+ All Categories
Home > Documents > Design, Analysis, d M f t i and Manufacturing

Design, Analysis, d M f t i and Manufacturing

Date post: 11-Feb-2017
Category:
Upload: trantu
View: 214 times
Download: 1 times
Share this document with a friend
49
MGSE Design, Analysis, dM f t i and Manufacturing
Transcript
Page 1: Design, Analysis, d M f t i and Manufacturing

MGSE

Design, Analysis, d M f t iand Manufacturing

Page 2: Design, Analysis, d M f t i and Manufacturing

PAGNOTTA ENGINEERING, INC. COMPANY BACKGROUND

• Incorporated in June of 1996OUR MISSION • Based in Exton, PA

• Company founders have extensive experience in:» Architectural/Civil since 1980

» Aerospace Industry since 1982

OUR MISSION:To provide quality mechanical design and analytical services to our customers. We provide

» Aerospace Industry since 1982

» Vehicle Simulation Structures since 1991

• Since incorporation, PEI has completed over 400 projects in Architectural/Civil, Aerospace, Vehicle

creative solutions to complex problems utilizing both our

unique experience and cutting edge computer technology.

Simulation, Medical and Consumer Products, Power Generation, and other industries

• Please visit www.pageng.com for more information on our services experience and

We strive to exceed our customers expectations in

order to maintain our outstanding reputation. information on our services, experience and

personnel

Slide 2

Page 3: Design, Analysis, d M f t i and Manufacturing

PAGNOTTA ENGINEERING SERVICES AND CAPABILITIES

• Stress Analysis and Optimization• Dynamic, Fatigue, and Fracture Analysis• Program and Vendor Management• Conceptual and Detailed Design Engineering• CAD Modeling (3-D Parametric Solid, Surface, and Wireframe)• Thermal and Non Linear Structural Analysis• Thermal and Non-Linear Structural Analysis• Mechanism Design and Analysis• Material Process and Testing Coordination• Manufacturing Detail and Assembly DrawingsManufacturing Detail and Assembly Drawings

PRIMARY ENGINEERING SOFTWARE TOOLS:PRIMARY ENGINEERING SOFTWARE TOOLS:Design: Pro/Engineer, SolidWorks, AutoCAD Inventor

Analysis: NASTRAN, FEMAP, NASGRO

Slide 3

Page 4: Design, Analysis, d M f t i and Manufacturing

PAGNOTTA ENGINEERING: FOUR LEVELS OF SUPPORT

• Short-term overflow support– Allows the customer to avoid severe peaks in manpower needs– No long-term contract requirements as with job shops

• Long-term, fixed-price support– For well-defined scope– PEI takes ownership of the engineering, not just a “task doer”

• Turnkey solutionsD i l i d di ti / t f f t i d– Design, analysis, and coordination / management of manufacturing vendors

– Complete solution and delivery of hardware

• On-site engineering supportOn site engineering support– Allows for regular interaction with customer personnel

