Deluge Systems
Deluge systems are fixed fire protection systems with open discharge devicessystems with open discharge devices.
The water supply is held back by a deluge valve, which is controlled by a g , yrelease system.
When the release system operates, the y pdeluge valve opens and water discharges from every outlet connected to the sprinkler piping.
© Viking Page 2
Deluge Systems
Deluge systems are installed in areas or hazards that require total floodinghazards that require total flooding.
Examples of where deluge systems are installed:
• Aircraft Hangars• Petro-chemical facilities• Oil filled transformers• Coal conveyors• Bulk storage of flammable/combustible• liquids• Stage Prosceniums• Engine Test Rooms
© Viking Page 3
Deluge Systems
© Viking Page 4
Deluge Systems
© Viking Page 5
Deluge Systems
Empty Loading area duringarea during foam/water discharge
© Viking Page 6
Deluge Systems
Occupied Loading area during foam/waterduring foam/water discharge
© Viking Page 7
Deluge Valvesg
© Viking Page 8 © Viking
Deluge Valves
D l l d iDeluge valves are used in deluge systems and pre-action systems.
Viking deluge valves have one moving part, which is the clapperclapper.
Viking produces (2) styles of deluge valves a straightdeluge valves, a straight through Model F-1 and anangle style, a Model E-1.
Their operation is the same.
Both valves are listed and
Model EModel F
© Viking Page 9
approved for 250 psi.
Deluge Valves
Clapper Diaphragm Clamp RingValve Cover
Replaceable parts
Clapper Diaphragm
Teflon Coated Clapper
Clapper Seat Ring
Valve Seat
pp g
© Viking Page 12Valve Body
Deluge Valves
Outlet
Priming Chamber
Chamber
Priming Chamber
Inlet Chamber
© Viking Page 13
F-1 Deluge Valve Set-up
Step #1: Place PrimingStep #1: Place Priming Water in the Priming Chamber
Water pressure provided
© Viking Page 14
to the priming chamberis supplied upstream of awater supply control valve.
F-1 Deluge Valve Set-up
Step #2: Open the water supplyStep #2: Open the water supplycontrol valve to bring water intothe inlet chamber.
This is the normal condition
© Viking Page 15
for a deluge valve. The outletchamber has only atmospheric pressure.
Valve Operation
Outlet
Priming Chamber
Chamber
Priming Chamber
Once the release system operates,water drains from the primingchamber, allowing the valve clapperto open Water is directed fromInlet Chamber to open. Water is directed from the inlet chamber to the outlet chamber
© Viking Page 16
Valve Operation
Water fills the discharge chamberd i h l d fill hand exits the valve and fills the
sprinkler piping. Water dischargesfrom all open outlets connected to the sprinkler piping.the sprinkler piping.
Water discharges through
© Viking Page 17
system until water supplycontrol valve is closed.
Deluge System Releases
Release SystemsyThere are (3) primary release systemsThat control Deluge Systems:g y
1.Hydraulic Release – Mechanical releasey2.Pneumatic Release – Mechanical release3.Electric Release
© Viking Page 18
Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service
Ensure that the water supply control valve is closed and that the releasesystem piping is in working ordersystem piping is in working order.
© Viking Page 42
Water Supply Control Valve
Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service
Open Priming water supply controlvalve. Water will enter the valvetrimtrim.
Priming WaterSupply Control
Valve
© Viking Page 43
Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service
Open Priming water supply controlvalve. Water will enter the valvetrimtrim.
© Viking Page 44
Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service
Open Priming water supply controlvalve. Water will enter the valvetrim priming chambertrim, priming chamber,and the hydraulic release line.
Priming
© Viking Page 45
Priming Chamber
Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service
Open Priming water supply controlvalve. Water will enter the valvetrim and the hydraulic release linetrim and the hydraulic release line.
The time to prime the valve isdependent upon the length anddepe de t upo t e e gt a dthe height of the hydraulic releaseline.
© Viking Page 46
Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service
Open Priming water supply controlvalve. Water will enter the valvetrim and the hydraulic release linetrim and the hydraulic release line.
The time to prime the valve isdependent upon the length and
Release Line
depe de t upo t e e gt a dthe height of the hydraulic releaseline.
Once the trim and release line arefilled with priming water, the priming water pressure gage willindicate the static water supplypressure.
© Viking Page 47Priming WaterPressure Gage
Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service
When the priming chamber ispressurized, the water supplycontrol valve may be opencontrol valve may be open. Prior to opening the watersupply control valve, openthe flow test valve to purge
Flow Test Valve
t e o test a e to pu geany air that may be presentin the inlet chamber whenthe water supply control valvepp yis opened.
© Viking Page 48
Water SupplyControl Valve
Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service
When water flow is dischargingfrom the flow test valve, closethe flow test valve and fully openthe flow test valve and fully open the water supply control valve.Inlet water supply pressure willappear on the water supplyappea o t e ate supp ypressure gage.
The system is now in service.y
© Viking Page 49
Water Supply Pressure Gage
Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service
System Operation
© Viking Page 50
Hydraulic Release Deluge System - OperationSystem Operation
When a fire is present in thehazard area, the release deviceslocated in the hazard areawill be heated.
© Viking Page 51
Hydraulic Release Deluge System - Operation
If d t h t i t
System Operation
If adequate heat is present,the release devices will activate/open and drain
ater (priming) press re from thewater (priming) pressure from the release line.
© Viking Page 52
Hydraulic Release Deluge System - OperationSystem Operation
When enough water pressureis drained from the releaseline and the priming chamber, thedeluge valve clapper will openallowing water to flow into thedischarge outlet of the deluge
l d h h h i i ivalve and through the trim pipingattached to the outlet chamber.
© Viking Page 53
Water will discharge through allthe outlets on the system piping. Once the PORV is activated, waterwill no longer discharge throughthe release line because the PORVdrains priming pressure from the
l d i i i ivalve and trim prior to it enteringthe release line trim.
© Viking Page 54
PORV(Pressure Operated Relief Valve)
PORV Operation
© Viking Page 55
PORV Operation - Deluge Trim
Priming WaterPriming water closesthe PORV
To Drain
PORV Operation
From Intermediate Chamber
© Viking Page 56
PORV Operation
PORV Operation - Deluge Trim
Priming Water from gPriming trimWater pressure from
Intermediate pushesThe PORV open, draining
i i f t ipriming pressure from trimAnd priming chamberTo ensure the D l lDeluge valve Will not reset if theRelease system wereTo de activate
Water from discharge
To de-activate.
chamber once deluge valve activates
Sensing Side
To Open Drain
© Viking Page 57PORV OperationSensing Side
PORV Operation - Deluge Trim
Priming water dischargesg gfrom PORV untilthe water supply control valve is closedvalve is closedand the valveand trim is drained.
PORV Operation© Viking Page 58
PORV Operation
Hydraulic Release Deluge System - OperationSystem Operation
Water will discharge fromthe PORV to the drain cupas long as there is flow through the valve. The PORV ensures that thedeluge valve will not
l i d lclose in-advertently.
© Viking Page 59
Shut-down and Re-set Procedure
1. Close the water supply controlvalve.2. Drain system piping throughmain drain located on sprinkler piping.3. Open the Auxiliary drain valveto drain discharge chamberand all trim connected to thedi h h b (R lidischarge chamber. (Relievespressure from sensing side ofPORV)4 R t l t (R l4. Re-set release system (ReplaceAny damaged release devices andOpen priming valve)5 Open water supply control
© Viking Page 60
5. Open water supply controlvalve