PRESENTATION TO THE PORTFOLIO COMMITTEE ON DEFENCE AND MILITARY VETERANS MAY 2012 PRESENTATION TO PCD DEPARTMENTS OF DEFENCE and MILITARY VETERANS VOTE 22: 2012 BUDGET VOTE 1
Transcript
Page 1: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

PRESENTATION TO THE PORTFOLIO  COMMITTEE ON DEFENCE AND 

MILITARY VETERANS

MAY 2012

PRESENTATION TO PCDDEPARTMENTS OF DEFENCE and MILITARY VETERANSVOTE 22: 2012 BUDGET VOTE

1

Page 2: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

SCOPE

• Aim.

• Introduction.• Budget Information:

– Department

– Per programme

• Baseline reductions• Revenue• Concluding remarks.

2

Page 3: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

AIM

To present  to the Portfolio Committee on Defence and  Military Veterans, Vote 22 for the 2012/13 MTEF period  as per the 2012 Estimate of National Expenditure tabled  by the Minister of Finance on 22 February 2012.

3

Page 4: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2012/13 2013/14 2014/15R'000 R'000 R'000

Initial Defence Baseline Allocation 37,371,242 39,702,174 42,084,304+ Additional Funding Received 638,207 773,635 911,026 Salary Improvements 283,207 315,635 351,828 All Services and Divisions

Strategic Defence Procurement 150,000 200,000 250,000 Defence Materiel Division

Military Ombudsman 5,000 8,000 10,000 Office of the Minister

Border Safeguarding 200,000 250,000 299,198 Joint Operations Division

- Budget Reductions -516,495 -531,149 -663,221

Reducing MSDS -495,305 -531,149 -663,221 SA Army, SAAF, SA Navy, SAMHSLog Div, MP Div

Saving on Health and Protection Function -21,190 0 0 SAMHS

Final Defence Baseline Allocation 37,492,954 39,944,660 42,332,109

Item Remark

Vote 22: Final allocation for the FY 2012/13 as received 

from National Treasury on 25 November 2011

4

Page 5: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

5

BASELINE REDUCTIONS

2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15R Million R Million R Million R Million R Million R Million R Million

2008/09 23 50 99 0 0 0 02009/10 450 544 596 0 0 02010/11 447 627 624 0 02011/12 507 568 549 02012/13 516 531 663TOTAL 23 500 1,090 1,730 1,708 1,080 663

MTEF Cycle

Page 6: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

Vote 22: Allocation per Main Programme: FY 2012/13

Budget  increases  from Rb34  in FY 11/12  to Rb37  in FY 12/13  to Rb40  (FY 13/14) and Rb42  in FY 14/15 at an annual average of 7.75%.For FY 12/13 the budget is estimated to be approximately 1.2% of projected GDP for the same period.Force Employment increases due to additional allocation for border safeguarding

Landward  Defence  increases  due  to  Landward  Defence  renewal  projects,  procurement  of  ammunition  and maintenance of operational vehicles.

Maritime Defence increase due to maintenance and repair of the frigates and submarines as well as provisions for hydrographic and offshore patrol vessels

General Support increase due to budget baseline adjustment of Defence Works Formation and a non‐recurrent provision  in  2012/13  for  the write‐off  of  unauthorised  expenditure  that  occurred  in  1997/98  as  per  SCOPA resolution.

6

2011/12 2012/13 2013/14 2014/15R'000 R'000 R'000 R'000

Administration 3,718,428 3,730,776 4,040,659 4,262,656 Force Employment 2,332,012 2,670,902 2,959,205 3,200,673 Landward Defence 11,328,608 12,686,731 13,751,279 14,253,986 Air Defence 6,355,776 6,749,665 7,204,878 7,709,470 Maritime Defence 2,564,677 2,551,307 2,755,491 3,198,209 Military Health Support 3,244,263 3,316,507 3,515,105 3,692,513 Defence Intelligence 661,636 709,663 740,475 778,507 General Support 4,143,687 5,077,403 4,977,568 5,236,095 TOTAL 34,349,087 37,492,954 39,944,660 42,332,109

Main Programme

Page 7: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

Vote 22: Allocation per Economic Classification: FY 2012/13

Compensation of Employees represents 50.6% while Goods and Services amounts to 29.8% of total budget.Increases in compensation of employees provides for the military and reserve force salary dispensations as well as average salary increases of 5% and average pay progression of 1,5 to 2%, allocated annually during April and July of each year.

