify roadway sections and

intersections operating or projected to

operate at less than the area level of

service standard and develop a list of

projects necessary to eliminate

deficiencies

Level of Service Georgia Department of

Transportation

Page 19: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

19 | P a g e

FAST Act National Planning Factors

FAST Act National Goals

GA 2040 SWTP/2015 SSTP State Goals

Current DARTS 2040 MTP Regional Goals

Current DARTS 2040 MTP Objectives

Current DARTS 2040 MTP Update Regional Performance Measures

Data Source

Program and implement transportation

improvements through the TIP process.

Promote efficient

system management

and operation

To achieve a

significant reduction in

congestion on the

National Highway

System

To improve the

efficiency of the

surface transportation

system

To reduce project

costs, promote jobs and

the economy, and

expedite the movement

of people and goods by

accelerating project

completion through

eliminating delays in

the project

development and

delivery process,

including reducing

regulatory burdens and

improving agencies’

work practices

Relieve

congestion

and improve

reliability

Efficiently manage DARTS resources

and priorities through the

Transportation Improvement Program

(TIP)

Develop a transportation network that

links DARTS subareas and reduces

travel times for area residents and

commerce-related trips

Plan and improve routes to increase the

efficiency of travel and movement of

goods and services

Use the functional classification system

and road standards to guide public

investment, determine funding

requirements, and establish conditions

for approval of private development

projects

Consider functional Classification in

conjunction with land use designations

in the preparation and amendment of

both counties Comprehensive Plans

Vehicle Miles Traveled

(VMT)

Vehicle Hours Traveled

(VHT)

Georgia Electronic

Accident Reporting

System (GEARS) and

Critical Analysis

Reporting Environment

(CARE)

Protect and enhance the

environment, promote

energy conservation,

improve the quality of

life

Promote consistency

between transportation

improvements and

State and local planned

To enhance the

performance of the

transportation system

while protecting and

enhancing the natural

environment

Improve the

Environment

Limit and mitigate

adverse

environmental

impacts associated

with traffic and

transportation system

development through

facilities design and

system management

Develop future MTP’s within the

context of the Statewide Transportation

Plan (SWTP) to meet federal, state and

local air, water and noise standards

Apprise the EPD, EPA and Army Corps

of Engineers of transportation system

development projects at the earliest

opportunity to identify project related

environmental issues and to ensure

Page 20: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

20 | P a g e

FAST Act National Planning Factors

FAST Act National Goals

GA 2040 SWTP/2015 SSTP State Goals

Current DARTS 2040 MTP Regional Goals

Current DARTS 2040 MTP Objectives

Current DARTS 2040 MTP Update Regional Performance Measures

Data Source

growth and economic

development patterns.

compliance with federal and state air

water, wetland and noise standards

Enhance the integration

and connectivity of the

transportation system,

across and between

modes for people and

freight

To achieve a

significant reduction in

congestion on the

National Highway

System

To improve the

efficiency of the

surface transportation

system

Provide a multimodal

transportation system

which offers cost-

effective alternatives

to the automobile,

supports efficient

freight movement,

provides for

bicyclists and

pedestrians, and

encourages continued

use and development

of air transportation

facilities.

Freight:

Designate, prepare and maintain a map

of the Truck Route System

Consider freight and truck utilization

and impacts on adjacent land uses

Proposed transportation projects should

consider incorporating features to

enhance freight movement and provide

adequate design to accommodate

large freight vehicles

Transit

Work with Albany Transit System to

provide continued high-quality transit

service to City of Albany residents and

businesses and transportation

disadvantaged

Support transit-oriented development

through zoning and land-use policy

Design complete streets that include

provisions for transit access, including

complementary pedestrian and bicycle

facilities

Provide and maintain safe and

comfortable transit amenities (i.e.

shelters,

benches)

Bicycle and Pedestrian:

Transit

Passengers per Revenue

Hour, Cost per

Passenger, Percent of

population within one half

mile of a bus stop

Bicycle and Pedestrian

Percent of roadway network

with bicycle or

pedestrian facilities (bicycle

lanes, routes, sidewalks,

trails)

Annual Ridership

Surveys

Page 21: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

21 | P a g e

FAST Act National Planning Factors

FAST Act National Goals

GA 2040 SWTP/2015 SSTP State Goals

Current DARTS 2040 MTP Regional Goals

Current DARTS 2040 MTP Objectives

Current DARTS 2040 MTP Update Regional Performance Measures

Data Source

Provide for interconnected, direct, and

area-wide bicycle and pedestrian

circulation system linking recreational

areas, schools, shopping areas,

employment centers, and adjacent

neighborhoods

Utilize the Proposed Future Bicycle

Corridor Map to guide future bicycle

improvements to the Arterial and

Collector system

Integrate planning of pedestrian and

bicycle facilities into development

review processes

Utilize Regional Bicycle and Pedestrian

plan for determining bicycle and

pedestrian facility projects

Emphasize the

preservation of the

existing transportation

system

TO maintain the

highway infrastructure

asset system in a state

of good repair.

Maintain and

preserve the

existing

transportation

system

Maintain and

preserve the existing

transportation

system.

Determine the backlog of deferred

maintenance and the annual

maintenance

requirements of the area roadway

system

Determine area-wide roadway system

reconstruction needs

Prioritize and carry out maintenance

and reconstruction activities through the

annual maintenance and reconstruction

program process

When projects are planned, designed, or

constructed evaluate the life-cycle

costs and make appropriate decisions at

each step to ensure that projects that

Pavement Condition

Evaluation System

(PACES)

National Bridge Inventory

ratings

(structurally deficient or

functionally

obsolete)

Georgia Department of

Transportation

Page 22: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

22 | P a g e

FAST Act National Planning Factors

FAST Act National Goals

GA 2040 SWTP/2015 SSTP State Goals

Current DARTS 2040 MTP Regional Goals

Current DARTS 2040 MTP Objectives

Current DARTS 2040 MTP Update Regional Performance Measures

Data Source

are built are as maintenance free as

possible

Increase the safety of

the transportation

system for motorized

and non-motorized

users.

To achieve a

significant reduction in

traffic fatalities and

serious injuries on all

public roads.

Improve

safety

Maintain and

improve

transportation system

safety and security

for motorists,

pedestrians and

bicyclists

Review traffic crash data to

systematically identify potential safety

problems on roadway sections, bridges,

and intersections with traffic and

develop a list of projects necessary to

eliminate deficiencies

Prioritize and schedule roadway,

bikeway, and sidewalk maintenance

expenditures to maintain safe conditions

for travel

Provide adequate access for emergency

service vehicles throughout the system

Program and carry out safety

improvements throughout the TIP

process

Assist Albany Transit in continually

improving the safety and efficiency of

its active vehicle fleet

Property, injury and fatal

crashes per 100 million

VMT

Injury and fatal crashes per

population

Georgia Electronic

Accident Reporting

System (GEARS) and

Critical Analysis

Reporting Environment

(CARE)

Increase the security of

the transportation

system for motorized

and non-motorized

users.

To achieve a

significant reduction in

traffic fatalities and

serious injuries on all

public roads.

Improve

safety

Maintain and

improve

transportation system

safety and security

for motorists,

pedestrians and

bicyclists

Review traffic crash data to

systematically identify potential safety

problems on roadway sections, bridges,

and intersections with traffic and

develop a list of projects necessary to

eliminate deficiencies

Prioritize and schedule roadway,

bikeway, and sidewalk maintenance

expenditures to maintain safe conditions

for travel

Provide adequate access for emergency

service vehicles throughout the system

Property, injury and fatal

crashes per 100 million

VMT

Injury and fatal crashes per

population

Georgia Electronic

Accident Reporting

System (GEARS) and

Critical Analysis

Reporting Environment

(CARE)

Page 23: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

23 | P a g e

FAST Act National Planning Factors

FAST Act National Goals

GA 2040 SWTP/2015 SSTP State Goals

Current DARTS 2040 MTP Regional Goals

Current DARTS 2040 MTP Objectives

Current DARTS 2040 MTP Update Regional Performance Measures

Data Source

Program and carry out safety

improvements throughout the TIP

process

Assist Albany Transit in continually

improving the safety and efficiency of

its active vehicle fleet

Support the economic

vitality of the

metropolitan area,

especially by enabling

global competitiveness,

productivity and

efficiency

To improve the

national freight

network, strengthen the

ability of rural

communities to access

national and

international trade

markets, and support

regional economic

development.

