CONTROL REQUIRED PROVIDED COMPLIANT
BUILDING LINE FRONT SETBACK 3.0m 3.0m MIN YES
SIDE SETBACK GROUND FLOOR 0.9m 0.9m YES
ARTICULATION SETBACK 1.5m 1.5m MIN YES
SIDE SETBACK FIRST FLOOR 0.9m 0.98m YES
BUILDING HEIGHT 12.0 (AS PER SEPP MAPS) 7.07m YES3 STOREYS (AS PER DCP)
REAR SETBACK (FROM GARAGE) 0.5m 0.5m YES
SITE COVERAGE
FIRST FLOOR MAX. 40% 39.76% YES
LANDSCAPE AREA MIN. 15% 28.49% YES
PRIVATE OPEN SPACE MIN. 16SQ.M. (MIN. 3m) 28.44SQ.M. (MIN. 3m) YES
SOLAR ACCESS TO PPOS 3 HRS TO 50% OF PPOS NO NO
GARAGE & CARPARKING DOUBLE GARAGE DOUBLE GARAGE YES
LOT AREA - 168.41m2
SITE COVER FIRST FLOOR - 66.96m2 (39.76%)
LANDSCAPE AREA - 47.99m2 (28.49%)
PPOS - 28.44m2 (WITH MIN. DISTANCE 3.0m)
ROOF AREA - 101.09m2
GARDEN / INDIGENOUS AREA - 2.06m2
SITE DATA
BUILT-UP AREA:
GROUND FLOOR AREA - 81.14m2
FIRST FLOOR AREA - 66.49m2
GARAGE AREA - 33.13m2
DCP COMPLIANCE AS PER TABLE 4.2:
LEGEND:
HWS - HOT WATER SYSTEMRWT- RAIN WATER TANKHT- HOSE TAPA/C- AIR-CONDITIONING UNITCL- CLOTHING LINE
3914
6460
500
3434
1.8m HIGH COLOURBOND FENCE
LOCATION OFGARBAGE BINS ONSTREET
DOUBLE GARAGE5.5.x 5.4
1.8m HIGH COLORBOND FENCE
1.8m HIGH COLORBONDFENCE WITH GATE 2.0BEHIND BUILDING LINE
UP
FFL 43.89
MAXIMUMGRADIENT 1:14
LOCATION OFGARBAGE BINS
DP CL
HT RWTA/CHWS
REFER TO CIVIL ENGINEER'SDETAILS FOR RETAINING WALL
FFL 43.293
LOT BOUNDARY
LOT BOUNDARY
LO
T B
OU
ND
AR
Y
LO
T B
OU
ND
AR
Y
DP
LOT BOUNDARY
UP
HT
LO
T B
OU
ND
AR
YLO
T B
OU
ND
AR
Y
REFER TO CIVIL ENGINEER'SDETAILS FOR RETAINING WALL
5560
3917
3000 17108 5917
1500
32485
LOT BOUNDARY
5081 4181
900
26025
FLOWERBED
A ADDA ISSUE3/12/17
FOR DA APPROVAL
2º ROOF PITCH
DP
DPDP
NOTE:
1. ALL WORK TO BE DONE TO SATISFACTION OF BLACKTOWN CITY COUNCIL.2. PROPOSED CONCRETE DRIVEWAY TO BE CONSTRUCTED IN ACCORDANCE WITH PLANS, SPECIFICATIONS
AND LEVEL ISSUED SEPARATELY BY COUNCIL.3. ALL PIPES TO BE MIN. 100mm DIAMETER UNLESS NOTED OTHERWISE (UNO)4. ALL PIPES TO BE GRADE UPVC AT MIN 1% UNO.
ALL DRAINAGE FROM ROOF AND STORMWATERPITS FROM SITE CONNECTED TO DRAINAGE INVERGE / STREET, TYPICAL
COLORBOND GUTTERS ANDDOWNPIPES, TYPICAL
METAL ROOF TO ENGINEER'SDETAILS, TYPICAL
2º ROOF PITCH
2º ROOFPITCH
DP
DPDP
DP
2º ROOF PITCH
DP
6
3
62
1
4
6 1
FFL 46.293
980
4101
5997
1806
1555
3135 16948
AnKA DA ISSUE2/12/17
FOR DA APPROVAL
ROOF PLAN
FIRST FLOOR PLAN
COMMUNITY PLAN 3 -LOT 17
GROUND FLOOR
-100
FIRST FLOOR
3050
FINISHED FLOORLEVEL
50
CEILING LEVEL GR
2750
CEILING LEVEL
5750
RIDGE LEVEL
6975
2700
300
2700
150
7075
3000
BO
UN
DA
RY
BO
UN
DA
RY
FFL 43.293
NATURAL GROUNDLEVEL, SHOWN RED
REFER TO ENGINEER'SDRAWINGS FORRETAINING WALL DETAILS
NATURAL GROUND LEVEL,SHOWN RED
BO
UN
DA
RY
BO
UN
DA
RY
GROUND FLOOR
-100
FIRST FLOOR
3050
FINISHED FLOORLEVEL
50
CEILING LEVEL GR
2750
CEILING LEVEL
5750
RIDGE LEVEL
6975
150
2700
300
2700
7075
BO
UN
DA
RY
NATURAL GROUNDLEVEL, SHOWN RED
FFL 43.293
3000
AnKA DA ISSUE2/12/17
FOR DA APPROVAL
THESE COLOURS ARE NOMINAL ONLY, DEPENDING ONAVAILIBILITY CAN BE REPLACED WITH SIMILAR PRODUCTS
LEGEND:
FRONT ELEVATION
SIDE ELEVATION
REAR ELEVATION
FACE BRICKVENEER WALL
AND
SELECTED FEATURECLADDING VERTICALAND HORIZONTALMEMBERS
SELECTEDSMOOTH /TEXUTREDFINISHCLADDING
SELECTED LIGHTWEIGHTWALL WITH SMOOTH /TEXTURED FINISH TO FIRSTFLOOR
SECLECTED METAL ROOF
COMMUNITY PLAN 3 -LOT 17
GROUND FLOOR
-100
FIRST FLOOR
3050
FINISHED FLOORLEVEL
50
CEILING LEVEL GR
2750
CEILING LEVEL
5750
RIDGE LEVEL
6975
CONCRETE FLOOR SLABS FOOTING TOENGINEER'S DETAILS
NATURAL GROUND LEVEL, SHOWN RED
BO
UN
DA
RY
7075
300
2700
2700
150
3000
BO
UN
DA
RY
BED 2
LIVING / DINING
STRUCTURE TO METAL ROOFENGINEER'S DETAILS
FOIL SISALATION ASPER NATHERS REPORT
CEILING INSULATION AS PER NATHERSREPORT
230mm THK BRICK VENEER WALL ONGROUND FLOOR, TYPICAL
SELECTED LIGHTWEIGHTWALL WITH SMOOTH / TEXTURED FINISHEXTERNALLY & INSULATION TO NATHERSREPORT
FFL 43.293
SELECTED POWDERCOATED ALUMINIUMDOORS AND WINDOWS, TYPICAL
COLROBOND GUTTER AND DOWNPIPES
ABUTTING WALL2°
2°
450
450
AnKA DA ISSUE2/12/17
FOR DA APPROVAL
SECTION 1
COMMUNITY PLAN 3 -LOT 17