+ All Categories
Home > Documents > DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment....

DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment....

Date post: 25-May-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
21
(208) 458-4000 Office (208) 458-4043 Fax www.depatco.com 2205 East 200 North, St. Anthony, Idaho 83445 DePatco, Inc. specializes in construction services for commercial, industrial, environmental, residential, ground development projects and government. We have the capabilities of providing entire site packages which include: Utilities, Grading, Asphalt, Concrete and Gravel. We are licensed in Idaho, Utah, Montana, Nevada, Wyoming and North Dakota. Our work in the intermountain area has earned us a reputation of distinction. With over thirty years experience our company continues to improve its capabilities through state-of-the-art construction equipment, skilled project teams and office support. With our recent addition of asphalt production equipment and gravel locations we will stay true to our reputation of “Bringing Excellence to the Surface”. We will continue to provide quality products at aggressive rates. We look forward to providing you with a level of service and excellence that will exceed your expectations! Principals of the Company President & CEO Greg L. Stoddard VP, Director of Field Operations Jed O. Stoddard VP, Equipment Manager Chris J. Stoddard Treasurer / CFO Daniel D. Stoddard Director Jonathan L. Stoddard
Transcript
Page 1: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

DePatco, Inc. specializes in construction services for commercial, industrial, environmental,

residential, ground development projects and government. We have the capabilities of providing entire site packages which include: Utilities, Grading, Asphalt, Concrete and Gravel. We are licensed in Idaho, Utah, Montana, Nevada, Wyoming and North Dakota. Our work in the intermountain area has earned us a reputation of distinction. With over thirty years experience our company continues to improve its capabilities through state-of-the-art construction equipment, skilled project teams and office support. With our recent addition of asphalt production equipment and gravel locations we will stay true to our reputation of “Bringing Excellence to the Surface”. We will continue to provide quality products at aggressive rates. We look forward to providing you with a level of service and excellence that will exceed your expectations!

Principals of the Company

President & CEO Greg L. Stoddard VP, Director of Field Operations Jed O. Stoddard VP, Equipment Manager Chris J. Stoddard Treasurer / CFO Daniel D. Stoddard Director Jonathan L. Stoddard

Page 2: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Greg L. Stoddard, PMP: Greg graduated from Utah State University with a bachelor’s degree in Civil Engineering. He has served in the field overseeing and supervising projects since 1995. Greg manages all operations including accounting, estimating, and project management for DePatco.

Jed O. Stoddard: Jed graduated from Boise State University with bachelor’s degree in Construction Management. He has had experience in the field supervising crews and projects since 1997. Jed currently oversees all projects and gravel pits for DePatco as the Field Operations Manager.

Chris J. Stoddard: Chris graduated from Utah State University with a bachelor’s degree in Welding Engineering. He has had experience in the field since as a superintendent and foreman since 1999. Chris supervises the shop repairs and the purchasing and sales of the equipment.

Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s degree in Accounting. He worked two years in Utah at an accounting firm and returned in 2003 as DePatco’s CFO. Daniel supervises the accounting department, information technology (IT) & networking.

Jonathan L. Stoddard: Jonathan graduated from Ricks College with an associate’s degree in Accounting. He was the division manager and north western area manager for a construction based retail business beginning in 2003 and for 10 years he oversaw operations, budgets and purchasing. Jonathan is VP of Marketing, a Project Manager, and estimates.