To achieve a

significant reduction in

congestion on the

national Highway

System

To improve the

efficiency of the

surface transportation

system

Improve

freight

movement and

economic

development

opportunities

Improve the resiliency

and reliability of the

transportation system

and reduce or mitigate

storm water impacts of

surface transportation

To maintain the

highway infrastructure

asset system in a state

of good repair

To enhance the

performance of the

transportation system

while protecting and

The 2040

SWTP/2015

SSTP do not

currently

address this

federal goal.

Page 24: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

24 | P a g e

FAST Act National Planning Factors

FAST Act National Goals

GA 2040 SWTP/2015 SSTP State Goals

Current DARTS 2040 MTP Regional Goals

Current DARTS 2040 MTP Objectives

Current DARTS 2040 MTP Update Regional Performance Measures

Data Source

enhancing the natural

environment

Enhancing travel and

tourism

To improve the

national freight

network, strengthen the

ability of rural

communities to access

national and

international trade

markets, and support

regional economic

development

The 2040

SWTP/2015

SSTP do not

currently

address this

federal goal

Improve the livability

and quality of

transportation

system.

Select projects that will improve the

livability and quality of the area’s

transportation system

Pursue transportation enhancement

activity funds for suitable projects

Use community land use policies, plans,

and ordinances to support historic

preservation, limit of outdoor

advertising, landscaping and other

beautification,

and provisions for pedestrian and

bicycle facilities

Connectivity and gaps

between sidewalks and

activity centers (parks,

schools, malls, hospitals,

etc.)

Continue use and

development of air

transportation

facilities.

Coordinate Southwest Georgia Regional

Airport plans with the State Airport

Plan

Coordinate with service providers and

Southwest Georgia Regional Airport to

plan for appropriate future expansion

Review land use policies to examine

compatibility of airport and

complementary uses with adjacent

development

Passenger boarding’s and

deplaning’s

Air Cargo Volume

Georgia Department of

Transportation

Transportation

System

Management (TSM)

and

Transportation

Demand

Management (TDM)

-

Encourage

implementation of

Support TSM alternatives such as

access management and Intelligent

Transportation System (ITS)

Support formal development of a

DARTS-regional TDM program

Incorporate into the land use planning

and permitting process provisions for

review of the impact of specific

LOS

Mode Split

Georgia Department of

Transportation

Page 25: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

25 | P a g e

FAST Act National Planning Factors

FAST Act National Goals

GA 2040 SWTP/2015 SSTP State Goals

Current DARTS 2040 MTP Regional Goals

Current DARTS 2040 MTP Objectives

Current DARTS 2040 MTP Update Regional Performance Measures

Data Source

TSM and TDM to

reduce traffic

congestion and

promote low cost

solutions for road

capacity.

developments on the transportation

network

Provide a financially

balanced

twenty-five year

transportation

plan

Prepare estimates of the amount of

funding that will be available from

federal, state, and local sources

Prepare cost estimates for capital

projects and maintenance of the

transportation system

Cost-benefit Local Data

Ensure the cost of

transportation

facilities and services

are borne by those

who benefit from

them.

Develop equitable financing

mechanisms for existing system

maintenance and improvement, and

through the development review

process, require improvements

necessary to accommodate future

growth

Provide transportation services and

facilities in a timely manner according

to funding capabilities.

Cost-benefit Local Data

Page 26: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

26 | P a g e

Overview of DARTS MPO Planning Process, including MPO’s goals and

objectives

DARTS serves as the designated MPO for the Albany, Dougherty, Lee and Leesburg

Area. DARTS is responsible under Section 134 of Title 23, United States Code for

carrying out a “continuing, cooperative and comprehensive” (3-C) transportation

planning process. The process uses three committees (Policy Committee – PC) – the

decision making body, Technical Coordinating Committee – TCC) – staff members and

agencies with transportation interest and the Citizens Advisory Committee – CAC) – the

public. These committees help to develop and carry out a comprehensive

transportation planning process and to ensure that programs, improvements, and

expenditures are consistent with regional goals, policies and plans.

The following agencies have roles in the development, implementation, approval of

and/or funding of the UPWP:

US Department of Transportation

The Federal Highway Administration (FHWA) and the Federal Transit Administration

(FTA) jointly approve the UPWP. These two federal agencies provide valuable input

into the process leading to the development of this document.

FHWA develops regulations, policies, and guidelines to achieve safety, access, economic

development, and other goals of FHWA programs, and provides federal financial

resources, technical training, education and assistance to state and local transportation

agencies.

FTA provides financial assistance and oversees grants to state and local transit

providers, primarily through its regional metropolitan offices. FTA is responsible for

ensuring that grantees follow federal mandates along with statutory and administrative

requirements.

Georgia Department of Transportation

The Georgia Department of Transportation (GDOT) serves as the liaison between the

MPO, the state and the United States Department of Transportation (USDOT). The

MPO works cooperatively with GDOT on various transportation tasks, which include:

Transportation Improvement Program, Long Range Transportation Plan, and Travel

Demand Modeling. GDOT is the direct recipient of federal planning funds, and the

MPO’s are sub-recipients of these funds. Therefore, GDOT provides grant oversight of

Federal Planning (PL) funds. GDOT also reviews and approves UPWP’s and TIP’s before

requesting concurrency from FHWA and FTA.

Page 27: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

27 | P a g e

DARTS MPO PLANNING PRIORITIES Based on a desire to better implement federal planning requirements and to better

illustrate the activities of the DARTS MPO staff, Planning Priorities are identified below

to allow the DARTS MPO to be a more transparent and accountable organization to our

local officials, planning partners (GDOT, FHWA, FTA) and the public.

Planning Priority Tasks How Tasks will be

Accomplished

An accessible

transportation system

• Enhance connectivity

between housing, jobs,

services, and education

facilities

• Integrate local,

regional, and national

transportation systems

to facilitate movement

of people and freight

between modes

• Monitor socio-economic data

for transportation modeling

• Monitor projects and identify

impacts on regional network

• Implement identified

projects

• Continue implementing the

State’s performance targets

as well as completing and

making available the annual

Systems Performance

Report

An integrated

transportation system

• Improve the internal

connectivity of the

transportation network

• Reduce congestion on

major freight and

passenger routes

• Studies to address current

and future demands on the

MPO’s infrastructure – this

includes completion of the

DARTS MPO Metropolitan

Transportatin Plan; updating

the Bicycle and Pederstian

Plan and updating the

Freight Profile.

Public involvement • Increase public

involvement

• Continue to build a list of

public and private

stakeholders or special

interest groups

• Increase accessibility and

information sharing by

keeping electronic means

Page 28: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

28 | P a g e

DARTS Goals and Objectives Efficiency - Maintain an efficient transportation system within Dougherty and South Lee County for residents and businesses.

• Efficiently manage DARTS resources and priorities through the Transportation Improvement Program (TIP).

• Develop a transportation network that links DARTS subareas and reduces travel times for area residents and commerce-related trips.

• Plan and improve routes to increase the efficiency of travel and movement of goods and services.

• Use the functional classification system and road standards to guide public investment, determine funding requirements, and establish conditions for approval of private development projects.

• Consider functional Classification in conjunction with land use designations in the preparation and amendment of both counties’ Comprehensive Plans.

Safety - Maintain and improve transportation system safety and security for motorists, pedestrians, and bicyclists.