Relatively low growth in goods and services due to decrease in MSDS

Increases  in  transfers  and  subsidies  are  related  to  the  development  and  delivery  milestones  of  armament acquisition projects

Payments for capital assets increase due to procurement of logistic support vehicles by the SA Army

Once‐off provision for payment for financial assets in 2012/13 is for the write‐off of unauthorised expenditure that occurred in 1997/98

7

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Current Payments 28,090,710 30,156,953 31,784,511 33,297,244

Compensation of Employees 17,555,296 18,967,786 20,251,854 21,364,171

Goods and Services 10,535,414 11,189,167 11,532,657 11,933,073

Transfers and Subsidies 5,907,281 6,376,133 7,548,372 8,393,426

Payment for Capital Assets 351,096 622,164 611,777 641,439

Payment for Financial Assets 0 337,704 0 0

TOTAL 34,349,087 37,492,954 39,944,660 42,332,109

Economic Classification

Page 8: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

8

TRANSFER PAYMENTS

2011/12 2012/13 2013/14 2014/15R'000 R'000 R'000 R'000

Special Defence Account 5,973,388 5,260,016 6,379,685 7,157,973Armscor 820,871 914,753 966,989 1,030,776SASSETA 14,908 16,656 17,792 18,765Reserve Force Council 5,917 6,213 6,523 6,850Households 162,528 127,286 126,433 125,569Department of Military Veterans 0 51,207 50,941 53,488St Johns Ambulance Brigade 400 0 0 0TOTAL 6,978,012 6,376,131 7,548,363 8,393,421

Transfer Payment Recipient

Initial decrease in the transfer to the Special Defence Account is due to the moving of funds within the Air Defence programme from armament acquisition to the maintenance of air capabilities

Increase in the transfer payment to Armscor is due to additional allocations provided by C Navy to ensure sustainability of the Naval Dockyard and the Institute for Maritime Technology

DMV for the first time classified as transfer payment.

Page 9: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

9

REVENUE

2011/12 2012/13 2013/14 2014/15R'000 R'000 R'000 R'000

Sales of Goods & Services produced by the Department 261,222 289,804 294,153 300,035 Sales of Scrap, Waste, Arms and Other Used Current Goods 21,144 18,377 18,653 19,026 Transfers Received 3,668,529 168,558 171,086 174,508 Fines, Penalties and Forfeits 11,796 3,720 3,776 3,851 Interest, Dividends and Rent on Land 2,597 2,545 2,583 2,635 Sales of Capital Assets 28,500 54,211 55,025 56,125 Transactions in Financial Assets and Liabilities 66,023 246,990 253,654 258,728

TOTAL 4,059,811 784,205 798,930 814,908

Receipts

The large provision for transfers received in 2011/12 reflects the once-off reimbursement by Airbus due to the cancellation of the A400M contract

The increase in transaction in financial assets and liabilities is based on expected reimbursements for peace missions

Page 10: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

A

d

m

i

n

i

s

t

r

a

t

i

o

n

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Ministry 56,318 64,965 69,864 74,751

