Contents of presentation
Briefly history of Bandung TRIGA reactor
Location of the facility
Decommissioning options
Characterization of System, Structure and Component (SSC)
Experiences of staff on reactor modification
History of Bandung TRIGA reactor (1)
Bandung TRIGA Reactor is Indonesia's first nuclear research reactor in Indonesia
3
Year Power Activities
1964 250 kW Reached first criticality
1971 1000 kW First time modified
2000 2000 kW Second time modified
History of Bandung TRIGA reactor (2)
Year Power Activities
2011 - Reactor operating license suspended by Regulatory Body because of technical issues related to fuel burn-up (FFCRs) and seismic hazard.
2013 - Prepared a decommissioning plan, proposed IAEA TC programs to get expert mission assistance.
2014- 2015
- Experts mission, in helping to prepare the decommissioning plan documents
2015 - Replaced of two FFCRs and reinforced of the reactor building
2016 1000 kW Bandung TRIGA research reactor operates
In the preparation of decommissioning plan we have two options
OPTION 1
oAll System, Structure and Component (SSCs) inside and outside the reactor building are dismantled, except the reactor building.
o In addition, all laboratories supporting like hot cells and laboratories for the production of radioisotopes is not dismantled.
OPTION 2.
oAll SSCs inside the reactor tank are removed, but a part of the reactor tank, reactor shield is not dismantled.
o So in the long term, the Bandung TRIGA reactor building can be used as reactor museum.
Stages of characterization
Drawing of SSCs of the reactor
Identify building and room of facilities according to decommissioning scope
Identify contaminated & non-contaminated areas according to the controlled area definition
Determine quantities of various materials (carbon, SS steel, concrete, hazardous...)
Inventory of material radioactivity
6. LB
2.SB 3. CT
5.ST
1. Reactor Building (RB)
2. Secondary Circuit Building (SB)
3. Cooling Tower (CT)
4. Water Purification Room (WP)
5. Ventilation Stack (ST)
6. Laboratory Building (LB)
1. RB
4. WP
Outline of Bandung TRIGA Reactor
No. Bldg Room name Room No.,
1 RB Primary cooling circuit
room A10057.01
2 RB Spent fuel storage wet
pit A10057.02
3 RB Fresh fuel storage A10057.03
4 RB Equipment warehouse A10057.04
5 RB Reactor hall A10057
6 RB Reactor A10057.00
7 RB Control room A10057.05
1. Primary cooling
circuit room
2. Spent fuel storage wet pit
3. Fresh fuel storage
4. Equipment warehouse
5. Reactor
hall
6. Reactor
7. Control
room
Rooms in RB (Reactor Building)
11. Water purification room 9. Secondary pump house
10. Cooling towers No Bldg Room name Room No.
9 SB Secondary pump room A10058
10 CT Cooling towers CT01
11 WP Water Purification room A10059
Room of WP, CT and SB
14. Yellow Blower
13. Blue Blower
No Bldg Room name Room No.
13 AB Blue Blower A10030
14 AB Yellow Blower A10031
Rooms in 1F of LB (Laboratory Building)
An experience of thermalizing column demolition
• Empty bulk shielding tank;
• Open the door thermalizing column;
• Remove the graphite plate and Pb.
List of rooms have been characterized for dismantling
No. Bldg.
ID Room No. Room name
Controlled
area
Width
(m)
Length
(m)
Height
(m) Surface area
(m2)
Floor
area (m2)
Final survey
(m2)
Dose
(uSv/h)
Sc
(Bq/cm2)
1 RB A10057.01 Primary Cooling
Circuit Room Y 1.8 5.4 2.3 42.84 - 42.84 0.08 <0.37
2 RB A10057.02 Spent fuel
storage wet pit Y 1.6 1.6 1.5 12.16 - 12.16 0.32 <0.37
3 RB A10057.03 Fresh fuel
storage Y 3.3 1.0 2.5 28.10 3.30 28.10 0.05 <0.37
4 RB A10057.04 Equipment
warehouse Y 3.3 2.0 2.5 39.70 6.60 39.70 0.05 <0.37
5 RB A10057 Reactor hall Y 24.5 19.5 12.9 2090.70 477.75 2090.70 0.06 <0.37
6 RB A10057.00 Reactor Y 7.0 8.6 7.5 354.40 - 35.40 0.38 <0.37
7 RB A10057.05 Control room Y 3.5 4.9 2.9 83.02 - 83.02 0.05 <0.37
8 SB A10058 Secondary pump
house N 10.5 3.5 4.0 185.50 - - - -
9 CT CT01 Cooling towers N 12.5 15.0 x 187.5 - - - -
10 WP A10059 Water
purification room N 5.0 2.5 4.0 85.00 - - - -
11 LB LB01 Filter housing N 2.0 2.0 2.0 24.00 - - - -
12 LB A10030 Blue blower N 3.6 3.6 4.0 83.52 12.96 - - -
13 LB A10031 Yellow blower N 3.6 2.6 4.0 68.32 9.36 - - -
14 ST ST01 Ventilation stack Y 1.4 1.7 22.5 144.26 - 144.26 <0.03 <0.37
3,429.02 509.97 2,331.92
* Sc: Surface contamination
List of equipment for dismantling
Distribution of number of equipment for dismantling in each
building
Rooms in RB
85%
Rooms in LB 7%
Secondary pump house
4%
Water purificatio
n room 1%
Cooling towers
2%
Ventilation stack
1%
Total:
149
Rooms in RB
88%
Rooms in LB 1%
Secondary pump house
1%
Water purificatio
n room 1%
Cooling towers
1%
[CATEGORY NAME]
8%
Total:
666tons
Distribution of total mass of equipment for dismantling in each
building