Cost Estimation Parameter- Vessel 090-V-003 Project Name Sulphur Block - Resid Upgradation Project Originating Company TEXFAB MACHINERY PVT. LTD. Document Number DS-001 Document Revision A Document Title Cost Estimation Parameter- Vessel 090-V-003 Category of Submission Issued for Review Document type Datasheet Document Control Code DS REVIEW CODES Requisition No. : Date. : 1 No Comments, Work may Proceed. 2 3 5 Document/Drawing Retained for Information Name - Rev Description Approved By Sulphur Block – Resid Upgradation Project CPCL Manali Refinery The contractor shall proceed with the fabrication/manufacturing taking care of and incorporating Owner/PMC comments. Contractor shall submit the drawings/documents again duly incorporating Owner/PMC comments. Major non-conformance and deviation to contract specifications and the document is rejected. Contractor is to resubmit for review after incorporating comments. Manufactures and suppliers remain responsible under all circumstances for their drawings, whether accepted without comments or accepted after alteration in accordance with comments and they shall never to entitled to allege express or tacit approval there of by Jacobs nor shall they be entitled to allege that Jacobs has by accepting the drawings taken over the responsibility for any defects in the drawings or the construction founded thereon. Date of Issue Prepared By Checked By This document is exclusive property of Punj Lloyd Group It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject to return on demand.
Transcript
Page 1: Data Sheet

Cost Estimation Parameter- Vessel 090-V-003

Project Name Sulphur Block - Resid Upgradation Project

Originating Company TEXFAB MACHINERY PVT. LTD.

Document Number DS-001

Document Revision A

Document Title Cost Estimation Parameter- Vessel

090-V-003

Category of Submission Issued for Review

Document type Datasheet

Document Control Code DS

REVIEW CODES JACOBS Navi Mumbai

Requisition No. : Date. :

1 No Comments, Work may Proceed.

2

3

5 Document/Drawing Retained for Information

Name -

Rev Date of Issue Description Approved By

Sulphur Block – Resid Upgradation Project

CPCL Manali Refinery

The contractor shall proceed with the fabrication/manufacturing taking care of and incorporating Owner/PMC comments. Contractor shall submit the drawings/documents again duly incorporating Owner/PMC comments.

Major non-conformance and deviation to contract specifications and the document is rejected. Contractor is to resubmit for review after incorporating comments.

Manufactures and suppliers remain responsible under all circumstances for their drawings, whether accepted without comments or accepted after alteration in accordance with comments and they shall never to entitled to allege express or tacit approval there of by Jacobs nor shall they be entitled to allege that Jacobs has by accepting the drawings taken over the responsibility for any defects in the drawings or the construction founded thereon.

Prepared By

Checked By

This document is exclusive property of Punj Lloyd Group It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject to return on demand.

Page 2: Data Sheet

PROJECT INFORMATION

Client: Shell Global Solutions

Project: FLSO

Project no: Location: Project Director:

Technical Integration Manager:

Project Service Manager:

PROJECT TEAM

Project Function Names

GM/BOM Shell FLSO & Gabon LNG Victor Ojeda

Interface Manager Taco Hiemstra

Project Director Nicholas Kauffmann

Commercial Manager Paul Eckford

Portfolo Coordinator Eveline OttenHSE Lead Willie SchummProcess Integration Michiel van Aken

STASCo Hull & Cont't Willie Gray

IA/SP Lead Marja PrinslooRotating Equipment Engineer Samual AfolabiElectrical Engineer Andrew McKellar/Graham WoodCivil/Marine Engineer Jeroen VeenCivil Engineer Eelco VeenstraProcess Engineer

Process Control Engineer John CullumInstrument & Controls Engineer Ahmed Awlad ThaniMechanical/Piping Engineer Jonathan Cabrera

Layout/Structural Engineer John van BeekActivity Lead Rene SpaarmanNaval Architect Neil PollockMarine Facilities Advisor Dave ThomsonMarine Engineer Malcolm BurkeInstrument Engineer Alastair MesserLNG Commercial Shipping Justine ClarkOIP Lead Wolfgang Wienken

