Notice Inviting E-Tender
No. DOH/2019-20/01
The Director Horticulture, Punjab, invites applications on single bid system for
Empanelment of Reputed Firms for one year as follows:-
Empanelment of firms for construction of protected structure viz. Hi-tech Poly House, Naturally Ventilated Poly house (Tubular), Shade Net
House, Walk-in- Tunnel for One Year
i) Tender Form Fee ii) Processing Fee iii) Earnest Money Deposit (EMD) iv) Bid submission start date v) Bid submission end date vi) Bid opening date
Rs. 5000/- As applicable Rs. 3,00,000/- 27-08-2019 (09:00 a.m.) 16-09-2019 (05:00 p.m.) 18-09-2019 (11:00 a.m.)
The detailed specifications of the structures and terms & conditions of the
empanelment are available on the website: https://eproc.punjab.gov.in
If the firm has any query, can contact help desk number. 0172-2970284,
2970263.
The bidders are required to enrol themselves on website
https://eproc.punjab.gov.in for participating in the e-tender. Class 2/3
Digital Signature Certificate (DSC) is mandatory for participation in e-tender.
The corrigendum, if any will be published on referred website only.
-Sd- Director Horticulture, Punjab
2
DEPARTMENT OF HORTICULTURE, PUNJAB Kheti Bhawan, 3rd Floor, Near Dara Studio, Phase-6 (Sector 56), SAS Nagar (Mohali)
Ph: 0172-2970621,22,23 Email: [email protected]
E-Tender No. DOH/2019-20/01
EMPANELMENT OF FIRMS FOR CONSTRUCTION OF HI-TECH POLY HOUSE, NATURALLY VENTILATED POLY HOUSE (TUBULAR), SHADE NET
HOUSE AND WALK-IN-TUNNELS FOR ONE YEAR
TERMS AND CONDITIONS OF EMPANELEMENT INCLUDING INSTRUCTIONS TO BIDDERS
The tender shall be submitted in accordance with these instructions and any
tender not confirming to the instructions as under is liable to be rejected. These
instructions shall form the part of the tender.
1. General
i) The bidders are required to submit the bid online on Punjab Govt.
Procurement Portal https://eproc.punjab.gov.in using valid Class 3/2 Digital
Signature Certificates.
ii) More information useful for submitting the online bids is available on the
above mentioned website.
iii) Bidders are required to enroll on the e-Procurement portal
(https://eproc.punjab.gov.in). Enrolment on this portal is free of charge.
iv) All the bidders shall have to pay the required tender fee and processing fee
as applicable before the submission of tender.
v) The tenderers are advised in their own interest, to carefully read the
instructions and understand their purport and unless the tender specifically
states to the contrary in respect of any particular clause, it shall be
presumed that all tender conditions have been accepted as laid
down in this document.
vi) This tender is not transferrable.
vii) Conditional and incomplete tenders shall not be accepted.
viii) Firm (individual or partnership), company (Public or Private Ltd.) shall be
called as firm.
3
ix) The bids are invited for empanelment of reputed firms for construction of
protected structures viz. Hi-tech polyhouse, Naturally Ventilated Poly
Houses (Tubular), Shade Net Houses, Walk-in-Tunnels on rates as per
norms of Mission for Integrated Development Horticulture (MIDH) for the
financial year 2019-20 (rates subject to change as per MIDH norms as and
when).
2. Bidders/Firms applying for the empanelment should have an experience of
installation of Protected Cultivation structures in India for a minimum period of
2 years.
3. The bidder/firm shall have to submit compliance for both specifications and
terms & conditions of the tender as per given format (Annexure 1), failing
which the bid will be treated as incomplete and is liable to be rejected.
4. Categorization of Firms and Work Allotment
i) The Firms have been categorized in two Categories i.e Category-A and B
based on their turnover and area of installed protected structures. The firm
having turnover of Rs. 2.50 Crore consecutive for the FY 2017-18 & 2018-
19 and installed minimum 50000 sqm shall be categorized as Category A.
Firms having turnover of Rs. 0.50 Crore consecutive for the FY 2017-18 &
2018-19 and installed minimum 25000 sqm shall be categorized as
Category B. A proof is required to attach in the technical bid.
ii) Based on Category, the firms shall have to meet the following parameters
while applying for empanelment:-
Category of Firm
Turnover for last two consecutive years (Rs.)
Req. Experience of installing protected cultivation structure (Area in SQM)
EMD (Rs. lakh)
Bank Guarantee (Rs. lakh)
Work allotment based on Category
Category –A
2.50 Crore 50,000 3.00 10.00 2081-4000 sqm
Category –B
0.50 Crore 25,000 3.00 05.00 up to 2080 sqm
4
iii) Category B Firms shall be allowed to work in its own “size category” (upto
2080 sqm) of work allotment but Category A can work in the both size
categories of work.
5. Protected cultivation structures for a minimum area of 50,000 sqm and 25,000
sqm should have been installed by Category A and Category B, respectively.
Bidders shall have to attach list of such protected structures installed as per
Annexure 2.
6. Bidders must enclose last 2 years income tax return (Assessment year 2017-
18 and 2018-19) and must have GSTIN number. A proof to this effect should
be attached with the technical bid.
7. Bidder should not be black listed anywhere in any case. Undertaking is
required with the technical bid (Annexure 3).
8. Manufacturer and/or bidder (if bidder is authorized dealer/agent/supplier)
should be ISO certified Company. Proof required with technical bid.
9. The bidder must give the undertaking about the trueness of all the documents
(Annexure 4).
10. The last date for receiving the bids would be 16-09-2019 at 5:00 P.M and shall
be opened on 18-09-2019 at 11.00 a.m in the presence of the representatives
of the participating firms, who wish to be present. Firms are suggested to
submit the tender well in time. No request to extend the last date of
submission and opening shall be entertained at any circumstances.
11. Earnest Money Deposit (EMD) and Bank Guarantee.
i) EMD amounting to Rs. 3,00,000/- shall have to be deposited online for this
tender. Bidder should ensure that the online transaction carries the name of
firm/bidder and address of bank to access the details. Bidders shall have to
enclose the EMD receipt in technical bid. No tender will be entertained
without earnest money deposit.
ii) EMD shall be refunded to the firms without interest after the empanelment
tenure only.
12. All the tender documents must be clear and readable and must be uploaded in
a Single/double PDF file format with numbering on each page.
5
13. Firm must have their own workshop in a minimum area of 1000 sq. meter
with the following minimum installed infrastructure
i) Hydraulic pipe bending machine ii) Tower type drill machine iii) Power press iv) Welding machine/grinders and drills etc.
These requirements will be verified at the time of empanelment. if any discrepancy detected the firm will not be given work order and empanelment will be cancelled.
14. Firm having serious complaint shall not be empanelled. Undertaking in this
regard is required to attach with technical bid.
15. Bank Guarantee
i) The successful tenderer shall be required to furnish Bank Guarantee
amounting to Rs. 10.00 lakh for Category A and Rs. 5.00 lakh for
Category B as security within fifteen days after opening the bid. This bank
guarantee shall have validity of one year.
ii) This Bank Guarantee shall be refundable after the expiry of empanelment
i.e one year subject to the submission of completion certificate of all work
duly signed by concerned District Head.
iii) If any firm violates any specification and terms & conditions of the
empanelment, the Bank Guarantee amount shall be forfeited and firm shall
be black listed by Director Horticulture-cum-Mission Director, SHM, Punjab.
16. The beneficiaries shall be free to choose the empanelled firm of their own
choice (Form No. 2) but execution of work should only be allowed after the
approval of Director Horticulture-cum-Mission Director, SHM, Punjab.
17. The application of beneficiaries shall be prioritized through HortNet only.
18. Approval for execution of work for protected structures shall be accorded by
Director Horticulture-cum-Mission Director, SHM, Punjab. District head will
endorse/recommend the Application Form within seven days of receipt to
Director Horticulture-cum-Mission Director, SHM, Punjab along with Form no.
1 & 2 duly completed.
19. If the firm does not start the work within one month from issuing of work
order then on the basis of written complaint of the farmer endorsed by district
6
head, work order shall be cancelled by Director Horticulture-cum-Mission
Director, SHM, Punjab.
20. The financial assistance on protected structure shall be released by the
department to the beneficiary or to the lending bank in when the farmer has
taken loan for the project from that bank.
21. If the firm fails to complete the protected structure within stipulated time i.e.
within 60 days from the date of work order (90 days in case of bank loan)
then on the written complaint of the farmer and verified by the district head,
penalty of 2% of total project amount will be imposed. This amount will be
deducted from the EMD of the firm and the concerned firm cannot take up
any further work till it completes the project in hand. Decision of Director
Horticulture-cum-Mission Director, SHM, Punjab in this regard shall be final.
22. The beneficiaries will provide the suitable levelled site and arrangement of
water. The arrangement of electricity would be the responsibility of the firm at
its own expenses. The firm will be responsible for watch & ward of structure
material.
23. The firm shall collect the payment of work directly from beneficiaries through
RTGS/DD only. The payment receipt shall be attached while submitting the file
for the release of subsidy.
24. Payment terms
The mode of payment by farmer shall be as under;
i) 1st instalment: The farmer will have to pay 10% of total estimate at the
execution of Tri Partite Agreement.
ii) 2nd instalment: Farmer has to pay 40% to concerned firm on completion
of foundation work and supply of complete steel material (excluding
cladding material). Farmer has to pay this amount within 3 working days
from unloading the material and inspection by duly constituted committee.
iii) 3rd instalment: 30% will be paid by the farmer to concerned firm after
supply of cladding material. Farmer has to pay this amount within 3 days
from unloading the material.
7
iv) 4th instalment: Final instalment of 20% after completion of protected
structure in all respects. Farmer has to pay this amount within 10 days from
the final inspection/removal of short comings, if any.
Note: In case the structure is financed by the bank then bank is responsible
for the payment as per their terms and conditions.
25. The firm will get the structure insured from reputed insurance company for
consecutive two years at the cost of the firm. The cover note will be in the
name of beneficiaries by covering all risks thereof as per policy terms and
conditions.
26. All the firms should submit design, drawing specifications as per prescribed
specifications before execution of the work to the department along with time
submission of Tri Partite Agreement.
27. Inspections
The inspection of protected structure will be as under;
i) 1st inspection will be conducted by the concerned HDO in the presence of
concerned firm’s representative and concerned farmer and representative
from Director Horticulture Office (Form No. 1).
ii) 2nd inspection will be conducted by the concerned HDO, District Nodal
Officer for Protected structures in the presence of concerned firm’s
representative and concerned farmer. This inspection will be carried out at
the time of completion of foundation work and supply of complete steel
material (excluding cladding material) (Form No. 7).
iii) 3rd final inspection will be conducted after completion of protected
structure in all respects subject to submission of No Due Certificate, and
“Completion certificate” from concerned firm. Afterwards the district head
will arrange the final inspection. Committee for final inspection shall be
comprising District Head, District Nodal Officer for protected cultivation,
concerned block HDO, Assistant Agriculture Engineer or SCO or
representative from PAU and representative from Director Horticulture
Office. This inspection shall be done in the presence of concerned firm’s
representative, concerned farmer and financing institution if, applicable.
This inspection shall be arranged within 15 days after completion of the
8
protected structure subject to availability of committee members (Form
No. 9).
