DEPARTMENT OF ENERGY. PPC MINISTERIAL BRIEFING ON THE OUTCOMES OF THE SERVICE DELIVERY AGREEMENT Ms Dipuo Peters, MP Minister of Energy 09 October 2012. PRESENTATION LAYOUT. Introduction Key focus areas for 2011/12 Hydrocarbons Electricity and electrification Nuclear - PowerPoint PPT Presentation
Popular Tags:
26
DEPARTMENT OF ENERGY PPC MINISTERIAL BRIEFING ON THE OUTCOMES OF THE SERVICE DELIVERY AGREEMENT Ms Dipuo Peters, MP Minister of Energy 09 October 2012
Transcript
Page 1: DEPARTMENT OF ENERGY

DEPARTMENT OF ENERGY

PPC MINISTERIAL BRIEFING ON THE OUTCOMES OF THE SERVICE DELIVERY

AGREEMENT

Ms Dipuo Peters, MPMinister of Energy

09 October 2012

Page 2: DEPARTMENT OF ENERGY

PRESENTATION LAYOUT•Introduction •Key focus areas for 2011/12

• Hydrocarbons• Electricity and electrification• Nuclear• Clean Energy, Climate Change and energy efficiency• International relations (including the Africa Continent)

•Government Outcomes and related programmes • In April 2010 – signed a Performance Agreement on government outcomes 6 and 10.• Subsequently an additional five service delivery agreements were co-signed•DOE has a supporting responsibility in all these outcomes.

•Conclusion

Page 3: DEPARTMENT OF ENERGY

2011/12 Key focus areas

•HydrocarbonsSecurity of supply of petroleum products• Improve national refining infrastructure and capacity.• Up-grade the supply network.

•Electricity and electrification• Development of the Integrated Resource Plan (IRP).• Security of supply through revamping and maintenance of

electricity infrastructure (generation, distribution and reticulation).

Page 4: DEPARTMENT OF ENERGY

2011/12 Key focus areas (cont)

•Electricity and electrification (cont)•Refine INEP to eradicate the electrification backlog. •Provision of a framework for IPP participation.•Implementation of the IRP.•Establishment of the Independent Systems Market Operator (ISMO).

•Nuclear•Pursue nuclear energy in line with the IRP.•Implement nuclear decisions – e.g establishment of the NNEECC,•Establishment of the National Radioactive Waste Disposal Institute.•Education and awareness on nuclear matters.

Page 5: DEPARTMENT OF ENERGY

2011/12 Key focus areas (cont)

•Clean Energy, Climate Change and Energy Efficiency•Promote the development and usage of clean and renewable energy and improve our efforts to meet our energy efficiency and renewable targets. •Implementation of the Solar Water Heaters programme to meet the 1 million systems’ target by 2014.•Implementation of energy efficiency programmes for the industrial and domestic sectors in line with the IRP for the achievement of the 2015 national target of 12%.•Implementation of the demand side management initiatives – e.g Carbon Capture and Storage, etc•Co-hosting of COP 17.

Page 6: DEPARTMENT OF ENERGY

2011/12 Key focus areas (cont)

•International Relations•Provision of an enabling environment to pursue regional development and Africa advancement and enhance international co-operation:

•Signing of the Grand Inga MOU.•Signing of agreements and declaration of intent, covering areas of cooperation in capacity building, funding, technology and infrastructure development .

Page 7: DEPARTMENT OF ENERGY

Government Outcomes and related programmes

Page 8: DEPARTMENT OF ENERGY

SIGNED PERFORMANCE AGREEMENT

(OUTCOMES 6 and 10)

Page 9: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMES

OUTCOME 6:AN EFFICIENT, COMPETITIVE & RESPONSIVE ECONOMIC

INFRASTRUCTURE NETWORKOutput 1: Improving competition and regulation:•Establishment of the ISMO – The Bill was introduced in Parliament after stakeholder consultation at NEDLAC. A due diligence process has been initiated to investigate the possible transfer of transmission assets into ISMO. It is anticipated that the legislation will be finalised by the first quarter of 2013, where after the state-owned company will become operational.•Building of the NMPP between Durban and Johannesburg to ensure a reliable and sustainable supply of liquid fuels. This year will be making the last transfer of R1,5bn to Transnet. The pipeline was operationalised in December 2011