• Review traffic crash data to systematically identify potential safety problems on roadway sections, bridges, and intersections with traffic and develop a list of projects necessary to eliminate deficiencies.

• Prioritize and schedule roadway, bikeway, and sidewalk maintenance expenditures to maintain safe conditions for travel.

• Provide adequate access for emergency service vehicles throughout the system. • Program and carry out safety improvements through the TIP process. • Assist Albany Transit in continually improving the safety and efficiency of its

active vehicle fleet.

(website, email, Facebook,

etc.) viable

• Consider setting up

information booths at the

public libraries and mall to

give information about

upcoming activities and

obtain public opinion

• Review/evaluate and update

its website by posting all

planning related products in

a timely manner

Page 29: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

29 | P a g e

Mobility - Provide a transportation system that affords sufficient mobility to accommodate the travel demands of Dougherty and South Lee County residents and businesses.

• Expand the transportation system to accommodate a variety of travel modes and minimize reliance on any single mode.

• Design and manage the transportation system to meet a minimum level of service (LOS) “C” on roadways classified as arterials and collectors.

• Encourage transportation services that accommodate the needs of the transportation disadvantaged.

• Identify roadway sections and intersections operating or projected to operate at less than the area level of service standard and develop a list of projects necessary to eliminate deficiencies.

• Program and implement transportation improvements through the TIP process.

Environment - Limit and mitigate adverse environmental impacts associated with traffic and transportation system development through facilities design and system management.

• Develop the DARTS 2045 MTP within the context of the Statewide Transportation Plan (SWTP) to meet federal, state, and local air, water, and noise standards.

• Apprise the EPD, EPA, and Army Corps of Engineers of transportation system development projects at the earliest opportunity to identify project-related environmental issues and to ensure compliance with federal and state air, water, wetland, and noise standards.

Enhancement - Improve the livability and quality of transportation system.

• Select projects that will improve the livability and quality of the area’s transportation system.

• Pursue transportation enhancement activity funds for suitable projects. • Use community land use policies, plans, and ordinances to support historic

preservation, limit of outdoor advertising, landscaping and other beautification, and provisions for pedestrian and bicycle facilities.

Multimodal - Provide a multimodal transportation system which offers cost-effective alternatives to the automobile, supports efficient freight movement, provides for bicyclists and pedestrians, and encourages continued use and development of air transportation facilities. Freight:

• Designate, prepare and maintain a map of the Truck Route System. • Consider freight and truck utilization and impacts on adjacent land uses. • Proposed transportation projects should consider incorporating features to

enhance freight movement and provide adequate design to accommodate large freight vehicles.

Transit:

Page 30: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

30 | P a g e

• Work with Albany Transit System to provide continued high-quality transit service to City of Albany residents and businesses and transportation disadvantaged.

• Support transit-oriented development through zoning and land-use policy. • Design complete streets that include provisions for transit access, including

complementary pedestrian and bicycle facilities. • Provide and maintain safe and comfortable transit amenities (i.e. shelters,

benches). Bicycle and Pedestrian:

• Provide for interconnected, direct, and area-wide bicycle and pedestrian circulation system linking recreational areas, schools, shopping areas, employment centers, and adjacent neighborhoods.

• Utilize the Proposed Future Bicycle Corridor Map to guide future bicycle improvements to the Arterial and Collector system.

• Integrate planning of pedestrian and bicycle facilities into development review processes.

• Utilize Regional Bicycle and Pedestrian plan for determining bicycle and pedestrian facility projects

Air Transportation - Continue use and development of air transportation facilities.

• Coordinate Southwest Georgia Regional Airport plans with the State Airport Plan. • Coordinate with service providers and Southwest Georgia Regional Airport to

plan for appropriate future expansion. • Review land use policies to examine compatibility of airport and complementary

uses with adjacent development. Transportation System Management (TSM) and Transportation Demand Management (TDM) - Encourage implementation of TSM and TDM to reduce traffic congestion and promote low cost solutions for road capacity.

• Support TSM alternatives such as access management and Intelligent Transportation System (ITS).

• Support formal development of a DARTS-regional TDM program. • Incorporate into the land use planning and permitting process provisions for

review of the impact of specific developments on the transportation network. Financial - Provide financially balanced transportation documents.

• Prepare estimates of the amount of funding that will be available from federal, state, and local sources.

• Prepare cost estimates for capital projects and maintenance of the transportation system.

Equity - Ensure the cost of transportation facilities and services are borne by those who benefit from them.

Page 31: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

31 | P a g e

• Develop equitable financing mechanisms for existing system maintenance and improvement, and through the development review process, require improvements necessary to accommodate future growth.

• Provide transportation services and facilities in a timely manner according to funding capabilities.

System Maintenance - Maintain and preserve the existing transportation system.

• Determine the backlog of deferred maintenance and the annual maintenance requirements of the area roadway system.

• Determine area-wide roadway system reconstruction needs. • Prioritize and carry out maintenance and reconstruction activities through the

annual maintenance and reconstruction program process. When projects are planned, designed, or constructed evaluate the life-cycle costs and

make appropriate decisions at each step to ensure that projects that are built are as

maintenance free as possible.

Page 32: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

32 | P a g e

Task 1 Administration

Sub-element 1.1 Program Coordination

Objective (Meets DARTS MTP GOAL: Efficiency and Financial)

• Coordinate and conduct the transportation planning activates of the MPO in compliance

with all federal, state and local laws, regulations and requirements

• Regional Planning with neighboring MPO’s, GDOT and the Georgia Association of

Metropolitan Planning Organizations (GAMPO) and transit

Previous Work

• Served on the data collection committee for GAMPO

• Served as an alternate on the Technical Coordinating Committee for AMPO

• Served on the conference review committee for GPA and APA

• Served as facilitatior for Programs for AMPO

Project Description (FY 2020 Activities)

• Work with GDOT and neighboring jurisdictions/agencies to maintain a comprehensive,

coordinated, continuous, regional, mutlti-modal transportation process

• Coordinate/participate with other resource agencies at both state and local level on

various transportation projects and ongoing activities

• Attend local government finance and board meetings to support DARTS actions as

needed

Product

• Continued participation with GAMPO and other state and national organizations on the

role of MPO’s in planning

• Support statewide GAMPO activities through participation in meeting and events

• Serve on committees to help move forward the conversation of transportation planning

• Correspondence, presentations and public information materials

Target Start and End Dates

7/1/2019 -6/30/2020 Lead Agency DARTS MPO

Funding Source Amount

FHWA (80%) $10,000.00

Local Match $2,000.00

TOTAL $12,000.00

Page 33: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

33 | P a g e

Sub-element 1.2 Operations and Administration

OBJECTIVE (Meets DARTS MTP GOAL: Efficiency and Financial)

• Provide overall management of DARTS’s transportation planning program and ensure

compliance with applicable federal and state requirements

• Maintain study records

• Prepare for and document committee meetings

• General administration duties

PREVIOUS WORK

• In FY 2019, the three DARTS committees had four regular meetings in September

2018, December 2018, April 2019 and June 2019. There was one called meeting for

the TCC and PC January 2019. Meeting minutes and agendas were prepared and

later archived on the DARTS website

• Quarterly Reports for Reimbursement (November 2018, January 2019, April 2019,

June 2019) and an annual report of activities (September 2018) were prepared and

submitted to the GDOT Planning Office

• Developed agendas, sign in sheets, and supporting materials packets for all MPO

meetings in FY 2019

• Developed minutes for all MPO meetings

• Developed advertisments for meetings dates and documents

• Utilized GDOT and FHWA approved resolution templave for Performance Measures 2

and 3

• Updated website and Facebook page throughout FY 19

Project Description (FY 2020 Activities)

• Ensure that activities associated with the transportation planning process are carried

out in an efficient and cost effective manner

• Provide opportunity for an open and inclusive process assuring continuing,

comprehensive and cooperative decision making with all jurisdictions in the DARTS

planning area

PRODUCT

• DARTS committee meetings, agendas, presentations, speakers and minutes

• Quarterly Reimbursement reports (July - 4th Quarter FY 2019, October - 1st Quarter

FY 2019, January – 2nd Quarter FY 2020, April – 3rd Quarter FY 2020) and an Annual

Performance Report FY 2020 - August.

