CONCEPTS TO KAIZENS Started with concepts Kaizen activities
include our concepts Prove feasibility and practicality of these
concepts Small, resource constrained, fast implementation We
welcome feedback
Slide 3
SCALING A DAY IN THE PROCESS Shares station w/ commercial.
Cross-training evident. 4 AM Commercial Pre-Scaler comes in. 11 AM
Frozen Pre-Scaler comes in. Multiple batches are pre-scaled at a
time. Ingredients are stored in multiple locations. Work in process
is not trackable.
Slide 4
SCALING KAIZEN Add labels to pre-scaled ingredients Speeds up
communication Less errors Modify cookies recipes format Less errors
in scaling Easier for training. Checklist of whether ingredients
are there before starting a batch Prepared if low on ingredients
Can change plan earlier
Slide 5
ADD LABELS TO PRE-SCALED INGREDIENTS
Slide 6
REDUCE DEFECTS ON SCALING %INGREDIENTS SINGLE FULL
BAGSPARTIALPROCEDURES STAGE 1 21.76Brown Sugar8485379129Cream
together for 19.78Vream Rite Shortening271498504020 seconds
0.61Salt2976372.20 0.61Baking Soda0722002.20 STAGE 2 13.78Bessie
Flour0848545010Add to above on high for 10.2Am. Beauty Cake
Flour520460370 2 minutes STAGE 3 5.09Liquid Whole Eggs07235218.50
Add to above on high for 3 minutes 1.1Clear Vanilla
Extract042752404 0.28FB Soybean Oil(buckets)326108101 STAGE 4
32.79Chocolate Chips-1000 ct088755116.67416.67Add to above on mix
thoroughly on high for 1 min 90 COOKIES PER CASE 100TOTAL: 360.57
Cookie Pucks no Nuts
Slide 7
CHECKLIST OF WHETHER INGREDIENTS ARE THERE BEFORE STARTING A
BATCH
Slide 8
MIXING A DAY IN THE PROCESS Shares with commercial. Deviation
between types. Average cleaning time: 12 minutes Labor driven
process Average process time and Actual vs. Scheduled:
Slide 9
Slide 10
Slide 11
MIXING KAIZEN Have all boxes opened before being placed beside
the mixer Faster once on the mixer Scale liquids (eggs, vanilla)
ahead then store in pie room Faster once on the mixer Break down
ingredient boxes after all mixing is complete Reduces mixing cycle
times Tracking sheet for mixer Tracking improvement for system
Slide 12
MIXING KAIZEN Mixer schedule located by the mixer Other lines
know when mixer is available Material handler knows when materials
are needed at the mixer After mixing, operator takes all unused
ingredients away and checks schedule to see if any will be need for
next product Speeds up next product Can be done by other employees
Assign roles to material handler to collect and return ingredients
Speeds up machine downtime Relieves mixer operator of extra work
Have mixer operator do sanitation on mixer Reduce downtime for
mixing changeovers
Slide 13
MIXING KAIZEN Get a 3 rd commercial trough Less downtime on
mixer Have all ingredients put into one bucket so no box opening
while on the mixer Faster once on the mixer Different boxes to
receive ingredients in, easier to open Faster to open and break
down
Slide 14
DIVIDING A DAY IN THE PROCESS Shared with doughnuts, muffins,
etc. Average actual run time: 2 hrs and 33 mins Start time: Min
5:49 pm Max 8:14 pm Avg 6:52 pm
Slide 15
AVERAGE DOWNTIME:
Slide 16
Slide 17
DIVIDING KAIZEN Reassign roles for dividing staff Reduces
dividing downtime Change type of wire Will break less often Ensure
machine is setup on time Maximize available time for dividing One
type of machine per day Changeover time doesnt interact with
operation time
Slide 18
SYSTEM A DAY IN THE PROCESS Frozen Cookies Commercial
Cookies
Slide 19
SYSTEM-LEVEL KAIZEN (METHODS) Update schedule with more
accurate times Schedule will reflect actual better. Add changeover
time into schedule Schedule will reflect actual better. Offset
break schedules so another operator can run mixer increased
utilization of mixer Add in breaks of workers into schedule if
breaks cannot be offset more accurate scheduling and planning of
resources Start commercial mixing earlier in the day Frozen cookie
mixing should have less late starts Create standard work best and
fastest way, reduces variability
Slide 20
SYSTEM-LEVEL KAIZEN (METHODS) Run commercial cookies with
butter on a different day than frozen cookies with butter more soft
butter available, less nearby inventory Mix sheet cookies the night
before more mixing time available A way to know if there is enough
time to do more batches for the night get ahead for the next day,
not run late Have schedule of spiral 2 and commercial oven line up
better Scheduled Production = Actual Production, Reduce variability
Make communication board Everyone knows what is going on. Improve
tracking board for management Everyone knows what is going on.
Slide 21
SYSTEM-LEVEL KAIZEN (MAN) Packaging workers come help with
dividing Dividing downtime reduced Divider workers come help with
mixing Mixing downtime reduced Add more cross training Flexible
staff to work different processes.
Slide 22
SYSTEM-LEVEL KAIZEN (MACHINE) Fix frozen troughs and redesign
to stop future problems Safer and easier workflow