28. Guarantee/Warranty
The firm will provide guarantee/warranty certificate to the farmer for the material
used for construction of protected structure as follows:-Guarantee:
i) Three years for structure ii) One year for cladding material iii) Three years for properties of poly sheet. iv) Three years for MI systems.
Warranty:
Two years for cladding material after the completion of one year of Guarantee period.
29. Director Horticulture-cum-Mission Director, SHM, Punjab shall have right to get
the cladding material/structure material tested from laboratory or agency at
any time, if required and the cost of testing shall be borne by the concerned
firm.
30. Service Centre:-
i) Firm should have to establish at least one "service centre" in the state of
Punjab after the empanelment but before the execution of work.
ii) The service centre should have one graduate engineer and one agricultural
graduate. The firm shall give salary slip/bank statement as proof of hiring of
expert.
iii) The technical person other than Agriculture Engineer should have completed
the training on polyhouse/net house from State Department of Horticulture,
Punjab State/State Agricultural Universities (SAU's)/ Horticultural Training
Centre (HTC) In due course of time and as per additional requirements,
number of trained technical persons should be increased.
iv) The service centre must provide free after sales service to the farmers at least
for three years. This may exclude the material cost, transportation of material
and installation cost. And must execute the protected cultivation after
sales service card as per Annexure 5.
9
v) Service centre shall have the information board as per the format provided by
Department of Horticulture, Punjab.
vi) Service centre shall maintain the list of farmers covered under the scheme.
vii) Service centre shall maintain the registers as per the format provided.
viii) It will be the responsibility of the firm to see that the service centre is kept
functional all the year and grievances/complaints of beneficiaries are attended
within a week after receiving written complaints/phone calls.
ix) The service centre must be equipped with the communication facilities such as
phone, internet/email etc and must display these at service centre.
31. The Firm shall furnish the technical bid in the prescribed Performa with
supporting documents.
32. The firm shall display an iron board at site having size 5’ x 3’ where particulars
viz name of the beneficiaries, size of structure, date of completion, total
estimate, amount of subsidy, name of manufacturing firms, established under
MIDH for the year 2019-20 etc. should be mentioned.
33. The officers of department of horticulture Punjab can check the structure at
any time.
34. Successful firm has to open at least one registered/branch office in Punjab or
Chandigarh after empanelment but before the execution of the work.
35. Inventory of material, complete operational and maintenance manual shall be
provided by the firm to farmers.
36. Director Horticulture-cum -Mission Director, SHM, Punjab reserves the right to
accept/reject the tender without assigning any reason thereof.
37. Director Horticulture-cum-Mission Director, SHM, Punjab shall have all rights to
amend/delete/add any clause.
38. All disputes and differences arising out of or in any way touching upon or
concerning the fabrication, construction what so ever shall be referred to the
District Head. The decision of district head shall be final and binding of the
concerned parties.
39. Director Horticulture-cum-Mission Director, SHM, Punjab will be appellant
authority in case the dispute is not settled at district level.
10
40. Firm/farmers have to submit required forms timely to the concerned district
head.
41. Applicant (Beneficiary) will have to complete performa's before / during/ or at
completion of protected structure.
42. Firm will have to complete Protected cultivation after sales service card and
hand it over to concerned beneficiary at completion of construction
43. This empanelment is solely for the purpose of protected house construction
from reputed firms so that only best quality units are constructed for the
farmers of Punjab. The department of Horticulture, Punjab reserves the right
to demand at any time from firm/ applicant farmer, any certification/affidavit
as per the requirement which is found supporting/necessary as legal
documentary proof for the constructed protected structure, its stability,
working, etc.
(Balwinder Singh) Horticulture Development Officer, Hoshiarpur
(Daljit Singh) Horticulture Development Officer, Kartarpur, Jalandhar
(Danesh Kumar) Deputy Director Horticulture, Ludhiana
(Arvrinder Singh) Soil Conservation Officer, S.A.S. Nagar
(Dr. Rakesh Sharda) Officer, PAU Ludhiana
(Karun Sagar ) Assistant Director Horticulture, S.A.S. Nagar
(Gulab Singh Gill) Joint Director Horticulture, Punjab
11
Annexure 1
Note: The undertaking should be on the letter head of the bidder's firm
COMPLIANCE STATEMENT FOR SPECIFICATIONS AND TERMS &
CONDITIONS OF THE TENDER
It is certified that I/we have read and understood all the specifications and terms
& conditions and instructions contained in this tender. I/we hereby giving
compliance to all the terms & conditions, instructions and specifications mentioned
in the tender document.
Signatures of the authorized signatory_________________
Name of the signatory ______________________________
Designation ______________________________________
Name & Seal of the bidding firm
Dated___________
12
Annexure 2
List of Installed Structures
Sr. No.
Order No. and date
Name and
Address of
Famer
Phone number
Type of structure
Area Amount of Work
(Rs.)
Year of Construction
Stipulated time of completion
Actual time taken for completion
Reasons of delay, if any
Has the work been done satisfactorily? (Attach a certificate from purchaser)
Signatures of the authorized signatory_________________
Name of the signatory ______________________________
Designation ______________________________________
Name & Seal of the bidding firm
Dated___________
Annexure 3
Note: The undertaking should be on the letter head of the bidder's firm
Undertaking
It is hereby declared that M/s …………………………………………… (name and address of
bidder's firm) has never been black listed and banned by any Govt. Department/
Organization/Institute/PSU in any case anywhere in India.
Signatures of the authorized signatory_________________
Name of the signatory ______________________________
Designation ______________________________________
Name & Seal of the bidding firm
Dated___________
Annexure 4
Note: The undertaking should be on the letter head of the bidder's firm
Undertaking
It is hereby declared that all the documents submitted by …………………………… (name and
address of bidder's firm) for participating in this tender are true in all respects and nothing
is concealed. If any information at any time found wrong, I/we shall be liable for legal
action against me/us for concealing true information.
Signatures of the authorized signatory_________________
Name of the signatory ______________________________
Designation ______________________________________
Name & Seal of the bidding firm
Dated___________
Annexure 5
Protected Cultivation After Sales Service Card
Security Deposit: An amount has been retained as "Security deposit"(as per category
of firm) from the earnest money deposit against the after sale service for 3 years. The
Security deposit is interest free & refundable after submission of duly filled card from
the farmers by respective firm.
Payments terms: The firm is required to make at least six visits to farmer’s field at an
interval of six month or at start of cropping season. Firm will submit duly signed
"Protected cultivation after Sales Service Card" after 32 months but before 36 months
from date of installation & handing over of polyhouse to farmers. The Department Of
Horticulture, Punjab will release payment to the firm within 15 days of submission of
protected cultivation after Sales Service Card.
Protected Cultivation after Sales Service Card
Name of Polyhouse fabricator: ________________ Date of handing over of polyhouse :
__________
Name of Farmer _____________ ________
Village____________Tehsil___________ Dist. __________ Ph: Land Line. ____
_____________
Mobile ___________
Sr. no.
Date of visit
Description of services provided
Details of Representative of Polyhouse fabricator
Sign/ Thumb Impression of Farmer/ or representative
Name & designation
Sign
1
2
3
4
5
6
Technical Specifications
For the
Protected Cultivation Structures
Punjab
Introduction
The horticulture offers the diversification of the Punjab agriculture from the monoculture of paddy wheat
rotation. This will also create the ample employment opportunities for the youth of Punjab. To make
horticulture viable there is need to make horticulture more resource efficient. The hi-tech horticulture which
includes development and cultivation of high yielding varieties, protected cultivation, micro irrigation,
fertigation etc. will certainly improve the quality and quantity of the horticultural produce.
The quality and uncertainty of the vegetable as well as flower production under open cultivation in
the state results in the produce which is not suitable for export markets as well as the high end consumers of
the state. And as such most of this is procured from other states. The need of the hour is to increase the
productivity and quality of the produce to meet the requirements of quality conscious consumer. A paradigm
shift is required which fuels the vertical growth in the productivity.
Protected cultivation is one such technology which can provide the solution. Protected cultivation
means some level of control over plant microclimate to alleviate one or more of a biotic stresses for optimum
plant growth. The protected cultivation includes different levels of technologies from hi-tech vegetable
production to low tunnels to save the crop from frost. From the previous experiences it has been observed
that yields are several times higher than those under open field conditions, quality of produce is superior,
higher input use efficiencies are achieved and vegetable export can be enhanced. Under such circumstances,
protected cultivation is best option. To increase productivity there are mainly two approaches. First by
improvement in genetic base and second by maintenance of favorable environment. In a given genetic
material, they field potentials fully exploited only when an optimum growing environment is provided.
Environment refers to light, temperature, air composition and nature of root medium. Traditionally it is
possible to control only nature of root medium by way of till age, nutrition, irrigation, etc. Protected
cultivation is one which has control over growing environmental conditions.
Protected cultivation is being practiced in the various parts of the world for the last 150 years or so. In
India due to m o r e e m p h a s i s o n food grain production this technology lagged behind. Moreover the
Punjab the harbinger of green revolution there was very less area under horticulture as compared to area under
food grains.
The declining farm sizes in the states is furthering the decreasing farm incomes, thus making agriculture
financially unviable. The protected cultivation technologies will certainly increase the income levels of the
farmers and making small farms financially viable. Of late this technology is catching the fancy of the farmers
and more and farmers are coming forward for the adoption of this technology. The need was felt for the
development of specifications, so that the farmer gets best of the technology.
Specifications for Protected Structures
A. Naturally Ventilated Poly house (NVPH) 1. Height of NVPH - 6 m to 7 m (Normally 6.5 m)
2. Height of Gutter– 4 m to4.5 m (Normally 4.5 m)
3. Height of Top Vent- 1m(or10% area of covered area whichever is higher)
4. Bay Size-8 m x 4 m.
5. Corridors – Maximum 2 m all sides for area calculation.
6. Type -Saw tooth design or vents with butterfly opening.
7. Shape – Aero dynamic
8. Structure –Hot Dip Galvanized structure. Galvanization of the structural members of BIS
standards and should not be less than 300 GSM.
