No Company Name Date Ordered End User Project 1 REKAYASA INDUSTRI 01-Oct-14 CONOCOPHILLIPS (GRISSIK) Ltd. Dayung Compression and Grissik Central Gas Plant 2 PT. WIJAYA KARYA 07-Jan-13 CONOCOPHILLIPS (GRISSIK) Ltd. Suban Condensate Storage Tank Project 3 PACIFIC PROCESS ENGINEERING 31-Jan-13 Gas Supply to Tambak Lorok Power Plant 4 REKAYASA INDUSTRI 18-Jun-12 Conocophillips DC-1/CGPX Project modification stopper 5 REKAYASA INDUSTRI 08-Mar-13 MOBIL CEPU Ltd. Banyu Urip EPC5 6 REKAYASA INDUSTRI 08-Mar-13 MOBIL CEPU Ltd. Banyu Urip EPC5 7 REKAYASA INDUSTRI 20-Oct-13 MOBIL CEPU Ltd. Banyu Urip EPC5 8 TECHNIP INDONESIA 18-Mar-13 Petronas Carigali Ketapang II None 9 TECHNIP INDONESIA 07-May-13 Petronas Carigali Ketapang II None 10 TECHNIP INDONESIA 21-Jun-13 Petronas Carigali Ketapang II None 11 TECHNIP INDONESIA 08-Jul-14 Petronas Carigali Ketapang II None 12 PT. MEINDO ELANG INDAH 13-Mar-13 PETROCHINA INTERNATIONAL JABUNG LTD Betara Complex Development 13 PT. CITRA PANJI MANUNGGAL 08-Apr-13 PERTAMINA EP Up Grading / Modifikasi Di Lapangan Rantau 14 PT. ALSTOM POWER ENERGY SYSTEMS INDONESIA 22-Apr-13 Noli Project 15 PT. MEINDO ELANG INDAH 23-Apr-13 Ruby Field Development Project 16 PT. TIMAS SUPLINDO 26-Apr-13 PERTAMINA EP Penambahan Reaktor NHDT di RU Dumai. 17 OSA Industries Indonesia 10-May-13 TOTAL E&P INDONESIE SISINUBI PHASE 2B AND PECIKO PHASE 7B DEVELOPMENT PROJECT 18 PT. KRAKATAU ENGINEERING 17-Jun-13 Hydrocyclone Package 19 PT. GUNANUSA UTAMA FABRICATORS 17-Jul-13 TOTAL E&P INDONESIE Yadana Subsidance Project 20 PT. WIFGASINDO DINAMIKA INSTRUMENT ENGINEERING 22-Jul-13 SANTOS (SAMPANG) Pty Ltd Peluang Development 21 INDOTURBINE 04-Sep-13 None 22 PT. INTI KARYA PERSADA TEHNIK 10-Sep-13 PT. PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA INDUSTRI 17-Sep-13 PT. PERTAMINA (Persero) Arun LNG receiving Hub re-gasification terminal 24 REKAYASA INDUSTRI 18-Sep-13 PERTAMINA EP Arun LNG receiving Hub re-gasification terminal 25 REKAYASA INDUSTRI 14-Jul-14 PERTAMINA EP Arun LNG receiving Hub re-gasification terminal 26 PT. REMAJA BANGUN KENCANA KONTRAKTOR 17-Sep-13 PT. CIKARANG LISTRINDO FUEL GAS SYSTEM CIKARANG LISTRINDO MM2100 27 PT. GASPRO WAHYU WIDADA 25-Sep-13 PERTAMINA EP Subang additional Gas Compression 28 PT. MEINDO ELANG INDAH 30-Sep-13 Ruby Field Development Project 29 PT. TIMAS SUPLINDO 26-Sep-13 PT. PERTAMINA (PERSERO) UP II DUMAI None 30 MENTARI GEMILANG ABADI 17-Oct-13 PERTAMINA HULU ENERGI ONWJ LTD. GG Field Development Project
Transcript
Page 1: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

No Company NameDate

OrderedEnd User Project

1 REKAYASA INDUSTRI 01-Oct-14 CONOCOPHILLIPS (GRISSIK) Ltd. Dayung Compression and Grissik Central Gas Plant2 PT. WIJAYA KARYA 07-Jan-13 CONOCOPHILLIPS (GRISSIK) Ltd. Suban Condensate Storage Tank Project3 PACIFIC PROCESS ENGINEERING 31-Jan-13 Gas Supply to Tambak Lorok Power Plant

4 REKAYASA INDUSTRI 18-Jun-12 Conocophillips DC-1/CGPX Project modification stopper

5 REKAYASA INDUSTRI 08-Mar-13 MOBIL CEPU Ltd. Banyu Urip EPC56 REKAYASA INDUSTRI 08-Mar-13 MOBIL CEPU Ltd. Banyu Urip EPC57 REKAYASA INDUSTRI 20-Oct-13 MOBIL CEPU Ltd. Banyu Urip EPC58 TECHNIP INDONESIA 18-Mar-13 Petronas Carigali Ketapang II None9 TECHNIP INDONESIA 07-May-13 Petronas Carigali Ketapang II None

10 TECHNIP INDONESIA 21-Jun-13 Petronas Carigali Ketapang II None11 TECHNIP INDONESIA 08-Jul-14 Petronas Carigali Ketapang II None

12 PT. MEINDO ELANG INDAH 13-Mar-13PETROCHINA INTERNATIONAL JABUNG

LTDBetara Complex Development

13 PT. CITRA PANJI MANUNGGAL 08-Apr-13 PERTAMINA EP Up Grading / Modifikasi Di Lapangan Rantau

14PT. ALSTOM POWER ENERGY SYSTEMS

INDONESIA22-Apr-13 Noli Project

15 PT. MEINDO ELANG INDAH 23-Apr-13 Ruby Field Development Project16 PT. TIMAS SUPLINDO 26-Apr-13 PERTAMINA EP Penambahan Reaktor NHDT di RU Dumai.

17 OSA Industries Indonesia 10-May-13 TOTAL E&P INDONESIESISINUBI PHASE 2B AND PECIKO PHASE 7B DEVELOPMENT

PROJECT18 PT. KRAKATAU ENGINEERING 17-Jun-13 Hydrocyclone Package19 PT. GUNANUSA UTAMA FABRICATORS 17-Jul-13 TOTAL E&P INDONESIE Yadana Subsidance Project

20PT. WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING22-Jul-13 SANTOS (SAMPANG) Pty Ltd Peluang Development

21 INDOTURBINE 04-Sep-13 None22 PT. INTI KARYA PERSADA TEHNIK 10-Sep-13 PT. PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project23 REKAYASA INDUSTRI 17-Sep-13 PT. PERTAMINA (Persero) Arun LNG receiving Hub re-gasification terminal 24 REKAYASA INDUSTRI 18-Sep-13 PERTAMINA EP Arun LNG receiving Hub re-gasification terminal 25 REKAYASA INDUSTRI 14-Jul-14 PERTAMINA EP Arun LNG receiving Hub re-gasification terminal 26 PT. REMAJA BANGUN KENCANA KONTRAKTOR 17-Sep-13 PT. CIKARANG LISTRINDO FUEL GAS SYSTEM CIKARANG LISTRINDO MM210027 PT. GASPRO WAHYU WIDADA 25-Sep-13 PERTAMINA EP Subang additional Gas Compression28 PT. MEINDO ELANG INDAH 30-Sep-13 Ruby Field Development Project29 PT. TIMAS SUPLINDO 26-Sep-13 PT. PERTAMINA (PERSERO) UP II DUMAI None30 MENTARI GEMILANG ABADI 17-Oct-13 PERTAMINA HULU ENERGI ONWJ LTD. GG Field Development Project

Page 2: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

31 PT. MEINDO ELANG INDAH 17-Oct-13SALAMANDER ENERGY (NORTH

SUMATRA) LIMITEDKERENDAN GAS FACILITY PROJECT

32 PT. MITRA PRANA ABADI SENTOSA 24-Oct-13 VICO INDONESIA Semberah Northern Plant 33 PT. MITRA PRANA ABADI SENTOSA 24-Oct-13 VICO INDONESIA Semberah Northern Plant 34 PT. GASPRO WAHYU WIDADA 28-Oct-13 PERTAMINA GAS Cambai Additional Gas Phase I Project35 PT. GASPRO WAHYU WIDADA 13-Nov-13 PERTAMINA EP Subang additional Gas Compression36 PERTA ARUN GAS 10-Dec-13 PT. PERTAMINA (Persero) Arun LNG receiving Hub re-gasification terminal 37 REKAYASA INDUSTRI 18-Dec-13 Dayung Compressions (DC-1) Project38 PT. KRAKATAU ENGINEERING 23-Dec-13 PERTAMINA EP Upgrading Unit Produksi Pelumas Jakarta

39PT. ALSTOM POWER ENERGY SYSTEMS

INDONESIA28-Jun-13 Noli Project

40 PROMATCON TEPATGUNA 27-Jan-14 PERTAMINA EP LIMAU None41 PROMATCON TEPATGUNA 27-Jan-14 PERTAMINA UBEB LIMAU -42 PROMATCON TEPATGUNA 04-Feb-14 PERTAMINA SEAUNION (LIMAU) LTD Gas Scrubber

43 PT. BINA SARANA PUTRA 10-Feb-14JOB PERTAMINA - TALISMAN JAMBI

MERANGNew NGF Condensate Storage Tanks Facility

44 PT. MEINDO ELANG INDAH 20-Mar-14 PERTAMINA HULU ENERGI ONWJ LTD. GG NEW FIELD DEVELOPMENT PROJECT

45 PROMATCON TEPATGUNA 21-Apr-14PETROCHINA INTERNATIONAL JABUNG

LTDNone

46 SARANA GASTEKINDO UTAMA 07-May-14PERTAMINA OPERASI PRODUKSI E&P

PRABUMULIHUpgrading fasilitas pendukung & SKG Lembak

47 PROMATCON TEPATGUNA 22-May-14 VICO INDONESIA Gas Lift Skid package 48 UD MITRA KENCANA 03-Jul-14 VICO INDONESIA Nilam Satellite-4 purchasing movable compressor 49 REKAYASA INDUSTRI 18-Jul-14 PT. PUPUK SRIWIDJAJA PUSRI-II B PROJECT

50 PT. MEINDO ELANG INDAH 25-Jul-14 PERTAMINA HULU ENERGI ONWJ LTD. KL Gas Lift Comperssor Installation Appraise & Select Stage

51 PT. BHUMI ARTHAPRIMA CEMERLANG 25-Jul-14 PERTAMINA PHE WMO PHE-West Madura Offshore

52 PT. BINA SARANA PUTRA 09-Oct-14JOB PERTAMINA - TALISMAN JAMBI

MERANGNew NGF Condensate Storage Tanks Facility

53 REKAYASA INDUSTRI 30-Oct-14 EXXON MOBIL OIL INDONESIA INC. Banyu Urip 54 REKAYASA INDUSTRI 30-Oct-14 EXXON MOBIL OIL INDONESIA INC. Banyu Urip 55 PGAS SOLUTION 21-Nov-14 Kalimantan Jawa Gas Project56 PT. MEINDO ELANG INDAH 03-Dec-14 VICO INDONESIA -57 PT. GLOBAL HADITECH 09-Dec-14 PERTAMINA EP Donggi Gas Development Project58 Consortium WIKA TECHNIP 12-Dec-14 PERTAMINA EP Matindok Gas Development Project59 CONOCOPHILLIPS INDONESIA INC. LTD 10-Feb-14 Suban Condensate Storage Tank Project60 SAKA INDONESIA - PANGKAH LIMITED 15-Dec-14 Modification of Topside Flowline Connection Project61 REKAYASA INDUSTRI 19-Sep-12 CONOCOPHILLIPS INDONESIA INC. LTD Dayung Compression and Grissik Central Gas Plant62 PT. INTI KARYA PERSADA TEHNIK 18-Dec-12 MOBIL CEPU Ltd. Banyu Urip

Page 3: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

63 PT. INTI KARYA PERSADA TEHNIK 14-Jul-12 MOBIL CEPU Ltd. Banyu Urip

64 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 20-Jun-14 EXXON MOBIL OIL INDONESIA INC. Banyu Urip

65 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 10-Nov-12 EXXON MOBIL OIL INDONESIA INC. Banyu Urip

66 PT. TIMAS SUPLINDO 31-Dec-12 CONOCOPHILLIPS INDONESIA INC. LTD Eastern Hub Mercury Removal-Water

67 Toyo Engineering Korea Limited 01-Jan-13PT. PERTAMINA (PERSERO) UP VI

BALONGANROPP Balongan

68 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 14-Dec-12 MOBIL CEPU Ltd. Banyu Urip