Page 3: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

PROJECTS UNDER CONSTRUCTION

Currently 2017

Schedule I Commercial Apron Recon. Jackson, WY

Owner: WYDOT

ISP Facility District 5 Pocatello, ID

Owner: Idaho State Police

Driggs Water System Improvements Driggs, ID

Owner: City of Driggs

Rexburg City Water Project Rexburg, ID

Owner: City of Rexburg

Stuart Park Renovations Pocatello, ID

Owner: City of Chubbuck

SH-28 Mud Lake to Salmon Salmon, ID

Owner: State of Idaho

Deseret Industries Ammon, ID

Owner: Church of Jesus Christ of Latter-day Saints

WYDOT District 3 Patching Afton, WY

Owner: State of Wyoming

BMW Idaho Falls, ID

Owner: BMW of Idaho Falls

MFC RFP #173957 Idaho Falls, ID

Owner: Idaho National Laboratories

Hemming Cedars Bldg. B Rexburg, ID

Owner: Hemming Village

Premier Eyedaho Building Idaho Falls, ID

Owner: Premier Eyedaho

Corral Excavation Services Rexburg, ID

Owner: Idaho State Dept of Agriculture

Highland & Field Renovation Pocatello, ID

Owner: Pocatello/Chubbuck School Dist #25B

Idaho Falls Airport Idaho Falls, ID

Owner:City of Idaho Falls

Henry's Fork Snake River Bridge to US 20 Rexburg, ID

Owner: State of Idaho

Idaho Falls Power Gem State Right Dike Drain Idaho Falls, ID

Owner: City of Idaho Falls

Page 4: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

PROJECTS BY YEAR

2016

Norris Peak Road Rapid City, SD

Contract Amount: $3,922,594

Project consisted of .75 miles of road realignment through the Black Hills National Forest. This work included 37,800 cubic yards of excavation. We also imported 11,095 tons of ¾ road base to build the new road. 1500 feet of guardrail was installed. The projected also included several acres of seeding and mulching as well as riprap lined ditches and check dams. A portion of this project involved importing 30,000 ton of aggregate to the Lacreek National Wildlife Refuge and reconditioning 15.9 Miles of roadway.

West Main St, North 12th West Bridge St St. Anthony, ID

Contract Amount: $2,277,038

Consisted of rehabilitation & reconstruction of approximately .8 miles of West Main St between 12th West St & Bridge St including curb, gutter, sidewalk, asphalt paving, pavement markings, signage, landscaping, fencing, road lighting reconstruction, associated utility adjustments, with storm water collection retainage and treatment.

Hemming Cedars Bldg. A Rexburg, ID

Contract Amount: $866,660

Consisted of 11,000 CY of building excavation for a 28,275 SF apartment complex and a 31,000 SF six story parking garage. The associated work with this was utilities, (storm tech system, water, fire hydrant, sewer, electrical trenching), concrete prep, and asphalt paving.

Schedule I – Commercial Apron Recon. Jackson, WY

Contract Amount: $5,816,849

Work includes the removal of existing pavement, Portland Cement concrete paving (13-inch) 9,500 SY, Portland Cement concrete paving (8-inch) 6,000 SY, bituminous paving 1,200 TN, aggregate base course 3,000 CY, unclassified excavation 7,800 CY, storm drain pipe installation (RCP & Ductile Iron) 2,700 LF, 12-inch modular trench drain 340 LF, a modular subsurface storm water retention system and airfield lighting and pavement marking improvements.

Page 5: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Comore Loma Water District Improvements Idaho Fall, ID

Contract Amount: $1,966,964

Construction of new 400,000-gallon Tank 1 and Tank 1 Booster Pump Station

building, pumping, piping, electrical and mechanical equipment for Big Bend

Booster Pump Station, 450,000-gallon Tank 3, pump station building for Well 7,

transfer switch at Well 2, associated site work and 24 new hydrants.

Stuart Addition Pocatello, ID

Contract Amount: $2,460,904

Project consists of reconstruction of approximately 7,800 LF of roadway including 5000 ton of asphalt in a developed residential subdivision. The work also includes 14,032 Linear foot of curb and gutter, 5,206 CY of sidewalks, storm water systems, and landscaping.

Fremont Lake Pine Dale, WY

Contract Amount: $2,541,702

Work included the rehabilitation and realignment of 6.93 miles of Sublette County road near Fremont Lake. DePatco was subcontracted to crush the base course aggregate and HMA aggregate at the projects designated Skyline Pit, place and finish grade the base course and pave the HMA Super Pave mainline, including pullouts.

Summerfield Subdivision Rexburg, ID

Contract Amount: $656,682

Consisted of a 43 lot subdivision with city water and sewer services, storm ponds, 2,700 LF of road, 1,500 TN of Asphalt, 4,430 F of curb & gutter, and all other appurtenances that go with this type of construction.

Granite Creek Idaho Falls, ID

Contract Amount: $1,096,000

Install 4092 LF Water and 2770 LF Sewer lines in new subdivision. Paved streets

pouring 1638 ton of asphalt and chip seal. Installed 5763 LF Curb and gutter and

concrete sidewalks.

Page 6: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Craters of the Moon Craters of the Moon

Contract Amount: $783,955

Project consists of the demolition, removal, and disposal of the existing asphalt paved roads with the Lava Flow Campground. Installing curb, storm drainage systems, and paving both campsite parking pads and roads. Design and construct a fully accessible parking and walkway area including a mounting pad designed to attach an automatic fee machine and information kiosk within the Craters of the Moon National Monument.