Page 34: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

34 | P a g e

• Accounting Narratives and Invoices

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $64,117.50

LOCAL PL MATCH $16,029.38

TOTAL $80,146.88

Page 35: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

35 | P a g e

Sub-element 1.3 Training/Employee Education

TARGET START

AND END DATES

7/1/2018 – 6/30/20 LEAD AGENCY DARTS MPO

OBJECTIVE (Meets DARTS MTP GOAL: Efficiency and Financial)

• Develop staff knowledge of transportation planning through relevant workshops and

conferences

PREVIOUS WORK

• 2018 Conference of Minority Transit Officials Baltimore, MD • Planning Funds Review Board Meeting Atlanta, GA (September 2018, March 2019)

• Association of Metropolitan Planning Organizations (AMPO) Conference San Antonio, TX (October 16-20, 2018)

• Transportation Research Board Tools of the Trade Conference Kansas City, MO • FHWA Freight Workshop Macon, GA (November 15, 2018) • 2018 American Planning Association National Conference, San Fransico, CA (April 13-

16, 2019) Project Description (FY 2020 Activities)

• Staff plans to attend the Transportation Research Boards Annual Meeting; 2019

Association of Metropolitan Planning Organizations (AMPO) Annual Conference; the

Transportation Research Board Annual meeting in Washington, DC (January 2020);

and the 2020 American Planning Association National Conference.

• Staff may attend other transportation related conferences, seminars and courses

including those offered by the National Highway Institute (NHI), Transportation

Research Board (TRB), FHWA, FTA and GDOT

• Attend webinars on transportation topics

PRODUCT

• Staff Improvement

• Continuing Education

• Updates on current legislation

Page 36: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

36 | P a g e

FUNDING SOURCE AMOUNT

FHWA (80%) $10,000.00

LOCAL MATCH $2,000.00

TOTAL $12,000.00

Page 37: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

37 | P a g e

Sub-element 1.4 Equipment and Supplies

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $4,000.00

LOCAL MATCH $1,000.00

TOTAL $5,000.00

OBJECTIVE (Meets DARTS MTP GOAL: Efficiency and Financial)

• Maintain computer systems used by the MPO for relevant transportation planning

activities

• Acquire software and hardware, as necessary, to maintain the MPO’s transportation

planning process

• Purchase necessary office supplies to operate the MPO

PREVIOUS WORK

• Purchased office supplies including file folders, highlighters, paper, 1 inch binders, 1.5 inch binders, 2 inch binders, book shelf and 3 inch binders

• Updated Adobe Suite

Project Description (FY 2020 Activities)

• Maintain computer systems and other office equipment used by the MPO in line with

relevant transportation planning activities

PRODUCT

• Adequate technology and office equipment to operate the MPO

Page 38: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

38 | P a g e

Sub-element 1.5 Contracts/Grants

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $4,000.00

LOCAL MATCH $1,000.00

TOTAL $5,000.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency and Financial)

• Issue and administer contracts for transportation plans and studies

• Apply for transportation grants

PREVIOUS WORK

• No previous work

Project Description (FY 2020 Activities)

• Administration of contracts and grants awarded to DARTS MPO

• Administration of Freight Plan

• Administration of Bicycle and Pedestrian Plan

PRODUCT

• Leesburg School Connectivity study

• Freight Profile Update

• Bicycle and Pedestrian Plan Update

Page 39: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

39 | P a g e

Sub-element 1.6 UPWP

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $10,000.00

LOCAL MATCH $2,000.00

TOTAL $12,000.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Safety, Mobility, Enhancement,

Multimodal, Air Transportation, Transportation System Management (TSM) and

Transportation Demand Management (TDM), Financial, Equity and System Maintenance)

• Identify work tasks undertaken by DARTS to address metropolitan area

transportation planning

• Collect public and committee input on a proposed UPWP

• Develop and draft final UPWP

PREVIOUS WORK

• Developed FY 2020 UPWP • Submitted FY 2019 Budget Report to GDOT • Draft FY 2020 UPWP was posted on the DARTS website

Project Description (FY 2020 Activities)

• Identify transportation planning work tasks and sub-elements, prepare descriptive

narrative and cost estimate for each sub-element, and coordinate input for the FY

2021 UPWP

• Monitor the activities and prpogress identified in the UPWP to ensure compliance

with the approved tasks

PRODUCT

• Adoption of FY 2021 UPWP (April 2020)

Page 40: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

40 | P a g e

TASK #2 PUBLIC INVOLVEMENT

Sub-element 2.1 Community Outreach/Education

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency and Equity)

• Gain input from the general public on transportation planning

• Comply with the federal and local public participation requirements

• Provide opportunities for convenient public access to review and comment on the

DARTS planning and programming documents and the data and processes leading to

those documents

• Identify and involve stakeholders and traditionally underserved groups in the

transportation process

PREVIOUS WORK

• Periodic updates and maintenance of dartsmpo.org website on MPO activities (July 2017, December 2017, March 2018, June 2018)

• Updated and expanded mail and e-mail contact lists (updated all of the contacts, positions and key staff persons)

• Periodic updates to the Facebook page with upcoming events and meetings, hearings and transportation articles that included Traffic warnings and events.

Project Description (FY 2020 Activities)

• Provide opportunity for public comment and review on documents and activities

• Establish and maintain a record keeping system that documents official actions of

transportation planning processes and related public review

• Advertise the availability of draft documents for public review and comment

• Maintain and update the dartsmpo.org website

• Maintain and update database of community stakeholders for mail and electronic

notification of transportation activities

• Provide two transportation workshops Fall and Spring to educate the public on

transportation related topics

• Host public input meetings concerning the MTP so that Environmental Justice

communities will get reached

• Meet with minority and traditionally underserved groups to be more inclusive to the

transportation process

Page 41: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

41 | P a g e

FUNDING SOURCE AMOUNT

FHWA (80%) $4,000.00

LOCAL MATCH $1,000.00

TOTAL $5,000.00

PRODUCT

• Community Outreach and education

• Updated mailing list

• Updated e-mail list

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

Page 42: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

42 | P a g e

Sub-element 2.2 Environmental Justice/Title VI

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $4,000.00

LOCAL MATCH $1,000.00

TOTAL $5,000.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency and Equity)

• Promote equity of all people independent of age, race, ethnicity, economic status

and physical ability

• Identify communities and populations that are traditionally underrepresented in

decision making process

• Create relationships with community based organizations and schools and minority

business to engage minority and low income people in the decision making process

PREVIOUS WORK

• No previous work

Project Description (FY 2020 Activities)

• Update Environmental Justice/Title VI document

• Use social media to keep environmental justice stakeholders informed of upcoming

transportation planning opportunities for public involvement

• Create a database of stakeholders in underserved communities to disseminate

information to regarding transportation issues

• Convene a focus group to better reach underserved populations

• Evaluate compliance with Americans with Disabilities Act, particularly around schools, concentrations of disadvantaged populations, social

services, medical, and transit facilities.

PRODUCT

• Amend Environmental Justice Document as deemed necessary

Page 43: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

43 | P a g e

Sub-element 2.3 Participation Plan

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $2,500.00

LOCAL MATCH $750.00

TOTAL $3,250.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency and Equity)

• Promote participation, of individuals, community leaders, businesses and special

interest groups.

• Provide communications to encourage citizen participation in DARTS MPO processes

that are understandable, timely and broadly distributed.

• Provide citizens with an opportunity to be involved early in the process of policy

development, planning and projects.