9. Stability of Structure – Structure should with stand minimum wind speed of 150 km/hr.
FRAME COMPONENTS (GIPIPES)
Sr. No. Part name Specification Description
1. Main Column 76 mm OD&2 mm
thick(@3.75
kgpermeter)
6 m to 7 m length
2. Small column along
gable
76 mm OD&2 mm
thick(@3.75
kgpermeter)
4m to 5m length
3. Small Column along
gutter
76 mm OD&2 mm
thick(@3.75
kgpermeter)
4 m to 5 m length
4. Foundation Stub 60 mm OD&3.0 mm
thick(@4.20
kgpermeter)
Minimum 1.2 m to 1.4 m
5. Corridor pipe along
gable
60 mm OD&2.0 mm
thick(@2.85
kgpermeter)
As per design
requirement
6. Corridor pipe along
gutter
60 mm OD&2.0 mm
thick(@2.85
kgpermeter)
As per design
requirement
7. Small bottom chord
along gable
60 mm OD&2.0 mm
thick(@2.85
kgpermeter)
4 m
8. Big Bottom chord 60 mm OD&2.0 mm
thick(@2.85
kgpermeter)
8 m
9. End Purlin 48 mm OD&2.0 mm
thick(@2.3 kg per
meter)
10. First top purlin 48 mm OD&2.0 mm
thick(@2.3 kg per
meter)
Top vent
11. Second top purlin 48 mm OD&2.0 mm
thick(@2.3 kg per meter)
Top vent
12. 4 m gutterpurlin 42 mm OD&2 mm
thick(@2.10
kgpermeter)
Support to gutter
13. 6 m gutterpurlin 42 mm OD&2 mm
thick(@2.10
kgpermeter)
Last pipe towards slope
14. Curtain runner 42 mm OD&2 mm
thick(@2.10
kgpermeter)
15. Horizontal member 42 mm OD&2 mm
thick(@2.10
kgpermeter)
16. Long arc at end 42 mm OD&2 mm
thick(@2.10
kgpermeter)
17. Long arc 42 mm OD&2 mm
thick(@2.10
kgpermeter)
18. Small arc 42 mm OD&2 mm
thick(@2.10
kgpermeter)
19. Knee Bracing and
Small Inclined strut
33 mm OD&2.0 mm
thick(@1.60
kgpermeter)
20. Big Inclined strut 33 mm OD&2.0 mm
thick(@1.60
kgpermeter)
21. Top chord runner in
last bay
33 mm OD&2.0 mm
thick(@1.60
kgpermeter)
At both ends
22. Cross Bracing 33 mm OD&2.0 mm
thick(@1.60
kgpermeter)
At all top corners
23. Curtain pipe 27 mm OD &2.0 mm
thick(@1.60 kg per meter)
Max length 44 m
24. Curtain pipe handle 20/22 mm OD &2.0 mm
thick(@1.30 kg per meter)
25. Flap control system GI curtain pipe Guard 20/22 mm
OD at all corridor pipes
At every3m/4m
FIXTURESANDACCESSORIES
Sr. No. Part name Specification Description
1. Angle Bracket ISA 40 X40X 3
2. Full angle Cleat ISA 40 X40X 3
3. Half angle Cleat ISA 40 X40X 3
4. Flat Patti 25 MM X 5 MM
5. 76 ID Full Clamp 40 mm Width &2 mm thick Hot Dip Galvanized
6. 76 ID Half Clamp 40 mm Width &2 mm thick Hot Dip Galvanized
7. 60 ID Full Clamp 40 mm Width &2 mm thick Hot Dip Galvanized
8. 60 ID Half Clamp 40 mm Width &2 mm thick Hot Dip Galvanized
9. 43 ID Full Clamp 40 mm Width &2 mm thick Hot Dip Galvanized
10. 43 ID Half Clamp 40 mm Width &2 mm thick Hot Dip Galvanized
11. T-Fixtures 33 mm OD&2.0 mm thick Hot Dip Galvanized
12. L-Fixtures 33 mm OD&2.0 mm thick Hot Dip Galvanized
13. Curtain Clamp 40 mm Width Hot Dip Galvanized
14. Universal Joint 20 mm sq. bar
15. Stud Cover 21 mm OD&2.0 mm thick Hot Dip Galvanized
16. Curtain Pipe Insert 21 mm OD&2.0 mm thick Hot Dip Galvanized
17. Self Trapping Screw 20 mm length Th
Hot Dip Galvanized
18. Bitumen Washer 3 mm thick
19. Spring Insert 2.3 mm dia.
20. Spring Insert(Platting) 2.3 mm dia.
21. M 10 X 125 10 mm dia. Hot Dip Galvanized
22. M 10 X 100 10 mm dia. Hot Dip Galvanized
23. M 10 X 90 10 mm dia. Hot Dip Galvanized
24. M 10 X40 10 mm dia. Hot Dip Galvanized
25. M 10 Nuts 10 mm dia. Hot Dip Galvanized
31
26. M 10 washers 10 mm dia. Hot Dip Galvanized
27. M 8 X 200 8 mm dia. Hot Dip Galvanized 28. M 8 X 90 8 mm dia. Hot Dip Galvanized 29. M 8 X 65 8 mm dia. Hot Dip Galvanized 30. M 8 Nuts 8 mm dia. Hot Dip Galvanized
31. M 8 washers 8 mm dia. Hot Dip Galvanized
32. M 6 X 75 6 mm dia. Hot Dip Galvanized 33. M 6 X 20 6 mm dia. Hot Dip Galvanized
34. M 6 Nuts 6 mm dia. Hot Dip Galvanized
35. M 6 washers 6 mm dia. Hot Dip Galvanized 38. Pulley with clamp
HDPE/MS
40 mm dia. Hot Dip Galvanized
39. Rings stainless steel 20 mm dia.
Entry Room(2 door of 1.2mx 2m Aluminium, FRP Sheet sand poly carbonate sheet (mix)
Sr. No. Description Specification
1. Entry room size 4 m x4 m, 4mx3 m, 3m x3 m
2. Double door entry (Prefer sliding door )
Door should be made of Aluminium, FRP
Sheets and poly carbonate sheet (mix).
Door area should have 50 mm PCC
flooring over 75 mm thick sub base.
3. Door size 1.2 m x2 m; Door of GI square/ round pipe 4. Frame of door (ISA four sides to
cover the gap below the door)
Hot Dip Galvanized
5. Half part of door (Downside)
6. Upper half part of door Poly carbonate sheet 5 mm thick
7. Flooring RCC 4 inch with foot dip .
PROFILE AND GUTTER
Sr. No. Part Name Specification Description
1. Profile Aluminum
profile/GI Profile
OR
profile made of GI45 % + 55 % Aluminum.
200 to 250 gr per running meter
2. Gutter,1-1.5%
slope, max.
gutter length 40
m
GI drainage sheet 2.0
mm supported by gutter
purlins
(Single piece,
supported) or gutter
make of GI +
Aluminum (Mix)
500 mm wide having minimum
120 GSM, Galvanization. It
should leak proof. Assure
uniform slope to gutter to avoid
stagnant water in gutter to achieve
maximum life of gutter. Gutter
orientation should be North-
South.
32
3. Drain age
water pipe
PVC 90/110 mm OD, 4 kg/sq centimeter
pressure
4. Zig zag spring insert High carbon steel wire
for repeated action,
2.3mm dia.
GI spring over 2 inch strip of new
poly film over the main plastic in
profile. Double lock at the end of
span.
POLYTHENE
Sr. No. Description Specification
1. Multi-layered Polythene
film.
Fixed properties- 200 micron thick, UV
stabilized, UV blocking IR Reflective Cooling,
diffused, Anti dust, Anti drip.
Optional property-,Anti sulphur for the crops
where sulphur consumption is high. For rose
cultivation (As per farmer choice)
NETS
Sr. No Part Name Description
1. 40 mesh insect net to all four sides of
curtains
UV Stabilized, 2.5 m width (height)(for
vegetables & flowers) minimum 25 %of
floor area. The stitching below 3.2 m
width are not allowed.
2. Shade Net(On top underneath polythene) Shade Net 50% (Green, Aluminet,
Black or White)/operated through
manual gear pulley system. Gear wire
manual operation system with rotary
handle having ball bearings. Shade Nets
40/50/75 percent based on crop
requirement of any colour. 3. 30 mesh insect net UV stabilized to be fixed at top vent
Note 1. The width of insect net scrolls available is 3.6 meter or more. The stitch in below 3.6 meters
not permitted. Above 3.6m, if needed, the double stitching shall be done with machine using
UV stabilized thread.
33
Specific Requirements
Sr.No Particulars Description
01 Gutter slope The slope to the gutter side must be between 1.0 to1.5%. If the
gutter length is more than 40 m, then the slope should be prefer
able given to both sides to avoid damages/leakages.
02 Gable side slope 0 to 1.0 %
03 Foundations Telescopic type. The column size to be 45 cm x 45 cm x 90 cm
depth of CC1:2:4 ratio properly compacted over 10 cm layer of
1:8:16. Two hold fasteners to be used in perpendicular direction
at 20 cm apart in concrete starting from 20cm from base.
04 Bottom apron UV stabilized woven polythene 160 GS Manda height of 1m
above ground and 50 cm buried below ground (Total width 1.5
m) with profile spring assembly on all the four sides on the top.
05 Side wall curtain Insect net 40 mesh fixed and polythene movable fitted to curtain
pipe with plastic / GI clamps and supported by GI guard 20 / 22
mm OD pipes 2.0 mm thick on corridor pipes
06 Orientation The Polyhouse gutters should be preferably installed in North–
South direction. All the vents should preferably face to East
direction and the last vent of eastern direction to face to West
direction.
Alternate Specifications with channel section
Sr.
No.
Item Indicative Specifications
I Structure: Structure should with stand wind velocity as per Punjab conditions, without
weld.
1. Columns Channel / Rectangular Closed Pipe Structure :80 mm x 50 mm /3.0 mm
thickness (interior column) /10x50x80x50x10 mm(channel) and side columns
of size 50 mm x 40 mm of 2.0 mm thickness (Exterior /sloping column)
/10x40x60x40x10 mm (channel)
2. Purlin Channel/Rectangular Closed Pipe Structure: 37 mm x 37 mm of 2.0 mm
thickness /10 x 40 x 60 x 40 x10 mm (channel)
3. Trusses Channel/Rectangular Closed Pipe Structure: size 50 mm x 50 mm, bracing
member 25 mm and 50 mm OD GI pipe, 2.0 mm thickness.
/10x50x70x50x10mm (channel)
34
MI Component
Indicative Quantity of Material of Drip / Fogging System in Poly house / Net
House
S. No. Description of Items Unit Size of Poly House(sqm)
500 1008 2080 4000
A Drip System
1 Main and Sub main Line PVC 63
mmx4kg/cm2
Meter 36 48 70 110
2 Main Line PVC 75 mmx4 kg/cm2 Meter 0 0 0 60
3 16 mm LLDPE Lateral line CL-B
Cylindrical (PC)
Meter 60 70 130 200
4 Inline 16mm, 1.3 to 2.4LPH @ 20-40
cmCL2
Meter 750 1500 3000 6000
5 Ball Valve 63 mm (Moulded Seal, Plain) Nos. 2 2 2 2
6 Ball Valve 75 mm (Moulded Seal, Plain) Nos. 0 0 0 1
7 Sub main Flush Valve 40mm Nos. 2 2 2 2
B Fogging System
1 Main and Sub mail Line PVC 50 mm x
6kg/cm2
Meter 36 42 70 110
2 Main and Sub mail Line PVC 63 mm x
6kg / cm2
Meter 0 0 210 60
3 16 mm LLDPE Lateral line Meter 200 400 800 1600
4 4 way Fogger Assembly with HPLPD Nos. 50 96 192 384
5 Ball Valve 50mm (Teflon Seal, Plain) Nos. 2 1 1 0
6 Ball Valve 63mm (Teflon Seal, Plain) Nos. 0 0 0 1
7 Sub main Flush Valve 40mm Nos. 2 2 2 2
8 GI Wire 2 mm thick Meter 200 350 800 1400
C Filtration Unit
1 Disc filter25 m3/hr Nos. 1 1 1 0
2 Disc filter40 m3/hr Nos. 0 0 0 1
3 Sand filter/Hydrocyclone filter 10 m3/hr Nos. 1 1 0 0
4 Sand filter/ hydrocyclone filter 25m3/hr Nos. 0 0 1 0
5 Sand filter/ Hydrocyclone filter 40 m3/hr Nos. 0 0 0 1
6 ManifoldGI+GMV/HDPE Nos. 1 1 1 1
7 Ventury Assembly Complete Nos. 1 1 1 1
8 Air Release Valve Assembly1" Nos. 1 1 1 1
Note:
1. For any additional / optional item that is fitted / provided in structure by firm with the
consent of farmer that shall not be part of cost norms*.