9

Page 10: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 6 (cont):

AN EFFICIENT, COMPETITIVE & RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK

Output 2: Ensure reliable generation, distribution & transmission of energy:Generation:

• Introduction of IPPs – The Renewable Energy IPP procurement process is underway to facilitate IPPs that will generate power side by side with Eskom. Approximately 2400MW of renewable energy IPPs have been selected as preferred bidders for the generation of power using wind, solar and small-hydro technologies starting in 2012.

• Electricity generation/build programme – (Completion of OCGT IPP – 100MW) Contract negotiations have been completed and reached commercial close. Awaiting signature of proven power purchase agreement once conditions precedent (including government guarantees) imposed by Eskom are fulfilled.

10

Page 11: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMES

OUTCOME 6 (cont):AN EFFICIENT, COMPETITIVE & RESPONSIVE ECONOMIC

INFRASTRUCTURE NETWORKDistribution & Transmission:•Develop a funding and implementation plan and reduce the distribution infrastructure maintenance backlog of 27.4 Billion to R 15 billion by 2014:

o Funding and implementation Plan was in place by March 2012(MYD 3).

•Restructuring of the Electricity Distribution Industry: o The Approach to the Distribution Asset Management (ADAM)

proposal has been completed.

11

Page 12: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMES

OUTCOME 6 (cont):AN EFFICIENT, COMPETITIVE & RESPONSIVE ECONOMIC

INFRASTRUCTURE NETWORKOutput 2: Ensure reliable generation, distribution & transmission of energy:Distribution and Transmission:•Address the backlog challenges in the maintenance of the electricity distribution infrastructure;•Development of Substations; •Household access to electricity to be 92% by 2014 – ( Details in slide no 3.2)

12

Page 13: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 10:

Environmental assets and natural resources that are well protected and continually enhanced

Development & implementation of policies to reduce greenhouse gas emissions & climate change impacts, & improve air/atmospheric quality.

Output 2: Reduce greenhouse gas emissions, enhance measures to adapt to climate change impacts and improved air quality•2.3 Renewable energy deployment ( refer to RE: IPP process slide 17 )

13

Page 14: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 10 (cont):

Environmental assets and natural resources that are well protected and continually enhanced

Sub -output 2.5: Efficient energy use:•2.5.1Energy efficiency improvement of 12% by 2015

• Completed the Second review of the National Energy Efficiency Strategy (Consultation with Residential and Commercial Building sector, Mining and Industrial Sector, Business Unity South Africa and National Business Initiative and sector workshops held during the course of 2011 (i.e. etc)

• The Energy Efficiency Campaign was consulted upon extensively and was launched during COP 17.

14

Page 15: DEPARTMENT OF ENERGY

Additional outcomes co-signed by the Minister of Energy

Outcomes 2,4,7,8 and 9

Page 16: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 2 (cont):

A LONG AND HEALTHY LIFE FOR ALL SOUTH AFRICANS

• INEP - Electrification of clinics & health centreso The electrification backlog in 2009/10 was completed.o Electrification of all new clinics & health centres from

2010/11 onwards are addressed by the National Department of Health.

• Conversion from non-grid to grid will be done by the Department

• Solar Water Heaters ( Addressed in Outcome 4)

16

Page 17: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 4:

DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH

Energy security project implementation & local industrialisation of the main value chains to sustain economic growth and job creation.

•Introduction of renewable energy under the RE:IPP procurement programme:

• 1st and 2nd windows under the IPP programme have been concluded. 28 and 19 selected projects under window 1 and 2, respectively.