69 PT. TIMAS SUPLINDO 15-Jan-13 CONOCOPHILLIPS INDONESIA INC. LTD Eastern Hub Mercury Removal-Water70 PT. TIMAS SUPLINDO 18-Jan-13 PREMIER OIL NATUNA SEA BV ANOA Phase 4 project71 PT. BHUMI ARTHAPRIMA CEMERLANG 25-Jan-13 CONOCOPHILLIPS INDONESIA INC. LTD Rawa Modification project72 PT. BHUMI ARTHAPRIMA CEMERLANG 29-Jan-13 CONOCOPHILLIPS INDONESIA INC. LTD Rawa Modification project73 PT. ADHI Karya (Persero) Tbk 11-Jan-13 PERTAMINA CILACAP RFCC Cilacap 74 PT. ADHI Karya (Persero) Tbk 12-Apr-13 PERTAMINA CILACAP RFCC Cilacap 75 PT. ADHI Karya (Persero) Tbk 11-Jan-13 PERTAMINA CILACAP RFCC Cilacap 76 PT. ADHI Karya (Persero) Tbk 11-Jan-13 PERTAMINA CILACAP RFCC Cilacap 77 PT. ADHI Karya (Persero) Tbk 11-Jan-13 PERTAMINA CILACAP RFCC Cilacap 78 PT. AKUSARA MITRA SINERGI 11-Feb-13 INDONESIA POWER, PT Gas Supply to Tambak Lorok Power Plant79 PT. GUNANUSA UTAMA FABRICATORS 12-Feb-13 TOTAL E&P INDONESIE Yadana Subsidance Project 80 PT. JGC INDONESIA 12-Feb-13 JCF Project81 PT. WIJAYA KARYA 13-Feb-13 DPPU Kuala Namu82 PT. PRATIWI PUTRI SULUNG 12-Feb-13 None83 PT. ADHI Karya (Persero) Tbk 31-Jan-13 PERTAMINA CILACAP RFCC Cilacap 84 TOYO ENGINEERING CORPORATION 27-Feb-13 PERTAMINA EP ROPP Balongan85 PT. Satyamitra Surya Perkasa 15-Mar-13 Gunung Megang 30 MW add - on Project86 TECHNIP INDONESIA 18-Mar-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT

87 PT. PRAKARSA DAYA JUANG 18-Mar-13 TOTAL E&P INDONESIESISINUBI PHASE 2B AND PECIKO PHASE 7B DEVELOPMENT

PROJECT88 PT. Satyamitra Surya Perkasa 19-Mar-13 PLN PEMBANGKITAN SUMBAGSEL Gunung Megang 30 MW add - on Project89 PT. RAJAWALI SWIBER CAKRAWALA 13-Mar-13 CONOCOPHILLIPS INDONESIA INC. LTD EPCI South belut Project90 PT. RAJAWALI SWIBER CAKRAWALA 13-Mar-13 CONOCOPHILLIPS INDONESIA INC. LTD EPCI South belut Project91 PT. PUNJ LLOYD INDONESIA 15-Mar-13 CONOCOPHILLIPS INDONESIA INC. LTD Sumpal Expansion Project

92 PT. MEINDO ELANG INDAH 01-Apr-13PETROCHINA INTERNATIONAL JABUNG

LTDBetara Complex Development

93 PT. PRATIWI PUTRI SULUNG 19-Mar-13 None94 PT. PRATIWI PUTRI SULUNG 03-Apr-13 -95 PT. CITRA PANJI MANUNGGAL 03-Apr-13 PERTAMINA EP -

Page 4: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

96 PT. MEINDO ELANG INDAH 09-Apr-13 PEARLOIL (TUNGKAL) LTD. Ruby Field Development Project97 TECHNIP INDONESIA 08-Apr-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT98 TECHNIP INDONESIA 21-Apr-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT99 TECHNIP INDONESIA 08-Apr-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT

100 PT PERTA-SAMTAN GAS 09-Apr-13 South Sumatra NGL Project

101 TECHNIP INDONESIA 15-Apr-13 PT. GEO DIPA ENERGIEPC PRO Tie In Wll 29&29A and 30&30A to Steam Gathering

Sys

102 TECHNIP INDONESIA 23-May-13 PT. GEO DIPA ENERGIEPC PRO Tie In Wll 29&29A and 30&30A to Steam Gathering

Sys103 PT. KLARAS PUSAKA INTERNASIONAL 12-Apr-13 CONOCOPHILLIPS INDONESIA INC. LTD Chemical Injection Skid South Belut Project104 SANGGAR SARANA BAJA 11-Apr-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT105 SANGGAR SARANA BAJA 02-Apr-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT106 SANGGAR SARANA BAJA 02-Apr-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT107 SANGGAR SARANA BAJA 08-Apr-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT108 TECHNIP INDONESIA 22-Apr-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT

109 PROMATCON TEPATGUNA 02-Apr-13PERTAMINA UBEP SANGASANGA -

TARAKANPengadaan 2 Unit filter Kap. 15.000

110 PROMATCON TEPATGUNA 11-Apr-13 CONOCOPHILLIPS INDONESIA INC. LTD Rawa Fuel Gas Conditioning Project111 PT. TIMAS SUPLINDO 22-Apr-13 PT. PERTAMINA (PERSERO) UP II DUMAI Penambahan Reaktor NHDT di RU Dumai.112 PT. PRATIWI PUTRI SULUNG 01-May-13 None113 REKAYASA INDUSTRI 08-May-13 CONOCOPHILLIPS INDONESIA INC. LTD Dayung Compression and Grissik Central Gas Plant114 PT. PRATIWI PUTRI SULUNG 20-May-13 None115 PT. Satyamitra Surya Perkasa 22-May-13 Gunung Megang 30 MW add - on Project116 PT. JGC INDONESIA 22-May-13 PT. ASAHIMAS CHEMICAL ASC 6 Project117 PT. TIMAS SUPLINDO 17-May-13 CONOCOPHILLIPS INDONESIA INC. LTD Eastern Hub Mercury Removal-Water118 PT. ADHI Karya (Persero) Tbk 25-May-13 PERTAMINA CILACAP RFCC Cilacap 119 PT. JGC INDONESIA 28-May-13 JCF Project120 PT. PRATIWI PUTRI SULUNG 31-May-13 SANTOS (SAMPANG) Pty Ltd Sales Gas Metering Project121 PT. ZONETA PRIMA ABADI 10-Jun-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT122 REKAYASA INDUSTRI 04-Jun-13 MOBIL CEPU Ltd. Banyu Urip EPC5123 REKAYASA INDUSTRI 04-Jun-13 MOBIL CEPU Ltd. Banyu Urip EPC5124 REKAYASA INDUSTRI 04-Jun-13 MOBIL CEPU Ltd. Banyu Urip 125 REKAYASA INDUSTRI 04-Jun-13 EXXON MOBIL OIL INDONESIA INC. Banyu Urip EPC5126 YAMA ENGINEERING 07-Jun-13 HESS (INDONESIA - PANGKAH) LIMITED Provision API Separator & LPG Run Pump127 PT. GUNANUSA UTAMA FABRICATORS 24-Jun-13 TOTAL E&P INDONESIE Yadana Subsidance Project - HVAC

128 REKAYASA INDUSTRI 28-Jun-13PT. PERUSAHAAN GAS NEGARA

(PERSERO) TbkLampung LNG Floating Storage & regasification

129 PT. WIJAYA KARYA 04-Jul-13 PT. CHEVRON PACIFIC INDONESIA North Duri Development Area-13130 PT. PRATIWI PUTRI SULUNG 04-Jul-13 None

Page 5: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

131 PT. DURAQUIPT CEMERLANG 08-Jul-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT132 PT. YOKOGAWA INDONESIA 11-Jul-13 PT. KRAKATAU ENGINEERING Upgrading Unit Produksi Pelumas Jakarta

133 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 16-Jul-13 EXXON MOBIL OIL INDONESIA INC. Banyu Urip

134 PT. Satyamitra Surya Perkasa 19-Jul-13PT. PERTAMINA (PERSERO) UP VI

BALONGAN-

135 PT. GUNANUSA UTAMA FABRICATORS 25-Jul-13 TOTAL E&P INDONESIESISINUBI PHASE 2B AND PECIKO PHASE 7B DEVELOPMENT

PROJECT

136 PT. PRATIWI PUTRI SULUNG 31-Jul-13PT. PERUSAHAAN GAS NEGARA

(PERSERO) TbkLampung LNG Floating Storage & regasification

137 REKAYASA INDUSTRI 02-Aug-13 MOBIL CEPU Ltd. Banyu Urip 138 REKAYASA INDUSTRI 02-Aug-13 MOBIL CEPU Ltd. Banyu Urip 139 PT. WIJAYA KARYA 17-Jul-13 CONOCOPHILLIPS INDONESIA INC. LTD Suban Condensate Storage Tank Project140 PT. WIJAYA KARYA 17-Jul-13 CONOCOPHILLIPS INDONESIA INC. LTD Suban Condensate Storage Tank Project141 PT. WIJAYA KARYA 17-Jul-13 CONOCOPHILLIPS INDONESIA INC. LTD Suban Condensate Storage Tank Project142 PT. MEINDO ELANG INDAH 22-Aug-13 -143 REKAYASA INDUSTRI 22-Aug-13 -

144 PT. MEINDO ELANG INDAH 29-Aug-13SALAMANDER ENERGY (NORTH

SUMATRA) LIMITEDKERENDAN GAS FACILITY PROJECT

145 PT. MEINDO ELANG INDAH 29-Aug-13SALAMANDER ENERGY (NORTH

SUMATRA) LIMITEDKERENDAN GAS FACILITY PROJECT

146 PT. GUNANUSA UTAMA FABRICATORS 09-Sep-13 TOTAL E&P INDONESIESISINUBI PHASE 2B AND PECIKO PHASE 7B DEVELOPMENT

PROJECT147 PT. GUNANUSA UTAMA FABRICATORS 10-Sep-13 TOTAL E&P INDONESIE Yadana Subsidance Project 148 PT. PUNJ LLOYD INDONESIA 11-Sep-13 CONOCOPHILLIPS INDONESIA INC. LTD Sumpal Expansion Project149 PT. MEINDO ELANG INDAH 19-Sep-13 PEARLOIL (TUNGKAL) LTD. Ruby Field Development Project150 PT. PRATIWI PUTRI SULUNG 20-Sep-13 SANTOS (SAMPANG) Pty Ltd Sales Gas Metering Project151 PT PERTA-SAMTAN GAS 27-Sep-13 South Sumatra NGL Project

152 PT. CITRA PANJI MANUNGGAL 02-Oct-13JOB PERTAMINA - TALISMAN JAMBI

MERANGEPC Sales Pipeline Skin Project

153 PT. WIJAYA KARYA 02-Oct-13 PT. CHEVRON PACIFIC INDONESIA North Duri Development Area-13154 PT. MEINDO ELANG INDAH 01-Oct-13 PEARLOIL (TUNGKAL) LTD. Ruby Field Development Project155 PT. Satyamitra Surya Perkasa 02-Oct-13 Gunung Megang 30 MW add - on Project

156 PT. SAS INTERNATIONAL 08-Oct-13PETROCHINA INTERNATIONAL JABUNG

LTDBatara Complex Development Project

157 PT. WIJAYA KARYA 17-Oct-13 PT. CHEVRON PACIFIC INDONESIA North Duri Development Area-13158 PP (PERSERO) Tbk 23-Oct-13 PJB Muara Tawar CNG Storage UP Muara Tawar159 REKAYASA INDUSTRI 24-Oct-13 PERTAMINA EP Arun LNG receiving Hub re-gasification terminal 160 REKAYASA INDUSTRI 06-Mar-14 PERTAMINA EP Arun LNG receiving Hub re-gasification terminal

Page 6: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

161 REKAYASA INDUSTRI 11-Oct-13 PERTAMINA EP Arun LNG receiving Hub re-gasification terminal 162 PT. DURAQUIPT CEMERLANG 30-Oct-13 BUKIT TUA DEVELOPMENT PROJECT163 PT. PRATIWI PUTRI SULUNG 31-Oct-13 -

