HYDRAULIC FRACTURING. DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING ) - PowerPoint PPT Presentation
Popular Tags:
29
Transcript
Page 1: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )
Page 2: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

DESCRIPTION OF HYDRAULIC FRACTURING (FRACKING)

The operation entails using special pump/compressor pipes to pump highly viscous fluid (gel) based on water or hydrocarbons (petroleum, diesel fuel) into the well. The pressure created by the fluid fractures the formation along minimum stress planes of overburden pressure. As a result, a fracture forms in the formation. After fracking the fracture keeps growing as more fluid is pumped into the well.

When the fracture grows to a particular size, propping agent (proppant) is fed into the fracking fluid (artificial bauxite sand with spherical particles). The fluid takes the proppant to the fracture. The proppant must hold the fracture open when the pumping stops and the overpressure is withdrawn. At the final stage the gel pushes the proppant, which remains in the well after filling the fracture, into the formation.

In this way, by creating a proppant-filled fracture, formation volume drained by the well is expanded, previously untapped deposits are connected, and a high-throughput channel is formed to deliver oil into the well. This allows to increase the flow rate of the well several-fold (average increase for oil is 3-fold), increase the recovery ratio of the formation thus turning a part of non-commercial OIP into commercial oil reserves.

HYDRAULIC FRACTURING

Page 3: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

RUSSIAN HYDRAULIC FRACTURING SPREAD

FOR OIL AND GAS FORMATIONS

Page 4: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

HYDROFRACKING SPREAD LAYOUT DIAGRAM

1 – SKU-10; 2 – UN-2250; 3 – US-10; 4 – BM-105; 5 – MM-105; 6 – gel tank; 7 – proppant bunker.

Page 5: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

HYDRAULIC FRACTURING SPREAD

AUTOMATED CONTROL AND MONITORING SYSTEM The spread facilitates automated (computerized) control of the hydrofracturing

process under oversight of the operations manager, the engineer, and the operator of the UN-2250 pumping unit, who are present at the SKU-10 monitoring and control station. It also enables visual monitoring of fracking parameters on three monitors and the main control panel of the SKU-10station, as well as on the US-10 blender.

Hydrofracking process parameters can be adjusted manually throughout the process; it is also possible to switch to manual control completely.

Components of hydrofracturing process control and monitoring (incl. visual) of fracking parameters are combined into the SAUK automated control and monitoring system, including:• System software• 2 industrial computers of the SKU-10 station • Three monitors of the SKU-10 station • Common control panel for pumping units in the SKU-10 station• Printer of the SKU-10 station• 1 industrial computer of the US-10 blender• Coupling hardware unit of the US-10 blender• Control and monitoring panel with a monitor and manual controls of the US-10

blender

Page 6: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

SKU-10 MONITORING AND CONTROL STATION

Page 7: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

SKU-10 MONITORING AND CONTROL STATION

The SKU-10 monitoring and control station automatically controls the UN-2250 (UN) pumping units and the US-10 blender as part of hydraulic fracturing of oil and gas formations. It maintains, as specified by industrial computer software or the operator, set points for working fluid and dry and liquid chemicals, and proppant concentration. It also monitors and logs parameters (direct and calculated), archives behavior and operating parameters of the spread, and logs behavior and operating parameters on paper media. Climatic category “U1” (temperate climate, outdoors) GOST 15150-69.

Page 8: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

SKU-10 MONITORING AND CONTROL STATION

TECHNICAL DETAILS

No. Parameters Values1. Special van truck (on MAZ-5336A5-320 chassis)

1.1 Fully loaded mass (operating weight), not more than 120001.2 Number of compartments in the van 21.3 Number of workplaces 41.4 Number of seats for customer representatives (supervisors) 31.5 Main power supply from external 220V grid or own generator  1.6 Supplementary power supply 24VDC from truck battery  1.7 Equipment of the van  

1.7.1 Diesel generator (220V, 9000W), quantity: 1 1.7.2 Air conditioner (220V, 2000W), quantity  11.7.3 Autonomous diesel air heater (24V), quantity  21.7.4 Electric heater, wall-mounted (220V, 1500W), quantity  21.7.5 Cabinet with fume hood for laboratory tests, quantity 11.7.6 Cabinet for computer hardware units , quantity 1

2 Special electrical equipment of the SKU2.1 Common control panel of the UN, quantity 12.2 Industrial computer, quantity 22.3 Monitors, quantity 32.4 Printer, quantity 12.5 50m cable reels, quantity 102.6 Stationary/remote projectors, quantity 4/2

TECHNICAL DETAILS

No. Parameters Values1. Special van truck (on MAZ-5336A5-320 chassis)

1.1 Fully loaded mass (operating weight), not more than 12000 kg1.2 Number of compartments in the van 21.3 Number of workplaces 41.4 Number of seats for customer representatives (supervisors) 31.5 Main power supply from external 220V grid or own generator  1.6 Supplementary power supply 24VDC from truck battery  1.7 Equipment of the van  