2. The list above under MI component is tentative. However, the actual material to be
used at site may vary as per structural design requirement and this will be binding
to the firm.
General Conditions of Erection
1. No pipes should be found welded. The bottom horizontal of 8 m length should be
prepared by placing one feet section of lesser size. (inside & clamping it properly).
2. The apron plastic must be buried in the ground at least 50 cm from ground level.
3. The curtain pipe should be cut near the door in case door is placed at the centre of the
side wall. The wall of poly house having more length, at centre of the wall a complete
plastic without side curtain, insect net etc. should be fixed with separate profile and
springs so that it can be removed as and when tractor operation is required in the poly
house.
4. Supplier should ensure checking of poly house construction materials for
specifications by department representatives after supply of material at site.
5. In case of top poly film fitted to the arches, if the length of top is more than 30 m,
then the top plastic to be fitted to arch at every 24 m length by using profile and zig
zag spring to avoid flapping of top plastic during winds.
6. Fixing of top poly – sheet should be fixed with profile and spring in the center of
gutter length.
7. Self-drilling screw in profile should not be more than 30 cm apart
8. While installing the multi layer film, first in sure that respective layers are facing the
right direction as shown on film (e.g. inside out)
9. Provide a sample of one sqm size of poly film, thermal net etc. having manufacturer’
identification mark along with batch no.
10. Film should be tensioned tightly enough so that there should not be flapping during
windy days.
11. The structural design should be sound enough to with stand minimum wind velocity of
150 km/hr.
12. Regarding material used under MI component the firm will use BIS mark material.
The system should run smoothly and there shall be no leakage.
13. Farmer will arrange the water source, electricity and booster pump at his own level to
operate the MI system.
14. The overall structure should perform satisfactorily in all respects.
B. Shade net House (Dome shaped)
Sr No Particulars Description
1 Area in sqm 1000 to 4000 sqm
2 Length of the structure As per situation
3 Width of the structure As per situation
4 Grid 6 m x 4 m, 8 m x 4 m,
5 Corridors Maximum 2m all sides for area calculation.
Structural parts(GI Pipes)–
Sr No Name of the part Length in m Dia in mm Thickness in
mm
1 Foundation pipe 1 m to 1.2 m 48 mm OD 3 mm
2 Net house column 4.5 m 60 mm OD 2 mm
3 Top purlins 4 m and 6 m 42 mm OD 2 mm
6 Clamps and nut bolts As per requirement
7 Corridors 2.0 m 48 mm OD 2 mm
8 Horizontal members 1 to 1.5 m 42 mm OD 2 mm
9 Cross Bracing sat top
corners
As per requirement 42 mm OD 2 mm
10 Knee bracing to connect
horizontal and vertical
member at the corner
0.5 m 33/42 mm
OD
2 mm
11 Arches As per requirement 42 mm OD 2 mm
Other parts of the structure–
Sr No Particulars Description
1 Shade net
50% at the top of the structure fitted in Aluminum /GI
profile and springs. UV stabilized
2 Profiles Aluminum/GI profiles of 200 to 220gr per running or profile
make of GI + Aluminum (Mix)
3 Spring Insert Zig zag spring (UV stabilized plastic coating) insert to fix
shade net to Profile. 2.3 mm dia meter of spring wire and cold
galvanization is applied on the wire. Wire material is high
carbon steel with spring action. 4 Foundation work Telescopic type. The column size to be 45 cm x 45 cm x 90 cm
depth of CC1:2:4 ratio properly compacted over 10 cm layer of
1:8:16.Two hold fast to be used in perpendicular direction at 20
cm apart in concrete starting from 20 cm from base.
5 Top purlins To be fixed on each column on top (4 m x6 m)
Entry Room(2 doorof1.2mx 2m Aluminium and poly carbonate mix)
Sr. No. Description Specification
1 Double door entry size ( prefer sliding doors) 4 m x4 m, 4mx3 m, 3m x3 m
2 Door size 1.2 m x2 m; Door of GI square pipe
3 Frame of door (ISA four sides to cover the
gapbelow thedoor)
Hot Dip Galvanized
4 Half part of door (Downside) Aluminium sheet
5 Upper half part of door Polycarbonate sheet 5 mm thick
6 Flooring RCC 4 inch with foot dip
MI Component Indicative Quantity of Material of Drip / Fogging System in Poly houses / Net House
Sr
No.
Description of Items Unit Size of Poly House (sqm)
500 1008 2080 4000
A Drip System
1 Main and Sub mail Line PVC 63mm x4 kg/cm2 Meter 36 48 70 110
2 Main Line PVC 75 mmx4 kg/cm2 Meter 0 0 0 60
3 16 mm LLDPE Lateral line CL-B Cylindrical (PC) Meter 60 70 130 200
4 Inline 16mm, 1.3 to 2.4LPH @ 20-40 cmCL2 Meter 750 1500 3000 6000
5 Ball Valve 63 mm (Moulded Seal, Plain) Nos. 2 2 2 2
6 Ball Valve 75 mm (Moulded Seal, Plain) Nos. 0 0 0 1
7 Sub main Flush Valve 40mm Nos. 2 2 2 2
B Fogging System
1 Main and Sub-main Line PVC 50mm x6 kg/ cm2 Meter 36 42 70 110
2 Main and Sub-main Line PVC 63mm x6 kg/ cm2 Meter 0 0 210 60
3 16mm LLDPE Lateral line Cylindrical Meter 200 400 800 1600
4 4 way Fogger Assembly with HPLPD Nos. 50 96 192 384
5 Ball Valve 50mm (Teflon Seal, Plain) Nos. 2 1 1 0
6 Ball Valve 63mm (Teflon Seal, Plain) Nos. 0 0 0 1
7 Sub-main Flush Valve 40mm Nos. 2 2 2 2
8 GI Wire 2 mm thick Meter 200 350 800 1400
C Filteration Unit (2 separate mains
& sub mains for misting /fogging
and drip.
1 Disc filter25 m3/hr Nos. 1 1 1 0
2 Disc filter40 m3/hr Nos. 0 0 0 2
3 Sand filter 10 m3/hr/Hydro cyclone Nos. 1 1 0 0
4 Sand filter 25m3/hr/Hydro cyclone Nos. 0 0 1 0
5 Sand filter 40 m3/hr/Hydro cyclone Nos. 0 0 0 2
6 ManifoldGI+GMV/HDPE Nos. 1 1 1 2
7 Ventury Assembly Complete Nos. 1 1 1 1
8 Air Release Valve Assembly1" Nos. 1 1 1 2
Note:
1. For any additional /optional item that is fitted /provided in structure by firm
with the consent of farmer that shall not be part of cost norms*.
2. The list above under MI component is tentative. However, the actual material to
be used at site may vary as per structural design requirement and this will be
binding to the firm.
General conditions of Erection
1. No pipes should be welded as all length GI pipes are available in the market.
2. The net must be buried in the ground at least 50 cm from ground level.
3. The main column and small column must touch the concrete of the foundation and
the foundation pipe should not be visible. In other words, the foundations should
be leveled.
4. Supplier should ensure checking of net-house construction materials for
specifications by department representatives after supply of materials at site.
5. The structure should withstand wind speed of 120km/hr.
6. Regarding material used under MI component the firm will use BIS mark material.
The system should run smoothly and there shall be no leakage.
7. The overall structure should perform satisfactorily in all respects.
C. Shade net House (Top Flat)
SrNo Particulars Description
1 Area in sqm 1000 to 4000 sqm
2 Length of the structure As per situation
2 Width of the structure As per situation
4 Grid 4 m x6 m or 8 m x 4 m
5 Corridors Maximum 2m all sides for area calculation.
Structural parts(GI Pipes)–
SrNo Name of the part Length inm Dia inmm Thickness
inmm
1 Foundation pipe 1 m to 1.2 m 48 mm OD 3 mm
2 Net house column 4m 60 mm OD 2 mm
3 Top purlins 4 m 42 mm OD 2 mm
4 3/4/5 way 200 mm each side 48 mm ID 2 mm
5 Clamps and nut bolts As per requirement
6 Corridors 2.0 m 48 mm OD 2 mm
7 Horizontal members 1 to 1.5 m 42 mm OD 2 mm
8 Cross Bracing sat top
corners
As perrequirement 42 mm OD 2 mm
9 Knee bracing to connect
horizontal and vertical
member at the corner
0.5 m 33/42 mm
OD
2 mm
Other parts of the structure –
Sr No Particulars Description
1 Shade net
50% at the top of the structure fitted in profile and springs.
UV stabilized
2 Profiles Aluminium profiles /GI Profile of 200 to 220gr per running
m or profile make of GI + Aluminum (Mix)
3 Spring Insert Zig zag spring (UV stabilized plastic coating) insert to fix
shade net to Profile. 2.3 mm dia meter of spring wire and cold
galvanization is applied on the wire. Wire material is high
carbon steel with spring action. The net is to be fixed at every
4 m on top purlin.
4 Foundation work Telescopic type. The column size to be 45 cm x 45 cm x 90
cm depth of CC 1:2:4 ratio properly compacted over 10 cm
layer of 1:8:16. Two hold fast to be used in perpendicular
direction at 20 cm apart in concrete starting from 20 cm from
base.
5 Top purlins To be fixed on each column on top (6 m x4 m)
Entry Room(2 doorof1.2mx 2mAluminiumand poly carbonate mix)
Sr.
No.
Description Specification
1 Entry room size( Prefer sliding doors )
4 m x4 m, 4mx3 m, 3m x3 m
2 Double Door Entry Inner door may be of frame stitched with 40
mesh insect net of minimum 50 cm overlapping)
3 Door size 1.2 m x2 m; Door of GI square pipe
4 Frame of door (ISA four sides to
cover the gap below the door)
Hot Dip Galvanized
5 Half part of door (Downside) Aluminium sheet
6 Upper half part of door Poly carbonate sheet 5 mm thick
7 Flooring RCC 4 inch with foot dip .
MI Component
Indicative Quantity of Material of Drip / Fogging System in Poly houses /Net House
Sr. No. Description of Items Unit Size of Poly House (sqm)
500 1008 2080 4000
A Drip System
1 Main and Sub-main Line PVC 63
mmx4 kg/cm2
Meter 36 48 70 110
2 Main Line PVC 75 mmx4 kg/cm2 Meter 0 0 0 60
3 16 mm LLDPE Lateral line CL-B Cylindrical (PC)
Meter 60 70 130 200
4 In line 16mm, 1.3 to 2.4LPH @ 20-
40cmCL2
Meter 750 1500 3000 6000
5 Ball Valve 63 mm (Moulded Seal,
Plain)
Nos. 2 2 2 2
6 Ball Valve 75 mm (Moulded Seal,
Plain)
Nos. 0 0 0 1
7 Sub-main Flush Valve 40mm Nos. 2 2 2 2
B Fogging System
1 Main and Sub-main Line PVC 50 mm
x 6 kg/cm2
Meter 36 42 70 110
2 Main and Sub-main Line PVC 63 mm
x 6 kg/cm2
Meter 0 0 210 60
3 16mm LLDPE Lateral line Cl-B
Cylindrical
Meter 200 400 800 1600
4 4 way Fogger Assembly with HPLPD Nos. 50 96 192 384
5 Ball Valve 50mm (Teflon Seal, Plain) Nos. 2 1 1 0
6 Ball Valve 63mm (Teflon Seal, Plain) Nos. 0 0 0 1
7 Sub-main Flush Valve 40 mm Nos. 2 2 2 2
8 GI Wire 2 mm thick Meter 200 350 800 1400
C Filtration Unit ( 2 separate mains and
drip )
1 Disc filter25 m3/hr Nos. 1 1 1 0
2 Disc filter40 m3/hr Nos. 0 0 0 2
3 Sand filter/Hydrocyclone10 m3/hr Nos. 1 1 0 0
4 Sand filter/Hydrocyclone25m3/hr Nos. 0 0 1 0
5 Sand filter/Hydro cyclone 40 m3/hr Nos. 0 0 0 2
6 ManifoldGI+GMV/HDPE Nos. 1 1 1 2
7 Ventury Assembly Complete Nos. 1 1 1 1
8 Air Release Valve Assembly1" Nos. 1 1 1 2
Note:
1. For any additional /optional item that is fitted /provided in structure by firm with the
consent of farmer that shall not be part of cost norms*.
