February 2019 Decker Electric Progress Gander Outdoor/ Camping World
Transcript
Page 1: Decker Electric February 2019 · 2/9/2019  · This fast-paced project is scheduled for completion mid-t o-late May 2019. Progress Ronald McDonald House ... advertisement for Decker!

February 2019

Decker ElectricProgress

Gander Outdoor/ Camping World

Page 2: Decker Electric February 2019 · 2/9/2019  · This fast-paced project is scheduled for completion mid-t o-late May 2019. Progress Ronald McDonald House ... advertisement for Decker!

Dondlinger and Decker Electric are currently ramping up manpower as the CampingWorld and Gander Outdoor Buildings become “weathered in”. Current constructioninvolves temp power for roof-top units for temporary heat, service and mechanicalwire pull, branch conduit for power and lighting and general purpose power for retailspace and office areas. This fast-paced project is scheduled for completion mid-to-late May 2019.

Progress

Ronald McDonald House

Page 3: Decker Electric February 2019 · 2/9/2019  · This fast-paced project is scheduled for completion mid-t o-late May 2019. Progress Ronald McDonald House ... advertisement for Decker!

Key Construction and Decker Electric are nearing substantial completion of the firstphase of the Ronald McDonald Project. Current construction involves final overheadlighting, access control, and device installation. Decker Electric has also recentlybeen awarded the Telecommunications scope for the second phase of the project. The second phase is scheduled to be completed by the end of May. Key DeckerElectric on-site management consists of Ryan Atchison (Foreman).

Recently Awarded

ICM-Colwich, KS

With great excitement, Decker Electric has been awarded the ICM Element EnergyIsland Package. The ICM project will be on an accelerated schedule with a tentativecompletion date the end of May. Key Decker Electric management consists of Kyle

Page 4: Decker Electric February 2019 · 2/9/2019  · This fast-paced project is scheduled for completion mid-t o-late May 2019. Progress Ronald McDonald House ... advertisement for Decker!

Kennedy (General Foreman), Jesse Robinson (Project Manager) and Chris Helten(Project Coordinator).

Community

Lord's Diner

Page 5: Decker Electric February 2019 · 2/9/2019  · This fast-paced project is scheduled for completion mid-t o-late May 2019. Progress Ronald McDonald House ... advertisement for Decker!

Thank you to the Decker employees and family members who volunteered at theLord's Diner on February 5th. Volunteers served approximately 250 meals to anyonewho was in need. Thanks to everyone who helped out!

Pictured left to right: Brian Fair, Jo Fair, Carson Fair, Lisa Stafford, James Kelley, Clint Townsend, &Hannah Townsend.

Staff

Notable Work Anniversary

A big thank you and congratulations to James Helton for 5 years at Decker Electric!

Customer Recognition

Jim Barrow

Happy birthday to one of our favorite customers, JimBarrow. Jim is a long-time customer of DeckerElectric and our #1 fan. He’s had us complete amultitude of projects at his house. He speaks VERYhighly of the quality of work and integrity of the

Page 6: Decker Electric February 2019 · 2/9/2019  · This fast-paced project is scheduled for completion mid-t o-late May 2019. Progress Ronald McDonald House ... advertisement for Decker!

business. He knows our electricians by name and isalways looking for new projects to make his homemore efficient! He most recently had us install someoutdoor lighting on his car port that will make hisproperty safer and he’s very excited about the switchthat allows him to turn them on/off from inside hiskitchen. Thank you, Jim, for being a walkingadvertisement for Decker!

Progress

Project Updates

Recently-Awarded Projectsin the First Quarter

Ark City Flood PumpsCity of Goddard Police Access ControlCity of Wichita Riverview CablingCocentrix-Appleton, WI TelecomEKAE-Garnett, KS Preventative MaintenanceFermi-Lead, SD LBNF Cyber InfrastructureFord County Sherriff- Dodge City, KS Access Control and CCTVICM Element-Colwich, KS NTE T&MICM Element-Colwich, KS TelecomKICE-Barrington, IL Pepsi CoKICE-Saginaw, TX Rail CanopyMt. Hope-Mt. Hope, KS RemodelStandard Beverage 2nd FloorTyson-Emporia, KS Brick Pack UpgradeTyson-Emporia, KS UK-6 Coil ReplacementTyson-Lexington, NE Chad WashTyson-Lexington, NE Limit Switches

Current Projects

Andale Church-Andale, KSCamping World/ Gander Mountain-Wichita, KSClean Harbors Pre Fab ShopCreekstone Farms Case Sealer Power AutomationCreekstone Farms Case Sealer Power Automation/EngineeringGregory GymnasiumHealth South-Wichita Falls, TX GeneratorHealth South-Wichita, KS GeneratorKanPak-Ark City, KS WTPLockheed Martin-Fort Worth, TX Booth 10Lockheed-Fort Worth, TX PMM3Minnesota Unlimited SeawayPCC-Wichita, KS Service UpgradeRonald McDonald/HealthStrategiesStandard Beverage Office RemodelTyson-Amarillo, TX Intervention ControlsTyson-Amarillo, TX Tech RenderingTyson-Holcomb, KS Process Service/ Engine Room

Page 7: Decker Electric February 2019 · 2/9/2019  · This fast-paced project is scheduled for completion mid-t o-late May 2019. Progress Ronald McDonald House ... advertisement for Decker!

City of Wichita WTP Telecom Recable

Monthly Projects

City of Wichita Service DepartmentCity of Wichita Telecom DepartmentCNH-Wichita, KS Electrical MaintenanceFoley-Wichita, KS ElectricalKanPak-Ark City, KS ElectricalTyson-Emporia, KS UPRR-Throughout US Electrical Upgrades, T&M, Master Agreement

Tyson-Joslin, IL Lower RenderingValley Center Well ReplacementWichita Ice Rink