Data Center Facility Study
2Mapping
3Purposes
IT/ telecom company centers
Storage service providers
Industry/ commercial in house
4Priorities
•Degrees of downtime•Center tiers
Business Continuity
•Power Use Effectiveness•Total consumption
Energy Efficiency
•Physical•CyberSecurity
5Data
Climatic•Temperature
•Humidity
•Pressure
Electric•Power
•Current
•Power Factor…
IT•Data Speed
•Storage
6Equipment Data
Servers
• Electric Data through Power Distribution Unit (PDU)
• Climatic data through sensor at rack/server intake (and exhaust)
HVAC / Climate Control
• Electric data metering
• Temperature, humidity and possibly pressure
7Power equipment
• Input and output voltage and current, losses• Power• Harmonics
UPS
• Power (charging and discharging)• Energy storedBattery
• Generation – power and quality• UsageDG
• Power input/ output, Losses• Grid power qualityTransformer
8Metering Overview: Power
• Servers
• Power Equipment monitoring
• Load monitoring: IT and HVAC (+lighting)
• Network monitoring (harmonics: active filters, ballasts)
9Metering Overview: Climate
10Process
Understanding:
- Smart Sense- Data
Centers
Referring to Foundry Case Study
Identifying Value of
Ecolibrium
11
Proposition
12Main Points
• Active PUE Monitoring and Optimization
• Asset Health Monitoring
• Reducing Redundancy through Asset Optimization
• Power Source Optimization
• Predictive Maintenance
• Modularity Integration and Scalability
13Operational Efficiency
•
• Climate Monitoring and Asset Optimization
• Thermal zone mapping (and fluid flow analysis) for optimal equipment placement
• Minimizing losses
• Server performance monitoring
14Asset Health and Predictive Maintenance
• HVAC health through motor, chiller and other asset analysis
• Battery health
• Transformer health
• UPS Health
• Active monitoring provides insight for when tests are needed
15Redundancy
Reducing CapEx by optimizing assets
and assuring reliability
- Lower value of assets and
predictive because of redundancy- Certification
requiring redundancy
16Power Sourcing and Billing Insights
• Power source optimization including DERs
• Contract demand optimization
• Energy Trading from Open Access Feasibility and Bid optimization
• TOD optimization
• Incoming Voltage check
• Power factor optimization
17Modularity Integration and Scalability
• Modular integration allows scalability of Ecolibrium in given data center
• Challenge is: They are very advanced and one product so difficult to integrates
18Data Center Infrastructure Management
• Several discussed features exist
• Analytics is doubtful
• Use, especially in India is sparse (instead use SCADA/ BMS)
• IT Data centers vs facility supporting data centers
19Data Center Certification
TIA 942
20
21Infibeam Meeting
• Meeting with a very experienced person in the industry, in charge of designing Infibeam’s next data center at GIFT city
His opinion:
• What we are proposing already exists (including analytics) and done by big companies
• Can’t reduce redundancy because it is needed for certification
• Look at data centers of people who’s core business isn’t data centers (industry, hospital, etc.)
• Modular data centers have company integrted monitoring
• Infibeam (first in India) getting Lithium Ion batteries instead of VRLA
22GIFT city visit
• Supposedly very advanced for India, “only Tier 4 data center in India”
• Manual readings (LT, HT, etc.) – Schneider equipment with integrated panels
• Redundancy in everything – needed for certification
• BMS used for monitoring – extremely limited
23Creating a world where every watt counts!