NPS Millings West Yellowstone, WY

Contract Amount: $42,862

Consisted of 30,500 SY of 2 ½” thick milling at Lake and Canyon developed areas inside West Yellowstone National park.

4th West Storm Sewer Rexburg, ID

Contract Amount: $1,361,169

Installation of 5650 LF storm sewer along with typical street reconstruction on 4th

West and along 4th South including asphalt and granular subbase materials.

Replacement of 1500 LF existing curb and gutter and sidewalk.

The Falls Apartments Idaho Falls, ID

Contract Amount: $1,938,313

Project consists of a 10-building apartment complex in Snake River Landing

division of Idaho Falls. Supply and install rock retaining walls on the site,

excavation and back fill of concrete retaining walls. Install 16,635 SF thickened

edge sidewalks, curb & gutter and valley gutter. Run 3857 LF water and sewer

lines and fire riser into buildings, maintain SWPPP and BMP while on site.

Teton County Landfill Cap Rehabilitation Driggs, ID

Contract Amount: $855,884

Remove and replace landfill 208,000 cubic yards of earth cap. Install Lysimeter

test pad. Reseed 18 acres’ landfill.

Page 7: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

ITD Flandro to Poleline Rd Pocatello, ID

Contract Amount: $920,366

Total reconstruction of Yellowstone Highway in Pocatello, Idaho. Maintained on

this 5-lane road while completing the work at night and re-opening each morning

to full traffic flow. Project was approximately ½ mile long. Removal of

bituminous surface, excavation, pave and soft spot repair.

Monida – Lima Seismic Retrofit Monida & Lima, MT

Contract Amount: $522,065

Work included the seismic retrofit of a bridge on North Bound I-15 near Monida and a seismic retrofit of a bridge on South Bound I-15 near Lima. DePatco was subcontracted to pave the crossover lanes between North and South bound I-15 and to also supply and pave the Superpave HMA on each side of the new bridge abutments.

Schedule I Taxiway A/A4 Intersection Rehab Jackson, WY

Contract Amount: $221,569

Work included cold milling 2,500 SY of asphalt pavement, providing and paving 800 tons of HMA leveling and surface course, and providing airfield pavement marking improvements.

Page 8: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

PROJECTS BY YEAR

2015

25th Hitt Road Improvements Idaho Falls, ID

Contract Amount: $2,236,941

Expansion of the busiest intersection in Idaho Falls including a new traffic signal and street lighting

Maintained traffic signal and operational traffic lights while adding a complete new signal system

Maintained traffic during the compete project while performing all the underground utility installation at night and re-opening to traffic every morning.

Completed the job on time with a very limited construction window to complete work. Install 300 LF of waterline, 2,200 LF of sanitary sewer and storm drain, traffic signals,

landscaping, and sprinkler systems.

Del Rio Bridge St. Anthony, ID

Contract Amount: $273,134

Installation of under drain system for new roadway approaches to new bridge

Installation of Granular Borrow and Base Gravel for new roadway approaches to new Bridge

Provided asphalt paving for new Bridge

BYU-I 1st West Road Rexburg, ID

Contract Amount: $542,194

Complete Road Removal.

Installing new storm drain system and widening the road.

Installing new concrete crosswalks and ADA approaches.

Teton County Landfill Cap Driggs, ID

Contract Amount: $676,205

Removing 89,000 SY of cap material Moving 45,000 CY fill material Placing 200,000 CY of layers of new cap and materials Re-seeding 24.76 acres and new lysimeter pads

Page 9: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Western States Cat Pocatello, ID

Contract Amount: $2,789,138

Built parking lot and building pad, excavated and backfilled footing, prepped 110,000 SF of floor, placed 8” water line, installed water services and fire hydrants, placed 4000 ton of asphalt, installed French Drains, installed storm piping, set lift station, placed BMP's for SWPPP, installed Pressure Sewer line, and excavated a large quantity of rock.

Whitaker Road Reconstruction Chubbuck, ID

Contract Amount: $820,285

Re-construction of Whitaker Road in Chubbuck. Consisted of sidewalks, roadway, lights, manholes, sidewalk crossings, new water and sewer lines.

Rigby Urban Renewal Rigby, ID

Contract Amount: $1,243,001

Consisted of improving Rigby Main Street ADA /Sidewalk improvements. This project also included a complete renovation of the fairground parking lot. Including 3000 ton of Asphalt, Lighting, Curb and Gutter, and French Drains.