164 PT. PRATIWI PUTRI SULUNG 11-Nov-13PT. PERUSAHAAN GAS NEGARA

(PERSERO) TbkPengadaan & Pemasangan Kalibrator Meter

165 PT. PRATIWI PUTRI SULUNG 12-Nov-13 PT. TRANSPORTASI GAS INDONESIA USM Pamping Project 166 PT. GUNANUSA UTAMA FABRICATORS 26-Nov-13 TOTAL E&P INDONESIE Yadana Subsidance Project 167 PT. RAGA PERKASA EKAGUNA 26-Nov-13 Petronas Carigali Ketapang II ORF BUKIT TUA DEVELOPMENT168 PT. RAGA PERKASA EKAGUNA 28-Nov-13 Petronas Carigali Ketapang II ORF BUKIT TUA DEVELOPMENT169 PT. GUNANUSA UTAMA FABRICATORS 09-Dec-13 TOTAL E&P INDONESIE Yadana Subsidance Project 170 PT. RAGA PERKASA EKAGUNA 26-Dec-13 CNOOC SES Ltd. Mila Asti

171 PT. PRATIWI PUTRI SULUNG 13-Dec-13PT. PERUSAHAAN GAS NEGARA

(PERSERO) TbkPengadaan & Pemasangan Kalibrator Meter

172 PT. MEINDO ELANG INDAH 27-Dec-13 PERTAMINA HULU ENERGI ONWJ LTD. GG NEW FIELD DEVELOPMENT PROJECT

173 PT. GUNANUSA UTAMA FABRICATORS 03-Jan-14 TOTAL E&P INDONESIESISINUBI PHASE 2B AND PECIKO PHASE 7B DEVELOPMENT

PROJECT174 PT. PRATIWI PUTRI SULUNG 08-Jan-14 PT. TRANSPORTASI GAS INDONESIA USM Pamping Project

175 PT. CITRA PANJI MANUNGGAL 20-Jan-14 PERTAMINA GAS Jalur Pipa Transmissi Gas South Lhoksukon A - Belawan

176 PT. TIMAS SUPLINDO 13-Feb-14 PT. CHEVRON PACIFIC INDONESIA Bangko GS Tank Facility Upgrade

177 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 05-Feb-14 PERTAMINA GAS South Sumatra NGL Project

178 PT. PRATIWI PUTRI SULUNG 20-Feb-14PT. PERUSAHAAN GAS NEGARA

(PERSERO) TbkInstallation Upgrading Indonesia Power PLN Tanjung Priok

179 PT. GUNANUSA UTAMA FABRICATORS 26-Feb-14 TOTAL E&P INDONESIE Yadana Subsidance Project 180 PT. CABOT INDONESIA 28-Feb-14 CL Coal Tar Storange Tank Project181 MULTI KREASI ENGINEERING 05-Mar-14 PERTAMINA GAS METERING ARUN BELAWAN182 PT. TIMAS SUPLINDO 11-Mar-14 PT. PERTAMINA (PERSERO) UP II DUMAI Penambahan Reaktor NHDT di RU Dumai.183 PT. RAGA PERKASA EKAGUNA 04-Apr-14 PERTAMINA EP Pondok Makmur Development Project

184PT. ALSTOM POWER ENERGY SYSTEMS

INDONESIA08-Apr-14 Keppel Merlimau II A

185 PT. PRATIWI PUTRI SULUNG 14-Apr-14 PT. TRANSPORTASI GAS INDONESIA USM Pamping Project 186 SARANA GASTEKINDO UTAMA 17-Apr-14 PERTAMINA EP Upgrading fasilitas pendukung & SKG Lembak

187PT. WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING05-May-14 PERTAMINA HULU ENERGI ONWJ LTD. Bravo fire & gas system upgrade

188 PT. INDOKOMAS BUANA PERKASA 07-May-14 TOTAL E&P INDONESIESISINUBI PHASE 2B AND PECIKO PHASE 7B DEVELOPMENT

PROJECT189 PT. MEINDO ELANG INDAH 06-May-14 PERTAMINA HULU ENERGI ONWJ LTD. GG Field Development Project190 PT. INDOKOMAS BUANA PERKASA 13-May-14 PERTAMINA HULU ENERGI ONWJ LTD. Bravo Compresor Control System Upgrade

Page 7: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

191 PT. INDOKOMAS BUANA PERKASA 13-May-14 PERTAMINA HULU ENERGI ONWJ LTD. Foxtrot Compressor Retrofit Project192 PT. RAGA PERKASA EKAGUNA 16-May-14 PERTAMINA EP Pondok Makmur Development Project193 PT. RAGA PERKASA EKAGUNA 16-May-14 PERTAMINA EP Pondok Makmur Development Project194 PT. BHUMI ARTHAPRIMA CEMERLANG 30-May-14 PERTAMINA HULU ENERGI ONWJ LTD. Foxtrot Compressor Upgrading Project195 PT. RAGA PERKASA EKAGUNA 30-May-14 CNOOC SES Ltd. Mila Asti 196 PT. PRATIWI PUTRI SULUNG 30-Jun-14 -197 PT. TIMAS SUPLINDO 02-Jul-14 PT. PUPUK SRIWIDJAYA NPK Fusion - PUSRI198 PT. TIMAS SUPLINDO 30-Jun-14 PT. PUPUK SRIWIDJAYA NPK Fusion - PUSRI199 PT. GUNANUSA UTAMA FABRICATORS 15-Jul-14 CO2 System at DEG Fire Water Pump200 MULTI FABRINDO GEMILANG 11-Jul-14 Pertamina EP Asset 3 Field Subang Upgrading fasilitas produksi subang201 PT. BHUMI ARTHAPRIMA CEMERLANG 21-Jul-14 PERTAMINA PHE WMO Feed for PHE-7, PHE-12 and PHE-24 Project202 PT. INDOKOMAS BUANA PERKASA 16-Jul-14 PERTAMINA HULU ENERGI ONWJ LTD. Foxtrot Compressor Retrofit Project203 PT. PRATIWI PUTRI SULUNG 26-Jun-14 None204 PT. PAKARTI TIRTOAGUNG 13-Aug-14 PERTAMINA PHE WMO PHE-West Madura Offshore205 MULTI FABRINDO GEMILANG 14-Aug-14 Pertamina EP Asset 3 Field Subang Upgrading fasilitas produksi subang206 PT. INDOKOMAS BUANA PERKASA 21-Aug-14 PERTAMINA HULU ENERGI ONWJ LTD. Bravo Compresor Control System Upgrade

207 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 26-Aug-14 MOBIL CEPU Ltd. Banyu Urip

208 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 26-Aug-14 MOBIL CEPU Ltd. Banyu Urip

209 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 26-Aug-14 MOBIL CEPU Ltd. Banyu Urip

210 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 26-Aug-14 MOBIL CEPU Ltd. Banyu Urip

211 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 26-Aug-14 MOBIL CEPU Ltd. Banyu Urip

212 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 26-Aug-14 MOBIL CEPU Ltd. Banyu Urip

213 PT. INDOKOMAS BUANA PERKASA 28-Aug-14 PERTAMINA HULU ENERGI ONWJ LTD. Foxtrot Compressor Retrofit Project214 MULTI KREASI ENGINEERING 11-Sep-14 PERTAMINA GAS METERING ARUN BELAWAN215 PT. JGC INDONESIA 09-Sep-14 JCF Project216 PT. PRATIWI PUTRI SULUNG 10-Sep-14 None217 REKAYASA INDUSTRI 10-Sep-14 PERTAMINA EP Donggi Gas Development Project218 REKAYASA INDUSTRI 22-Sep-14 PERTAMINA EP Matindok Gas Development Project219 REKAYASA INDUSTRI 08-Sep-14 None

220 PT. PRATIWI PUTRI SULUNG 26-Sep-14PT. PERUSAHAAN GAS NEGARA

(PERSERO) TbkInstallation Upgrading Indonesia Power PLN Tanjung Priok

221 PT FIS Sejahtera Bersama 26-Sep-14 PT. PETROKIMIA GRESIK NPK Fusion - PUSRI

Page 8: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

222 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 16-Oct-14 MOBIL CEPU Ltd. Wellpad B First Oil

223 MULTI KREASI ENGINEERING 28-Oct-14 PERTAMINA HULU ENERGI ONWJ LTD. FSB Platfom

224 REKAYASA INDUSTRI 31-Oct-14 Pertamina Geothermal Energy (Kamojang) Kamojang V Geothermal Power Plant

225 PT. MEINDO ELANG INDAH 11-Nov-14 TOTAL E&P INDONESIE Bekapai Phase 2B

226 PT. PRATIWI PUTRI SULUNG 26-Nov-14PT. PERUSAHAAN GAS NEGARA

(PERSERO) TbkGarawangi & Sunyaragi Offtake Station Project ( CP-12 )

227 REKAYASA INDUSTRI 06-Dec-14 CONOCOPHILLIPS INDONESIA INC. LTDDayung Compression and Central Gas Plant Debottleneck

Projec228 PT. MEINDO ELANG INDAH 06-Dec-14 PREMIER OIL NATUNA SEA BV West Lobe Lama 5x Flowline Tie-in 229 PT. MEINDO ELANG INDAH 03-Dec-14 PREMIER OIL NATUNA SEA BV Modification of Topside Flowline Connection Project230 PT. MEINDO ELANG INDAH 16-Dec-14 PREMIER OIL NATUNA SEA BV Modification of Topside Flowline Connection Project231 PT. INDOKOMAS BUANA PERKASA 16-Dec-14 PERTAMINA HULU ENERGI ONWJ LTD. Foxtrot Compressor Upgrading Project

232 PT. PRATIWI PUTRI SULUNG 23-Dec-14 PT PERUSAHAAN GAS NEGARA ( Persero) Pekerjaan Pemasangan MRS sektor Ngoro & PIER

233 PT. WIJAYA KARYA 14-Jan-13 PT. CHEVRON PACIFIC INDONESIA North Duri Development Area-13234 PT. WIJAYA KARYA 12-Jun-13 PT. CHEVRON PACIFIC INDONESIA North Duri Development Area-13235 PT. ADHI Karya (Persero) Tbk 30-Jan-13 PERTAMINA CILACAP RFCC Cilacap 236 PT. RAJAWALI SWIBER CAKRAWALA 14-Mar-13 CONOCOPHILLIPS INDONESIA INC. LTD SOUTH BELUT FEL-3 PROJECT 237 POSCO ENGINEERING 25-Nov-13 Merak CFPP 2 x 60 MW238 CONOCOPHILLIPS INDONESIA INC. LTD 26-Sep-13 Belanak Project239 PT. CABOT INDONESIA 28-Feb-14 CL Coal Tar Storange Tank Project240 REKAYASA INDUSTRI 23-Apr-14 PT. PETROKIMIA GRESIK AMMONIA TANK CAPACITY 20.000 MT DOUBLE WALL 241 PT. MEINDO ELANG INDAH 26-May-14 PERTAMINA HULU ENERGI ONWJ LTD. GG NEW FIELD DEVELOPMENT PROJECT 242 REKAYASA INDUSTRI 25-Jul-14 PT. PUPUK SRIWIDJAJA PUSRI-II B PROJECT243 BASF CARE CHEMICALS INDONESIA 12-Aug-14 Debottlenecking Project

244 PT. WIJAYA KARYA 03-Dec-13 Pertamina UPMS TBBM Ujung Berung Pengadaan Metering System CB1 Tasik Malaya Ujung Berung

245 PT. WIJAYA KARYA 06-Mar-14 Pertamina UPMS TBBM Ujung Berung Pengadaan Metering System CB1 Tasik Malaya Ujung Berung

246 SANTOS (SAMPANG) Pty Ltd 13-Feb-13 Sales Gas Senior Orifice Metering System

247 SANTOS (SAMPANG) Pty Ltd 12-Dec-13sanggata Sales Gas Metering System Package Supply &

Service

248 PT. MEINDO ELANG INDAH 05-Jun-13 PEARL OILRuby Field Development Project Ruby Tie-In Basic

Ebgineering

249EMERSON PROCESS MANAGEMENT ASIA

PACIFIC PTE LTD19-Feb-13 PEARL OIL

Ruby Field Development Project Ruby Tie-In Basic

Ebgineering

Page 9: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

250 PT. MEINDO ELANG INDAH 24-Jul-13 PEARL OILRuby Field Development Project Ruby Tie-In Basic

Ebgineering251 CONOCOPHILLIPS INDONESIA INC. LTD 18-Jan-12 SOUTH BELUT FEL-3 PROJECT 252 CONOCOPHILLIPS INDONESIA INC. LTD 18-Jan-12 SOUTH BELUT FEL-3 PROJECT 253 CONOCOPHILLIPS INDONESIA INC. LTD 26-Mar-14 SOUTH BELUT FEL-3 PROJECT 254 PT. KUTILANG PAKSI MAS 14-Mar-14 PT. TRANSPORTASI GAS INDONESIA None255 PT. INTI KARYA PERSADA TEHNIK 15-Nov-13 PT. PUPUK KALIMANTAN TIMUR Tbk. Kaltim-5 2500 MTPD amonia & 3500 MTPD urea256 PT. ADHI Karya (Persero) Tbk 30-Oct-12 PERTAMINA EP RFCC Cilacap 257 PT. ADHI Karya (Persero) Tbk 01-Oct-13 PERTAMINA CILACAP RFCC Cilacap 258 REKAYASA INDUSTRI 18-Dec-12 PGN Jakarta Lampung LNG Floating Storage & regasification 259 PETROCHINA INTERNATIONAL JABUNG LTD 14-Jan-13 Petrochina - Gas Custody Matering 260 VICO INDONESIA 22-Feb-13 Pengadaan Paket Custady Gas Metering261 JOB PERTAMINA - TALISMAN JAMBI MERANG 20-Mar-13 Feed Gas Metering System at Grissik 262 Samsung Engineering Co,. Ltd. 18-Apr-13 PT. MEDCO E&P INDONESIA Senoro Development Project

