Mano a Mano is currently working on a demonstration and training center in Cochabamba, Bolivia. The project has 2 primary goals: 1) ensure that subsistence farmers attain maximum benefits from water projects that Mano a Mano completes in partnership with them; and 2) increase the organization’s capacity to implement successful agricultural water projects over the long term. The past month's work has focused on preparing and planting the gardens, which will be used to teach Bolivian farmers best methods to grow, harvest, and process their crops.
Popular Tags:
40
Demonstration Training Center (or CEA by its Spanish acronym - Center of Ecological Farming Training) January 2013 Update
Transcript
Page 1: Demonstration Center Update - January 2013

Demonstration Training Center(or CEA by its Spanish acronym - Center of Ecological

Farming Training)

January 2013 Update

Page 2: Demonstration Center Update - January 2013

Week 2

Preparation and construction of the integrated farming activity in the

demonstration center

Page 3: Demonstration Center Update - January 2013

Preparation of the tools and seed

Page 4: Demonstration Center Update - January 2013

Marking, leveling and weeding of the land

Page 5: Demonstration Center Update - January 2013

Spreading seeding and subsequent covering of barley and alfalfa

Page 6: Demonstration Center Update - January 2013

Planting a large Chilijchi tree

Page 7: Demonstration Center Update - January 2013

Sowing and planting work completed

Page 8: Demonstration Center Update - January 2013

Marking and excavating for the main irrigation canal

Page 9: Demonstration Center Update - January 2013

Measuring and Marking

2nd Stage: Installation of Partial Shading

Page 10: Demonstration Center Update - January 2013

The excavation of holes

Page 11: Demonstration Center Update - January 2013

Some curious visitors caused a little damage to the seedbed, but the problem was fixed.

Page 12: Demonstration Center Update - January 2013

Week 3: Arboles y Futuro

• Arboles y Futuro (Trees and the Future) is a local foundation in Cochabamba with the goal of investing in environmental education through school curriculum.

• The organization visits educational sites which focus on jobs related to caring for the environment to provide refresher workshops for teachers.

Page 13: Demonstration Center Update - January 2013

The First Visit to the Ecological Farming Training Center

• This opportunity was enabled through the Center of Ecological Farming Training (CEA).

• The group, 34 classroom teachers and 25 from the field, listened to a talk on alternative energies and were able to visit the CEA.

• At the CEA, participants learned with the help of a model, projections and activities, including practicing composting.

Page 14: Demonstration Center Update - January 2013

Talk at the Education Facility

Page 15: Demonstration Center Update - January 2013

Visit to the Ecological Farming Center

Page 16: Demonstration Center Update - January 2013

Participants practicing composting

Page 17: Demonstration Center Update - January 2013

Caring for the trees

Beginning state Final State

Page 18: Demonstration Center Update - January 2013
Page 19: Demonstration Center Update - January 2013

Preparing the planting mixture for the posts

Continuation of the Installation of the Partial Shading

Page 20: Demonstration Center Update - January 2013

Preparing the posts

Page 21: Demonstration Center Update - January 2013

Standing and leveling the posts

Page 22: Demonstration Center Update - January 2013

Posts are finished

Page 23: Demonstration Center Update - January 2013

Preparing and leveling the terrain and marking the holes

Planting the Fruit

Page 24: Demonstration Center Update - January 2013

Replanting some of the posts and seedlings for the perimeter fence

Page 25: Demonstration Center Update - January 2013

Despite some damage caused by pigs in the seedbed, the crops continue to grow.

Continuing Projects

Page 26: Demonstration Center Update - January 2013

Visual of the vegetable garden

Page 27: Demonstration Center Update - January 2013

Garbage is a problem we are working to minimize.

Page 28: Demonstration Center Update - January 2013

Week 3

Partial Shading is ready and the planting can begin

Page 29: Demonstration Center Update - January 2013

Finishing the placement of the wire

Finishing the Partial Shade Project

Page 30: Demonstration Center Update - January 2013

The structure is now ready for the mesh which will provide the partial shade.

Page 31: Demonstration Center Update - January 2013

Placing the mesh on the wire

Page 32: Demonstration Center Update - January 2013

Mesh is completed and secured

Page 33: Demonstration Center Update - January 2013

The partial shade is completed

Page 34: Demonstration Center Update - January 2013

The ground is marked for the fruit

Continuing to plant the fruit orchard

Page 35: Demonstration Center Update - January 2013

Holes are dug for the fruit

Page 36: Demonstration Center Update - January 2013

Manure is distributed throughout the terrain

Preparations are made for planting

Page 37: Demonstration Center Update - January 2013

Preparing for the installation of the perimeter fence

Page 38: Demonstration Center Update - January 2013

Ground is completely prepared and wire has been stretched on the fence

Page 39: Demonstration Center Update - January 2013

Seeing how far we’ve come motivates us to continue!

Page 40: Demonstration Center Update - January 2013

Learn more about the demonstration center at the Mano a Mano website: http://manoamano.org/blog/demonstration-and-training-center-in-el-abra/

www.manoamano.org


Recommended