Bridgewater Idaho Falls, ID

Contract Amount: $634,087

Installed 6336’ of site utilities and storm drain. Consisted of new asphalt roadway, curb and gutter, lighting, and electrical trench.

ITD ADA School Routes Idaho Falls, ID

Contract Amount: $274,000

Demo, remove and replace 54 existing ADA ramps within the city limits.

Page 10: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Cheyenne S Valley Connection Pocatello, ID

Contract Amount: $1,565,603

Work included the construction of an east-west connector between Bannock Highway, South 2nd Avenue and South 5th Avenue including bridges on both the I-15 north and south bound lanes as well as a bridge crossing over South 2nd Avenue, the Union Pacific Railroad, and the Portneuf river. DePatco was subcontracted to haul imported aggregates including granular borrow, granular fill, base, open grade rock, fine aggregate, and MSE materials. DePatco also provided onsite hauling with dump trucks, side dumps and belly dumps. DePatco provided and placed SP-5 Superpave HMA on each end of the I-15 bridges and SP-2 Superpave on the entire connector route include approaches and HMA paving on an associated bike/walking path.

West Little Avenue Driggs, ID

Contract Amount: $461,719

Work included the rehabilitation and reconstruction of approximately 759 feet of West Little Avenue, from SH33 to Front Street including demolition of existing road, curb, gutter, and sidewalk; new subgrade, base, asphalt roadway, curb, gutter, storm drainage, sidewalks, lighting, signs, and pavement markings.

Vialetto Phase 2 Lehi, UT

Contract Amount: $289,805

Work included the installation of 1200 feet of Storm Drain RCP with a riprapped Fox Canyon inlet and a diversion box tying into an existing storm system on Chapel Ridge road. Pipe installation was in excess of 22 feet deep in locations. Crews also performed cut and fill work and installed an access road which also received aggregate surfacing. Work included providing erosion control and seeding.

Camping World Idaho Falls, ID

Contract Amount: $1,000,000

Complete site package, curb and gutter, water sewer and utility lines, foundation footings and grade work. Paved over 5,000 ton of asphalt.

BYU-Idaho Science & Tech Rexburg, ID

Contract Amount: $160,000

1800 tons of Asphalt paving

Page 11: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Fremont Co. Asphalt Paving St. Anthony, ID

Contract Amount: $340,000

5100 tons of asphalt paving in 3 different locations within Fremont County.

Skanska USA Rocky Mtn. Div Moose, WY

Contract Amount: $120,000

Asphalt paving, ¾ road base paving, trucking, and slinger truck distribution.

Page 12: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

PROJECTS BY YEAR

2014

Dubois Municipal Airport Dubois, WY

Contract Amount: $6,707,678

Included 15,140 Ton of Bituminous Paving, 7375 CY Aggregate Base Course, 7375 CY Aggregate Drainage Layer, and 435,000 Embankment Place

Removal of existing pavement, wildlife fencing, pavement of underdrain system, storm drain improvements, new airfield lighting, signage, and navigational aids

Completed in 150 calendar days

Afton Streets Improvement Afton, WY

Contract Amount: $2,753,129

Grading, milling plant mix, removal of sidewalk, curb and gutter, placing crushed base and bituminous pavement surfacing, plant mix wearing course, bridge deck overlay, sidewalk, curb and gutter and miscellaneous work on 3.15 miles

Wind River Job Corp Riverton, WY

Contract Amount: $2,021,527

Construction of 7 buildings consisting of 162,000 gross square feet including, clearing, grading, general landscaping, roads, parking, drainage, installing utility lines, wells, and lighting.

South Cache Street Jackson, WY

Contract Amount: $1,268,588

Include the installation of 1,450 tons of Asphalt, 12,000 SF of brick paver, 3,350 linear feet of curb and gutter, 16,000 SF of sidewalk, and 1,120 linear feet of storm drain.

Upper Hawley Creek Irrigation Project Jackson, WY

Contract Amount: $917,960

Furnish and install four pivots, 18,850 FT of 24” and 12” plastic irrigation pipe, generator set and electrical and wires to move pivots, furnish and install thrust blocks and valves.

