Delay Time

Date post: 06-May-2017
Category:
Upload: navpreet-kaur-riar
View: 227 times
Download: 1 times
Share this document with a friend
35
1 of Quantity m: start end 10am 3:30pm Worker Equipment Work piece (input) Remarks (e.g. important environmental influences, quality of results, etc.) Comment (technical data, condition, etc.) Material, dimension, weight, etc. Comment Description of the task stopwatch, delay time sheet total observation time O total Comment (Experience with this task, etc.) 20 yrs kawa we have done this study to find the worker are productive Jagroop sandhu Ajay Gurtej billing Task: delay time study Doc No: Page D1 Delay time sheet -cover page- observer date duration Department: Order No: Parwinder sing Gurwant gill askaran singh 16.8.13
Transcript

1 of

Quantity m:

start end

10am 3:30pm

Worker

Equipment

Work piece (input)

Remarks (e.g. important environmental influences, quality of results, etc.)

Comment (technical data, condition, etc.)

Material, dimension, weight, etc. Comment

Description of the task

stopwatch, delay time sheet

total observation time Ototal

Comment (Experience with this task, etc.)

20 yrskawa

we have done this study to find the worker are productive

Jagroop sandhu

Ajay

Gurtej billing

Task: delay time study

Doc No:

PageD1

Delay time sheet-cover page-

observer date duration

Department:Order No:

Parwinder singh

Gurwant gill

Jaskaran singh 16.8.13

Doc No:

Page 1 of

subtotal: 31237 [HM]

No Date Activitysplit time

[HM]