PREVIOUS WORK

• No previous work

Project Description (FY 2020 Activities)

• Internal update of Public Participation Plan

PRODUCT

• Community outreach and education

• Website and Social Media Updates

• Email Listserv of interested parties to receive periodic updates

Page 44: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

44 | P a g e

TASK #3 DATA COLLECTION

Sub-element 3.1 Socio-Economic Data/EJ Analysis Data

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $4,000.00

LOCAL MATCH $1,000.00

TOTAL $5,000.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Environment and Equity)

• Collect and prepare socio-economic data for the development of long-range

transportation plan and transportation studies

• Provide socio-economic information and research services to transportation project

• Provide socio-economic data to policy makers

• Maintain an inventory of socioeconomic data

PREVIOUS WORK

• No previous work

Project Description (FY 2020 Activities)

• Identify population, housing, median income, employment, and school enrollment

information

• Monitor socio-economic data and amend as necessary

PRODUCT

• Utilize socio-economic data in the upcoming MTP

• Maps of underserved populations

Page 45: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

45 | P a g e

Sub-element 3.2 Land Use Monitoring

TARGET START

AND END DATES

7/1/2019– 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $1,000.00

LOCAL MATCH $250.00

TOTAL $1,250.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Environment and Equity)

• Gather information on existing and future land use patterns for the development of

long range transportation planning and special studies.

PREVIOUS WORK

• No previous work.

Project Description (FY 2020 Activities)

• Track land use and growth patterns of the DARTS planning area

PRODUCT

• Updated Land Use Maps

Page 46: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

46 | P a g e

Sub-element 3.5 System Monitoring

TARGET START AND

END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $1,000.00

LOCAL MATCH $250.00

TOTAL $1,250.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Environment and Equity)

• Collect data pertaining to the current transportation system including Average Annual

Daily Traffic (AADT)

PREVIOUS WORK

• No previous work

Project Description (FY 2020 Activities)

• Track land use and growth patterns

PRODUCT

• Creation of an inventory of transportation related data maintained and updated to

benchmark characteristics of the transportation system

• Compilation of data into user friendly information

• Processing of data request

Page 47: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

47 | P a g e

Sub-element 4.3 Intermodal (i.e. airports and ports)

TRANSPORTATION RELATED PLANNING ACTIVITIES ORGANIZATION ACTIVITIES

DARTS Intermodal Planning

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $1,000.00

LOCAL MATCH $250.00

TOTAL $1,250.00

OBJECTIVE

• Plan for intermodal modes of transportation.

PREVIOUS WORK

• No previous work Project Description (FY 2020 Activities)

• Assess local air and freight transportation

PRODUCT

• Database of updated local air and freight transportation for the Freight Plan Update.

Page 48: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

48 | P a g e

Sub-element 4.5 Bike/Pedestrian

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $4,000.00

LOCAL MATCH $1,000.00

TOTAL $5,000.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Safety, Mobility, Environment,

Enhancement, Multimodal and Equity)

• Plan for bicycle and pedestrian modes of transportation

• Find improvements for the bicycle and pedestrian network

• Adopt complete streets policies within the DARTS MPO Boundary

• Define a developed bicycle and pedestrian network

PREVIOUS WORK

• No previous work

Project Description (FY 2020 Activities)

• Comprehensive update of the 2011 Regional Bike and Pedestrian Plan

• Assessing the safety and condition of pedestrian and bicycle facilities

PRODUCT

• Updated Bike/Ped Plan

Page 49: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

49 | P a g e

Sub-element 4.7 GIS Development and Applications

TARGET START

AND END DATES

LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $1,0000.00

LOCAL MATCH $250.00

TOTAL $1,2500.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Environment, Enhancement, and

Equity)

• Apply GIS to develop maps for transportation plans and studies.

• Create up to date land information for traditional mapping and display

PREVIOUS WORK

• No previous work

Project Description (FY 2020 Activities)

• Create GIS maps, as necessary, for analysis.

• Use GIS as a tool in spatial work projects

PRODUCT

• GIS maps will be prepared through the GIS department

Page 50: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

50 | P a g e

Sub-element 4.8 Highway Planning

TARGET START

AND END DATES

LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $1,0000.00

LOCAL MATCH $250.00

TOTAL $1,2500.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Safety, Mobility, Environment,

Enhancement, Multimodal and Equity)

• Assess performance of the DARTS highways

• Plan highway improvements in light of current condition and future travel demands

PREVIOUS WORK

• No previous work

Project Description (FY 2020 Activities)

• Develop a list of highway project improvements

• Update maps of functional road classification changes in the DARTS planning area

PRODUCT

• Database of functional road classifications

Page 51: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

51 | P a g e

Sub-element 4.10 Freight Planning

TRANSPORTATION RELATED PLANNING ACTIVITIES ORGANIZATION ACTIVITIES

DARTS Freight Planning

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $4,000.00

LOCAL MATCH $1,000.00

TOTAL $5,000.00

OBJECTIVE

• Plan for efficient movement of freight throughout the DARTS area.

PREVIOUS WORK

• No previous work – this project was postponed and will have a section in the Metropolitan Transportation Plan Update

Project Description (FY 2020 Activities)

• Update the DARTS Freight Study

PRODUCT

• Updated Freight Profile

Page 52: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

52 | P a g e

Sub-element 4.11 Metropolitan Transportation Plan (MTP)

TARGET START

AND END DATES

7/1/2019 – 12/31/2019

LEAD AGENCY RS&H

DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $10,000.00

LOCAL MATCH $2,000.00

TOTAL $12,000.00

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Safety, Mobility, Enhancement,

Multimodal, Air Transportation, Transportation System Management (TSM) and

Transportation Demand Management (TDM), Financial, Equity and System Maintenance)

• Continue to implement the 2040 MTP

PREVIOUS WORK

• Monitor the Plan and amend as needed Project Description (FY 2020 Activities)

• Consultant Services to update 2045 Metropolitan Transportation Plan

PRODUCT

• 2045 DARTS MTP (September2019)

Page 53: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

53 | P a g e

Sub-element 4.12 Transportation Improvement Plan

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $11,056.24

LOCAL MATCH $2,764.06

TOTAL $13,820.30

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Safety, Mobility, Enhancement,

Multimodal, Air Transportation, Transportation System Management (TSM) and

Transportation Demand Management (TDM), Financial, Equity and System Maintenance)

• Programming transportation projects in the region (ONGOING)

• Maintain a financial plan to balance project costs with expected revenues

(ONGOING)

PREVIOUS WORK

• Attended GDOT project meetings • Coordinated with GDOT and local jurisdictions on project status and dollar amounts • Draft of the 2018-2021 TIP Presented to committees for review November 2018 • Adoption of 2018-2021 TIP in January 2018

Project Description (FY 2020 Activities)

• Update TIP FY 20-23

• Monitor the TIP, and amend as needed

• Continue implementation of State’s performance targets

PRODUCT

• Amend TIP as necessary

• FY 2020-2023 TIP

Page 54: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

54 | P a g e

Sub-element 4.13 Special Studies

OBJECTIVE (Meets DARTS MTP GOALS: Efficiency, Safety, Mobility, Enhancement,

Multimodal, Air Transportation, Transportation System Management (TSM) and

Transportation Demand Management (TDM), Financial, Equity and System Maintenance)

• Special studies are listed for work to be performed by a consultant for the

Metropolitan Planning Organization

• To provide the MPO witht the capability to develop planning studies to meet identified

needs in the TIP or in response to locally identified transportation initiatives. The

MPO will also respond to requests from other agencies or the general public and

addres planning needs not otherwise covered by the UPWP.

• In FY 2019 two special studies were initiated by DARTS

Leeburg Connectivity Study

Leesburg Bypass study

PREVIOUS WORK

• In FY 2019 DARTS developed applications for two special studies for consideration

• Both aplications were selected for funding at the GAMPO PL Funds Committee • Staff coordinated with GDOT to ensure contracting progressed

Project Description (FY 2020 Activities)

• Leesburg Connectivity Study

This is a Comprehensive Traffic Opertaion Study that will analyze the relocation of the

SR 32 corridor in the Downtown area to connect with US 19 and remove the turning

mvements now required to connt to US 19. This study also investigates the two

railroad crossings that would be involved. The also analyzes seventeen congested

intersections near the nine schools in the City of Leesburg for pedestrian safety and

vehicle travel improvement.

