Presenters:Samantha Morgan– COO for 42U
Patrick McConaughy– Product Specialist for Avocent
Agenda
• Overview of Data Center Management Software
• Today's Data Center Challenges• Features AMIE• AMIE Demonstration• Benefits of AMIE• Special Price Announcement• Q&A
©2009 42U All rights reserved2
Datacenter Management Software
1. Environmental Monitoring – Monitors critical environmental factors such as
temperature, humidity and pressure.
2. Power Management – Power capacity planning, power efficiency metrics, and
power trending at the rack, room, or data center level.
3. Infrastructure Management – Modeling, asset and change management, capacity
planning, reporting and remote management.
©2009 42U All rights reserved3
Today’s Data Center Challenges
©2009 42U All rights reserved
• Cost & complexity of data centermanagement keeps rising
• IT staff is not growing withinfrastructure cost
• “Green IT” initiatives gaining speed
• Over-cooling of the Data Center prevalent everywhere
• 54% of Data Centers are currently being redesigned, retrofitted or built new (Avocent –Data Center Issues study)
4
• Over the next five years power failures and limits onpower availability will halt data center operations atmore than 90% of all companies
• By 2011, more than 70 percent of US enterprisedata centers will face 'significant disruptions' relatedto energy consumption and floor space
• Power management and cooling have emerged asa bottleneck and critical element in data centeroperations and planning
Increased densities make power and cooling thenumber one factor to ensuring satisfactory datacenter operation
The Data Center Power Crisis
©2009 42U All rights reserved 5
Case in Point
©2009 42U All rights reserved
• AFCOM ran studies at 19 Data Centers and found the following:– The Data Centers were over-cooled by an average of 2.6 times– 40-60% of power consumption was used for cooling– Potential savings of 20 – 35%!
• 5 Megawatts Data Center @ 10 cents/KWh – Annual power costs = $4, 380,000
• Optimize power utilization (by modeling power consumption)
• Selecting appropriate hardware• Consolidate underutilized equipment
– Reduce power consumption by just 20%• $876,000 annual savings
6
Business Requirements on the Data Center
• Stretch lifespan of existing Data Centers– Right-size infrastructure resources
• Improve energy efficiency (“Green IT” initiatives)– Lower energy costs
• Proactively manage Data Center capacity– New Data Center builds,
consolidation, retrofits
• Deliver predictable, high quality service– Operational improvements, time to
provision, 24x7 availability
©2009 42U All rights reserved 7
Today’s Tools Cannot Meetthe Challenge
©2009 42U All rights reserved
Multiple ExcelSpreadsheets
AutoCADDrawings
Email &Meetings
Databases
VendorDependent Monitoring
VisioIndividuals
Varying Degrees of
Completeness
Manage the Data Center as a Single Entity
8
©2009 42U All rights reserved
Enter MergePoint Infrastructure Explorer
Data Center Asset Management
Capacity Planning
Change Management
Reporting
9
©2009 42U All rights reserved
Data Center Planning & Optimization
Displays a number of environmental states:•Power•Space•Weight•Heat•Connectivity
10
Trending reports
©2009 42U All rights reserved
Plan moves, adds, and changes with precision, not guesswork
Sep, 2008
Oct, 2008
Nov, 2008
Dec, 2008
Jan, 2009
Feb, 2009
Mar, 2009
0
200
400
600
800
1000
Heat (kW)
Consumed
Max Capacity
Sep, 2008
Oct, 2008
Nov, 2008
Dec, 2008
Jan, 2009
Feb, 2009
Mar, 2009
0
200
400
600
800
1000
Weight(lbs)
Consumed
Max Capacity
Sep, 2008
Oct, 2008
Nov, 2008
Dec, 2008
Jan, 2009
Feb, 2009
Mar, 2009
0
200
400
600
800
1000
Space(ru)
Consumed
Max Capacity
Sep, 2008
Oct, 2008
Nov, 2008
Dec, 2008
Jan, 2009
Feb, 2009
Mar, 2009
0
200
400
600
800
1000
Power (kW)
Consumed
Max Capacity
11
New Features for 2.2
©2009 42U All rights reserved
Reservations, Capacity Search & Rack Timelines• Fields for Power, Heat, Weight, and even Space• Capacities include the ability to narrow a search by User Defined Properties, or properties that are custom• Add a UDP to a number of assets and then use that as a way to refine a search• Point in time and display the rack changes• Allows navigation to any one point easily using labels • Main view allows user to reserve the racks or turn off reservations
12
AMIE DEMO
©2009 42U All rights reserved13
©2009 42U All rights reserved
Benefits of Using MergePoint Infrastructure Explorer
Key Benefits for Your Data Center Needs
Reduce power consumption / costs
Balance cabinet heat distribution
Reduce labor costs
Avoid expensive consulting engagements & engineering services
Reduce risk of moves/adds/changes
14
Special Price Announcement• Manage 100 racks for $10,000 • Offer Includes:
• 100-rack license package (MergePoint® Infrastructure Explorer)
• One year, Silver level, software upgrade protection
• Access for one person to attend two online training classes (MergePoint® Infrastructure Explorer course 360 and 361) for 30 days
• For More Details:
Call: 1.800.638.2638
Visit:©2009 42U All rights reserved
15
http://www.42u.com/management/avocent-amie-limited-time-offer.htm
Q&A
For a copy of today’s presentation please email [email protected]
For additional information on 42U’s products and services, please visit:
http://www.42U.com
Speak to your Solutions Consultant Today1.800.638.2638
Thank You!