Page 13: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Idaho Falls Packing Plant Idaho Falls, ID

Contract Amount: $831,809

Removal of topsoil, haul, place, and compact pit run, excavate footing and imported fill for footing, placement of water line water services and fire hydrants, place asphalt for parking areas, install French Drains, Catch Basins, Storm Piping, 2325 square feet of Valley Gutter, Gravel drive, Placement of BMP's for SWPPP, place 4 inch and 2 inch Sewer line, and place fire risers.

Rexburg LID 44 Rexburg, ID

Contract Amount: $809,190

Installing approximately 550 FT of 8” sanitary sewer line, 1,100 FT of water line, 10,000 SY of street reconstruction, 3,000 FT of curb and gutter and 2,200 SY of sidewalk removal and installation.

Riverside Parking Lot Rexburg, ID

Contract Amount: $522,388

Construction of asphalt parking lot, and concrete sidewalk and curb and gutter with granular sub base materials.

Rigby 1st North Roadway Rigby, ID

Contract Amount: $499,747

Consists of widening and improving the roadway including asphalt, curb and gutter sidewalk, storm drains, and French Drains.

Rexburg CRABS Rexburg, ID

Contract Amount: $433,000

Consists of recycling the roadway to the full thickness of existing pavement and a portion of the base layer.

Tyhee Elementary Pocatello, ID

Contract Amount: $379,003

Provide and install 12” storm lines, removal of asphalt, install curb and gutter, place French drains, all sub grade and road base materials placed and pave 1350 ton asphalt.

Page 14: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

South Fremont High School Overlay St. Anthony, ID

Contract Amount: $326,171

Overlay and Petro Mat school parking lot and reconstruct concrete approaches.

Anheuser Busch Idaho Falls, ID

Contract Amount: $260,066

Building site excavation, and install 7,225 FT of 6” to 12” size pipe, and provide and place import pit run and ¾” road base.

Lambert Detention System Lehi, UT

Contract Amount: $204,588

Excavate 23,882 CY existing material and install 674 LF 48” Class 3 RCP.

Page 15: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

PROJECTS BY YEAR

2013

American Falls Downtown Street American Falls, ID

Contract Amount: $3,968,859

Complete reconstruction of nine city blocks removal of asphalt, installing pipe ranging from 4” to 24” for all utilities. New concrete curb and gutters, water, storm, sewer, and asphalt pavement.

Mesa Falls Apartment Complex Rexburg, ID

Contract Amount: $2,226,716

Eleven 4 unit complex consisting of 3800 LF of 8”-12” water line, 5200 LF Sanitary and Storm Drain completed in 8 Month period of time, Utilities, Asphalt and Concrete

Idaho Falls Waste Water Upgrades Idaho Falls, ID

Contract Amount: $2,181,000

Reconstruction of 6800 LF of Sewer and Sanitary Water Lines consisting of HDP and PVC pipe ranging from 6” up to 54” diameter

BYU-I Student Housing Rexburg, ID

Contract Amount: $1,780,075

Site work for all utilities, blasting, installing concrete curb and gutter, and paving asphalt.

InfraSource – Asphalt Patching Idaho Falls, ID

Contract Amount: $1,800,000

Saw Cut 5 miles of Natural Gas trench work, removal of asphalt, and repave roads.

Mountain Lofts Apartments Rexburg, ID

Contract Amount: $1,140,000

Site Work, Utilities, Asphalt and Concrete

Page 16: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Dove Ave. Waterline Improvements Idaho Falls, ID

Contract Amount: $198,571

Installing 8” PVC Waterline in Dove Avenue consisting of improvements including piping, water meter boxes, and storm water French drains.

Sugar Salem School Dist. Asphalt Project Sugar Salem, ID

Contract Amount: $351,987

Milling schools parking lot and paving asphalt.

Idaho Falls Overlay Phase II Idaho Falls, ID

Contract Amount: $174,202

Overlay asphalt roadway and placing concrete curb and gutter.

Iona Stake Parking Lot Rehab Iona, ID

Contract Amount: $138,645

Milling church parking lot and paving asphalt.

KJ’s Broadway Truck Parking Lot Idaho Falls, ID

Contract Amount: $116,036

Grade and slope parking lot for semis, place concrete gutter and pave asphalt.

Spring Gulch Road Jackson, WY

Contract Amount: $110,068

Road Reconstruction and paving asphalt.

Iona Denning Building Parking Lot Iona, ID

Contract Amount: $106,355

Milling parking lot and paving asphalt.

Page 17: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Teton County Crushing Driggs, ID

Contract Amount: $213,800

Crushing for county pit.

