Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
LS 1 $50,000.00 $50,000.00 $395,000.00 $395,000.00 $345,000.00 $345,000.00FIELD EQUIPMENT0130.162
AN 1 $750,000.00 $750,000.00 $750,000.00 $750,000.00 $0.00 $0.00PEDESTRIAN TRAFFICMAINTENANCE
0130.406
AN 1 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.429
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00ELECTRIC COMPANY0130.436
FP 1 $665,302.13 $665,302.13 $665,302.13 $665,302.13 $0.00 $0.00MOBILIZATION0170.101
SY 1,000 $35.00 $35,000.00 $70.00 $70,000.00 $35.00 $35,000.00REMOVAL AND DISPOSAL OFASPHALT PAVEMENT AT PLATFORMAND SIDEWALK LOCATIONS
0211.013
EA 360 $500.00 $180,000.00 $600.00 $216,000.00 $100.00 $36,000.00UTILITY STRUCTURE ADJUSTED0211.430
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00BOSTON WATER AND SEWERCOMMISSION UTILITIES
0211.472
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00TRANSPORTATION & DISPOSAL OFHAZARDOUS MATERIALS
0212.147
Page 1 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
A 4 $10,000.00 $35,000.00 $5,000.00 $17,500.00 ($5,000.00) ($17,500.00)CLEARING AND VEGETATIONCONTROL
0213.020
SY 2,000 $150.00 $300,000.00 $450.00 $900,000.00 $300.00 $600,000.00FULL DEPTH PAVEMENT PATCH(LESS THAN 1,000 SY)
0216.111
SY 4,000 $100.00 $400,000.00 $100.00 $400,000.00 $0.00 $0.00FULL DEPTH PAVEMENTRECONSTRUCTION (MORE THAN1,000 SY)
0216.112
SY 2,500 $5.50 $13,750.00 $52.00 $130,000.00 $46.50 $116,250.001.5'' PAVEMENT MILLING0216.120
SY 3,000 $6.50 $19,500.00 $59.00 $177,000.00 $52.50 $157,500.002'' PAVEMENT MILLING0216.121
EA 675 $175.00 $118,125.00 $250.00 $168,750.00 $75.00 $50,625.00SILT SACK0221.052
SY 1,100 $5.00 $5,500.00 $47.00 $51,700.00 $42.00 $46,200.00GRADING AND COMPACTION0221.201
CY 4,500 $35.00 $157,500.00 $85.00 $382,500.00 $50.00 $225,000.00UNCLASSIFIED EXCAVATION0222.003
CY 450 $95.00 $42,750.00 $825.00 $371,250.00 $730.00 $328,500.00TEST PITS0222.442
Page 2 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
CY 180 $125.00 $22,500.00 $125.00 $22,500.00 $0.00 $0.00LIGHTWEIGHT AGGREGATE0222.470
CY 810 $40.00 $32,400.00 $32.00 $25,920.00 ($8.00) ($6,480.00)ORDINARY BORROW0222.501
CY 7,000 $40.00 $280,000.00 $61.00 $427,000.00 $21.00 $147,000.00GRAVEL BORROW0222.504
EA 22 $2,500.00 $55,000.00 $3,600.00 $79,200.00 $1,100.00 $24,200.00PRECAST DRAIN MANHOLE0222.522
EA 25 $1,005.00 $25,125.00 $1,500.00 $37,500.00 $495.00 $12,375.00CATCH BASIN OR MANHOLECHANGE IN TYPE
0222.530
EA 25 $1,500.00 $37,500.00 $1,400.00 $35,000.00 ($100.00) ($2,500.00)CATCH BASIN OR MANHOLEREMODELED
0222.531
EA 25 $500.00 $12,500.00 $750.00 $18,750.00 $250.00 $6,250.00CATCH BASIN, MANHOLE ORLEACHING BASIN -ADJUST TO LINE AND/OR GRADE
0222.540
EA 300 $250.00 $75,000.00 $800.00 $240,000.00 $550.00 $165,000.00FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
CY 1,000 $50.00 $50,000.00 $75.00 $75,000.00 $25.00 $25,000.00LOAM BORROW0222.550
Page 3 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
CY 360 $45.00 $16,200.00 $95.00 $34,200.00 $50.00 $18,000.003/4" CRUSHED STONE0222.596
EA 40 $850.00 $34,000.00 $1,250.00 $50,000.00 $400.00 $16,000.00INSTALL MBTA MANHOLE FRAMESAND COVERS
0225.110
CY 300 $150.00 $45,000.00 $300.00 $90,000.00 $150.00 $45,000.00FLOWABLE FILL0227.010
EA 150 $300.00 $45,000.00 $3,750.00 $562,500.00 $3,450.00 $517,500.00BOLLARDS0234.195
SF 300 $500.00 $150,000.00 $375.00 $112,500.00 ($125.00) ($37,500.00)RETAINING WALL - A0242.141
EA 150 $300.00 $45,000.00 $1,250.00 $187,500.00 $950.00 $142,500.00CLEANING DRAINAGE STRUCTURES0250.001
EA 25 $3,500.00 $87,500.00 $2,400.00 $60,000.00 ($1,100.00) ($27,500.00)CATCH BASIN TYPE A0250.094
EA 25 $3,500.00 $87,500.00 $2,400.00 $60,000.00 ($1,100.00) ($27,500.00)CATCH BASINS MUNICIPALSTANDARD
0250.101
EA 45 $1,500.00 $67,500.00 $1,650.00 $74,250.00 $150.00 $6,750.00DRAIN INLET0250.985
Page 4 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
LF 2,000 $60.00 $120,000.00 $30.00 $60,000.00 ($30.00) ($60,000.00)12" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 450 $60.00 $27,000.00 $40.00 $18,000.00 ($20.00) ($9,000.00)12" PVC PIPE0251.593
LF 200 $100.00 $20,000.00 $75.00 $15,000.00 ($25.00) ($5,000.00)18" PVC DRAIN PIPE SCHEDULE 400251.718
LF 180 $110.00 $19,800.00 $30.00 $5,400.00 ($80.00) ($14,400.00)10" DUCTILE IRON PIPE0251.774
LF 450 $150.00 $67,500.00 $40.00 $18,000.00 ($110.00) ($49,500.00)15" DUCTILE IRON PIPE0251.775
LF 2,500 $120.00 $300,000.00 $35.00 $87,500.00 ($85.00) ($212,500.00)12" DUCTILE IRON PIPE0251.818
EA 60 $850.00 $51,000.00 $1,250.00 $75,000.00 $400.00 $24,000.00FRAME AND GRATE OR COVER- MUNICIPAL STANDARD
0255.077
EA 10 $1,500.00 $15,000.00 $4,000.00 $40,000.00 $2,500.00 $25,000.00DROP INLET0255.088
EA 16 $3,000.00 $48,000.00 $2,400.00 $38,400.00 ($600.00) ($9,600.00)MANHOLES MUNICIPAL STANDARD0255.100
Page 5 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
VF 36 $1,150.00 $41,400.00 $950.00 $34,200.00 ($200.00) ($7,200.00)DRAINAGE STRUCTURE REBUILT0255.604
LF 6,000 $2.00 $12,000.00 $21.00 $126,000.00 $19.00 $114,000.00SAW CUTTING BITUMINOUSCONCRETE
0261.115
LF 9,000 $2.00 $18,000.00 $8.00 $72,000.00 $6.00 $54,000.00SAW CUTTING CEMENT CONCRETE0261.120
SY 4,000 $6.00 $24,000.00 $20.00 $80,000.00 $14.00 $56,000.00RECLAIMED BASE COURSE0261.165
TN 8,300 $300.00 $2,490,000.00 $180.00 $1,494,000.00 ($120.00) ($996,000.00)BITUMINOUS CONCRETEPAVING-BUSWAY
0261.180
TN 4,000 $200.00 $800,000.00 $195.00 $780,000.00 ($5.00) ($20,000.00)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1 TOP COURSE
0261.192
TN 120 $200.00 $24,000.00 $350.00 $42,000.00 $150.00 $18,000.00CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1LEVELING COURSE
0261.196
TN 2,000 $200.00 $400,000.00 $180.00 $360,000.00 ($20.00) ($40,000.00)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
TN 90 $300.00 $27,000.00 $690.00 $62,100.00 $390.00 $35,100.00CLASS I BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 TOP COURSE- HAND OPERATION
0261.204
Page 6 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
GL 650 $9.00 $5,850.00 $15.00 $9,750.00 $6.00 $3,900.00BITUMEN FOR TACK0261.331
LF 20,000 $44.60 $892,000.00 $10.00 $200,000.00 ($34.60) ($692,000.00)GRANITE CURB STRAIGHT0262.180
LF 3,000 $50.00 $150,000.00 $15.00 $45,000.00 ($35.00) ($105,000.00)GRANITE CURB CURVED0262.185
LF 15,000 $60.00 $900,000.00 $15.00 $225,000.00 ($45.00) ($675,000.00)GRANITE TRANSITION CURB0262.251
LF 1,000 $28.00 $28,000.00 $15.00 $15,000.00 ($13.00) ($13,000.00)CONCRETE CURB - STRAIGHT0262.300
LF 2,870 $32.00 $91,840.00 $20.00 $57,400.00 ($12.00) ($34,440.00)CONCRETE CURB - CURVED0262.310
LF 1,500 $31.00 $46,500.00 $75.00 $112,500.00 $44.00 $66,000.00CURBING - REMOVE AND RESET0262.701
LF 6,075 $7.00 $42,525.00 $7.10 $43,132.50 $0.10 $607.50CURBING - REMOVE AND DISCARD0262.720
LF 1,500 $100.00 $150,000.00 $10.00 $15,000.00 ($90.00) ($135,000.00)BITUMINOUS CONCRETE CURBTYPE 2
0262.799
Page 7 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
SY 12,500 $189.00 $2,362,500.00 $45.00 $562,500.00 ($144.00) ($1,800,000.00)CONCRETE SIDEWALK0263.015
SF 8,000 $64.00 $512,000.00 $25.00 $200,000.00 ($39.00) ($312,000.00)TACTILE WARNING STRIP0263.116
SF 1,350 $80.00 $108,000.00 $27.50 $37,125.00 ($52.50) ($70,875.00)TACTILE WARNING STRIP- CASTIRON
0263.118
SY 5,000 $220.00 $1,100,000.00 $42.50 $212,500.00 ($177.50) ($887,500.00)CONCRETE SIDEWALKS0263.150
EA 1,500 $1,145.00 $1,717,500.00 $25.00 $37,500.00 ($1,120.00) ($1,680,000.00)PEDESTRIAN RAMP0263.180
LF 3,000 $45.00 $135,000.00 $65.00 $195,000.00 $20.00 $60,000.00CHAIN LINK FENCE- REMOVE AND RESET
0271.026
LF 2,500 $75.00 $187,500.00 $75.00 $187,500.00 $0.00 $0.0072" CHAIN LINK FENCE0271.072
LF 900 $50.00 $45,000.00 $75.00 $67,500.00 $25.00 $22,500.00CHAIN LINK FENCE0271.110
SY 1,100 $2.00 $2,200.00 $10.00 $11,000.00 $8.00 $8,800.00SEEDING0282.150
Page 8 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
LF 5,062 $7.50 $37,965.00 $5.00 $25,310.00 ($2.50) ($12,655.00)EROSION CONTROL SYSTEM0282.202
CY 450 $25.00 $11,250.00 $60.00 $27,000.00 $35.00 $15,750.00SHREDDED BARK MULCH0282.407
EA 15 $1,200.00 $18,000.00 $1,000.00 $15,000.00 ($200.00) ($3,000.00)TREES REMOVED - UNDER 24"0284.100
EA 15 $2,500.00 $37,500.00 $2,000.00 $30,000.00 ($500.00) ($7,500.00)TREES REMOVED - OVER 24"0284.101
EA 18 $200.00 $3,600.00 $350.00 $6,300.00 $150.00 $2,700.00STUMPS REMOVED0284.110
EA 15 $2,500.00 $37,500.00 $10,000.00 $150,000.00 $7,500.00 $112,500.00CONCRETE FOUNDATION- MBTASTANDARD BUS SHELTER
0334.121
EA 15 $2,000.00 $30,000.00 $9,000.00 $135,000.00 $7,000.00 $105,000.00CONCRETE FOUNDATION- MBTANARROW BUS SHELTER
0334.122
EA 30 $3,000.00 $90,000.00 $9,000.00 $270,000.00 $6,000.00 $180,000.00CONCRETE FOUNDATION- JCDECAUEX STANDARD BUS SHELTER
0334.123
LF 2,500 $90.00 $225,000.00 $65.00 $162,500.00 ($25.00) ($62,500.00)12" REINFORCED CONCRETE PIPECLASS IV
0348.412
Page 9 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
LF 1,000 $100.00 $100,000.00 $70.00 $70,000.00 ($30.00) ($30,000.00)18" REINFORCED CONCRETE PIPECLASS IV
0348.418
SF 2,000 $25.00 $50,000.00 $25.00 $50,000.00 $0.00 $0.00BRICK PAVING0426.154
LF 450 $5.00 $2,250.00 $10.00 $4,500.00 $5.00 $2,250.00REMOVE HIGHWAY GUARD0590.050
LF 450 $30.00 $13,500.00 $65.00 $29,250.00 $35.00 $15,750.00STEEL BEAM HIGHWAY GUARD- TYPE SS
0590.198
EA 8 $60.00 $480.00 $3,000.00 $24,000.00 $2,940.00 $23,520.00HIGHWAY GUARD STEEL BEAMTERMINAL SECTION
0590.202
LF 1,500 $1.25 $1,875.00 $2.00 $3,000.00 $0.75 $1,125.006" REFLECTORIZED YELLOW LINE1040.704
SF 15,200 $40.00 $608,000.00 $5.00 $76,000.00 ($35.00) ($532,000.00)REFLECTORIZED WHITE LINECROSSWALKS AND STOPS
1040.707
LF 1,500 $1.00 $1,500.00 $2.00 $3,000.00 $1.00 $1,500.004" REFLECTORIZED THERMOPLASTICWHITE LINE
1040.738
LF 1,500 $1.25 $1,875.00 $2.25 $3,375.00 $1.00 $1,500.006" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.739
Page 10 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
LF 35,000 $3.11 $108,850.00 $0.01 $350.00 ($3.10) ($108,500.00)12" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.740
LF 1,500 $1.00 $1,500.00 $2.00 $3,000.00 $1.00 $1,500.004" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.760
LF 400 $4.00 $1,600.00 $3.80 $1,520.00 ($0.20) ($80.00)12" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.765
AN 1 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $0.00 $0.00COLORED PAVEMENTMARKING-BUSWAY
1040.905
SF 200 $400.00 $80,000.00 $12.00 $2,400.00 ($388.00) ($77,600.00)PAVEMENT ARROWS1040.912
SF 6,750 $1.75 $11,812.50 $4.50 $30,375.00 $2.75 $18,562.50PAVEMENT MARKING REMOVAL1040.920
EA 700 $250.00 $175,000.00 $125.00 $87,500.00 ($125.00) ($87,500.00)BUS STOP SIGNS AND ATTACHMENTHARDWARE
1041.120
SF 4,000 $15.00 $60,000.00 $10.00 $40,000.00 ($5.00) ($20,000.00)TRAFFIC SIGN, ALUMINUMPANEL - TYPE A
1041.262
EA 700 $275.00 $192,500.00 $75.00 $52,500.00 ($200.00) ($140,000.00)P-5 SIGN SUPPORT1041.336
Page 11 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
EA 400 $300.00 $120,000.00 $65.00 $26,000.00 ($235.00) ($94,000.00)2" SIGN POST1041.350
SF 2,000 $15.00 $30,000.00 $25.00 $50,000.00 $10.00 $20,000.00DIRECTIONAL SIGNS1041.619
SF 3,000 $15.00 $45,000.00 $12.00 $36,000.00 ($3.00) ($9,000.00)WARNING AND REGULATORY SIGNS(PERMANENT)
1041.640
EA 400 $250.00 $100,000.00 $50.00 $20,000.00 ($200.00) ($80,000.00)SIGN AND SIGN SUPPORT REMOVED1042.089
EA 350 $225.00 $78,750.00 $85.00 $29,750.00 ($140.00) ($49,000.00)SIGNS - REMOVE AND RESET1042.100
EA 350 $30.00 $10,500.00 $20.00 $7,000.00 ($10.00) ($3,500.00)SIGNS - REMOVE AND STACK1042.110
EA 38 $1,000.00 $38,000.00 $2,950.00 $112,100.00 $1,950.00 $74,100.00BENCHES - REMOVE AND RESET1050.215
EA 25 $6,500.00 $162,500.00 $7,500.00 $187,500.00 $1,000.00 $25,000.00PASSENGER SHELTER- REMOVE AND RESET
1076.021
EA 20 $1,500.00 $30,000.00 $4,925.00 $98,500.00 $3,425.00 $68,500.00TRASH RECEPTACLE1098.020
Page 12 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
EA 20 $2,500.00 $50,000.00 $3,950.00 $79,000.00 $1,450.00 $29,000.00BICYCLE RACK1112.000
EA 10 $400.00 $4,000.00 $2,000.00 $20,000.00 $1,600.00 $16,000.00BICYCLE RACK -- REMOVE ANDRESET
1112.002
EA 40 $500.00 $20,000.00 $250.00 $10,000.00 ($250.00) ($10,000.00)PARKING METERS -REMOVE AND STACK
1185.201
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00ELECTRICAL WORK1600.359
LF 1,000 $100.00 $100,000.00 $40.00 $40,000.00 ($60.00) ($60,000.00)2" PVC SCHEDULE 80 CONDUIT1615.102
LF 500 $110.00 $55,000.00 $45.00 $22,500.00 ($65.00) ($32,500.00)3" PVC SCHEDULE 80 CONDUIT1615.103
LF 500 $120.00 $60,000.00 $50.00 $25,000.00 ($70.00) ($35,000.00)4" PVC SCHEDULE 80 CONDUIT1615.104
LF 1,000 $60.00 $60,000.00 $55.00 $55,000.00 ($5.00) ($5,000.00)2" RIGID STEEL CONDUIT1619.204
LF 500 $82.00 $41,000.00 $80.00 $40,000.00 ($2.00) ($1,000.00)3" RIGID STEEL CONDUIT1619.206
Page 13 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2880
06/18/2019
Sps New England, Inc.
