Deployment Completion R p rt D D I . I _ 1972-July 973 ---
Transcript
Page 1: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

Deployment Completion R p rt

D D

I I _ ova~ber 1972-July 973

---

From

To

Subj

U S NAVAL MoelLE CONsTwUcTloN BATTAUON tQ lliSr PI09T OFFICll NllW YORK 08IJOI NMCB13330mb

5213 Ser 523 1 AUGUST 1973

Commanding Officer U S Naval Mobile Construction Battalion ONE THREE THREE Commander Naval Construction Battalions U S Atlantic Fleet

Deployment Completion Report for Period November 1972 to July 1973 submission of

Ref (a) COMCBPACCOMCBLANTINST 5213l COMCBLANT OPORD 3-73 ( b)

Encl (1) ( 2 ) ( 3) ( 4 ) ( 5 ) ( 6 ) ( 7 ) ( 8 ) ( 9 )

( l 0) ( 11) ( 12) (13) ( 14) ( l 5 ) ( 16) ( l 7 )

Unit Location Summary Unit Moves Summary Significant Events Summary Administrative Summary Historical Summary Training Summary Equipment Summary Labor Distribution Summary Project Status Summary Main Body Summary Detail Chagos Summary Detail Naples Summary Detail Sigonella Summary Detail Greece Summary Detail Crete Summary Detail Todendorf Summary Detail Sardinia Summary

1 Enclosures (1) through (17) are forwarded in ac co rdance with reference (a) as required in the performance o f reference ( b)

2 Unit Location In accordance with refer e n c e (b) NMCB 133 was deployed to Rota Spain from November 1972 to July 1973 Details and detached unit locations are indicated in enclosur e ( l )

3 Unit Mo vemen t NMCB 133 deployed on 11 Nov e mber 197 2 and r et urn e d to home port on 15 J u ly 197 3 Ot her uni t mov e me n ts during this period are summariz ed in enclosure (2)bull

i

4 Significant Events Significant events taking place during the deployment are set forth in enclosure l3)

W C CONNOR

ii

Copy to COMCBLANT Original and 2 copies CINCLANTFLT 1 COMSEHVLANT 1 COMCBPAC 2 DIR OF NAVAL HISTORY 1 NAVFACENGCOMHQ (Code 06) 1 COM 31ST NCR 1 COM OTH NCR 1 COM 21ST NCR 1 CO CBC PORHUE (Code 17) 1 CO CBC PORHUE (Code 15) 1 CO CBC DAVISVILLE 1 CO CBC GULFPORT 1 CO NAVCONSTAU GULFPORT l CO NAVSCON PORHUE 1 CO NAVSCON DAVISVILLE 1 CO CFXOS PORHUE 1 ALL NMCBS 1 CNO (OP-44G) 1 CO NCEL PORHUE 1 COMMANDANT MARINE CORPS 1 Director Trainin~ Publications Division 1 ALL RNCBS RNCRS and RNMCBS 1

iii

UNIT LOCATION SUMMARY

Enclosure (1)

UNIT ~OCATION SUMMARY ARRDP

TYPI UNIT amp PESIGNATION OFF1JIL LOCATION DATE AT SITE MISSION

MAIN BODY 14210 ROT A SPAIN NOV 72JUL 73 Training in con-junction vith c -struction of base facilities

REAR ECHELOtlrAD 043 VARIOUS LOCATIONS JUN 72JUL 73 20NCR aupportschoola Medical amp legal holds

stABEE TEAM 13310 112 KUSAI T T P I OCT 72MAY 73 Civic Action

DETAIL TODENDORF 07 TODENOORF GERMANY FEB 73JUN 73 Ccnstruction of N~A Todendorf Facilities

DETAIL CHAGOS 416o DIEGO GARCIA NOV 72JUN 73 Construction of Reindeer Station

DETAIL SIGONELLA 133 SIGClELLA SICILY NOV 72JUL 7) Construction of NAF Sigonella Base Facil-ities

DlAIL NAPLES 026 NAPLES IT ALY NOV 72JUL 73 Construction of NSA Naples Facilities

DETAIL GREECE 015 DA MAXRI GRIECE NOV 72JUL 73 Construction of NCS Nea Makri Facilities

DETAIL SARDINIA 111 LA MADDALENA SARDIN IA MAR 73JUL 73 Construction of NSA Det La Maddalena

t Facilities () 0 DT AIL CRETE 126 SOUDA BAY CRETE NOV 72JUL 73 Construction of NAVDEI ~ Souda Bay Base CTl Facilities - - ADV ANCI PARTY 6215 GULFPORT MISSISSIPPI JUN 73JUL 73 Preparation for arrival

Of Mainbody

UNIT MOVES u 11UY

tncioRUrf ( 2)

26 October 1m

27 Qctober 1972

10 Noyeber 1972

11 November 1972

13 NOT8Jllber 1972

21 Januaa 1973

19 Febryorv 1973

11 April 1973

21 ra1 1973

24 May 1973

2 Jmicrope 1973

9 Jmicrope 1973

3 JulY 1973bull

11 July 193

14 July 1973

UN IT MOVEMENTS

NMCB-133 Detail Chagos Advance Party departed Gulfport for Diego Garcia by MAC

NMCB-133 Advance Party departed Gulfport for Jrurope Tia MAC charter

NMCB-133 Detail Chagos Main Body departed Gulf port for Diego Garcia by MAC

NMCB-133 Main Body departed Gulfport by MAC Charter to Rota Spain

NMCB-133 EUropean details departed Rota by gove[llllent air to uropean detail sites in Sigonella Sicily Naples Italy Nea Makri Greece and Souda Baymiddot Crete

Detail Crete comprised of one (1) officer and tvelTe (12) enlisted departed Souda Bay Crete via government air to return to Rota Spain

Detail Todendorf comprised of eight (8) enlisted departed Rota via government air for Todendort Germany

Fifteen (15) enlisted or Detail Crete redeployed to Souda Bay Crete by government air from Rota

SEABE Team 13310 redeployed from Guam to Gulfport Mississippi

NMCB-133 Pre-Advance Party consisting of one (1) officer and six (6) enlisted departed Rota Spain by MAC to return to Gulfport Mississippi

Seven (7) enlisted of Detail Todendorf returned by government air to Rota Spain from NSGA Todendorf Germany

Four (4) officers and one hundred fifty-five (155) enlisted of Detail Chagos departed Diego Garcia by MAC to return to Gulfport Mississippi

NMCB-133 Advance Party consisting of one (1) officer and seveDty-seven (Tl) enlisted personnel departed Rota Spain by MAC to return to Gulfport Miasisaippi

Details Naples Sigonella Sardinia Greece and Crete returned to Rota Spain by government air

NMCB-lJJ departed Rota Spain by government air to return to homeport in Gulfport Mississippi

Enclosure (2)

I I

-

SIGNIFTC ll NT tVEfHl SlliM Y

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 2: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

From

To

Subj

U S NAVAL MoelLE CONsTwUcTloN BATTAUON tQ lliSr PI09T OFFICll NllW YORK 08IJOI NMCB13330mb

5213 Ser 523 1 AUGUST 1973

Commanding Officer U S Naval Mobile Construction Battalion ONE THREE THREE Commander Naval Construction Battalions U S Atlantic Fleet

Deployment Completion Report for Period November 1972 to July 1973 submission of

Ref (a) COMCBPACCOMCBLANTINST 5213l COMCBLANT OPORD 3-73 ( b)

Encl (1) ( 2 ) ( 3) ( 4 ) ( 5 ) ( 6 ) ( 7 ) ( 8 ) ( 9 )

( l 0) ( 11) ( 12) (13) ( 14) ( l 5 ) ( 16) ( l 7 )

Unit Location Summary Unit Moves Summary Significant Events Summary Administrative Summary Historical Summary Training Summary Equipment Summary Labor Distribution Summary Project Status Summary Main Body Summary Detail Chagos Summary Detail Naples Summary Detail Sigonella Summary Detail Greece Summary Detail Crete Summary Detail Todendorf Summary Detail Sardinia Summary

