+ All Categories
Home > Documents > Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Date post: 03-Jan-2016
Category:
Upload: elmer-robbins
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
13
Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012
Transcript
Page 1: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Design Concept

University of Rhode IslandArmy ROTC Hall of Fame Display

As modified 8-29-2012

Page 2: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Purpose

• To provide a design concept for the URI Army ROTC Hall of Fame display board

• Provide a list of required features• To gain approval from URI officials

and student government• Provide a point of departure for

discussions on the way ahead

Page 3: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Agenda

• Facts• Current Display• Proposed Design• Features Required• Display Options• Sample Display Screens• Way Ahead

Page 4: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Facts

• Current display board is outdated• URI is going to campus-wide digital

display system• Hall of Fame contract can be under

URI umbrella contract or we can go independent

• Timeline for development and construction is approximately one year

• Funds for this project require private donations and/or fund raising activities

Page 5: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Current Display

Page 6: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Future Display Dimensions

7 ft.

11 ft.

6-10 in.

• Acrylic construction• External lighting• Hardware contained within display

Page 7: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Sample Proposed Design

Page 8: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Sample Proposed Design

Page 9: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Features Required• Americans with Disabilities Act Compliant• First-Class construction in Student Union• Acrylic construction in appropriate colors• All hardware mounted within display• All software required / updated every two

years• Software integrated into URI system• Digital message streamer• Estimated 12-hour operation daily

Page 10: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

42 in..

24 in.

Option 1 – Five Independent Flat

Screens

University of Rhode Islandand United States Army

Reserve Officer Training CorpsHall of Fame

42 in..

24 in.

42 in..

24 in.

Page 11: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Hall of Fame Display Theme

Colonel (R) John J. Christy ‘ 38

University of Rhode Island Army ROTC GraduatesHelp Shape the History of the World

Page 12: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

A True “RHODY HERO”

PHOTOColonel Christy 1970

PHOTOColonel Christy 1970

PHOTOCranston, RI1930s

PHOTOCranston, RI1930s

PHOTOLieutenant Christy 1941

PHOTOLieutenant Christy 1941

PHOTOCadetChristy 1937

PHOTOCadetChristy 1937

BIOGRAPHY

Colonel (R) John J. Christy ‘ 38

Page 13: Design Concept University of Rhode Island Army ROTC Hall of Fame Display As modified 8-29-2012.

Way Ahead• Establish a 3-person Hall of Fame display

committee -- DONE• Establish permanent liaison with URI

campus-wide digital communications committee --DONE

• Gain approval from URI officials on Hall of Fame concept –Initial Done – Final In=Process

• Develop fund raising strategies--Ongoing• Develop a one year timeline• Select contractor(s) – Pending final URI

Approval


Recommended