Reducing construction waste through design. Dave Marsh Construction Project Manager. WRAP’s approach How to Design out Waste key principles design review process Tools and resources. contents. WRAP’s approach. Architects Civil engineers Geotechnical engineers Structural engineers - PowerPoint PPT Presentation
Popular Tags:
41
Reducing construction waste through design Dave Marsh Construction Project Manager
Transcript
Page 1: Dave Marsh Construction Project Manager

Reducing construction waste through design

Dave MarshConstruction Project Manager

Page 2: Dave Marsh Construction Project Manager

WRAP’s approach

How to Design out Waste

– key principles

– design review process

Tools and resources

contents

Page 3: Dave Marsh Construction Project Manager

WRAP’s approach

Page 4: Dave Marsh Construction Project Manager

Architects

Civil engineers

Geotechnical engineers

Structural engineers

Cost consultants / quantity surveyors

Specialist technical consultants

Landscape architects

Interior / fit out designersdesigners

including

Page 5: Dave Marsh Construction Project Manager

Designingout waste

water efficiency

accessibility

sustainable procurement

energy efficiency

future proofing

recycled content

BREEAM

embodied carbon

Page 6: Dave Marsh Construction Project Manager

Raising awareness

Tools and guidance

Advocacy and training

WRAP with designers

Page 7: Dave Marsh Construction Project Manager

Raising awareness– Workshop events– RIBA design

competition– Case studies– Marketing & PR

WRAP with designers

Page 8: Dave Marsh Construction Project Manager

Raising awareness

Tools and guidance– Design guides– Design detailing data

sheets– Cost benefit analyses– Design tools

WRAP with designers

Page 9: Dave Marsh Construction Project Manager
Page 10: Dave Marsh Construction Project Manager

Raising awareness

Tools and guidance– Design guides– Design detailing data

sheets– Cost benefit analyses– Design tools

WRAP with designers

Page 11: Dave Marsh Construction Project Manager

Raising awareness

Tools and guidance

Advocacy and training– Direct engagement– In-house seminars– Self-help resources

WRAP with designers

Page 12: Dave Marsh Construction Project Manager

How to go about it

Page 13: Dave Marsh Construction Project Manager

Design for …

1. Reuse and recovery

2. Off site construction

3. Materials optimisation

4. Waste efficient procurement

5. Deconstruction & flexibility

five principles

Page 14: Dave Marsh Construction Project Manager

design for reuse & recovery

Insert relevant image

Page 15: Dave Marsh Construction Project Manager

reuse & recovery

Can materials from demolition be reused in the design?

Can reclaimed products or components be reused?

Can materials be reused at their highest value?

Can excavation materials be reused?

Can cut and fill balance be achieved?How can it be optimised to avoid spoil removal from site?

key questions

Page 16: Dave Marsh Construction Project Manager

design for off site construction

Page 17: Dave Marsh Construction Project Manager

off site construction

Can any part of the design be manufactured off site?

Can site activities become a process of assembly rather than construction?

key questions

Page 18: Dave Marsh Construction Project Manager

design for materials optimisation

Page 19: Dave Marsh Construction Project Manager

materials optimisation

Can the design, form and layout be simplified?

Can the design be coordinated to minimise excess cutting and jointing?

Is the building designed to standard material dimensions?

Can the range of materials required be standardised to encourage reuse of off-cuts?

Is there repetition and coordination of design to reduce number of variables?

key questions

Page 20: Dave Marsh Construction Project Manager

design for waste efficient procurement

Page 21: Dave Marsh Construction Project Manager

Has research been carried out by the Design Team to identify where onsite waste arises?

Have specialist contractors been consulted on how to reduce waste in the supply chain?

Have the project specifications been reviewed to select elements / components / materials and construction processes that reduce waste?

key questions

waste efficient procurement

Page 22: Dave Marsh Construction Project Manager

design for deconstruction & flexibility

Page 23: Dave Marsh Construction Project Manager

Is the design adaptable for a variety of purposes during its life span?

Does the design incorporate reusable/recyclable components and materials?

Are the building elements/components/materials easily disassembled?

key questions

deconstruction & flexibility

Page 24: Dave Marsh Construction Project Manager

Design for …

1. Reuse and recovery

2. Off site construction

3. Materials optimisation

4. Waste efficient procurement

5. Deconstruction & flexibility

five principles

Page 25: Dave Marsh Construction Project Manager

The design review process

Page 26: Dave Marsh Construction Project Manager

Use existing design team meetings

RIBA stage C

Facilitated workshop

Review

design review process

Page 27: Dave Marsh Construction Project Manager

3 sessions

Awareness

Creativity

Reasoning

design review process

Page 28: Dave Marsh Construction Project Manager

design review process

Page 29: Dave Marsh Construction Project Manager

next steps

Decide on options

Allocate responsibilities

Review at meetings

Record in SWMP

design review process

Page 30: Dave Marsh Construction Project Manager

Tools and resources

Page 31: Dave Marsh Construction Project Manager

design guidance

Page 32: Dave Marsh Construction Project Manager

case studies

Page 33: Dave Marsh Construction Project Manager

Net Waste Tool

Page 34: Dave Marsh Construction Project Manager

Achieving good practice in regeneration projects

reclaimed materials

Page 35: Dave Marsh Construction Project Manager

Achieving good practice in regeneration projects

Reclaimed products guide

reclaimed materials

Page 36: Dave Marsh Construction Project Manager

recycled content

Recycled products guide

Page 37: Dave Marsh Construction Project Manager

recycled content

Recycled products guide

‘Rules of thumb’

Page 38: Dave Marsh Construction Project Manager

SWMP template

Page 39: Dave Marsh Construction Project Manager

Summary

Page 40: Dave Marsh Construction Project Manager

WRAP’s approach

How to Design out Waste

– key principles

– design review process

Tools and resources

summary

Page 41: Dave Marsh Construction Project Manager

Questions