263 PT. MEINDO ELANG INDAH 19-Jun-13 PEARLOIL (TUNGKAL) LTD.Ruby Field Development Project Ruby Tie-In Basic

Ebgineering

264 PT. MEINDO ELANG INDAH 02-Jul-13 PEARLOIL (TUNGKAL) LTD.Ruby Field Development Project Ruby Tie-In Basic

Ebgineering265 PETROCHINA INTERNATIONAL JABUNG LTD 14-Jan-13 Petrochina - Gas Custody Matering

266 PT. WIJAYA KARYA 26-Jul-13 Pengadaan Metering System CB1 Tasik Malaya Ujung Berung

267 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 23-Aug-13 EXXON MOBIL OIL INDONESIA INC. Banyu Urip

268 PT. MEINDO ELANG INDAH 04-Oct-13 PEARLOIL (TUNGKAL) LTD. Ruby Field Development Project269 MULTI KREASI ENGINEERING 12-Nov-13 PERTAMINA GAS METERING ARUN BELAWAN

270 PT. BINA SARANA PUTRA 25-Nov-13JOB PERTAMINA - TALISMAN JAMBI

MERANGNew NGF Condensate Storage Tanks Facility

271 PT. BINA SARANA PUTRA 18-Nov-13JOB PERTAMINA - TALISMAN JAMBI

MERANGNew NGF Condensate Storage Tanks Facility

272 PT. MEINDO ELANG INDAH 13-Dec-13 PERTAMINA HULU ENERGI ONWJ LTD. GG NEW FIELD DEVELOPMENT PROJECT

273 PT. MEINDO ELANG INDAH 26-Dec-13 PEARLOIL (TUNGKAL) LTD.Ruby Field Development Project Ruby Tie-In Basic

Ebgineering

274 PT. MEINDO ELANG INDAH 26-Dec-13 PEARLOIL (TUNGKAL) LTD.Ruby Field Development Project Ruby Tie-In Basic

Ebgineering

275 PEARLOIL (TUNGKAL) LTD. 04-Jan-14 PEARLOIL (TUNGKAL) LTD.Ruby Field Development Project Ruby Tie-In Basic

Ebgineering

276 PT. MEINDO ELANG INDAH 22-Jan-14SALAMANDER ENERGY (NORTH

SUMATRA) LIMITEDKERENDAN GAS FACILITY PROJECT

Page 10: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

277 PT. BINA SARANA PUTRA 20-Mar-14JOB PERTAMINA - TALISMAN JAMBI

MERANGNew NGF Condensate Storage Tanks Facility

278 PT. MEINDO ELANG INDAH 23-Apr-14 PERTAMINA HULU ENERGI ONWJ LTD. GG NEW FIELD DEVELOPMENT PROJECT 279 PT. MEINDO ELANG INDAH 12-May-14 PEARLOIL (TUNGKAL) LTD. Ruby Field Development Project280 PT. INTI KARYA PERSADA TEHNIK 04-May-14 PT. PUPUK KALIMANTAN TIMUR Tbk. Kaltim-5 2500 MTPD amonia & 3500 MTPD urea281 ENVIROMATE TECHNOLOGY INTERNATIONAL 28-May-14 PLN SEKTOR GRESIK CNG Marine Project282 ENVIROMATE TECHNOLOGY INTERNATIONAL 28-May-14 PLN SEKTOR GRESIK CNG Marine Project283 REKAYASA INDUSTRI 20-Jun-14 PERTAMINA EP Pembangunan Fasilitas Produksi Gas Donggi284 REKAYASA INDUSTRI 02-Dec-14 PERTAMINA EP Donggi Gas Produksi Fasilitas Project285 PT. MEINDO ELANG INDAH 21-Jul-14 TOTAL E&P INDONESIE SOUTH MAHAKAM PHASE 3 DEVELOPMENT PROJECT

286KONSORSIUM PT. WIJAYA KARYA - PT TECHNIP

INDONESIA27-Oct-14 PERTAMINA EP Matindok Gas Development Project

287 JOB PERTAMINA - TALISMAN JAMBI MERANG 15-Apr-14 Feed Gas Metering System at Grissik 288 JOB PERTAMINA - TALISMAN JAMBI MERANG 14-Jul-14 Feed Gas Metering System at Grissik 289 JOB PERTAMINA - TALISMAN JAMBI MERANG 24-Dec-13 Fabricated Single Stream Gas USM Meter290 CONOCOPHILLIPS INDONESIA INC. LTD 22-Oct-14 Hang Tuah Ultrasonic Gas Flow Meter Wet Calibration291 PT. WIJAYA KARYA 07-Jan-13 CONOCOPHILLIPS (GRISSIK) Ltd. Suban Condensate Storage Tank Project292 PACIFIC PROCESS ENGINEERING 28-Jan-13 PERTAMINA EP Gas Supply to Tambak Lorok Power Plant293 PT. GUNANUSA UTAMA FABRICATORS 22-Feb-13 TOTAL E&P INDONESIE None294 PT. CITRA PANJI MANUNGGAL 05-Apr-13 PERTAMINA EP Up Grading / Modifikasi Di Lapangan Rantau 295 PT. INDOKOMAS BUANA PERKASA 22-May-13 None296 PT. WIJAYA KARYA 23-May-13 PERTAMINA CILACAP -

297 REKAYASA INDUSTRI 21-May-13 PGN Jakarta EPCIC Lampung LNGFloating Stroage and Regastification

298 CIME GLOBAL TEKNOLOGI 02-Jul-13 None299 PT. MEINDO ELANG INDAH 01-Jul-13 PEARLOIL (TUNGKAL) LTD. Ruby Field Development Project300 PT. GUNANUSA UTAMA FABRICATORS 12-Jul-13 TOTAL E&P INDONESIE Yadana Subsidance Project 301 ADHI KARYA GEMILANG 24-Jun-13 PERTAMINA CILACAP RFCC Cilacap 302 PT. INDOKOMAS BUANA PERKASA 30-Jul-13 -303 PT. MEINDO ELANG INDAH 28-Aug-13 SALAMANDER ENERGY (BANGKANAI) KERENDAN GAS FACILITY PROJECT304 PT. REMAJA BANGUN KENCANA KONTRAKTOR 17-Sep-13 PT. CIKARANG LISTRINDO Gas Fuel & Liquid System305 PT. INDOKOMAS BUANA PERKASA 21-Oct-13 PERTAMINA HULU ENERGI ONWJ LTD. None306 PT. GASPRO WAHYU WIDADA 28-Oct-13 PERTAMINA GAS Cambai Additional Gas Phase I Project307 PT. MITRA PRANA ABADI SENTOSA 28-Oct-13 VICO INDONESIA Mutiara Southern Gas Lift Line Installation 308 PT. GASPRO WAHYU WIDADA 13-Nov-13 PERTAMINA EP Subang additional Gas Compression309 PT. MITRA PRANA ABADI SENTOSA 20-Nov-13 VICO INDONESIA Mutiara Southern Gas Lift Line Installation 310 PT. MEINDO ELANG INDAH 06-Dec-13 PERTAMINA HULU ENERGI ONWJ LTD. GG NEW FIELD DEVELOPMENT PROJECT 311 PT. SEAMLESS PIPE INDONESIA JAYA 11-Jul-13 SPIJ Cilegon Plant - Exiros 312 PGAS SOLUTION 16-Aug-13 Kerja Tambah PIPDTPGP SBU II

Page 11: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

313 PGAS SOLUTION 18-Nov-13 Kerja Tambah PIPDTPGP SBU II314 CIME GLOBAL TEKNOLOGI 08-Jan-14 -315 PT. KRAKATAU ENGINEERING 17-Jan-14 PERTAMINA (PERSERO) Upgrading Unit Produksi Pelumas Jakarta316 PT. INTI KARYA PERSADA TEHNIK 30-Jan-14 -317 PACIFIC PROCESS ENGINEERING 17-Feb-14 UNIVERSAL BATAM ENERGY Tanjung Uncang project318 PT. INDOKOMAS BUANA PERKASA 18-Feb-14 TOTAL E&P INDONESIE -319 PT. CABOT INDONESIA 28-Feb-14 CL Coal Tar Storange Tank Project320 PT. MEINDO ELANG INDAH 06-Mar-14 PERTAMINA HULU ENERGI ONWJ LTD. GG NEW FIELD DEVELOPMENT PROJECT 321 PT. MEINDO ELANG INDAH 05-Mar-14 TOTAL E&P INDONESIE South Mahakam322 PT. KRAKATAU ENGINEERING 07-Mar-14 PERTAMINA (PERSERO) Upgrading Unit Produksi Pelumas Jakarta323 BANUA CITRA INSTRUMINDO 14-Mar-14 TOTAL E&P INDONESIE SOUTH MAHAKAM PHASE 3 DEVELOPMENT PROJECT324 CIME GLOBAL TEKNOLOGI 24-Mar-14 None

325 PT. BINA SARANA PUTRA 26-Mar-14JOB PERTAMINA - TALISMAN JAMBI

MERANGNew NGF Condensate Storage Tanks Facility

326 PROMATCON TEPATGUNA 21-Apr-14PETROCHINA INTERNATIONAL JABUNG

LTDNone

327 SARANA GASTEKINDO UTAMA 07-May-14PERTAMINA OPERASI PRODUKSI E&P

PRABUMULIHUpgrading fasilitas pendukung & SKG Lembak

328 PT. GUNANUSA UTAMA FABRICATORS 07-Apr-14 -329 PROMATCON TEPATGUNA 22-May-14 VICO INDONESIA Gas Lift Skid package

330 CONSORTIUIM RAGA PERKASA - JGC INDONESIA 03-Jun-14 BP BERAU LTD Small Micro Modification

331 REKAYASA INDUSTRI 20-May-14 PT. PUPUK SRIWIDJAYA PUSRI-II B PROJECT332 PT. INDOKOMAS BUANA PERKASA 05-Jun-14 PERTAMINA HULU ENERGI ONWJ LTD. Bravo Compresor Control System Upgrade333 PT. GASPRO WAHYU WIDADA 02-Jul-14 Arbel Project334 PT. JGC INDONESIA 04-Jul-14 PERTAMINA EP Donggi Gas Development Project

335 PT. MEINDO ELANG INDAH 14-Jul-14 PERTAMINA HULU ENERGI ONWJ LTD. KL Gas Lift Comperssor Installation Appraise & Select Stage

336 PT. TIMAS SUPLINDO 11-Aug-14 PERTAMINA HULU ENERGI ONWJ LTD. EPCI for UL Development project

337 CONSORTIUIM RAGA PERKASA - JGC INDONESIA 03-Sep-14 BP BERAU LTD Combo Dock new refuelling system

338 PT. MEINDO ELANG INDAH 08-Oct-14 PERTAMINA HULU ENERGI ONWJ LTD. KL Gas Lift Comperssor Installation Appraise & Select Stage

339 PT. MEINDO ELANG INDAH 11-Nov-14 VICO INDONESIA Mutiara Produced Water Injection and Electrical Power

340 PT. GUNANUSA UTAMA FABRICATORS 24-Nov-14 TOTAL E&P INDONESIE Yadana Subsidance Project 341 MULTI KREASI ENGINEERING 18-Nov-13 PERTAMINA EP METERING ARUN BELAWAN342 PACIFIC PROCESS ENGINEERING 20-Mar-13 IP TAMBAK LOROK Gas Supply to Tambak Lorok Power Plant343 PT. INTI KARYA PERSADA TEHNIK 02-Apr-13 PERTAMINA EP Proyek Pengembangan Gas Jawa

