Design and Management for Routine Maintenance Contracts
October 11, 2011
Pedro R. Alvarez, P.E. Director of Maintenance – Pharr District
Project Selection Needs Based: Pavement
PMP PMIS Pavement Repair
Traffic Safety Signage Signals/Flashing Beacon
Roadside Mowing Litter Misc.
Letting Dates Due Date for processing: State Letting Local Letting
Managing letting dates to meet FY requirements
Maintenance Section/ Area Office
Contract Management District Maintenance Oversight
Area Office Support & Inspection Change Orders
Maintenance Section Managing Inspection Diary Estimate/Payment
Combining Contracts
Managing Section Area Office / Region
District Wide
Multiple Items
Mowing Litter Etc.
Compass Project
Coming in the later part of FY 11
Full Implementation – Sept. 2012 (maybe later)
Computer based resource management
One-DOT – Shared approach
Bundle Bid & Performance Based Contracts
Generally used in Metro/Urban Areas
Utilize Contractors
Limited Maintenance Staffing
Pros vs Cons