+ All Categories
Home > Documents > Delta Day 2. BC Pump Discharge Permanent Stopping.

Delta Day 2. BC Pump Discharge Permanent Stopping.

Date post: 14-Dec-2015
Category:
Upload: damien-fennimore
View: 217 times
Download: 0 times
Share this document with a friend
Popular Tags:
66
Delta Day 2
Transcript

Delta Day 2

BC

Pump Discharge

PermanentStopping

PumpCable

Briefing Officer

35 HP Pump Switch

ON OFF

8

35 HP Pump Switch

ON OFF

Place on back of placard # 8

PowerCenter

11

Place on back of placard # 11

Temporary Stopping

Unsafe Rib

Unsafe Roof

Unsafe Roof

Unsafe Rib

Light Smoke

End of Smoke

0.9 % CH4200 PPM CO

17.0 % O2

Permanent Stopping

With Door Open

End of Smoke

Light Smoke

Battery ScoopCannot Move

Permanent Stopping

3.5 % CH410 PPM CO18.0 % O2

Body

5.8 % CH410 PPM CO18.0 % O2

Barricade

Live Conscious

Miner28

“Help, it’s airtight

behind me”Place on back of placard # 28

Face

RefugeAlternative

Temporary Stopping

Unsafe Rib

Unsafe Roof

Unsafe Roof

Unsafe Rib

Light Smoke

End of Smoke

0.9 % CH4200 PPM CO

17.0 % O2

Airtight Cave

Airtight Cave

End of Smoke

Light Smoke

End of Smoke

Light Smoke

12 Timbers

1.2 % CH4200 PPM CO

18.0 % O2

LiveUnconscious

Miner

Permanent Stopping

With DoorOpen

3.5 % CH410 PPM CO18.0 % O2

PumpDischarge

PumpCable

5.8 % CH410 PPM CO18.0 % O2

LineCurtain

Water Over Knee

deep

35 HP pump

5.8 % CH410 PPM CO18.0 % O2

ContinuousMiner

Face

10 Crib Blocks Set(Passable)

Conveyor Belt

0.9 % CH4150 PPM CO

17.5 % O2

Belt Tail Piece

Water Over Knee

deep

3.5 % CH410 PPM CO18.0 % O2

5.8 % CH4200 PPM CO

18.0 % O2

Body

Roof Bolter

Face


Recommended