Page 12: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

344 PT. GUNANUSA UTAMA FABRICATORS 09-Nov-12 TOTAL E&P INDONESIESISINUBI PHASE 2B AND PECIKO PHASE 7B DEVELOPMENT

PROJECT345 PT. WIJAYA KARYA 19-Aug-13 PLTG PEAKING KALTIM BARU PLTG PEAKING KALTIM BARU 2X (50-60) MW346 PT. AIR LIQUIDE INDONESIA 05-Sep-13 KUJANG PROJECT347 LANEG MANUNGGAL 24-Jun-13 PJB Muara Tawar TURNKEY PROJECT348 PT. RAGA PERKASA EKAGUNA 04-Apr-14 BUKIT TUA DEVELOPMENT PROJECT349 PT. SYAMSIR KARYA PERTAMA 14-Jul-14 KPJB JEPARA Senoro Development Project350 PT. MEINDO ELANG INDAH 11-Nov-14 TOTAL E&P INDONESIE Bekapai Phase 2B

351 REKAYASA INDUSTRI 31-Oct-14 Pertamina Geothermal Energy (Kamojang) Kamojang V Geothermal Power Plant

352 PT. MEINDO ELANG INDAH 28-Nov-14 PERTAMINA HULU ENERGI ONWJ LTD. GG NEW FIELD DEVELOPMENT PROJECT 353 PT. MEINDO ELANG INDAH 11-Nov-14 TOTAL E&P INDONESIE Bekapai Phase 2B354 CONOCOPHILLIPS INDONESIA INC. LTD 26-Aug-14 Suban Condensate Storage Tank Project

355 REKAYASA INDUSTRI 31-Dec-12 CONOCOPHILLIPS INDONESIA INC. LTD dayung compression and central gas plant debottleneck

356 REKAYASA INDUSTRI 15-Mar-13 CONOCOPHILLIPS INDONESIA INC. LTD dayung compression and central gas plant debottleneck

357 CNOOC SES Ltd. 03-Apr-13 CINTA-C358 PT PERTA-SAMTAN GAS 09-Apr-13 South Sumatra NGL Project359 PT. ENVITECH PERKASA 23-May-13 PERTAMINA CILACAP RFCC Cilacap 360 REKAYASA INDUSTRI 10-Jul-13 CONOCOPHILLIPS INDONESIA INC. LTD Dayung Compression and Grissik Central Gas Plant361 PT. INTI KARYA PERSADA TEHNIK 01-Oct-14 PT. PUPUK KALIMANTAN TIMUR Tbk. Kaltim-5 2500 MTPD amonia & 3500 MTPD urea362 REKAYASA INDUSTRI 08-Sep-14 PT. PUPUK SRIWIDJAJA PUSRI-II B PROJECT

363 CONOCOPHILLIPS INDONESIA INC. LTD 03-Oct-14North Belut Continious Emission Monitoring System

Upgrade364 CONOCOPHILLIPS INDONESIA INC. LTD 20-Nov-14 Belanak FPSO Development365 REKAYASA INDUSTRI 17-Feb-14 CONOCOPHILLIPS (GRISSIK) Ltd. Dayung Compression and Grissik Central Gas Plant366 REKAYASA INDUSTRI 24-Jul-13 CONOCOPHILLIPS (GRISSIK) Ltd. Dayung Compression and Grissik Central Gas Plant367 PT. INTI KARYA PERSADA TEHNIK 04-Jul-13 CONOCOPHILLIPS INDONESIA INC. LTD EPC Rawa Modification368 PT. INTI KARYA PERSADA TEHNIK 22-Jan-14 CONOCOPHILLIPS INDONESIA INC. LTD EPC Rawa Modification369 PT. INTI KARYA PERSADA TEHNIK 12-Feb-14 CONOCOPHILLIPS INDONESIA INC. LTD EPC Rawa Modification370 PT. INTI KARYA PERSADA TEHNIK 10-Mar-14 CONOCOPHILLIPS INDONESIA INC. LTD EPC Rawa Modification371 PT. PUNJ LLOYD INDONESIA 18-Oct-12 CONOCOPHILLIPS (GRISSIK) Ltd. Sumpal Expansion Project

372PT Indonesia Power Unit Bisnis Pembangkitan

Kamojang31-May-13

RETROFIT DCS PLTP GUNUNG SALAK UNIT 2 UBP

KAMOJANG373 PT. MUSIM MAS 02-Jan-13 GMS PROJECT

374 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 04-Jan-13 PT PERTA-SAMTAN GAS South Sumatra NGL Project

375 REKAYASA INDUSTRI 01-Feb-13 CONOCOPHILLIPS (GRISSIK) Ltd. None

Page 13: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

376 PT PERTA-SAMTAN GAS 09-Apr-13 NGL Project-PERTAGAS377 PT INDO BHARAT RAYON 06-May-13 SPINNING LINE# 7 PROJECT378 PT INDO BHARAT RAYON 11-May-13 SPINNING LINE# 7 PROJECT379 PT INDO BHARAT RAYON 23-Oct-14 SPINNING LINE# 7 PROJECT380 PT. MUSIM MAS 08-Jul-13 MM#52381 PT. MUSIM MAS 08-Jul-13 MM#52382 PT. MUSIM MAS 08-Jul-13 MM#58383 PT. MUSIM MAS 08-Jul-13 MM#58384 PT. AKUSARA MITRA SINERGI 22-Aug-13 PJB Muara Tawar CNG Muara Tawar

385PT. WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING01-Oct-13 CONOCOPHILLIPS (GRISSIK) Ltd. Rawa Power Generation

386 NIRA MURNI KONSTRUKSI 06-Dec-13 CONOCOPHILLIPS (GRISSIK) Ltd. Sumpal Expansion Project387 PT. MUSIM MAS 09-Dec-13 MCT # 3 Project388 PT. MUSIM MAS 12-Dec-13 MCT # 3 Project389 PT. SULFINDO ADIUSAHA 09-Dec-13 HCL SYNTHESIS390 PT. WIJAYA KARYA 03-Jan-13 PLTG PEAKING KALTIM BARU PLTG PEAKING KALTIM BARU 2X (50-60) MW391 PT. WIJAYA KARYA 19-Nov-13 PLTG PEAKING KALTIM BARU PLTG PEAKING KALTIM BARU 2X (50-60) MW392 REKAYASA INDUSTRI 06-Feb-13 SEMEN TONASA Tonasa Coal Fired Power Plant Project393 REKAYASA ENGINEERING 02-Jan-14 Pertamina EP Asset 3 Field Subang TIE IN VENTING CO 2 REMOVAL SUBANG PROJECT394 REKAYASA ENGINEERING 25-Jun-14 Pertamina EP Asset 3 Field Subang TIE IN VENTING CO 2 REMOVAL SUBANG PROJECT395 NIRA MURNI KONSTRUKSI 18-Feb-14 CONOCOPHILLIPS INDONESIA INC. LTD Sumpal Expansion Project396 NIRA MURNI KONSTRUKSI 06-Mar-14 CONOCOPHILLIPS INDONESIA INC. LTD Sumpal Expansion Project397 BASF CARE CHEMICALS INDONESIA 13-Mar-14 BASF CARE CHEMICALS INDONESIA FEED BASF CIMANGGIS DEBOTTLENECKING398 NIRA MURNI KONSTRUKSI 12-Mar-14 CONOCOPHILLIPS INDONESIA INC. LTD Sumpal Expansion Project399 PT. JETEC INDONESIA 12-Jun-14 MAHARAJA LELA SOUTH PROJECT400 BASF CARE CHEMICALS INDONESIA 04-Jul-14 Debottlenecking Project401 PT. JETEC INDONESIA 10-Jul-14 MAHARAJA LELA SOUTH PROJECT402 PT. JETEC INDONESIA 17-Jul-14 MAHARAJA LELA SOUTH PROJECT403 REDWOOD INDONESIA 10-Oct-14 Redwood Indonesia Phase I404 REDWOOD INDONESIA 10-Oct-14 Redwood Indonesia Phase I405 CONOCOPHILLIPS INDONESIA INC. LTD 10-Feb-14 Suban Condensate Storage Tank Project406 CONOCOPHILLIPS (GRISSIK) Ltd. 25-Sep-14 Grissik Safety Instrumented System Upgrade Project407 TROPIK ENERGI PANDAN 31-Oct-14 ICSS Project at Blok Sriwijaya 408 REKAYASA INDUSTRI 04-Feb-11 SEMEN TONASA Tonasa Coal Fired Power Plant Project409 PT. INTI KARYA PERSADA TEHNIK 04-Feb-13 PT. PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project410 PT. JGC INDONESIA 12-Feb-13 ASAHIMAS SUBENTRA CHEMICAL ASC Phase-V Expansion411 PT. JGC INDONESIA 20-Mar-13 JCF Project412 PT. MEINDO ELANG INDAH 21-Mar-13 PEARLOIL (TUNGKAL) LTD. Ruby Field Development Project413 REKAYASA INDUSTRI 04-Feb-11 SEMEN TONASA -

Page 14: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

414 REKAYASA INDUSTRI 10-Jul-13 CONOCOPHILLIPS (GRISSIK) Ltd. None

415 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS 25-Jul-13 PT PERTA-SAMTAN GAS South Sumatra NGL Project

416 PT. CITRA PANJI MANUNGGAL 03-Oct-13 PERTAMINA EP Water Treatment Facility - Rantau417 PT. PACINESIA CHEMICAL INDUSTRY 14-Aug-13 Noli Project418 PT. PACINESIA CHEMICAL INDUSTRY 24-Apr-14 Noli Project419 REKAYASA INDUSTRI 21-Mar-13 CONOCOPHILLIPS (GRISSIK) Ltd. None420 PT. INTI KARYA PERSADA TEHNIK 26-Mar-13 CONOCOPHILLIPS (GRISSIK) Ltd. Rawa Modification project421 PT. INTI KARYA PERSADA TEHNIK 07-Jan-14 PERTAMINA EP PPGJ Project422 PT. INTI KARYA PERSADA TEHNIK 07-Mar-14 PERTAMINA EP Gundih Project423 REKAYASA INDUSTRI 23-Mar-14 Tonasa Coal Fired Power Plant Project424 Hager + Elsaesser Asia Pte. Ltd 08-Oct-14 PERTAMINA CILACAP Pertamina Project425 PT. PERTAMINA (PERSERO) UP II DUMAI 21-Jan-14 TSA Metering system Dumai426 PT. OILTANKING MERAK 05-May-14 Standard427 PT. OILTANKING MERAK 05-May-14 Standard428 PT. PERTAMINA (PERSERO) UP II DUMAI 08-Apr-15 TSA Metering system Dumai429 PT. PERTAMINA (PERSERO) UP II DUMAI 14-Nov-14 TSA Metering system Dumai430 PT. PERTAMINA (PERSERO) UP II DUMAI 14-Nov-14 TSA Metering system Dumai431 PT. PERTAMINA (PERSERO) UP II DUMAI 14-Nov-14 TSA Metering system Dumai432 PT. PERTAMINA (PERSERO) UP II DUMAI 14-Nov-14 TSA Metering system Dumai433 PT. PERTAMINA (PERSERO) UP II DUMAI 14-Nov-14 TSA Metering system Dumai434 PT. PERTAMINA (PERSERO) UP II DUMAI 14-Nov-14 TSA Metering system Dumai435 PT. PERTAMINA (PERSERO) UP II DUMAI 14-Nov-14 TSA Metering system Dumai436 PT. PERTAMINA (PERSERO) UP II DUMAI 19-Nov-14 TSA Metering system Dumai437 PT. PERTAMINA (PERSERO) UP II DUMAI 05-Dec-14 TSA Metering system Dumai438 CONOCOPHILLIPS INDONESIA INC. LTD 25-Sep-14 Delta V DCS M. Contract439 CONOCOPHILLIPS INDONESIA INC. LTD 10-Oct-14 Delta V DCS M. Contract440 PREMIER OIL NATUNA SEA BV 22-Sep-14 Standard441 PREMIER OIL NATUNA SEA BV 12-Dec-14 Standard442 PT. TIMAS SUPLINDO 27-Jan-13 PERTAMINA HULU ENERGI ONWJ LTD. Lima Subsidence remediation443 PT. MCDERMOTT INDONESIA 07-Mar-13 Kepodang Gas Development Project444 TECHNIP INDONESIA 02-Apr-13 Petronas Carigali Ketapang II BUKIT TUA DEVELOPMENT PROJECT445 PT. INDOKOMAS BUANA PERKASA 04-Jul-13 PT. OGAN INTERIOR GAS Ogan Komering Pilot Wells

446 PT. INTI KARYA PERSADA TEHNIK 26-Aug-13 PERTAMINA EPPembangunan Processing Plant Area Gundih PPGJ Bagian

Timur447 REKAYASA INDUSTRI 08-Sep-14 PT. PUPUK SRIWIDJAYA PUSRI-II B PROJECT448 PT. CITRA PANJI MANUNGGAL 03-Apr-13 PERTAMINA EP Water Treatment Facility - Rantau449 PT. JGC INDONESIA 04-Apr-13 PT. JGC INDONESIA JCF Project450 PT. JGC INDONESIA 12-Apr-13 JCF Project