1.7.1 Diesel generator (220V, 9000W), quantity: 1 1.7.2 Air conditioner (220V, 2000W), quantity  11.7.3 Autonomous diesel air heating (24V), quantity  21.7.4 Electric heater, wall-mounted (220V, 1500W), quantity  21.7.5 Cabinet with fume hood for laboratory tests, quantity 11.7.6 Cabinet for computer hardware units , quantity 1

2 Special electrical equipment of the SKU2.1 Common control panel of the UN, quantity 12.2 Industrial computer, quantity 22.3 Monitors, quantity 32.4 Printer, quantity 12.5 50m cable reels, quantity 102.6 Stationary/remote projectors, quantity 4/2

Page 9: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

COMPONENTS AND EQUIPMENT OF SKU-10Cabinet withfume hood

Rack with computingequipment

Common control panelof the UN

Air conditioner

UN operatorOperationsmanager

Supervisor

Process engineer

Laboratory chemist

Page 10: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

COMPONENTS AND EQUIPMENT OF SKU-10

Diesel generator

Cable reels

Coupling socketboard

Page 11: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

SKU-10 MONITORING AND CONTROL STATIONSCHEDULE OF MONITORED AND LOGGED PARAMETERS OF THE FRACKING PROCESS

Time and pressure parameters- Date, time, Customer, Contractor, field, well, planned fracking parameters.- Pumping pressure 1 (BM-105), mPa. (max 85mPa)- Pumping pressure 2 (UN-2250), mPa (max 85 mPa)- Casing pressure, mPa (max 20 mPa)

Mixture flow rate and totalizers- Flow 1 at US mixer outlet, m3/min (max 15 m3/min)- Flow 2 at US mixer outlet, m3/min (max 15 m3/min)- Flow 3 at UN No. 1...4 pumping unit tachometers, m3/min (max 15 m3/min)- Mixture totalizer for flow 1 at outlet, m3

- Mixture totalizer for flow 2 at outlet, m3

- Mixture totalizer for flow 3 at tachometers, m3

Pure fluid flow and totalizers- Flow 1 at US inlet, m3/min- Flow 2 at US inlet, m3/min- Pure flow totalizer for flow 1 at US-10 inlet, m3- Pure flow totalizer for flow 2 at US-10 inlet, m3 - Total volume of pumped pure fluid from tanks, m3

Proppant concentration and totalizers- Proppant concentration 1 (acc. to density meter), kg/m3

- Proppant concentration 2, kg/m3

- Proppant totalizer 1, kg- Proppant totalizer 2, kg- Proppant totalizer 3, kg- Proppant delivery rate deriv. from rpm, screw conveyor

1 kg/min- Proppant delivery rate deriv. from rpm, screw conveyor 2 kg/min- Proppant delivery rate deriv. from rpm, screw conveyor 3 kg/min- Proppant totalizer, deriv. from rpm of screw conveyors 1, 2, 3 kg- Total mass of pumped proppant, kg Concentration of liquid and dry additives and totalizers- Flow rate of liquid additive 1, l/min- Flow rate of liquid additive 2, l/min- Totalizer for liquid additive 1, l- Totalizer for liquid additive 2, l- Delivery rate of dry additive. Screw conveyor 1, kg/min- Delivery rate of dry additive. Screw conveyor 2, kg/min- Totalizer for dry additive. Screw conveyor 1, kg- Totalizer for dry additive. Screw conveyor 2, kg- Total mass of pumped dry additive, kg

Page 12: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

SKU-10 SOFTWAREMONITORING AND DIAGNOSTICS OF HYDROFRACKING PROCESS

Page 13: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

SKU-10 SOFTWARERAW DATA INPUT GRAPHICAL REPRESENTATION OF HYDROFRACKING

REPORT GENERATION

Page 14: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

UN-2250 PUMPING UNIT

Page 15: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

UN-2250 PUMPING UNIT

The UN-2250 pumping unit is designed for the pumping of working fluid or working fluid–proppant mixtures into the well under pressure and with performance sufficient for hydraulic fracturing of deposits, and to effect hydraulic, sand jet, or chemical treatment of bottom-hole area at oil and gas fields. Climatic category “U1” (temperate climate, outdoors) GOST 15150-69.

The UN-2250 provides the following functionality:- Automated hydrofracturing operation

- Automated transmission gear shifting without breaking the power path and managing gas turbine engine operating modes.

- The common control panel allows smooth adjustment of SKU test pressure for manifolds and pump/compressor pipes, created by the UN in the 0...85 MPa range.

- 0...2.5 m3/min smooth adjustment range of UN pumping rate at the common control panel on the SKU.

- Automatic maintenance of constant pumping rate (regardless of the differential pressure caused by the well) on command from the common control panel to the SKU.

- Automated integrated monitoring of UN units and systems.

- Halting the pumping of working fluid into the well if maximum well pressure protection is tripped, without stopping the gas turbines.

Page 16: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

UN-2250 PUMPING UNITTECHNICAL DETAILS

No. Parameters Values1 Chassis MAZ 6303A52 Total mass of the UN (operating weight), not more than 29600 kg3 Mass of the process equipment (operating weight), kg 19500 kg4 Power unit: two gas turbine engines with auxiliary systems in a monolithic unit.