Slide 4

Page 5: Design, Analysis, d M f t i and Manufacturing

PAGNOTTA ENGINEERING: INDUSTRIES SERVICED

Industries Serviced as a Percentage of Total Contract Awards

Industries Serviced: Percentage of Total Number of Contracts

MISC*4%

CIVIL STRUCTURES5%

COMMERCIAL PRODUCTS8%

POWER GENERATION5%

Industries Serviced: Percentage of Total Number of Contracts

MISC*

8%

CONSUMER PRODUCTS3%

DEFENSE HARDWARE2%

DER CONSULTINGMGSE FOR SPACE FLIGHT

SPACE FLIGHT HARDWARE20%

CIVIL STRUCTURES

COMMERCIAL PRODUCTS

CONSUMER PRODUCTS

DEFENSE HARDWARE

DER CONSULTING

FLIGHT SIMULATION

13%

FLIGHT SIMULATION17%

GENERAL AVIATION7%

INDUSTRIAL PRODUCTS3%

MGSE FOR SPACE FLIGHT HDWR13%

GENERAL AVIATION

INDUSTRIAL PRODUCTS

MGSE FOR SPACE  FLIGHT HDWR

SPACE FLIGHT HARDWARE

POWER GENERATION

* MISC = UTILITIES, AUTOMOTIVE, MEDICAL, ENTERTAINMENT, RESEARCH

Slide 5

Page 6: Design, Analysis, d M f t i and Manufacturing

RECENT CLIENTS

• Lockheed Martin……………………….……..Orlando, FL; Newtown, PA; Valley Forge, PA

• Orbital Sciences Corp……………….....……Dulles, VA; Greenbelt, MD

• Alphaport, Inc………………………………….Cleveland, OH

Si N d C ti• Sierra Nevada Corporation………………….Hagerstown, MD

• Rockwell Collins / STS……………………….Sterling, VA; Binghamton NY

• Boeing…………………………………………..Ridley Park, PA

• Northrop Grumman Baltimore MD• Northrop Grumman……………………..…….Baltimore, MD

• Keystone Helicopters……………………..….Coatesville, PA

• NASA Langley…………………………….……Hampton, VA

• PMC Engineering….….………………….……Pottstown, PAg g ,

• Environmental Tectonics Corp.…………….Southampton, PA

• JRL Ventures………………............................Cape Coral, FL

• J.F. Taylor, Inc………………..………………...Lexington Park, MD

• Eagle-Picher Technologies, LLC……………Joplin, MO

• Flight Safety International……….……..........St. Louis, MO; Austin, TX

• Fibertek, Inc……………………………………..Herndon, VA

Slide 6

Page 7: Design, Analysis, d M f t i and Manufacturing

ABBREVIATED LIST OF MGSE PROJECTS

• Spacecraft L-Fixture (LOCKHEED MARTIN)

• Payload Module Shipping Fixture (OSC)

• Analysis of B-SAT 3B Antenna L-Fixture(LOCKHEED MARTIN)

• Design and Analysis of AMC-21 Payload Module Shipping Fixture (OSC)

• Analysis of PIM Fixture, South Feed (LOCKHEED MARTIN)

• Analysis of Jitter Air Spring Assembly (LOCKHEED MARTIN)(LOCKHEED MARTIN)

• Analysis of Motorized Spacecraft Pivot Shipping Fixture (OSC)

• Design and Analysis of TVAC Rail System (OSC)

D i d A l i f MUOS M M d l

y p g y ( )

• Analysis of Raymond Platform (LOCKHEED MARTIN)

• Structural Analysis of ECHO-X Tooling Fixtures(LOCKHEED MARTIN)

• Design and Analysis of Single GPHS Test Stand• Design and Analysis of MUOS Mass Model(LOCKHEED MARTIN)

• Analysis of Range Fixture for JCSAT 12(LOCKHEED MARTIN)

D i d A l i f St 2 4 I t ti D ll

• Design and Analysis of Single GPHS Test Stand(ALPHAPORT)

• Design and Analysis of Motorized Spacecraft Pivot Shipping Structure (OSC)

• Analysis of Lift Beam Extensions (OSC)• Design and Analysis of Star 2.4+ Integration Dolly(OSC)

• Design and Analysis of Falcon MGSE Hardware including Multi-Use Dolly, L-Fixture, and Lifting Beams

• Analysis of Lift Beam Extensions (OSC)

• Analysis of Various Hardware Support Equipment (vibe plates, TVAC Plates, battery handling and shipping fixtures) (LOCKHEED MARTIN)

• Analysis of Various Fixtures for GPSIIIBeams (LOCKHEED MARTIN)

• Design and Analysis of STAR 2.4+ Core Shipping Fixture (OSC)

• Analysis of Sirius S4 Lifting Fixtures (LOCKHEED MARTIN)

• Analysis of Various Fixtures for GPSIII(LOCKHEED MARTIN)

• Design and Fabrication of GPSIII Mass Models(LOCKHEED MARTIN)

Slide 7

Page 8: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

PEI responsibilities: design analyze fabrication drawings

Satellite L-Fixture for Lockheed Martin

PEI responsibilities: design, analyze, fabrication drawings, manufacture, test, deliver finished product, FFMEA

L-FIXTURE:• 20 FEET LONG• WEIGHT = 3500 LBSWITH PROOF

WEIGHT

WITH SATELLITE

Slide 8

Page 9: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

S t llit L Fi t f L kh d M ti

HornAbsorber

S/C Mass Element(61.38 in. offset forL-Fixture interface plate)