1 Enclosures (1) through (17) are forwarded in ac co rdance with reference (a) as required in the performance o f reference ( b)

2 Unit Location In accordance with refer e n c e (b) NMCB 133 was deployed to Rota Spain from November 1972 to July 1973 Details and detached unit locations are indicated in enclosur e ( l )

3 Unit Mo vemen t NMCB 133 deployed on 11 Nov e mber 197 2 and r et urn e d to home port on 15 J u ly 197 3 Ot her uni t mov e me n ts during this period are summariz ed in enclosure (2)bull

i

4 Significant Events Significant events taking place during the deployment are set forth in enclosure l3)

W C CONNOR

ii

Copy to COMCBLANT Original and 2 copies CINCLANTFLT 1 COMSEHVLANT 1 COMCBPAC 2 DIR OF NAVAL HISTORY 1 NAVFACENGCOMHQ (Code 06) 1 COM 31ST NCR 1 COM OTH NCR 1 COM 21ST NCR 1 CO CBC PORHUE (Code 17) 1 CO CBC PORHUE (Code 15) 1 CO CBC DAVISVILLE 1 CO CBC GULFPORT 1 CO NAVCONSTAU GULFPORT l CO NAVSCON PORHUE 1 CO NAVSCON DAVISVILLE 1 CO CFXOS PORHUE 1 ALL NMCBS 1 CNO (OP-44G) 1 CO NCEL PORHUE 1 COMMANDANT MARINE CORPS 1 Director Trainin~ Publications Division 1 ALL RNCBS RNCRS and RNMCBS 1

iii

UNIT LOCATION SUMMARY

Enclosure (1)

UNIT ~OCATION SUMMARY ARRDP

TYPI UNIT amp PESIGNATION OFF1JIL LOCATION DATE AT SITE MISSION

MAIN BODY 14210 ROT A SPAIN NOV 72JUL 73 Training in con-junction vith c -struction of base facilities

REAR ECHELOtlrAD 043 VARIOUS LOCATIONS JUN 72JUL 73 20NCR aupportschoola Medical amp legal holds

stABEE TEAM 13310 112 KUSAI T T P I OCT 72MAY 73 Civic Action

DETAIL TODENDORF 07 TODENOORF GERMANY FEB 73JUN 73 Ccnstruction of N~A Todendorf Facilities

DETAIL CHAGOS 416o DIEGO GARCIA NOV 72JUN 73 Construction of Reindeer Station

DETAIL SIGONELLA 133 SIGClELLA SICILY NOV 72JUL 7) Construction of NAF Sigonella Base Facil-ities

DlAIL NAPLES 026 NAPLES IT ALY NOV 72JUL 73 Construction of NSA Naples Facilities

DETAIL GREECE 015 DA MAXRI GRIECE NOV 72JUL 73 Construction of NCS Nea Makri Facilities

DETAIL SARDINIA 111 LA MADDALENA SARDIN IA MAR 73JUL 73 Construction of NSA Det La Maddalena

t Facilities () 0 DT AIL CRETE 126 SOUDA BAY CRETE NOV 72JUL 73 Construction of NAVDEI ~ Souda Bay Base CTl Facilities - - ADV ANCI PARTY 6215 GULFPORT MISSISSIPPI JUN 73JUL 73 Preparation for arrival

Of Mainbody

UNIT MOVES u 11UY

tncioRUrf ( 2)

26 October 1m

27 Qctober 1972

10 Noyeber 1972

11 November 1972

13 NOT8Jllber 1972

21 Januaa 1973

19 Febryorv 1973

11 April 1973

21 ra1 1973

24 May 1973

2 Jmicrope 1973

9 Jmicrope 1973

3 JulY 1973bull

11 July 193

14 July 1973

UN IT MOVEMENTS

NMCB-133 Detail Chagos Advance Party departed Gulfport for Diego Garcia by MAC

NMCB-133 Advance Party departed Gulfport for Jrurope Tia MAC charter

NMCB-133 Detail Chagos Main Body departed Gulf port for Diego Garcia by MAC

NMCB-133 Main Body departed Gulfport by MAC Charter to Rota Spain

NMCB-133 EUropean details departed Rota by gove[llllent air to uropean detail sites in Sigonella Sicily Naples Italy Nea Makri Greece and Souda Baymiddot Crete

Detail Crete comprised of one (1) officer and tvelTe (12) enlisted departed Souda Bay Crete via government air to return to Rota Spain

Detail Todendorf comprised of eight (8) enlisted departed Rota via government air for Todendort Germany

Fifteen (15) enlisted or Detail Crete redeployed to Souda Bay Crete by government air from Rota

SEABE Team 13310 redeployed from Guam to Gulfport Mississippi

NMCB-133 Pre-Advance Party consisting of one (1) officer and six (6) enlisted departed Rota Spain by MAC to return to Gulfport Mississippi

Seven (7) enlisted of Detail Todendorf returned by government air to Rota Spain from NSGA Todendorf Germany

Four (4) officers and one hundred fifty-five (155) enlisted of Detail Chagos departed Diego Garcia by MAC to return to Gulfport Mississippi

NMCB-133 Advance Party consisting of one (1) officer and seveDty-seven (Tl) enlisted personnel departed Rota Spain by MAC to return to Gulfport Miasisaippi

Details Naples Sigonella Sardinia Greece and Crete returned to Rota Spain by government air

NMCB-lJJ departed Rota Spain by government air to return to homeport in Gulfport Mississippi

Enclosure (2)

I I

-

SIGNIFTC ll NT tVEfHl SlliM Y

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 3: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

4 Significant Events Significant events taking place during the deployment are set forth in enclosure l3)

W C CONNOR

ii

Copy to COMCBLANT Original and 2 copies CINCLANTFLT 1 COMSEHVLANT 1 COMCBPAC 2 DIR OF NAVAL HISTORY 1 NAVFACENGCOMHQ (Code 06) 1 COM 31ST NCR 1 COM OTH NCR 1 COM 21ST NCR 1 CO CBC PORHUE (Code 17) 1 CO CBC PORHUE (Code 15) 1 CO CBC DAVISVILLE 1 CO CBC GULFPORT 1 CO NAVCONSTAU GULFPORT l CO NAVSCON PORHUE 1 CO NAVSCON DAVISVILLE 1 CO CFXOS PORHUE 1 ALL NMCBS 1 CNO (OP-44G) 1 CO NCEL PORHUE 1 COMMANDANT MARINE CORPS 1 Director Trainin~ Publications Division 1 ALL RNCBS RNCRS and RNMCBS 1

iii

UNIT LOCATION SUMMARY

Enclosure (1)

UNIT ~OCATION SUMMARY ARRDP

TYPI UNIT amp PESIGNATION OFF1JIL LOCATION DATE AT SITE MISSION

MAIN BODY 14210 ROT A SPAIN NOV 72JUL 73 Training in con-junction vith c -struction of base facilities

REAR ECHELOtlrAD 043 VARIOUS LOCATIONS JUN 72JUL 73 20NCR aupportschoola Medical amp legal holds

stABEE TEAM 13310 112 KUSAI T T P I OCT 72MAY 73 Civic Action

DETAIL TODENDORF 07 TODENOORF GERMANY FEB 73JUN 73 Ccnstruction of N~A Todendorf Facilities

DETAIL CHAGOS 416o DIEGO GARCIA NOV 72JUN 73 Construction of Reindeer Station

DETAIL SIGONELLA 133 SIGClELLA SICILY NOV 72JUL 7) Construction of NAF Sigonella Base Facil-ities

DlAIL NAPLES 026 NAPLES IT ALY NOV 72JUL 73 Construction of NSA Naples Facilities

DETAIL GREECE 015 DA MAXRI GRIECE NOV 72JUL 73 Construction of NCS Nea Makri Facilities

