Jon Pettitt, EMEA DataCenter Business Development Manager 1 Data Centre Cooling Technologies
Transcript
Page 1: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Jon Pettitt, EMEA DataCenter Business Development Manager 1

Data Centre Cooling Technologies

Page 2: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

• 3.000 Employees

• 30 Countries

• Turnover of €470 M

• HQ in Sweden

• Founded1955

• Global DC Support

•25+ Data Centers

• 95 MW+ Cooling

• 455 Installed units

2

Munters Group – Key facts

Munters – Your Perfect Climate

Page 3: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Global Manufacturing & Logistics Support

Manufacturing plants

Logistic & assembly hubs

16 Manufacturing Plants

5 Logistic & Assembly Hubs

53 Sales & Service Centres

Page 4: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

1946 Munters CargoCaire

manufacture under

licence

2012 Acquire

Proflute

2008

Acquire TN

Belgium

2010 Acquired

by Nordic

Capital

2011 Acquire

Kerulai China

and Rotem

2007 Acquire Des

Champs USA

1955 Munters Sweden

bought UK/US

CargoCaire

1960

Munters

Worldwide

1997 on

Swedish stock

exchange

● Swedish inventor and entrepreneur

● A pioneer in desiccant rotor &

evaporative cooling/humidification

● Applied for close to 1,000 patents

● Invented Desiccant rotor technology

over 30 years ago Carl Munters (1897-1989)

A Corporate Culture of Technical Innovation

and a History of Customer Service

Page 5: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Munters Data Centre Installations to May 2013

Page 6: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Why Choose Munters?

6

• Stable Organisation - 66+ year history - Group sales approx €430m.

• Financial Strength - Consistently profitable with strong backing from Nordic Capital &

Rothschild.

• Commitment to the Data Centre Market - €600k invested in the Data Centre Test Facility

in Dison.

• Proven Technology - 13+ years of fault-free performance.

• Capacity for Large Projects - 15 manufacturing facilities worldwide, including 6 plants able

to produce Data Centre cooling systems.

• Global Support - 53 Sales & Service Centres in over 30 countries

• After Sales Support - 20+ Munters Service Engineers in Asia.

• Customer Service - Dedicated structure to support our Data Centre customers.

• Proven Track Record - 12 years experience in Data Centre Cooling, with over 85mW of

cooling installed worldwide.

Page 8: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

no. 8

• Challenges in DC Development

Page 9: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Key Challenges & Drivers Impacting the Data Centre Industry

• Reliability/Uptime

• SLA’s

• Contamination

• Energy Costs

• Carbon Emissions

• Modularity

Page 10: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Uptime & Reliability

• Tier 1: Non-redundant capacity components (single uplink and servers).

• Tier 2: Tier 1 + Redundant capacity components.

• Tier 3: Tier 1 + Tier 2 + Dual-powered equipment and multiple uplinks. • Tier 4: Tier 1 + Tier 2 + Tier 3 + all components are fully fault-tolerant including

uplinks, storage, chillers, HVAC systems, servers etc.

Everything is dual-powered.

The levels also describes the guaranteed availability of data from the hardware at a location:

• Tier 1: 99.671% availability.

• Tier 2: 99.741% availability.

• Tier 3: 99.982% availability. • Tier 4: 99.995% availability. RELIABILITY is THE Critical Success Factor

Page 11: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Air Contamination

Page 12: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Air Contamination

Page 13: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Energy Efficiency and Carbon Footprint

Page 14: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Industry 2013 - Future ?

+ + +

Future

?

?

?

?

Page 15: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Sustainability

Green Grid introducing new metrics to measure and help DC owners improve

Sustainability with Data Centre’s

PUE = Power Usage Effectiveness

CUE = Carbon Usage Effectiveness

WUE = Water Usage Effectiveness

Page 16: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Infrastructure

• Power Supplies

• Data Centre size is often restricted by availability of power to site.

• By reducing cooling power consumption, more power becomes

available for critical processes and server operations.

• Space

• Land cost

• Availability

• Planning Consents

• Water

• Availability

• Cost

Page 17: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

ASHRAE Recommended & Allowable Envelopes

5.5oC dew point

15oC dew point 60%

A1

A2

A3 A4

18oC 27oC

Page 18: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

no. 18

• Cooling Technologies

Page 19: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

no. 19

Indirect Evaporative Cooling

Page 20: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Exhaust

Outside

35°C

23°C

Indirect Air Side Economizer Using Polymer Tube HX

Page 21: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Three Modes of Operation

• Mode 1 – Cold Ambient

– Operation:- DRY MODE

– Air to Air Heat exchanger only

• Mode 2 – Warm Ambient

– Operation:- EVAP MODE

– Indirect Evaporative Cooling only

• Mode 3 – Very Warm/Hot Ambient (above approx 22°C WB)