PID 3 –Vertical I-Beams

Satellite L-Fixture for Lockheed Martin

Mass PID 2 - Lateral I-Beams

Cold PlateMass Elements

PID 11

PID 4 -Horizontal I-Beams PID 11 –

S/C Interface Plate

I-Beams

PID 41 & 42 -Detailed I-Beam mesh

PID 12 & 13PID 12 & 13 -Caster Interface

Constraintat caster axle

PID 21-23 Jack Interface

PID 6 Jack Beam

PID 5 -Diagonal I-Beams

LongitudinalI-Beams

Slide 9

PID 6 Jack Beam P1404-LFrame-CDR-05.MOD

Page 10: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Satellite L-Fixture for Lockheed Martin

Mike Pagnotta, President Brian Dreibelbis, Staff Engineer

Slide 10

Page 11: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

• OSC needs to safety ship their AMC-21 S/C Payload Module (PM) t Al t l (E t ) f i t l ti

AMC-21 Payload Module Shipping Fixture for Orbital Sciences Corp. (OSC)

(PM) to Alcatel (European customer) for equipment population.

• The populated PM must then be shipped back to OSC for integration.PEI contracted to develop the shipping fixture• PEI contracted to develop the shipping fixture

Design Requirements:» Fit in standard 747 shipping container» Fit in standard 747 shipping container

» Meeting OSC MGSE strength requirements:- Sine-sweep response analysis

- Random (PSD) spectrum ( ) presponse analysis

- Shock response analysis

- Quasi-static load cases

+ =

Slide 11

Page 12: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

AMC-21 Payload Module Shipping Fixture for Orbital Sciences Corp.

Sine Response, 1.3GY input, N101 (CG)

4 50

Sine Response, 1.3GY input, N101 (CG)

Fabricated 2 00

2.50

3.00

3.50

4.00

4.50

onse

[g's

]

RSS-magX-magY-magZ-magInput

shipping fixture mounted to shipping container base

0.00

0.50

1.00

1.50

2.00

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00

Resp

o

PEI

MODE FREQNO. [Hz] T1 T2 T3 R1 R2 R3

1 5 192 0 498 0 014 0 000 0 013 0 514 0 000

MODAL EFFECTIVE MASS FRACTION

base 0 00 5 00 0 00 5 00 0 00 5 00 30 00 35 00 0 00

Frequency [Hz]designed the handling frame too!

1 5.192 0.498 0.014 0.000 0.013 0.514 0.0002 5.349 0.014 0.542 0.000 0.472 0.013 0.0003 10.450 0.000 0.000 0.000 0.000 0.000 0.9974 10.482 0.000 0.000 0.999 0.000 0.000 0.0005 12.889 0.488 0.000 0.000 0.000 0.472 0.0006 13.221 0.000 0.440 0.000 0.511 0.000 0.000

Sum = 1 000 0 997 1 000 0 997 1 000 0 998

Payload module being lowered over shipping

fixture

Slide 12

Sum 1.000 0.997 1.000 0.997 1.000 0.998

Page 13: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Handling Frame with Payload Module

Slide 13

Page 14: Design, Analysis, d M f t i and Manufacturing

Fi it El t A l i f P l d H dli F f OSC

EXAMPLES OF MGSE ENGINEERING SERVICES

Finite Element Analysis of Payload Handling Frame for OSC

Detail of stiffening gussetgusset

Rendered FE model of fixtureFE d l f fi t ith l d

Slide 14

FE model of fixture with payload

Page 15: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Flotron Turnover Configuration

Slide 15

Page 16: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Handling Frame Supporting Payload Module at OSC Facility

Slide 16

Page 17: Design, Analysis, d M f t i and Manufacturing

Payload Module Handling Fixture on Flotron

EXAMPLES OF MGSE ENGINEERING SERVICES

Payload Module Handling Fixture on Flotron

Slide 17

Page 18: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Handling Frame Supporting Payload Module During Flotron Turn-over Operations at OSC Facility

Slide 18

Page 19: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

56 5656 56123456123456123456123456

31

Finite Element Analysis of Payload Handling Frame for OSC, Turn-over Configurations

151” 167”

4564565656

44444444444444444444444444

44444444444444444444444444

Y

X Y

Z

456456456456

12

X

Y

Z

X

Y

Z

Slide 19

Page 20: Design, Analysis, d M f t i and Manufacturing

L Frame for Orbital Sciences Corporation (OSC)

EXAMPLES OF MGSE ENGINEERING SERVICES

L-Frame for Orbital Sciences Corporation (OSC)

• PEI developed fixture per OSC internal requirements.