Page 15: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

451 JGC COAL FUEL 11-Sep-13 JGC COAL FUEL JCF Project452 PT. CITRA PANJI MANUNGGAL 03-Feb-14 PT PERTAMINA EP FIELD RANTAU Water Treatment Facility - Rantau453 PT. JGC INDONESIA 04-Apr-14 PT. SHELL INDONESIA SHELL LOBP Monas454 PT. TIMAS SUPLINDO 06-Jun-14 PT. PUPUK SRIWIDJAYA NPK Fusion - PUSRI455 BASF CARE CHEMICALS INDONESIA 12-Aug-14 Debottlenecking Project456 REKAYASA INDUSTRI 22-Aug-14 PERTAMINA EP Donggi Gas Produksi Fasilitas Project457 REKAYASA INDUSTRI 12-Aug-14 PERTAMINA EP Donggi Gas Produksi Fasilitas Project458 PERTAMINA BALIKAPAPAN/ UP V 16-Sep-13 System radar tangki inventory area oil movement unit

459 PERTAMINA BALIKAPAPAN/ UP V 02-Sep-13 System radar Tangki custody transfer area oil movement

460 PT. BINA SARANA PUTRA 15-Jul-13JOB PERTAMINA - TALISMAN JAMBI

MERANGNew NGF Condensate Storage Tanks Facility

461 PT. WIJAYA KARYA 17-Jun-14 BP BERAU LTD New Condensate tanks & diesel tanks 462 PT. WIJAYA KARYA 16-Oct-14 BP BERAU LTD New Condensate tanks & diesel tanks 463 PT. MEINDO ELANG INDAH 11-Nov-14 TOTAL E&P INDONESIE Bekapai Phase 2B464 Automation & Intergration 27-Nov-14 Project Operation Support465 CONOCOPHILLIPS (GRISSIK) Ltd. 02-May-14 Standard466 PT. CHEVRON PACIFIC INDONESIA 04-Apr-14 Price Agreement467 REKAYASA INDUSTRI 23-Apr-13 None468 PT. GLOBAL HADITECH 09-Dec-14 PERTAMINA EP Donggi Gas Development Project469 REKAYASA INDUSTRI 22-Aug-14 MOBIL CEPU Ltd. Bayu Urip Project

470EMERSON PROCESS MANAGEMENT ASIA

PACIFIC PTE LTD15-Nov-14 Kaltim-5 2500 MTPD amonia & 3500 MTPD urea

471 Zeeco 19-Dec-14 PT. PUPUK KALIMANTAN TIMUR Tbk. KALTIM-5 Project Job site in Bontang

472 AMERICAN EQUIPMENT & MACHINERY PTE LTD  25-Sep-15 Betara Complex Development 479  PT MEINDO ELANG INDAH 

473 BECHTEL INTERNATIONAL, INC  26-Aug-15 Wheatstone Project LNG Plant 474 BUT TOYO ENGINEERING CORPORATION  27-Aug-15 PUSRI/II B PROJECT  PT PUPUK SRIWIDJAJA 

475EMERSON PROCESS MANAGEMENT ASIA

PACIFIC PTE LTD 11-Mar-15 Banyu Urip Project  BUT EXXONMOBIL CEPU LIMITED 

476EMERSON PROCESS MANAGEMENT ASIA

PACIFIC PTE LTD 08-Oct-15 SENORO GAS DEVELOPMENT PROJECT  SAMSUNG ENGINEERING CO., LTD 

477EMERSON PROCESS MANAGEMENT ASIA

PACIFIC PTE LTD 02-Feb-15 TIGA project  PT IHI GASIFICATION INDONESIA 

478 FEDERAL HARDWARE ENGINEERING PTE LTD  11-Nov-15EPCI/1; PHE 12, PHE 24 And CPP2

Platform Development PT PERTAMINA HULU ENERGI WMO 

479 FEDERAL HARDWARE ENGINEERING PTE LTD  16-Nov-15EPCI/1; PHE 12, PHE 24 And CPP2

Platform Development PT PERTAMINA HULU ENERGI WMO 

480 FEDERAL HARDWARE ENGINEERING PTE LTD  23-Oct-15 PT GUNANUSA UTAMA FABRICATORS 

Page 16: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

481KONSORSIUM PT. WIJAYA KARYA / PT. TECHNIP

INDONESIA 20-Feb-15 Matindok Gas Development  PT PERTAMINA EP 

482KONSORSIUM PT. WIJAYA KARYA / PT. TECHNIP

INDONESIA 05-Mar-15 Matindok Gas Development  PT PERTAMINA EP 

483KONSORSIUM PT. WIJAYA KARYA / PT. TECHNIP

INDONESIA 11-Mar-15 Matindok Gas Development  PT PERTAMINA EP 

484 KONSORSIUM WIKA/RABANA/KELSRI  30-Jul-15

JASA PERANCANGAN, PENGADAAN DAN

KONSTRUKSI PEMBANGUNAN PIPA

TRANSMISI GAS DARI GRESIK/SEMARANG 

PT PERTAMINA GAS 

485 KONSORSIUM WIKA/RABANA/KELSRI  11-Aug-15

JASA PERANCANGAN, PENGADAAN DAN

KONSTRUKSI PEMBANGUNAN PIPA

TRANSMISI GAS DARI GRESIK/SEMARANG 

PT PERTAMINA GAS 

486 PC KETAPANG II LTD  03-Sep-15 Bukit Tua Project 

487 PT ADHI KARYA  17-Feb-15Resid Fluid Catalytic cracking (RFCC)

Cilacap PT PERTAMINA UP IV CILACAP 

488 PT ADHI KARYA  11-Mar-15Resid Fluid Catalytic cracking (RFCC)

Cilacap PT PERTAMINA UP IV CILACAP 

489 PT ADHI KARYA  03-Mar-15 RFCC Project  PT PERTAMINA UP IV CILACAP 490 PT ADIPROTEK ENVIRODUNIA  23-Apr-15 Donggi   PT PERTAMINA EP 491 PT ADIPROTEK ENVIRODUNIA  16-Jul-15 Donggi   PT PERTAMINA EP 492 PT AKUSARA MITRA SINERGI  06-Aug-15 PT INDOCEMENT TUNGGAL PRAKARSA TBK 493 PT ALAM BERSEMI SENTOSA  26-Feb-15 2ND Stage LP Separator Project  BUT PETROCHINA INTERNATIONAL JABUNG LTD 

494 PT ALAM BERSEMI SENTOSA  18-Aug-15SCRUBBER AND GAS FUEL LINE

REPLACEMENT PT TOTAL E&P INDONESIE 

495 PT ALAM BERSEMI SENTOSA  03-Sep-15SCRUBBER AND GAS FUEL LINE

REPLACEMENT BUT PETROCHINA INTERNATIONAL (BERMUDA) LTD 

496 PT ALAM BERSEMI SENTOSA  9-Mar-15 BUT PETROCHINA INTERNATIONAL JABUNG LTD 497 PT ALAM BERSEMI SENTOSA  10-Mar-15 BUT PETROCHINA INTERNATIONAL JABUNG LTD 498 PT ALAM BERSEMI SENTOSA  18-Mar-15 BUT PETROCHINA INTERNATIONAL JABUNG LTD 

499PT ALSTOM POWER ENERGY SYSTEMS

INDONESIA 22-Jun-15 BAYAN/ HL5E OCC Modules 

500 PT ANPRESS PRAMESTI  15-Oct-15 PT PERTAMINA EP 501 PT ANSI MEGA INSTRUMINDO  22-May-15 Gresik/Semarang Pipeline Project  PT PERTAMINA GAS 502 PT ANSI MEGA INSTRUMINDO  23-Jul-15 Konsorsium Wika/Rabana/Kelsri  PT PERTAMINA GAS 503 PT ANSI MEGA INSTRUMINDO  24-Apr-15 PT TANJUNGENIM LESTARI PULP AND PAPER 

504 PT BANGUN BEJANA BAJA  30-Jul-15Petroleum Storage and Distribution

Samarinda PT PUMA ENERGY SINGAPORE PTE LTD 

Page 17: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

505 PT BUKAKA TEKNIK UTAMA TBK  21-Aug-15YAKIN ELECTRICAL POWER GAS

GENERATOR BUT CHEVRON INDONESIA COMPANY 

506 PT BUKAKA TEKNIK UTAMA TBK  21-Aug-15YAKIN ELECTRICAL POWER GAS

GENERATOR BUT CHEVRON INDONESIA COMPANY 

507 PT BUKAKA TEKNIK UTAMA TBK  24-Aug-15YAKIN ELECTRICAL POWER GAS

GENERATOR BUT CHEVRON INDONESIA COMPANY 

508 PT BUKAKA TEKNIK UTAMA TBK  24-Aug-15YAKIN ELECTRICAL POWER GAS

GENERATOR BUT CHEVRON INDONESIA COMPANY 

509 PT BUKAKA TEKNIK UTAMA TBK  24-Aug-15YAKIN ELECTRICAL POWER GAS

GENERATOR BUT CHEVRON INDONESIA COMPANY 

510 PT CIME GLOBAL TEKNOLOGI  03-Mar-15 Well Connection Package 2  PT TOTAL E&P INDONESIE 511 PT CIME GLOBAL TEKNOLOGI  27-Feb-15 PT TOTAL E&P INDONESIE 512 PT CIME GLOBAL TEKNOLOGI  16-Apr-15 PT TOTAL E&P INDONESIE 513 PT CIME GLOBAL TEKNOLOGI  16-Apr-15 PT TOTAL E&P INDONESIE 514 PT CIME GLOBAL TEKNOLOGI  15-May-15 PT TOTAL E&P INDONESIE 515 PT CIME GLOBAL TEKNOLOGI  22-Oct-15 PT TOTAL E&P INDONESIE 

516 PT CINOVASI REKAPRIMA  06-Apr-15EPC System Instrumentasi Spherical Tank

2 x 300T LPG Storage Mundu PT PATRA BADAK ARUN SOLUSI 

517PT CONSORTIUM PT. RAGA PERKASA EKAGUNA /

PT. JGC INDONESIA 17-Feb-15 Tangguh LNG Project  BP BERAU LTD 

518 PT DAVIDI INTERNATIONAL  07-Sep-15YAKIN ELECTRICAL POWER GAS

GENERATOR BUT CHEVRON INDONESIA COMPANY 

519 PT DAVIDI INTERNATIONAL  23-Sep-15 BUT CHEVRON INDONESIA COMPANY 

520 PT ENVIROMATE TECHNOLOGY INTERNATIONAL  16-Apr-15 CNG Grati PT PLN (PERSERO) PUSAT PENELITIAN DAN

PENGEMBANGAN KETENAGALISTRIKAN 521 PT FREEPORT INDONESIA  03-Jun-15 SAG1 Project 522 PT GASPRO WAHYU WIDADA  08-Apr-15 Cambai 2 project  PT PERTAMINA EP SCM FIELD SUBANG 

523 PT GRAMA BAZITA TENAGA  13-Oct-15Flow Computer Upgrade North Booster

Station PT CHEVRON PACIFIC INDONESIA 

524 PT GRAMA BAZITA TENAGA  18-May-15Flow Computer Upgrade/North Booster

Station PT CHEVRON PACIFIC INDONESIA 

525 PT GRAMA BAZITA TENAGA  01-Jun-15

Pekerjaan Desain, Pengadaan, Dan

Pemasangan Sistem Metering Custody

Transfer Gas Bumi 

PT PELANGI CAKRAWALA LOSARANG 

526 PT GRAND KARTECH, Tbk  12-Mar-15 Pertamina Bunyu Field Tank Project  PT PERTAMINA EP 527 PT GUNANUSA UTAMA FABRICATORS  28-Jan-15 Yadana Project  PT TOTAL E&P INDONESIE 528 PT GUNANUSA UTAMA FABRICATORS  24-Feb-15 Yadana Project  PT TOTAL E&P INDONESIE 

Page 18: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

529 PT HEAT TRANSFER SOLUTIONS INDONESIA  04-Mar-15Pengadaan Material Utama & Penunjang

Offtake Station Tambak Lorok PT PGAS SOLUTION 

530 PT INAKO PERSADA  12-Mar-15 PT EVONIK INDONESIA 531 PT INAKO PERSADA  10-Apr-15 PT ASIA PACIFIC FIBERS TBK 532 PT INAKO PERSADA  07-May-15 PT PJB UNIT PEMBANGKITAN MUARA KARANG 533 PT INAKO PERSADA  12-Aug-15 PT EVONIK INDONESIA 534 PT INAKO PERSADA  9-Sep-15 PT ASIA PACIFIC FIBERS TBK 535 PT INDOKOMAS BUANA PERKASA  06-Feb-15 PT PERTAMINA HULU ENERGI ONWJ 536 PT INDOMUDA CAKRA ENERGI  10-Nov-15 PLN Batam  PT INTI DAYA LATU PRIMA 