– Operation:- EVAP + DX MODE

– Indirect Evaporative Air Cooling only + DX Cooling circuit

Page 22: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Oasis IEC Video

Oasis video runs here

Page 23: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

23

Polymer Heat Exchanger

Page 24: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

24

● Flexible Polymer Tubes

● 2.44 meters length

● 75-80% approach to outdoor

scavenger air wet bulb temp

● 55% dry heat recovery

• Scale Limiting design

• Corrosion Resistant

• Independently tested

• UL 900 Class II

• Flame retardant (UL94-V0)

Polymer Heat Exchanger

Page 25: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

no. 27

Water Spray Operation

Video of water running through the H/Ex runs here

Page 26: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

26

Beneath the Heat Exchanger

Page 27: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Beneath the Heat Exchanger, in Wet Mode

Scavenger

Air

Page 28: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Legionella Risk Analysis

• The Risk Assessment of the OASIS unit

confirms that the risks of causing growth and

spread of Legionella bacteria are negligible.

• If the temperature is below 25°C, no risk of

occurrence of Legionella in the system,

which is the case most of the time.

• In the operating conditions for water above

25°C, the system is designed so that water

flows continuously in the circuit so that there

is no stagnation of water and no risk of

emergence of bacteria.

• The Oasis IEC has an automatic emptying

system that starts if installation is at standstill

for agreed hours. Therefore no risk of

proliferation of legionella in the water

recovery pan.

Page 29: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

< 310 kW

54.000m3/h 66.000m3/h

2 prefab blocks

6.9 x 3.94 x 3.6 / 27.2m2

8.8 Ton

OASISTM IEC Range

Oasis 100 Oasis 200 Oasis 300

< 100 kW

18.000m3/h 22.000m3/h

1 block

6.9 x 1.4 x 3.6 / 9.4 m2

2.8 Ton

< 200 kW

36.000m3/h 44.000m3/h

1 block

6.9 x 2.6 x 3.6 / 17.8m2

6.6 Ton

Page 30: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Perimeter format Oasis 200

30

Page 31: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

no. 33 Section 5

• #5: Performance & Cost Comparisons

Page 32: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Independent Performance Verification

Page 33: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Results of Independent Engineering Review

Benefits of Oasis™ IEC Cooling over

high efficiency free-cooling chillers:

• Lower capital costs

• Reduced Infrastructure

• 40% lower annual operating cost • Low partial PUE

Source: Cundall Product Engineering Review. Based on 1MW data centre (N+1)

Page 34: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Oasis™ Indirect Evaporative Cooler Energy savings vs Chillers

Page 35: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Oasis™ Indirect Evaporative Cooler Energy savings vs Chillers

Page 36: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Hours pa that Oasis IEC can provide 23°C without Mechanical Cooling

Based on Hot Aisle return air temperature of 35DegC

Hours run with

EPX only

Hours run with

EPX and

supplementary

cooling

Hours of operation per year

Page 37: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Based on Hot Aisle return air temperature of 39DegC

Hours run with

EPX only

Hours run with

EPX and

supplementary

cooling

Hours of operation per year

Hours pa that Oasis IEC can provide 27°C without Mechanical Cooling

Page 38: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

no. 39

Existing Installations

Page 39: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Oasis™Indirect Evaporative Air Cooler (IEAC)

Page 40: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Australia

Page 41: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Australia

Page 42: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Wenatchee, WA

Page 43: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

T5 El Segundo, CA.

Page 44: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

DCO2 Belgium – 5 MW

● Winner Datacenter Dynamics leadership award – 'Green Datacentre' 2011 & European Code of Conduct Award for new Data Centre 2011

● With free cooling system: dust & pollution from surrounding farmland caused - Frequent replacement of filters

- Required man power & frequent inspection

- Caused pressure drop & increased fan power

Solution: Munters Oasis Indirect Evaporative Cooler replaced full free cooling system

Page 45: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

no. 46

Sabey Intergate Quincy

Page 46: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

46

Sabey Case Study

Sabey video runs here

Page 47: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Data Centre Test Facility

Wenatchee, WA

Page 48: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

48

All units can be FATesting in our Data Center Test Facility

• Performance testing

• Leakage testing

• Controls simulations

Page 49: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre

Benefits Oasis™ IEC Systems

• Contamination Control

Supply and outdoor airflow do not mix

• Corrosion Prevention:

No added moisture/humidity to supply

• Usable for any kind of sweet water

Rain water harvesting

• Eliminating DX cooling

100% IEC Cooling in some regions

• IEC efficiency can increase further

As allowable supply air temperature to server inlet increases,

Page 50: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre