JOINT PUBLIC NOTICE Savannah DistrictState of Georgia
The Savannah District has received an application for a Department ofthe Army Permit pursuant to Section 404 of the Clean Water Act (33 USC 1344) as follows
Application Number SAS-2012-00679
Applicant Gainesville Waste amp Recycling LLC Attention Mr Ken Cronan 1602 Athens Highway Gainesville Georgia 30507
Environmental Services Inc Attention Mr Brandon Smith Post Office Box 2383 Savannah Georgia 31402
Location ofProposed Work The project site is loca1ed south of Athens Highway (US Highway 129) approximately 2 miles southeast ofthe City of Gainesville Hall County Georgia at latitude 342760 and longitude -837917
Description ofWork Subject to the Jurisdiction of the US Army Corps ofEngineers The Gainesville Waste and Recycling LLC proposes the expansion ofan existing operational section of the facility and proper disposal of solid waste from an unlined landfill The unlined landfill closed in the 1970s and all h istoric solid waste must be disposed of or properly treated The proposed project activities include the relocation construction and maintenance offacility roads construction and demolition (CampD) waste disposal cells clearing and grubbing for remediation activities side slope middotfill and stormwater management areas and structures The applicant proposes to purchase 440 wetland credits from Prichett Mitigation Bank and 2 24604 stream credits from Chicopee Woods Mitigation Bank The purchase of wetland and stream
credits would offset the 0 78 acre ofwetland 0007 acre of ephemeral channel and 4635 linear feet ofperennial stream for lbe proposed project impacts
BACKGROUND
This Joint Public Notice announces a request for authorizations from both the US Army Corps of Engineers and the State ofGeorgia The applicants proposed work may also require local governmental approval
STATE OF GEORGIA
Water Quality Certificat10n The Georgia Department ofNatural Resources Environmental Protection Division intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act which is required for a Federal Pennit to conduct activity in on or adjacent to the waters of the State of Georgia Copies of the application and supporting documents relative 10 a specific application will be available for review and copying at the office ofthe Georgia Department ofNatural Resources Environmental Protection Division Water Protection Branch 4220 International Parkway Suite 101 Atlanta Georgia 30354 during regular office hours A copier machine is available fo r public use at a charge of25 cents per page Any person who desires to comment object or request a public hearing relative to State Water Quality Certification must do so within 30 days of the States receipt ofapplication in writing and state the reasons or basis ofobjections or request for a bearing The application can be reviewed in the Savannah District US Army Corps of Engineers Regulatory Division Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515
State-owned Property and Resources The applicant may also require assent from the State of Georgia which may be in the form of a license easement lease pennit or other appropriate instrument
US ARMY CORPS OF ENGINEERS
The Savannah District must consider the purpose and the impacts of the applicants proposed work prior to a decision on issuance ofa Departmen1 of the Army Permit
Cultural Resources Assessment Review of the latest published version of the National Register of Historic Places indicates that no registered properties or properties listed as eligible for inclusion are located at the site or in the area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work
Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 U SC 1531 et seq) we request information from the US Department of the Interior Fish and Wildlife Service the US Department of Commerce the National Ocearric and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or proposed for listing may be present in the area
2
Public Interest Review Tbe decision whether to issue a permit will be based on an evaluation ofthe probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands~ historic properties fish and wildlife values flood hazards flood plain val ues land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people
Consideration ofPublic Comments The US Army Corps of Engineers is soliciting comments from the public federal~ state and local agencies and officials Native American T ribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the US Army Corps of Engineers to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity
Application of Section 404(b)(l) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the U ruted States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act
Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to bold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project
Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Anny Corps of Engineers Savannah District Attention Natalie Edwards Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments
3
[f you have any further questions concerning this matter please contact Natalie Edwards Project Manager Piedmont Branch at (678) 804 5228
Enclosures 1 Project Location Map 2 Topographic Map 3 NRCS Soil Map 4 FEMA Q3 Flood Data Map 5 National Wetlands Inventory Map 6 Approximate Wetland and Stream Map 7 Estimated Offsite Alternatives impacts Map
4
~rlProject Boundary - Freeway
c- County Line = limited Access
Perennial Stream Highway
Intermittent Stream Local Road
Intermittent Canal Other Road
0 0~
01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL
ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull
-middot~lttWixtt-JcCOn
Project Location Map
GWAR CampD Landfill Expansion Hall County Georgia
Project E$0808001
Date Jun2012
DrwnChkd TSSB
Ftgure 1
1000 2000
Feet
Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc
-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________
IRONM ENTA L iCpoundS INC Topographic Map
GWAR CampD Landfill Expansion Hall County Georgia
Pr~ ES0808000
Dale J un 2012
OrwnChkd TSIBS
F ure z
--
NRCS Soils ApC Apping
MdE M adison
MID2 Madison eroded
PTF Pacoletmiddot Tallapoosa
PaE Pacolet
W Water
0 100
Feet
Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia
ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711
bull - fttZ) 2J5SB bull bull Hall County Georgia
500 1000
Fshy
Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull
ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia
~_COf
Intermittent
Perennial
JOO 600
r Souroejs) usrws N WclendllnvotUlt1
c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt
ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
credits would offset the 0 78 acre ofwetland 0007 acre of ephemeral channel and 4635 linear feet ofperennial stream for lbe proposed project impacts
BACKGROUND
This Joint Public Notice announces a request for authorizations from both the US Army Corps of Engineers and the State ofGeorgia The applicants proposed work may also require local governmental approval
STATE OF GEORGIA
Water Quality Certificat10n The Georgia Department ofNatural Resources Environmental Protection Division intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act which is required for a Federal Pennit to conduct activity in on or adjacent to the waters of the State of Georgia Copies of the application and supporting documents relative 10 a specific application will be available for review and copying at the office ofthe Georgia Department ofNatural Resources Environmental Protection Division Water Protection Branch 4220 International Parkway Suite 101 Atlanta Georgia 30354 during regular office hours A copier machine is available fo r public use at a charge of25 cents per page Any person who desires to comment object or request a public hearing relative to State Water Quality Certification must do so within 30 days of the States receipt ofapplication in writing and state the reasons or basis ofobjections or request for a bearing The application can be reviewed in the Savannah District US Army Corps of Engineers Regulatory Division Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515
State-owned Property and Resources The applicant may also require assent from the State of Georgia which may be in the form of a license easement lease pennit or other appropriate instrument
US ARMY CORPS OF ENGINEERS
The Savannah District must consider the purpose and the impacts of the applicants proposed work prior to a decision on issuance ofa Departmen1 of the Army Permit
Cultural Resources Assessment Review of the latest published version of the National Register of Historic Places indicates that no registered properties or properties listed as eligible for inclusion are located at the site or in the area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work
Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 U SC 1531 et seq) we request information from the US Department of the Interior Fish and Wildlife Service the US Department of Commerce the National Ocearric and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or proposed for listing may be present in the area
2
Public Interest Review Tbe decision whether to issue a permit will be based on an evaluation ofthe probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands~ historic properties fish and wildlife values flood hazards flood plain val ues land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people
Consideration ofPublic Comments The US Army Corps of Engineers is soliciting comments from the public federal~ state and local agencies and officials Native American T ribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the US Army Corps of Engineers to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity
Application of Section 404(b)(l) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the U ruted States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act
Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to bold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project
Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Anny Corps of Engineers Savannah District Attention Natalie Edwards Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments
3
[f you have any further questions concerning this matter please contact Natalie Edwards Project Manager Piedmont Branch at (678) 804 5228
Enclosures 1 Project Location Map 2 Topographic Map 3 NRCS Soil Map 4 FEMA Q3 Flood Data Map 5 National Wetlands Inventory Map 6 Approximate Wetland and Stream Map 7 Estimated Offsite Alternatives impacts Map
4
~rlProject Boundary - Freeway
c- County Line = limited Access
Perennial Stream Highway
Intermittent Stream Local Road
Intermittent Canal Other Road
0 0~
01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL
ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull
-middot~lttWixtt-JcCOn
Project Location Map
GWAR CampD Landfill Expansion Hall County Georgia
Project E$0808001
Date Jun2012
DrwnChkd TSSB
Ftgure 1
1000 2000
Feet
Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc
-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________
IRONM ENTA L iCpoundS INC Topographic Map
GWAR CampD Landfill Expansion Hall County Georgia
Pr~ ES0808000
Dale J un 2012
OrwnChkd TSIBS
F ure z
--
NRCS Soils ApC Apping
MdE M adison
MID2 Madison eroded
PTF Pacoletmiddot Tallapoosa
PaE Pacolet
W Water
0 100
Feet
Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia
ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711
bull - fttZ) 2J5SB bull bull Hall County Georgia
500 1000
Fshy
Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull
ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia
~_COf
Intermittent
Perennial
JOO 600
r Souroejs) usrws N WclendllnvotUlt1
c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt
ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
Public Interest Review Tbe decision whether to issue a permit will be based on an evaluation ofthe probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands~ historic properties fish and wildlife values flood hazards flood plain val ues land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people
Consideration ofPublic Comments The US Army Corps of Engineers is soliciting comments from the public federal~ state and local agencies and officials Native American T ribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the US Army Corps of Engineers to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity
Application of Section 404(b)(l) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the U ruted States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act
Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to bold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project
Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Anny Corps of Engineers Savannah District Attention Natalie Edwards Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments
3
[f you have any further questions concerning this matter please contact Natalie Edwards Project Manager Piedmont Branch at (678) 804 5228
Enclosures 1 Project Location Map 2 Topographic Map 3 NRCS Soil Map 4 FEMA Q3 Flood Data Map 5 National Wetlands Inventory Map 6 Approximate Wetland and Stream Map 7 Estimated Offsite Alternatives impacts Map
4
~rlProject Boundary - Freeway
c- County Line = limited Access
Perennial Stream Highway
Intermittent Stream Local Road
Intermittent Canal Other Road
0 0~
01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL
ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull
-middot~lttWixtt-JcCOn
Project Location Map
GWAR CampD Landfill Expansion Hall County Georgia
Project E$0808001
Date Jun2012
DrwnChkd TSSB
Ftgure 1
1000 2000
Feet
Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc
-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________
IRONM ENTA L iCpoundS INC Topographic Map
GWAR CampD Landfill Expansion Hall County Georgia
Pr~ ES0808000
Dale J un 2012
OrwnChkd TSIBS
F ure z
--
NRCS Soils ApC Apping
MdE M adison
MID2 Madison eroded
PTF Pacoletmiddot Tallapoosa
PaE Pacolet
W Water
0 100
Feet
Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia
ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711
bull - fttZ) 2J5SB bull bull Hall County Georgia
500 1000
Fshy
Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull
ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia
~_COf
Intermittent
Perennial
JOO 600
r Souroejs) usrws N WclendllnvotUlt1
c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt
ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
[f you have any further questions concerning this matter please contact Natalie Edwards Project Manager Piedmont Branch at (678) 804 5228
Enclosures 1 Project Location Map 2 Topographic Map 3 NRCS Soil Map 4 FEMA Q3 Flood Data Map 5 National Wetlands Inventory Map 6 Approximate Wetland and Stream Map 7 Estimated Offsite Alternatives impacts Map
4
~rlProject Boundary - Freeway
c- County Line = limited Access
Perennial Stream Highway
Intermittent Stream Local Road
Intermittent Canal Other Road
0 0~
01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL
ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull
-middot~lttWixtt-JcCOn
Project Location Map
GWAR CampD Landfill Expansion Hall County Georgia
Project E$0808001
Date Jun2012
DrwnChkd TSSB
Ftgure 1
1000 2000
Feet
Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc
-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________
IRONM ENTA L iCpoundS INC Topographic Map
GWAR CampD Landfill Expansion Hall County Georgia
Pr~ ES0808000
Dale J un 2012
OrwnChkd TSIBS
F ure z
--
NRCS Soils ApC Apping
MdE M adison
MID2 Madison eroded
PTF Pacoletmiddot Tallapoosa
PaE Pacolet
W Water
0 100
Feet
Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia
ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711