4.1 Engine specification GTD-12504.2 Maximum power of one engine, h.p. 12504.3 Specific flow of fuel at maximum power, g/h.p.·h. 2354.4 Mass of a single engine in a monolithic unit (with systems), kg 15004.5 Fuel diesel fuel,

TS, RT5. Mechanical transmission with electric-hydraulic gear shifting, including two

planetary gearboxes and compound gear train.5.1 Number of gears in transmission 46. Plunger pump6.1 Model NTP-22506.2 Number of plungers 36.3 Plunger diameter, mm ( ) 127 (5.0)6.4 Maximum performance, m3/min 2.56.5 Maximum working fluid pressure, MPa 85

Page 17: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

UN-2250 PUMPING UNITPERFORMANCE DIAGRAM

The diagram shows flow rates,at which the automated operating modes control system shifts gearsof KP1 and KP2

Page 18: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

Fuel tank

GTD-1250gas turbine engines

NTP-2250 pump

Automatictransmission

Tank of the NTP-2250 power endlubrication system

EQUIPMENT OF THE UN-2250 PUMPING UNIT

Enginecontrol drive

Page 19: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

EQUIPMENT OF THE UN-2250 PUMPING UNIT

Coupling

Air system tanks

Engine startupequipment

Rechargeablebatteries

Plunger seal lubrication system

Page 20: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

REMOTE CONTROL PANEL OF THE UN-2250

Operational monitoringof systems

Switching of processmodes

Automated flow set point maintenance

Automatic overpressureprotection

Mon

itorin

g of

ope

ratin

g pa

ram

eter

s Switching of control m

odes

Page 21: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

NTP-2250 PLUNGER PUMP

Maximum power: 2250 h.p.

Page 22: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

US-10 BLENDER

Page 23: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

The Mixing Unit is designed for preparing working fluids and mixtures as part of mobile systems for hydraulic fracturing and delivery of fluids and mixtures to the UN unit during hydraulic conditioning of the well bore area at oil fields.

The Mixing unit allows:- Automated operation in fluid, mixture preparation modes and hydrofracturing mode- Preparation of working fluids and mixtures using guar gum powder, activators,

thickeners, clay stabilizers, demulsifiers, crosslinkers, bulk chemicals, breakers, proppants- Adjustable supply of liquid chemicals when preparing working fluids and delivering

fluids and mixtures to the UN during hydrofracturing- Adjustable supply of breaker and proppant to the ingress bunker of the mixer during

hydrofracturing.

US-10 BLENDER

Page 24: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

TECHNICAL DETAILS

No. Parameters Values1 Chassis (heavy duty semitrailer), model 946222 Fully loaded mass of the US (operating weight), kg 214003 Power unit

3.1 Engine specification YaMZ 3.2 Number of cylinders 123.3 Nominal power at 2100 min-1, kW (h.p.) 500 (680)4 Power takeoff mechanism with gear train, model AM450VD BD 3300

TECHNODRIVE5 Technical details of process equipment

5.1 Maximum process fluid flow rate, m3/min 105.2 Working gauge pressure in discharge header of the US, not less than,

MPa 0.2

5.3 Proppant delivery rate through the US mixer, t/min 0.1...65.4 Liquid additives flow rate, l/min 0.5...205.5 Dry additive (breaker) delivery rate:  5.6 - 1st range, kg/min 0.5...4.05.7 - 2nd range, kg/min 3.0...30.05.8 Bulk chemical (guar gum powder) delivery rate, kg/min 1.0...25.05.9 Maximum proppant concentration, kg/m3 1800 

US-10 BLENDER

Page 25: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

COMPONENTS AND EQUIPMENT OF US-10Diesel drive

Liquid additive tanks

Mixer

Proppant deliverymechanism

Aspirator pump

Controlled-volume pumps

Liquid additiveflow meters

Page 26: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

COMPONENTS AND EQUIPMENT OF US-10

Dry additive introduction mechanism

Force pump

Electromagneticflow meter

Turbineflow meter

Densitymeter

Page 27: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

US-10 CONTROL SYSTEM

The US-10 operation control system automatically provides:

- Scheduled flow of working fluids (mixtures) during preparation and hydrofracturing

- Scheduled flow of liquid additives during fluid and mixture preparation and delivery to

the UN unit

- Scheduled introduction of dry additives (breakers) into fluids and mixtures during

hydrofracturing

- Scheduled proppant concentration in the mixture during hydrofracturing

- Processing of instrument data and transmitting data to the SKU

If necessary, the operator may quickly switch to manual operation on the monitoring and

control panel in the US cabin.

Page 28: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

US-10 MONITORING AND CONTROL PANEL

Hydraulic systemmonitoring

Operating parametersdisplay

YaMZ enginecontrol panel

Valvecontrol

US electric equipmentcontrol

Controlmodeswitch

Manualcontrol

of processequipment

Page 29: DESCRIPTION OF HYDRAULIC FRACTURING ( FRACKING )

US-10 CONTROL SOFTWARE INTERFACE