DETAIL SARDINIA 111 LA MADDALENA SARDIN IA MAR 73JUL 73 Construction of NSA Det La Maddalena

t Facilities () 0 DT AIL CRETE 126 SOUDA BAY CRETE NOV 72JUL 73 Construction of NAVDEI ~ Souda Bay Base CTl Facilities - - ADV ANCI PARTY 6215 GULFPORT MISSISSIPPI JUN 73JUL 73 Preparation for arrival

Of Mainbody

UNIT MOVES u 11UY

tncioRUrf ( 2)

26 October 1m

27 Qctober 1972

10 Noyeber 1972

11 November 1972

13 NOT8Jllber 1972

21 Januaa 1973

19 Febryorv 1973

11 April 1973

21 ra1 1973

24 May 1973

2 Jmicrope 1973

9 Jmicrope 1973

3 JulY 1973bull

11 July 193

14 July 1973

UN IT MOVEMENTS

NMCB-133 Detail Chagos Advance Party departed Gulfport for Diego Garcia by MAC

NMCB-133 Advance Party departed Gulfport for Jrurope Tia MAC charter

NMCB-133 Detail Chagos Main Body departed Gulf port for Diego Garcia by MAC

NMCB-133 Main Body departed Gulfport by MAC Charter to Rota Spain

NMCB-133 EUropean details departed Rota by gove[llllent air to uropean detail sites in Sigonella Sicily Naples Italy Nea Makri Greece and Souda Baymiddot Crete

Detail Crete comprised of one (1) officer and tvelTe (12) enlisted departed Souda Bay Crete via government air to return to Rota Spain

Detail Todendorf comprised of eight (8) enlisted departed Rota via government air for Todendort Germany

Fifteen (15) enlisted or Detail Crete redeployed to Souda Bay Crete by government air from Rota

SEABE Team 13310 redeployed from Guam to Gulfport Mississippi

NMCB-133 Pre-Advance Party consisting of one (1) officer and six (6) enlisted departed Rota Spain by MAC to return to Gulfport Mississippi

Seven (7) enlisted of Detail Todendorf returned by government air to Rota Spain from NSGA Todendorf Germany

Four (4) officers and one hundred fifty-five (155) enlisted of Detail Chagos departed Diego Garcia by MAC to return to Gulfport Mississippi

NMCB-133 Advance Party consisting of one (1) officer and seveDty-seven (Tl) enlisted personnel departed Rota Spain by MAC to return to Gulfport Miasisaippi

Details Naples Sigonella Sardinia Greece and Crete returned to Rota Spain by government air

NMCB-lJJ departed Rota Spain by government air to return to homeport in Gulfport Mississippi

Enclosure (2)

I I

-

SIGNIFTC ll NT tVEfHl SlliM Y

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 4: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

Copy to COMCBLANT Original and 2 copies CINCLANTFLT 1 COMSEHVLANT 1 COMCBPAC 2 DIR OF NAVAL HISTORY 1 NAVFACENGCOMHQ (Code 06) 1 COM 31ST NCR 1 COM OTH NCR 1 COM 21ST NCR 1 CO CBC PORHUE (Code 17) 1 CO CBC PORHUE (Code 15) 1 CO CBC DAVISVILLE 1 CO CBC GULFPORT 1 CO NAVCONSTAU GULFPORT l CO NAVSCON PORHUE 1 CO NAVSCON DAVISVILLE 1 CO CFXOS PORHUE 1 ALL NMCBS 1 CNO (OP-44G) 1 CO NCEL PORHUE 1 COMMANDANT MARINE CORPS 1 Director Trainin~ Publications Division 1 ALL RNCBS RNCRS and RNMCBS 1

iii

UNIT LOCATION SUMMARY

Enclosure (1)

UNIT ~OCATION SUMMARY ARRDP

TYPI UNIT amp PESIGNATION OFF1JIL LOCATION DATE AT SITE MISSION

MAIN BODY 14210 ROT A SPAIN NOV 72JUL 73 Training in con-junction vith c -struction of base facilities

REAR ECHELOtlrAD 043 VARIOUS LOCATIONS JUN 72JUL 73 20NCR aupportschoola Medical amp legal holds

stABEE TEAM 13310 112 KUSAI T T P I OCT 72MAY 73 Civic Action

DETAIL TODENDORF 07 TODENOORF GERMANY FEB 73JUN 73 Ccnstruction of N~A Todendorf Facilities

DETAIL CHAGOS 416o DIEGO GARCIA NOV 72JUN 73 Construction of Reindeer Station

DETAIL SIGONELLA 133 SIGClELLA SICILY NOV 72JUL 7) Construction of NAF Sigonella Base Facil-ities

DlAIL NAPLES 026 NAPLES IT ALY NOV 72JUL 73 Construction of NSA Naples Facilities

DETAIL GREECE 015 DA MAXRI GRIECE NOV 72JUL 73 Construction of NCS Nea Makri Facilities

DETAIL SARDINIA 111 LA MADDALENA SARDIN IA MAR 73JUL 73 Construction of NSA Det La Maddalena

t Facilities () 0 DT AIL CRETE 126 SOUDA BAY CRETE NOV 72JUL 73 Construction of NAVDEI ~ Souda Bay Base CTl Facilities - - ADV ANCI PARTY 6215 GULFPORT MISSISSIPPI JUN 73JUL 73 Preparation for arrival

Of Mainbody

UNIT MOVES u 11UY

tncioRUrf ( 2)

26 October 1m

27 Qctober 1972

10 Noyeber 1972

11 November 1972

13 NOT8Jllber 1972

21 Januaa 1973

19 Febryorv 1973

11 April 1973

21 ra1 1973

24 May 1973

2 Jmicrope 1973

9 Jmicrope 1973

3 JulY 1973bull

11 July 193

14 July 1973

UN IT MOVEMENTS

NMCB-133 Detail Chagos Advance Party departed Gulfport for Diego Garcia by MAC

NMCB-133 Advance Party departed Gulfport for Jrurope Tia MAC charter

NMCB-133 Detail Chagos Main Body departed Gulf port for Diego Garcia by MAC

NMCB-133 Main Body departed Gulfport by MAC Charter to Rota Spain

NMCB-133 EUropean details departed Rota by gove[llllent air to uropean detail sites in Sigonella Sicily Naples Italy Nea Makri Greece and Souda Baymiddot Crete

Detail Crete comprised of one (1) officer and tvelTe (12) enlisted departed Souda Bay Crete via government air to return to Rota Spain

Detail Todendorf comprised of eight (8) enlisted departed Rota via government air for Todendort Germany

Fifteen (15) enlisted or Detail Crete redeployed to Souda Bay Crete by government air from Rota

SEABE Team 13310 redeployed from Guam to Gulfport Mississippi

NMCB-133 Pre-Advance Party consisting of one (1) officer and six (6) enlisted departed Rota Spain by MAC to return to Gulfport Mississippi

Seven (7) enlisted of Detail Todendorf returned by government air to Rota Spain from NSGA Todendorf Germany

Four (4) officers and one hundred fifty-five (155) enlisted of Detail Chagos departed Diego Garcia by MAC to return to Gulfport Mississippi

NMCB-133 Advance Party consisting of one (1) officer and seveDty-seven (Tl) enlisted personnel departed Rota Spain by MAC to return to Gulfport Miasisaippi

Details Naples Sigonella Sardinia Greece and Crete returned to Rota Spain by government air

NMCB-lJJ departed Rota Spain by government air to return to homeport in Gulfport Mississippi

Enclosure (2)

I I

-

SIGNIFTC ll NT tVEfHl SlliM Y

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 5: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

UNIT LOCATION SUMMARY

Enclosure (1)

UNIT ~OCATION SUMMARY ARRDP

TYPI UNIT amp PESIGNATION OFF1JIL LOCATION DATE AT SITE MISSION

MAIN BODY 14210 ROT A SPAIN NOV 72JUL 73 Training in con-junction vith c -struction of base facilities