bull - fttZ) 2J5SB bull bull Hall County Georgia
500 1000
Fshy
Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull
ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia
~_COf
Intermittent
Perennial
JOO 600
r Souroejs) usrws N WclendllnvotUlt1
c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt
ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
~rlProject Boundary - Freeway
c- County Line = limited Access
Perennial Stream Highway
Intermittent Stream Local Road
Intermittent Canal Other Road
0 0~
01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL
ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull
-middot~lttWixtt-JcCOn
Project Location Map
GWAR CampD Landfill Expansion Hall County Georgia
Project E$0808001
Date Jun2012
DrwnChkd TSSB
Ftgure 1
1000 2000
Feet
Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc
-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________
IRONM ENTA L iCpoundS INC Topographic Map
GWAR CampD Landfill Expansion Hall County Georgia
Pr~ ES0808000
Dale J un 2012
OrwnChkd TSIBS
F ure z
--
NRCS Soils ApC Apping
MdE M adison
MID2 Madison eroded
PTF Pacoletmiddot Tallapoosa
PaE Pacolet
W Water
0 100
Feet
Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia
ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711
bull - fttZ) 2J5SB bull bull Hall County Georgia
500 1000
Fshy
Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull
ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia
~_COf
Intermittent
Perennial
JOO 600
r Souroejs) usrws N WclendllnvotUlt1
c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt
ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
1000 2000
Feet
Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc
-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________
IRONM ENTA L iCpoundS INC Topographic Map
GWAR CampD Landfill Expansion Hall County Georgia
Pr~ ES0808000
Dale J un 2012
OrwnChkd TSIBS
F ure z
--
NRCS Soils ApC Apping
MdE M adison
MID2 Madison eroded
PTF Pacoletmiddot Tallapoosa
PaE Pacolet
W Water
0 100
Feet
Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia
ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711
bull - fttZ) 2J5SB bull bull Hall County Georgia
500 1000
Fshy
Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull
ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia
~_COf
Intermittent
Perennial
JOO 600
r Souroejs) usrws N WclendllnvotUlt1
c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt
ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
--
NRCS Soils ApC Apping
MdE M adison
MID2 Madison eroded
PTF Pacoletmiddot Tallapoosa
PaE Pacolet
W Water
0 100
Feet
Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia
ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711
bull - fttZ) 2J5SB bull bull Hall County Georgia
500 1000
Fshy
Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull
ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia
~_COf
Intermittent
Perennial
JOO 600
r Souroejs) usrws N WclendllnvotUlt1
c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt
ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
500 1000
Fshy
Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull
ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia
~_COf
Intermittent
Perennial
JOO 600
r Souroejs) usrws N WclendllnvotUlt1
c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt
ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
Intermittent
Perennial
JOO 600
r Souroejs) usrws N WclendllnvotUlt1
c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt
ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
~ I I I I
I
[Q)Projeet Boundary
i200-ft Boundary Buffer
Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)
Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae
__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~
____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)
Ephemeral Channel Impact Remediation I Expansion
1427-feet
-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot
I I
I-
Q) l)
~ 0
It) lt (l1J
~ ~ ~() 0
~ 0
sect atS 0 0
-middot- a _
Impacted Wetiand (~78-ac)
Jurisdictional Weiland (li)67-ac)
StreamWetland Buffer (t74-ac)
M
~
Perennial Stream Impact A
Jurisdictional Wetland Impact A Remediation I Expansion
002-acres
Perennial Stream Impact B Remediation I Expansion
388-feet
Jurisdictional Wetland Impact B Remediation I Expansion
076-acres
0 200
Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401
ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11
middotshy Intermittent Stream
Perennial Stream
Offslte Parcel 3 Impacted Intermitte nt Stream
i200middotft Boundary Buffer shy Impacted Perennial Stream
CampD Cells Impacted Wetland
Jurisdictional Wetland
StreamWalland Buffer
Offslte Alternative 1 30871-rt Impacted Perennial Stream
019-ac Impacted Jurisdictional Wetland
Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream
Offsite Alternative 3
ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp
~OIt~lfAtW~tWCOIS
12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland
Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)
GWAR CampD Landfill Expansion Hall County Georgia
0 100 1100
Fool
Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----
=~-==~~~toor___- Project E$0808001
Date Jun 2012
DrwnChkd TSJSB
F ure 11