Departmental Direction 39,134 55,667 58,149 61,209

Policy & Planning 95,500 103,877 109,171 114,367

Financial Services 278,913 281,657 293,617 306,759

HR Support Services 595,902 614,659 639,308 666,089

Legal Services 162,580 175,258 184,604 196,560

Inspection Services 70,443 77,987 81,593 85,451

Acquisition Services 53,595 46,115 49,128 51,287

Communication Services 31,970 31,408 32,558 34,042

SANDF Command & Control 110,884 117,085 121,574 126,692

Religious Services 9,752 11,652 12,220 12,779

Defence Reserve Direction 18,097 16,856 17,648 18,573

Defence Foreign Relations 188,020 196,982 207,750 217,991

Office Accommodation 1,961,950 1,885,401 2,112,534 2,242,618

Military Veterans Management 45,370 51,207 50,941 53,488

TOTAL 3,718,428 3,730,776 4,040,659 4,262,656

Subprogramme

Budget increases from Rb3.71 in FY 11/12 to Rb3.73 in FY 12/13 to Rb4.40 (FY 13/14) and Rb4.26 in FY 14/15 at an annual average of 5.05%.Increases in Ministry due to additional allocation for establishment of Military Ombudsman 

Increase in Departmental Direction due to function shift of supply chain office

Increase in Inspection Services is due to provision for closing down audits

Increase  in SANDF Command and Control  is due to staffing of organisational structures at the DOD HQ Unit

Decrease in Acquisition Services due to function shift of supply chain office

Decrease  in Office Accommodation  due  to  utilization  of  accommodation  charges  funding  to  establish 10

Page 11: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

Administration

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Current Payments 3,672,851 3,624,512 3,931,670 4,148,470

Compensation of Employees 1,256,319 1,301,586 1,373,615 1,440,233

Goods and Services 2,416,532 2,322,926 2,558,055 2,708,237

Transfers and Subsidies 32,148 90,116 91,327 94,730

Payment for Capital Assets 13,429 16,148 17,662 19,456

TOTAL 3,718,428 3,730,776 4,040,659 4,262,656

Economic Classification

Decrease in goods and services reflects the decreased accommodation charges being utilised for the Defence Works Formation

Increase in transfers and subsidies reflects the transfer payment for the Department of Military Veterans and an increased provision for SASSETA based on the department’s increased payroll

11

Page 12: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Strategic Direction 109,580 109,391 113,790 120,247

Operational Direction 264,019 233,648 246,155 260,738

Special Operations 553,798 631,762 628,131 681,583

Regional Security 1,028,050 1,076,896 1,223,829 1,369,726

Support to the People 344,631 596,859 725,767 744,701

Defence Capability Management 31,934 22,346 21,533 23,678

TOTAL 2,332,012 2,670,902 2,959,205 3,200,673

Subprogramme

Force Employment

Budget increases from Rb2.33 in FY 11/12 to Rb2.67 in FY 12/13 to Rb2.96 (FY 13/14) and Rb3.2 in FY 14/15 at an annual average of 12.4%Increase in Special Operations is to provide for the development and acquisition of specialised equipment used by Special Forces

Increase in Support to the People due to additional allocation for border safeguarding

Decrease in Capability Management from 2011/12 to 2012/13 due to Exercise SHARED ACCORD which took place in 2011/12.

12

Page 13: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Current Payments 2,054,479 2,395,266 2,710,195 2,910,880

Compensation of Employees 1,126,656 1,297,375 1,435,761 1,551,097

Goods and Services 927,823 1,097,891 1,274,434 1,359,783

Transfers and Subsidies 208,268 201,374 172,728 195,521

Payment for Capital Assets 69,265 74,262 76,282 94,272

TOTAL 2,332,012 2,670,902 2,959,205 3,200,673

Economic Classification

Force Employment

Initial decrease and latter increase in transfers and subsidies due to the delivery and development milestones of specialised equipment used by Special Forces

Increases in compensation of employees and goods and services are related to the additional allocations received for border safeguarding

13

Page 14: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Strategic Direction 556,075 387,034 389,806 392,326

Infantry Capability 3,361,685 3,812,948 4,922,011 5,033,848

Armour Capability 295,270 332,032 342,424 360,719

Artillery Capability 381,722 499,408 426,619 454,935

Air Defence Artillery Capability 389,008 630,694 425,941 378,622

Engineering Capability 498,308 540,839 571,566 605,261

Operational Intelligence 185,609 237,063 172,624 177,432

Command and Control Capability 125,996 159,954 167,848 176,841

Support Capability 4,361,756 4,760,887 4,941,807 5,195,817

General Training Capability 320,359 400,130 419,750 444,564

Signal Capability 852,820 925,742 970,883 1,033,621

TOTAL 11,328,608 12,686,731 13,751,279 14,253,986

Subprogramme

Landward Defence

Budget increases from Rb11.3 in FY 11/12 to Rb12.68 in FY 12/13 to Rb13.75 (FY 13/14) and Rb14.25 in FY 14/15 at an annual average of 8.6%