Page 18: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

PROJECTS BY YEAR

2012

Rigby Sewer Replacement Rigby, ID

Contract Amount: $3,631,000

Sewer Rehabilitation Opened, cut and replaced 4.5 miles of sewer line

Melaleuca Office Phase 1 Idaho Falls, ID

Contract Amount: $3,900,000

Site package for 35 acres and 350,000 sq ft building Includes Asphalt and Concrete

Beaumont Medical Center Rexburg, ID

Contract Amount: $229,904

Utilities, Parking Lot preparation and Asphalt

Love’s Travel Stop Idaho Falls, ID

Contract Amount: $2,500,000

11 Acre Site Preparation for Truck Stop Site Concrete which included Curb & Gutter 11,000 Tons Asphalt – Prep and Pave

Dora Erickson Elementary Idaho Falls, ID

Contract Amount: $1,280,000

Site Work, Utilities, Asphalt and Concrete Excavation Prep for 60,000 sq ft School Building

Ethel Boyes Elementary Idaho Falls, ID

Contract Amount: $1,100,000

Site Work, Utilities, Asphalt and Concrete Excavation Prep for 60,000 sq ft School Building

Page 19: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Steel Line Replacement Project Phase II Star Valley, WY

Contract Amount: $1,598,963

Removed old water lines and replaced with new Potable water line

Fish Creek Road Ashton, ID

Contract Amount: $325,000

Paved Road using 4,300 Tons of Asphalt in 2 ½ Days

Hemming Deseret Book Rexburg, ID

Contract Amount: $120,000

Site Package, including, Paving, Concrete, Parking Lot and Utilities

Idahoan Foods Idaho Falls, ID

Contract Amount: $291,347

Utilities, Curb and Gutter and Paving

Rigby High School Rigby, ID

Contract Amount: $577,000

Site Concrete, including Curb and Gutter, Sidewalks and Planter Walls

BYU-I Concrete Replacement Rexburg, ID

Contract Amount: $275,331

Campus Wide Concrete Replacement

ITD Culvert Replacement Bonneville County, ID

Contract Amount: $954,138

Jack and Bore 42” & 48” Culvert on SH31 Demo Existing Culvert in 3 Locations Forest Reclamation

Page 20: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Licenses

Idaho Public Works Contractor License PWC-C-10937-U-1-2-3

(Heavy Construction, Building Construction, Specialty Construction)

Idaho Registration Number RCE-7946

Idaho Falls Contractor License 1389

Rexburg, Idaho Contractors Business License

DUNS # 144482304

Wyoming Contractor ID Number: 03204

Montana Contractors License 38786

Utah State Contractors License 5978463-5501

o (R-100) Residential, Small Commercial

o (E-100) General Engineering

Nevada State Contractors License (B-2) 0038735

Nevada Business License C-0180743

North Dakota

Bonding Limit $50 Million

Aggregate Bonding Limit $25 Million

Average Contract Amount $2-4 Million

Annual Work Load $25-30 Million

Page 21: DePatco, Inc · Chris supervises the shop repairs and the purchasing and sales of the equipment. Daniel D. Stoddard: Daniel also graduated from Utah State University with bachelor’s

(208) 458-4000 Office (208) 458-4043 Fax

www.depatco.com

2205 East 200 North, St. Anthony, Idaho 83445

Equipment

DePatco, Inc. has a wide variety of equipment at its disposal. The following is a list of what is available to and owned by the company:

Excavators: range from mini excavators to 450 class excavators. In all, the company has fifteen excavators and seven backhoes. Attachments include compactors, thumbs for excavators and rock hammers.

Loaders: range from skid steers to 7 ½ yard loaders. The company also has four dozers ranging in sizes up to a D6 with GPS systems.

Road Graders: DePatco, Inc. owns and operates four road graders with GPS systems.

Scraper: 20 yard in capacity.

Asphalt Pavers: four pavers used in projects ranging from residential applications to state highways.

Concrete Extruder. Place concrete curb and gutter, side walk, and retaining walls. Concrete Paver for Airports & Hwy Paving.

Truck fleet: includes over fifty trucks; water trucks, dump trucks, truck and pups, side dump trailers, end dumps, and large off road haul trucks are in the fleet.

Asphalt Plants: 300 Ton Asphalt Plant, 250 Ton Mobile Asphalt Plant.

Crushing and screening equipment.

500 CY Concrete Batch Plant.