• Created 3D design model and all manufacturing drawingsCreated 3D design model and all manufacturing drawings

• Performed all stress analyses

L-Frame Spacecraft

Fixture

Slide 20

Page 21: Design, Analysis, d M f t i and Manufacturing

L F W ld d A bl

EXAMPLES OF MGSE ENGINEERING SERVICES

L-Frame Welded Assembly

Slide 21

Page 22: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

L-Frame Turn-over Configuration

Slide 22

Page 23: Design, Analysis, d M f t i and Manufacturing

L F ith P l d

EXAMPLES OF MGSE ENGINEERING SERVICES

L-Frame with Payload

Slide 23

Page 24: Design, Analysis, d M f t i and Manufacturing

Thermal-Vacuum (TVAC) Chamber Rail and Exterior Hoist Structure for Orbital

EXAMPLES OF MGSE ENGINEERING SERVICES

Thermal Vacuum (TVAC) Chamber Rail and Exterior Hoist Structure for Orbital Sciences Corporation (OSC)

• Interior rail structure design to accommodate temperature extremes of TVAC chamber using flexible titanium stand-offs

• Created 3D design models and all manufacturing drawings

• Managed fabrication vendors and installation

• Created FE models and performed all stress analysesp y

Thermal-Vacuum Chamber Rail and exterior hoist beam Payload fixture rolling into

C

Slide 24

structureTVAC chamber

Page 25: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

L-frame in Thermal-Vacuum Chamber at Lockheed Martin - Newtown, PA

Slide 25

Page 26: Design, Analysis, d M f t i and Manufacturing

A l i f H i l R Fi f kh d M i N PA

EXAMPLES OF MGSE ENGINEERING SERVICES

Analysis of Horizontal Range Fixture for Lockheed Martin, Newtown, PA

Rendered Finite El t d lElement model

shown

Slide 26

Page 27: Design, Analysis, d M f t i and Manufacturing

Design and Analysis of JCSAT-9 C-Band Support Fixture for

EXAMPLES OF MGSE ENGINEERING SERVICES

Design and Analysis of JCSAT 9 C Band Support Fixture for Lockheed Martin, Newtown, PA

First Stage of Assembly

Rendered View of C-band Support Fixture

Finite Element Model Pro-Engineer Model

Slide 27

Page 28: Design, Analysis, d M f t i and Manufacturing

C Band Assembly Finite Element Model

EXAMPLES OF MGSE ENGINEERING SERVICES

C-Band Assembly Finite Element Model

First Stage

Flotron components prior to attachment of C-Band Assembly

2nd Stage

Slide 28

Stage

Page 29: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Complete Range Assembly Finite Element Model

Range Fixture Finite Element Model

Slide 29

Page 30: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Tilt T bl A blReflector

Ka Band Antenna L-Fixture (Lockheed Martin)

Tilt Table Assembly (20121912G1)

Reflector Support Frame

Assembly (20122178G1)PEI responsibilities:

design, analyze,Reflector Interface Fitting Assembly (20122185G1) 3X

design, analyze, fabrication drawings,

manufacture, test, deliver finished product, FFMEA

Ka-Band Antenna L-Fixture Assembly (20121910G1)

Tower Strong Back Assembly (20121911G1) (20121910G1)(20121911G1)

Calculated Weight (less reflector and tower) = 575 lb

Slide 30

Page 31: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Tower Strong Back/Flotron ConfigurationL-Fixture Lifting Configuration

Plate Assembly,Flotron

Installation Tower Strong Back Lift Beam

A bl

L-Fixture Lift Beam Assembly

Flotron (to be

li d

Assembly

supplied by LMCSS)