Decrease in Strategic Direction mainly due to rollout of CALMIS (Log Management System) in 2011/12 (RM 105)

Increase in Infantry Capability due to the extension of the development plan of the new generation infantry combat vehicle and the new generation operational supply support vehicles system

Increase in Artillery Capability due to delivery milestones of the artillery target engagement system

Increase in Air Defence Artillery Capability due to delivery milestones of the shoulder launched air defence artillery system

Increase  in Support Capability due  to provision  for  transport of  redundant assets  to be disposed of, procurement of ammunition and parachutes, replacement of logistic support vehicles and the delivery milestones of the mobile and rapid deployable mass feeding system14

Page 15: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Current Payments 9,465,951 9,989,817 10,772,775 11,367,098

Compensation of Employees 7,631,429 8,307,562 8,961,149 9,461,754

Goods and Services 1,834,522 1,682,255 1,811,626 1,905,344

Transfers and Subsidies 1,808,001 2,351,293 2,651,998 2,555,382

Payment for Capital Assets 54,656 345,621 326,506 331,506

TOTAL 11,328,608 12,686,731 13,751,279 14,253,986

Economic Classification

Increase in payment for capital assets due to replacement of logistic support vehicles (COTS)

Trend  in  transfer &  subsidies due  to delivery milestones of  the artillery  target engagement  system,  shoulder launched air defence artillery system and mobile ground to air missile system programmes

Decrease in goods and services due to reduction in MSDS intakesCompensation of Employees amounts to 65.5% of budget.

15

Page 16: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Strategic Direction 14,691 16,318 17,069 17,934

Operational Direction 129,896 195,938 35,480 49,753

Helicopter Capability 747,508 879,857 777,344 693,497

Transport and Maritime Capability 711,262 495,534 1,251,560 1,342,917

Air Combat Capability 1,335,075 1,584,713 1,671,525 2,051,382

Ops Support and Int Capability 287,101 425,215 316,366 318,383

Command and Control Capability 343,435 410,270 366,188 357,748

Base Support Capability 1,402,119 1,568,073 1,576,485 1,649,182

Command Post 49,816 45,123 47,274 49,337

Training Capability 688,332 310,435 298,006 297,759

Technical Support Services 646,541 818,189 847,581 881,578

TOTAL 6,355,776 6,749,665 7,204,878 7,709,470

Subprogramme

Air Defence

Budget increases from Rb34 in FY 11/12 to Rb37 in FY 12/13 to Rb40 (FY 13/14) and Rb42 in FY 14/15 at an annual average of 7.1%

Increase  in  Transport & Maritime  Capability  due  to  the  planned  upgrade  of  the  Falcon  900  project  and  to  increase  the serviceability of the C130 aircraft capability

Increase in C&C Capability due to the delivery milestones of the replacement of aircraft rescue and fire vehicles project

Decrease  in Helicopter Capability due to the completion of the Rooivalk support helicopter project and the Oryx operational helicopter upgrading project

Increase in Operational Support & Intelligence Capability due to the implementation of protection systems at air force bases, units and deployed elements 16

Page 17: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Current Payments 4,460,749 4,898,363 4,608,761 4,719,721

Compensation of Employees 2,514,548 2,719,403 2,881,355 3,025,908

Goods and Services 1,946,201 2,178,960 1,727,406 1,693,813

Transfers and Subsidies 1,880,274 1,830,870 2,578,614 2,972,738

Payment for Capital Assets 14,753 20,432 17,503 17,011

TOTAL 6,355,776 6,749,665 7,204,878 7,709,470

Economic Classification

Air Defence

Decrease  in goods and services during the  latter part of the period  is due  to the huge aircraft maintenance requirements  in 2012/13 while  investing  in aircraft development  through  transfer payments  to  the Special Defence Account in 2013/14 and 2014/15