LF 500 $86.00 $43,000.00 $110.00 $55,000.00 $24.00 $12,000.004" RIGID STEEL CONDUIT1619.207
EA 75 $800.00 $60,000.00 $1,440.00 $108,000.00 $640.00 $48,000.00HANDHOLE - TYPE A1622.025
EA 25 $1,000.00 $25,000.00 $3,700.00 $92,500.00 $2,700.00 $67,500.00HANDHOLE - TYPE B1622.026
EA 100 $500.00 $50,000.00 $2,000.00 $200,000.00 $1,500.00 $150,000.00LIGHT POLE BASE1640.090
EA 100 $2,000.00 $200,000.00 $2,500.00 $250,000.00 $500.00 $50,000.00HIGHWAY LIGHT POST 24 FTCONCRETE WITH ONE SLIP OVERTYPE BRACKET - MUNICIPAL STD
1642.982
EA 30 $60,000.00 $1,800,000.00 $40,000.00 $1,200,000.00 ($20,000.00) ($600,000.00)SIGNALIZED PEDESTRIANCROSSING- RRFB
1651.140
EA 10 $60,000.00 $600,000.00 $35,000.00 $350,000.00 ($25,000.00) ($250,000.00)SIGNALIZED PEDESTRIANCROSSING- LED EDGE LIT FLASHINGSIGN
1651.144
RA 1 $1.00 $1.00 $1.00 $1.00 $0.00 $0.00RISK ALLOWANCE6500.000
$19,393,560.63 ($5,662,015.00)$25,055,575.63Total Estimate Contract Base Bid:
$19,393,560.63 ($5,662,015.00)$25,055,575.63Contract Total - Base Bid and Alternates:
Page 14 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
LS 1 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $0.00 $0.00FIELD EQUIPMENT0130.162
AN 1 $750,000.00 $750,000.00 $750,000.00 $750,000.00 $0.00 $0.00PEDESTRIAN TRAFFICMAINTENANCE
0130.406
AN 1 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.429
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00ELECTRIC COMPANY0130.436
FP 1 $665,302.13 $665,302.13 $665,302.13 $665,302.13 $0.00 $0.00MOBILIZATION0170.101
SY 1,000 $35.00 $35,000.00 $100.00 $100,000.00 $65.00 $65,000.00REMOVAL AND DISPOSAL OFASPHALT PAVEMENT AT PLATFORMAND SIDEWALK LOCATIONS
0211.013
EA 360 $500.00 $180,000.00 $15.00 $5,400.00 ($485.00) ($174,600.00)UTILITY STRUCTURE ADJUSTED0211.430
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00BOSTON WATER AND SEWERCOMMISSION UTILITIES
0211.472
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00TRANSPORTATION & DISPOSAL OFHAZARDOUS MATERIALS
0212.147
Page 15 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
A 4 $10,000.00 $35,000.00 $5,000.00 $17,500.00 ($5,000.00) ($17,500.00)CLEARING AND VEGETATIONCONTROL
0213.020
SY 2,000 $150.00 $300,000.00 $80.00 $160,000.00 ($70.00) ($140,000.00)FULL DEPTH PAVEMENT PATCH(LESS THAN 1,000 SY)
0216.111
SY 4,000 $100.00 $400,000.00 $80.00 $320,000.00 ($20.00) ($80,000.00)FULL DEPTH PAVEMENTRECONSTRUCTION (MORE THAN1,000 SY)
0216.112
SY 2,500 $5.50 $13,750.00 $70.00 $175,000.00 $64.50 $161,250.001.5'' PAVEMENT MILLING0216.120
SY 3,000 $6.50 $19,500.00 $70.00 $210,000.00 $63.50 $190,500.002'' PAVEMENT MILLING0216.121
EA 675 $175.00 $118,125.00 $1.00 $675.00 ($174.00) ($117,450.00)SILT SACK0221.052
SY 1,100 $5.00 $5,500.00 $90.00 $99,000.00 $85.00 $93,500.00GRADING AND COMPACTION0221.201
CY 4,500 $35.00 $157,500.00 $1.00 $4,500.00 ($34.00) ($153,000.00)UNCLASSIFIED EXCAVATION0222.003
CY 450 $95.00 $42,750.00 $1.00 $450.00 ($94.00) ($42,300.00)TEST PITS0222.442
Page 16 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
CY 180 $125.00 $22,500.00 $200.00 $36,000.00 $75.00 $13,500.00LIGHTWEIGHT AGGREGATE0222.470
CY 810 $40.00 $32,400.00 $4.00 $3,240.00 ($36.00) ($29,160.00)ORDINARY BORROW0222.501
CY 7,000 $40.00 $280,000.00 $2.00 $14,000.00 ($38.00) ($266,000.00)GRAVEL BORROW0222.504
EA 22 $2,500.00 $55,000.00 $4,000.00 $88,000.00 $1,500.00 $33,000.00PRECAST DRAIN MANHOLE0222.522
EA 25 $1,005.00 $25,125.00 $1,000.00 $25,000.00 ($5.00) ($125.00)CATCH BASIN OR MANHOLECHANGE IN TYPE
0222.530
EA 25 $1,500.00 $37,500.00 $1,000.00 $25,000.00 ($500.00) ($12,500.00)CATCH BASIN OR MANHOLEREMODELED
0222.531
EA 25 $500.00 $12,500.00 $500.00 $12,500.00 $0.00 $0.00CATCH BASIN, MANHOLE ORLEACHING BASIN -ADJUST TO LINE AND/OR GRADE
0222.540
EA 300 $250.00 $75,000.00 $25.00 $7,500.00 ($225.00) ($67,500.00)FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
CY 1,000 $50.00 $50,000.00 $6.00 $6,000.00 ($44.00) ($44,000.00)LOAM BORROW0222.550
Page 17 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
CY 360 $45.00 $16,200.00 $100.00 $36,000.00 $55.00 $19,800.003/4" CRUSHED STONE0222.596
EA 40 $850.00 $34,000.00 $1,000.00 $40,000.00 $150.00 $6,000.00INSTALL MBTA MANHOLE FRAMESAND COVERS
0225.110
CY 300 $150.00 $45,000.00 $200.00 $60,000.00 $50.00 $15,000.00FLOWABLE FILL0227.010
EA 150 $300.00 $45,000.00 $1,000.00 $150,000.00 $700.00 $105,000.00BOLLARDS0234.195
SF 300 $500.00 $150,000.00 $200.00 $60,000.00 ($300.00) ($90,000.00)RETAINING WALL - A0242.141
EA 150 $300.00 $45,000.00 $600.00 $90,000.00 $300.00 $45,000.00CLEANING DRAINAGE STRUCTURES0250.001
EA 25 $3,500.00 $87,500.00 $4,000.00 $100,000.00 $500.00 $12,500.00CATCH BASIN TYPE A0250.094
EA 25 $3,500.00 $87,500.00 $4,000.00 $100,000.00 $500.00 $12,500.00CATCH BASINS MUNICIPALSTANDARD
0250.101
EA 45 $1,500.00 $67,500.00 $1,250.00 $56,250.00 ($250.00) ($11,250.00)DRAIN INLET0250.985
Page 18 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
LF 2,000 $60.00 $120,000.00 $70.00 $140,000.00 $10.00 $20,000.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 450 $60.00 $27,000.00 $70.00 $31,500.00 $10.00 $4,500.0012" PVC PIPE0251.593
LF 200 $100.00 $20,000.00 $85.00 $17,000.00 ($15.00) ($3,000.00)18" PVC DRAIN PIPE SCHEDULE 400251.718
LF 180 $110.00 $19,800.00 $75.00 $13,500.00 ($35.00) ($6,300.00)10" DUCTILE IRON PIPE0251.774
LF 450 $150.00 $67,500.00 $75.00 $33,750.00 ($75.00) ($33,750.00)15" DUCTILE IRON PIPE0251.775
LF 2,500 $120.00 $300,000.00 $80.00 $200,000.00 ($40.00) ($100,000.00)12" DUCTILE IRON PIPE0251.818
EA 60 $850.00 $51,000.00 $1,500.00 $90,000.00 $650.00 $39,000.00FRAME AND GRATE OR COVER- MUNICIPAL STANDARD
0255.077
EA 10 $1,500.00 $15,000.00 $4,500.00 $45,000.00 $3,000.00 $30,000.00DROP INLET0255.088
EA 16 $3,000.00 $48,000.00 $5,000.00 $80,000.00 $2,000.00 $32,000.00MANHOLES MUNICIPAL STANDARD0255.100
Page 19 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
VF 36 $1,150.00 $41,400.00 $800.00 $28,800.00 ($350.00) ($12,600.00)DRAINAGE STRUCTURE REBUILT0255.604
LF 6,000 $2.00 $12,000.00 $0.25 $1,500.00 ($1.75) ($10,500.00)SAW CUTTING BITUMINOUSCONCRETE
0261.115
LF 9,000 $2.00 $18,000.00 $1.00 $9,000.00 ($1.00) ($9,000.00)SAW CUTTING CEMENT CONCRETE0261.120
SY 4,000 $6.00 $24,000.00 $75.00 $300,000.00 $69.00 $276,000.00RECLAIMED BASE COURSE0261.165
TN 8,300 $300.00 $2,490,000.00 $190.00 $1,577,000.00 ($110.00) ($913,000.00)BITUMINOUS CONCRETEPAVING-BUSWAY
0261.180
TN 4,000 $200.00 $800,000.00 $175.00 $700,000.00 ($25.00) ($100,000.00)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1 TOP COURSE
0261.192
TN 120 $200.00 $24,000.00 $175.00 $21,000.00 ($25.00) ($3,000.00)CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1LEVELING COURSE
0261.196
TN 2,000 $200.00 $400,000.00 $175.00 $350,000.00 ($25.00) ($50,000.00)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
TN 90 $300.00 $27,000.00 $700.00 $63,000.00 $400.00 $36,000.00CLASS I BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 TOP COURSE- HAND OPERATION
0261.204
Page 20 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
GL 650 $9.00 $5,850.00 $15.00 $9,750.00 $6.00 $3,900.00BITUMEN FOR TACK0261.331
LF 20,000 $44.60 $892,000.00 $3.00 $60,000.00 ($41.60) ($832,000.00)GRANITE CURB STRAIGHT0262.180
LF 3,000 $50.00 $150,000.00 $6.00 $18,000.00 ($44.00) ($132,000.00)GRANITE CURB CURVED0262.185
LF 15,000 $60.00 $900,000.00 $4.00 $60,000.00 ($56.00) ($840,000.00)GRANITE TRANSITION CURB0262.251
LF 1,000 $28.00 $28,000.00 $8.00 $8,000.00 ($20.00) ($20,000.00)CONCRETE CURB - STRAIGHT0262.300
LF 2,870 $32.00 $91,840.00 $6.00 $17,220.00 ($26.00) ($74,620.00)CONCRETE CURB - CURVED0262.310
LF 1,500 $31.00 $46,500.00 $70.00 $105,000.00 $39.00 $58,500.00CURBING - REMOVE AND RESET0262.701
LF 6,075 $7.00 $42,525.00 $70.00 $425,250.00 $63.00 $382,725.00CURBING - REMOVE AND DISCARD0262.720
LF 1,500 $100.00 $150,000.00 $20.00 $30,000.00 ($80.00) ($120,000.00)BITUMINOUS CONCRETE CURBTYPE 2
0262.799
Page 21 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
SY 12,500 $189.00 $2,362,500.00 $100.00 $1,250,000.00 ($89.00) ($1,112,500.00)CONCRETE SIDEWALK0263.015
SF 8,000 $64.00 $512,000.00 $5.00 $40,000.00 ($59.00) ($472,000.00)TACTILE WARNING STRIP0263.116
SF 1,350 $80.00 $108,000.00 $15.00 $20,250.00 ($65.00) ($87,750.00)TACTILE WARNING STRIP- CASTIRON
0263.118
SY 5,000 $220.00 $1,100,000.00 $100.00 $500,000.00 ($120.00) ($600,000.00)CONCRETE SIDEWALKS0263.150
EA 1,500 $1,145.00 $1,717,500.00 $100.00 $150,000.00 ($1,045.00) ($1,567,500.00)PEDESTRIAN RAMP0263.180
LF 3,000 $45.00 $135,000.00 $40.00 $120,000.00 ($5.00) ($15,000.00)CHAIN LINK FENCE- REMOVE AND RESET
0271.026
LF 2,500 $75.00 $187,500.00 $50.00 $125,000.00 ($25.00) ($62,500.00)72" CHAIN LINK FENCE0271.072
LF 900 $50.00 $45,000.00 $50.00 $45,000.00 $0.00 $0.00CHAIN LINK FENCE0271.110
SY 1,100 $2.00 $2,200.00 $25.00 $27,500.00 $23.00 $25,300.00SEEDING0282.150
Page 22 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
LF 5,062 $7.50 $37,965.00 $15.00 $75,930.00 $7.50 $37,965.00EROSION CONTROL SYSTEM0282.202
CY 450 $25.00 $11,250.00 $75.00 $33,750.00 $50.00 $22,500.00SHREDDED BARK MULCH0282.407
EA 15 $1,200.00 $18,000.00 $1,500.00 $22,500.00 $300.00 $4,500.00TREES REMOVED - UNDER 24"0284.100