REAR ECHELOtlrAD 043 VARIOUS LOCATIONS JUN 72JUL 73 20NCR aupportschoola Medical amp legal holds

stABEE TEAM 13310 112 KUSAI T T P I OCT 72MAY 73 Civic Action

DETAIL TODENDORF 07 TODENOORF GERMANY FEB 73JUN 73 Ccnstruction of N~A Todendorf Facilities

DETAIL CHAGOS 416o DIEGO GARCIA NOV 72JUN 73 Construction of Reindeer Station

DETAIL SIGONELLA 133 SIGClELLA SICILY NOV 72JUL 7) Construction of NAF Sigonella Base Facil-ities

DlAIL NAPLES 026 NAPLES IT ALY NOV 72JUL 73 Construction of NSA Naples Facilities

DETAIL GREECE 015 DA MAXRI GRIECE NOV 72JUL 73 Construction of NCS Nea Makri Facilities

DETAIL SARDINIA 111 LA MADDALENA SARDIN IA MAR 73JUL 73 Construction of NSA Det La Maddalena

t Facilities () 0 DT AIL CRETE 126 SOUDA BAY CRETE NOV 72JUL 73 Construction of NAVDEI ~ Souda Bay Base CTl Facilities - - ADV ANCI PARTY 6215 GULFPORT MISSISSIPPI JUN 73JUL 73 Preparation for arrival

Of Mainbody

UNIT MOVES u 11UY

tncioRUrf ( 2)

26 October 1m

27 Qctober 1972

10 Noyeber 1972

11 November 1972

13 NOT8Jllber 1972

21 Januaa 1973

19 Febryorv 1973

11 April 1973

21 ra1 1973

24 May 1973

2 Jmicrope 1973

9 Jmicrope 1973

3 JulY 1973bull

11 July 193

14 July 1973

UN IT MOVEMENTS

NMCB-133 Detail Chagos Advance Party departed Gulfport for Diego Garcia by MAC

NMCB-133 Advance Party departed Gulfport for Jrurope Tia MAC charter

NMCB-133 Detail Chagos Main Body departed Gulf port for Diego Garcia by MAC

NMCB-133 Main Body departed Gulfport by MAC Charter to Rota Spain

NMCB-133 EUropean details departed Rota by gove[llllent air to uropean detail sites in Sigonella Sicily Naples Italy Nea Makri Greece and Souda Baymiddot Crete

Detail Crete comprised of one (1) officer and tvelTe (12) enlisted departed Souda Bay Crete via government air to return to Rota Spain

Detail Todendorf comprised of eight (8) enlisted departed Rota via government air for Todendort Germany

Fifteen (15) enlisted or Detail Crete redeployed to Souda Bay Crete by government air from Rota

SEABE Team 13310 redeployed from Guam to Gulfport Mississippi

NMCB-133 Pre-Advance Party consisting of one (1) officer and six (6) enlisted departed Rota Spain by MAC to return to Gulfport Mississippi

Seven (7) enlisted of Detail Todendorf returned by government air to Rota Spain from NSGA Todendorf Germany

Four (4) officers and one hundred fifty-five (155) enlisted of Detail Chagos departed Diego Garcia by MAC to return to Gulfport Mississippi

NMCB-133 Advance Party consisting of one (1) officer and seveDty-seven (Tl) enlisted personnel departed Rota Spain by MAC to return to Gulfport Miasisaippi

Details Naples Sigonella Sardinia Greece and Crete returned to Rota Spain by government air

NMCB-lJJ departed Rota Spain by government air to return to homeport in Gulfport Mississippi

Enclosure (2)

I I

-

SIGNIFTC ll NT tVEfHl SlliM Y

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 6: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

UNIT ~OCATION SUMMARY ARRDP

TYPI UNIT amp PESIGNATION OFF1JIL LOCATION DATE AT SITE MISSION

MAIN BODY 14210 ROT A SPAIN NOV 72JUL 73 Training in con-junction vith c -struction of base facilities

REAR ECHELOtlrAD 043 VARIOUS LOCATIONS JUN 72JUL 73 20NCR aupportschoola Medical amp legal holds

stABEE TEAM 13310 112 KUSAI T T P I OCT 72MAY 73 Civic Action

DETAIL TODENDORF 07 TODENOORF GERMANY FEB 73JUN 73 Ccnstruction of N~A Todendorf Facilities

DETAIL CHAGOS 416o DIEGO GARCIA NOV 72JUN 73 Construction of Reindeer Station

DETAIL SIGONELLA 133 SIGClELLA SICILY NOV 72JUL 7) Construction of NAF Sigonella Base Facil-ities

DlAIL NAPLES 026 NAPLES IT ALY NOV 72JUL 73 Construction of NSA Naples Facilities

DETAIL GREECE 015 DA MAXRI GRIECE NOV 72JUL 73 Construction of NCS Nea Makri Facilities

DETAIL SARDINIA 111 LA MADDALENA SARDIN IA MAR 73JUL 73 Construction of NSA Det La Maddalena

t Facilities () 0 DT AIL CRETE 126 SOUDA BAY CRETE NOV 72JUL 73 Construction of NAVDEI ~ Souda Bay Base CTl Facilities - - ADV ANCI PARTY 6215 GULFPORT MISSISSIPPI JUN 73JUL 73 Preparation for arrival

Of Mainbody

UNIT MOVES u 11UY

tncioRUrf ( 2)

26 October 1m

27 Qctober 1972

10 Noyeber 1972

11 November 1972

13 NOT8Jllber 1972

21 Januaa 1973

19 Febryorv 1973

11 April 1973

21 ra1 1973

24 May 1973

2 Jmicrope 1973

9 Jmicrope 1973

3 JulY 1973bull

11 July 193

14 July 1973

UN IT MOVEMENTS

NMCB-133 Detail Chagos Advance Party departed Gulfport for Diego Garcia by MAC

NMCB-133 Advance Party departed Gulfport for Jrurope Tia MAC charter

NMCB-133 Detail Chagos Main Body departed Gulf port for Diego Garcia by MAC

NMCB-133 Main Body departed Gulfport by MAC Charter to Rota Spain

NMCB-133 EUropean details departed Rota by gove[llllent air to uropean detail sites in Sigonella Sicily Naples Italy Nea Makri Greece and Souda Baymiddot Crete

Detail Crete comprised of one (1) officer and tvelTe (12) enlisted departed Souda Bay Crete via government air to return to Rota Spain

Detail Todendorf comprised of eight (8) enlisted departed Rota via government air for Todendort Germany

Fifteen (15) enlisted or Detail Crete redeployed to Souda Bay Crete by government air from Rota

SEABE Team 13310 redeployed from Guam to Gulfport Mississippi

NMCB-133 Pre-Advance Party consisting of one (1) officer and six (6) enlisted departed Rota Spain by MAC to return to Gulfport Mississippi

Seven (7) enlisted of Detail Todendorf returned by government air to Rota Spain from NSGA Todendorf Germany

Four (4) officers and one hundred fifty-five (155) enlisted of Detail Chagos departed Diego Garcia by MAC to return to Gulfport Mississippi

NMCB-133 Advance Party consisting of one (1) officer and seveDty-seven (Tl) enlisted personnel departed Rota Spain by MAC to return to Gulfport Miasisaippi

Details Naples Sigonella Sardinia Greece and Crete returned to Rota Spain by government air

NMCB-lJJ departed Rota Spain by government air to return to homeport in Gulfport Mississippi

Enclosure (2)

I I

-

SIGNIFTC ll NT tVEfHl SlliM Y

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 7: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

UNIT MOVES u 11UY

tncioRUrf ( 2)

26 October 1m

27 Qctober 1972

10 Noyeber 1972

11 November 1972

13 NOT8Jllber 1972

21 Januaa 1973

19 Febryorv 1973

11 April 1973

21 ra1 1973

24 May 1973

2 Jmicrope 1973

9 Jmicrope 1973

3 JulY 1973bull

11 July 193

14 July 1973

UN IT MOVEMENTS

NMCB-133 Detail Chagos Advance Party departed Gulfport for Diego Garcia by MAC

NMCB-133 Advance Party departed Gulfport for Jrurope Tia MAC charter

NMCB-133 Detail Chagos Main Body departed Gulf port for Diego Garcia by MAC

NMCB-133 Main Body departed Gulfport by MAC Charter to Rota Spain

NMCB-133 EUropean details departed Rota by gove[llllent air to uropean detail sites in Sigonella Sicily Naples Italy Nea Makri Greece and Souda Baymiddot Crete

Detail Crete comprised of one (1) officer and tvelTe (12) enlisted departed Souda Bay Crete via government air to return to Rota Spain

Detail Todendorf comprised of eight (8) enlisted departed Rota via government air for Todendort Germany

Fifteen (15) enlisted or Detail Crete redeployed to Souda Bay Crete by government air from Rota

SEABE Team 13310 redeployed from Guam to Gulfport Mississippi

NMCB-133 Pre-Advance Party consisting of one (1) officer and six (6) enlisted departed Rota Spain by MAC to return to Gulfport Mississippi

Seven (7) enlisted of Detail Todendorf returned by government air to Rota Spain from NSGA Todendorf Germany

Four (4) officers and one hundred fifty-five (155) enlisted of Detail Chagos departed Diego Garcia by MAC to return to Gulfport Mississippi

NMCB-133 Advance Party consisting of one (1) officer and seveDty-seven (Tl) enlisted personnel departed Rota Spain by MAC to return to Gulfport Miasisaippi

Details Naples Sigonella Sardinia Greece and Crete returned to Rota Spain by government air

NMCB-lJJ departed Rota Spain by government air to return to homeport in Gulfport Mississippi

Enclosure (2)

I I

-

SIGNIFTC ll NT tVEfHl SlliM Y

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 8: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

26 October 1m

27 Qctober 1972

10 Noyeber 1972

11 November 1972

13 NOT8Jllber 1972

21 Januaa 1973

19 Febryorv 1973

11 April 1973

21 ra1 1973

24 May 1973

2 Jmicrope 1973

9 Jmicrope 1973

3 JulY 1973bull

11 July 193

14 July 1973

UN IT MOVEMENTS

NMCB-133 Detail Chagos Advance Party departed Gulfport for Diego Garcia by MAC

NMCB-133 Advance Party departed Gulfport for Jrurope Tia MAC charter

NMCB-133 Detail Chagos Main Body departed Gulf port for Diego Garcia by MAC

NMCB-133 Main Body departed Gulfport by MAC Charter to Rota Spain

NMCB-133 EUropean details departed Rota by gove[llllent air to uropean detail sites in Sigonella Sicily Naples Italy Nea Makri Greece and Souda Baymiddot Crete

Detail Crete comprised of one (1) officer and tvelTe (12) enlisted departed Souda Bay Crete via government air to return to Rota Spain

Detail Todendorf comprised of eight (8) enlisted departed Rota via government air for Todendort Germany

Fifteen (15) enlisted or Detail Crete redeployed to Souda Bay Crete by government air from Rota

SEABE Team 13310 redeployed from Guam to Gulfport Mississippi

NMCB-133 Pre-Advance Party consisting of one (1) officer and six (6) enlisted departed Rota Spain by MAC to return to Gulfport Mississippi

Seven (7) enlisted of Detail Todendorf returned by government air to Rota Spain from NSGA Todendorf Germany

Four (4) officers and one hundred fifty-five (155) enlisted of Detail Chagos departed Diego Garcia by MAC to return to Gulfport Mississippi

NMCB-133 Advance Party consisting of one (1) officer and seveDty-seven (Tl) enlisted personnel departed Rota Spain by MAC to return to Gulfport Miasisaippi

Details Naples Sigonella Sardinia Greece and Crete returned to Rota Spain by government air

NMCB-lJJ departed Rota Spain by government air to return to homeport in Gulfport Mississippi

Enclosure (2)

I I

-

SIGNIFTC ll NT tVEfHl SlliM Y

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 9: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

I I

-

SIGNIFTC ll NT tVEfHl SlliM Y

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 10: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

28 October 1972

30 October 1972

12 November 1972

12 November 1972

13 November 1972

15 NoTember 1972

16 November 1972

16-26 November 1972

17 November 1972

18 November 192

26 November 1922

1 December 1972

2 December 1972

12 December 1972

SIGNIFICANT EVENTS

NMCB 133 Advance Party arrived in Europe

NMCB 133 Detail Chagos Advance Party arrived at Diego Garc i a

NMCB 133 Main Body arrived Rota Spain

NMCB 133 Main Body Detail Chagos arrived Diego Garcia

NMCB 133 European Details arrive at deployshyment s ites

LCDR HUBEL APWO NAF Sigonella visited Detail Crete site Souda Bay Crete

RADM WALTON COMLANTDIVNAVFACENGCOM vi sited Det~il Crete site

CDR CONNOR CONMCB 133 LTJG McCONNELL Asst Ops Officer and CUCH GOOSENS SEA visited European Detail sites

CAPT FLUSS COMFAIRMED Staff Civil Engineer visited Detail Crete site

RADM ROSENBERG DEPCINCUSNAVEUR and s taff visited Detail Crete site

LCDR MUIR XONMCB 133 and CUCH GOOS~S SEA departed for visit to Diego Garcia detail site

CAPT CL~TS COMCBLANT departed Diego middot Garcia after completing inspecti on tour

Sir BRUCE GREATBATCH Governor of Seychelles Mr JOHN TODD Administrator BIOT and Ambassador ROBINSON McILVAINE American Ambassador to Kenya arrived Diego Garcia

RADM CRAWFORD DEP CoS CI NCEUR visited Detail Crete at Souda Bay Crete to discuss P-729

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 11: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

r 25 December 1972

26 December 1972

8 January 1973

13 January 1973

21 January 1973bull

23-25 January 1973

25 January 1973

25 January 1973middot

8-14 February 1973

12-21 February 1973

12 February 1973

19 February 1973

22-23 February 1973

BOB HOPE Christmas Show entertained at Diego Garcia

CDR CONNOR CO NMCB 133 inspected Detail Crete Souda Bay Crete and Detail Greece Nea Hakri Greece

CDR J E BODAMER Commanding Officer NMCB-74 arrived Diego Garcia with pre-deployment party

BU2 NATHAN K HONAKER named NMCB-133 Seabee of the Month and Diego Garcia Island Sailor of the Month

LT J P PARPER and twelve enlisted departed Souda Bay Crete for Rota Spain leavang Detail Crete in caretaker status of three men on board

NMCB-133 Battalion Mount Out Exercise Bee Alert 1-73 was conducted by CBLANT S-2 LCDR CONNELIE and IDC roLLAR

RADM A R MARSCHALL CEC USN VICE Commander NAVFACENGCOM arrived Diego Garcia

CDR W C CONNOR CEC USN Commanding Officer NMCB-133 departed Rota for tour of detail sites at Naples Italy and Diego Garcia

CDR W C CONNOR Commanding Officer NMCB-133 and CUCM JPA GOOSD(S SEA toured European detail sites

BUC MILTON COMCBLANT Safety Chief completed inspection tour of European de tail sites and main body site

CMC WELK COMCBLANT Equipment Representative completed inspection tour of main body and detail sites

Detail Todendorf departed Rota Spain for NAVSECGRUACT Todendorf Germany to complete the construction of NAVSECGRUACT facilities

CDR W C CONNOR Commanding Officer NHCB 133 and LCDR J E JARVIS Operations Officer NMCB 133 attended Facilities Planning Conference at CINCUSNAVEUR

3-2

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 12: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

5-9 March 1973

8-9 March 1973

17-19 March 1973

17-20 March 1973

27 March 1973middot

4-7 April 1973

6-11 April 1973

7 April 1973

12 April 1973middot

14 April 1973

18 April 1973

19 April 1973

20 April 1973middot

25 April-3 May 1973

CDR W C CONNOR Commanding Officer NMCB-133 and CUCH JPA GOOSENS SEA attended COMCBUNT CO Conference at Davisville R I