537 PT INDOTURBINE  02-Feb-15 Musi Timur / Field Pendopo Palembang  PT PERTAMINA EP ASSET 2 

538 PT INDOTURBINE  04-Jun-15 Musi Timur / Field Pendopo Palembang  PT PERTAMINA EP ASSET 2 

539 PT INTI KARYA PERSADA TEKNIK (IKPT)  02-Nov-15Dayung Compression Phase 2 (DC/2) EPC

Project BUT CONOCOPHILLIPS (GRISSIK) LTD 

540 PT INTI KARYA PERSADA TEKNIK (IKPT)  02-Nov-15Dayung Compression Phase 2 (DC/2) EPC

Project BUT CONOCOPHILLIPS (GRISSIK) LTD 

541 PT INTI KARYA PERSADA TEKNIK (IKPT)  03-Nov-15Dayung Compression Phase 2 (DC/2) EPC

Project BUT CONOCOPHILLIPS (GRISSIK) LTD 

542 PT INTI KARYA PERSADA TEKNIK (IKPT)  06-Feb-15 Pupuk Kaltim/5 Project  PT PUPUK KALIMANTAN TIMUR TBK 543 PT INTI KARYA PERSADA TEKNIK (IKPT)  8-May-15 Pupuk Kaltim/5 Project  PT PUPUK KALIMANTAN TIMUR TBK 544 PT IOT EPC INDONESIA  08-Jan-15 OT Karimun Indonesia 00075  PT OILTANKING MERAK 545 PT IOT EPC INDONESIA  25-Feb-15 PSE Sanggata Indonesia  PT OILTANKING MERAK 546 PT IOT EPC INDONESIA  14-Apr-15 PT PT. PETRO STORINDO ENERGI 547 PT JETEC Indonesia  16-Feb-15 MLJ3 project  PT TOTAL E&P INDONESIE 548 PT JETEC Indonesia  30-Apr-15 MLJ3 project  PT TOTAL E&P INDONESIE 549 PT JETEC Indonesia  29-Jun-15 MLJ3 project  PT TOTAL E&P INDONESIE 550 PT JGC INDONESIA  28-Apr-15 JCF DEMO PROJECT 551 PT JGC INDONESIA  05-Feb-15 JCF Project 552 PT JGC INDONESIA  19-Mar-15 JCF Project 553 PT KELSRI  14-Apr-15 Porong Grati Gas Pipeline  PT PERTAMINA GAS 554 PT KRAKATAU ENGINEERING  26-Mar-15 Pembangunan Open Access Tahap 1  PT PERTAMINA UP II DUMAI 555 PT KRAKATAU ENGINEERING  30-Mar-15 Pembangunan Open Access Tahap 1  PT PERTAMINA UP II DUMAI 556 PT KRAKATAU ENGINEERING  02-Apr-15 Pembangunan Open Access Tahap 1  PT PERTAMINA UP II DUMAI 557 PT KRAKATAU ENGINEERING  26-Jun-15 Pembangunan Open Access Tahap 1  PT PERTAMINA UP II DUMAI 

558 PT KRAKATAU ENGINEERING  26-Mar-15Proyek Pembangunan Pabrik NPK

Granular II PT PUPUK KUJANG 

Page 19: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

559 PT KRAKATAU ENGINEERING  26-Mar-15Proyek Pembangunan Pabrik NPK

Granular II PT PUPUK KUJANG 

560 PT MEINDO ELANG INDAH  03-Nov-15 BANGKA TOPSIDE EPCI  BUT CHEVRON INDONESIA COMPANY 561 PT MEINDO ELANG INDAH  22-Jan-15 Bangka Topside Project  BUT CHEVRON INDONESIA COMPANY 562 PT MEINDO ELANG INDAH  18-Feb-15 Bangka Topside Project  BUT CHEVRON INDONESIA COMPANY 563 PT MEINDO ELANG INDAH  9-Mar-15 Bangka Topside Project  BUT CHEVRON INDONESIA COMPANY 564 PT MEINDO ELANG INDAH  14-Sep-15 Bangka Topside Project  BUT CHEVRON INDONESIA COMPANY 565 PT MEINDO ELANG INDAH  26-Jan-15 Bekapai 2B/EPSC/1  PT TOTAL E&P INDONESIE 566 PT MEINDO ELANG INDAH  28-Jan-15 Bekapai 2B/EPSC/1  PT TOTAL E&P INDONESIE 567 PT MEINDO ELANG INDAH  18-Feb-15 Bekapai 2B/EPSC/1  PT TOTAL E&P INDONESIE 568 PT MEINDO ELANG INDAH  9-Mar-15 Bekapai 2B/EPSC/1  PT TOTAL E&P INDONESIE 569 PT MEINDO ELANG INDAH  9-Mar-15 Bekapai 2B/EPSC/1  PT TOTAL E&P INDONESIE 570 PT MEINDO ELANG INDAH  14-Apr-15 Bekapai 2B/EPSC/1  PT TOTAL E&P INDONESIE 571 PT MEINDO ELANG INDAH  06-May-15 Bekapai 2B/EPSC/1  PT TOTAL E&P INDONESIE 572 PT MEINDO ELANG INDAH  31-Aug-15 Bekapai 2B/EPSC/1  PT TOTAL E&P INDONESIE 573 PT MEINDO ELANG INDAH  30-Sep-15 Betara Complex Development 479  BUT PETROCHINA INTERNATIONAL JABUNG LTD 574 PT MEINDO ELANG INDAH  19-Jan-15 GG NEW DEVELOPMENT PROJECT  PT PERTAMINA HULU ENERGI ONWJ 575 PT MEINDO ELANG INDAH  12-May-15 GG NEW DEVELOPMENT PROJECT  PT PERTAMINA HULU ENERGI ONWJ 576 PT MEINDO ELANG INDAH  28-May-15 Kerendan Gas Project  PT SALAMANDER ENERGY PTE LTD 577 PT MEINDO ELANG INDAH  05-Jun-15 Kerendan Gas Project  PT SALAMANDER ENERGY PTE LTD 578 PT MEINDO ELANG INDAH  9-Jul-15 Kerendan Gas Project  PT SALAMANDER ENERGY PTE LTD 579 PT MEINDO ELANG INDAH  11-Mar-15 KL Gas Lift Compressor Project  PT PERTAMINA HULU ENERGI ONWJ 580 PT MEINDO ELANG INDAH  23-Jun-15 KL Gas Lift Compressor Project  PT PERTAMINA HULU ENERGI ONWJ 

581 PT MEINDO ELANG INDAH  13-Apr-15

PROVISION OF EPCI FOR MODIFICATION

OF TOPSIDE FLOWLINE CONNECTION

PROJECT 

BUT PREMIER OIL NATUNA SEA BV 

582 PT MEINDO ELANG INDAH  14-Jul-15 Ruby Field Development Project  BUT PEARLOIL (SEBUKU) LTD 

583 PT MEINDO ELANG INDAH  13-May-15SOUTH MAHAKAM DEVELOPMENT

PROJECT/PHASE 3 PT TOTAL E&P INDONESIE 

584 PT MULTI CIPTA KREASI  13-Oct-15PT PLN (PERSERO) PUSAT PENELITIAN DAN

PENGEMBANGAN KETENAGALISTRIKAN 585 PT MULTI KREASI ENGINEERING  07-Jul-15 PT TRANSPORTASI GAS INDONESIA 586 PT MULTI KREASI ENGINEERING  01-Sep-15 KANGEAN ENERGY INDONESIA, LTD. 587 PT MULTI KREASI ENGINEERING  01-Sep-15 KANGEAN ENERGY INDONESIA, LTD. 588 PT MULTI KREASI ENGINEERING  21-Sep-15 PT TRANSPORTASI GAS INDONESIA 589 PT MULTI LINTASAN MANDIRI  26-Jan-15 Cophi/Suban Mid Term  BUT CONOCOPHILLIPS INDONESIA INC. LTD 

590 PT NINDYA KARYA (PERSERO)  23-Oct-15UPGRADING TANGSI OFFTAKE STATION

PROJECT (CP11A) PT PERUSAHAAN GAS NEGARA (PERSERO) TBK 

591 PT PATRA BADAK ARUN SOLUSI  17-Feb-15 PT PERTAMINA ( PERSERO ) 

Page 20: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

592 PT PATRA BADAK ARUN SOLUSI  13-Apr-15 PT PERTAMINA UP IV CILACAP 593 PT PATRA BADAK ARUN SOLUSI  15-Jun-15 PT PERTAMINA UP IV CILACAP 594 PT PATRA BADAK ARUN SOLUSI  24-Jun-15595 PT PERTAMINA ( PERSERO )  06-Oct-15 RFCC Project 596 PT PETROTEC REKAYASA DINAMIKA  07-Jul-15 PT PERTAMINA UP VI BALONGAN 597 PT PETROWOOD BANGUN MANDIRI  07-Aug-15 PT PUMA ENERGY SINGAPORE PTE LTD 598 PT PRAJUGO PUTRA PERKASA  10-Mar-15 PT KOMIPO PEMBANGKITAN JAWA BALI (KPJB) 599 PT PRAJUGO PUTRA PERKASA  06-May-15 PT KOMIPO PEMBANGKITAN JAWA BALI (KPJB) 600 PT PRAKARSALANGGENG MAJUBERSAMA  23-Mar-15 Separator Skid Project  BUT PETROCHINA INTERNATIONAL JABUNG LTD 601 PT PRAKARSALANGGENG MAJUBERSAMA  23-Mar-15 Separator Skid Project  BUT PETROCHINA INTERNATIONAL JABUNG LTD 602 PT PRAKARSALANGGENG MAJUBERSAMA  23-Mar-15 Separator Skid Project  BUT PETROCHINA INTERNATIONAL JABUNG LTD 603 PT PRAKARSALANGGENG MAJUBERSAMA  23-Mar-15 Separator Skid Project  BUT PETROCHINA INTERNATIONAL JABUNG LTD 604 PT PRATIWI PUTRI SULUNG  9-Jan-15 PT PGAS SOLUTION 605 PT PRATIWI PUTRI SULUNG  04-May-15 PT PERUSAHAAN GAS NEGARA (PERSERO) TBK 606 PT PRATIWI PUTRI SULUNG  8-May-15 PT PERUSAHAAN GAS NEGARA (PERSERO) TBK 

607 PT PROMATCON TEPATGUNA  22-Apr-15Pengadaan 2 Unit Pressure Vessel cw

Media Filter di Asset 1 Rantau Field PT PERTAMINA EP ASSET 1 

608 PT PUTRA ARTHA MANDIRI  21-Aug-15 PT PERTAMINA UP III PLAJU 609 PT PUTRA DHARMA HARMOTEKNIK  15-Jun-15 CO2 Removal Plant SP Field Subang  PT PERTAMINA EP ASSET 3 610 PT REKAYASA ENGINEERING  06-Aug-15 CT LOAD CONTROL IMPROVEMENT #2  PT MANDAU CIPTA TENAGA NUSANTARA 

611 PT REKAYASA ENGINEERING  26-Mar-15PEKERJAAN LOAD CONTROL

IMPROVEMENT STUDY PT MANDAU CIPTA TENAGA NUSANTARA 

612 PT REKAYASA ENGINEERING  26-Mar-15 PEKERJAAN MINI FAT FOR CIRS IP   PT MANDAU CIPTA TENAGA NUSANTARA 613 PT REKAYASA ENGINEERING  24-Apr-15 PEKERJAAN MODBUS POINT TESTING  PT MANDAU CIPTA TENAGA NUSANTARA 