Tower Strong Back A blAssembly

Slide 31

Page 32: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

L-Fixture Finite Element Model

Horizontal Orientation

Vertical Orientation

Slide 32

Model: P1490-KaLFixture_06.MOD

Page 33: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

PID 100003 & 100004 –

L-Fixture Finite Element Model

PID 100003 & 100004 Tilt table support block PID 100005 – Inner

I-Beam Support Blocks

PID 100002 – Tilt Table standoff support block

PID 100006 & 100007 - I-Beam

PID 100008 -I t f Ri

standoff support block

Interface Ring

PID 100009 & 100010 - Channel

PID 100001 – I-Beam Support Blocks

Constraint at caster base

PID 100011 –Caster Mount Plate

Slide 33

Page 34: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

L-Fixture Turnover Configurations

45 Turnover Configuration Vertical Turnover Configuration Horizontal Turnover Configuration

Slide 34

Page 35: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Ka Band Antenna L-Fixture (Lockheed Martin)

Slide 35

Page 36: Design, Analysis, d M f t i and Manufacturing

Single Advanced Stirling Convertor (ASC) Test Stand for NASA-Glenn

EXAMPLES OF MGSE ENGINEERING SERVICES

Single Advanced Stirling Convertor (ASC) Test Stand for NASA Glenn» Design and Analysis Requirements:

- Develop a Test Stand with the required flexure assemblies at the test table to Test Stand and the Test Stand to single ASC interfaces to ensure that the assembly meets the minimum frequency requirements

- Perform Modal Analyses to determine the required stiffness at the interface between the single ASC and the Test St d d th tiff d d i t th i t f b t th T t St d d th t t t blStand and the stiffness and damping at the interface between the Test Stand and the test table

- Run a Disturbance Analysis to predict the forces and accelerations at the load cells (SineVibe)- Provide an acceptance test plan and procedure for the testing and use of the single ASC Test Stand at NASA GRC

Single ASC

Load Cells

Test Stand

Slide 36

Test table interface

Page 37: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

Stress Analysis of the STAR 2.4+ Core Structure transport fixture

For Orbital Sciences Corp. 2008

FE Model

Slide 37

Page 38: Design, Analysis, d M f t i and Manufacturing

MUOS Reflector Mass Simulators for Lockheed Martin

EXAMPLES OF MGSE ENGINEERING SERVICES

» Design and Analysis Requirements:- The mass simulators (shown below) are designed to comply with the mass properties and interface requirements

provided by LM. The simulators both accurately represent the mass, C.G. and interfaces of the flight hardware.- Installation procedure provided to LM- Static analysis of each simulator performed, as well as bolted joint analyses at every connection

UOS e ecto ass S u ato s o oc eed a t

y p , j y y- Complete a Functional Failure Modes and Effects Analysis (FFMEA)

MBA Mass Simulator

Slide 38

Legacy Mass Simulator

Page 39: Design, Analysis, d M f t i and Manufacturing

Motorized Pivot Structure Shipping Fixture (MPSSF) for STAR 2 7 Spacecraft for OSC

EXAMPLES OF MGSE ENGINEERING SERVICES

Motorized Pivot Structure Shipping Fixture (MPSSF) for STAR-2.7 Spacecraft for OSC» Design and Analysis Requirements:

- Designed to meet the OSC MGSE specifications in the General Environmental Requirements and Test (GERT) Document

- Dynamic handling (turnover) loading conditions

Pivot Frame

y g ( ) g- Transportation loading conditions (quasi-static, random, sine sweep, and shock)- Various detailed connection analyses of both welded and bolted joints

Base Frame

Actuators, 2x

Pivot Arm 2xArm

FEM: P1599_Turnover_45-MARS_020110.MODOne isolator shown in MARS and one shown

in ANTONOV fi ti f l it

MARS isolators (interior positions, 8x)

(4x on +Z, 4x on –Z sides)

ANTONOV isolators (exterior

positions, 8x)(4x on +Z,

4x on –Z sides)

Slide 39

configurations for clarity

Page 40: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

• Lockheed Martin needs to assemble and test components of the

Falcon Hypersonic Vehicle for Lockheed Martin

vehicle as well as the full vehicle assembly.