C~Seabee birthday celebrated with Seabee Ball and Battalion picnic

CDR R D GlDRGE C~ Detailer visited Main Body site at Rota Spain

RADM A W WALTON COMLANTNAVFACENGCOM visited Main Body site at Rota Spain

Detail Sardinia departed Rota Spain for La Maddalena to install an interim sewage disposal system and recreational facilities

RADM Burke COMSERVLANT visited detail sites at Naples Italy Sigone1la S~cily and Nea Makri Greece

CDR CONNOR CO NMCB-133 visited jobsites in Sigonella Sicily Naples middot Italy and La Maddalena Sardinia

Permission granted to start P-729 project at Souda Bay Crete

CAP RUMBLE OICC Madrid visited jobsite at Todendorf Jermany

ADM ANGELLOZZI Commander Sardinian Naval Command visited Detail Sardinia jobsite

MR CHURCHILL of the U s State Department visited Detail Crete jobsite

CAPT FlUSS COMFAIRMED Staff Civil Engineer visited Detail Sardinia jobsite

CDR CROCKElT of LANTDIV visited Detail Sardinia jobsite

CAP CLEMENTS COMCBLANT CDR CONNOR CO NMCB-133 CUCM BROWN SEA CBLANT and CUCM GOOSENS SEA NMCB 133 toured European detail sites

3-l

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 13: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

7 May 1973

9-11 May l 973

15 Mav 1973

lS-1 8 tiav 1973

16-4 May 19Z2middot

3 J micrope 1973

4 June i97J

5 June 1973

6-17 Jmicrope 1973

9 June 1973

15 Jppe 197)

15 Jmicrope 1973

28 June 1973

1-8 July 193

3-4 Ju1y 1973

5 July 1973

NATO Commission visited Detail Sardinia job site

CDR W C CONNOR CO NMCB-133 visited Detail Cha~os Die~o Garcia

CDR J C CONNOR CO NMCB-133 CUC- GOOENS SKA NMCB-133 11ccompinied CDR LYONcl CO NMCI3-4D anrl his prPd~nlovm~nt party on a tour of the ~uropean 0Ptails

CAPI FLUSS Staff Civil En~i neer COMFAIHMED visited Detail gtardinia jobsite

CDR CROSSON COMCBLNT Operations Officer visited Details in furope

CDH J R WILLIAMS COMC8L4NT RDS Coordinator vis)terl DiPfO Garcia

RADM ROSENBERG Deputy CINCUSNAVEUR visited Detail Crete jobsite

NMCB-133 dvance Party establifhed in Gulfport Mississippi

VADM MICHAELIS COMNAVAIRLANT visited Detail Crete jobsite

Cilt URISH Chief staff Officer COMCBLANT CDR W C CONNOR CO NMCB-13) and CUCM GOOSDS SEA NMCB-133 visited European Detail sites

Detail Chagos redeployed to Gulfport and was disshyestablished

Detail JUllbuck with rAPl T W WALSH CO Naval Bapport Activity Naples and CDR W C CONNOO CO HMCB-133 dedicated the Carney Park Pool

SEABll Team 13310 disestablished

LCDR C R J OKELA relieved LCDR J E JARVIS as Operations Officer of MMCB-1))

CDR W C CONNOR CO NMCB-lJ) visited Details Crete Greece and Naples

NMCB-4C Advance Party arrived

NMCB-40 conmenced BEEP

3-4

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 14: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

-

I

I

l I

7 July 1973

13 July 1973

15 Juli 1973

Sewage Disposal at Santo stefano operational

Turnover to NMCB-40 completed

NMCB-lJJ iaainbody redeployed to Gulfport Mississippi

3-5

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 15: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

ADMINISTRATIVE SuHM Y

lnclosu re (4)

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 16: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

J

MOWTHlI OPERATIOMS RIPOllT A0MIMl5T~ATV( $1J~Y

UNTus NAVAL MOBILE CONSTRUCTION BATTALION ON THIRTY-THREE

AVERAGE FOR DEPLOYMENT --- - -middot I ATTACWB aur tloT T SIT -=-middot-bull914 OM eoAbullo AT

aADE f~r

~00( II MO~f bull1TI DITAILS I $lAM1~ 1rlAlt TAD ~~lltr LbullAW CEC~IPTS TRbullNFbullIU

D1AltaM TS TpoundA ~CMpoundLOlol I I

2 0 0 0 0 0 I 0 0 0 0 0 l-1 I

f-8 I n n n n n n n n n - - - - - -lf-T

0 n ) n n I n - - - - - -- -amp-bull I L I ) n -~ ~ - - 1-S _ n I I n n ) ) - ~ ~ - -If bull4-

I

I I ) L ) n ) 0 - - NOlol ltTIO

I --~ 10 n n 0 _ - - - - - - - -TOTAL

I ~ _ ) 0 n n - - - - OPlll1~US ll 6 1 0 1 middot o 0 0 0 2 3

2 1uIEWL1~TgtlaWTgt TOlALS FOR DEPLOY~ lNT

_ ~IPA1tAT10a5 SlfPfllATIOM abullbullwamplgtT_ampTJ IMTdegpound 11w ~

I ELIClaLf Foll -CIT re-oobullfW Igt elgt

CCbullWLlbullT bullMT llo~ wetw11C-Yo1t1o1r

-OM- ~oN- oampo w- soiImiddot

CIUU~ CAllMlt cAtbullsa

CA~--CAlteelt

cr~en CAlt felt CAUlllt

28 130 21 73 2 11 18 2

Cit$$ AT _ A4T AWA~lgteD ~I A A PeO Cov ltTmiddot AA1L 1i~

01tc1rlllJE ~2 48 0

PAG~

TOTAL A~lloMso

2

I

~

AP -

Lt

-

L

-

r- -22

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 17: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

r MOWnHI Of1lATIOU~ ftlPOkT Al)MILJl~TaATIVi SUMMAkI

r===============

IS degoabullH bull

(SEE NEXT PAGE)

AcTNMTY fRov1D1Nlt tgtbull llT-I lQUAlllI AltTIVITr PllOVIDlbulll6 MUtllt~ QuAlITI CB ONE THIRTY-THREE I ADEQUATE NMCB ONE mIRTY-THREE OUTSTANDING

NSA NAPLES G~D NSA NAPLES POOR NAF SI GONELLA I F IR NAF SIGONELLA GOOD --middot-NCS GREECE MSTANDING NCS GREECE OUTSTANDING NAVDET CRETE QUATE NAVDET CRETE EXCELLENT -NSO LA MADDALENA ADEQUATE USS GILKgtRE GOOD

- - middotmiddot

NAVSGA TODENDORF EXCELLENT NAVDET TODENDORF EXCELLENT ---NMCB 1S 62 amp 74

NMCBS 62 amp 74 DIEGO GARCIA SATTC11A ~ 111y nT11cn lAtgtrTA yrliT TllNt middot- - -

I -- -~- A st IC- ~ bull caui _

TbullAT -o AT

S middot~middot cAtt

ow ca( Li~middot TOgtA

wrw deg cbull~bulll

ToTM VO PAT I hi~ TbTAI Paocrobullbulllt

CAHS TllATbullD - -----

1834 68 7 7 18 805 1746 -7=~=M=~==~T=~=~=~~=1=e=1tv=6=~=11==i=r11= =-=r=t=7r=t=1o1e=1~a=gt=f~===~====11=T=it=~=R=~=L=t=u==-=$~cml=_= =_=w==3==~f=_=~middotT=t=_=-===~=-=_ =u=i1=~--~-n-L1-~~~middot~ -

t llPUlT RllLii i-1~TO~

1bull1gtbull 1~

36

(j oc D coitcgtvltT JllampDAI

35

-~---~------------------middotmiddotmiddot-----------

~~ I 01---48--

3 0 0 1 _0 I 4 10 IAMl~ o P8iti0~~bull1tt Rlcf 1V1t-lc Pi11t1ot1A- orc01tAf1o~s (ATTA~ ccibull1li ormiddot c11middotfll-r1ci~