• Leesburg Bypass

A comprehensive study of the West Bypass that has seen significant change over the last five years. Redevelopment of the downtown area, subdivision expansion, new recreational facilities, increased school traffic and business traffic all led to a corridor study. Due to the influx of population what was formally primarily used as a truck route has now become a main route for many residents creating gridlock at peak times of the day. A study is needed to determine the location of new collector and arterial streets, median openings and utility easement adjacent to the bypass. A Corridor Study developing a scope of work around the West Bypass that would plan for roads connecting into the Bypass along with appropriate spacing of median openings. In additional the Study would include the best location for utilities on the West Bypass and tie into the 100 acre Recreation Complex development with connection to other recreation facilities.

Page 55: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

55 | P a g e

TARGET START

AND END DATES

7/1/2019 – 12/31/2019

LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FHWA (80%) $72,000.00

LOCAL MATCH $18,000.00

TOTAL $90,000.00

• It was decided by the City of Leesburg to rescind the Leesburg Bypass study due to

construction that occurred prior to the RFP submission.

PRODUCT

• Leesburg Connectivity Study

Page 56: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

56 | P a g e

TASK #5 TRANSIT PLANNING

Sub-element 5.1 Program Support and Administration 44.21.00

TRANSPORTATION RELATED PLANNING ACTIVITIES ORGANIZATION ACTIVITIES

DARTS, Albany Transit System Transit Equipment and Supplies

TARGET START

AND END DATES

7/1/2019 – 6/30/2020

LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FTA SECTION 5303 $3,890.00

STATE FTA MATCH $486.00

LOCAL FTA MATCH $486.00

TOTAL $4,862.00

OBJECTIVE

• The purchase of hardware or software needed to assist staff with transit planning functions

PREVIOUS WORK

• Staff purchased office and printing supplies. This included printing of reports for distribution to

committee members, and final printing of TIP.

• Printed Transit Maps for new transit route proposal

• Printed meeting agendas and newspaper ads for transit public meetings

Project Description (FY 2020 Activities)

• Staff will purchase meeting supplies and large printed documents for public meetings and Para

Transit Advisory group

• Staff will purchase office and printing supplies for transit planning purpose (5303 Funds)

• Staff will expense printing cost for new system maps

• Staff will purchase new route schedule designs and individual route maps and schedules

PRODUCT

• To purchase necessary software or hardware to assist in transit planning

Page 57: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

57 | P a g e

Sub-element 5.2 Unified Planning Work Program UPWP 44.21.00

TRANSPORTATION RELATED PLANNING ACTIVITIES

ORGANIZATION ACTIVITIES

DARTS Unified Planning Work Program

TARGET START

AND END DATES

7/1/2019 –

6/30/2020 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FTA SECTION 5303 $800.00

STATE FTA MATCH $100.00

LOCAL FTA MATCH $100.00

TOTAL $1,000.00

OBJECTIVE

• The Unified Planning Work Program is the compilation of DARTS planning efforts scheduled by

the local planning staff for the upcoming fiscal year. The transit portion of the proposed UPWP for the next fiscal year reflects priorities and special concerns regarding the planning of transit

services for the local community

PREVIOUS WORK

• The FY 18 UPWP was adopted June 2017

• Staff ensured that the FY 17 UPWP met federal guidelines

Project Description (FY 2020 Activities)

• Staff will prepare the draft FY 19 UPWP and make it available on the website and distribute to local, state and federal agencies for review and comments. This draft will continue transition to

performance-based planning and programming

• The draft FY 19 UPWP will be reviewed by the DARTS planning committees and be recommended for adoption to the Policy Committee

PRODUCT

• Prepare draft FY 19 UPWP • Approval of Final FY 19 UPWP

Page 58: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

58 | P a g e

OBJECTIVE

• Monitor and update transportation projects that are identified in the DARTS 2040 Long Range

Transportation Plan. Changing future land use and large-scale developments can have a

significant impact on the adjacent road network and can also impact the regional network. Large scale projects can also impact the operation of the transit network.

PREVIOUS WORK

• Reviewed transit development plans for implementation

• Reviewed land use plan and socio-economic data to monitor impacts on the transit network

• Reviewed existing transit conditions and routes to compare to existing and future conditions

Project Description (FY 2020 Activities)

• Coordinate with planning and development services for new land use projects that impact the

transit network

• Monitor individual projects included in Long Range Transportation Plan

• Coordinate with DARTS committee for the Bike and Pedestrian Plan

• Continue review of existing transit conditions and routes to compare to existing and future condition

• Continuous coordination with State Tollway & Road Authority (SRTA) to provide project

updates on the Albany Transportation Center Project

• Continuous implementation of Transit Development Plan recommendations for improving

efficiency of current network

PRODUCT

• Continuous monitoring of transit planning system development and planning processes

TRANSPORTATION RELATED PLANNING ACTIVITIES

ORGANIZATION ACTIVITIES

DARTS Long Range Transportation Planning

TARGET START AND

END DATES

7/1/2019 – 6/30/2020 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FTA SECTION 5303 $1,200.00

STATE FTA MATCH $150.00

LOCAL FTA MATCH $150.00

TOTAL $1,500.00

Sub-element 5.3 Long Range Transportation Planning -System Level

44.23.01

Page 59: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

59 | P a g e

Sub-element 5.4 Short-Range Transportation 44.24.00

OBJECTIVE

• Prepare and submit required grant applications, budget documents, quarterly and annually

reports for Georgia Department of Transportation, and Federal Transportation Administration FTA. Continuous monitoring of the transit system performance and accessing the needs of all

transit patrons. Provide continuous maintenance financial reports for transit planning program.

PREVIOUS WORK

• Quarterly reports were prepared and submitted to GDOT for reimbursement of transit planning section 5303 funds

• Continuous data collection and tracking ridership trends for more efficient service

• Monitored the need to expand or trim service as it relates to the systems performance.

• Staff attended community outreach meetings

• Transit staff held general public meeting to obtain feedback on transit services and introduce

new transit amenities such as bus stop signs, new shelters and on board WiFi, and new buses.

• Staff managed transit government website and held quarterly para transit meeting for feedback

of ADA para transit service and eligibility criteria.

• Staff coordinated with local university to devise a plan for new service for the local university merger.

• Staff launched new transit mobile application.

• Staff coordinated with consultant to collect NTD sampling data for mandatory trip surveys.

• Updated NTD annual reports, Ridership reports and Safety & Security Reports

Project Description (FY 2020 Activities)

• Coordinate planning activities among DARTS committees to ensure that the DARTS

transportation and transit planning needs are met.

• Submit quarterly transit planning reports to GDOT for reimbursement

• Maintain proper records on all invoices, reports and annual reports

• Continuous coordination of community outreach for transportation need of transit patrons by hosting public meeting and para transit advisory group meetings

• Contract administration 5303 &5307

• Staff will coordinate with ATS staff to purchase mobility management software to provide more

efficient and economical services

• Staff will seek assistance from consultant to assists with NTD sampling development trip survey

data

• Continuous transit planning assistance to ATS

• Staff will continue to utilize Remix transit planning software (1-year agreement $9,900)

• Ridership Tracking and Data Analysis with Genfare fare collection system

• Update NTD annual reports, Ridership reports and Safety & Security Reports

• Coordinate with local university to launch pilot service for Albany State University effective

• Staff will continue to maintain ATS website

• Coordinate with local university and primary retail access point for improving the customer experience with new ticket vending machines.