• Financial close for window 1 is expected to be achieved soon.• Construction to commence after the financial close.• Total capacity procured under the bidding rounds stands at

1050MW for solar, 1197MW for wind and 200MW for CSP.

17

Page 18: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 4 (cont)

DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH

• RE:IPP procurement programme (cont):• Expected job creation – 14 000 construction, 415 permanent

under the solar programme, 3400 construction and 193 permanent under the wind programme, 1827 construction and 120 permanent under the CSP.

• Challenges – delays with the financial close.

• Solar Water Heaters:• Over 270 000 systems installed to date under the rebate

programme.• R4.7bn over the MTEF has been secured with National

Treasury to ensure the 1million target is reached by 2012.

18

Page 19: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 4 (cont)

DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH

• Solar Water Heaters (cont):• The designation under the PPPFA for local content is being

developed.• A centralised procurement system based on approved

suppliers will be phased in to increase the attractiveness of local manufacturing.

• A new contracting model has been agreed with Eskom to be based on the plate technology standard that will be locally manufactured.

• The Eskom rebate programme to be replaced by the new contracting model.

19

Page 20: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 4 (cont)

DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH

• Solar Park • Engagement started with the Siyathemba Municipality;• An MoU between DoE, CEF and Siyathemba Municipality

signed off in September 2012; and• Siyathemba Municipality already took a council resolution to

allocation 5000 hectors for a Solar Park.

20

Page 21: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 7:

VIBRANT, EQUITABLE & SUSTAINABLE RURAL COMMUNITIES WITH FOOD SECURITY FOR ALL

Electrification of rural households & building of bulk infrastructure through INEP concentrating on 23 district municipalities that have been identified by the Department of Rural Development & Land Reform (DRDLR) as the areas in the country that have the most deprived municipalities .Identified District Municipalities: •Limpopo = 4•Mpumalanga =1•Kwa-Zulu Natal =9•Eastern Cape =5•Free State =1•Northern Cape =1•North West =2

21

Page 22: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 7 (cont):

VIBRANT, EQUITABLE & SUSTAINABLE RURAL COMMUNITIES WITH FOOD SECURITY FOR ALL

Bulk SubstationsAccess to energy •Increase % of households linked to grid as capacity building for Municipalities from 55% to 70% •Integrated Energy Centers

o Seven IeCs are already operational o Five IeCs are in the pipeline for the 2012/13 financial year( EC -

2,KZN ,FS, Limpopo•Setting cost reflective tariffs while cushioning the poor from increasing electricity costs

o Five year phase in of cost reflective tariffs up to 2015 , including measures to protect the poor is in place.

22

Page 23: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 7 (cont):

VIBRANT, EQUITABLE & SUSTAINABLE RURAL COMMUNITIES WITH FOOD SECURITY FOR ALL

• Development of LPG retail price regulation to accelerate the penetration of LPG in the household marketo LPG retail price regulation is in place

23

Page 24: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 8:

SUSTAINABLE HUMANSETTLEMENT & IMPROVED QUALITY OF

HOUSEHOLD LIFE

•Contribute to support households & business via the Electrification Programme & the job opportunities presented by the Electrification Programme, the Integrated Energy Centres (IECs), the installation & maintenance of solar systems & SWH.

24

Page 25: DEPARTMENT OF ENERGY

GOVERNMENT OUTCOMESOUTCOME 9:

A RESPONSIVE,ACCOUNTABLE, EFFECTIVE & EFFICIENT LOCAL

GOVERNMENT SYSTEM• Electrification of households through INEP & increased service delivery

by all municipalities.• R 2.8 billion was received for INEP Budget Allocation for 2011/12.

o Eskom received R 1.74 billion.o R 1.10 billion was allocated to the municipalities.

• Budgeted connections for 2011/12 were 198,882.o Municipality R 99,505 and Eskom R 99,377.

• INEP Budget Allocation for 2012/13 R 3,03 billion.• Electrification of households in rural areas with off-grid

technology- 10 00 planed connections per annum.

25

Page 26: DEPARTMENT OF ENERGY