EA 15 $2,500.00 $37,500.00 $1,500.00 $22,500.00 ($1,000.00) ($15,000.00)TREES REMOVED - OVER 24"0284.101
EA 18 $200.00 $3,600.00 $1,000.00 $18,000.00 $800.00 $14,400.00STUMPS REMOVED0284.110
EA 15 $2,500.00 $37,500.00 $15,000.00 $225,000.00 $12,500.00 $187,500.00CONCRETE FOUNDATION- MBTASTANDARD BUS SHELTER
0334.121
EA 15 $2,000.00 $30,000.00 $15,000.00 $225,000.00 $13,000.00 $195,000.00CONCRETE FOUNDATION- MBTANARROW BUS SHELTER
0334.122
EA 30 $3,000.00 $90,000.00 $20,000.00 $600,000.00 $17,000.00 $510,000.00CONCRETE FOUNDATION- JCDECAUEX STANDARD BUS SHELTER
0334.123
LF 2,500 $90.00 $225,000.00 $75.00 $187,500.00 ($15.00) ($37,500.00)12" REINFORCED CONCRETE PIPECLASS IV
0348.412
Page 23 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
LF 1,000 $100.00 $100,000.00 $75.00 $75,000.00 ($25.00) ($25,000.00)18" REINFORCED CONCRETE PIPECLASS IV
0348.418
SF 2,000 $25.00 $50,000.00 $45.00 $90,000.00 $20.00 $40,000.00BRICK PAVING0426.154
LF 450 $5.00 $2,250.00 $6.00 $2,700.00 $1.00 $450.00REMOVE HIGHWAY GUARD0590.050
LF 450 $30.00 $13,500.00 $40.00 $18,000.00 $10.00 $4,500.00STEEL BEAM HIGHWAY GUARD- TYPE SS
0590.198
EA 8 $60.00 $480.00 $2,000.00 $16,000.00 $1,940.00 $15,520.00HIGHWAY GUARD STEEL BEAMTERMINAL SECTION
0590.202
LF 1,500 $1.25 $1,875.00 $5.00 $7,500.00 $3.75 $5,625.006" REFLECTORIZED YELLOW LINE1040.704
SF 15,200 $40.00 $608,000.00 $5.00 $76,000.00 ($35.00) ($532,000.00)REFLECTORIZED WHITE LINECROSSWALKS AND STOPS
1040.707
LF 1,500 $1.00 $1,500.00 $5.00 $7,500.00 $4.00 $6,000.004" REFLECTORIZED THERMOPLASTICWHITE LINE
1040.738
LF 1,500 $1.25 $1,875.00 $5.00 $7,500.00 $3.75 $5,625.006" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.739
Page 24 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
LF 35,000 $3.11 $108,850.00 $5.00 $175,000.00 $1.89 $66,150.0012" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.740
LF 1,500 $1.00 $1,500.00 $5.00 $7,500.00 $4.00 $6,000.004" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.760
LF 400 $4.00 $1,600.00 $10.00 $4,000.00 $6.00 $2,400.0012" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.765
AN 1 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $0.00 $0.00COLORED PAVEMENTMARKING-BUSWAY
1040.905
SF 200 $400.00 $80,000.00 $50.00 $10,000.00 ($350.00) ($70,000.00)PAVEMENT ARROWS1040.912
SF 6,750 $1.75 $11,812.50 $3.00 $20,250.00 $1.25 $8,437.50PAVEMENT MARKING REMOVAL1040.920
EA 700 $250.00 $175,000.00 $200.00 $140,000.00 ($50.00) ($35,000.00)BUS STOP SIGNS AND ATTACHMENTHARDWARE
1041.120
SF 4,000 $15.00 $60,000.00 $25.00 $100,000.00 $10.00 $40,000.00TRAFFIC SIGN, ALUMINUMPANEL - TYPE A
1041.262
EA 700 $275.00 $192,500.00 $290.00 $203,000.00 $15.00 $10,500.00P-5 SIGN SUPPORT1041.336
Page 25 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
EA 400 $300.00 $120,000.00 $500.00 $200,000.00 $200.00 $80,000.002" SIGN POST1041.350
SF 2,000 $15.00 $30,000.00 $40.00 $80,000.00 $25.00 $50,000.00DIRECTIONAL SIGNS1041.619
SF 3,000 $15.00 $45,000.00 $25.00 $75,000.00 $10.00 $30,000.00WARNING AND REGULATORY SIGNS(PERMANENT)
1041.640
EA 400 $250.00 $100,000.00 $100.00 $40,000.00 ($150.00) ($60,000.00)SIGN AND SIGN SUPPORT REMOVED1042.089
EA 350 $225.00 $78,750.00 $210.00 $73,500.00 ($15.00) ($5,250.00)SIGNS - REMOVE AND RESET1042.100
EA 350 $30.00 $10,500.00 $100.00 $35,000.00 $70.00 $24,500.00SIGNS - REMOVE AND STACK1042.110
EA 38 $1,000.00 $38,000.00 $1,000.00 $38,000.00 $0.00 $0.00BENCHES - REMOVE AND RESET1050.215
EA 25 $6,500.00 $162,500.00 $75,000.00 $1,875,000.00 $68,500.00 $1,712,500.00PASSENGER SHELTER- REMOVE AND RESET
1076.021
EA 20 $1,500.00 $30,000.00 $1,500.00 $30,000.00 $0.00 $0.00TRASH RECEPTACLE1098.020
Page 26 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
EA 20 $2,500.00 $50,000.00 $1,500.00 $30,000.00 ($1,000.00) ($20,000.00)BICYCLE RACK1112.000
EA 10 $400.00 $4,000.00 $750.00 $7,500.00 $350.00 $3,500.00BICYCLE RACK -- REMOVE ANDRESET
1112.002
EA 40 $500.00 $20,000.00 $100.00 $4,000.00 ($400.00) ($16,000.00)PARKING METERS -REMOVE AND STACK
1185.201
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00ELECTRICAL WORK1600.359
LF 1,000 $100.00 $100,000.00 $75.00 $75,000.00 ($25.00) ($25,000.00)2" PVC SCHEDULE 80 CONDUIT1615.102
LF 500 $110.00 $55,000.00 $75.00 $37,500.00 ($35.00) ($17,500.00)3" PVC SCHEDULE 80 CONDUIT1615.103
LF 500 $120.00 $60,000.00 $80.00 $40,000.00 ($40.00) ($20,000.00)4" PVC SCHEDULE 80 CONDUIT1615.104
LF 1,000 $60.00 $60,000.00 $100.00 $100,000.00 $40.00 $40,000.002" RIGID STEEL CONDUIT1619.204
LF 500 $82.00 $41,000.00 $125.00 $62,500.00 $43.00 $21,500.003" RIGID STEEL CONDUIT1619.206
Page 27 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3670
06/18/2019
Newport Construction Corporation
LF 500 $86.00 $43,000.00 $150.00 $75,000.00 $64.00 $32,000.004" RIGID STEEL CONDUIT1619.207
EA 75 $800.00 $60,000.00 $2,500.00 $187,500.00 $1,700.00 $127,500.00HANDHOLE - TYPE A1622.025
EA 25 $1,000.00 $25,000.00 $2,500.00 $62,500.00 $1,500.00 $37,500.00HANDHOLE - TYPE B1622.026
EA 100 $500.00 $50,000.00 $1,500.00 $150,000.00 $1,000.00 $100,000.00LIGHT POLE BASE1640.090
EA 100 $2,000.00 $200,000.00 $4,500.00 $450,000.00 $2,500.00 $250,000.00HIGHWAY LIGHT POST 24 FTCONCRETE WITH ONE SLIP OVERTYPE BRACKET - MUNICIPAL STD
1642.982
EA 30 $60,000.00 $1,800,000.00 $55,000.00 $1,650,000.00 ($5,000.00) ($150,000.00)SIGNALIZED PEDESTRIANCROSSING- RRFB
1651.140
EA 10 $60,000.00 $600,000.00 $50,000.00 $500,000.00 ($10,000.00) ($100,000.00)SIGNALIZED PEDESTRIANCROSSING- LED EDGE LIT FLASHINGSIGN
1651.144
RA 1 $1.00 $1.00 $1.00 $1.00 $0.00 $0.00RISK ALLOWANCE6500.000
$20,877,468.13 ($4,178,107.50)$25,055,575.63Total Estimate Contract Base Bid:
$20,877,468.13 ($4,178,107.50)$25,055,575.63Contract Total - Base Bid and Alternates:
Page 28 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
LS 1 $50,000.00 $50,000.00 $31,013.54 $31,013.54 ($18,986.46) ($18,986.46)FIELD EQUIPMENT0130.162
AN 1 $750,000.00 $750,000.00 $750,000.00 $750,000.00 $0.00 $0.00PEDESTRIAN TRAFFICMAINTENANCE
0130.406
AN 1 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.429
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00ELECTRIC COMPANY0130.436
FP 1 $665,302.13 $665,302.13 $665,302.13 $665,302.13 $0.00 $0.00MOBILIZATION0170.101
SY 1,000 $35.00 $35,000.00 $30.00 $30,000.00 ($5.00) ($5,000.00)REMOVAL AND DISPOSAL OFASPHALT PAVEMENT AT PLATFORMAND SIDEWALK LOCATIONS
0211.013
EA 360 $500.00 $180,000.00 $0.01 $3.60 ($499.99) ($179,996.40)UTILITY STRUCTURE ADJUSTED0211.430
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00BOSTON WATER AND SEWERCOMMISSION UTILITIES
0211.472
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00TRANSPORTATION & DISPOSAL OFHAZARDOUS MATERIALS
0212.147
Page 29 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
A 4 $10,000.00 $35,000.00 $25,000.00 $87,500.00 $15,000.00 $52,500.00CLEARING AND VEGETATIONCONTROL
0213.020
SY 2,000 $150.00 $300,000.00 $80.00 $160,000.00 ($70.00) ($140,000.00)FULL DEPTH PAVEMENT PATCH(LESS THAN 1,000 SY)
0216.111
SY 4,000 $100.00 $400,000.00 $70.00 $280,000.00 ($30.00) ($120,000.00)FULL DEPTH PAVEMENTRECONSTRUCTION (MORE THAN1,000 SY)
0216.112
SY 2,500 $5.50 $13,750.00 $8.00 $20,000.00 $2.50 $6,250.001.5'' PAVEMENT MILLING0216.120
SY 3,000 $6.50 $19,500.00 $10.00 $30,000.00 $3.50 $10,500.002'' PAVEMENT MILLING0216.121
EA 675 $175.00 $118,125.00 $0.01 $6.75 ($174.99) ($118,118.25)SILT SACK0221.052
SY 1,100 $5.00 $5,500.00 $30.00 $33,000.00 $25.00 $27,500.00GRADING AND COMPACTION0221.201
CY 4,500 $35.00 $157,500.00 $30.00 $135,000.00 ($5.00) ($22,500.00)UNCLASSIFIED EXCAVATION0222.003
CY 450 $95.00 $42,750.00 $75.00 $33,750.00 ($20.00) ($9,000.00)TEST PITS0222.442
Page 30 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
CY 180 $125.00 $22,500.00 $200.00 $36,000.00 $75.00 $13,500.00LIGHTWEIGHT AGGREGATE0222.470
CY 810 $40.00 $32,400.00 $0.01 $8.10 ($39.99) ($32,391.90)ORDINARY BORROW0222.501
CY 7,000 $40.00 $280,000.00 $28.00 $196,000.00 ($12.00) ($84,000.00)GRAVEL BORROW0222.504
EA 22 $2,500.00 $55,000.00 $10,000.00 $220,000.00 $7,500.00 $165,000.00PRECAST DRAIN MANHOLE0222.522
EA 25 $1,005.00 $25,125.00 $1,500.00 $37,500.00 $495.00 $12,375.00CATCH BASIN OR MANHOLECHANGE IN TYPE
0222.530
EA 25 $1,500.00 $37,500.00 $1,000.00 $25,000.00 ($500.00) ($12,500.00)CATCH BASIN OR MANHOLEREMODELED
0222.531
EA 25 $500.00 $12,500.00 $250.00 $6,250.00 ($250.00) ($6,250.00)CATCH BASIN, MANHOLE ORLEACHING BASIN -ADJUST TO LINE AND/OR GRADE
0222.540
EA 300 $250.00 $75,000.00 $250.00 $75,000.00 $0.00 $0.00FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
CY 1,000 $50.00 $50,000.00 $70.00 $70,000.00 $20.00 $20,000.00LOAM BORROW0222.550
Page 31 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
CY 360 $45.00 $16,200.00 $32.00 $11,520.00 ($13.00) ($4,680.00)3/4" CRUSHED STONE0222.596
EA 40 $850.00 $34,000.00 $1,000.00 $40,000.00 $150.00 $6,000.00INSTALL MBTA MANHOLE FRAMESAND COVERS
0225.110
CY 300 $150.00 $45,000.00 $180.00 $54,000.00 $30.00 $9,000.00FLOWABLE FILL0227.010
EA 150 $300.00 $45,000.00 $1,000.00 $150,000.00 $700.00 $105,000.00BOLLARDS0234.195
SF 300 $500.00 $150,000.00 $250.00 $75,000.00 ($250.00) ($75,000.00)RETAINING WALL - A0242.141
EA 150 $300.00 $45,000.00 $225.00 $33,750.00 ($75.00) ($11,250.00)CLEANING DRAINAGE STRUCTURES0250.001