PRODUCT

• Contract Administration

• All Quarterly reports and invoices

• Update Transit Information on website

• New Transit Route schedule

Page 60: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

60 | P a g e

• Staff will see and obtain consultant for implementation of Transit Development Plan route

trims, expansion, and route modifications

TRANSPORTATION RELATED PLANNING ACTIVITIES ORGANIZATION ACTIVITIES

DARTS, Albany Transit System Program Support and Administration

TARGET START AND

END DATES

7/1/2019 – 6/30/2020 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FTA SECTION 5303 $44,022.00

STATE FTA MATCH $5,503.00

LOCAL FTA MATCH $5,503.00

TOTAL $55,028.00

Page 61: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

61 | P a g e

TARGET START

AND END DATES

7/1/2019 – 6/30/20 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FTA SECTION 5303 $1,600.00

STATE FTA MATCH $200.00

LOCAL FTA MATCH $200.00

TOTAL $2,000.00

Sub-element 5.5 Transportation Improvement Program 44.25.00 OBJECTIVE

• This document contains planned transit and transportation improvements over the next four

years. The TIP lists projects and identifies the fiscal year that preliminary engineering, right-of-way acquisition and construction is scheduled. This schedule includes estimated costs and

funding source for each project. The TIP must be financially balanced for the funding period. Federal regulations require that the TIP include proposed public transportation activities such

as capital improvements, and requests for operating assistance in order to secure federal

assistance in financing mass transportation. This element highlights TIP projects as it relates to transit.

PREVIOUS WORK

• Prepared FY 18-21 TIP

• Approved FY 18-21 TIP

Project Description (FY 2020 Activities)

• Monitor Bus Purchase Schedule for new transit fleet

• Continue planning of Albany Transportation Center development to include Project Schedule and Property Acquisition.

• Continuous coordination with ATS staff for bus stop sign installation schedule

• Monitor and update ADA bus stop improvements

• Identify areas that need bus stop amenities

PRODUCT

• Prepare Transit portion of the FY 18-21 TIP

TRANSPORTATION RELATED PLANNING ACTIVITIES ORGANIZATION ACTIVITIES

DARTS, Albany Transit System Transportation Improvement Program

Page 62: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

62 | P a g e

Sub-element 5.6 Training& Employee Education 44.24.00

TRANSPORTATION RELATED PLANNING ACTIVITIES

ORGANIZATION ACTIVITIES

DARTS, Albany Transit Training and Professional Development

TARGET START

AND END DATES

7/1/2019 – 6/30/2020

LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

FTA SECTION 5303 $10,000.00

STATE FTA MATCH $1,250.00

LOCAL FTA MATCH $1,250.00

TOTAL $12,500.00

OBJECTIVE

• Identify training opportunities to further the knowledge and capabilities of the DARTS transit planner

PREVIOUS WORK

• Staff attended GAMPO Conference

• Staff attended GTA Conference

• Staff attended APTA Training

• Staff attended National APA Conference

Project Description (FY 2020 Activities)

• Staff will continue to review potential transit related courses and their benefits for providing training that will advance knowledge in transit planning and public transportation.

• Staff may attend the following but not limited to (includes rough cost estimate): GA Transit

Assoc. (800), American Planning Assoc. (2600), GA Assoc. of MPOs (500), Assoc. of MPOs (2000), COMTO (3000) and training provided by FTA, GDOT, NTI, or NTD.

• Staff will attend CTAA SUN Training and Financial Management for Transit Agencies (3500)

• Staff will attend American Public Transportation Association training (2650)

• Continuous coordination with peer agencies

PRODUCT

• Training will enhance transit planning knowledge and skill and improve the knowledge of public

transportation services

Page 63: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

63 | P a g e

UNFUNDED PROJECTS

TRANSPORTATION RELATED PLANNING ACTIVITIES

ORGANIZATION ACTIVITIES

DARTS, Albany Transit Training and Professional Development

TARGET START

AND END DATES

7/1/2019 –

6/30/2020 LEAD AGENCY DARTS MPO

FUNDING SOURCE AMOUNT

Unidentified

OBJECTIVE

• This section describes prijects that have been identified, but lack funding to move forward

PREVIOUS WORK

• No previous work

Project Description (FY 2020 Activities)

• Bike Pedestrian Plan Update - $100,000 The current DARTS MPO Bike/Ped Plan is from 2011 and is need of an update.

• Freight Profile Update - $50,000

With a renewed focus on freight our profile is in need of an update. Albany operates the second

largest freight airport in the state and with increasing manufacturing and truck movements new

data should be inputted in the current profile.

PRODUCT

• Bike Ped Plan Update

• Freight Profile Update

Page 64: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

64 | P a g e

SUMMARY BUDGET TABLE Summary Budget Table

PROPOSED FUNDING BY TASK PERFORMING AGENCY FUNDING SOURCE

TASK NO.

TASK DESCRIPTION FHWA FTA – 5303 FEDERAL

TOTAL STATE 5303

MATCH STATE TOTAL LOCAL TOTAL

PL 1.1 Program Coordination $10,000.00 $10,000.00 $2,000.00 $12,000.00

PL 1.2 Operations and Administration $64,117.50 $64,117.50 $16,029.38 $80,146.88

PL 1.3 Training/Employee Education $10,000.00 $10,000.00 $2,000.00 $12,000.00

PL 1.4 Equipment and Supplies $4,000.00 $4,000.00 $1,000.00 $5,000.00

PL 1.5 Contracts/Grants $4,000.00 $4,000.00 $1,000.00 $5,000.00

PL 1.6 UPWP $10,000.00 $10,000.00 $2,000.00 $12,000.00

PL 2.1 Community Outreach/Education $4,000.00 $4,000.00 $1,000.00 $5,000.00

PL 2.2 Environmental Justice/Title VI $4,000.00 $4,000.00 $1,000.00 $5,000.00

PL 2.3 Participation Plan $2,500.00 $2,500.00 $750.00 $3,250.00

PL 3.1 Socio-Economic/EJ Analysis Data $4,000.00 $4,000.00 $1,000.00 $5,000.00

PL 3.2 Land Use Monitoring $1,000.00 $1,000.00 $250.00 $1,250.00

PL 3.5 System Monitoring $1,000.00 $1,000.00 $250.00 $1,250.00

PL 4.3 Intermodal (i.e. airports and ports) $1,000.00 $1,000.00 $250.00 $1,250.00

PL 4.5 Bicycle and Pedestrian Plan $4,000.00 $4,000.00 $1,000.00 $5,000.00

PL 4.7 GIS Development and Applications $1,000.00 $1,000.00 $250.00 $1,250.00

PL 4.8 Highway Planning $1,000.00 $1,000.00 $250.00 $1,250.00

PL 4.10 Freight Planning $4,000.00 $4,000.00 $1,000.00 $5,000.00

PL 4.11 Metropolitan Transportation Plan $10,000.00 $10,000.00 $2,000.00 $12,000.00

PL 4.12 Transportation Improvement Plan $11,056.24 $11,056.24 $2,764.06 $13,820.30

5303 A.L.I

44.21.00 5.1 Program Support & Administration $3,890.00 $3,890.00 $486.00 $486.00 $486.00 $4,862.00

Page 65: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

65 | P a g e

5303 A.L.I

44.21.00 5.2 Unified Planning Work Program $800.00 $800.00 $100.00 $100.00 $100.00 $1,000.00

5303 A.L.I.

44.23.01 5.3 Long Range Transportation Planning System Level $1,200.00 $1,200.00 $150.00 $150.00 $150.00 $1,500.00

5303 A.L.I

44.24.00 5.4 Short Range Transportation Planning (SRTP) $44,022.00 $44,022.00 $5,503.00 $5,503.00 $5,503.00 $55,028.00

5303 A.L.I

44.25.00 5.5 Transportation Improvement Program $1,600.00 $1,600.00 $200.00 $200.00 $200.00 $2,000.00

5303 A.L.I

44.24.00 5.6 Training & Employee Education $10,000.00 $10,000.00 $1,250.00 $1,250.00 $1,250.00 $12,500.00

Contract Totals:

