Date post: | 04-Apr-2018 |
Category: |
Documents |
Upload: | craig-midgley |
View: | 230 times |
Download: | 0 times |
of 16
7/31/2019 Datums and Planning
1/16
Marking Out
Good Morning
7/31/2019 Datums and Planning
2/16
Todays aims
Ensure that you understand and canuse basic tooling
Learn about the main types of datum
Practice planning a task.
7/31/2019 Datums and Planning
3/16
Tooling
Scribe Very sharp point
Sharpened with an oil
stone.
Used for very sharp
lines Should not be ground
sharp
Cuts into the work to
produce its mark.
Soft materials only
7/31/2019 Datums and Planning
4/16
Centre punch & Dot punch
Centre punch:
Used for pre-drillingpunches, and chisiling
Dot punch:
Used for lighter punching.
Provides a protection line
Prevents slip of callipers
and compasses.
Point angle 90
Centre punch
Point angle 60
Dot punch
7/31/2019 Datums and Planning
5/16
Dividers Odd leg callipers
Used to scribe a circle or
a radius. Tips need to be needle
sharp and level.
Used to scribe following
a datum edge or offsetany other edge.
7/31/2019 Datums and Planning
6/16
Questions
What do we use a height gauge for?
What must we do before we use a
height gauge?
What do we use to keep our workPerpendicular when marking out?
What should we mark out from:
A) The table
B) Surface plate
C) Surface plate and parallel strip.
7/31/2019 Datums and Planning
7/16
Datum types
What is the purpose of a datum?
There are 3 main types of datum that you
will need to know:
Point datum: A single point from which
all measurements are marked out.
Can you think when this would be
used?
7/31/2019 Datums and Planning
8/16
Point Datum All taken from one
point
A
B
D
C
7/31/2019 Datums and Planning
9/16
Line Datum
This is a single line or sometimes twolines that all measurements are taken
from.
The lines normally run along the
central axis of a symmetrical shape.
7/31/2019 Datums and Planning
10/16
The line datum's in green are where all
measurements are taken from
7/31/2019 Datums and Planning
11/16
Surface datum
The most common type of datum
Taken from two edges perpendicular
to each other
Enables easy marking out using
co-ordinates for centres and simplemeasurements for length.
7/31/2019 Datums and Planning
12/16
Surface datum
A
B
7/31/2019 Datums and Planning
13/16
Marking out planning
Before you mark out your componentyou must first plan what you are goingto do and in what order.
This plan includes equipment neededand methods used.
It enables the item to be markedefficiently without missing andmeasurements out
7/31/2019 Datums and Planning
14/16
Your task
For the item you marked out last weekyou are to produce a plan.
It must be logical and methodical.
All measurements are to be included
and how these will be produced.
7/31/2019 Datums and Planning
15/16
Op Dist from A
(MM)
Dist from B
(MM)
Method of
marking
Equipment Feature
produced
5 0 10 scribe Height gauge,
surface plate,
angle plate
10mm step
10 10 10 scribe same 15mm vertical
line (left hand)
15
20
25
30
7/31/2019 Datums and Planning
16/16
Well done
That is another good lesson.
Next week we will be practicing:
Planning
Marking out
Using tools