Novosibirsk: statistical data
• Population: 1 547 910 citizens
• GDP: 659,5 billion rubles
• GDP/citizen: 426 058 rubles
• Avg. salary: 25 877 rubles/month (310 524 rubles/year)
• Internet: 57 % of population
• Power consumption: 14 973.6 mil. kWh * year
• Cost of electricity: 2,09-2,18 rubles/kwh
• Cost of land: 290 431 rubles/m2
• Cost of rent: 9 931 rubles/m2 (for offices)2
Novosibirsk: datacenters
pcs users per 1 pc
Datacenters 7 126 044
Cabinets 2 828 312
Servers 56 560 16
Web sites 1.5 * 10^6 0.57
3
Service sale price
Colo provider PowerTier I
(per month)
Tier II
(per month)
Tier III
(per month)
Tier IV
(per month)
МегаФон 6 kWh — — 13 630 —
НвсФ ФГУП«ЦентрИнформ»
— individually on request
Ростелеком — — — — 15 800
РТКомм-Сибирь — individually on request
4
Your data: requirements
Country Russia
City Novosibirsk
1st Stage capacity 100 Cabinets 800 IT Power
Stage capacity 100 Cabs/ 800 kW
DC Capacity 300 Cabs / 2 400 kW
Power supply [N+1]
Cooling supply [N+1]
Rack sell price 1000 $ (8kW included)
Project time 3 years
5
Cooling costsPower cons,
KW
Capacity, KW CUE Dims, LxWxH m Unit cost *,
kRUR
Maintenance cost,
kRUR
Maintenance wrk hrs
Chiller without FC
CHILLER
Lessar LUC-
SSDA720CX 227 729 3.2 7.4x2.3x2.4 9 169 560.48 183 391.2 32
CHILLER
Lessar LUC-
SSDA800CX 251 810 3.2 8.4x2.3x2.4 9 877 411.51 197 548.23 32
CHILLER
Lessar LUC-
SSDA900CX 278 902 3,2 9,4x2,2x2,4 10 855 183.69 217 103.67 32
Air handler unit (chilled water)
Systemair TA
4500 HW
AIR
HANDLING
UNIT 1.592 1,62x0,87x1,98 247 983 4 959.66 22
6
Power costs
Capacity, KW
Efficiency
50/90 Dims, LxWxH m
Product cost *,
RUR
Maintenance
cost, RUR
Maintenance
wrk hrs
Genset
DOOSAN
P086Ti 200 0.8 30х13.2х18.5 1 445 000 28 900 150
DOOSAN
P158LE 437.5 0.8 30.2х14.6х18.8 2 267 000 45 340 150
DOOSAN
P222LE 625 0.8 36.5х14.2х20 3 550 000 71 000 150
UPS
Ippon Back
Verso 400 2 0.5 2.02х1.24х1.66 2 888.13 57.76 32
Ippon Back
Power Pro 600 3.6 0.6 1×1.4×3.3 3 556.19 71.12 48
IPPON Smart
Winner 3000 21 0.7 4.38 x 0.86 x 5.82 29 820.69 596.4 64
7
Operation staff• Security:
• Security officer— 1 / 2 500 sq. m.• Guard— 1 / Check Point
• DC Engineers:• 24x7 — 2 for 1 shift
• Client support:• Remote hands: 3 in shift per 100 cabinets• Manager: 3 per 300 cabinets
• Building/office:• Engineer — 1 per 2 500 sq.m.• Support/storekeeper — 1 person• Driver — 1• Cleaner — 2 / 2 500 sq.m.• Receptionist — 1
• IT support / monitoring:• 1 / 100 cabinets
• Datacenter manager: — 1 / DC
8
Data: design
• Land: 3 000 sq.m.
• Building: 2 500 x 3 sq.m.
• Technology:• Number of GenSets: 4
• 5 x 625 kW (DGU)• 2 x 227kW + 278kW (CHILLER)• 20 x 210kW (UPS)
• Number of UPS: 7 (7 x 360kW)• Number of Cooling units:
• (2 * 902 = 1 804 kW)• (3 * 729 = 2 187 kW)
9
Investment costs
• Cooling = 49 219 049
• Standby power = 113 613 926
• UPS power = 596 414
• Wages = 24 360 000
• Land cost = 871 293 000
• Building cost = 74 482 500
• 72 000 * 300 * 12 * x = 1 133 564 889
• x = 4.4
10