EA 25 $3,500.00 $87,500.00 $10,000.00 $250,000.00 $6,500.00 $162,500.00CATCH BASIN TYPE A0250.094
EA 25 $3,500.00 $87,500.00 $10,000.00 $250,000.00 $6,500.00 $162,500.00CATCH BASINS MUNICIPALSTANDARD
0250.101
EA 45 $1,500.00 $67,500.00 $2,500.00 $112,500.00 $1,000.00 $45,000.00DRAIN INLET0250.985
Page 32 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
LF 2,000 $60.00 $120,000.00 $350.00 $700,000.00 $290.00 $580,000.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 450 $60.00 $27,000.00 $350.00 $157,500.00 $290.00 $130,500.0012" PVC PIPE0251.593
LF 200 $100.00 $20,000.00 $400.00 $80,000.00 $300.00 $60,000.0018" PVC DRAIN PIPE SCHEDULE 400251.718
LF 180 $110.00 $19,800.00 $400.00 $72,000.00 $290.00 $52,200.0010" DUCTILE IRON PIPE0251.774
LF 450 $150.00 $67,500.00 $450.00 $202,500.00 $300.00 $135,000.0015" DUCTILE IRON PIPE0251.775
LF 2,500 $120.00 $300,000.00 $400.00 $1,000,000.00 $280.00 $700,000.0012" DUCTILE IRON PIPE0251.818
EA 60 $850.00 $51,000.00 $1,000.00 $60,000.00 $150.00 $9,000.00FRAME AND GRATE OR COVER- MUNICIPAL STANDARD
0255.077
EA 10 $1,500.00 $15,000.00 $2,500.00 $25,000.00 $1,000.00 $10,000.00DROP INLET0255.088
EA 16 $3,000.00 $48,000.00 $10,000.00 $160,000.00 $7,000.00 $112,000.00MANHOLES MUNICIPAL STANDARD0255.100
Page 33 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
VF 36 $1,150.00 $41,400.00 $250.00 $9,000.00 ($900.00) ($32,400.00)DRAINAGE STRUCTURE REBUILT0255.604
LF 6,000 $2.00 $12,000.00 $0.01 $60.00 ($1.99) ($11,940.00)SAW CUTTING BITUMINOUSCONCRETE
0261.115
LF 9,000 $2.00 $18,000.00 $0.01 $90.00 ($1.99) ($17,910.00)SAW CUTTING CEMENT CONCRETE0261.120
SY 4,000 $6.00 $24,000.00 $10.00 $40,000.00 $4.00 $16,000.00RECLAIMED BASE COURSE0261.165
TN 8,300 $300.00 $2,490,000.00 $122.00 $1,012,600.00 ($178.00) ($1,477,400.00)BITUMINOUS CONCRETEPAVING-BUSWAY
0261.180
TN 4,000 $200.00 $800,000.00 $122.00 $488,000.00 ($78.00) ($312,000.00)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1 TOP COURSE
0261.192
TN 120 $200.00 $24,000.00 $185.00 $22,200.00 ($15.00) ($1,800.00)CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1LEVELING COURSE
0261.196
TN 2,000 $200.00 $400,000.00 $122.00 $244,000.00 ($78.00) ($156,000.00)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
TN 90 $300.00 $27,000.00 $450.00 $40,500.00 $150.00 $13,500.00CLASS I BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 TOP COURSE- HAND OPERATION
0261.204
Page 34 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
GL 650 $9.00 $5,850.00 $6.00 $3,900.00 ($3.00) ($1,950.00)BITUMEN FOR TACK0261.331
LF 20,000 $44.60 $892,000.00 $60.00 $1,200,000.00 $15.40 $308,000.00GRANITE CURB STRAIGHT0262.180
LF 3,000 $50.00 $150,000.00 $60.00 $180,000.00 $10.00 $30,000.00GRANITE CURB CURVED0262.185
LF 15,000 $60.00 $900,000.00 $0.01 $150.00 ($59.99) ($899,850.00)GRANITE TRANSITION CURB0262.251
LF 1,000 $28.00 $28,000.00 $40.00 $40,000.00 $12.00 $12,000.00CONCRETE CURB - STRAIGHT0262.300
LF 2,870 $32.00 $91,840.00 $40.00 $114,800.00 $8.00 $22,960.00CONCRETE CURB - CURVED0262.310
LF 1,500 $31.00 $46,500.00 $100.00 $150,000.00 $69.00 $103,500.00CURBING - REMOVE AND RESET0262.701
LF 6,075 $7.00 $42,525.00 $0.01 $60.75 ($6.99) ($42,464.25)CURBING - REMOVE AND DISCARD0262.720
LF 1,500 $100.00 $150,000.00 $12.00 $18,000.00 ($88.00) ($132,000.00)BITUMINOUS CONCRETE CURBTYPE 2
0262.799
Page 35 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
SY 12,500 $189.00 $2,362,500.00 $180.00 $2,250,000.00 ($9.00) ($112,500.00)CONCRETE SIDEWALK0263.015
SF 8,000 $64.00 $512,000.00 $0.01 $80.00 ($63.99) ($511,920.00)TACTILE WARNING STRIP0263.116
SF 1,350 $80.00 $108,000.00 $40.00 $54,000.00 ($40.00) ($54,000.00)TACTILE WARNING STRIP- CASTIRON
0263.118
SY 5,000 $220.00 $1,100,000.00 $200.00 $1,000,000.00 ($20.00) ($100,000.00)CONCRETE SIDEWALKS0263.150
EA 1,500 $1,145.00 $1,717,500.00 $1,000.00 $1,500,000.00 ($145.00) ($217,500.00)PEDESTRIAN RAMP0263.180
LF 3,000 $45.00 $135,000.00 $80.00 $240,000.00 $35.00 $105,000.00CHAIN LINK FENCE- REMOVE AND RESET
0271.026
LF 2,500 $75.00 $187,500.00 $133.00 $332,500.00 $58.00 $145,000.0072" CHAIN LINK FENCE0271.072
LF 900 $50.00 $45,000.00 $115.00 $103,500.00 $65.00 $58,500.00CHAIN LINK FENCE0271.110
SY 1,100 $2.00 $2,200.00 $5.00 $5,500.00 $3.00 $3,300.00SEEDING0282.150
Page 36 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
LF 5,062 $7.50 $37,965.00 $10.00 $50,620.00 $2.50 $12,655.00EROSION CONTROL SYSTEM0282.202
CY 450 $25.00 $11,250.00 $70.00 $31,500.00 $45.00 $20,250.00SHREDDED BARK MULCH0282.407
EA 15 $1,200.00 $18,000.00 $1,000.00 $15,000.00 ($200.00) ($3,000.00)TREES REMOVED - UNDER 24"0284.100
EA 15 $2,500.00 $37,500.00 $2,300.00 $34,500.00 ($200.00) ($3,000.00)TREES REMOVED - OVER 24"0284.101
EA 18 $200.00 $3,600.00 $350.00 $6,300.00 $150.00 $2,700.00STUMPS REMOVED0284.110
EA 15 $2,500.00 $37,500.00 $12,000.00 $180,000.00 $9,500.00 $142,500.00CONCRETE FOUNDATION- MBTASTANDARD BUS SHELTER
0334.121
EA 15 $2,000.00 $30,000.00 $12,000.00 $180,000.00 $10,000.00 $150,000.00CONCRETE FOUNDATION- MBTANARROW BUS SHELTER
0334.122
EA 30 $3,000.00 $90,000.00 $12,000.00 $360,000.00 $9,000.00 $270,000.00CONCRETE FOUNDATION- JCDECAUEX STANDARD BUS SHELTER
0334.123
LF 2,500 $90.00 $225,000.00 $350.00 $875,000.00 $260.00 $650,000.0012" REINFORCED CONCRETE PIPECLASS IV
0348.412
Page 37 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
LF 1,000 $100.00 $100,000.00 $400.00 $400,000.00 $300.00 $300,000.0018" REINFORCED CONCRETE PIPECLASS IV
0348.418
SF 2,000 $25.00 $50,000.00 $40.00 $80,000.00 $15.00 $30,000.00BRICK PAVING0426.154
LF 450 $5.00 $2,250.00 $13.00 $5,850.00 $8.00 $3,600.00REMOVE HIGHWAY GUARD0590.050
LF 450 $30.00 $13,500.00 $100.00 $45,000.00 $70.00 $31,500.00STEEL BEAM HIGHWAY GUARD- TYPE SS
0590.198
EA 8 $60.00 $480.00 $4,000.00 $32,000.00 $3,940.00 $31,520.00HIGHWAY GUARD STEEL BEAMTERMINAL SECTION
0590.202
LF 1,500 $1.25 $1,875.00 $1.30 $1,950.00 $0.05 $75.006" REFLECTORIZED YELLOW LINE1040.704
SF 15,200 $40.00 $608,000.00 $4.00 $60,800.00 ($36.00) ($547,200.00)REFLECTORIZED WHITE LINECROSSWALKS AND STOPS
1040.707
LF 1,500 $1.00 $1,500.00 $1.50 $2,250.00 $0.50 $750.004" REFLECTORIZED THERMOPLASTICWHITE LINE
1040.738
LF 1,500 $1.25 $1,875.00 $1.50 $2,250.00 $0.25 $375.006" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.739
Page 38 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
LF 35,000 $3.11 $108,850.00 $5.00 $175,000.00 $1.89 $66,150.0012" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.740
LF 1,500 $1.00 $1,500.00 $1.20 $1,800.00 $0.20 $300.004" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.760
LF 400 $4.00 $1,600.00 $5.00 $2,000.00 $1.00 $400.0012" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.765
AN 1 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $0.00 $0.00COLORED PAVEMENTMARKING-BUSWAY
1040.905
SF 200 $400.00 $80,000.00 $12.00 $2,400.00 ($388.00) ($77,600.00)PAVEMENT ARROWS1040.912
SF 6,750 $1.75 $11,812.50 $2.60 $17,550.00 $0.85 $5,737.50PAVEMENT MARKING REMOVAL1040.920
EA 700 $250.00 $175,000.00 $120.00 $84,000.00 ($130.00) ($91,000.00)BUS STOP SIGNS AND ATTACHMENTHARDWARE
1041.120
SF 4,000 $15.00 $60,000.00 $24.00 $96,000.00 $9.00 $36,000.00TRAFFIC SIGN, ALUMINUMPANEL - TYPE A
1041.262
EA 700 $275.00 $192,500.00 $275.00 $192,500.00 $0.00 $0.00P-5 SIGN SUPPORT1041.336
Page 39 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
EA 400 $300.00 $120,000.00 $390.00 $156,000.00 $90.00 $36,000.002" SIGN POST1041.350
SF 2,000 $15.00 $30,000.00 $40.00 $80,000.00 $25.00 $50,000.00DIRECTIONAL SIGNS1041.619
SF 3,000 $15.00 $45,000.00 $24.00 $72,000.00 $9.00 $27,000.00WARNING AND REGULATORY SIGNS(PERMANENT)
1041.640
EA 400 $250.00 $100,000.00 $0.01 $4.00 ($249.99) ($99,996.00)SIGN AND SIGN SUPPORT REMOVED1042.089
EA 350 $225.00 $78,750.00 $0.01 $3.50 ($224.99) ($78,746.50)SIGNS - REMOVE AND RESET1042.100
EA 350 $30.00 $10,500.00 $0.01 $3.50 ($29.99) ($10,496.50)SIGNS - REMOVE AND STACK1042.110
EA 38 $1,000.00 $38,000.00 $900.00 $34,200.00 ($100.00) ($3,800.00)BENCHES - REMOVE AND RESET1050.215
EA 25 $6,500.00 $162,500.00 $12,000.00 $300,000.00 $5,500.00 $137,500.00PASSENGER SHELTER- REMOVE AND RESET
1076.021
EA 20 $1,500.00 $30,000.00 $800.00 $16,000.00 ($700.00) ($14,000.00)TRASH RECEPTACLE1098.020
Page 40 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
EA 20 $2,500.00 $50,000.00 $800.00 $16,000.00 ($1,700.00) ($34,000.00)BICYCLE RACK1112.000
EA 10 $400.00 $4,000.00 $500.00 $5,000.00 $100.00 $1,000.00BICYCLE RACK -- REMOVE ANDRESET
1112.002
EA 40 $500.00 $20,000.00 $0.01 $0.40 ($499.99) ($19,999.60)PARKING METERS -REMOVE AND STACK
1185.201
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00ELECTRICAL WORK1600.359
LF 1,000 $100.00 $100,000.00 $100.00 $100,000.00 $0.00 $0.002" PVC SCHEDULE 80 CONDUIT1615.102
LF 500 $110.00 $55,000.00 $100.00 $50,000.00 ($10.00) ($5,000.00)3" PVC SCHEDULE 80 CONDUIT1615.103
LF 500 $120.00 $60,000.00 $100.00 $50,000.00 ($20.00) ($10,000.00)4" PVC SCHEDULE 80 CONDUIT1615.104
LF 1,000 $60.00 $60,000.00 $70.00 $70,000.00 $10.00 $10,000.002" RIGID STEEL CONDUIT1619.204
LF 500 $82.00 $41,000.00 $100.00 $50,000.00 $18.00 $9,000.003" RIGID STEEL CONDUIT1619.206
Page 41 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
4999
06/18/2019
Fred DeRoma & Son, Inc.