2. The list above under MI component is tentative. However, the actual material to be
used at site may vary as per structural design requirement and this will be binding to
the firm.
General conditions of Erection
1. No pipes should be welded as all length GI pipes are available in the market.
2. The net must be buried in the ground at least 50 cm from ground level.
3. The main column and small column must touch the concrete of the foundation and the
foundation pipe should not be visible. In other words, the foundations should be leveled.
4. Supplier should ensure checking of net-house construction materials for specifications by
department representatives after supply of materials at site.
5. The structure should withstand wind speed of 120km/hr.
6. Regarding material used under MI component the firm will use BIS mark material. The
system should run smoothly and there shall be no leakage.
7. The overall structure should perform satisfactorily in all respects.
D. Walk-In Tunnel
Sr. No. Particulars Description
1 Area proposed 280 sqm to 800 sqm
2 Length of Tunnel 28 m to 100 m or as per site
3 Width of Tunnel 8.0 m to 10 m
4 Center height 3.5/4 m; variable
5 Distance between 2 arches 3 m
6 Height of side curtain 2 m to 2.5 m
7 Side column height 2.5 m to 3 m
8 Bottom Apron 0.5-0.6m
9 Shade net UV stabilized with 50% shade factor
List of Parts(GI)
Sr. No. Name of the parts. Size– Dia /thickness in mm. Description
1 Foundation stub 48/2 Length 80cm to 100 cm
2 Column 60/2 3 m
3 Bottom Chord 60/2 8/10 m
4 Arches with W
bracings
43/2 As per requirement
5 Purlins 43/2
6 2 Doors and entry
room
Doors – 1.2 m x2 m
Entry room – 3m x3m, 3m x
2m, 2m x2m
7 Clamps and nut-bolts. As per requirements.
8 Cross bracings 4 no
sat gable ends
32/2, length as per requirement
Entry Room(2 door of 1.2mx 2m Aluminium and poly carbonate mix)
Sr. No. Description Specification
1. Entry room size 4 m x4 m, 4mx3 m, 3m x3 m
2. Double door entry ( prefer double doors )
3. Door size 1.2 m x2 m; Door of GI square pipe
4. Frame of door (ISA four sides to cover
the gap below the door)
Hot Dip Galvanized
5. Half part of door (Downside) Aluminium sheet
6. Upper half part of door Polycarbonate sheet 5 mm thick
7. Flooring RCC 4 inch with foot dip .
Profiles and springs
Sr.
No.
Part Name Specification Description
1. Profile Aluminum/GI profile OR profile
made of GI 45 % + 55 %
Aluminum.
200 to 250 gr per running meter
2. Zig zag
spring insert
High carbon steel wire repeated action, 2.3 mm dia
GI/UV stabilized plastic
coating
Poly film
Sr.
No. Description Specification
1. Multi-layered Polythene film.
Fixed properties-200 micron thick, UV
stabilized, UV blocking IR Reflective
Cooling, diffused, Anti dust, Anti drip.
Optional property-,Anti sulphur for the
crops where sulphur consumption is high. For
rose cultivation (As per farmer choice)
Nets (monofilament)
Sr No Part Name Description
1. 40/50 mesh insect net to both sides
length wise
UV Stabilized, 2.5 m width(height)
Specific Requirements
Sr
No
Particulars Description
1. Shade Net (On
top underneath polythene)
Manual Gear pulley system for all sizes. Gear wire manual operation
system with rotary handle having ball bearings. Shade Nets 50
percent shade factor.
2 Foundations Telescopic type. The column size to be 45 cm x45cm x60 cm depth
of CC 1:2:4 ratio properly compacted over 10 cm layer of 1:8:16.
Two hold fast to be used in perpendicular direction at 20 cm apart
in concrete starting from 20 cm from base.
3 Bottom apron UV stabilized woven polythene 160 GSM and a height of 0.5/0.6m
above ground and 50 cm buried be low ground
4 Side wall
curtain
Insect net 40 mesh fixed and polythene movable fitted to curtain
pipe with plastic/GI clamp sand supported by GI guard20/22mm
OD pipes 2.0 mm thick on corridor pipes
MI Component
S.No. Description of Items Unit
(56X8) 448
A Drip System
1 Main Line PVC 50 mmx6 kg/cm2 Meter 18
2 16 mm LLDPE Lateral line CL-B Cylindrical (PC) Meter 16
3 Inline 16mm, 1.3 to 2.4LPH @ 20-40 cmCL2 Meter 450
4 Ball Valve 50 mm (Teflon Seal, Plain) Nos. 1
5 Sub-main Flush Valve 40 mm Nos. 2
B Filtration Unit ( 2 separate mains & sub mains for misting
/fogging and drip.)
1 Disc filter25 m3/hr Nos. 1
2 Sand filter/hydro cyclone filter Nos. 1
2 Manifold for fertigation devices1"X 2.5" Nos. 1
3 Ventury injector Assembly without manifold 3/4" Nos. 1
4 Air Release Valve Assembly1" Nos. 1
Note:
1. For any additional /optional item that is fitted/ provided in structure by firm with
the consent of farmer that shall not be part of cost norms*.
2. The list above under MI component is tentative. However, the actual material to
be used at site may vary as per structural design requirement and this will be
binding to the firm.
3. The width of insect nets rolls available is 3.6 meter or more. The stitching
below3.6 meter is not permitted. Above 3.6m, if needed, the double stitching shall
be done with machine using UV stabilized thread.
General conditions of Erection
1. No pipes should be found welded. The bottom horizontal of 8m length should be
prepared by placing one feet section of lesser size. (inside & clamp in git
properly).
2. The apron plastic must be buried in the ground at least 50 cm from ground level.
3. If fixtures found rusted the structure will be considered incomplete.
4. Regarding material used under MI component the firm will use BIS mark
material. The system should run smoothly and there shall be no leakage.
5. The overall structure should perform satisfactorily in all respects.
6. Trellising system–Trellising wires of 2 mm gear wire or 3 mm dia high carbon
steel to be used at suitable height from ground level parallel to bed sand number
of wires will be 8 for 8 m span.
*= Cost norms means upper limit of cost for calculation of subsidy
Fan and Pad cooled system
1. Corridors – Maximum 2m all sides for area calculation.
2. Shape – Aero dynamitic
3. Structure – Hot Dip Galvanized structure. Galvanization of the structural members
of BIS standards and should not be less than 300 GSM.
4. Stability of Structure – Structure should with stand to minimum wind velocity of
150 km/hr.
S.No. Particulars Description
1. Structure All columns will be of size 86 mm x 46 mm of 2.9 mm thickness sand side
corridor member of size 60 mm x 40 mm of 2 mm thickness, roof purlins
of size 60 mm x 40 mm of 2mm thickness, Trusses of size 40 mm x20 mm
of 2 mm thickness. Gutter thickness is 2 mm.(ThicknessTolerance+or-
10%).
The structural design should be sound enough to withstand 150km/hr
of wind speed. And minimum load of 25kg/m2.
2. Multi-layered
Polythene film
Fixed properties- 200 micron thick, UV stabilized, UV blocking
IR Reflective Cooling, diffused, Anti dust, Anti drip.
Optional property-,Anti sulphur for the crops where sulphur
consumption is high. For rose cultivation (As per farmer choice)
3. Automated Humidity and temperature control inside the poly house
Entry Room(2 doorof1.2mx 2mAluminiumand poly carbonate mix)
Sr. No. Description Specification
1. Entry room size 4 m x4 m, 4mx3 m, 3m x3 m
2. Double door( prefer sliding doors) 02
3. Door size 1.2 m x2 m; Door of GI square pipe
4. Frame of door (ISA four sides to
cover the gap below the door)
Hot Dip Galvanized
5. Half part of door (Downside) Aluminium sheet
6. Upper half part of door Polycarbonate sheet 5 mm thick
7. Flooring
Brick flooring with Plaster 15 mm thick (under the farmer’s scope)
PROFILE AND GUTTER
Sr. No. Part Name Specification Description
1. Profile Aluminum/GI
profile OR
profile made of GI 45 % +
55 % Aluminum.
200 to 250 gr per running meter
>300 gr per running meter
2. Gutter,1-1.5%
slope, max. gutter
length 40 m.
GI drainage sheet 2.0
mm supported by gutter
purlins
(Single piece, supported
on arch )
500 mm wide having minimum
120 GSM, Galvanization. It
should leak proof. Assure
uniform slope to gutter to avoid
stagnant water in gutter to achieve
maximum life of gutter. Gutter
orientation should be North-
South.
3. Drainage water
pipe
PVC 90/110 mm OD, 4 kg/sq centimeter
pressure
4. Zigzag spring insert High carbon steel wire
for repeated action,
2.3mm dia or PVC
plastic coating.
GI spring over 2 inch strip of new
poly film over the main plastic in
profile.(25% over lapping)
NETS
Sr.No. Part Name Description
1. Shade Net 50% (On top underneath
polythene)
Shade Net 50% (Green, black, aluminet
or White)/ inside greenhouse 50% with
nylon support cables, pulleys, side
support with clamps, plastic clamps
etc. with manual gear pulley system
2. 40 mesh insect net Insect net 40 mesh on outside Cooling Pad to prevent the entry of insect from cooling pad.
Fans and Pad for cooling system
SrNo Part Name Description
1. Fans Exhaust fans of 50"withHot Dip Galvanized body,
1.5hpmotor3phase,belt drive with louvers in each bay of 8m. The
height of the fans is to be determined based on the plant height
which is proposed to be grown in the greenhouse. The fan blades
and frame are to be made of non-corrosive materials like
aluminum / stainless steel. The fan to pad distance should not
exceed 40 m. The air flow rate should be of 75 cubic meter /
minute / sq.mof pad. The water flow rate should be of 9 litre per
minute/linear meter pad. The uniform distribution of water on pad
is to be maintained. 2. Cooling Pad (BIS specifications)
Cellulose cooling pad of size 1.8 m width and 0.1 m thickness
alongwith Hot Dip Galvanized water collecting gutter, profiles to
fix pads, PVC water distribution system, pump complete
3. Civil work Construction of brick wall in CM1:4,0.3 m thick,0.9 m height
above ground and 0.45 m below ground, 32 m long for cooling
pad side and 0.15 m thick 0.2 m height above ground and 0.2
m below ground at three sides with duly plastered on both
side.
