Page 1: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

October 18, 2016

DC2RVA CTB October Update

Page 2: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Southeast High

Speed Rail

(SEHSR)

What is Southeast High

Speed Rail?

2

Page 3: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

DC2RVA Purpose & Need

3

Page 4: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Schedule

4

Page 5: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

• Purpose and Need

• Natural/environmental• Wetlands

• Air Quality

• Noise

• Social• Cultural Resources

• Environmental Justice

• Title VI

• Public Safety

• Economic • Annual O&M Costs

• Infrastructure Costs

• Ridership

Draft EIS Evaluation Criteria & Screening

Process

5

Page 6: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Washington, DC to

Richmond Southeast High

Speed Rail

6

Summary of

Alternatives

Carried

Forward

Page 7: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Arlington Area

7

Page 8: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Arlington Area

8

Page 9: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Arlington Area

9

Page 10: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Northern Virginia –

Common Corridor

10

Page 11: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Fredericksburg & Ashland Concepts

11

Fredericksburg Bypass Ashland Bypass

Page 12: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Central Virginia –

Common Corridor

12

Page 13: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Richmond Station Concepts

13

• Single-station options:

• Boulevard (new)

• Broad Street (new)

• Main Street

• Staples Mill Road

• Two-station option:

• Staples Mill Road & Main

Street

• :

Page 14: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

S-Line

Richmond Route Concepts

14

• A-Line:

• Double main-line capacity

• Existing primary passenger service route

• Double-track bridge across James River

• S-Line:

• Single main-line capacity

• Limited passenger service (Hampton

Roads)

• Significant speed restrictions

• Unwelded track

• Single-lane bridge across James River

• :

A-Line

Page 15: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Richmond Two-Station Service Concepts*

15

Main Street & Staples Mill

Road- Full Service

Main Street & Staples Mill

Road- Split Service

Main Street & Staples Mill

Road- Shared Service

* Drawings are conceptual and not to scale

Page 16: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Richmond Single-Station Service Options*

16

A-Line

S-Line

Boulevard Only (new) Broad Street Only (new)

* Drawings are conceptual and not to scale

Page 17: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

Richmond Single-Station Service Concepts*

17

A-Line

S-Line

Main Street Only Staples Mill Road Only

* Drawings are conceptual and not to scale

Page 18: DC2RVA CTB October Update · 2018. 6. 14. · 5. Washington, DC to Richmond Southeast High Speed Rail 6 Summary of Alternatives ... • Draft EIS release –12/2016 • Draft EIS

DC2RVA Project – Anticipated Next Steps

18

• FRA DEIS review

• Local briefings

• Draft EIS release – 12/2016

• Draft EIS Public Hearings - 1/2017

• 45-day public comment period

• Compile public comments

• CTB review

• Service development planning, preliminary

engineering, and additional analysis

• Additional local coordination; ongoing

coordination with Atlantic Gateway Program and

other related transportation projects

• Final EIS

• Record of Decision to be issued by FRA


Recommended