Compensation of Employees amounts to 72.57% of budget

17

Page 18: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Maritime Direction 489,368 445,489 465,163 483,843

Maritime Combat Capability 567,097 560,821 638,564 955,213

Maritime Logistic Support Capability 755,983 727,221 824,730 898,314

Maritime HR and Training Capability 245,033 305,251 302,370 308,753

Base Support Capability 507,196 512,525 524,664 552,086

TOTAL 2,564,677 2,551,307 2,755,491 3,198,209

Subprogramme

Maritime Defence

Budget increases from Rb2.5 in FY 11/12 to Rb2.5 in FY 12/13 to Rb2.7 (FY 13/14) and Rb3.2  in FY 14/15 at an annual average of  8.2%

Increase in Maritime Logistic Support Capability is due to the planned recruitment and staffing of personnel with scarce skills such as divers, technicians and engineers as well as the replacement of the hydrographic vessel

Increase in Maritime Combat Capability during the latter part of the medium term is due to provisions for the 

replacement of the offshore and inshore patrol vessels and procurement of new harbour tugs.2012/13 overall budget decrease Rm13.37 due to reduced MSDS allocation. 

18

Page 19: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Current Payments 2,109,238 2,169,900 2,246,032 2,282,137

Compensation of Employees 1,469,926 1,505,340 1,574,728 1,646,342

Goods and Services 639,312 664,560 671,304 635,795

Transfers and Subsidies 421,781 348,102 488,453 897,129

Payment for Capital Assets 33,658 33,305 21,006 18,943

TOTAL 2,564,677 2,551,307 2,755,491 3,198,209

Economic Classification

Maritime Defence

Decrease  in payment  for capital assets due to gradual downscaling of  infrastructure upgrade  in Simon’s Town and not replacing or procuring passenger motor vehicles

Transfers  and  Subsidies  trend  reflects  delivery milestones  of  the  SDPs  while  the  increases  in  2013/14  and 2014/15 are due to the provisions for the replacement of the offshore and inshore patrol vessels, procurement of new harbour tugs and the replacement of the hydrographic vessel.

Compensation of Employees amounts to 58.99%.

19

Page 20: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Strategic Direction 232,154 240,413 224,158 259,646

Mobile Military Health Support 122,913 127,404 158,503 182,039

Area Military Health Service 1,054,871 1,002,181 1,056,989 1,108,784

Specialist/Tertiary Health Service 1,017,531 1,143,219 1,203,800 1,241,897

Military Health Product Support Capability 187,289 230,971 267,227 285,599

Military Health Maintenance Capability 242,753 198,963 221,138 233,945

Military Health Training Capability 386,752 373,356 383,290 380,603

TOTAL 3,244,263 3,316,507 3,515,105 3,692,513

Subprogramme

Military Health Support

Budget increases from Rb3.2 in FY 11/12 to Rb3.3 in FY 12/13 to Rb3.5 (FY 13/14) and Rb3.7 in FY 14/15 at an annual average of  4.6%

Increase  in Specialist/Tertiary Health Service due to planned appointment of personnel with scarce skills and the acquisition of medical and surgical equipment.

Increase  in Mobile Military Health  Support mainly  due  to  the  initiation  of  a  defence  against  chemical  and biological warfare project.

Increase  in  Military  Health  Product  Support  Capability  due  to  repair  and  replacement  of  operational ambulances.