11cmicroJ111o1~ U~IT ltbullTAT10~bull oR UTTllll 0 A11ifcIAT101L bull ~IATiit ou-reubull ~ cow1 AND

NAVY ACHIEVEMENT EOCS RE CAROTHERS BU2 C L EASTERDAY E03 SR NORK CM3 SL BEHRENS ampWC EO PALMER

NAVY COMMENDATION CECS JS SWINDLE EOC JL FENNELL

MERITORIOUS UNIT COMMENDATION DETAIL WALLABY SEPT 71-MAY 72

Enclosure (4)

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 18: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

MORALE SUMMARY

Morale for the battalion remained at a high level throughout the deployment with minor peaks and valleys as unprogrammed events such as the NAVOP early release action and modifications to our deployment schedule impacted on the troops By and large main body morale showed a steady trend upward largely due to improvements in special services programs and berthing facilities that were achieved The quality of berthing and messing available varied considerably from site to site depending on t he local conditionsand this factor had its effect upon the relative level of morale Mitigating the adverse effects was a positive program of visits to the European detail sites by all levels of main body support elements to ensure that the meds needs were being looked after in the best fashion available Further the challenge of the work at all the sites fostered by each of the detail ores aided immeasureably in maintaining the morale of the men at a high level The maintenance of a liberal leave policy throughshyout the deployment plus the very appealing opportunities for sight- seeing and touring available at the European sites formed a very positive force for high spirits in this theater While these benefits were not available to the men of Detail Chagos in Diego Garcia the challenge of the job and the great leadership exhibited by the officers and chiefs who led this detail were sufficient to keep the morale of our detail at Diego Garcia at an oatstanding level throughout a most taxing deployment

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 19: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

~ SJFET( SUMMA9V

(1) (Z) (~) (4)

VampMlltlf D$A~IMG MAfol lgt-S IR-T AIO

Ac tgtt1S I WiJUln l fl ST 1M~ubull 1bulls

AlI lWll1bull~ M1) T llUo ool

WO lO ~T 1t-4 f

A CMA C-EAa1~

25

0 HCN Ol ~CAbullur JO~

0 47

2 off duty ill c ampTAWD V1 tAP bullTI MllbullT1W6~ 11amp1Igt 271959 p VIU-ltI C LE MILliO C 1 bull N

~ E NU M V 1 Cl VI _ 1ltl 1~ tbull~1diJ1n~

4- 4 Enclosure (4)

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 20: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

JI STO HC fl L STJMM4RY

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 21: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

HISTORICAL SUMMARY

1 November 1972 The month of November marked the beginning of NMCB l 33 s deployment to Rota Spain and to detail sites in Sigonella Sicil y Naples I taly Nea Makri Greece Souda Bay Crete and Diego Garcia The main body arrived i n Rot a from Gulfport Missis sippi on 12 November and on 13 November main body personnel on European details departed Rota for detail sites in the Mediterranean area The main body flight for Diego Garcia departed Gulfport on 10 November arriving at Reindeer Station on 12 November

At the European detail sites ent husiasm was high and crews began working hard on t heir newly assigned tasks Most of the work consisted of turnover work from NMCB Ten and it was readily apparent that many manshydays would be spent on these turnover projects during NMCB 133s deployment

At NAF Sigonella Sicily Detail Sigonella continued work on a Diesel generator building the rehabbing of transient barracks and general mess an Air Passenger Terminal and Air Cargo Terminal and its biggest project the No Break Generator building and office spaces

I n Naples Italy Detail Naples continued turnover work on the Swimming PoolBathhouse at Carney Park

At the NCS Nea Makri Greece Detail Greece started work on installshying an Air Conditioning system in the BEQ and also started work at the T-Site Fuel Tanks Detail Greece continued work at the Diesel Repair Shop

At Souda Bay Crete Detail Crete was delayed in beginning work on the Advance Base facilities The Detai l directed its efforts toward establishing its headquarters a nd shops

Detail Chagos in Di ego Garcia got off to a good start in integratshying its work efforts with the on site battalion NMCB 62 The Detail began work on a wide variety of projects providi ng excellent training for its personnel

The ma in body in Rota Spain was kept busy with several turnover projects at NAVSTA Rota Among these were t he DGF School Communications Dept Operations Building Supply Dept Computer Room RA5C Jet Shop buildings and the Part II Storage at t he Seabee Camp NMCB 133 s Bravo Company began breaki ng ground f or the Gym Addi tion at the DGF school near the end of the month The Battali on also continued Camp Rehab jobs and Alfa Company s operation of t he concrete batch plant bull

2 December 1972 The month of December was the f i rst full mont h f or the Battalion at Rota Spain and at detail sites in Diego Garc i a Sici ly I taly Greece and Crete Production was high during the month even though some work days were lost because of the Holidays Cool weather in Europe did not dampen enthusiasm on the job and job satisfaction for personnel was great

At NAF Sigonella Sicily Detail Sigonella continued its turnover work putting emphasis on the No Break Generator project Heavy rains slowed progress somewhat during the month however the Detail turned to improving its shop spaces during rainy periods

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 22: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

Detail Naples in Naples Italy continued to make excellent progress on the Swimming PoolBathhouse at Carney Park Work was begun this month on the Bathhouse portion of this job

At NCS Nea Makri Greece Detail Greece continued to make good progress on the Air Conditioning installation in the BEQ and also completed some foundation work for the first T-site Fuel Tank to be placed

Detail Crete at Souda Bay Crete continued to be delayed in start i ng work on the Advance Base facilities However the Detail di d some important work for NAVDEI Souda Bay i ncluding i mproving t he BEQ erectshying a Lewis Building installation of a reefer and f Club renoTation

Detail Chagoe awarded the KANGROO-OF-THF-WAUlt in November for its outstanding performance continued t o make good progress on jobs assigned to it in Diego Garcia These included lllQ 1 Air Ops Bldg Sewage Plant and various eart hwor k pro j ects

At Rota Spain the main body conti nued work on several turnover proj ects Among these are t he DGF School Communications Operations Building Supply Department Computer Room and the RA5C J e t Shop build-ings

Bravo Company also started work on t he E-28 Arresting Gear and Alfa continued Batch Plant Operations and work a t the DGF School track and football field

3 January 1973middot Inclement Ye _ther hampered progr ess on some of the Battalions construction projects in Europe during the month of January however good production resulted in spite of this weather The arly release program for enlisted pers onnel als o had an effect on construction efforts during January as t he Batt lions personnel strength r eached the lowes t point of the depl oymebullt

At NAF Sigonel la Sicil y Det ail Si gonella continued work on its several turnover proj ects some of which r equired extensive rework of previously install ed utili ty s ystems Again this month the Detail concentrated its efforts on the No Break Generator proj ect Rains caused t he Detail to cont inue working in mud

Detail Naples in Naples Italy made good progress on the Swi mming PoolBathhouse at Carney Park putti ng forth most of its efforts on the Bathhouse portion of t he project

Detail Greece at NCS Nea Makri Greece devoted much of their effort on the installation of the air conditioning equipment for the BEQ Most of the work involved electrical and piping commections of the AC units thems el ves The Detai l also completed a concrete pour for the foundation ring of the first fuel tank to be erected at the T-Site

At Souda Bay Crete permission to start P-729 has not yet been granted and some personnel have returned to the main body A 3-man caretaker force was left at Souda Bay While the Detail was in Souda Bay it did complete several minor projects for NAVDEI Souda Bay

In Diego Garcia Detail Chagos continued its excellent performshyance working on BOQ 1 Air Ops Bldg RAWIN Building and various earthshywork projects

The main body in Rota Spain was exercised by CBLANT with a Battalion Mount Out drill during the last full week in January and most projects were secured during this period Bravo Company did complete

5 -2

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 23: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

two projects with punch list items remaining These were the Communicashytions Operations Builii~g and the Supply n~partment rom~uter Room Bravo Company continued work at DGF School and RA5C Buildings Alfa Company continued Batch Plant Operations and work at the DGF School track and football field Also Alfa Company placed fill and graded a soccer field for a local Rota school

