Day 3 Final Revision (Time)
Transcript
Page 1: Day 3-3 - Final Revision (Time)

Day 3 Final Revision(Time)

Page 2: Day 3-3 - Final Revision (Time)

All time management begins with PLANNINGTom Greening

Page 3: Day 3-3 - Final Revision (Time)

3Time Management

Project Time Management includes the processes involved in planning, estimating, managing and controlling project schedule to ensure that the project is able to complete within expected timeframe.

Key Concepts Project Schedule to define

work duration Milestone List to determine

key activity checkpoints Resource Breakdown

Structure to assign tasks Work Performance

Measurements to monitor the project schedule against baseline schedule

Tips

Time Management Plan Activity Duration Estimations

Schedule Compression

Techniques Leads and Lags Critical Chain Methods

Schedule Performance

Index (SPI) Change Requests

Page 4: Day 3-3 - Final Revision (Time)

4Time Management6.1 Plan Schedule Management—The process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.6.2 Define Activities—The process of identifying and documenting the specific actions to be performed to produce the project deliverables.6.3 Sequence Activities—The process of identifying and documenting relationships among the project activities.6.4 Estimate Activity Resources—The process of estimating the type and quantities of material, human resources, equipment, or supplies required to perform each activity.6.5 Estimate Activity Durations—The process of estimating the number of work periods needed to complete individual activities with estimated resources.6.6 Develop Schedule—The process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule model.6.7 Control Schedule—The process of monitoring the status of project activities to update project progress and manage changes to the schedule baseline to achieve the plan.

Page 5: Day 3-3 - Final Revision (Time)

56.1 Plan Schedule Management

Page 6: Day 3-3 - Final Revision (Time)

66.2 Define Activities

Page 7: Day 3-3 - Final Revision (Time)

76.3 Sequence Activities

Page 8: Day 3-3 - Final Revision (Time)

86.4 Estimate Activity Resources

Page 9: Day 3-3 - Final Revision (Time)

96.5 Estimate Activity Durations

Page 10: Day 3-3 - Final Revision (Time)

106.6 Develop Schedule

Page 11: Day 3-3 - Final Revision (Time)

116.7 Control Schedule