LF 500 $86.00 $43,000.00 $125.00 $62,500.00 $39.00 $19,500.004" RIGID STEEL CONDUIT1619.207
EA 75 $800.00 $60,000.00 $2,000.00 $150,000.00 $1,200.00 $90,000.00HANDHOLE - TYPE A1622.025
EA 25 $1,000.00 $25,000.00 $5,000.00 $125,000.00 $4,000.00 $100,000.00HANDHOLE - TYPE B1622.026
EA 100 $500.00 $50,000.00 $3,000.00 $300,000.00 $2,500.00 $250,000.00LIGHT POLE BASE1640.090
EA 100 $2,000.00 $200,000.00 $6,500.00 $650,000.00 $4,500.00 $450,000.00HIGHWAY LIGHT POST 24 FTCONCRETE WITH ONE SLIP OVERTYPE BRACKET - MUNICIPAL STD
1642.982
EA 30 $60,000.00 $1,800,000.00 $45,000.00 $1,350,000.00 ($15,000.00) ($450,000.00)SIGNALIZED PEDESTRIANCROSSING- RRFB
1651.140
EA 10 $60,000.00 $600,000.00 $45,000.00 $450,000.00 ($15,000.00) ($150,000.00)SIGNALIZED PEDESTRIANCROSSING- LED EDGE LIT FLASHINGSIGN
1651.144
RA 1 $1.00 $1.00 $1.00 $1.00 $0.00 $0.00RISK ALLOWANCE6500.000
$24,875,027.27 ($180,548.36)$25,055,575.63Total Estimate Contract Base Bid:
$24,875,027.27 ($180,548.36)$25,055,575.63Contract Total - Base Bid and Alternates:
Page 42 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
LS 1 $50,000.00 $50,000.00 $15,000.00 $15,000.00 ($35,000.00) ($35,000.00)FIELD EQUIPMENT0130.162
AN 1 $750,000.00 $750,000.00 $750,000.00 $750,000.00 $0.00 $0.00PEDESTRIAN TRAFFICMAINTENANCE
0130.406
AN 1 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.429
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00ELECTRIC COMPANY0130.436
FP 1 $665,302.13 $665,302.13 $665,302.13 $665,302.13 $0.00 $0.00MOBILIZATION0170.101
SY 1,000 $35.00 $35,000.00 $30.00 $30,000.00 ($5.00) ($5,000.00)REMOVAL AND DISPOSAL OFASPHALT PAVEMENT AT PLATFORMAND SIDEWALK LOCATIONS
0211.013
EA 360 $500.00 $180,000.00 $625.00 $225,000.00 $125.00 $45,000.00UTILITY STRUCTURE ADJUSTED0211.430
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00BOSTON WATER AND SEWERCOMMISSION UTILITIES
0211.472
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00TRANSPORTATION & DISPOSAL OFHAZARDOUS MATERIALS
0212.147
Page 43 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
A 4 $10,000.00 $35,000.00 $15,000.00 $52,500.00 $5,000.00 $17,500.00CLEARING AND VEGETATIONCONTROL
0213.020
SY 2,000 $150.00 $300,000.00 $200.00 $400,000.00 $50.00 $100,000.00FULL DEPTH PAVEMENT PATCH(LESS THAN 1,000 SY)
0216.111
SY 4,000 $100.00 $400,000.00 $100.00 $400,000.00 $0.00 $0.00FULL DEPTH PAVEMENTRECONSTRUCTION (MORE THAN1,000 SY)
0216.112
SY 2,500 $5.50 $13,750.00 $15.00 $37,500.00 $9.50 $23,750.001.5'' PAVEMENT MILLING0216.120
SY 3,000 $6.50 $19,500.00 $20.00 $60,000.00 $13.50 $40,500.002'' PAVEMENT MILLING0216.121
EA 675 $175.00 $118,125.00 $150.00 $101,250.00 ($25.00) ($16,875.00)SILT SACK0221.052
SY 1,100 $5.00 $5,500.00 $20.00 $22,000.00 $15.00 $16,500.00GRADING AND COMPACTION0221.201
CY 4,500 $35.00 $157,500.00 $45.00 $202,500.00 $10.00 $45,000.00UNCLASSIFIED EXCAVATION0222.003
CY 450 $95.00 $42,750.00 $150.00 $67,500.00 $55.00 $24,750.00TEST PITS0222.442
Page 44 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
CY 180 $125.00 $22,500.00 $110.00 $19,800.00 ($15.00) ($2,700.00)LIGHTWEIGHT AGGREGATE0222.470
CY 810 $40.00 $32,400.00 $30.00 $24,300.00 ($10.00) ($8,100.00)ORDINARY BORROW0222.501
CY 7,000 $40.00 $280,000.00 $40.00 $280,000.00 $0.00 $0.00GRAVEL BORROW0222.504
EA 22 $2,500.00 $55,000.00 $5,000.00 $110,000.00 $2,500.00 $55,000.00PRECAST DRAIN MANHOLE0222.522
EA 25 $1,005.00 $25,125.00 $1,800.00 $45,000.00 $795.00 $19,875.00CATCH BASIN OR MANHOLECHANGE IN TYPE
0222.530
EA 25 $1,500.00 $37,500.00 $1,800.00 $45,000.00 $300.00 $7,500.00CATCH BASIN OR MANHOLEREMODELED
0222.531
EA 25 $500.00 $12,500.00 $630.00 $15,750.00 $130.00 $3,250.00CATCH BASIN, MANHOLE ORLEACHING BASIN -ADJUST TO LINE AND/OR GRADE
0222.540
EA 300 $250.00 $75,000.00 $630.00 $189,000.00 $380.00 $114,000.00FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
CY 1,000 $50.00 $50,000.00 $60.00 $60,000.00 $10.00 $10,000.00LOAM BORROW0222.550
Page 45 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
CY 360 $45.00 $16,200.00 $50.00 $18,000.00 $5.00 $1,800.003/4" CRUSHED STONE0222.596
EA 40 $850.00 $34,000.00 $1,600.00 $64,000.00 $750.00 $30,000.00INSTALL MBTA MANHOLE FRAMESAND COVERS
0225.110
CY 300 $150.00 $45,000.00 $150.00 $45,000.00 $0.00 $0.00FLOWABLE FILL0227.010
EA 150 $300.00 $45,000.00 $1,500.00 $225,000.00 $1,200.00 $180,000.00BOLLARDS0234.195
SF 300 $500.00 $150,000.00 $100.00 $30,000.00 ($400.00) ($120,000.00)RETAINING WALL - A0242.141
EA 150 $300.00 $45,000.00 $500.00 $75,000.00 $200.00 $30,000.00CLEANING DRAINAGE STRUCTURES0250.001
EA 25 $3,500.00 $87,500.00 $5,300.00 $132,500.00 $1,800.00 $45,000.00CATCH BASIN TYPE A0250.094
EA 25 $3,500.00 $87,500.00 $5,300.00 $132,500.00 $1,800.00 $45,000.00CATCH BASINS MUNICIPALSTANDARD
0250.101
EA 45 $1,500.00 $67,500.00 $1,900.00 $85,500.00 $400.00 $18,000.00DRAIN INLET0250.985
Page 46 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
LF 2,000 $60.00 $120,000.00 $125.00 $250,000.00 $65.00 $130,000.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 450 $60.00 $27,000.00 $128.00 $57,600.00 $68.00 $30,600.0012" PVC PIPE0251.593
LF 200 $100.00 $20,000.00 $142.00 $28,400.00 $42.00 $8,400.0018" PVC DRAIN PIPE SCHEDULE 400251.718
LF 180 $110.00 $19,800.00 $150.00 $27,000.00 $40.00 $7,200.0010" DUCTILE IRON PIPE0251.774
LF 450 $150.00 $67,500.00 $180.00 $81,000.00 $30.00 $13,500.0015" DUCTILE IRON PIPE0251.775
LF 2,500 $120.00 $300,000.00 $160.00 $400,000.00 $40.00 $100,000.0012" DUCTILE IRON PIPE0251.818
EA 60 $850.00 $51,000.00 $1,000.00 $60,000.00 $150.00 $9,000.00FRAME AND GRATE OR COVER- MUNICIPAL STANDARD
0255.077
EA 10 $1,500.00 $15,000.00 $2,500.00 $25,000.00 $1,000.00 $10,000.00DROP INLET0255.088
EA 16 $3,000.00 $48,000.00 $4,850.00 $77,600.00 $1,850.00 $29,600.00MANHOLES MUNICIPAL STANDARD0255.100
Page 47 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
VF 36 $1,150.00 $41,400.00 $1,700.00 $61,200.00 $550.00 $19,800.00DRAINAGE STRUCTURE REBUILT0255.604
LF 6,000 $2.00 $12,000.00 $3.00 $18,000.00 $1.00 $6,000.00SAW CUTTING BITUMINOUSCONCRETE
0261.115
LF 9,000 $2.00 $18,000.00 $3.00 $27,000.00 $1.00 $9,000.00SAW CUTTING CEMENT CONCRETE0261.120
SY 4,000 $6.00 $24,000.00 $12.00 $48,000.00 $6.00 $24,000.00RECLAIMED BASE COURSE0261.165
TN 8,300 $300.00 $2,490,000.00 $230.00 $1,909,000.00 ($70.00) ($581,000.00)BITUMINOUS CONCRETEPAVING-BUSWAY
0261.180
TN 4,000 $200.00 $800,000.00 $242.00 $968,000.00 $42.00 $168,000.00CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1 TOP COURSE
0261.192
TN 120 $200.00 $24,000.00 $200.00 $24,000.00 $0.00 $0.00CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1LEVELING COURSE
0261.196
TN 2,000 $200.00 $400,000.00 $242.00 $484,000.00 $42.00 $84,000.00CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
TN 90 $300.00 $27,000.00 $1,000.00 $90,000.00 $700.00 $63,000.00CLASS I BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 TOP COURSE- HAND OPERATION
0261.204
Page 48 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
GL 650 $9.00 $5,850.00 $15.00 $9,750.00 $6.00 $3,900.00BITUMEN FOR TACK0261.331
LF 20,000 $44.60 $892,000.00 $48.00 $960,000.00 $3.40 $68,000.00GRANITE CURB STRAIGHT0262.180
LF 3,000 $50.00 $150,000.00 $72.00 $216,000.00 $22.00 $66,000.00GRANITE CURB CURVED0262.185
LF 15,000 $60.00 $900,000.00 $72.00 $1,080,000.00 $12.00 $180,000.00GRANITE TRANSITION CURB0262.251
LF 1,000 $28.00 $28,000.00 $32.00 $32,000.00 $4.00 $4,000.00CONCRETE CURB - STRAIGHT0262.300
LF 2,870 $32.00 $91,840.00 $46.00 $132,020.00 $14.00 $40,180.00CONCRETE CURB - CURVED0262.310
LF 1,500 $31.00 $46,500.00 $50.00 $75,000.00 $19.00 $28,500.00CURBING - REMOVE AND RESET0262.701
LF 6,075 $7.00 $42,525.00 $15.00 $91,125.00 $8.00 $48,600.00CURBING - REMOVE AND DISCARD0262.720
LF 1,500 $100.00 $150,000.00 $15.00 $22,500.00 ($85.00) ($127,500.00)BITUMINOUS CONCRETE CURBTYPE 2
0262.799
Page 49 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
SY 12,500 $189.00 $2,362,500.00 $68.00 $850,000.00 ($121.00) ($1,512,500.00)CONCRETE SIDEWALK0263.015
SF 8,000 $64.00 $512,000.00 $15.00 $120,000.00 ($49.00) ($392,000.00)TACTILE WARNING STRIP0263.116
SF 1,350 $80.00 $108,000.00 $30.00 $40,500.00 ($50.00) ($67,500.00)TACTILE WARNING STRIP- CASTIRON
0263.118
SY 5,000 $220.00 $1,100,000.00 $80.00 $400,000.00 ($140.00) ($700,000.00)CONCRETE SIDEWALKS0263.150
EA 1,500 $1,145.00 $1,717,500.00 $2,250.00 $3,375,000.00 $1,105.00 $1,657,500.00PEDESTRIAN RAMP0263.180
LF 3,000 $45.00 $135,000.00 $35.00 $105,000.00 ($10.00) ($30,000.00)CHAIN LINK FENCE- REMOVE AND RESET
0271.026
LF 2,500 $75.00 $187,500.00 $56.00 $140,000.00 ($19.00) ($47,500.00)72" CHAIN LINK FENCE0271.072
LF 900 $50.00 $45,000.00 $56.00 $50,400.00 $6.00 $5,400.00CHAIN LINK FENCE0271.110
SY 1,100 $2.00 $2,200.00 $3.50 $3,850.00 $1.50 $1,650.00SEEDING0282.150
Page 50 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
LF 5,062 $7.50 $37,965.00 $7.00 $35,434.00 ($0.50) ($2,531.00)EROSION CONTROL SYSTEM0282.202
CY 450 $25.00 $11,250.00 $60.00 $27,000.00 $35.00 $15,750.00SHREDDED BARK MULCH0282.407
EA 15 $1,200.00 $18,000.00 $900.00 $13,500.00 ($300.00) ($4,500.00)TREES REMOVED - UNDER 24"0284.100
EA 15 $2,500.00 $37,500.00 $4,500.00 $67,500.00 $2,000.00 $30,000.00TREES REMOVED - OVER 24"0284.101
EA 18 $200.00 $3,600.00 $1,000.00 $18,000.00 $800.00 $14,400.00STUMPS REMOVED0284.110
EA 15 $2,500.00 $37,500.00 $4,500.00 $67,500.00 $2,000.00 $30,000.00CONCRETE FOUNDATION- MBTASTANDARD BUS SHELTER
0334.121
EA 15 $2,000.00 $30,000.00 $4,500.00 $67,500.00 $2,500.00 $37,500.00CONCRETE FOUNDATION- MBTANARROW BUS SHELTER
0334.122
EA 30 $3,000.00 $90,000.00 $4,500.00 $135,000.00 $1,500.00 $45,000.00CONCRETE FOUNDATION- JCDECAUEX STANDARD BUS SHELTER
0334.123
LF 2,500 $90.00 $225,000.00 $100.00 $250,000.00 $10.00 $25,000.0012" REINFORCED CONCRETE PIPECLASS IV
0348.412
Page 51 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
LF 1,000 $100.00 $100,000.00 $110.00 $110,000.00 $10.00 $10,000.0018" REINFORCED CONCRETE PIPECLASS IV
0348.418
SF 2,000 $25.00 $50,000.00 $50.00 $100,000.00 $25.00 $50,000.00BRICK PAVING0426.154
LF 450 $5.00 $2,250.00 $15.00 $6,750.00 $10.00 $4,500.00REMOVE HIGHWAY GUARD0590.050
LF 450 $30.00 $13,500.00 $30.00 $13,500.00 $0.00 $0.00STEEL BEAM HIGHWAY GUARD- TYPE SS
0590.198
EA 8 $60.00 $480.00 $1,600.00 $12,800.00 $1,540.00 $12,320.00HIGHWAY GUARD STEEL BEAMTERMINAL SECTION
0590.202
LF 1,500 $1.25 $1,875.00 $2.00 $3,000.00 $0.75 $1,125.006" REFLECTORIZED YELLOW LINE1040.704
SF 15,200 $40.00 $608,000.00 $5.00 $76,000.00 ($35.00) ($532,000.00)REFLECTORIZED WHITE LINECROSSWALKS AND STOPS
1040.707
LF 1,500 $1.00 $1,500.00 $2.00 $3,000.00 $1.00 $1,500.004" REFLECTORIZED THERMOPLASTICWHITE LINE
1040.738
LF 1,500 $1.25 $1,875.00 $2.00 $3,000.00 $0.75 $1,125.006" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.739
Page 52 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
LF 35,000 $3.11 $108,850.00 $5.00 $175,000.00 $1.89 $66,150.0012" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.740
LF 1,500 $1.00 $1,500.00 $2.00 $3,000.00 $1.00 $1,500.004" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.760
LF 400 $4.00 $1,600.00 $5.00 $2,000.00 $1.00 $400.0012" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.765
AN 1 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $0.00 $0.00COLORED PAVEMENTMARKING-BUSWAY
1040.905
SF 200 $400.00 $80,000.00 $15.00 $3,000.00 ($385.00) ($77,000.00)PAVEMENT ARROWS1040.912
SF 6,750 $1.75 $11,812.50 $10.00 $67,500.00 $8.25 $55,687.50PAVEMENT MARKING REMOVAL1040.920
EA 700 $250.00 $175,000.00 $110.00 $77,000.00 ($140.00) ($98,000.00)BUS STOP SIGNS AND ATTACHMENTHARDWARE
1041.120
SF 4,000 $15.00 $60,000.00 $22.00 $88,000.00 $7.00 $28,000.00TRAFFIC SIGN, ALUMINUMPANEL - TYPE A
1041.262
EA 700 $275.00 $192,500.00 $250.00 $175,000.00 ($25.00) ($17,500.00)P-5 SIGN SUPPORT1041.336
Page 53 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
EA 400 $300.00 $120,000.00 $490.00 $196,000.00 $190.00 $76,000.002" SIGN POST1041.350
SF 2,000 $15.00 $30,000.00 $40.00 $80,000.00 $25.00 $50,000.00DIRECTIONAL SIGNS1041.619
SF 3,000 $15.00 $45,000.00 $25.00 $75,000.00 $10.00 $30,000.00WARNING AND REGULATORY SIGNS(PERMANENT)