lap time

[HM]time type worker

1 16.8.13 cut 19 b1

2 16.8.13 cleaning 111 20

3 no timber 190 22

4 cut 41 b1

5 cut 39 b1

6 cut 31 b1

7 timber waiting 31 b2

8 cut 22 b1

9 cut 19 b1

10 cut 31 b1

11 other machine 179 b2

12 timber waiting 71 b3

13 cut 183 b1

14 other machine 221 b1

15 timber waiting 85 b3

16 cut 247 b1

17 other machine 75 b2

18 timber waiting 153 b3

19 cut 139 b1

20 fault 38 21

21 cut 54 b1

22 other machine 68 b2

23 timber waiting 110 b3

24 cut 174 b1

25 other machine 234 b2

26 timber waiting 259 b3

27 cut 18 b1

28 other machine 220 b2

29 timber waiting 26 b3

30 cut 115 b1

31 other machine 132 b2

32 timber waiting 70 b3

33 cut 165 b1

34 other machine 75 b2

35 timber waiting 118 b3

36 cut 190 b1

37 other machine 90 b2

38 timber waiting 91 b3

39 cut 145 b1

40 other machine 115 b2

41 timber waiting 95 b3

42 cut 186 b1

43 other machine 77 b2

D3 Delay time sheet-evaluation-

44 timber waiting 88 b3

45 cut 145 b1

46 other machine 193 b2

47 timber waiting 54 b3

48 cut 61 b1

49 other machine 15 b2

50 timber waiting 532 b3

51 cut 31 b1

52 no timber 71 22

53 cut 28 b1

54 no timber 36 22

55 cut 57 b1

56 other machine 104 b2

57 timber waiting 153 b3

58 cut 193 b1

59 other machine 106 b2

60 timber waiting 152 b3

61 cut 127 b1

62 other machine 199 b2

63 timber waiting 152 b3

64 cut 127 b1

65 other machine 199 b2

66 timber waiting 40 b3

67 cut 229 b1

68 no timber 20 22

69 cut 27 b1

70 other machine 79 b2

71 timber waiting 35 b3

72 cut 109 b1

73 other machine 256 b2

74 timber waiting 23 b3

75 cut 189 b1

76 other machine 95 b2

77 timber waiting 113 b3

78 cut 172 b1

79 fault 31 21

80 no timber 30 22

81 cut 29 b1

82 other machine 927 b2

83 timber waiting 42 b3

84 cut 150 b1

85 other machine 156 b2

86 timber waiting 31 b3

87 cut 172 b1

88 other machine 179 b2

89 timber waiting 22 b3

90 cut 120 b1

91 lunch 3,000 x

92 coming late 4,125 n

93 timber waiting 39 b3

94 cut 79 b1

95 other machine 178 b2

96 timber waiting 158 b3

97 cut 34 b1

98 cleaning 161 20

99 other machine 68 b2

100 timber waiting 48 b3

101 cut 168 b1

102 other machine 187 b2

103 timber waiting 86 b3

104 cut 185 b1

105 other machine 251 b2

106 timber waiting 32 b3

107 cut 181 b1

108 other machine 162 b2

109 timber waiting 64 b3

110 cut 121 b1

111 other machine 31 b2

112 timber waiting 172 b3

113 cut 145 b1

114 other machine 96 b2

115 timber waiting 198 b3

116 cut 145 b1

117 other machine 288 b2

118 timber waiting 118 b3

119 cut 172 b1

120 other machine 256 b2

121 timber waiting 60 b3

122 cut 120 b1

123 cleaning 48 b2

124 timber waiting 208 b3

125 cut 146 b1

126 other machine 151 b2

127 timber waiting 47 b3

128 cut 160 b1

129 other machine 81 b2

130 timber waiting 88 b3

131 cut 29 b1

132 cleaning 101 20

133 other machine 416 b2

134 no timber 37 22

135 cut 136 b1

136 operator waiting 129 b2

138 timber waiting 97 b3

139 cut 174 b1

140 other machine 24 b2

141 timber waiting 244 b3

142 cut 154 b1

143 other machine 38 b2

144 timber waiting 33 b3

145 cut 207 b1

146 other machine 205 b2

147 timber waiting 17 b3

148 cut 168 b1

149 other machine 286 b2

150 timber waiting 22 b3

151 cut 151 b1

152 other machine 138 b2

153 timber waiting 107 b3

154 cut 143 b1

155 other machine 123 b2

156 timber waiting 59 b3

157 cut 257 b1

158 other machine 156 b2

159 timber waiting 102 b3

160 cut 160 b1

161 other machine 67 b2

162 timber waiting 149 b3

163 cut 257 b1

164 other machine 96 b2

165 timber waiting 148 b3

166 cut 155 b1

167 cleaning 62 20

168 other machine 290 b2

169 timber waiting 467 b3

170 cut 267 b1

171 other machine 184 b2

172 timber waiting 69 b3

173 cut 217 b1

174 cleaning 82 20

175 other machine 164 b2

176 timber waiting 94 b3

177 cut 128 b1

178 other machine 215 b2

179 timber waiting 51 b3

180 cut 154 b1

181 other machine 15 b2

182 timber waiting 223 b3

183 cut 177 b1

184 other machine 99 b2

185 timber waiting 111 b3

186 cut 180 b1

187 other machine 295 b2

of

Time typeactual

[HM]

O 28,237

B 23,142

B1 8,775

B2 8,541

B3 5,826

B4

B5

D 970 Ad:

DCC Acc:

1

2

3

4

5

6

7

8

9

10

11

12

13

DCV 970 Acv:

20 517

21 69

22 384

23

24

25

26

27

28

29

30

31

32

DP Ap:

40

41

42

43

44

I

N 4,125

Infrequent time

Not usable time 14.6%

100%

Doc No:

Page

Delay time sheet-results-

4:42total observation time

actual

[%]

target

[%]

D2

4.2%

4.2%

1.4%

0.2%

actual

[hh:mm]

timber waiting

other machine

personal delay time

total delay time D = DCC+ DCV+DP

cleaning 1.8%

3.4%

fault

no timber

delay time contingency variable (dependent on basic time)

delay time contingency constant (per shift)

cut 31.1%

total recorded basic time 82.0%

30.2%

20.6%

3.4%

file: 226336313.xlsx.ms_office printed: 5/5/2014 - 3:03 AM

Doc No:

Page of

No time typelap timesplit time worker

Delay time sheet-observation-

Activity

Date:

Observer:D4

No CommentNo Comment

Doc No:

Page of

Date:

time type: time type: time type: time type: time type:

No lap time No lap time No lap time No lap time No lap time

total: total: total: total: total:

time type: time type: time type: time type: time type:

No lap time No lap time No lap time No lap time No lap time

total: total: total: total: total:

time type: time type: time type: time type: time type:

No lap time No lap time No lap time No lap time No lap time

total: total: total: total: total:

D5Delay time sheet-manual evaluation-