4. Electrical control panel Consisting of MCB, Relay, switches, RYB
Indicator, panel, Voltmeter, MS body duly painted etc.(for fan and
pad). All the electrical gadgets and appliance used must meet BIS
standards 5. Water tank Multi layered plastic water tank 2000 lits. X 2no.,for cooling pad.
6. Climate control system
A Fan Pad System Numbers of fan depends upon size of Fan-fad house and it should be capable of exhausting air volume in one minutes.
Exhaust Fans – 50"however it depends upon size of fan-pad house with louvers, 1.5 HP – 3 phase ISI standard electric motor.
Cellulose cooling pads of 1.8 meter with 100 mm / 150 mm thickness covering the area properly, PVC water distribution system, screen / disc filter, valve and pumps etc.
Control panel with manual operation, temp and humidity sensors.
The necessary digital controller with sensory device & accessories of standard quality as per requirement should be provided to operate the fan & pad system for controlling temperature& humidity inside the Green house.
B Fogging System In consist of four way anti leak fogger 28 lph flow rate (working pressure should be mentioned at which we will be able to get required particle size, fogger spacing along the lateral and lateral spacing) and particle size 80-100 micron, 16 mm lateral class-B Cylindrical (PC), PVC pipe 6 kg / cm2, valves, filter, pump, panel with volt meter, MCB, relay, temp and humidity sensor etc. complete application rate 3 mm/hr.
Specific Requirements
Sr.No Particulars Description
01 Gutter slope The slope to the gutter side must be between 1.0 to1.5%.If the gutter
length is more than 40m, then the slope should be preferable given to
both sides to avoid damages / leakages.
02 Gable side slope 0 to 1.0 %
03 Foundations Telescopic type. The column size to be 45 cm x 45 cm x 90 cm depth of
CC1:2:4 ratio properly compacted over 10 cm layer of 1:8:16.Two hold
fast to be used in perpendicular direction at 20 cm apart in concrete
starting from 20cmfrom base.
06 Orientation The Poly house gutters should be preferably installed in North–South
direction. All the vents should preferably face to East direction and the
last vent of eastern direction to face to West direction.
Note:
1. For any additional /optional item that is fitted /provided in structure by firm
with the consent of farmer that shall not be part of cost norms*.
2. The list above under MI component is tentative. However, the actual material to be
used at site may vary as per structural design requirement and this will be binding to
the firm.
General conditions of Erection
Indicative Quantity of Material of Drip/ Fogging System
S.No. Description of Items Unit Size of Poly House(sqm)
500 1008 2080 4000
A Drip System
1 Main and Sub-main LinePVC 63
mmx4kg/cm2
Meter 36 48 70 110
2 Main Line PVC 75 mmx4 kg/cm2 Meter 0 0 0 60
3 16 mm LLDPE Lateral line CL-B
Cylindrical (PC)
Meter 60 70 130 200
4 Inline 16mm, 1.3 to 2.4LPH @ 20-40
cmCL2
Meter 750 1500 3000 6000
5 Ball Valve 63 mm (Moulded Seal, Plain) Nos. 2 2 2 2
6 Ball Valve 75 mm (Moulded Seal, Plain) Nos. 0 0 0 1
7 Sub main Flush Valve 40mm Nos. 2 2 2 2
B Fogging System
1 Main and Sub mail Line PVC 50
mmx6kg/cm2
Meter 36 42 70 110
2 Main and Sub mail Line PVC 63
mmx6kg/cm2
Meter 0 0 210 60
3 16 mm LLDPE Lateral line CL-B Cylindrical (PC)
Meter 200 400 800 1600
4 4 way Fogger Assembly with HPLPD Nos. 50 96 192 384
5 Ball Valve 50mm (Teflon Seal, Plain) Nos. 2 1 1 0
6 Ball Valve 63mm (Teflon Seal, Plain) Nos. 0 0 0 1
7 Sub main Flush Valve 40mm Nos. 2 2 2 2
8 GI Wire 2 mm thick Meter 200 350 800 1400
C Filtration Unit ( 2 separate mains and
sub mains for misting/ fogging and drip
)
1 Disc filter25 m3/hr Nos. 1 1 1 0
2 Disc filter40 m3/hr Nos. 0 0 0 1
3 Sand filter/hydrocyclone10 m3/hr Nos. 1 1 0 0
4 Sand filter/hydro cyclone filter 25m3/hr Nos. 0 0 1 0
5 Sand filter/hydro cyclone filter 40 m3/hr Nos. 0 0 0 1
6 Mani fold GI+GMV/HDPE Nos. 1 1 1 1
7 Ventury Assembly Complete Nos. 1 1 1 1
8 Air Release Valve Assembly1" Nos. 1 1 1 1
1. No pipes should be welded as all length GI pipes are available in the market.
2. The main column and small column must touch the concrete of the foundation and
the foundation pipe should not be visible. In other words, the foundations should be
leveled.
3. The structure can withstand the wind speed of 150km/hr.
4. Supplier should ensure checking of net-house construction materials for
specifications by department representatives after supply of materials at site.
5. Regarding material used under MI component the firm will use BIS mark material.
The system should run smoothly and there shall be no leakage.
6. The overall structure should perform satisfactorily in all respects.
AGREEMENT FOR INSTALLATION OF PROTECTED
STRUCTURE
Non-Judicial Stamp Paper of Rs. 100/- (Rupees One Hundred only)
(To be borne and executed by applicant)
Every page to be signed by all the parties
To be attested by First Class Magistrate/ Notary Public
TRI PARTITE AGREEMENT (TPA) FOR PROTECTED CULTIVATION
(Applicable w.e.f. __________)
This Deed of agreement executed on this day of _____ Month _________20__ (Two
Thousand ____) at _____________, Distt. ______________ among Shri/Smt.
_____________________________ Residence of village _____________________, Tehsil:
__________________________, District:___________________, Punjab State (herein after
called "Farmer") which expression shall be deemed to include his / her / heirs, executors,
administrator and assigns on the first part.
AND
Empanelled Firm selected by farmer for installation of Protected structure and to provide
after sales service during three years, M/s ______________________________
address:____________________ (herein after called the Firm), which expression shall be
deemed to include its successors and assigns on the second part, (Represented by authorized
signatory of the firm).
AND
Horticulture Development Officer of concerned block (herein after called the "HDO") having
its office at, which expression shall be deemed to include its successors and assigns on the
third part, Farmer, therefore, approached HDO vide application dated _________ which is
received by Block Office vide receipt No. ________ and farmer requested for installation of
Protected Cultivation structure (tick mark on applicable) on _____________sqm.(........... in
words) Of and situated in village _____________, Tehsil____________________,
District___________________________, Punjab State. HDO has organized installation of
poly house on farmer's field through empanelled and selected Firm by farmer on the
following terms and conditions, obligations and responsibilities of each party as under:
1. APPLICATION REGISTRATION
1.1. HDO has received above referred application of farmer in MIDH Performa along
with design, cost estimates, original copy of and record and attested copy of ration
card / residence proof.
1.2. Farmer undertakes that he / she has not availed assistance on account of Protected
Cultivation in his / her name from any Government agency at anytime, anywhere in
Punjab State.
1.3. HDO issued application receipt no. ____________________ dated _____________
2. SANCTION LETTER
2.1. District Head of concerned district received followings estimates from farmer
alongwith estimate of the Firm duly accepted by farmer and after verification from
HDO of concerned block to accord approval in the format as under:
Sr. No. Content Total Amt. (Rs.)
A. Cost of Material
B. Installation & Service charges
C. Miscellaneous
Total amount of (A+B+C)
2.2. Director Horticulture-cum-Mission Director SHM, Punjab shall issue sanction to
farmer in Form-5 with copy to Firm & Bank (if financed) after receipt of following
documents.
1. Tri partite Agreement
2. Site Survey Report (Form-1)
3. Choice/Selection of firm by the farmer (Form-2).
4. Design and cost estimate of structure and Design and technical
specifications of MIS System (Form-3).
5. Site Clearance Certificate (Form-4)
6. Undertaking of farmer (if financed).
Farmer agreed to undertake and work at his own cost as per advice of firm and hand
over the site to the firm for installation of structure on the date of signing of TPA..
3. SIGNING OF TPA (TRI PARTITE AGREEMENT) & ISSUE OF WORK ORDER
3.1 This tri-partite agreement is signed by the farmer, authorized representative of Firm
and HDO.
3.2 The Tri-partite Agreement shall be effective from the date of signing of Agreement.
4. INSTALLATION AND INSPECTION :
4.1. Farmer shall provide facilities like levelled site and water required during installation
of structure free of cost.
4.2. Farmer shall provide safe storage place to Firm for storing various components /
instrument subject to watch and ward of firm.
4.3. Firm shall undertake installation activity after received work order from Director
Horticulture-cum-Mission Director SHM, Punjab and complete installation work in a
maximum period of 60 calendar days( 90 days in bank loan case). The start of period
shall be counted from the date of issue of work order. The firm shall be responsible
and liable for installation of structure as per standards applicable.
4.4. Firm agreed to construct suitable pucca platform of size 8'x 8' or as per guidance
given by the MIS Supplier for creation of platforms for filter, fertigation tank, head
control unit and also take up other involved civil works. The cost of civil work as
above is to be borne by the firm.
4.5. Firm should ensure that trenches are kept open at defined locations for physical
verifications cum trial run.
4.6. Firm will hand over after trial run of the MIS system, a complete and updated "As
Made Design Map" to the farmer. The map should include a clear presentation of the
head control unit, water carrier and distribution system including pipelines, location
of valves, air release valves, junctions and other components etc.
4.7. Inspection
4.7.1 1st inspection will be conducted by the concerned HDO in the presence of concerned
Firm representative and concerned Farmer (site selection).
4.7.2 2nd
inspection will be conducted by the concerned HDO, District Nodal Officer for
Protected structures in the presence of concerned Firm representative and concerned
Farmer. This inspection will be carried out at the time of completion of foundation
work and supply of complete steel material excluding cladding material (Form No.
7).
5.7.3 3rd
final inspection will be conducted after completion of protected structure in all
respect subject to submission of No Dues Certificate, and “Completion certificate”
from concerned firm. Afterwards the district head will arrange the final inspection.
Committee for final inspection shall be comprising District Head, District Nodal
Officer for protected structures, concerned HDO, Assistant Agriculture Engineer or
SCO or nominee from PAU as representative. This inspection shall be done in the
presence of concerned firm representative, concerned farmer and financing
institution if, applicable. This inspection shall be arranged within 15 days after
completion of the protected structure subject to availability of committee members.
4.8. Additional inspection: Due to the shortcoming in structure during first / final
inspection, the additional inspection if required, the firm shall be responsible for
arranging inspection.
4.9. Delay in start of work: In case delay in start of work by firm is more than 30
calendar days, then, farmer is free to choose another empanelled firm. In this case
first firm shall pay actual amount along with interest @18% per annum to the
farmer on the deposited amount.
4.10. Delay in completion of work : If firm fail to complete the protected structure with
in stipulated time i.e. within 60 days from the date of confirmed order then there
will be a penalty of 2 % of total project cost .Decision of the sanctioning authority
will be final. This amount will be deducted from the EMD of the firm and the
concerned firm cannot take up any further work till it completes the project in
hand.