1041.640
EA 400 $250.00 $100,000.00 $100.00 $40,000.00 ($150.00) ($60,000.00)SIGN AND SIGN SUPPORT REMOVED1042.089
EA 350 $225.00 $78,750.00 $300.00 $105,000.00 $75.00 $26,250.00SIGNS - REMOVE AND RESET1042.100
EA 350 $30.00 $10,500.00 $62.00 $21,700.00 $32.00 $11,200.00SIGNS - REMOVE AND STACK1042.110
EA 38 $1,000.00 $38,000.00 $406.00 $15,428.00 ($594.00) ($22,572.00)BENCHES - REMOVE AND RESET1050.215
EA 25 $6,500.00 $162,500.00 $7,200.00 $180,000.00 $700.00 $17,500.00PASSENGER SHELTER- REMOVE AND RESET
1076.021
EA 20 $1,500.00 $30,000.00 $406.00 $8,120.00 ($1,094.00) ($21,880.00)TRASH RECEPTACLE1098.020
Page 54 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
EA 20 $2,500.00 $50,000.00 $680.00 $13,600.00 ($1,820.00) ($36,400.00)BICYCLE RACK1112.000
EA 10 $400.00 $4,000.00 $1,100.00 $11,000.00 $700.00 $7,000.00BICYCLE RACK -- REMOVE ANDRESET
1112.002
EA 40 $500.00 $20,000.00 $200.00 $8,000.00 ($300.00) ($12,000.00)PARKING METERS -REMOVE AND STACK
1185.201
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00ELECTRICAL WORK1600.359
LF 1,000 $100.00 $100,000.00 $66.00 $66,000.00 ($34.00) ($34,000.00)2" PVC SCHEDULE 80 CONDUIT1615.102
LF 500 $110.00 $55,000.00 $68.00 $34,000.00 ($42.00) ($21,000.00)3" PVC SCHEDULE 80 CONDUIT1615.103
LF 500 $120.00 $60,000.00 $70.00 $35,000.00 ($50.00) ($25,000.00)4" PVC SCHEDULE 80 CONDUIT1615.104
LF 1,000 $60.00 $60,000.00 $45.00 $45,000.00 ($15.00) ($15,000.00)2" RIGID STEEL CONDUIT1619.204
LF 500 $82.00 $41,000.00 $90.00 $45,000.00 $8.00 $4,000.003" RIGID STEEL CONDUIT1619.206
Page 55 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2687
06/18/2019
R. ZOPPO CO. INC.
LF 500 $86.00 $43,000.00 $121.00 $60,500.00 $35.00 $17,500.004" RIGID STEEL CONDUIT1619.207
EA 75 $800.00 $60,000.00 $2,100.00 $157,500.00 $1,300.00 $97,500.00HANDHOLE - TYPE A1622.025
EA 25 $1,000.00 $25,000.00 $3,900.00 $97,500.00 $2,900.00 $72,500.00HANDHOLE - TYPE B1622.026
EA 100 $500.00 $50,000.00 $4,000.00 $400,000.00 $3,500.00 $350,000.00LIGHT POLE BASE1640.090
EA 100 $2,000.00 $200,000.00 $5,400.00 $540,000.00 $3,400.00 $340,000.00HIGHWAY LIGHT POST 24 FTCONCRETE WITH ONE SLIP OVERTYPE BRACKET - MUNICIPAL STD
1642.982
EA 30 $60,000.00 $1,800,000.00 $43,000.00 $1,290,000.00 ($17,000.00) ($510,000.00)SIGNALIZED PEDESTRIANCROSSING- RRFB
1651.140
EA 10 $60,000.00 $600,000.00 $36,500.00 $365,000.00 ($23,500.00) ($235,000.00)SIGNALIZED PEDESTRIANCROSSING- LED EDGE LIT FLASHINGSIGN
1651.144
RA 1 $1.00 $1.00 $1.00 $1.00 $0.00 $0.00RISK ALLOWANCE6500.000
$24,903,180.13 ($152,395.50)$25,055,575.63Total Estimate Contract Base Bid:
$24,903,180.13 ($152,395.50)$25,055,575.63Contract Total - Base Bid and Alternates:
Page 56 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
LS 1 $50,000.00 $50,000.00 $250,000.00 $250,000.00 $200,000.00 $200,000.00FIELD EQUIPMENT0130.162
AN 1 $750,000.00 $750,000.00 $750,000.00 $750,000.00 $0.00 $0.00PEDESTRIAN TRAFFICMAINTENANCE
0130.406
AN 1 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.429
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00ELECTRIC COMPANY0130.436
FP 1 $665,302.13 $665,302.13 $665,302.13 $665,302.13 $0.00 $0.00MOBILIZATION0170.101
SY 1,000 $35.00 $35,000.00 $135.00 $135,000.00 $100.00 $100,000.00REMOVAL AND DISPOSAL OFASPHALT PAVEMENT AT PLATFORMAND SIDEWALK LOCATIONS
0211.013
EA 360 $500.00 $180,000.00 $775.00 $279,000.00 $275.00 $99,000.00UTILITY STRUCTURE ADJUSTED0211.430
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00BOSTON WATER AND SEWERCOMMISSION UTILITIES
0211.472
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00TRANSPORTATION & DISPOSAL OFHAZARDOUS MATERIALS
0212.147
Page 57 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
A 4 $10,000.00 $35,000.00 $30,000.00 $105,000.00 $20,000.00 $70,000.00CLEARING AND VEGETATIONCONTROL
0213.020
SY 2,000 $150.00 $300,000.00 $290.00 $580,000.00 $140.00 $280,000.00FULL DEPTH PAVEMENT PATCH(LESS THAN 1,000 SY)
0216.111
SY 4,000 $100.00 $400,000.00 $96.00 $384,000.00 ($4.00) ($16,000.00)FULL DEPTH PAVEMENTRECONSTRUCTION (MORE THAN1,000 SY)
0216.112
SY 2,500 $5.50 $13,750.00 $20.00 $50,000.00 $14.50 $36,250.001.5'' PAVEMENT MILLING0216.120
SY 3,000 $6.50 $19,500.00 $22.00 $66,000.00 $15.50 $46,500.002'' PAVEMENT MILLING0216.121
EA 675 $175.00 $118,125.00 $240.00 $162,000.00 $65.00 $43,875.00SILT SACK0221.052
SY 1,100 $5.00 $5,500.00 $30.00 $33,000.00 $25.00 $27,500.00GRADING AND COMPACTION0221.201
CY 4,500 $35.00 $157,500.00 $67.00 $301,500.00 $32.00 $144,000.00UNCLASSIFIED EXCAVATION0222.003
CY 450 $95.00 $42,750.00 $200.00 $90,000.00 $105.00 $47,250.00TEST PITS0222.442
Page 58 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
CY 180 $125.00 $22,500.00 $95.00 $17,100.00 ($30.00) ($5,400.00)LIGHTWEIGHT AGGREGATE0222.470
CY 810 $40.00 $32,400.00 $85.00 $68,850.00 $45.00 $36,450.00ORDINARY BORROW0222.501
CY 7,000 $40.00 $280,000.00 $55.00 $385,000.00 $15.00 $105,000.00GRAVEL BORROW0222.504
EA 22 $2,500.00 $55,000.00 $8,000.00 $176,000.00 $5,500.00 $121,000.00PRECAST DRAIN MANHOLE0222.522
EA 25 $1,005.00 $25,125.00 $2,000.00 $50,000.00 $995.00 $24,875.00CATCH BASIN OR MANHOLECHANGE IN TYPE
0222.530
EA 25 $1,500.00 $37,500.00 $1,500.00 $37,500.00 $0.00 $0.00CATCH BASIN OR MANHOLEREMODELED
0222.531
EA 25 $500.00 $12,500.00 $900.00 $22,500.00 $400.00 $10,000.00CATCH BASIN, MANHOLE ORLEACHING BASIN -ADJUST TO LINE AND/OR GRADE
0222.540
EA 300 $250.00 $75,000.00 $900.00 $270,000.00 $650.00 $195,000.00FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
CY 1,000 $50.00 $50,000.00 $75.00 $75,000.00 $25.00 $25,000.00LOAM BORROW0222.550
Page 59 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
CY 360 $45.00 $16,200.00 $100.00 $36,000.00 $55.00 $19,800.003/4" CRUSHED STONE0222.596
EA 40 $850.00 $34,000.00 $1,500.00 $60,000.00 $650.00 $26,000.00INSTALL MBTA MANHOLE FRAMESAND COVERS
0225.110
CY 300 $150.00 $45,000.00 $200.00 $60,000.00 $50.00 $15,000.00FLOWABLE FILL0227.010
EA 150 $300.00 $45,000.00 $2,200.00 $330,000.00 $1,900.00 $285,000.00BOLLARDS0234.195
SF 300 $500.00 $150,000.00 $150.00 $45,000.00 ($350.00) ($105,000.00)RETAINING WALL - A0242.141
EA 150 $300.00 $45,000.00 $500.00 $75,000.00 $200.00 $30,000.00CLEANING DRAINAGE STRUCTURES0250.001
EA 25 $3,500.00 $87,500.00 $7,000.00 $175,000.00 $3,500.00 $87,500.00CATCH BASIN TYPE A0250.094
EA 25 $3,500.00 $87,500.00 $8,000.00 $200,000.00 $4,500.00 $112,500.00CATCH BASINS MUNICIPALSTANDARD
0250.101
EA 45 $1,500.00 $67,500.00 $5,000.00 $225,000.00 $3,500.00 $157,500.00DRAIN INLET0250.985
Page 60 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
LF 2,000 $60.00 $120,000.00 $100.00 $200,000.00 $40.00 $80,000.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 450 $60.00 $27,000.00 $120.00 $54,000.00 $60.00 $27,000.0012" PVC PIPE0251.593
LF 200 $100.00 $20,000.00 $200.00 $40,000.00 $100.00 $20,000.0018" PVC DRAIN PIPE SCHEDULE 400251.718
LF 180 $110.00 $19,800.00 $200.00 $36,000.00 $90.00 $16,200.0010" DUCTILE IRON PIPE0251.774
LF 450 $150.00 $67,500.00 $250.00 $112,500.00 $100.00 $45,000.0015" DUCTILE IRON PIPE0251.775
LF 2,500 $120.00 $300,000.00 $215.00 $537,500.00 $95.00 $237,500.0012" DUCTILE IRON PIPE0251.818
EA 60 $850.00 $51,000.00 $980.00 $58,800.00 $130.00 $7,800.00FRAME AND GRATE OR COVER- MUNICIPAL STANDARD
0255.077
EA 10 $1,500.00 $15,000.00 $4,000.00 $40,000.00 $2,500.00 $25,000.00DROP INLET0255.088
EA 16 $3,000.00 $48,000.00 $10,000.00 $160,000.00 $7,000.00 $112,000.00MANHOLES MUNICIPAL STANDARD0255.100
Page 61 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
VF 36 $1,150.00 $41,400.00 $800.00 $28,800.00 ($350.00) ($12,600.00)DRAINAGE STRUCTURE REBUILT0255.604
LF 6,000 $2.00 $12,000.00 $5.00 $30,000.00 $3.00 $18,000.00SAW CUTTING BITUMINOUSCONCRETE
0261.115
LF 9,000 $2.00 $18,000.00 $8.00 $72,000.00 $6.00 $54,000.00SAW CUTTING CEMENT CONCRETE0261.120
SY 4,000 $6.00 $24,000.00 $60.00 $240,000.00 $54.00 $216,000.00RECLAIMED BASE COURSE0261.165
TN 8,300 $300.00 $2,490,000.00 $185.00 $1,535,500.00 ($115.00) ($954,500.00)BITUMINOUS CONCRETEPAVING-BUSWAY
0261.180
TN 4,000 $200.00 $800,000.00 $175.00 $700,000.00 ($25.00) ($100,000.00)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1 TOP COURSE
0261.192
TN 120 $200.00 $24,000.00 $200.00 $24,000.00 $0.00 $0.00CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1LEVELING COURSE
0261.196
TN 2,000 $200.00 $400,000.00 $175.00 $350,000.00 ($25.00) ($50,000.00)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
TN 90 $300.00 $27,000.00 $695.00 $62,550.00 $395.00 $35,550.00CLASS I BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 TOP COURSE- HAND OPERATION
0261.204
Page 62 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
GL 650 $9.00 $5,850.00 $20.00 $13,000.00 $11.00 $7,150.00BITUMEN FOR TACK0261.331
LF 20,000 $44.60 $892,000.00 $75.00 $1,500,000.00 $30.40 $608,000.00GRANITE CURB STRAIGHT0262.180
LF 3,000 $50.00 $150,000.00 $90.00 $270,000.00 $40.00 $120,000.00GRANITE CURB CURVED0262.185
LF 15,000 $60.00 $900,000.00 $85.00 $1,275,000.00 $25.00 $375,000.00GRANITE TRANSITION CURB0262.251
LF 1,000 $28.00 $28,000.00 $75.00 $75,000.00 $47.00 $47,000.00CONCRETE CURB - STRAIGHT0262.300
LF 2,870 $32.00 $91,840.00 $90.00 $258,300.00 $58.00 $166,460.00CONCRETE CURB - CURVED0262.310
LF 1,500 $31.00 $46,500.00 $60.00 $90,000.00 $29.00 $43,500.00CURBING - REMOVE AND RESET0262.701
LF 6,075 $7.00 $42,525.00 $10.00 $60,750.00 $3.00 $18,225.00CURBING - REMOVE AND DISCARD0262.720
LF 1,500 $100.00 $150,000.00 $45.00 $67,500.00 ($55.00) ($82,500.00)BITUMINOUS CONCRETE CURBTYPE 2
0262.799
Page 63 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
SY 12,500 $189.00 $2,362,500.00 $125.00 $1,562,500.00 ($64.00) ($800,000.00)CONCRETE SIDEWALK0263.015
SF 8,000 $64.00 $512,000.00 $65.00 $520,000.00 $1.00 $8,000.00TACTILE WARNING STRIP0263.116
SF 1,350 $80.00 $108,000.00 $150.00 $202,500.00 $70.00 $94,500.00TACTILE WARNING STRIP- CASTIRON
0263.118
SY 5,000 $220.00 $1,100,000.00 $135.00 $675,000.00 ($85.00) ($425,000.00)CONCRETE SIDEWALKS0263.150
EA 1,500 $1,145.00 $1,717,500.00 $1,500.00 $2,250,000.00 $355.00 $532,500.00PEDESTRIAN RAMP0263.180
LF 3,000 $45.00 $135,000.00 $120.00 $360,000.00 $75.00 $225,000.00CHAIN LINK FENCE- REMOVE AND RESET
0271.026
LF 2,500 $75.00 $187,500.00 $125.00 $312,500.00 $50.00 $125,000.0072" CHAIN LINK FENCE0271.072
LF 900 $50.00 $45,000.00 $100.00 $90,000.00 $50.00 $45,000.00CHAIN LINK FENCE0271.110
SY 1,100 $2.00 $2,200.00 $10.00 $11,000.00 $8.00 $8,800.00SEEDING0282.150
Page 64 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
LF 5,062 $7.50 $37,965.00 $20.00 $101,240.00 $12.50 $63,275.00EROSION CONTROL SYSTEM0282.202
CY 450 $25.00 $11,250.00 $80.00 $36,000.00 $55.00 $24,750.00SHREDDED BARK MULCH0282.407
EA 15 $1,200.00 $18,000.00 $1,300.00 $19,500.00 $100.00 $1,500.00TREES REMOVED - UNDER 24"0284.100
EA 15 $2,500.00 $37,500.00 $2,000.00 $30,000.00 ($500.00) ($7,500.00)TREES REMOVED - OVER 24"0284.101
EA 18 $200.00 $3,600.00 $750.00 $13,500.00 $550.00 $9,900.00STUMPS REMOVED0284.110
EA 15 $2,500.00 $37,500.00 $35,000.00 $525,000.00 $32,500.00 $487,500.00CONCRETE FOUNDATION- MBTASTANDARD BUS SHELTER