4 February 1973 The Battalion in Europe experienced better weather during the month of February which made conditions for construction more favorable The early release pro~ram for enlisted personnel conshytinued during February wi t h the last of thes e personnel l eaving near the end of the month The Battalion s personnel stren~th reached a new deployment low t his month

Detail Sigonella at NAF Sigonella Sicily continued its emphashys i s on the No Break Generator project The Detail made good progress on punch list items on other turnover projects however material delivery problems delay completion of most of these projects

At NCS Nea Makri Greece Detail Greece completed the Air Condishytionin~ of BEQs except for balancing and testing The Detail began t o dismantle the second fuel tank at the T-site and began installation of fuel lines

Detail Naples continued to make good progress at Carney Park Italy on the Swimming PoolBathhouse project most of the work involving CMU walls and rou~h in utilities on the Bathhouse

Durin~ February Detail Todendorf consisting of eight (8) enlisted personnel departed Rota Spain to complete construction for NAVSEXGRUACT Todendorf Germany The construction involves generator installation and an addition to an existinp b11ilding

A 3-man caretaker force remained at Souda Bay Crete receivin~ materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been ~ranted

Detail Chagos in Diego Garcia continued work on the Sewa~e Plant Air Ops Building Regulator Vault BOQ 1 and Road Maintenance Work on BOQ 2 was also started

In Rota Bravo Company put most of its effort into the Rota School Gym Addition project continuing work on punch list i t ems at the DGF School Computer Room and Ops Buildin~ Alfa Company completed most of its work at the DGF school track and began a new project ExploratorY Wells for NAVSTA Rota

5 March 1973 The Battalion in Europe became more dispersed during the month of March with the establishment of Detail Sardinia at La Maddalena Sardinia The detail comprised of one (1) officer and twelve (12) enlisted personnel is tasked with construction of an interim sewage disposal system and recreational f~ cilities ~hi s brou~ht the tot al number of details detached from the Main Body to seven

Inclement weather at NAF Sigonella Sicily hampered the Construcshytion progress of Detail Sigonella Several turnover jobs are still awaiting materials for comnletion The Detail started site prep on SIC-24 this month

5 - 3

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 24: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

At NCS Nea Makri Greece Detail Greece dismantled tank No 2 at the T-site and began foundation work for the new tank Installation of piping for this job GRE-22 was continued

Detail Naples continued work at the Swimming PoolBathhouse at Carney Park Italy with several items of construction being worked on including placement of the concrete roof slab at the equipment room

Detail Todendorf placed its construction effort on GER-01 Buildshying 1522 Addition Most of the work involved finish carpentry finish electrical and finish utilities

A 3-man caretaker force at Souda Bay Crete continued receiving materials and cycling equipment for Detail Crete Permission to start P-729 has not yet been granted

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

In Rota Bravo Company continued its work on the School Gym Addition RA5C Shops and DGF School punch list items Material delivery delays precluded the completion of the Computer Room and Ops Building projects Alfa Company continued its Exploratory Wells for NAVSTA Rota as vell as Batch Plant Operations

6 April 1973 During April permission to start the P-729 project at Souda Bay Crete was granted and Detail Crete redeployed to the project site from the Main Body at Rota Spain Overall the Battalion enjoyed better production during the month mainly due to full employshyment of personnel at all detail sites and warmer weather conducive to construction

Detail Sigonella at NAF Sigonella continued to make good progress on the No Break Generator project while continuing effort on several other projects Foundation work r~ SIC-24 was completed

At NCS Nea Makri Greece Detail Greece continued assembling the walls of T-Site Tank No 1 while nearly completing the foundation work for Tank No 2

Detail Naples working at the Swimming Pool at Carney Park Italy continued plastering work at the bathhouse along with several other items of work towards completion of the total project

The Building 1522 Addition at Todendorf Germany was completed by Detail Todendorf during April The Detail continued work at GER-02 looking to complete it in May

Detail Sardinia at Santo Stefano Sardinia encountered some necessary design changes in the Sewage Disposal project this delaying the desired completion date

In Diego Garcia Detail Chagos continued work on the Sewage Plant BOQ 1 BOQ 2 RAWIN building and on the Air Ops Building

Bravo Company placed its emphasis on the Gym Addition at Rota Spain and continued work at the RA5C shops Minor necessary projects aroUAd the SEABEE camp were also completed Alfa Company continued its Batch Plant Operations Well Drilling and other smaller grading jobs around NAVSTA Rota

5-4

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 25: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

r 1- 7 May 1973 Durin~ May the P-72q Project at Souda Bay Crete

moved Alon~ well with Detail Crete h~ving all three buildings in various sta~es of construction Sidin~ and roofin~ were completed on the first building while subslab utilities were bein~ completed on the t hird buildin~

At Nea Makri Greece T-Site Tank number 1 was tested and painted by Detail Greece and site preparation for the Security Post Office Building was be~un

At NAF Si~onella the emphasis remained on the No Break Generator pro~ect with Detail Sigonellas placement of the founshydation for the Phase II Building Projects SIC-16 and SIC-19 were turned over to NAF Si~onella

The Sewa~e Disposal project a t Santo Stefano Sardinia wa s completed by Deta il Sardinia except for one hose connection to the s hip On SAR-02 work was sta rted on the forming for th f Recreation Court slab

Detail Todendorf at Todendorf Germany was reduced due to material problems on GErt- 02 One man who is returnin~ 1 June 73 was left behind for final equipment a djustments

At Rota Spa in Bravo Company continued emphasis on the Gym Addition and added effort to the RA5C Jet Shop due to an increased number of personnel work was also begun on the Commissar~ Additshyion Alfa Company continued Well Drillin~ Batch Plant Operations and Site Preparation on the Acey-Deucy Club

Detail Naples continued w~~k on the Swimmin~ Pool and Bathshyhouse at Ca rney Park Italy Test of the pool was begun a nd s ome leaks were encountered Repairs are now being accomplished

Detail Chagos at Diego Garcia c ontinued work on the SewaFe Lagoon BOQ 1 BOQ -1-2 t he lir Ops Buildinp and the wet well at the Desa l Plant The RAWI N Building RDS 68 has been occupied

8 June 1973 nle highpoint of June was the dedication of the Garney Park Pool a t tTaple s Italy by Oiptain T W Walsh Commanding Officer Naval Support Activity Na ples on 15 June

Detail Crete at Souda Bay continued the P-729 Project by startshying site prep on BEQ nuTber 4 and erection of the PW shop

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty

5 - - 6

-

Page 26: Deployment Completion R rt - United States Navy · 2016-11-19 · CDR CONNOR, CONMCB 133, LTJG McCONNELL, Ass't Ops Officer, and CUCH GOOSENS, SEA, visited European Detail sites.

At Nea Mlkri Greece fabrication of T-Site Tank I 2 was started and disassembly of the last remaining old tank vas beshygun On the SecurityPost Office Building subslab utilities were installed and oae half of the slab was poured

After relocatiag the playing court Detail Sardinia began forming the slab and setting feace posts for its fence The Sew age disposal project i3 still awaiting float material for its completion

At Rota Spain Alfa Compaay paved the area around the Part II Storage Buildiags as well as coatinuing work on the Acey-Deucy Club site and the Ord11ance Area Security Project Bravo Company made significant progress on the RA5C Buildings as well as conshytinuiag emphasis on the Gym Extension

The ~o Break Generator project at Sigonella Sicily conshytinued to receive the emphasis of Detail Sigonella Phase I is now 100 percent aad has been accepted and backfilling aad comshyptcting continue oa Phase II

9 July 1973 July was the last month of tmCB-133 s deploy-ment to Europe The first two weeks of the moath were spent turning over the various deployment sites to NMCB-4obulls mainbody arrived and NMCB-133 departed for Gulfport ~ississippi where they spent the remainder of the month eajoying post deployment leave and liberty