4.11. Termination of Contract : In case of delay of more than 90 days(including penalty
days) the contract may be terminated and work may be got completed by the farmer
from any other empanelled firm at the risk and cost of the first firm after approval
from Director Horticulture-cum-Mission Director SHM, Punjab and action may be
initiated against first firm.
4.12. Completion of structure: The completion of structure means submission of
completion certificate and satisfactory final inspection report along with removal of
short coming if any (Submission of Form-9 and 10) .
5. GOVERNMENT CONTRIBUTION
5.1. HDO will calculate Government contribution (Subsidy), farmers share as per the
provision under the scheme.
5.2. As per requirement of Government contribution, farmer is required to maintain
structure for five years from the date of handing over by firm. In case the farmer
dismantle the structure within five years from the date of handing over by Firm,
farmer is bound to refund the subsidy amount.
5.3. This agreement will be considered as part of undertaking for the purpose of subsidy.
6. OTHER OBLIGATIONS OF THE FARMER
6.1. Farmer agreed to settle (pay or receive) the account, after the installation of structure
on the field and firm agreed to collect/pay difference amount, if any.
6.2. The farmer agreed not to change / modify / remove / dispose / resell the structure
during the five years period. The farmer shall note that HDO and / or Firm will not
be responsible for any consequence like Government contribution entitlement
variation due to amendments issued by Government, reduction in yield, crop
damages etc. arising out of changes such as modification / removal / disposal / sale /
damage of the structure by the farmer.
6.3. The farmer cannot create any lien / charge or transfer the structure fully or any
portion thereof. In case of bankable projects, the banks are free to make lien as per
RBI norms and guidelines.
6.4. HDO and firm shall not be responsible for cropping plan, yield, crop damage, etc.
arising out of either delay in installation of structure or after handing over of
structure to the farmer.
6.5. The farmer agrees that he has acquired sufficient knowledge to run the Poly house.
Therefore, in this context the firm and Department of Horticulture, Punjab are no
where responsible.
6.5.1. The construction of protected structure is to be executed by farmer through
empanelled firm of his/ her choice, the responsibility of quality standard of material
and erection rests with the farmer. However, Department is facilitating the farmer by
conducting inspection two times during erection. Department is not supervising the
entire erection of protected structure. These inspections are on random sample basis
of each structure. As farmer is executing the erection and supposed to supervise his /
her structure during execution of work, therefore, any deviation of specifications and
standards the farmer shall bring this into the notice of Block HDO and District Head
in writing during execution of work for timely correction and deficiency if any and
even stoppage of work. The Department shall release the financial assistance
after successful final inspection subject to availability of funds.
6.5.2. At the time of first inspection (Form-6) farmer will be present with the inspection
team and will certify that the material being used by the firm is as per specification
and he will give certificate to the firm as well as to the inspection team (Form-6,
Progress Report – I). The farmer will also submit the report of supply of cladding
material in Form-8 as Progress Report – II.
6.5.3. Before final inspection the firm will intimate to the farmers as well as to the
Department that the work has been completed in all respects (Form-9). The farmer
will inspect the work done by the firm before final inspection and point out
deficiencies / short coming to the firm as well as to the Department, if any . The
firm will remove these deficiencies / short coming before final inspection pointed
out by the farmer.
6.6. At the time of final inspection farmer will be present with the inspection team. The
farmer can point out if any short coming is still left in that case the firm will remove
short comings immediately and intimate to the farmer and Department for additional
inspection. The expenditure for the additional inspection will be borne by the
concerned firm.
6.7. At the time of final inspection, if the farmer is satisfied with the work done by the
firm, the farmer will take possession of the structure in the presence of team and will
give possession certificate (Form-10) to the firm as well as to the Department. If the
farmer fails to give possession certificate within one week after final inspection /
additional inspection his / her structure shall stands completed.
7. Release of Assistance :
7.1. Assistance release in case of non-bankable projects: District head will send the
complete case along with final inspection to the mission Director. if documents
founds complete in all respects, mission Director shall release the finical assistance to
the concern the district which further transfer it online to the beneficiary’s account.
to farmer in single instalment, on receipt of invoice along with first and final
inspection report subject to availability of funds.
8. Guarantee / Warranty / After Sale Service :
8.1. Guarantee / Warranty of material : The firm will provide guarantee / Warranty
certificate of the material used for construction of protected structure to farmer. This
guarantee / Warranty shall remain valid for a period of three years after final
inspection. The guarantee / Warranty includes all the structure material including
cladding material. If material has to be replaced in guarantee / Warranty period, the
same shall be done by the construction agency free of cost.
8.2. The guarantee / Warranty of cladding material shall be of properties only.
8.3. The guarantee period of cladding material shall be for one year. After one year
warranty period is for two years. Firm must supply guarantee of cladding material for
three years for its properties.
8.4. After sale service : After sale service is the responsibility of the firm. The after sale
service has to be provide the sale service on following items free of cost.
8.4.1. Any type of technical defect.
8.4.2. Gutter leakage and other type of leakage.
8.4.3. Improper operation of shade net beneath poly sheet.
8.4.4. Leakage in MI system.
8.4.5. Side vent curtain not proper opening and closing.
8.4.6. Curtain clamps left out from curtain folder.
8.4.7. Tighten of nut bolts / fasteners.
8.4.8. Rusted fasteners / nut-bolts / steel parts.
8.4.9. Agronomical services as per provisions of After Sales Service Card.
8.5. Process of repair in case of damage and claim of penalty :
8.5.1. Repairing must be executed by the construction firm. Farmer shall intimate to
firm through email or in written and shall maintain receipt of the same. Firm
has to ensure to repair the structure within seven days. If firm fails to repair the
structure then farmer has to complaint to District Head in written.
8.5.2. The District Head will intervene the problem of farmer and wrote to the firm
to repair the structure of said farmer within five days. If again firm fails to
repair the structure then the concerned firm will not be given any further work
in Punjab and it will be conveyed to Mission Director Horticulture, SHM,
Punjab for debarring the firm for next year’s empanelment.
10. OTHER TERMS
10.1 The farm productivity does not depend on the use of structure alone. It is also
impacted by other factor such as planting materials, application of inputs in terms of
quantity and schedule, incidence of diseases, soil quality and weather conditions etc.
The responsibility of Firm is limited to the quality installation, technical guidance
about maintenance and operation of structure.
10.2 Firm is bound to entertain all type of cases for which it is empanelled irrespective of
size of unit.
10.3 Farmers should strictly follow the guidelines for operation and maintenance given
by firm for successful performance.
10.4 Farmers should not lodge any false complaint / claim or to create any unpleasant
situation and try to settle differences and disputes if any, amicably and as far as
possible at local level through concerned HDO. In no case the department of
Horticulture will be involved in any legal procedures.
10.5 If any time during the continuance of this contract, the performance in whole or in
part by either party of any obligation under this contract shall be prevented or
delayed by reason of any war, hostility, act of the public enemy , civil commotion,
sabotage, fires, floods, explosion, epidemics, quarantine restriction, strikes etc.
(herein referred to as event), then provided written notice of the happening of any
such event is given by either party to the other within 60 days from the date of
occurrence thereof, neither party shall by reason of such event be entitled to
terminate this contract nor shall either part have any claim for damages against the
other in respect of such non-performance or delay in performance, and deliveries /
services under this contract shall be resumed as soon as practicable after such event
has come to end or ceased to exist and the decision of District Head as to whether
the deliveries have been submitted or not shall be final and conclusive.
10.6 In case of damage of structure before completion the firm is responsible. In any
circumstance the Department is not responsible for any type of damage.
10.7 All disputes and difference arising out of or in any way touching upon or concerning
this construction fabricated what so-ever-shall be referred to Director Horticulture-
cum-Mission Director SHM, Punjab. The decision of Director Horticulture-cum-
Mission Director SHM, Punjab shall be final and binding on the concerned parties.
10.8 Mission Director Horticulture, Punjab will be Appellant Authority in case the
dispute is not settled at district level.
10.9 Any suit or proceedings to enforce the right of either party under this, agreement
shall be instituted and tried only in the court of concerned district and by no other
courts, and parties here to expressly agree to submit to the exclusive jurisdiction of
Courts in concerned district.
10.11 The contents of this agreement have explained fully to the farmer and the farmer
signed this agreement after fully understanding the contents of this Agreement.
Name , Designation and Address Signature with stamp/ thumb impression
1. Farmer
2. Firm
3. HDO of concerned block
TECHNICAL BID PERFORMA
E-Tender No. DOH/2019-20/01
EMPANELMENT OF FIRMS FOR CONSTRUCTION OF HI-TECH POLY HOUSE, NATURALLY VENTILATED POLY HOUSE (TUBULAR), SHADE NET
HOUSE AND WALK-IN-TUNNELS FOR ONE YEAR
Carefully read all the points and provide the required information. Also, make sure to
attach the documents as per requirement.
1. Firm Details Required Information
a. Category of Firm (A/B)
b. Name of the firm
c. Address of the firm
d. Year of Establishment
e. Name of Proprietor/ Owner/ Director
f. Contact No. 1.
g. Contact No. 2.
h. E-mail
i. Website, if any
K GST No.
l. PAN No.
m. Address of factory/ works/ unit
n. Address of service centre
o. Area of workshop with address
p. Minimum installed Infrastructure
1) Hydraulic Pipe bending Machine
2) Tower type drill Machine
3) Power press
4) Welding machine / grinders and drills
etc.
q. Name of authorized signatory
r. Specimen sign of authorized signatory
2. Bank Details for availing farmer share (directly from farmer)
a. Name & address of the Bank
b. IFSC Code
c. Account No.
3. Business Profile: Annual Turnover of last consecutive two years
2017-18 2018-19
4. Work experience: Number and Area of protected structures already constructed
5. Name of the Insurance Company /Firm with whom the fabricator has tie up (attach certificate of tie up)
6. Name and qualification of the Engineer and Agriculture Graduate
Sr. No.
Documents required Compliance (Attached or
Not Attached)
Page No.
1. Compliance of Specifications and Terms & Conditions (As per Annexure 1)
2 EMD Receipt
3 GST No. (Attach proof)
4 PAN No. (Attach proof)
5 Copy of Income Tax Returns for Assessment Year 2017-18 and 2018-19
6 Copy of Annual Turnover Certificate from CA for FY 2017-18 and 2018-19
7 Proof of tie up with Insurance Company
8 List of protected structures installed (as per Annexure 2)
9 Attach self attested and clearly scanned copied of work orders and performance certificates
10 Undertaking regarding not blacklisted (As per Annexure 3)
11 Undertaking from company/ Firm that till date there is no serious complaint against firm pertaining to protected structures anywhere in India.
12 Copy of Licence issued by small /medium scale industries. If not available, firm will give undertaking in writing to produce licence before execution of work.
13 Proof of ISO certified company (attach the proof).
14 Certificate regarding items to be supplied will be of ISI/ISO/BIS standard
15 Bidder should give undertaking that all the given information and submitted documents are true (As per Annexure 4)
.
Total No. of Pages attached in PDF file: ......................