Commissioning & Start Up Brady Wild

Jorden van Dam/Siew Hoon Lee/Lisa Looi/Arold Routier/Astrid Schilderman

Page 3: Data Sheet

Operations Org/Training Peter ReeseLead Project Engineer John KnezevichProject Engineer Toby NormantonProject Services Graham FyfeContracts & Procurement lead Guus De RuyterContracts & Procurement Alex Rubinchik Cost Control Ayaz BanguyPlanning Engineer Aidan Carney Business Support Karin van der SwartFinance Support Hanneke Outshoorn IM Lead Syed Haq

Document Control Vinay SinghLegal Support Benjamin MinneeGabon Upstream Yusoff Mohd-KamariReservoir Engineer Mustapha BouhdaidU/S Interface Co-ordinator Pepijn Schipper

Page 4: Data Sheet
Page 5: Data Sheet
Page 6: Data Sheet

PROJECT PHASE

Scouting Phase x

FED 1 x

FED 2FED 3ImplementationOperation

RACI MATRIXR Responsible

A Accountable "The Buck Stops Here"

C Consulted

I Informed "After decision is made"

COST TIME RESOUCE (CTR) OWNER

CTR No. Description Owner

1GM/BOM Shell FLSO & Gabon LNG Victor Ojeda

2 Interface Manager Taco Hiemstra3 Project Director Nicholas Kauffmann4 Commercial Manager Paul Eckford5 Portfolo Coordinator Eveline Otten6 HSE Lead Willie Schumm

7 Process Integration Michiel van Aken

8STASCo Hull & Cont't Willie Gray

9 IA/SP Lead Marja Prinsloo10 Rotating Equipment Engineer Samual Afolabi11 Electrical Engineer Andrew McKellar/Graha12 Civil/Marine Engineer Jeroen Veen13 Civil Engineer Eelco Veenstra

14

Process Engineer

15 Process Control Engineer John Cullum16 Instrument & Controls Engineer Ahmed Awlad Thani17 Mechanical/Piping Engineer Jonathan Cabrera18 Layout/Structural Engineer John van Beek19 Activity Lead Rene Spaarman20 Naval Architect Neil Pollock21 Marine Facilities Advisor Dave Thomson22 Marine Engineer Malcolm Burke23 Instrument Engineer Alastair Messer24 LNG Commercial Shipping Justine Clark

25 OIP Lead Wolfgang Wienken

26 Commissioning & Start Up Brady Wild

"The Doer"

"Prior to making a decision"

Jorden van Dam/Siew Hoon Lee/Lisa Looi/Arold Routier/Astrid

Page 7: Data Sheet

27 Operations Org/Training Peter Reese28 Lead Project Engineer John Knezevich29 Project Engineer Toby Normanton30 Project Services Graham Fyfe31 Contracts & Procurement lead Guus De Ruyter32 Contracts & Procurement Alex Rubinchik 33 Cost Control Ayaz Banguy34 Planning Engineer Aidan Carney 35 Business Support Karin van der Swart36 Finance Support Hanneke Outshoorn 37 IM Lead Syed Haq38 Document Control Vinay Singh39 Legal Support Benjamin Minnee40 Gabon Upstream Yusoff Mohd-Kamari41 Reservoir Engineer Mustapha Bouhdaid42 U/S Interface Co-ordinator Pepijn Schipper

Page 8: Data Sheet

Basis Of Design

Client Input

1 Vessel I.D2 Vessel Height3 Liquid Heigh4 Density5 Viscosity6 RPM7 Agitator Type

Output for Cost Estimation

1 RPM2 Motor HP3 Shaft Diameter4 Impeller Diameter5 Baffle Width6 No of Impeller7 No of Baffle8 Baffle angle9 Impeller Width

Notes

Doc No. PEIN17-AAA-F-BBB-ZZZ, Rev. Page 2 of XX

Sulphur Block - Resid Upgradation Project CPCL Manali Refinery


Recommended