0334.121
EA 15 $2,000.00 $30,000.00 $35,000.00 $525,000.00 $33,000.00 $495,000.00CONCRETE FOUNDATION- MBTANARROW BUS SHELTER
0334.122
EA 30 $3,000.00 $90,000.00 $35,000.00 $1,050,000.00 $32,000.00 $960,000.00CONCRETE FOUNDATION- JCDECAUEX STANDARD BUS SHELTER
0334.123
LF 2,500 $90.00 $225,000.00 $100.00 $250,000.00 $10.00 $25,000.0012" REINFORCED CONCRETE PIPECLASS IV
0348.412
Page 65 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
LF 1,000 $100.00 $100,000.00 $130.00 $130,000.00 $30.00 $30,000.0018" REINFORCED CONCRETE PIPECLASS IV
0348.418
SF 2,000 $25.00 $50,000.00 $65.00 $130,000.00 $40.00 $80,000.00BRICK PAVING0426.154
LF 450 $5.00 $2,250.00 $10.00 $4,500.00 $5.00 $2,250.00REMOVE HIGHWAY GUARD0590.050
LF 450 $30.00 $13,500.00 $72.00 $32,400.00 $42.00 $18,900.00STEEL BEAM HIGHWAY GUARD- TYPE SS
0590.198
EA 8 $60.00 $480.00 $500.00 $4,000.00 $440.00 $3,520.00HIGHWAY GUARD STEEL BEAMTERMINAL SECTION
0590.202
LF 1,500 $1.25 $1,875.00 $2.00 $3,000.00 $0.75 $1,125.006" REFLECTORIZED YELLOW LINE1040.704
SF 15,200 $40.00 $608,000.00 $4.00 $60,800.00 ($36.00) ($547,200.00)REFLECTORIZED WHITE LINECROSSWALKS AND STOPS
1040.707
LF 1,500 $1.00 $1,500.00 $2.00 $3,000.00 $1.00 $1,500.004" REFLECTORIZED THERMOPLASTICWHITE LINE
1040.738
LF 1,500 $1.25 $1,875.00 $2.00 $3,000.00 $0.75 $1,125.006" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.739
Page 66 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
LF 35,000 $3.11 $108,850.00 $4.00 $140,000.00 $0.89 $31,150.0012" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.740
LF 1,500 $1.00 $1,500.00 $2.00 $3,000.00 $1.00 $1,500.004" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.760
LF 400 $4.00 $1,600.00 $5.00 $2,000.00 $1.00 $400.0012" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.765
AN 1 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $0.00 $0.00COLORED PAVEMENTMARKING-BUSWAY
1040.905
SF 200 $400.00 $80,000.00 $20.00 $4,000.00 ($380.00) ($76,000.00)PAVEMENT ARROWS1040.912
SF 6,750 $1.75 $11,812.50 $3.00 $20,250.00 $1.25 $8,437.50PAVEMENT MARKING REMOVAL1040.920
EA 700 $250.00 $175,000.00 $110.00 $77,000.00 ($140.00) ($98,000.00)BUS STOP SIGNS AND ATTACHMENTHARDWARE
1041.120
SF 4,000 $15.00 $60,000.00 $14.00 $56,000.00 ($1.00) ($4,000.00)TRAFFIC SIGN, ALUMINUMPANEL - TYPE A
1041.262
EA 700 $275.00 $192,500.00 $160.00 $112,000.00 ($115.00) ($80,500.00)P-5 SIGN SUPPORT1041.336
Page 67 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
EA 400 $300.00 $120,000.00 $150.00 $60,000.00 ($150.00) ($60,000.00)2" SIGN POST1041.350
SF 2,000 $15.00 $30,000.00 $25.00 $50,000.00 $10.00 $20,000.00DIRECTIONAL SIGNS1041.619
SF 3,000 $15.00 $45,000.00 $15.00 $45,000.00 $0.00 $0.00WARNING AND REGULATORY SIGNS(PERMANENT)
1041.640
EA 400 $250.00 $100,000.00 $25.00 $10,000.00 ($225.00) ($90,000.00)SIGN AND SIGN SUPPORT REMOVED1042.089
EA 350 $225.00 $78,750.00 $110.00 $38,500.00 ($115.00) ($40,250.00)SIGNS - REMOVE AND RESET1042.100
EA 350 $30.00 $10,500.00 $22.00 $7,700.00 ($8.00) ($2,800.00)SIGNS - REMOVE AND STACK1042.110
EA 38 $1,000.00 $38,000.00 $1,500.00 $57,000.00 $500.00 $19,000.00BENCHES - REMOVE AND RESET1050.215
EA 25 $6,500.00 $162,500.00 $10,000.00 $250,000.00 $3,500.00 $87,500.00PASSENGER SHELTER- REMOVE AND RESET
1076.021
EA 20 $1,500.00 $30,000.00 $3,800.00 $76,000.00 $2,300.00 $46,000.00TRASH RECEPTACLE1098.020
Page 68 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
EA 20 $2,500.00 $50,000.00 $3,800.00 $76,000.00 $1,300.00 $26,000.00BICYCLE RACK1112.000
EA 10 $400.00 $4,000.00 $2,800.00 $28,000.00 $2,400.00 $24,000.00BICYCLE RACK -- REMOVE ANDRESET
1112.002
EA 40 $500.00 $20,000.00 $500.00 $20,000.00 $0.00 $0.00PARKING METERS -REMOVE AND STACK
1185.201
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00ELECTRICAL WORK1600.359
LF 1,000 $100.00 $100,000.00 $58.00 $58,000.00 ($42.00) ($42,000.00)2" PVC SCHEDULE 80 CONDUIT1615.102
LF 500 $110.00 $55,000.00 $80.00 $40,000.00 ($30.00) ($15,000.00)3" PVC SCHEDULE 80 CONDUIT1615.103
LF 500 $120.00 $60,000.00 $85.00 $42,500.00 ($35.00) ($17,500.00)4" PVC SCHEDULE 80 CONDUIT1615.104
LF 1,000 $60.00 $60,000.00 $95.00 $95,000.00 $35.00 $35,000.002" RIGID STEEL CONDUIT1619.204
LF 500 $82.00 $41,000.00 $115.00 $57,500.00 $33.00 $16,500.003" RIGID STEEL CONDUIT1619.206
Page 69 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
3654
06/18/2019
N.E.L. Corporation
LF 500 $86.00 $43,000.00 $135.00 $67,500.00 $49.00 $24,500.004" RIGID STEEL CONDUIT1619.207
EA 75 $800.00 $60,000.00 $1,500.00 $112,500.00 $700.00 $52,500.00HANDHOLE - TYPE A1622.025
EA 25 $1,000.00 $25,000.00 $3,500.00 $87,500.00 $2,500.00 $62,500.00HANDHOLE - TYPE B1622.026
EA 100 $500.00 $50,000.00 $3,500.00 $350,000.00 $3,000.00 $300,000.00LIGHT POLE BASE1640.090
EA 100 $2,000.00 $200,000.00 $6,000.00 $600,000.00 $4,000.00 $400,000.00HIGHWAY LIGHT POST 24 FTCONCRETE WITH ONE SLIP OVERTYPE BRACKET - MUNICIPAL STD
1642.982
EA 30 $60,000.00 $1,800,000.00 $43,000.00 $1,290,000.00 ($17,000.00) ($510,000.00)SIGNALIZED PEDESTRIANCROSSING- RRFB
1651.140
EA 10 $60,000.00 $600,000.00 $33,000.00 $330,000.00 ($27,000.00) ($270,000.00)SIGNALIZED PEDESTRIANCROSSING- LED EDGE LIT FLASHINGSIGN
1651.144
RA 1 $1.00 $1.00 $1.00 $1.00 $0.00 $0.00RISK ALLOWANCE6500.000
$29,667,343.13 $4,611,767.50$25,055,575.63Total Estimate Contract Base Bid:
$29,667,343.13 $4,611,767.50$25,055,575.63Contract Total - Base Bid and Alternates:
Page 70 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
LS 1 $50,000.00 $50,000.00 $80,530.51 $80,530.51 $30,530.51 $30,530.51FIELD EQUIPMENT0130.162
AN 1 $750,000.00 $750,000.00 $750,000.00 $750,000.00 $0.00 $0.00PEDESTRIAN TRAFFICMAINTENANCE
0130.406
AN 1 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.429
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00ELECTRIC COMPANY0130.436
FP 1 $665,302.13 $665,302.13 $665,302.13 $665,302.13 $0.00 $0.00MOBILIZATION0170.101
SY 1,000 $35.00 $35,000.00 $12.00 $12,000.00 ($23.00) ($23,000.00)REMOVAL AND DISPOSAL OFASPHALT PAVEMENT AT PLATFORMAND SIDEWALK LOCATIONS
0211.013
EA 360 $500.00 $180,000.00 $1,500.00 $540,000.00 $1,000.00 $360,000.00UTILITY STRUCTURE ADJUSTED0211.430
AN 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $0.00 $0.00BOSTON WATER AND SEWERCOMMISSION UTILITIES
0211.472
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00TRANSPORTATION & DISPOSAL OFHAZARDOUS MATERIALS
0212.147
Page 71 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
A 4 $10,000.00 $35,000.00 $25,000.00 $87,500.00 $15,000.00 $52,500.00CLEARING AND VEGETATIONCONTROL
0213.020
SY 2,000 $150.00 $300,000.00 $175.00 $350,000.00 $25.00 $50,000.00FULL DEPTH PAVEMENT PATCH(LESS THAN 1,000 SY)
0216.111
SY 4,000 $100.00 $400,000.00 $150.00 $600,000.00 $50.00 $200,000.00FULL DEPTH PAVEMENTRECONSTRUCTION (MORE THAN1,000 SY)
0216.112
SY 2,500 $5.50 $13,750.00 $20.00 $50,000.00 $14.50 $36,250.001.5'' PAVEMENT MILLING0216.120
SY 3,000 $6.50 $19,500.00 $25.00 $75,000.00 $18.50 $55,500.002'' PAVEMENT MILLING0216.121
EA 675 $175.00 $118,125.00 $420.00 $283,500.00 $245.00 $165,375.00SILT SACK0221.052
SY 1,100 $5.00 $5,500.00 $30.00 $33,000.00 $25.00 $27,500.00GRADING AND COMPACTION0221.201
CY 4,500 $35.00 $157,500.00 $90.00 $405,000.00 $55.00 $247,500.00UNCLASSIFIED EXCAVATION0222.003
CY 450 $95.00 $42,750.00 $375.00 $168,750.00 $280.00 $126,000.00TEST PITS0222.442
Page 72 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
CY 180 $125.00 $22,500.00 $175.00 $31,500.00 $50.00 $9,000.00LIGHTWEIGHT AGGREGATE0222.470
CY 810 $40.00 $32,400.00 $105.00 $85,050.00 $65.00 $52,650.00ORDINARY BORROW0222.501
CY 7,000 $40.00 $280,000.00 $90.00 $630,000.00 $50.00 $350,000.00GRAVEL BORROW0222.504
EA 22 $2,500.00 $55,000.00 $7,000.00 $154,000.00 $4,500.00 $99,000.00PRECAST DRAIN MANHOLE0222.522
EA 25 $1,005.00 $25,125.00 $5,000.00 $125,000.00 $3,995.00 $99,875.00CATCH BASIN OR MANHOLECHANGE IN TYPE
0222.530
EA 25 $1,500.00 $37,500.00 $5,000.00 $125,000.00 $3,500.00 $87,500.00CATCH BASIN OR MANHOLEREMODELED
0222.531
EA 25 $500.00 $12,500.00 $1,800.00 $45,000.00 $1,300.00 $32,500.00CATCH BASIN, MANHOLE ORLEACHING BASIN -ADJUST TO LINE AND/OR GRADE
0222.540
EA 300 $250.00 $75,000.00 $2,000.00 $600,000.00 $1,750.00 $525,000.00FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
CY 1,000 $50.00 $50,000.00 $100.00 $100,000.00 $50.00 $50,000.00LOAM BORROW0222.550
Page 73 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
CY 360 $45.00 $16,200.00 $350.00 $126,000.00 $305.00 $109,800.003/4" CRUSHED STONE0222.596
EA 40 $850.00 $34,000.00 $1,800.00 $72,000.00 $950.00 $38,000.00INSTALL MBTA MANHOLE FRAMESAND COVERS
0225.110
CY 300 $150.00 $45,000.00 $400.00 $120,000.00 $250.00 $75,000.00FLOWABLE FILL0227.010
EA 150 $300.00 $45,000.00 $1,200.00 $180,000.00 $900.00 $135,000.00BOLLARDS0234.195
SF 300 $500.00 $150,000.00 $150.00 $45,000.00 ($350.00) ($105,000.00)RETAINING WALL - A0242.141
EA 150 $300.00 $45,000.00 $855.00 $128,250.00 $555.00 $83,250.00CLEANING DRAINAGE STRUCTURES0250.001
EA 25 $3,500.00 $87,500.00 $12,000.00 $300,000.00 $8,500.00 $212,500.00CATCH BASIN TYPE A0250.094
EA 25 $3,500.00 $87,500.00 $10,000.00 $250,000.00 $6,500.00 $162,500.00CATCH BASINS MUNICIPALSTANDARD
0250.101
EA 45 $1,500.00 $67,500.00 $7,000.00 $315,000.00 $5,500.00 $247,500.00DRAIN INLET0250.985
Page 74 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
LF 2,000 $60.00 $120,000.00 $225.00 $450,000.00 $165.00 $330,000.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 450 $60.00 $27,000.00 $265.00 $119,250.00 $205.00 $92,250.0012" PVC PIPE0251.593
LF 200 $100.00 $20,000.00 $325.00 $65,000.00 $225.00 $45,000.0018" PVC DRAIN PIPE SCHEDULE 400251.718
LF 180 $110.00 $19,800.00 $425.00 $76,500.00 $315.00 $56,700.0010" DUCTILE IRON PIPE0251.774
LF 450 $150.00 $67,500.00 $600.00 $270,000.00 $450.00 $202,500.0015" DUCTILE IRON PIPE0251.775
LF 2,500 $120.00 $300,000.00 $540.00 $1,350,000.00 $420.00 $1,050,000.0012" DUCTILE IRON PIPE0251.818
EA 60 $850.00 $51,000.00 $1,500.00 $90,000.00 $650.00 $39,000.00FRAME AND GRATE OR COVER- MUNICIPAL STANDARD
0255.077
EA 10 $1,500.00 $15,000.00 $9,500.00 $95,000.00 $8,000.00 $80,000.00DROP INLET0255.088
EA 16 $3,000.00 $48,000.00 $11,500.00 $184,000.00 $8,500.00 $136,000.00MANHOLES MUNICIPAL STANDARD0255.100
Page 75 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
VF 36 $1,150.00 $41,400.00 $1,350.00 $48,600.00 $200.00 $7,200.00DRAINAGE STRUCTURE REBUILT0255.604
LF 6,000 $2.00 $12,000.00 $11.00 $66,000.00 $9.00 $54,000.00SAW CUTTING BITUMINOUSCONCRETE
0261.115
LF 9,000 $2.00 $18,000.00 $15.00 $135,000.00 $13.00 $117,000.00SAW CUTTING CEMENT CONCRETE0261.120
SY 4,000 $6.00 $24,000.00 $20.00 $80,000.00 $14.00 $56,000.00RECLAIMED BASE COURSE0261.165
TN 8,300 $300.00 $2,490,000.00 $195.00 $1,618,500.00 ($105.00) ($871,500.00)BITUMINOUS CONCRETEPAVING-BUSWAY
0261.180
TN 4,000 $200.00 $800,000.00 $200.00 $800,000.00 $0.00 $0.00CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1 TOP COURSE
0261.192