FHWA PL (80%) $149,173.74 FTA 5303 (80%) $149,512.00

STATE PL 0 STATE 5303 (10%) $18,688.00

LOCAL PL (20%) $37,293.44 LOCAL 5303 (10%) $18,688.00

TOTAL $186,467.18 TOTAL $186,888.00

Page 66: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

66 | P a g e

APPENDIX

Page 67: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

67 | P a g e

Metropolitan Planning Factors to be considered in the 2018 UPWP

METROPOLITAN PLANNING FACTORS

TO BE CONSIDERED IN THE 2019 UPWP WORK ELEMENT METROPOLITAN PLANNING

FACTORS

1 2 3 4 5 6 7 8

1.0 ADMINISTRATION

1.1 Program Coordination X X X X X X X X

1.2 Operations and Administration X X X X X X X X

1.3 Training/Employee Education X X X X X

1.4 Equipment and Supplies X X X

1.5 Contracts/Grants X X X X

1.6 Unified Planning Work Program X X X X X X X X

2.0 PUBLIC INVOLVEMENT

2.1 Community Outreach/Education X X X X X X

2.2 Environmental Justice/Title VI X X X

2.3 Participation Plan X X X X X X X X

3.0 DATA COLLECTION

3.1 Socio-Economic Data X X X X X X X X

3.2 Land Use Monitoring X X X X X X X X

3.4 Transportation Surveys, Models, and

Analysis

X X X X X X X X

3.5 System Monitoring X X X X X X X X

4.0 SYSTEM PLANNING

4.1 Congestion Management X X X X X X X

4.3 Intermodal (i.e. airports and ports) X X X X X X X X

Page 68: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

68 | P a g e

X = work element demonstrates

4.5 Bike/Pedestrian X X X X X X X X

4.7 GIS Development and Applications X X X X X X X X

4.8 Highway Planning X X X X X X X X

4.10 Freight Planning X X X X X X X X

4.11 Long Range Plan X X

4.12 Transportation Improvement Plan X X X X X X X X

5.0 TRANSIT PLANNING

5.1 Program Support & Administration X X X X X X X X

5.2 Long Range Transportation Planning X X X X X X X X

5.3 Transportation Improvement Program X X X X X X X X

5.4 Training & Employee Education X X X X X

5.5 Equipment and Supplies X X X

5.6 Unified Planning Work Program X X X X X X X X

Page 69: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

69 | P a g e

MPO Self-Certification

Page 70: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

70 | P a g e

Page 71: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

71 | P a g e

Page 72: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

72 | P a g e

Page 73: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

73 | P a g e

Page 74: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

74 | P a g e

DARTS BYLAWS

Page 75: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

75 | P a g e

Page 76: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

76 | P a g e

Page 77: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

77 | P a g e

Page 78: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

78 | P a g e

Page 79: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

79 | P a g e

Page 80: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

80 | P a g e

COMMENTS

Georgia Department of Transportation

Hey Kerrie,

I have reviewed the FY20 UPWP and have a few comments:

The contents section pg.3 – Metropolitan Planning Factors…update to 2020 UPWP

What is the UPWP section pg.5 – Revise dates FY 2018-2019 (FY 2020)

Purpose of UPWP section pg. 14 – Revise dates (FY 2020)

Goals and Objectives should include the MTP Update as it was listed as a priority in the Executive Summary.

Task and Sub-Elements:

Revise dates and be consistent with the target start and end dates. (pg. 35, 48)

Include the MTP Update in this section as previous work and include funding source (pg. 52)

Include Bike/Ped Plan as it is listed as a priority…include funding source (pg. 48)

Include Freight Plan and funding source (as discussed in post TCC/PC meeting in June w/Ann-Marie) (pg. 51)

Thanks,

Jacqueline Williams

Transportation Planner

Office of Planning, 5th Floor

600 W Peachtree Street NW

Atlanta, GA, 30308

404.631.1789 office

[email protected]

Page 81: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

81 | P a g e

Federal Highway Administration

FY 2020 Unified Planning Work Program (UPWP)

FHWA Comments MPO: Albany

Section / Page

FHWA Comments

DARTS MPO RESPONSE

WORK PROGRAM

DEVELOPMENT

PROCESS

• Prior to distribution of this draft product, were the various committees and/or jurisdictions solicited for planning related priorities within the MPO boundary? If so, can the MPO staff provide documentation of this? One activity identified under the Executive Summary is updating the Bike/Ped Plan. Was this activity vetted/discussed with the various committees and documented in details?

All committees had discussion and input on recommended studies. Our minutes reflect these conversations.

CIVIL RIGHTS

DISCLAIMER

• Please revise to say Title VI

Changed to read Title VI

WHAT IS THE UPWP

This page is still showing FY 2018 – 2019. Please revise accordingly

Updated to FY 2020

EXECUTIVE SUMMARY

• Internship Program. Please provide further details the process for this. Is this a paid internship and if so, is it being funded with PL funds? What went into/will go into the selection process, etc.?

This section was eliminated

due to the hiring freeze being

listed. The MPO instead will

hire an additional Planner.

PURPOSE OF THE

UPWP

At bottom of page, there is still usage of FY 2018 and 19

Updated to read 2019/2020

PLANNING EMPHASIS

AREAS

These PEAs are dated. Furthermore, these emphasis areas should now be a part of the MPO’s planning process through the planning factors, performance

This section was removed

Page 82: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

82 | P a g e

management, and the FAST Act. Please remove this section.

BEGINNING ON PAGE

19

• The table/matrix does not have a title and/or accompanying verbiage to demonstrate its purpose/relevance;

• With the MTP update underway, recent adoption of the various targets, and producing the first Performance Systems Report, all these activities will be addressing items outlined in the attached matrix and should be stated as such in a summary paragraph.

Title and explanation added

DARTS PLANNING

PRIORITIES

• Please revise this section as the MPO’s priorities must focus on actual tasks/activities with tangible deliverables for the upcoming fiscal year, i.e., FY 20:

o For example, the DARTS MPO’s MTP is due 12/3/2019, so in FY 20, one of the MPO’s priorities is completing and adopting this product. This task is identified as a priority in the Executive Summary but should also be documented under DARTS Planning Priorities. Please revise accordingly;

o Additionally, the Executive Summary identified updating the MPO’s Bike/Ped Plan and Freight Profile as a priorities, but these activities and resulting products are not included under the MPO’s Planning Priorities section. Please revise accordingly;

o Please also include language stating that the DARTS MPO will continue implementing the State’s performance targets as well as completing and

Update this section to reflect

bullets

Page 83: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

83 | P a g e

making available the annual Systems Performance Report;

o Please add to the FY 20 priorities that MPO will review/evaluate and update its website by posting all planning related products in a timely manner.

ALL MPO’s TASKS AND

SUB-ELEMENTS

• This MPO does not have funds dedicated to staff performing Tasks and/or sub-tasks for the MPO’s core functions such as MTP update and related work. This MPO is in the process of updating its MTP. Along with this update, are the related public involvement, coordination, data collection and analysis, etc. Please revise all these tasks/sub-tasks accordingly to identify staff work and funding to carry out these activities that will result in the timely adoption of this plan;

• This MPO identified Bike/Ped plan and Freight Profile update as priorities in FY 20, yet there are no activities outlined and funding to carry out these tasks. Building on the recent GFP event, FHWA GA considers updating the MPO’s Freight Profile a higher priority than the Bike/Ped Plan so it is recommended to adjust work tasks accordingly.

• The MTP update is not included in FY 20. Please revise this document to include the MTP update

• Previous Work under individual tasks should only focus on the prior fiscal year

• Consider revising the title, Project Description to say instead, FY XXXX Activities. In its current state, it is

Update this section to reflect

bullets

Page 84: DARTS Unified Planning Work Programdartsmpo.org/wp-content/uploads/2019/05/DARTS-Unified-Planning-… · 2 | P a g e Contents TITLE VI DISCLAIMER ..... 4

84 | P a g e

not clear what activities will be occurring during FY 2020

Recommended