• The Falcon HVT-2 is a crewless, experimental hypersonic research aircraft.

• PEI contracted to design, analyze, and manufacture several MGSE components for testing of the LMSSC Falcon HTV-2 program.

Design Requirements:Design Requirements:» Meeting MGSE strength requirements:

- Quasi-static and over-the-floor load cases

- Lifting analysisLifting analysis

- MGSE Proof Test Requirements

Slide 40

Page 41: Design, Analysis, d M f t i and Manufacturing

F l H i V hi l M lti U D ll d L Fi t

EXAMPLES OF MGSE ENGINEERING SERVICES

Falcon Hypersonic Vehicle Multi-Use Dolly and L-Fixture

Slide 41

Page 42: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

F l H i V hi l M lti U D ll d L Fi tFalcon Hypersonic Vehicle Multi-Use Dolly and L-Fixture

Slide 42

Page 43: Design, Analysis, d M f t i and Manufacturing

F l H i V hi l P f W i ht

EXAMPLES OF MGSE ENGINEERING SERVICES

Falcon Hypersonic Vehicle Proof Weights

Slide 43

Page 44: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

L kh d M ti d t f t t t d t t f th GPS III

NAVSTAR Global Positioning System (GPS) III Phase B

• Lockheed Martin needs to safety transport and support components of the GPS III satellite around the facility for various tests.

• PEI contracted to analyze several ground support and shipping equipment

Analysis Requirements:» Meeting Lockheed Martin CIPS requirements:

- Quasi-static and over-the-floor load casesQuasi static and over the floor load cases

- Acoustic Vibration Testing- Thermal analysis

- Proof Load Testing

Slide 44

Page 45: Design, Analysis, d M f t i and Manufacturing

NAVSTAR Gl b l P iti i S t (GPS) III Ph B

EXAMPLES OF MGSE ENGINEERING SERVICES

Absorber Hat Structure

• Static analysis for transportation on casters, mounted on jack stands, resting on foot plates

NAVSTAR Global Positioning System (GPS) III Phase B

• Analyzed for the thermal environment and T-VAC testing

Constraint Set 1 Constraint Set 35Constraint Set 1 Constraint Set 35

Slide 45

Page 46: Design, Analysis, d M f t i and Manufacturing

NAVSTAR Gl b l P iti i S t (GPS) III Ph B

EXAMPLES OF MGSE ENGINEERING SERVICES

Antenna Panel Acoustic Test Fixture

• Static analysis for transportation on casters, mounted on jack stands

NAVSTAR Global Positioning System (GPS) III Phase B

• Analyzed for Acoustic Vibration Testing

• Analyzed for the Proof Load Assembly

Front Side of Assembly, Antenna Panel and Antenna

Mass Elements Shown

Back Side of Assembly, View of Antenna Mounting

Plate Support Beams

Slide 46

Page 47: Design, Analysis, d M f t i and Manufacturing

NAVSTAR Gl b l P iti i S t (GPS) III Ph B

EXAMPLES OF MGSE ENGINEERING SERVICES

V-Sensor Acoustic Vibe Fixture

• Static analysis for transportation on casters, mounted on jack stands

NAVSTAR Global Positioning System (GPS) III Phase B

• Analyzed for Acoustic Vibration Testing

Slide 47

Page 48: Design, Analysis, d M f t i and Manufacturing

NAVSTAR Gl b l P iti i S t (GPS) III Ph B

EXAMPLES OF MGSE ENGINEERING SERVICES

V-Sensor T-Cycle Configuration• Static analysis for transportation on casters for four configurations

• Analyzed for the thermal environment in each configuration

NAVSTAR Global Positioning System (GPS) III Phase B

Analyzed for the thermal environment in each configuration

• Analyzed for the Proof Load Assembly for tall configurations

Slide 48

Page 49: Design, Analysis, d M f t i and Manufacturing

EXAMPLES OF MGSE ENGINEERING SERVICES

NAVSTAR Global Positioning System (GPS) III Phase B

• Created 3D design models and manufacturing drawings

• Managed fabrication vendors

NAVSTAR Global Positioning System (GPS) III Phase BElectronics Box Mass Simulators

• Managed fabrication vendors

Slide 49


Recommended