(FORM-1)
DEPARTMENT OF HORTICULTURE, PUNJAB MIDH/Other Schemes
Site Survey Report (First Inspection Report)
Farmer Detail:
Farmer Name: ________________________ S/o /D/o/W/o:__________________________
House No.: _______________Gali/Street No. : ___________________________________
Village: _________________ Block: _______________ Tehsil: _____________________
District: ______________________________ Phone No.___________________________
Khasra No: _______________________ Killa No.________________________________
Land Details:
Land suitability for installation of structures (it should be based on following documents)
Sr.
No.
Type of Record to Check Check List
(Horticulture Development
Officer to write that based on
parameters the site is suitable
or unsuitable and write
accordingly in the below
column
1. Soil Test Report
2. Water Test Report
3. Site is not prone to water stagnation
4. Water Table should not be shallow enough to affect
foundation and subsequent cultivation
5. Efficient Drainage (The site should not be
landlocked to restrict out flow of water from site)
6. Isolation Distance (free from obstacles e g.
a. Minimum distance of 6.5 mtr or equal to the height
of boundary wall/other structure whichever is
higher
b. Minimum distance of 5 mtr from electric pole and
wires and to avoid site through which electric wires
crisscross.
c. Branches of tree should not touch the proposed
structure
7. Dimension of structure falls within area as per
revenue record and sizra
8. Source of irrigation available or not available
Date: (Signature of Horticulture Development Officer)
Signature of the Farmer Name:_____________
(FORM-2)
Choice of Firm by Farmer
(Specimen copy to be issued by farmer to firm of his choice)
To
The Deputy Director Horticulture
____________________
1. Firm Name : _____________________________
Address of firm : _____________________________
2. Firm Name : _____________________________
Address of firm : _____________________________
Subject: Choice of firm for installation of HTGH/NVPH/Shade Net house/WIT.
I am pleased to prioritize the above mentioned firms for installation of
protected structure in my field as per design, specifications and quotation of the structure
given by firm. You are requested to allot work to one of the above-mentioned firm.
Encls. As above.
Signature
(Name of farmer)
CC:
Director Horticulture -cum-Mission Director, SHM, Punjab.
Undertaking by the Farmer
I _______________________ s/o D/o W/o ____________________, resident of
_______________________________________, Block ____________________, Circle
_______________, District _______________ hereby declare that
_______________________ (name of bank), Branch ________________ have sanctioned
me a term loan of Rs _______________ (In words __________________________)
specifically for the purpose of protected house construction. The subsidy/ financial assistance
under NHM/ SHM for protected structures (If the department of horticulture finds me eligible
for financial assistance/ subsidy) shall be directly credited to my term loan bank account
number ______________________, IFSC __________________, Account name
_________________ in the bank branch as stated above.
Deponent signature
Name and complete address
Bank certification Bank has sanctioned term loan to Mr/Mrs/Ms _________________ S/o D/o W/o
_________________, resident of __________________________of Rs. ___________ for
the purpose of protected house construction . His term loan bank account number
______________________, IFSC __________________.
Authorised signatory
Name and designation along with seal
Bank details
(FORM-3)
DEPARTMENT OF HORTICULTURE, PUNJAB
MIDH/Other Schemes
(Quotation for Protected Structure Design, Specification & Estimate)
(to be submitted by farmer after taking it from firm)
Sr.
No.
Particulars / Item Details
1. Type of Structure (HTGH/NVPH/Shade Net
house/WIT)
2. Size of Structure
3. Location of Structure (Khasra No. & Killa No.) :
4. Type of Steel Material
(Tubular/Channel/Square/Rectangular)
5. Grid size/Span size (as per specifications)
6. Profile (Aluminium or GI)
7. Brand of Poly film as per properties specified in
technical specifications
8. Brand of insect net as per properties specified in
technical specifications
9. Brand of shade net as per properties specified in
technical specifications.
10. Micro irrigation system (name of company)
11. Others specifications
12. Estimated Cost
(Sign of Firm Representative)
Name of Representative: ______________________
Name of Firm: ______________________
Accepted by
(Sign of Farmer)
Name of farmer:
S/o __________________
Village: ______________
Note: While submitting the quotation the farmer should note that the structure should meet
out the minimum prescribed specifications and terms and conditions laid by Department of
Horticulture, Punjab for the year 2019-20
(FORM-4)
DEPARTMENT OF HORTICULTURE, PUNJAB
MIDH/Other Schemes
Site Clearance Certificate
I/we (Name & address of farmer) ________________________ have handed over site
of ________ sqm area to M/s. (Name of firm) _________________________ on dated
___________ for installation of HTGH/NVPH/ Shade Net House/WIT as per requirement
and the firm has taken over the site for the purpose of installation of structure as per terms
and conditions as agreed in Tri Partite Agreement.
Handed over Taken over
(Signature of farmer) (Authorized Signatory of firm with stamp)
Name: Name & designation:
Address:
(FORM-5)
DEPARTMENT OF HORTICULTURE, PUNJAB
MIDH/Other Schemes
Work Order
To
_________________________________________(Farmer Name)
S/o/D/o/W/o : ______________________ House No.: ________________________
Gali/Street No.: _________________________Village:________________________
Block: ______________ Tehsil: _______________District: ____________________
Memo. No.______________ Dated: ________________
Subject: work order for installation of HTGH/NVPH/Net house/WIT.
Ref: Director Horticulture -cum-Mission Director SHM,Punjab
sanction No._________ dated____________.
We have received your following documents:
1. Tri Partite Agreement duly filled-in and signed by all the three parties.
2. Site clearance certificate duly signed by farmer and firm.
3. Design of the structure along with MI Component.
4. Cost estimate of the project.
On the basis of above documents work order is hereby issued to Sh./Smt.
___________________ Vill. _________________, District ______________ with the
following details:
HORTNET
Registration/
Application
No.
Type of
structure (Poly
house/net
house)
Area of
structure
(sqm.)
Total estimated
cost after
negotiations
(Rs.)
Estimated
Govt.
contribution
(Rs.)
Estimated
farmer share
(Rs.)
We issue this work order based on the sanction of MD, SHM, Punjab and
submission of documents. Firm shall comply with the minimum departmental
standards/specifications for structure circulated to all and as amended to date. The work shall
be executed as per the design, specification and estimate as submitted to this office. Firm
have to complete work within 60 days ( 90 days in bank loan case) from the date of work
order.
Director Horticulture -
cum-Mission Director,
SHM, Punjab.
CC: Name of firm with address : __________________________________________
Director Horticulture -
cum-Mission Director,
SHM, Punjab
(FORM-6)
PROGRESS REPORT-I
(To be issued by farmer after foundation work and supply of steel material)
To
Firm Name : ________________________________
Address of firm : _____________________________
Subject: Progress Report after completion of foundation work and supply of steel
material at site.
Ref: MD SHM, Punjab sanction No._____________ dated___________.
As per work order, the foundation and other work was executed by your firm
in my presence as per design and specification approved Department of Horticulture, Punjab.
All the GI material supplied by firm at site is also as per design & specifications. I am
satisfied with the quality and quantity of material supplied. The GI certificate of material
used at my site has been received by me from firm as a matter of record. Therefore, I request
you to continue the work and complete the same.
Date: Signature
Name of Farmer
Village ----------------------
Block -----------------------
Distt ------------------------
Mobile No.------------------
CC:
1. Horticulture Development Officer
___________________________
2. The District Head
___________________________
3. Name of bank with address, if financed
____________________________
(FORM-7)
DEPARTMENT OF HORTICULTURE, PUNJAB
MIDH/Other Schemes
Second Inspection Report
(After foundation and supply of material)
Name & Add. of Beneficiary: Sh ____________________S/o Sh.____________________,
VPO-___________________, Distt._________________Ph. No._____________________,
Date of inspection:____________________Firm: M/s ______________________________,
Sr.
No.
Item Remarks (The inspection team to write
dimensions or either Yes or No
in the column below)
A. General Details
1 Sanction Letter Issued by Mission Director, SHM,
Punjab Number & Date
2 Work order issued by Deputy Director Horticulture to
firm: date
3. Whether copy of Progress report-1 issued by farmer
handed over to HDO and Deputy Director Horticulture-
Cum-Chairman, District NHM Society (Yes/No)
4. Location of Structure (Khasra No. & Killa No.) :
B. Structure type & size
1 Type of structure (HTGH/NVPH/Net house/WIT)
2 Type of Steel Material
(Tubular/Channel/Square/Rectangular)
3. Size of structure: (Gable Length X Gutter Length) =
___________sqm
C. Foundation inspection
4. Length of insertion pipe
5. Thickness of insertion pipe
6. Size of filled material in the pit (Length x width x depth)
7. Structure specification and quantity (Certificate and list
to be submitted by the firm that the material supplied is
as per design and specification)
8. Whether the material is complete or not. (Inspection team
will check the material as per the list attached)
9. Galvanization of structural parts (The certificate of
Galvanization of structural part is attached or not)
10. Gutter direction
11. Shape of structure (regular/irregular)
12. Report submitted and comments: __________________
_____________________________________________
Farmer
Firm Representative
Block HDO
District Nodal Officer
for Protected Structures
(FORM – 8)
PROGRESS REPORT-II
(To be issued by farmer after supply of cladding material)
To
Firm Name : ________________________________
Address of firm : _____________________________
Subject: Progress Report after supply of cladding material at site.
Ref: Director Horticulture-cum-Mission Director, SHM, Punjab
sanction No._____________ dated___________.
In continuation to earlier progress report. The firm has started the work of
erection of steel structure. The work is under progress. As on today the firm has supplied the
cladding material as per specification and quotation approved by Department of Horticulture.
I am satisfied with the quality and make of material supplied. The guarantee/warrantee
certificate of cladding material has been received by me from firm. Therefore, I request the
firm to continue the work and complete the same.
Date: Signature
(Name of farmer)
CC:
1. Horticulture Development Officer
___________________________
2. The District Head
___________________________
3. Name of bank with address, if financed
___________________________
(FORM-9)
Completion Certificate
(On Letter Head of Firm)
Dated: __________
It is certified that the work of construction of protected structure as per details given
below is complete in all respects:
1. Name and address of beneficiary :
2. Location of structure : Killa No._____________________________
Village : ___________; Distt.____________
3. Type of structure and area :
4. Sanction order no. & date :
5. Date of completion :
So, you are requested to arrange for final inspection and release the subsidy
amount accordingly.
(Authorized Signatory of firm with stamp)
CC:
1. (Name & Address of Farmer) is requested to take-over the guarantee/warrantee
certificates of Structure and cladding material.
2. Horticulture Development Officer.
3. District Head-Cum-Chairman, District NHM Society.
3. Name & Address of Bank, if bankable.
(FORM-10)
Possession Certificate after final inspection
Dated: __________
It is certified that the work of construction of my protected structure as per details
given below is complete in all respects:
1. Name and address of beneficiary :
2. Location of structure : Killa No.______________________________
Village : ___________; Distt._____________
3. Type of structure and area :
4. Sanction order no. & date :
5. Date of completion :
As I have taken possession of aforesaid structure. The guarantee/warrantee certificates
as applicable have been received by me from the firm. I have acquired sufficient knowledge
to operate Protected Structures and cultivate the crop.
Signature of Farmer
(Name:________________________
(s/o, d/o, w/o Sh.________________)
VPO __________________________
District: ________________________
CC:
1. Horticulture Development Officer
___________________________
2. The District Head
___________________________
3. Name of bank with address, if financed
____________________________