TN 120 $200.00 $24,000.00 $210.00 $25,200.00 $10.00 $1,200.00CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1LEVELING COURSE
0261.196
TN 2,000 $200.00 $400,000.00 $195.00 $390,000.00 ($5.00) ($10,000.00)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
TN 90 $300.00 $27,000.00 $280.00 $25,200.00 ($20.00) ($1,800.00)CLASS I BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 TOP COURSE- HAND OPERATION
0261.204
Page 76 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
GL 650 $9.00 $5,850.00 $10.50 $6,825.00 $1.50 $975.00BITUMEN FOR TACK0261.331
LF 20,000 $44.60 $892,000.00 $60.00 $1,200,000.00 $15.40 $308,000.00GRANITE CURB STRAIGHT0262.180
LF 3,000 $50.00 $150,000.00 $80.00 $240,000.00 $30.00 $90,000.00GRANITE CURB CURVED0262.185
LF 15,000 $60.00 $900,000.00 $70.00 $1,050,000.00 $10.00 $150,000.00GRANITE TRANSITION CURB0262.251
LF 1,000 $28.00 $28,000.00 $45.00 $45,000.00 $17.00 $17,000.00CONCRETE CURB - STRAIGHT0262.300
LF 2,870 $32.00 $91,840.00 $50.00 $143,500.00 $18.00 $51,660.00CONCRETE CURB - CURVED0262.310
LF 1,500 $31.00 $46,500.00 $40.00 $60,000.00 $9.00 $13,500.00CURBING - REMOVE AND RESET0262.701
LF 6,075 $7.00 $42,525.00 $10.00 $60,750.00 $3.00 $18,225.00CURBING - REMOVE AND DISCARD0262.720
LF 1,500 $100.00 $150,000.00 $50.00 $75,000.00 ($50.00) ($75,000.00)BITUMINOUS CONCRETE CURBTYPE 2
0262.799
Page 77 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
SY 12,500 $189.00 $2,362,500.00 $70.00 $875,000.00 ($119.00) ($1,487,500.00)CONCRETE SIDEWALK0263.015
SF 8,000 $64.00 $512,000.00 $40.00 $320,000.00 ($24.00) ($192,000.00)TACTILE WARNING STRIP0263.116
SF 1,350 $80.00 $108,000.00 $100.00 $135,000.00 $20.00 $27,000.00TACTILE WARNING STRIP- CASTIRON
0263.118
SY 5,000 $220.00 $1,100,000.00 $85.00 $425,000.00 ($135.00) ($675,000.00)CONCRETE SIDEWALKS0263.150
EA 1,500 $1,145.00 $1,717,500.00 $800.00 $1,200,000.00 ($345.00) ($517,500.00)PEDESTRIAN RAMP0263.180
LF 3,000 $45.00 $135,000.00 $90.00 $270,000.00 $45.00 $135,000.00CHAIN LINK FENCE- REMOVE AND RESET
0271.026
LF 2,500 $75.00 $187,500.00 $100.00 $250,000.00 $25.00 $62,500.0072" CHAIN LINK FENCE0271.072
LF 900 $50.00 $45,000.00 $100.00 $90,000.00 $50.00 $45,000.00CHAIN LINK FENCE0271.110
SY 1,100 $2.00 $2,200.00 $5.00 $5,500.00 $3.00 $3,300.00SEEDING0282.150
Page 78 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
LF 5,062 $7.50 $37,965.00 $20.00 $101,240.00 $12.50 $63,275.00EROSION CONTROL SYSTEM0282.202
CY 450 $25.00 $11,250.00 $100.00 $45,000.00 $75.00 $33,750.00SHREDDED BARK MULCH0282.407
EA 15 $1,200.00 $18,000.00 $2,500.00 $37,500.00 $1,300.00 $19,500.00TREES REMOVED - UNDER 24"0284.100
EA 15 $2,500.00 $37,500.00 $3,000.00 $45,000.00 $500.00 $7,500.00TREES REMOVED - OVER 24"0284.101
EA 18 $200.00 $3,600.00 $2,000.00 $36,000.00 $1,800.00 $32,400.00STUMPS REMOVED0284.110
EA 15 $2,500.00 $37,500.00 $50,500.00 $757,500.00 $48,000.00 $720,000.00CONCRETE FOUNDATION- MBTASTANDARD BUS SHELTER
0334.121
EA 15 $2,000.00 $30,000.00 $50,000.00 $750,000.00 $48,000.00 $720,000.00CONCRETE FOUNDATION- MBTANARROW BUS SHELTER
0334.122
EA 30 $3,000.00 $90,000.00 $60,000.00 $1,800,000.00 $57,000.00 $1,710,000.00CONCRETE FOUNDATION- JCDECAUEX STANDARD BUS SHELTER
0334.123
LF 2,500 $90.00 $225,000.00 $280.00 $700,000.00 $190.00 $475,000.0012" REINFORCED CONCRETE PIPECLASS IV
0348.412
Page 79 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
LF 1,000 $100.00 $100,000.00 $300.00 $300,000.00 $200.00 $200,000.0018" REINFORCED CONCRETE PIPECLASS IV
0348.418
SF 2,000 $25.00 $50,000.00 $65.00 $130,000.00 $40.00 $80,000.00BRICK PAVING0426.154
LF 450 $5.00 $2,250.00 $15.00 $6,750.00 $10.00 $4,500.00REMOVE HIGHWAY GUARD0590.050
LF 450 $30.00 $13,500.00 $55.00 $24,750.00 $25.00 $11,250.00STEEL BEAM HIGHWAY GUARD- TYPE SS
0590.198
EA 8 $60.00 $480.00 $4,500.00 $36,000.00 $4,440.00 $35,520.00HIGHWAY GUARD STEEL BEAMTERMINAL SECTION
0590.202
LF 1,500 $1.25 $1,875.00 $5.00 $7,500.00 $3.75 $5,625.006" REFLECTORIZED YELLOW LINE1040.704
SF 15,200 $40.00 $608,000.00 $6.00 $91,200.00 ($34.00) ($516,800.00)REFLECTORIZED WHITE LINECROSSWALKS AND STOPS
1040.707
LF 1,500 $1.00 $1,500.00 $2.00 $3,000.00 $1.00 $1,500.004" REFLECTORIZED THERMOPLASTICWHITE LINE
1040.738
LF 1,500 $1.25 $1,875.00 $2.50 $3,750.00 $1.25 $1,875.006" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.739
Page 80 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
LF 35,000 $3.11 $108,850.00 $6.00 $210,000.00 $2.89 $101,150.0012" REFLECTORIZEDTHERMOPLASTIC WHITE LINE
1040.740
LF 1,500 $1.00 $1,500.00 $3.00 $4,500.00 $2.00 $3,000.004" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.760
LF 400 $4.00 $1,600.00 $6.00 $2,400.00 $2.00 $800.0012" REFLECTORIZEDTHERMOPLASTIC YELLOW LINE
1040.765
AN 1 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $0.00 $0.00COLORED PAVEMENTMARKING-BUSWAY
1040.905
SF 200 $400.00 $80,000.00 $11.00 $2,200.00 ($389.00) ($77,800.00)PAVEMENT ARROWS1040.912
SF 6,750 $1.75 $11,812.50 $3.00 $20,250.00 $1.25 $8,437.50PAVEMENT MARKING REMOVAL1040.920
EA 700 $250.00 $175,000.00 $110.00 $77,000.00 ($140.00) ($98,000.00)BUS STOP SIGNS AND ATTACHMENTHARDWARE
1041.120
SF 4,000 $15.00 $60,000.00 $22.00 $88,000.00 $7.00 $28,000.00TRAFFIC SIGN, ALUMINUMPANEL - TYPE A
1041.262
EA 700 $275.00 $192,500.00 $250.00 $175,000.00 ($25.00) ($17,500.00)P-5 SIGN SUPPORT1041.336
Page 81 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
EA 400 $300.00 $120,000.00 $500.00 $200,000.00 $200.00 $80,000.002" SIGN POST1041.350
SF 2,000 $15.00 $30,000.00 $40.00 $80,000.00 $25.00 $50,000.00DIRECTIONAL SIGNS1041.619
SF 3,000 $15.00 $45,000.00 $25.00 $75,000.00 $10.00 $30,000.00WARNING AND REGULATORY SIGNS(PERMANENT)
1041.640
EA 400 $250.00 $100,000.00 $100.00 $40,000.00 ($150.00) ($60,000.00)SIGN AND SIGN SUPPORT REMOVED1042.089
EA 350 $225.00 $78,750.00 $300.00 $105,000.00 $75.00 $26,250.00SIGNS - REMOVE AND RESET1042.100
EA 350 $30.00 $10,500.00 $75.00 $26,250.00 $45.00 $15,750.00SIGNS - REMOVE AND STACK1042.110
EA 38 $1,000.00 $38,000.00 $5,000.00 $190,000.00 $4,000.00 $152,000.00BENCHES - REMOVE AND RESET1050.215
EA 25 $6,500.00 $162,500.00 $45,000.00 $1,125,000.00 $38,500.00 $962,500.00PASSENGER SHELTER- REMOVE AND RESET
1076.021
EA 20 $1,500.00 $30,000.00 $7,500.00 $150,000.00 $6,000.00 $120,000.00TRASH RECEPTACLE1098.020
Page 82 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
EA 20 $2,500.00 $50,000.00 $5,000.00 $100,000.00 $2,500.00 $50,000.00BICYCLE RACK1112.000
EA 10 $400.00 $4,000.00 $7,000.00 $70,000.00 $6,600.00 $66,000.00BICYCLE RACK -- REMOVE ANDRESET
1112.002
EA 40 $500.00 $20,000.00 $650.00 $26,000.00 $150.00 $6,000.00PARKING METERS -REMOVE AND STACK
1185.201
AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00ELECTRICAL WORK1600.359
LF 1,000 $100.00 $100,000.00 $120.00 $120,000.00 $20.00 $20,000.002" PVC SCHEDULE 80 CONDUIT1615.102
LF 500 $110.00 $55,000.00 $140.00 $70,000.00 $30.00 $15,000.003" PVC SCHEDULE 80 CONDUIT1615.103
LF 500 $120.00 $60,000.00 $150.00 $75,000.00 $30.00 $15,000.004" PVC SCHEDULE 80 CONDUIT1615.104
LF 1,000 $60.00 $60,000.00 $225.00 $225,000.00 $165.00 $165,000.002" RIGID STEEL CONDUIT1619.204
LF 500 $82.00 $41,000.00 $300.00 $150,000.00 $218.00 $109,000.003" RIGID STEEL CONDUIT1619.206
Page 83 of 90
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract N50CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Bus Infrastructure and Accessibility On-Call,Systemwide
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer:
WESTON & SAMPSON ENGINEERS INC.
3154 Bidder:
Firm Name:
Bid Date:
2997
06/18/2019
The Middlesex Corp.
LF 500 $86.00 $43,000.00 $415.00 $207,500.00 $329.00 $164,500.004" RIGID STEEL CONDUIT1619.207
EA 75 $800.00 $60,000.00 $4,500.00 $337,500.00 $3,700.00 $277,500.00HANDHOLE - TYPE A1622.025
EA 25 $1,000.00 $25,000.00 $5,100.00 $127,500.00 $4,100.00 $102,500.00HANDHOLE - TYPE B1622.026
EA 100 $500.00 $50,000.00 $5,000.00 $500,000.00 $4,500.00 $450,000.00LIGHT POLE BASE1640.090
EA 100 $2,000.00 $200,000.00 $8,000.00 $800,000.00 $6,000.00 $600,000.00HIGHWAY LIGHT POST 24 FTCONCRETE WITH ONE SLIP OVERTYPE BRACKET - MUNICIPAL STD
1642.982
EA 30 $60,000.00 $1,800,000.00 $75,000.00 $2,250,000.00 $15,000.00 $450,000.00SIGNALIZED PEDESTRIANCROSSING- RRFB
1651.140
EA 10 $60,000.00 $600,000.00 $75,000.00 $750,000.00 $15,000.00 $150,000.00SIGNALIZED PEDESTRIANCROSSING- LED EDGE LIT FLASHINGSIGN
1651.144
RA 1 $1.00 $1.00 $1.00 $1.00 $0.00 $0.00RISK ALLOWANCE6500.000
$35,576,498.64 $10,520,923.01$25,055,575.63Total Estimate Contract Base Bid:
$35,576,498.64 $10,520,923.01$25,055,575.63Contract Total - Base Bid and Alternates:
Page 84 of 90
N50CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer: 3154 Bidder:
Bid Date:
2997
06/18/2019
WESTON & SAMPSON ENGINEERS INC.Bus Infrastructure and Accessibility On-Call,Systemwide
Contract
Firm Name: The Middlesex Corp.
VarianceBidderEngineer
Total Type Basic = $25,055,575.63 $35,576,498.64 ($10,520,923.01)
Contract Total - Base Bid and Alternates: $25,055,575.63 $35,576,498.64 ($10,520,923.01)
Page 85 of 90
N50CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer: 3154 Bidder:
Bid Date:
3654
06/18/2019
WESTON & SAMPSON ENGINEERS INC.Bus Infrastructure and Accessibility On-Call,Systemwide
Contract
Firm Name: N.E.L. Corporation
VarianceBidderEngineer
Total Type Basic = $25,055,575.63 $29,667,343.13 ($4,611,767.50)
Contract Total - Base Bid and Alternates: $25,055,575.63 $29,667,343.13 ($4,611,767.50)
Page 86 of 90
N50CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer: 3154 Bidder:
Bid Date:
2687
06/18/2019
WESTON & SAMPSON ENGINEERS INC.Bus Infrastructure and Accessibility On-Call,Systemwide
Contract
Firm Name: R. ZOPPO CO. INC.
VarianceBidderEngineer
Total Type Basic = $25,055,575.63 $24,903,180.13 $152,395.50
Contract Total - Base Bid and Alternates: $25,055,575.63 $24,903,180.13 $152,395.50
Page 87 of 90
N50CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer: 3154 Bidder:
Bid Date:
4999
06/18/2019
WESTON & SAMPSON ENGINEERS INC.Bus Infrastructure and Accessibility On-Call,Systemwide
Contract
Firm Name: Fred DeRoma & Son, Inc.
VarianceBidderEngineer
Total Type Basic = $25,055,575.63 $24,875,027.27 $180,548.36
Contract Total - Base Bid and Alternates: $25,055,575.63 $24,875,027.27 $180,548.36
Page 88 of 90
N50CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer: 3154 Bidder:
Bid Date:
3670
06/18/2019
WESTON & SAMPSON ENGINEERS INC.Bus Infrastructure and Accessibility On-Call,Systemwide
Contract
Firm Name: Newport Construction Corporation
VarianceBidderEngineer
Total Type Basic = $25,055,575.63 $20,877,468.13 $4,178,107.50
Contract Total - Base Bid and Alternates: $25,055,575.63 $20,877,468.13 $4,178,107.50
Page 89 of 90
N50CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Engineer: 3154 Bidder:
Bid Date:
2880
06/18/2019
WESTON & SAMPSON ENGINEERS INC.Bus Infrastructure and Accessibility On-Call,Systemwide
Contract
Firm Name: Sps New England, Inc.
VarianceBidderEngineer
Total Type Basic = $25,055,575.63 $19,393,560.63 $5,662,015.00
Contract Total - Base Bid and Alternates: $25,055,575.63 $19,393,560.63 $5,662,015.00
Page 90 of 90