614 PT REKAYASA ENGINEERING  26-Mar-15PEKERJAAN NOTIFICATION AUTO

UNLOAD PT MANDAU CIPTA TENAGA NUSANTARA 

615 PT REKAYASA ENGINEERING  26-Mar-15PEKERJAAN OVATION CONNECTION TO

CWWS PT MANDAU CIPTA TENAGA NUSANTARA 

616 PT REKAYASA INDUSTRI  18-Feb-15 Banyu Urip Project  BUT EXXONMOBIL CEPU LIMITED 

617 PT REKAYASA INDUSTRI  16-Jul-15EPCC Ulubelu Unit 3&4 Geothermal

Power PROJECT PT PERTAMINA GEOTHERMAL ENERGY AREA ULUBELU 

618 PT REKAYASA INDUSTRI  16-Jul-15EPCC Ulubelu Unit 3&4 Geothermal

Power PROJECT PT PERTAMINA GEOTHERMAL ENERGY AREA ULUBELU 

619 PT REKAYASA INDUSTRI  25-Sep-15EPCC Ulubelu Unit 3&4 Geothermal

Power PROJECT PT PERTAMINA GEOTHERMAL ENERGY AREA ULUBELU 

620 PT REKAYASA INDUSTRI  22-Oct-15EPCC Ulubelu Unit 3&4 Geothermal

Power PROJECT PT PERTAMINA GEOTHERMAL ENERGY AREA ULUBELU 

621 PT REKAYASA INDUSTRI  25-Sep-15LAHENDONG UNIT 5&6 GEOTHERMAL

POWER PROJECT PT PERTAMINA GEOTHERMAL ENERGY ( LAHENDONG ) 

Page 21: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

622 PT REKAYASA INDUSTRI  29-Oct-15LAHENDONG UNIT 5&6 GEOTHERMAL

POWER PROJECT PT PERTAMINA GEOTHERMAL ENERGY ( LAHENDONG ) 

623 PT REKAYASA INDUSTRI  10-Jul-15Pembangunan Pabrik Gula Terpadu

Glenmore PT INDUSTRI GULA GLENMORE 

624 PT REKAYASA INDUSTRI  27-Mar-15 PUSRI/II B PROJECT  PT PUPUK SRIWIDJAJA 625 PT REKAYASA INDUSTRI  16-Apr-15 PUSRI/II B PROJECT  PT PUPUK SRIWIDJAJA 626 PT REKAYASA INDUSTRI  28-Apr-15 PUSRI/II B PROJECT  PT PUPUK SRIWIDJAJA 627 PT REKAYASA INDUSTRI  01-Jul-15 PUSRI/II B PROJECT  PT PUPUK SRIWIDJAJA 628 PT REKAYASA INDUSTRI  22-Jan-15 STG And Boiler Batubara Project  PT PUPUK SRIWIDJAJA 629 PT REKAYASA INDUSTRI  11-Feb-15 STG And Boiler Batubara Project  PT PUPUK SRIWIDJAJA 630 PT REKAYASA INDUSTRI  24-Jul-15 Sumpal Compresion Project  BUT CONOCOPHILLIPS INDONESIA INC. LTD 631 PT REKAYASA INDUSTRI  28-Sep-15 Sumpal Compresion Project  BUT CONOCOPHILLIPS (GRISSIK) LTD 632 PT REKAYASA INDUSTRI  07-Apr-15633 PT SAS INTERNATIONAL  29-Sep-15 BUT PETROCHINA INTERNATIONAL JABUNG LTD 634 PT SATYAMITRA SURYA PERKASA  02-Nov-15 Bukit Tua Project  PC KETAPANG II LTD 635 PT SLIPFORM INDONESIA  10-Mar-15 Sengkang LNG Plant Project  BUT ENERGY EQUITY EPIC ( SENGKANG) PTY.LTD 636 PT SUPLINTAMA MAJUSEMESTA  23-Apr-15 Bangka Topside Project  BUT CHEVRON INDONESIA COMPANY 637 PT SURYA CIPTA TEKNIK  16-Jun-15 PT PERTA ARUN GAS 638 PT SURYA CIPTA TEKNIK  16-Jun-15 PT PERTA ARUN GAS 639 PT SWING INDONESIA  18-Feb-15 WWTP Project 640 PT SWING INDONESIA  10-Mar-15 WWTP Project 641 PT SWING INDONESIA  11-Nov-15 PT MITSUBISHI MOTOR INDONESIA 642 PT TECHNIP INDONESIA  16-Feb-15 Bukit Tua Project  PC KETAPANG II LTD 643 PT TECHNIP INDONESIA  24-Jun-15 Jangkrik Complex Porject ( ENI)  PT ENI MUARA BAKAU BV 644 PT TECHNIP INDONESIA  24-Jun-15 Jangkrik Complex Porject ( ENI)  PT ENI MUARA BAKAU BV 645 PT TECHNIP INDONESIA  22-Oct-15 Jangkrik Complex Project  PT ENI MUARA BAKAU BV 

646 PT TIMAS SUPLINDO  21-Oct-15PENGADAAN 2 UNIT HORIZONTAL

HEATER TREATER V/1000 & V/2000 PT PERTAMINA EP 

647 PT TIMAS SUPLINDO  28-Oct-15PENGADAAN 2 UNIT HORIZONTAL

HEATER TREATER V/1000 & V/2000 PT PERTAMINA EP 

648 PT TIMAS SUPLINDO  22-Jun-15Penggantian Grease Plant di Unit Produksi

Pelumas PT PERTAMINA ( PERSERO ) 

649 PT TIMAS SUPLINDO  22-Jun-15Penggantian Grease Plant di Unit Produksi

Pelumas PT PERTAMINA ( PERSERO ) 

650 PT TIMAS SUPLINDO  31-Aug-15Penggantian Grease Plant di Unit Produksi

Pelumas PT PERTAMINA ( PERSERO ) 

651 PT TIMAS SUPLINDO  13-Feb-15Penggantian Grease Plant Unit Produk.

Pelumas JKT PT PERTAMINA ( PERSERO ) 

Page 22: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

652 PT TIMAS SUPLINDO  17-Mar-15Penggantian Grease Plant Unit Produk.

Pelumas JKT PT PERTAMINA ( PERSERO ) 

653 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  13-Feb-15 Banyu Urip Project  PT MOBIL CEPU LTD 

654 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  25-Feb-15 Banyu Urip Project  PT MOBIL CEPU LTD 

655 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  27-Feb-15 Banyu Urip Project  PT MOBIL CEPU LTD 

656 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  27-Feb-15 Banyu Urip Project  PT MOBIL CEPU LTD 

657 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  16-Mar-15 Banyu Urip Project  PT MOBIL CEPU LTD 

658 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  18-Mar-15 Banyu Urip Project  PT MOBIL CEPU LTD 

659 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  01-Apr-15 Banyu Urip Project  PT MOBIL CEPU LTD 

660 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  11-May-15 Banyu Urip Project  PT MOBIL CEPU LTD 

661 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  12-May-15 Banyu Urip Project  PT MOBIL CEPU LTD 

662 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  13-May-15 Banyu Urip Project  PT MOBIL CEPU LTD 

663 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  18-May-15 Banyu Urip Project  PT MOBIL CEPU LTD 

664 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  24-Jun-15 Banyu Urip Project  PT MOBIL CEPU LTD 

665 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  10-Jul-15 Banyu Urip Project  PT MOBIL CEPU LTD 

666 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  16-Jul-15 Banyu Urip Project  PT MOBIL CEPU LTD 

667 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  27-Jul-15 Banyu Urip Project  PT MOBIL CEPU LTD 

668 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  29-Sep-15 Banyu Urip Project  BUT EXXONMOBIL CEPU LIMITED 

669 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  30-Sep-15 Banyu Urip Project  BUT EXXONMOBIL CEPU LIMITED 

670 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  18-Nov-15 Banyu Urip Project  BUT EXXONMOBIL CEPU LIMITED 

Page 23: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

671 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  21-Sep-15 SENORO GAS DEVELOPMENT PROJECT  PT JOB PERTAMINA MEDCO TOMORI SULAWESI 

672 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  13-Oct-15 SENORO GAS DEVELOPMENT PROJECT  PT JOB PERTAMINA MEDCO TOMORI SULAWESI 

673 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  02-Mar-15

674 PT TRIPATRA ENGINEERS AND CONSTRUCTORS  07-Apr-15

675 PT WELTES ENERGI NUSANTARA  13-Jan-15 Pabrik Gula Komering ( LPI) 

676PT WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING 06-Aug-15 JATA GAS MONETIZATION PROJECT  PT MEDCO E&P INDONESIA 

677PT WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING 19-Aug-15 JATA GAS MONETIZATION PROJECT  PT MEDCO E&P INDONESIA 

678PT WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING 19-Aug-15 JATA GAS MONETIZATION PROJECT  PT MEDCO E&P INDONESIA 

679PT WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING 24-Aug-15 JATA GAS MONETIZATION PROJECT  PT MEDCO E&P INDONESIA 

680PT WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING 17-Sep-15

YAKIN ELECTRICAL POWER GAS

GENERATOR BUT CHEVRON INDONESIA COMPANY 

681PT WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING 11-Feb-15 BUT CHEVRON INDONESIA COMPANY 

682PT WIFGASINDO DINAMIKA INSTRUMENT

ENGINEERING 23-Mar-15 PT TOTAL E&P INDONESIE 

683 PT WIJAYA KARYA (Persero), Tbk  25-Aug-15 EPC PROJECT NDD AREA 13  PT CHEVRON PACIFIC INDONESIA 

684 PT WIJAYA KARYA (Persero), Tbk  21-Aug-15PENGEMBANGAN TERMINAL BBM PULAU

SAMBU PT PERTAMINA EP 

685 PT WIJAYA KARYA (Persero), Tbk  8-Sep-15Penggantian Pipanisasi CB/I Tasikmalaya

UjungBerung PT PERTAMINA ( PERSERO ) 

686 PT WIJAYA KARYA (Persero), Tbk  26-Mar-15Proyek Pengembangan TBBM Pulau

Sambu PT PERTAMINA EP 

687 PT WIJAYA KARYA (Persero), Tbk  26-Mar-15Proyek Pengembangan TBBM Pulau

Sambu PT PERTAMINA ( PERSERO ) 

688 PT WIJAYA KARYA (Persero), Tbk  26-Mar-15Proyek Pengembangan TBBM Pulau

Sambu PT PERTAMINA ( PERSERO ) 

689 PT WIJAYA KARYA (Persero), Tbk  8-May-15PULAU SAMBU FUEL STORAGE TERMINAL

REFURBISHMENT PROJECT PT PERTAMINA ( PERSERO ) 

690 PT WIJAYA KARYA (Persero), Tbk  21-Apr-15 Pulau Sambu Project  PT PERTAMINA ( PERSERO ) 691 PT WIJAYA KARYA (Persero), Tbk  21-Apr-15 Pulau Sambu Project  PT PERTAMINA ( PERSERO ) 692 PT WIJAYA KARYA (Persero), Tbk  10-Apr-15

Page 24: Date No Company Name End User Project Orderedapps.pp-epc.com/eproc/upload_file/register/1461643128_7CB532469E... · PUPUK KALIMANTAN TIMUR Tbk. coal bailer plant project 23 REKAYASA

693 PT YUAN SEJATI  26-Jun-15 PT PERTAMINA EP ASSET 2 694 PT YUAN SEJATI  03-Jul-15 PT PERTAMINA EP ASSET 2 695 REKIND MALAYSIA SDN BHD  18-Sep-15 SAMUR PROJECT  PT PETRONAS 696 SAMSUNG ENGINEERING CO., LTD  18-Feb-15 Banyu Urip Project  BUT EXXONMOBIL CEPU LIMITED 697 SAMSUNG ENGINEERING CO., LTD  15-Jun-15 Banyu Urip Project  PT MOBIL CEPU LTD 698 SAMSUNG ENGINEERING CO., LTD  30-Jun-15 Banyu Urip Project  PT MOBIL CEPU LTD 699 SAMSUNG ENGINEERING CO., LTD  8-Jul-15 Banyu Urip Project  PT MOBIL CEPU LTD 700 SAMSUNG ENGINEERING CO., LTD  15-Oct-15 Banyu Urip Project  BUT EXXONMOBIL CEPU LIMITED 701 SAMSUNG ENGINEERING CO., LTD  18-Jun-15 SENORO GAS DEVELOPMENT PROJECT  PT JOB PERTAMINA MEDCO TOMORI SULAWESI 702 SAMSUNG ENGINEERING CO., LTD  22-Oct-15 SENORO GAS DEVELOPMENT PROJECT  PT MEDCO E&P INDONESIA 703 SANGGAR SARANA BAJA  10-Jul-15 SANGGAR SARANA BAJA 

704STC JOINT OPERATION (SAIPEM TRIPATRA

CHIYODA JOINT OPERATION) 27-Feb-15 Jangkrik Complex Porject ( ENI)  PT ENI MUARA BAKAU BV 

705STC JOINT OPERATION (SAIPEM TRIPATRA

CHIYODA JOINT OPERATION) 17-Mar-15 Jangkrik Complex Porject ( ENI) 

706STC JOINT OPERATION (SAIPEM TRIPATRA

CHIYODA JOINT OPERATION) 22-May-15 Jangkrik Complex Project  PT ENI MUARA BAKAU BV 