Decreases primarily related to Rm21 budget  cut.20

Page 21: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Current Payments 3,168,160 3,271,449 3,445,580 3,578,305

Compensation of Employees 2,266,820 2,457,813 2,574,737 2,705,307

Goods and Services 901,340 813,636 870,843 872,998

Transfers and Subsidies 42,522 43,496 55,127 99,436

Payment for Capital Assets 33,581 1,562 14,398 14,772

TOTAL 3,244,263 3,316,507 3,515,105 3,692,513

Economic Classification

Military Health Support

Decrease in payment for capital assets due to the replacement of motor vehicles, medical instruments, dental instruments and computer equipment in 2011/12 that does not require replacement in 2012/13

Decrease in goods and services due to reduction in MSDS intakes

Increase  in  transfer &  subsidies due  to  the  initiation of a defence against  chemical and biological warfare project, development of a telehealth system and the development of a deployable health service

Compensation of Employees represents 74.09%

21

Page 22: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Strategic Direction 1,368 32 33 34

Operations 408,020 424,006 436,402 453,594

Defence Intelligence Support Services 252,248 285,625 304,040 324,879

TOTAL 661,636 709,663 740,475 778,507

Subprogramme

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Current Payments 249,761 280,835 297,656 321,802

Compensation of Employees 230,270 257,984 273,806 292,034

Goods and Services 19,491 22,851 23,850 29,768

Transfers and Subsidies 409,449 425,387 439,261 453,030

Payment for Capital Assets 2,426 3,441 3,558 3,675

TOTAL 661,636 709,663 740,475 778,507

Economic Classification

Defence Intelligence

22

Budget increases from Rm661 in FY 11/12 to Rm709 in FY 12/13 to Rb740 (FY 13/14) and Rb778 in FY 14/15 at an annual average of  5.9%

Page 23: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Joint Logistic Services 1,699,556 2,215,121 2,346,713 2,466,830

Command and Management Information Systems 960,418 1,021,204 1,103,379 1,151,611

Military Police 432,471 439,526 467,902 488,159

Technology Development 339,864 328,547 275,117 287,980

Departmental Support 711,378 1,073,005 784,457 841,515

TOTAL 4,143,687 5,077,403 4,977,568 5,236,095

Subprogramme

General Support

Budget increases from Rb4.1 in FY 11/12 to Rb5.07 in FY 12/13 to Rb4.97 (FY 13/14) and Rb5.23 in FY 14/15 at an annual average of  8.8%

Increase in Joint Logistic Services due to establishment of Defence Works Formation

Increase in Command & Management Information Systems due to the provision for research and development of new generation telecommunication systems

Decrease  in Technology Development due to the gradual completion of technology projects related to test and evaluation systems as well as electronic research and development

Increase in Departmental Support in 2012/13 is due to the provision for the write‐off of unauthorised expenditure that occurred in 1997/98 23

Page 24: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

2011/12 2012/13 2013/14 2014/15

R'000 R'000 R'000 R'000

Current Payments 2,909,521 3,526,811 3,771,842 3,968,831

Compensation of Employees 1,059,328 1,120,723 1,176,703 1,241,496

Goods and Services 1,850,193 2,406,088 2,595,139 2,727,335

Transfers and Subsidies 1,104,838 1,085,495 1,070,864 1,125,460

Payment for Capital Assets 129,328 127,393 134,862 141,804

Payment for Financial Assets - 337,704 - -

TOTAL 4,143,687 5,077,403 4,977,568 5,236,095

Economic Classification

General Support

Decrease in payment for capital assets due to completion of AFB Waterkloof upgrade

Decrease in transfer and subsidies is related to the decreases in technology development 

Increase in goods and services due to the establishment of the Defence Works formation

Once‐off provision for Payment for financial assets is due to the write‐off of unauthorised expenditure 

24

Page 25: DEPARTMENTS PRESENTATION OF DEFENCE TO PCD VOTE 22: 2012pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120509bud… · Vote 22: Allocation per Main Programme: FY 2012/13. ¾ Budget

CONCLUDING REMARKS

Challenges

•Rising fuel price and volatility of exchange rate will  impact on executing borderline control.impact  on  training  in  SA  Army,  SAAF,  SA  Navy  and supporting divisions.impact  on  operating  budget  due  to  envisaged  price increases  of  a  wide  range  of  commodities  used  by Defence.

Confirmation. 

It 

is 

hereby 

confirmed 

that 

the 

2012/13 

Estimates 

of 

Defence 

Expenditure 

is 

aligned 

with 

the 

Department’s Strategic Plan and Annual Performance Plan.

25